WO2009016854A1 - Procédé pour empêcher l'effondrement d'une digue - Google Patents
Procédé pour empêcher l'effondrement d'une digue Download PDFInfo
- Publication number
- WO2009016854A1 WO2009016854A1 PCT/JP2008/053171 JP2008053171W WO2009016854A1 WO 2009016854 A1 WO2009016854 A1 WO 2009016854A1 JP 2008053171 W JP2008053171 W JP 2008053171W WO 2009016854 A1 WO2009016854 A1 WO 2009016854A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- dike
- reinforcement pipe
- open end
- region
- drainage reinforcement
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Selon l'invention, un tuyau de renforcement d'évacuation (6) a une extrémité ouverte (7) et l'autre extrémité fermée (8), et a une région forée (9) où un grand nombre de trous (11) sont formés dans la direction longitudinale, et une région sans forage (10) d'une distance prédéterminée L, où aucun trou n'est formé. Le tuyau de renforcement d'évacuation (6) est introduit par pression, tout en vibrant, dans une digue (1) s'inclinant vers le bas à partir de la face arrière d'un côté de pente (5), de telle sorte que l'extrémité ouverte (7) est exposée à la surface et qu'une distance prédéterminée L' de la digue (1) à partir de la face arrière du côté de pente (5) comprend la région sans forage (10). La digue (1) est renforcée par compactage de la terre autour du tuyau de renforcement d'évacuation (6), et l'eau filtrée est évacuée à partir de l'extrémité ouverte (7) à travers les trous (11) du tuyau de renforcement d'évacuation (6) lorsque le niveau d'eau souterraine s'élève en raison de l'eau infiltrée dans la digue. Par conséquent, même lorsque l'eau de rivière s'est accrue de façon soudaine en raison d'une averse concentrée, on peut efficacement empêcher la digue de rivière de s'effondrer par une idée inventive simple à un coût faible.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007-200774 | 2007-08-01 | ||
JP2007200774 | 2007-08-01 | ||
JP2007235368A JP4067113B1 (ja) | 2007-08-01 | 2007-09-11 | 堤防の崩壊防止工法 |
JP2007-235368 | 2007-09-11 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2009016854A1 true WO2009016854A1 (fr) | 2009-02-05 |
Family
ID=39294033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2008/053171 WO2009016854A1 (fr) | 2007-08-01 | 2008-02-25 | Procédé pour empêcher l'effondrement d'une digue |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP4067113B1 (fr) |
WO (1) | WO2009016854A1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556612A (zh) * | 2013-10-30 | 2014-02-05 | 柏发忠 | 一种渗排水管及其施工方法 |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114553B (zh) * | 2013-03-20 | 2015-02-04 | 水利部交通运输部国家能源局南京水利科学研究院 | 一种土石坝管涌溃决现场试验方法 |
CN103954318B (zh) * | 2014-04-01 | 2016-04-13 | 山东康威通信技术股份有限公司 | 一种橡胶坝震动形变及动态溢流水位监测分析方法 |
CN106400647B (zh) * | 2016-09-21 | 2019-06-14 | 南京工业大学 | 用于既有高速公路边坡排水及加固的排水管及其施工方法 |
CN114703799A (zh) * | 2022-03-18 | 2022-07-05 | 西安理工大学 | 降低含泥夹层尾矿坝坝坡浸润面的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6040427A (ja) * | 1983-08-15 | 1985-03-02 | Kazuo Hasegawa | ストレ−ナ−付ア−スアンドロツクアンカ− |
JP2003147775A (ja) * | 2001-11-09 | 2003-05-21 | Chiyoda Kizai Kk | 排水パイプ |
JP2006274655A (ja) * | 2005-03-29 | 2006-10-12 | National Institute For Rural Engineering | 盛土堤体のドレーン構造及びその施工方法 |
JP2007070820A (ja) * | 2005-09-05 | 2007-03-22 | Kajima Corp | 盛土の補強工法および盛土 |
-
2007
- 2007-09-11 JP JP2007235368A patent/JP4067113B1/ja active Active
-
2008
- 2008-02-25 WO PCT/JP2008/053171 patent/WO2009016854A1/fr active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6040427A (ja) * | 1983-08-15 | 1985-03-02 | Kazuo Hasegawa | ストレ−ナ−付ア−スアンドロツクアンカ− |
JP2003147775A (ja) * | 2001-11-09 | 2003-05-21 | Chiyoda Kizai Kk | 排水パイプ |
JP2006274655A (ja) * | 2005-03-29 | 2006-10-12 | National Institute For Rural Engineering | 盛土堤体のドレーン構造及びその施工方法 |
JP2007070820A (ja) * | 2005-09-05 | 2007-03-22 | Kajima Corp | 盛土の補強工法および盛土 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556612A (zh) * | 2013-10-30 | 2014-02-05 | 柏发忠 | 一种渗排水管及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
JP4067113B1 (ja) | 2008-03-26 |
JP2009052377A (ja) | 2009-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105821830A (zh) | 一种用于低渗透性土坡的增渗虹吸排水系统 | |
WO2009016854A1 (fr) | Procédé pour empêcher l'effondrement d'une digue | |
CN204326055U (zh) | 航道岸坡组合式水平排水孔 | |
CN106381869A (zh) | 一种淤泥夹块石土层双护筒冲击成桩方法 | |
CN106592525A (zh) | 一种自启动式边坡虹吸排水系统 | |
CN102535384B (zh) | 一种沟内水石分离虹吸排水防治泥石流方法 | |
CN101575855A (zh) | 非取土引孔预应力管桩或预制方桩沉桩工艺 | |
CN208733655U (zh) | 一种高水位降水施工结构 | |
CN204551510U (zh) | 一种填方路基集水降压井降排水结构 | |
CN106759081A (zh) | 一种利用透空式堤坝辅助边坡排水的装置 | |
JP4727718B2 (ja) | 擁壁の補強工法 | |
KR100542739B1 (ko) | 하천의 과대한 유량을 수용할 수 있는 하천옹벽 | |
KR20080045600A (ko) | 튜브가 추가된 플라스틱 연직배수재 및 연약지반 개량공법 | |
CN106013199B (zh) | 一种双翼型橡塑软带式单向自动排水器 | |
RU2381327C1 (ru) | Водопропускное сооружение под насыпью в условиях многолетнемерзлых грунтов на периодически действующем водотоке | |
CN209243705U (zh) | 一种设置土工织物的ptc型星状对穿孔管桩 | |
CN212104428U (zh) | 一种渗水排水管 | |
JP2013087554A (ja) | 液状化対策構造及び液状化対策工法 | |
CN106592546A (zh) | 一种利用开孔圆筒辅助边坡排水的装置 | |
KR100873089B1 (ko) | 지반침하 방지용 피압대수층 감압 지하수로 | |
CN201245857Y (zh) | 一种温室蓄水装置 | |
KR101010204B1 (ko) | 하천의 제방용 배수장치 | |
JP2004204574A (ja) | 地盤の液状化防止方法 | |
KR100579469B1 (ko) | 친환경적인 하천호안블록 설치구조 | |
KR20130034340A (ko) | 투수성 호안블록 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08720824 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 08720824 Country of ref document: EP Kind code of ref document: A1 |