WO2009081639A1 - 内面リブ付鋼管の製造方法 - Google Patents

内面リブ付鋼管の製造方法 Download PDF

Info

Publication number
WO2009081639A1
WO2009081639A1 PCT/JP2008/068292 JP2008068292W WO2009081639A1 WO 2009081639 A1 WO2009081639 A1 WO 2009081639A1 JP 2008068292 W JP2008068292 W JP 2008068292W WO 2009081639 A1 WO2009081639 A1 WO 2009081639A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
steel pipe
chemical conversion
zinc phosphate
forming
Prior art date
Application number
PCT/JP2008/068292
Other languages
English (en)
French (fr)
Inventor
Kenichi Beppu
Original Assignee
Sumitomo Metal Industries, Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries, Ltd. filed Critical Sumitomo Metal Industries, Ltd.
Priority to JP2008548386A priority Critical patent/JP4462378B2/ja
Publication of WO2009081639A1 publication Critical patent/WO2009081639A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C22/00Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C22/05Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using aqueous solutions
    • C23C22/06Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using aqueous solutions using aqueous acidic solutions with pH less than 6
    • C23C22/07Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using aqueous solutions using aqueous acidic solutions with pH less than 6 containing phosphates
    • C23C22/08Orthophosphates
    • C23C22/12Orthophosphates containing zinc cations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • B21C1/16Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
    • B21C1/22Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles
    • B21C1/24Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles by means of mandrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C3/00Profiling tools for metal drawing; Combinations of dies and mandrels
    • B21C3/16Mandrels; Mounting or adjusting same
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/15Making tubes of special shape; Making tube fittings
    • B21C37/20Making helical or similar guides in or on tubes without removing material, e.g. by drawing same over mandrels, by pushing same through dies ; Making tubes with angled walls, ribbed tubes and tubes with decorated walls
    • B21C37/207Making helical or similar guides in or on tubes without removing material, e.g. by drawing same over mandrels, by pushing same through dies ; Making tubes with angled walls, ribbed tubes and tubes with decorated walls with helical guides
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C22/00Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C22/82After-treatment
    • C23C22/83Chemical after-treatment
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C28/00Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C28/00Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D
    • C23C28/04Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D only coatings of inorganic non-metallic material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F1/00Tubular elements; Assemblies of tubular elements
    • F28F1/10Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses
    • F28F1/40Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses the means being only inside the tubular element
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F21/00Constructions of heat-exchange apparatus characterised by the selection of particular materials
    • F28F21/08Constructions of heat-exchange apparatus characterised by the selection of particular materials of metal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2245/00Coatings; Surface treatments

Definitions

  • the present invention relates to a method of manufacturing a steel pipe with an inner rib by forming a spiral rib (protrusion) on the inner surface of a steel pipe by cold drawing, and more specifically, a helical rib is formed on the inner surface of a chemical conversion-treated pipe.
  • the present invention relates to a method for manufacturing an internally ribbed steel pipe that can be stably processed.
  • a steel pipe (rifle tube) with an inner rib having a spiral rib (protrusion) formed on the inner surface of the steel pipe is used for high-temperature heat-resistant parts such as for boilers and heat exchangers in order to improve power generation efficiency.
  • the inner surface of the steel pipe with the inner rib has a large surface area by providing the inner rib, the contact area between the heated pipe inner surface and the water vapor passing through the inside of the pipe is increased, and the fluid containing water vapor is made turbulent. Heat exchange efficiency.
  • the demand for steel pipes with internal ribs is rapidly increasing.
  • seamless steel pipes or ERW steel pipes are manufactured as raw pipes, and if necessary, the raw pipes are sufficiently softened and then applied to the drawing die and outer peripheral surface in a cold process. Drawing is performed using a plug having a spiral groove for rib formation.
  • FIG. 1 is a diagram schematically illustrating a method of manufacturing an internally ribbed steel pipe by drawing.
  • the plug 1 When drawing the tube 3, the plug 1 is inserted into the inner surface of the tube 3 concentrically with the die 2 and the tube 3, and the tube 3 is rotated in the direction of the white arrow while rotating the plug 1. Pull out.
  • the outer surface of the raw tube 3 is squeezed by the die 2.
  • the inner surface of the raw tube 3 is formed along a spiral groove 1a formed on the outer peripheral surface of the plug 1, and a spiral rib 3a is formed on the inner peripheral surface of the raw tube 3 after drawing.
  • the plug 1 to be used can be freely rotated and is held by the mandrel 4.
  • the plug shape greatly affects the quality of the rib height and rib shape of the internally ribbed steel pipe (especially rib corner and lead angle). Depending on the drawing conditions, seizure may occur between the raw pipe and the plug. It tends to occur.
  • the edge of the groove crest of the spiral groove is chamfered in a curved shape or a straight line to reduce the contact area between the top of the groove crest and the raw tube, and thereby the top of the groove crest.
  • a tool for drawing a steel pipe with an internal rib that aims to reduce the frictional resistance generated between the pipe and the base pipe is disclosed.
  • the present invention has been made in view of the problems in the drawing process of the above-described internally ribbed steel pipe, and prior to the drawing process for forming the helical rib, the condition of the lubrication treatment applied to the raw pipe is set. Control and, specifically, control the total thickness of the chemical conversion coating on at least the inner surface of the raw tube, thereby reducing troubles during the drawing process for forming the spiral rib and forming the spiral rib stably. It aims at providing the manufacturing method of the steel pipe with an inner surface rib which can be performed.
  • the present inventor has made various studies on the drawing of the internally ribbed steel pipe, and as a result, as shown in FIG. 1, the groove of the spiral groove provided in the drawing plug. From the initial stage of the drawing process to the final stage of finishing to the finished dimensions, the top of the pipe always comes into contact with the surface of the pipe, and the contact length between the plug and the pipe is necessarily increased. Saga is the main factor of seizure occurrence in internally ribbed steel pipes.
  • the contact length between the plug and the base pipe in the drawing process of a normal boiler steel pipe or heat exchanger steel pipe is about 3 mm, although it depends on the machining dimensions, but the finishing dimension is 28 to When manufacturing an internally ribbed steel pipe having a thickness of 70 mm, the contact length between the plug and the raw pipe ranges from 10 to 15 mm.
  • the present invention has been completed on the basis of the above findings, and the gist thereof is the following (1) and (2) manufacturing method of an internally ribbed steel pipe.
  • For forming the spiral rib comprising a pickling step for removing scale and rust, a step of forming a zinc phosphate coating on the surface of the neutralized tube, and a step of forming a lubricating layer on the surface of the zinc phosphate coating.
  • the total thickness of the chemical conversion coating on the inner surface of the pipe to be processed is 10 to 100 ⁇ m.
  • the chemical conversion coating is a zinc phosphate coating, a metal soap layer formed by reacting sodium zinc stearate with the zinc phosphate coating, and unreacted Na It is desirable to manage the total thickness of the soap layer.
  • the manufacturing method of the internally ribbed steel pipe described in (1) above applies to a steel grade of carbon steel or low alloy steel, and a steel pipe for boilers having a cold drawing finish size of 28 to 70 mm in outer diameter. Or steel pipes for heat exchangers.
  • JIS G 3461 STB types correspond to carbon steel
  • JIS G 3462 STBA22 (1Cr-1 / 2Mo steel) or STBA24 (2Cr-1Mo steel) correspond to low alloy steels.
  • the condition of the lubrication treatment applied to the raw pipe is managed before the drawing process for forming the spiral rib, and the total amount of the chemical conversion coating on the inner face of the raw pipe is controlled.
  • the thickness troubles at the time of drawing to form the spiral rib can be reduced, and the spiral rib can be stably formed.
  • the internally ribbed steel pipe thus obtained has excellent formability and quality.
  • FIG. 1 is a diagram schematically illustrating a method of manufacturing an internally ribbed steel pipe by drawing.
  • FIG. 2 is a diagram illustrating an example of a chemical conversion treatment process that can be applied to the method of manufacturing an internally ribbed steel pipe according to the present invention.
  • FIG. 3 is a diagram showing a cross-sectional configuration of the surface of the raw tube in which a lubricating layer is formed on the surface of the zinc phosphate film by chemical conversion treatment.
  • the production method of the present invention is intended for carbon steel or low-alloy steel grades, and a lubrication film is formed on the inner and outer surfaces of the raw tube before drawing to form a helical rib. Applied.
  • FIG. 2 is a diagram showing an example of a chemical conversion treatment process that can be applied to the method of manufacturing an internally ribbed steel pipe according to the present invention.
  • pickling is performed as a first treatment step to remove oxide scale and rust adhering to the surface.
  • sulfuric acid (10 to 13%) is used as the acid to be used, and free acidity and iron concentration are used as indicators as management items.
  • the treatment temperature is room temperature and the immersion time is 30 minutes. After this pickling, washing with water (for example, about several minutes) is performed to wash away the acid remaining on the surface.
  • oil / fat, dirt, etc. are attached to the surface of the tube, remove the oil / fat, dirt, etc. by wetting / dispersing / emulsifying using a degreasing agent before the pickling step. Is desirable.
  • the above-mentioned pickling is performed by washing with water to wash away the degreasing agent, oils and fats and dirt remaining on the surface of the raw tube.
  • the base tube is immersed in a caustic soda solution for neutralization.
  • the neutral tube surface is stabilized by this neutralization.
  • a zinc phosphate coating treatment is performed to form a phosphate coating foundation on the surface of the raw tube.
  • the reaction with the Fe substrate at this time is represented by the following formula (1). 3Zn (H 2 PO 4 ) + 2Fe ⁇ Zn 3 (PO 4 ) 2 + 2Fe (H 2 PO 4 ) 2 + H 2 (1)
  • the conditions for the zinc phosphate coating treatment are as follows: the treatment temperature is about 80 ° C., and the immersion time is 30 minutes. After the zinc phosphate coating treatment, washing with hot water (for example, at a treatment temperature of 50 ° C. for about several minutes) is performed.
  • the formed zinc phosphate film is reacted with a soap-based lubricant to form a lubricating layer on the surface.
  • the treatment for forming the lubricating layer is generally performed by reacting sodium stearate with a zinc phosphate coating to form a metal soap layer, but the manufacturing method of the present invention is not limited thereto.
  • the processing conditions for forming the lubricating layer are as follows: the processing temperature is about 80 ° C., and the immersion time is 15 minutes.
  • the raw tube subjected to the chemical conversion treatment is dried by the first to third treatment steps.
  • a method in which the raw tube is charged in a continuous drying furnace and dried can be employed.
  • FIG. 3 is a view showing a cross-sectional configuration of the surface of the raw tube in which a lubricating layer is formed on the surface of the zinc phosphate film by chemical conversion treatment.
  • the surface of the sufficiently dried raw tube 3 has a zinc phosphate coating layer 5, a metal soap layer 6, and unreacted soap on the inner surface and outer surface of the raw tube 3 as a chemical conversion coating layer.
  • a layer (Na soap layer) 7 is laminated.
  • the total thickness of the chemical conversion coating is less than 10 ⁇ m and the chemical conversion coating is insufficiently formed, it is provided in the drawing plug from the initial stage of drawing to the final stage of processing to the finished dimensions.
  • the contact between the spiral groove and the inner surface of the raw tube cannot be stably maintained via the chemical conversion coating, and seizure flaws are likely to occur in the internally ribbed steel pipe.
  • the total thickness of the chemical conversion coating increases, the contact state between the drawing plug and the inner surface of the blank tube can be stably maintained, but the effect is that the total thickness of the chemical conversion coating is 100 ⁇ m. Saturates at.
  • the immersion time is doubled in the above-described step of forming the lubricating layer, and in some cases, the step of forming the lubricating layer may be repeated twice. It may be necessary. For this reason, in the manufacturing method of the present invention, the total thickness of the chemical conversion coating on the inner surface of the raw tube is controlled to 10 to 100 ⁇ m.
  • the metal soap layer 6 contributes exclusively to the lubrication action, but in the drawing process for forming the spiral rib, the region that requires lubrication is long, and the spiral that requires the most lubrication action.
  • the function of the lubricating layer may not be exhibited at the rear end of the ribs.
  • the chemical conversion treatment film for controlling the film thickness is made of the zinc phosphate film layer 5 formed on the surface of the raw tube 3, and the zinc phosphate.
  • the metal soap layer 6 and the unreacted soap layer (Na soap layer) 7 formed by reacting sodium stearate with the film can be obtained.
  • the surface of the tube to be processed is activated by pickling treatment, and the zinc phosphate film is formed on the activated surface, so that the adhesion of the zinc phosphate film becomes strong, Furthermore, since the holding power of the lubricating layer such as metal soap formed on the surface is also increased, by controlling the thickness of these coatings, seizure flaws generated during the drawing of the steel pipe with the inner rib are effectively prevented. be able to.
  • Example 1 In order to confirm the effect of the manufacturing method of the internally ribbed steel pipe of the present invention, a seamless steel pipe having a steel type of JIS STBA22 (1Cr-1 / 2Mo steel) is used as a raw pipe, and the softening / pickling / lubricating treatment of the raw pipe is performed. -Intermediate drawing (circle finishing)-After passing through the softening step, an internally ribbed steel pipe having four spiral ribs was produced by drawing.
  • the drawing schedule at this time is as follows: the tube size is 38.0 mm outside diameter x 8.2 mm wall thickness, the drawing dimension is 32.0 mm outside diameter x 7.2 mm wall thickness, and finally 28.6 mm outside diameter x Drawing was performed to a thickness of 6.0 mm ⁇ rib depth of 0.8 mm.
  • sulfuric acid (10 to 13%) is used for pickling at a treatment temperature of room temperature, and after washing with water and neutralization, the treatment temperature is 75 to 85.
  • the zinc phosphate coating was performed at a temperature of 75 ° C., and sodium stearate was reacted with the zinc phosphate coating at a treatment temperature of 75 to 85 ° C. to form a metal soap layer.
  • the raw tube is dried, and the total thickness of the zinc phosphate film, the metal soap layer and the Na soap layer on the inner surface of the raw tube is measured.
  • Table 1 shows the time required for the chemical conversion treatment and the measurement result of the total thickness of the film.
  • Example 2 For the same purpose as in Example 1, using a seamless steel pipe of JIS STBA24 (2Cr-1Mo steel) as the raw pipe, the softening of the raw pipe-pickling / lubricating-intermediate drawing (round finish)-softening After the process, an internally ribbed steel pipe having four spiral ribs was produced by drawing.
  • the drawing schedule at this time is as follows: the raw tube dimensions are an outer diameter of 87.0 mm ⁇ wall thickness of 10.2 mm, the intermediate drawing dimensions are an outer diameter of 80.0 mm ⁇ wall thickness of 9.2 mm, and finally an outer diameter of 70.0 mm ⁇ Drawing was performed to a thickness of 8.0 mm and a rib depth of 1.1 mm.
  • Example 2 The conditions of the chemical conversion treatment before the drawing process for finally forming the helical ribs are the same as those in Example 1. After the treatment, the raw pipe is dried, and the zinc phosphate film and the metal soap layer on the inner face of the raw pipe And the total thickness of the Na soap layer was measured. Table 2 shows the time required for the chemical conversion treatment and the measurement results of the total thickness of the film.
  • Comparative Example 3 which did not reach the total thickness of the coating film defined by the present invention, seizure flaws occurred on the internally ribbed steel pipe finished by drawing. Further, in Comparative Example 4 exceeding the total thickness of the coating film defined in the present invention, no seizure flaws occurred on the internally ribbed steel pipe finished by the drawing process, but the treatment for forming the metal soap layer took a long time. It became.
  • the surface of the pipe to be processed is activated by pickling in the chemical conversion treatment, and the zinc phosphate film is formed on the activated surface. Since the adhesion force of the metal is strong and the holding power of the lubricating layer such as metal soap formed on the surface is also increased, the lubrication applied to the raw tube before the drawing process for forming the spiral rib.
  • the processing conditions and controlling the total thickness of the chemical conversion coating on the inner surface of the raw tube troubles during drawing to form spiral ribs can be reduced and the spiral ribs can be formed stably. it can.
  • the obtained steel pipe with inner ribs has excellent formability and quality as a steel pipe for boilers and steel pipes for heat exchangers, so it can sufficiently cope with an increase in boiler capacity and high temperature and pressure. Yes and widely applicable.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Materials Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Inorganic Chemistry (AREA)
  • Geometry (AREA)
  • Chemical Treatment Of Metals (AREA)
  • Metal Extraction Processes (AREA)

Abstract

 内面リブ付鋼管の螺旋状リブを形成する引抜加工時のトラブルを低減し、安定して螺旋状リブを形成することができる製造方法であり、化成処理された被加工管に冷間引抜加工を施し、管軸方向に複数条の螺旋状リブを形成する内面リブ付鋼管を製造する際に、前記化成処理が管表面の酸化スケールおよび錆びを取り除く酸洗工程、中和された管表面に燐酸亜鉛皮膜を形成する工程、および前記燐酸亜鉛皮膜の表面に潤滑層を形成する工程からなり、前記螺旋状リブを形成するための引抜加工では、前記被加工管の内表面における化成処理皮膜の総厚さを10~100μmとする。前記化成処理皮膜として燐酸亜鉛皮膜5、並びにこの燐酸亜鉛皮膜にステアリン酸ソーダを反応させて形成させた金属石鹸層6およびNa石鹸層7からなる総厚さを管理することができる。得られた内面リブ付鋼管は、ボイラー用鋼管として優れた成形性と品質を備えていることから、ボイラーの大容量化や高温高圧化に十分に対応できる。

Description

内面リブ付鋼管の製造方法
 本発明は、冷間引抜加工により鋼管内面に螺旋状のリブ(突起)を形成させる内面リブ付鋼管の製造方法に関し、さらに詳しくは、化成処理された被加工管の内面に螺旋状のリブを安定して加工することができる内面リブ付鋼管の製造方法に関するものである。
 通常、ボイラー用、熱交換器用等の高温耐熱部には、発電効率を向上させるため、鋼管内面に螺旋状のリブ(突起)を形成した内面リブ付鋼管(ライフルチューブ)が用いられる。内面リブ付鋼管の内面は、内面リブを設けることにより広い表面積を有するため、加熱された管内面と管内部を通過する水蒸気との接触面積が増加されるとともに、水蒸気を含む流体を乱流にして熱交換効率を高めている。最近のボイラーの大容量化や高温高圧化にともない、内面リブ付鋼管の需要は急速に増大している。
 内面リブ付鋼管の製造は、継目無鋼管または電縫鋼管を素管として製造し、必要に応じて、その素管を十分に軟化させた後、冷間工程にて引抜用ダイスおよび外周面にリブ形成用の螺旋溝を構成したプラグを用いて、引抜加工される。
 図1は、引抜加工によって内面リブ付鋼管を製造する方法を概略的に説明する図である。素管3を引抜加工する際には、ダイス2および素管3に対して同心状にプラグ1を素管3の内面に挿入し、プラグ1を回転させながら素管3を白抜き矢印の方向に引き抜く。素管3の外面は、ダイス2によって絞られる。素管3の内面は、プラグ1の外周面に形成された螺旋溝1aに沿って成形され、引抜後の素管3の内周面には、螺旋状のリブ3aが形成される。
 使用するプラグ1は、自由に回転でき、およびマンドレル4に保持される。そのプラグ形状は、内面リブ付鋼管のリブ高さ、リブ形状等(特に、リブコーナー部およびリード角)の品質に大きな影響を及ぼし、引抜条件によっては、素管とプラグとの間で焼き付きが生じ易くなる。
 このため、従来から、内面リブ付鋼管の製造に関し、プラグ構造や形状について、種々の提案がなされている。例えば、特開2001-179327号公報には、プラグの螺旋溝を形作る両側壁と底面とが交わる部分の曲率半径を、プラグの先端部側から後端部側に至るまで一定に保つと共に、プラグの先端部側から後端部側に向けて一定の勾配で縮径させたプラグが提案されている。
 また、特開2006-272392号公報では、螺旋溝の溝山のエッジを曲線状あるいは直線状に面取りして、溝山の頂部と素管との接触面積を低減し、これにより溝山の頂部と素管との間に生じる摩擦抵抗の低減を図る内面リブ付鋼管の引抜加工用工具が開示されている。
 前述した両公報によれば、これらに開示されたプラグを用いることにより、内面リブ付鋼管用素管の引抜加工時に焼き付きの発生を防止しできるとともに、プラグ自体も比較的容易に且つ安価に製造でき、内面リブ付鋼管製造コストを大幅に低減することができると記載されている。
 ところが、内面リブ付鋼管の製造に際し、プラグの形状や構造にかかわらず、螺旋状リブを形成するための引抜加工前に、被加工管である素管に施される潤滑処理の条件によっては、引抜加工トラブルが多発し、内面リブ付鋼管の成形性や製造歩留まりを著しく低下させることがある。
 本発明は、上述した内面リブ付鋼管の引抜加工での問題点に鑑みてなされたものであり、螺旋状リブを形成するための引抜加工前に、素管に施される潤滑処理の条件を管理し、具体的には、少なくとも素管内面における化成処理皮膜の総厚さをコントロールすることにより、螺旋状リブを形成する引抜加工時のトラブルを低減し、安定して螺旋状リブを形成することができる内面リブ付鋼管の製造方法を提供することを目的としている。
 本発明者は、上述した課題を解決するため、内面リブ付鋼管の引抜加工に関し種々の検討を加えた結果、前記図1に示すように、引抜加工用プラグに設けられた螺旋溝の溝山の頂部は、引抜加工の初期段階から仕上げ寸法に加工する最終段階に至るまで、必ず素管表面に接触し、必然的にプラグと素管との接触長さが長くなることから、この接触長さが内面リブ付鋼管における焼き付き発生の主な要因となっていることに着目した。
 例えば、通常のボイラー用鋼管や熱交換器用鋼管の引抜加工におけるプラグと素管との接触長さは、加工寸法にもよるが、約3mm程度とされているが、仕上寸法を外径28~70mmとなるような内面リブ付鋼管の製造になると、プラグと素管との接触長さが10~15mmに及ぶことになる。
 このため、プラグと素管との接触長さに起因する焼き付き発生を防止するには、螺旋状リブを形成するための引抜加工前に、素管に施される潤滑処理を最適にすることが必須であり、少なくとも素管内面における化成処理皮膜の総厚さをコントロールすることにより、螺旋状リブを形成する引抜加工時のトラブルを効果的に防止できることに知見した。
 本発明は、上記知見に基づいて完成されたものであり、下記(1)および(2)の内面リブ付鋼管の製造方法を要旨としている。
(1)化成処理された被加工管に冷間引抜加工を施し、管軸方向に複数条の螺旋状リブを形成する内面リブ付鋼管の製造方法であって、前記化成処理が管表面の酸化スケールおよび錆びを取り除く酸洗工程、中和された管表面に燐酸亜鉛皮膜を形成する工程、および前記燐酸亜鉛皮膜の表面に潤滑層を形成する工程からなり、前記螺旋状リブを形成するための引抜加工に際し、前記被加工管の内表面における化成処理皮膜の総厚さが10~100μmであることを特徴とする内面リブ付鋼管の製造方法である。
(2)上記(1)の内面リブ付鋼管の製造方法において、前記化成処理皮膜が燐酸亜鉛皮膜、並びにこの燐酸亜鉛皮膜にステアリン酸ソーダを反応させて形成させた金属石鹸層および未反応のNa石鹸層とからなる総厚さを管理するのが望ましい。
 また、上記(1)の内面リブ付鋼管の製造方法で対象とするのは、炭素鋼または低合金鋼の鋼種であり、冷間引抜加工の仕上寸法を外径28~70mmとするボイラー用鋼管や熱交換器用鋼管とすることができる。
 本発明が対象とする鋼種のうち、炭素鋼としてはJIS G 3461の各STB種が相当し、低合金鋼としてJIS G 3462のSTBA22(1Cr-1/2Mo鋼)、またはSTBA24(2Cr-1Mo鋼)クラスまでを対象として挙げることができる。
 本発明の内面リブ付鋼管の製造方法によれば、螺旋状リブを形成するための引抜加工前に、素管に施される潤滑処理の条件を管理し、素管内面における化成処理皮膜の総厚さをコントロールすることにより、螺旋状リブを形成する引抜加工時のトラブルを低減し、安定して螺旋状リブを形成することができる。これにより得られた内面リブ付鋼管は、優れた成形性と品質を備える。
 図1は、引抜加工によって内面リブ付鋼管を製造する方法を概略的に説明する図である。
 図2は、本発明の内面リブ付鋼管の製造方法に適用できる化成処理の工程例を示す図である。
 図3は、化成処理により燐酸亜鉛皮膜の表面に潤滑層が形成された素管表面の断面構成を示す図である。
 本発明の製造方法は、炭素鋼または低合金鋼の鋼種を対象にするものであり、螺旋状リブを形成する引抜加工前に、素管の内外表面に潤滑皮膜を形成するため、化成処理が施される。
 図2は、本発明の内面リブ付鋼管の製造方法に適用できる化成処理の工程例を示す図である。まず、第1の処理工程として酸洗を行って、表面に付着する酸化スケールおよび錆を除去する。通常、使用する酸としては硫酸(10~13%)が用いられ、管理項目として遊離酸度や鉄分濃度が指標として用いられる。酸洗条件は、処理温度を室温として、浸漬時間30分が目安となる。この酸洗の後は、水洗(例えば、数分間程度)を行って、表面に残っている酸を洗い流す。
 素管表面に油脂分、汚れ等が付着している場合には、上記の酸洗工程の前に、脱脂剤を用いて、油脂分、汚れ等を湿潤・分散・乳化作用によって除去しておくのが望ましい。この場合には、市販の脱脂剤を用いて処理した後、水洗して素管表面に残っている脱脂剤や油脂分、汚れを洗い流して、上記の酸洗を行うことになる。
 上記の酸洗工程に次いで、素管を苛性ソーダ液に浸漬し中和を行う。この中和により、素管表面は安定化する。その後、第2の処理工程として、燐酸亜鉛皮膜処理を行って、素管表面に燐酸塩皮膜の下地を形成する。このときのFe素地との反応は、下記(1)式で示される。
 3Zn(HPO)+2Fe→Zn(PO+2Fe(HPO+H
       ・・・  (1)
 燐酸亜鉛皮膜処理の条件は、処理温度を約80℃として、浸漬時間30分が目安となる。この燐酸亜鉛皮膜処理の後は、湯洗(例えば、処理温度50℃で数分間程度)を行う。
 その後、第3の処理工程として、形成された燐酸亜鉛皮膜と石鹸系潤滑剤と反応させて、表面に潤滑層を形成する。潤滑層を形成する処理としては、ステアリン酸ソーダを燐酸亜鉛皮膜と反応させて金属石鹸層を形成するのが一般的であるが、本発明の製造方法ではこれに限定されるものではない。
 例えば、第3の処理工程として、燐酸亜鉛皮膜の上に潤滑層を形成するため、ステアリンソーダを燐酸亜鉛皮膜と反応させて金属石鹸層を形成する場合には、その反応は(2)式により示される。
Zn(PO+6C1735COONa→3Zn(C1735COO)+2NaPO
       ・・・  (2)
 潤滑層を形成する処理の条件は、処理温度を約80℃として、浸漬時間15分が目安となる。上記の第1~第3の処理工程により、化成処理が施された素管は乾燥される。素管表面を充分に乾燥させるため、素管を連続乾燥炉に装入して乾燥する方法を採用することができる。
 図3は、化成処理により燐酸亜鉛皮膜の表面に潤滑層が形成された素管表面の断面構成を示す図である。充分に乾燥された素管3の表面には、図3に示すように、化成処理皮膜層として素管3の内表面および外表面に燐酸亜鉛皮膜層5、金属石鹸層6、および未反応石鹸層(Na石鹸層)7が積層される。
 本発明の製造方法では、螺旋状リブを形成するための引抜加工に際し、引抜加工用プラグと素管内表面との接触長さが長くなるにも拘わらず、これに起因する焼き付き発生を防止するため、素管の内表面における化成処理皮膜の総厚さが10~100μmで管理する必要がある。
 すなわち、化成処理皮膜の総厚さが10μm未満と、化成処理皮膜の形成が不充分であると、引抜加工の初期段階から仕上げ寸法に加工する最終段階に至るまで、引抜加工用プラグに設けられた螺旋溝と素管の内表面との接触を、化成処理皮膜を介して安定して維持することができず、内面リブ付鋼管に焼き付き疵が発生し易くなる。
 一方、化成処理皮膜の総厚さが厚くなるほど、引抜加工用プラグと素管の内表面との接触状態を安定して維持することができるが、その効果は化成処理皮膜の総厚さが100μmで飽和する。しかも、化成処理皮膜の総厚さが100μmを超えるようになると、前述の潤滑層を形成する工程において、浸漬時間が倍増し、場合によっては潤滑層を形成する工程を2度に亘り繰り返すことが必要になることがある。このため、本発明の製造方法では、素管の内表面における化成処理皮膜の総厚さが10~100μmで管理する。
 通常、化成処理皮膜層のうち、専ら金属石鹸層6が潤滑作用に寄与するが、螺旋状リブを形成するための引抜加工では潤滑を必要とする領域が長く、最も潤滑作用が必要となる螺旋状リブの後端部で潤滑層の機能が発揮できないことがある。
 これを回避するため、本発明の製造方法において、皮膜厚さを管理する化成処理皮膜を、前記図3に示すように、素管3表面に形成された燐酸亜鉛皮膜層5、並びにこの燐酸亜鉛皮膜にステアリン酸ソーダを反応させて形成させた金属石鹸層6および未反応石鹸層(Na石鹸層)7とすることができる。
 本発明の製造方法において、酸洗処理により被加工管の表面を活性化し、この活性化した表面に燐酸亜鉛皮膜を形成することとしたので、燐酸亜鉛皮膜の付着力を強固なものになり、さらにその表面に形成する金属石鹸などの潤滑層の保持力も高くなることから、これらの皮膜厚さを管理することにより、内面リブ付鋼管の引抜加工の際に発生する焼き付き疵を有効に防止することができる。
(実施例1)
 本発明の内面リブ付鋼管の製造方法の効果を確認するため、鋼種がJIS STBA22(1Cr-1/2Mo鋼)である継目無鋼管を素管として用いて、素管軟化-酸洗・潤滑処理-途中引抜加工(円仕上げ)-軟化の工程を経た後、引抜加工により4条の螺旋状リブを有する内面リブ付鋼管を製造した。
 このときの引抜スケジュールは、素管寸法を外径38.0mm×肉厚8.2mmで、途中引抜寸法を外径32.0mm×肉厚7.2mmとし、最終的に外径28.6mm×肉厚6.0mm×リブ深さ0.8mmに引抜加工を行った。
 最終的に螺旋状リブを形成するための引抜加工前の化成処理として、硫酸(10~13%)を用い処理温度が室温の酸洗を行い、水洗、中和後、処理温度が75~85℃の状態で燐酸亜鉛皮膜処理を行い、処理温度が75~85℃でステアリン酸ソーダを燐酸亜鉛皮膜と反応させて金属石鹸層を形成した。その後、素管を乾燥させて、素管内面の燐酸亜鉛皮膜、金属石鹸層およびNa石鹸層の総厚さを測定して。
 このときの化成処理に要した時間と、皮膜の総厚さの測定結果を表1に示す。
Figure JPOXMLDOC01-appb-T000001
 表1に示すように、本発明で規定する皮膜の総厚さを満足する本発明例1~3では、いずれも最終の引抜加工によって仕上げられた内面リブ付鋼管には焼き付き疵は認められなかった。
 本発明で規定する皮膜の総厚さに達しない比較例1では、引抜加工によって仕上げられた内面リブ付鋼管に焼き付き疵が発生した。また、本発明で規定する皮膜の総厚さを超えた比較例2では、引抜加工によって仕上げられた内面リブ付鋼管に焼き付き疵が発生しなかったが、金属石鹸皮膜処理で反応槽に2度漬けを行うなど、金属石鹸層を形成する処理が長時間となり、化成処理の効率化が図れなかった。
(実施例2)
 実施例1と同じ目的で、鋼種がJIS STBA24(2Cr-1Mo鋼)である継目無鋼管を素管に用いて、素管軟化-酸洗・潤滑処理-途中引抜加工(円仕上げ)-軟化の工程を経た後、引抜加工により4条の螺旋状リブを有する内面リブ付鋼管を製造した。
 このときの引抜スケジュールは、素管寸法を外径87.0mm×肉厚10.2mmで、途中引抜寸法を外径80.0mm×肉厚9.2mmとし、最終的に外径70.0mm×肉厚8.0mm×リブ深さ1.1mmに引抜加工を行った。
 最終的に螺旋状リブを形成するための引抜加工前の化成処理の条件は、実施例1と同様とし、その処理後に、素管を乾燥させて、素管内面の燐酸亜鉛皮膜、金属石鹸層およびNa石鹸層の総厚さを測定した。このときの化成処理に要した時間と、皮膜の総厚さの測定結果を表2に示した。
Figure JPOXMLDOC01-appb-T000002
 実施例1の場合と同様に、本発明で規定する皮膜の総厚さを満足する本発明例4~6では、いずれも最終の引抜加工によって仕上げられた内面リブ付鋼管には焼き付き疵は認められなかった。
 本発明で規定する皮膜の総厚さに達しない比較例3では、引抜加工によって仕上げられた内面リブ付鋼管に焼き付き疵が発生した。また、本発明で規定する皮膜の総厚さを超えた比較例4では、引抜加工によって仕上げられた内面リブ付鋼管に焼き付き疵が発生しなかったが、金属石鹸層を形成する処理が長時間となった。
産業上の利用の可能性
 本発明の内面リブ付鋼管の製造方法によれば、化成処理での酸洗により被加工管の表面を活性化し、この活性化した表面に燐酸亜鉛皮膜を形成するようにしたので、燐酸亜鉛皮膜の付着力を強固なものになり、さらにその表面に形成する金属石鹸などの潤滑層の保持力も高くなることから、螺旋状リブを形成するための引抜加工前に、素管に施される潤滑処理の条件を管理し、素管内面における化成処理皮膜の総厚さをコントロールすることにより、螺旋状リブを形成する引抜加工時のトラブルを低減し、安定して螺旋状リブを形成することができる。
 これにより、得られた内面リブ付鋼管は、ボイラー用鋼管や熱交換器用鋼管として優れた成形性と品質を備えていることから、ボイラーの大容量化や高温高圧化に十分に対応できるものであり、広く適用できる。

Claims (3)

  1.  化成処理された被加工管に冷間引抜加工を施し、管軸方向に複数条の螺旋状リブを形成する内面リブ付鋼管の製造方法であって、
     前記化成処理が管表面の酸化スケールおよび錆びを取り除く酸洗工程、中和された管表面に燐酸亜鉛皮膜を形成する工程、および前記燐酸亜鉛皮膜の表面に潤滑層を形成する工程からなり、
     前記螺旋状リブを形成するための引抜加工に際し、前記被加工管の内表面における化成処理皮膜の総厚さが10~100μmであることを特徴とする内面リブ付鋼管の製造方法。
  2.  前記化成処理皮膜が燐酸亜鉛皮膜、並びにこの燐酸亜鉛皮膜にステアリン酸ソーダを反応させて形成させた金属石鹸層および未反応のNa石鹸層とからなることを特徴とする請求項1に記載の内面リブ付鋼管の製造方法。
  3.  請求項1または2に記載の内面リブ付鋼管の製造方法であって、前記被加工管は炭素鋼および低合金鋼(例えば、JIS G 3462 STBA24相当)を用い、冷間引抜加工の仕上寸法を外径28~70mmとすることを特徴とする内面リブ付鋼管の製造方法。
PCT/JP2008/068292 2007-12-26 2008-10-08 内面リブ付鋼管の製造方法 WO2009081639A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008548386A JP4462378B2 (ja) 2007-12-26 2008-10-08 内面リブ付鋼管の製造方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2007333818 2007-12-26
JP2007-333818 2007-12-26

Publications (1)

Publication Number Publication Date
WO2009081639A1 true WO2009081639A1 (ja) 2009-07-02

Family

ID=40800955

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2008/068292 WO2009081639A1 (ja) 2007-12-26 2008-10-08 内面リブ付鋼管の製造方法

Country Status (2)

Country Link
JP (1) JP4462378B2 (ja)
WO (1) WO2009081639A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105834237A (zh) * 2016-03-29 2016-08-10 重庆钢铁(集团)有限责任公司 一种减少冷拔道次的荒管化学处理方法
CN109652789A (zh) * 2019-03-04 2019-04-19 徐超 一种锅炉内壁表面的处理方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819814A (ja) * 1994-07-01 1996-01-23 Sumitomo Metal Ind Ltd 鋼管の冷間抽伸方法および装置
JP2001179327A (ja) * 1999-12-17 2001-07-03 Sumitomo Metal Ind Ltd ライフルチューブ抽伸用プラグ
JP2002275651A (ja) * 2001-03-16 2002-09-25 Honda Motor Co Ltd ステンレス鋼の潤滑皮膜処理方法
JP2002371293A (ja) * 2001-06-14 2002-12-26 Nippon Parkerizing Co Ltd 潤滑性に優れる鋼線又は鋼線材

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819814A (ja) * 1994-07-01 1996-01-23 Sumitomo Metal Ind Ltd 鋼管の冷間抽伸方法および装置
JP2001179327A (ja) * 1999-12-17 2001-07-03 Sumitomo Metal Ind Ltd ライフルチューブ抽伸用プラグ
JP2002275651A (ja) * 2001-03-16 2002-09-25 Honda Motor Co Ltd ステンレス鋼の潤滑皮膜処理方法
JP2002371293A (ja) * 2001-06-14 2002-12-26 Nippon Parkerizing Co Ltd 潤滑性に優れる鋼線又は鋼線材

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105834237A (zh) * 2016-03-29 2016-08-10 重庆钢铁(集团)有限责任公司 一种减少冷拔道次的荒管化学处理方法
CN109652789A (zh) * 2019-03-04 2019-04-19 徐超 一种锅炉内壁表面的处理方法

Also Published As

Publication number Publication date
JP4462378B2 (ja) 2010-05-12
JPWO2009081639A1 (ja) 2011-05-06

Similar Documents

Publication Publication Date Title
JP4311503B1 (ja) 内面リブ付鋼管の製造方法
Bay The state of the art in cold forging lubrication
KR101157347B1 (ko) 피복 초경 플러그 및 그것을 이용한 냉간 인발 방법
JPWO2009051037A1 (ja) 内面リブ付鋼管の製造方法および内面リブ付鋼管
JP4271573B2 (ja) ヘッダー加工用金属線材の製造方法
CN104138901B (zh) 一种厚度≤1.6mm的热轧酸洗带钢的生产方法
JP4462378B2 (ja) 内面リブ付鋼管の製造方法
CN100571967C (zh) 汽车空调用冷凝器干燥筒筒体的生产方法
CN104107845B (zh) 一种不锈钢钢管的生产工艺
Bay New tribo-systems for cold forming of steel, stainless steel and aluminium alloys
CN111014314A (zh) 一种钛管生产加工方法
CN104475615A (zh) 一种双金属复合翅片管的制备方法
RU2426617C1 (ru) Способ изготовления тонкостенных оболочек
CN111744960A (zh) 一种钛合金薄壁管加工方法
JP4682450B2 (ja) 内面平滑性に優れた継目無鋼管の製造方法および継目無鋼管
CN102728652A (zh) 一种外层低碳钢内层轴承钢的双金属无缝钢管的制造方法
JP5045819B2 (ja) 冷間引抜用素管およびその製造方法並びに冷間引抜管の製造方法
CN111745354A (zh) 一种钛合金厚壁管加工方法
JP4788101B2 (ja) 冷間引抜鋼管の製造方法
WO2023138372A1 (zh) 一种带钢及其制造方法
WO2021193003A1 (ja) 有底筒状体の製造方法
JPH09295038A (ja) 炭素鋼鋼管の冷間引抜き法および製造方法
CN116393516A (zh) 一种n08810高镍合金无缝钢管扩连冷加工工艺
JPH0459118A (ja) 細径内面溝付管の製造方法
JP2009299105A (ja) 成形加工用表面処理板

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2008548386

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08863981

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08863981

Country of ref document: EP

Kind code of ref document: A1