WO2007132725A1 PCT/JP2007/059647 JP2007059647W WO2007132725A1 WO 2007132725 A1 WO2007132725 A1 WO 2007132725A1 JP 2007059647 W JP2007059647 W JP 2007059647W WO 2007132725 A1 WO2007132725 A1 WO 2007132725A1
Authority
WO
WIPO (PCT)
Prior art keywords
section
pipeline
pipe
pressure
flow rate
Prior art date
Application number
PCT/JP2007/059647
Other languages
English (en)
French (fr)
Inventor
Kazuaki Iwamura
Original Assignee
Hitachi, Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi, Ltd. filed Critical Hitachi, Ltd.
Priority to JP2008515508A priority Critical patent/JP4889734B2/ja
Publication of WO2007132725A1 publication Critical patent/WO2007132725A1/ja

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations

Definitions

  • the present invention relates to a technique for monitoring and controlling the state of a transportation facility such as a pipeline.
  • Patent Document 1 discloses a technique for detecting defects such as wear holes and corrosion holes in air transportation pipes and liquid transportation pipes in object transportation equipment such as powder air transportation equipment in converters. Is disclosed.
  • an anomaly detection device for double-pipe transport piping is installed in the transport direction conversion part, which is a specific wear part of the pneumatic piping of the powder pneumatic equipment, and the inner and outer pipes of the double pipe are installed.
  • the internal pressure is set so as to satisfy a predetermined condition. Then, this internal pressure is constantly monitored, and when the internal pressure no longer satisfies the predetermined condition, it is determined that wear perforation has occurred in the transportation direction changing portion of the pneumatic piping. Then, an alarm is output and the shut-off valve is closed.
  • Non-Patent Document 1 discloses a technology for linking SCADA (Supervisory Control And Data Acquisition) and GIS (Geographic Information System).
  • GIS displays process diagram data sent from SCADA on a graphical user interface (GUI).
  • GUI graphical user interface
  • the GIS searches the database for the selected range from the database and displays it on the GUI.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 2003-65944
  • Non-Patent Document 1 Nordic Distribution and Asset Management Conference 2004 [UTILIT Y SYSTEMS INTEGRATION] Lars S. Gundersen, Gorm Sande, Jan Bugge, Svein Va tlana, om-Arild Asbj ⁇ rnsen
  • a transportation facility such as a pipeline is configured by connecting a plurality of sections (pipes) and installing an acceleration device such as a booster pump or a compressor at least in each section.
  • SCA The DA monitors the status (pressure, flow rate) of each section constituting the pipeline. Then, set a target value in the accelerator so that the desired flow rate can be obtained.
  • the present invention has been made in view of the above circumstances, and an object of the present invention is to obtain a desired flow rate in consideration of the position of the pipe where corrosion has occurred on the pipeline.
  • the purpose is to provide a technology to determine the target value of multiple accelerators installed in the pipeline.
  • the present invention collects information on the corrosion state of each section of the pipeline and registers it in association with the position information of the corrosion location. Then, the following processing is performed for each section of the pipeline. Calculate the flow rate at the inlet of the zone using the pressure and flow rate at the zone outlet received from the operator, the noise information of the zone, and the pressure drop due to the corrosion state of the zone, and set the calculation result as the target value. To do. For each accelerating device installed in each section, control is made so that the flow rate at the section inlet reaches the target value.
  • the measured values of each section of the pipeline are collected, the measured value of the pressure at the outlet of the section is compared with the target value, and the target value is calculated so that the measured value approaches the target value. You may modify the coefficients used. Then, the target value of the accelerator is calculated again using the corrected coefficient.
  • the target value setting support device of the present invention includes:
  • a pipeline terrain data storage unit storing pipeline terrain data
  • a corrosion data storage unit storing corrosion data of corrosion parts of pipes
  • the pressure or flow rate of the chemical product fluid at the inlet of each section constituting the pipeline is calculated using the pipe diameter and chemical fluid attribute information and the preset pressure or flow rate of the chemical product fluid.
  • the pressure or flow rate of the chemical product fluid at the inlet of each section constituting the pipeline calculated by the transport amount calculation unit, and the pipe attribute information stored in the facility / fluid storage unit Identified from the specified pipe diameter, the corrosion data stored in the corrosion data storage unit, and the pipe attribute information stored in the equipment 'fluid storage unit
  • the stress applied to the pipe is calculated for each section constituting the pipeline using the pipe thickness, and the stress is determined by the information stored in the limit storage unit.
  • a stress check section that checks whether or not
  • An optimization unit for optimizing the pressure or flow rate of the chemical product fluid at the inlet of the section so as to pass the check of the stress check section for each section constituting the pipeline;
  • each of the acceleration devices installed in the pipeline is arranged so that a desired flow rate (delivery flow rate) can be obtained in consideration of the position of the pipe where corrosion has occurred on the pipeline.
  • the target value can be determined.
  • FIG. 1 is a schematic diagram of a spatial information control system to which an embodiment of the present invention is applied.
  • FIG. 2 is a schematic configuration diagram of the monitoring control unit 1 shown in FIG.
  • FIG. 3 is a diagram schematically showing registered contents in the target value storage unit 107.
  • FIG. 4 is a schematic configuration diagram of the target value setting support unit 1 shown in FIG.
  • FIG. 5 is a diagram schematically showing the registered contents of the facility / fluid storage unit 202.
  • Fig. 6 is a schematic representation of pipeline terrain data.
  • FIG. 7 is a diagram schematically showing corrosion data.
  • FIG. 8 is a diagram schematically showing the registered contents of the corrosion data storage unit 207.
  • FIG. 9 is a diagram schematically showing an example of registered contents of the limit pressure / flow velocity storage unit 209.
  • FIG. 10 is a flowchart for explaining the mapping process.
  • FIG. 11 is a flowchart for explaining target value setting support processing.
  • FIG. 12 is a flowchart for explaining the inlet pressure calculation process (S203 in FIG. 11).
  • FIG. 13 is a flowchart for explaining set value calculation processing (S204 in FIG. 11).
  • FIG. 14 is a diagram for explaining the effect of the acceleration device 32.
  • FIG. 14 is a diagram for explaining the effect of the acceleration device 32.
  • FIG. 15 is a flowchart for explaining the sending flow rate calculation process (S205 in FIG. 11).
  • FIG. 16 is a flowchart for explaining the pressure / flow velocity check process (S206 in FIG. 11).
  • FIG. 17 is a flowchart for explaining the stress check process (S207 in FIG. 11).
  • FIG. 18 is a flowchart for explaining the optimized inlet pressure recalculation process (S209 in FIG. 11).
  • FIG. 19 is a flowchart for explaining the monitoring control process.
  • FIG. 20 is a flowchart for explaining sensor data reflection processing.
  • FIG. 1 is a schematic diagram of a spatial information control system to which an embodiment of the present invention is applied.
  • the spatial information control system of this embodiment monitors and controls the pipeline 3 that transports a chemical product fluid such as natural gas.
  • the pipeline 3 is configured by being connected by a plurality of pipes 31, an unillustrated connection valve, and an acceleration device 32 such as a compressor and a booster pump.
  • the pipeline 3 is managed in the section divided by the accelerator 32, and the accelerator 32 installed at the entrance of the section is assigned to the section.
  • the spatial information control system of this embodiment includes a monitoring control unit 1, a target value setting support unit 2, a sensor 4, an RTU (Remote Terminal Unit) 5, an inspection big (internal inspection). Robot) 6.
  • the sensors 4 are installed at a plurality of locations including the entrances and exits of each section constituting the pipeline 3, and measure the state (pressure, flow rate, temperature) of the chemical product fluid flowing through the Neuve 31.
  • the RTU 5 is provided for each sensor 4, digitizes the sensor data obtained by the corresponding sensor 4, and transmits this to the monitoring control unit 1.
  • the monitoring control unit 1 is, for example, SCADA, and uses the sensor data obtained via the sensor 4 and the RTU 5 to check the state of the chemical product fluid at the entrance and exit of each section constituting the pipeline 3. Monitor. The monitoring control unit 1 transmits the sensor data to the target value setting support unit 2.
  • the monitoring control unit 1 outputs a control signal to each acceleration device 32 according to the target value of each acceleration device 32 received from the target value setting support unit 2.
  • the inspection big 6 is pushed by the chemical product fluid flowing through the pipe 31 and travels inside the pipe 31. Then, the corrosion state (pipe 31 thickness) is measured by ultrasonic waves, leakage magnetism, etc. Corrosion data is sent to the target value setting support unit 2 in association with the distance from the inspection start point (for example, the inlet of the pipeline 3).
  • the target value setting support unit 2 is a simulator having a GIS function, for example, and maps (corresponds) the corrosion data obtained in the inspection big 6 onto the pipeline terrain data using the GIS function.
  • the pipeline terrain data is data indicating the position and three-dimensional shape of each section constituting the pipeline 3.
  • the target value setting support unit 2 determines the target value of the accelerator 32 assigned to each section constituting the pipeline 3 using the corrosion data mapped on the pipeline topographic data, and the monitoring control unit Send to 1. Further, according to the monitoring data sent from the monitoring control unit 1, the target value of the acceleration device 32 is corrected as necessary and transmitted to the monitoring control unit 1.
  • FIG. 2 is a schematic configuration diagram of the monitoring control unit 1 shown in FIG.
  • the monitoring control unit 1 includes a sensor data reception unit 101, a sampling unit 102, a sensor data transmission unit 103, a current value / trend generation unit 104, a display unit 105, and a target value reception.
  • Unit 106 target value storage unit 107, comparison unit 108, control unit 109, alarm generation unit 110, and control signal generation unit 111.
  • the sensor data receiving unit 101 receives sensor data from each RTU 5.
  • the sampling unit 103 samples the sensor data received from each RTU 5 via the sensor data receiving unit 101 at a predetermined sampling frequency. Then, measurement position information (pipeline 3 section information, section entrance / exit information) determined by the RTU 5 of the sensor data transmission source is added to each sampled sensor data and output.
  • the sensor data transmission unit 103 transmits the sensor data output from the sampling unit 102 to the target value setting support unit 2.
  • the current value / trend generation unit 104 plots the sensor data output from the sampling unit 102 in a graph having the sensor value on the vertical axis and the time on the horizontal axis for each measurement position information. For each information, current value / trend graph data is generated.
  • the display unit 105 displays the current value / trend graph data generated by the current value / trend generation unit 104.
  • the target value receiving unit 106 receives the target value of each speed device 32 installed in the pipeline 3 (this acceleration).
  • the target flow rate of the chemical fluid flowing through the device 32 is received from the target value setting support unit 2.
  • FIG. 3 is a diagram schematically showing the registered contents of the target value storage unit 107.
  • a record 1070 is registered for each section constituting pipeline 3.
  • the record 1070 has a field 1071 for registering identification information of the target section, a field 1072 for registering a sending flow rate, and a field 1073 for registering a unit of sending flow rate.
  • the comparison unit 108 includes, for each of the sensor data output from the sampling unit 102, sensor data to which measurement position information indicating a section entrance is attached, an acceleration device associated with the section indicated by the measurement position information. Compare with the target value of 32 and output the comparison result (difference) together with the section indicated by the measurement position information.
  • the determination unit 109 determines whether or not the comparison result output from the comparison unit 108 is within a predetermined threshold for each section constituting the pipeline 3. If it is within the predetermined threshold, it is determined that it can be handled by adjusting the acceleration device 32 assigned to the target section, and the comparison result is output to the control signal generator 111 together with the target section. On the other hand, if it is not within the above threshold, it is determined that the response by adjusting the acceleration device 32 assigned to the target section is impossible, and this comparison result is output to the alarm generation unit 110 together with the target section.
  • the alarm generation unit 110 When the comparison result is received from the determination unit 109, the alarm generation unit 110 generates and outputs an alarm indicating the comparison result and the section added to the comparison result.
  • control signal generation unit 111 When the control signal generation unit 111 receives the comparison result from the determination unit 109, the control signal generation unit 111 follows the comparison result (difference) and assigns the acceleration device assigned to the section added to the comparison result. 32 control signals are generated. For example, when the comparison result indicates that the sensor data value (measured value) is lower than the target value, the control signal is generated so as to increase the output power of the accelerator 32. Further, when the comparison result indicates that the sensor data value (measured value) is higher than the target value, the control signal is generated so that the output power of the accelerator 32 is lowered.
  • FIG. 4 is a schematic configuration diagram of the target value setting support unit 2 shown in FIG.
  • the target value setting support unit 1 includes a sensor data receiving unit 201 and a facility 'fluid.
  • Storage unit 202 pipeline landform storage unit 203, search unit 204, corrosion data reception unit 205, mapping unit 206, corrosion data storage unit 207, transport amount calculation unit 208, limit pressure • flow velocity storage A unit 209, a pressure / flow velocity check unit 210, a stress check unit 211, an optimization unit 212, and a target value transmission unit 213.
  • the sensor data receiving unit 201 receives the sensor data transmitted from the monitoring control unit 1.
  • FIG. 5 is a diagram schematically showing the registered contents of the facility / fluid storage unit 202.
  • record 2020 is registered for each section of pipeline 3.
  • Record 2020 includes a field 2021 for registering identification information (pipeline ID) for pipeline 3, a finale 2022 for registering identification information for the target section, a field 2023 for registering attribute information for pipe 31 in the target section, It has a field 2024 for registering attribute information of the accelerator 32 installed in the target section, and a field 2025 for registering attribute information of the chemical product fluid flowing in the target section.
  • the finered 2023 has a subfield for registering the pipe diameter, a subfield for registering the pipe thickness, and a subfield for registering the pipe material.
  • Field 2023 has a subfield for registering the type of the accelerator 32 such as a compressor and a booster pump, and a subfield for registering the specifications of the accelerator 32 such as horsepower, maximum pressure, and maximum flow rate.
  • the field 2023 has a subfield for registering the specifications of the chemical fluid and a subfield for registering the expected composition ratio of the chemical fluid.
  • FIG. 6 is a schematic representation of pipeline terrain data.
  • the pipeline terrain data includes a field 2031 for registering identification information (pipeline ID) for pipeline 3, a field 2032 for registering the number of sections constituting pipeline 3, and a pipe 20 A field 2033 for registering information of each section constituting the line, and a field 2034 for registering information of a section that can be used as an alternative to the section constituting the pipeline 3 (an alternative section of the nobleed section).
  • Fino Red 2033 vs.
  • Subfield 20331 for registering the identification information of the target section subfield 20332 for registering the three-dimensional coordinate information of the start node of the target section, subfield 20333 for registering the three-dimensional coordinate information of the end node of the target section, and the target It has a subfield 20334 for registering the length of the section, and a subfield 20335 for registering identification information of the section when there is an alternative section.
  • a field 2034 includes sub-finole 20341 for registering the identification information of the alternative section, sub-finole 20342 for registering the three-dimensional coordinate information of the start node of the alternative section, and a sub-register for registering the three-dimensional coordinate information of the end node of the alternative section.
  • the search unit 204 searches the pipeline landform storage unit 203 for pipeline landform data having the pipeline ID received from the operator.
  • the corrosion data receiving unit 205 receives the corrosion data from the inspection pig 6.
  • Figure 7 is a schematic representation of corrosion data.
  • the corrosion data represents the position of the corroded portion on the pipe around time, with the pipeline ID 2051, the distance K2052 from the inspection start point, and a predetermined point on the pipe circumference at 12:00.
  • Corrosion type 2057 includes internal corrosion that corrodes the inner surface of the pipe and external corrosion that corrodes from the outer surface of the pipe.
  • mapping unit 206 maps the corrosion data received from the corrosion data receiving unit 205 onto the pipeline terrain data.
  • mapping refers to the process of correlating the corrosion data with the existing zone of the corroded portion indicated by the corrosion data.
  • the corrosion data storage unit 207 stores the corrosion data mapped on the pipeline terrain data by the mapping unit 206.
  • FIG. 8 is a diagram schematically showing the registration contents of the corrosion data storage unit 207.
  • record 2070 is registered for each corrosion data.
  • Record 2070 includes a field 2071 for registering the pipeline ID of pipeline 3 where corrosion is present, a field 2072 for registering identification information of a section where corrosion is present, a field 2073 for registering corrosion start time T, a corrosion length Fee for registering L Field 2075 for registering the corrosion width W, a field 2076 for registering the maximum corrosion depth ratio D, and a field 2077 for registering the corrosion type.
  • the corrosion data stored in the corrosion data storage unit 207 is obtained by replacing the distance K from the inspection start point with the identification information of the section where corrosion exists in the corrosion data shown in FIG.
  • the transport amount calculation unit 208 includes pipeline terrain data of the pipeline 3 searched by the search unit 204, and noise information of each section constituting the pipeline 3 stored in the facility / fluid storage unit 202. , Accelerator information, and fluid information are used to calculate the delivery flow rate (target value) at the inlet of the zone necessary for obtaining the desired pressure and flow rate at the outlet of the zone for each zone of the pipeline 3 To do.
  • the limit pressure * flow velocity storage unit 209 stores the limit pressure and the limit flow velocity of the pipe 31 for each material of the noise 31.
  • FIG. 9 is a diagram schematically showing an example of registered contents of the limit pressure / flow velocity storage unit 209. As shown in the figure, record 2090 is registered for each material of pipe 31.Record 2090 has a field 2091 for registering the material of pipe 31, a field 2092 for registering the axial pressure limit value of pipe 31, and a pipe 20 It has a field 2093 for registering the limit value of 31 shear direction pressures and a field 2094 for registering the rate coefficient used to calculate the erosion rate of the chemical fluid flowing through the pipe 31.
  • the pressure / flow velocity check unit 210 uses the limit pressure / limit flow rate of the pipe 31 stored in the limit pressure / flow velocity storage unit 209 for each section of the pipeline 3 searched by the search unit 204. Then, it is checked whether the pressure and flow rate necessary to obtain the delivery flow rate calculated by the transport volume calculation unit 208 exceed the limits.
  • the stress check unit 211 uses the corrosion data stored in the corrosion data storage unit 207, and for each section of the pipeline 3 searched by the search unit 204, the pipe 31 of the section is connected to the transport amount calculation unit. Check whether the pressure required to obtain the delivery flow calculated in 208 can be exhausted.
  • optimization unit 212 For each section of pipeline 3 searched by search unit 204, optimization unit 212 allows the pipeline 3 to pass both the pressure and flow rate check unit 210 and the stress check unit 211. Optimize the target value of each section. [0049] Then, the target value transmission unit 213 receives, for each section of the pipeline 3 to be monitored, target value data including the pipeline ID of the pipeline 3, the identification information of the section, and the target value. Send to 1.
  • the monitoring control unit 1 and the target value setting support unit 2 configured as described above read information from an external storage device such as a CPU, a memory, and an HDD, and a portable storage medium such as a CD-ROM and a DVD-ROM.
  • an external storage device such as a CPU, a memory, and an HDD
  • a portable storage medium such as a CD-ROM and a DVD-ROM.
  • an input device such as a keyboard and a mouse
  • an output device such as a display
  • a communication device for communicating with a partner device via a communication line and a bus connecting these devices
  • This can be realized by the CPU executing a predetermined program loaded on the memory.
  • a memory, an external storage device, or the like is used for each storage unit of the monitoring control unit 1 and the target value setting support unit 2.
  • An input device, an output device, and a communication device are used for the reception unit and the transmission unit.
  • mapping process is the target value setting support unit.
  • FIG. 10 is a flowchart for explaining the mapping process.
  • the corrosion data receiving unit 205 when the corrosion data receiving unit 205 receives the corrosion data (see FIG. 7) from the big 6 (YES in S101), it outputs this to the mapping unit 206.
  • the mapping unit 206 maps the corrosion data received from the corrosion data receiving unit 205 onto the pipeline terrain data (S102). Specifically, pipeline terrain data (see FIG. 6) having pipeline ID 2050 included in the corrosion data is retrieved from the pipeline terrain storage unit 203. Next, it is examined to which section of the pipeline terrain data the distance K2 051 included in the corrosion data belongs. This adds the section length of subfield 20334 in order from the first section, and determines whether or not the addition result exceeds the distance K. If so, map the corrosion data to the section with the last added section length. If not, add the section length of the next section.
  • the mapping unit 206 stores the corrosion data mapped onto the pipeline landform data as described above in the corrosion data storage unit 207 (S103).
  • the target value setting support process is a process for generating target value data to be transmitted from the target value setting support unit 2 to the monitoring control unit 1.
  • FIG. 11 is a flowchart for explaining the target value setting support process.
  • the search unit 204 receives the pipeline ID of the monitored pipeline 3 and the flow rate, flow velocity, and pressure at the outlet of each section of the pipeline 3 from the operator (S201). Then, pipeline terrain data having the accepted pipeline ID is read from the pipeline terrain storage unit 203 and transmitted to the transport amount calculation unit 208 (S202).
  • the transport amount calculation unit 208 refers to the equipment 'fluid storage unit 202, and for each section of the pipeline 3 specified by the pipeline topographic data received from the search unit 204, S20 1
  • the pressure at the pipe section inlet required to obtain the flow rate and pressure at the section outlet received in (the ideal value assuming that no corrosion has occurred in the pipe 31) is calculated (S203). Details of this process (inlet pressure calculation process) will be described later.
  • the transport amount calculation unit 208 refers to the facility 'fluid storage unit 202, and for each section of the pipeline 3, the acceleration device necessary for obtaining the pressure calculated in S203 at the section inlet.
  • a set value (output power) of 32 is calculated (S204). Details of this processing (setting value calculation processing) will be described later.
  • the transport amount calculation unit 208 refers to the facility / fluid storage unit 202 and calculates the sending flow rate (target value) at the entrance of each section of the pipeline 3 (S205). Details of this processing (sending flow rate calculation processing) will be described later.
  • the pressure / flow velocity check unit 210 determines whether the pressure and flow velocity of the chemical product fluid at the section inlet calculated in S203 and S204 exceeds the limit for each section of the pipeline 3, Is checked (S206). Details of this process (pressure / flow velocity check process) will be described later.
  • the stress check unit 211 checks whether the stress of the pipe 31 exceeds the limit considering the corrosion of the pipe 31 for each section of the pipeline 3 (S207).
  • the optimization unit 212 needs to optimize the delivery flow rate (target value) in each section of the pipeline 3 based on the results of the pressure / flow velocity check in S206 and the stress check in S207. It is determined whether or not there is (S208). Specifically, when there is a section where the pressure and flow velocity are determined to exceed the limits in the pressure / flow velocity check in S206, or in the stress check in S207, the stress on the pipe 31 takes corrosion into account. If there is an interval determined to exceed the limit, it is determined that there is a need for optimization, and otherwise, it is determined that there is no need for optimization.
  • the optimization unit 212 When it is determined that there is no need for optimization (NO in S208), the optimization unit 212 generates target value data including the delivery flow rate of each section of the pipeline 3. Then, the target value data is transmitted to the monitoring controller 1 via the target value transmitter 213 (S215).
  • the optimization unit 212 recalculates the inlet pressure in each section of the pipeline 3 (S209). Details of this process (optimized inlet pressure recalculation process) will be described later. Further, the transport amount calculation unit 208 recalculates the set value of the accelerator 32 for each section of the pipeline 3 in the same manner as S204 using the inlet pressure of each section recalculated by the optimization unit 212. (S210).
  • the transport amount calculation unit 208 determines whether or not optimization is possible based on the set value of each accelerator 32 recalculated in S210 (S211). Specifically, if the set value (output power) of each accelerator 32 is within the maximum output range of each accelerator 32 stored in the facility / fluid storage unit 202, it is determined that optimization is possible. Otherwise, it is determined that optimization is impossible.
  • the transport amount calculation unit 211 determines whether or not there is an alternative pipeline 3 (S2 12). Specifically, in the pipeline terrain data (see Figure 6), if there is a field 2033 in which the identification information of the alternative section is registered in Sub-Fino Redo 203 35, there is a pipeline 3 that can be replaced. If there is no such field 2033, it is determined that there is no pipeline 3 that can be replaced. If there is no pipeline 3 that can be replaced (NO in S212), the transport volume calculation unit 211 notifies the operator of an error message. A predetermined error process such as outputting a page is performed, and this flow is terminated.
  • the transport amount calculation unit 211 replaces at least a part of each section constituting the pipeline 3 with the replacement section (S213), and then returns to S203. .
  • FIG. 12 is a flowchart for explaining the inlet pressure calculation process (S203 in FIG. 11).
  • the transport amount calculation unit 208 sets the counter value n to 1 (S2031). Then, the traffic calculation unit 208 reads the field 2033 corresponding to the nth section from the pipeline topographic data searched by the search unit 204. Then, the pressure value P at the inlet of the nth section is calculated by the following equation (Equation 1) (S2032).
  • Q is the flow rate at the section outlet
  • P is the pressure value at the section outlet.
  • the value received from the operator at 201 is used.
  • T is a reference temperature
  • P is a reference pressure
  • T is an average temperature.
  • the specified value is used.
  • L is a variable determined by the following equation (Equation 2).
  • Lt is the section length
  • S is a variable determined by the following equation (Equation 3) c
  • H is the height of the start node of the section (z coordinate value)
  • H is the height of the end node of the section (z)
  • G is gas gravity.
  • the gas gravity G the gas gravity G stored in the fluid information 2025 of the nth section of the corresponding pipeline stored in the facility / fluid storage unit 202 is used.
  • Equation 1 f is a pipe friction coefficient calculated by the Colebrook-White equation shown in the following equation (Equation 4).
  • R is the internal roughness
  • R is the Reikarez number
  • D is the pipe diameter
  • the information stored in the pipe information 2023 of the nth section of the corresponding pipeline stored in the facility / fluid storage unit 202 is used.
  • the internal roughness R is determined in advance.
  • the Reynolds number R is a value determined by a known formula, and here, the known number e
  • Equation 1 C is the compression rate at the section inlet of the chemical fluid calculated by the known CNGA equation shown in the following equation (Equation 5).
  • Equation 5 in order to obtain the average pressure P in the section, the unknown value avg into the section avg
  • the pressure p at the inlet of the section and the pipe friction An assumed value is predetermined for the number f.
  • the transport amount calculation unit 208 calculates the pipe friction coefficient f by substituting the assumed value of the pipe friction coefficient f into the right side of Equation 4, and calculates the pressure P at the inlet of each section.
  • the transportation amount calculation unit 208 calculates the pressure P at the section inlet for the last section (YES in S2033), the flow is finished. If not (N203 in S2033), the force value n is incremented by one (S2034), and the process returns to S2032.
  • FIG. 13 is a flowchart for explaining the set value calculation processing (S204 in FIG. 11).
  • the transport amount calculation unit 208 sets the counter value n to 1 (S2041). Then, the transport amount calculation unit 208 calculates a set value (output power) P of the accelerator 32 installed at the entrance of the nth section by the following equation (Equation 6) (S2042).
  • is the specific heat ratio (ratio of constant pressure specific heat and constant volume specific heat), and ⁇ is the adiabatic ratio.
  • Specific heat ratio ⁇ Contact and adiabatic ratio ⁇ is used which is stored stored in the equipment and the fluid storage unit 202, the fluid information 2025 of ⁇ th section of the corresponding pipeline.
  • C is the compression rate at the section outlet of the chemical fluid.
  • the known number 5 shown above is the compression rate at the section outlet of the chemical fluid.
  • FIG. 14 is a diagram for explaining the effect of the acceleration device 32.
  • reference numeral 3201 is the maximum allowable pressure (MAOP) of the target section when there is no corrosion
  • reference numeral 3202 is the maximum allowable pressure of the target section when there is corrosion
  • reference numeral 3203 is the pressure drop curve when there is no corrosion
  • Reference numeral 3204 denotes a pressure drop curve in the presence of corrosion.
  • FIG. 15 is a flowchart for explaining the sending flow rate calculation process (S205 in FIG. 11).
  • the transport amount calculation unit 208 sets the counter value n to 1 (S2051). Then, the transport amount calculation unit 208 calculates the average flow velocity V of the chemical product fluid at the inlet of the nth section using the Bernoulli equation shown in the following equation (Equation 7) (S2052).
  • the average flow velocity V of the chemical product fluid at the exit of the nth section is controlled by S201 in Fig. 11.
  • the flow velocity at the exit of the corresponding section received from the data is used.
  • H is the loss head, and the known Darcy-Weisbach equation shown in the following equation (8)
  • Equation 7 p is the fluid density of the chemical fluid at the inlet of the nth section, p
  • the information stored in the fluid information 2025 of the nth section of the corresponding pipeline is used.
  • the transport amount calculation unit 208 uses the average flow velocity V of the chemical product fluid at the n-th section inlet calculated as described above, and calculates the inlet of the n-th section by the following equation (Equation 10). Calculate the flow rate Q of the chemical product fluid at (S2053).
  • FIG. 16 is a flowchart for explaining the pressure / flow velocity check process (S206 in FIG. 11).
  • the pressure / flow velocity check unit 210 sets the counter value n to 1 (S2061).
  • the pressure / flow velocity check unit 210 calculates the erosion velocity V at the entrance of the n-th section using the well-known erosion velocity equation shown in the following equation (Equation 11) (S2062).
  • K is the speed coefficient.
  • the pressure / flow velocity check unit 210 identifies the pipe material registered in the pipe information 2023 of the n-th section of the corresponding pipeline stored in the facility 'fluid storage unit 202. Then, the velocity coefficient stored in the limit pressure / flow velocity memory 209 in correspondence with the identified pipe material is further identified and substituted into K.
  • the pressure / flow velocity check unit 210 sets the flow velocity V of the nth section of the pipeline calculated by the transport amount calculation unit 208 in the sending flow rate calculation process at the entrance of the nth section calculated in S2062. Compare with erosion rate V (S2063). If the flow velocity is V and the erosion velocity is V, lenc lenc in S2063
  • the difference (referred to as the erosion degree difference) is registered in association with the identification information of the nth section (S2064), and the process proceeds to S2065.
  • FIG. 17 is a flowchart for explaining the stress check process (S207 in FIG. 11).
  • the stress check unit 211 sets the counter value n to 1 (S2071). Then, the stress check unit 211 uses the well-known Ballow equation shown in the following equation (Equation 12) to determine the tensile stress (Axial Stress) S and the shear stress (Hoop St ax) of the pipe 31 in the nth section.
  • the stress check unit 211 performs the tensile stress S calculated in S2072 and the shear stress ax.
  • the stress check unit 211 is equipped with equipment ho
  • the difference (referred to as stress difference) is registered in association with the identification information of the nth section (S2074), and then the process proceeds to S2075.
  • FIG. 18 is a flowchart for explaining the optimized inlet pressure recalculation process (S209 in FIG. 11).
  • the optimization unit 212 sets the counter value n to 1 (S2091).
  • the optimization unit 212 checks whether or not the erosion rate difference is registered in the pressure / flow rate check unit 210 in association with the nth section (S2092). If it is registered (YES in S2092), this erosion rate difference is deleted from registration, and the process proceeds to S2094. On the other hand, when not registered (N209 in S2092), the optimization unit 212 further checks whether or not the stress difference is registered in the stress check unit 210 in association with the nth category (S2093). . If registered (YES in S2093), the stress difference is deleted from the registration, and the process proceeds to S2094. On the other hand, if the registered level is not correct (NO in S2093), the process proceeds to S2096.
  • the optimization unit 212 reduces the pressure P at the n-th zone inlet by a predetermined value ⁇ .
  • the optimization unit 212 sets the pressure P at each of the nth and subsequent section inlets as a whole by ⁇ ⁇ Raise (S2095).
  • the number of pipeline sections is m (n-m).
  • the pressure P at each of the (n + 1) th to mth section inlets is increased by AP / (mn).
  • FIG. 14 is a diagram for explaining the effect of the acceleration device 32.
  • falls. Therefore, decrease the pressure ⁇ at the ⁇ th section inlet by ⁇ ⁇ , increase the pressure P at the n + 1st and subsequent section inlets by ⁇ , and decrease the pressure ⁇ at the ⁇ th section inlet ⁇ ⁇
  • the supervisory control process is a process in which the supervisory control unit 1 controls each accelerator 32 so that the target value received from the purpose setting support unit 2 is the same as the target value.
  • FIG. 19 is a flowchart for explaining the monitoring control process.
  • the target value receiving unit 106 receives target value data for each section of the monitored pipeline 3 from the target value setting support unit 2 and stores it in the target value storage unit 107 (S301).
  • the target value of each section stored in the target value storage unit 107 is transmitted to the determination unit 109 via the comparison unit 108.
  • the judgment unit 109 obtains the target value of the section for the control signal information of the accelerator 32 installed in the section (the transmission indicated by the corresponding target value). Information to obtain a flow rate) and transmit it to the control signal generator 111.
  • the control signal generation unit 111 generates a control signal based on the control signal information received from the determination unit 109, and transmits it to the acceleration device 32 to be controlled (S302).
  • the sensor data receiving unit 101 receives sensor data from each sensor 4 installed in the pipeline 3 via the RTU 5.
  • the received sensor data 303 is sampled by the sampling unit 102 and transmitted to the comparison unit 108 and the current value / trend generation unit 104. Further, it is transmitted to the target value setting support unit 2 via the sensor data transmission unit 103 (S303). ) 0
  • the current value / trend generation unit 104 plots the sensor data received from the sampling unit 102 on the trend graph for each section displayed on the display unit 105 (S304).
  • the comparison unit 108 for each section of the pipeline 3 to be monitored, sends the flow rate indicated by the sensor data received from the sampling unit 102 and the target value stored in the target value storage unit 107. And the comparison result is output to the determination unit 109 (S305).
  • the determination unit 109 determines whether or not the control signal for the acceleration device 32 in the section corresponding to the comparison result can be corrected according to the comparison result (S306). Specifically, it is determined that the correction can be made when the difference between the sending flow rate indicated by the sensor data and the target value is within a predetermined threshold, and otherwise it is determined that the correction is impossible.
  • determining unit 109 determines that the correction is possible (YES in S306), if it indicates that the feed flow rate indicated by the sensor data is lower than the target value, it sends a control signal to increase the output power by a predetermined value.
  • the control signal generation unit 111 generates the signal and transmits it to the acceleration device 32 in the section corresponding to the comparison result.
  • the control signal generation unit 111 generates a control signal for lowering the output power by a predetermined value, and this corresponds to the comparison result. It transmits to the acceleration device 32 of the area (S307).
  • the determination unit 109 determines that correction is impossible (NO in S306), the determination unit 109 outputs an alarm and can operate the accelerator 32 in the section corresponding to the comparison result according to the target value. The operator is notified of this (S308).
  • the sensor data reflection process is a process in which the target value setting support unit 2 corrects the coefficient used to calculate the target value so that the measured value indicated by the sensor data approaches the target value, and calculates the target value again. is there.
  • FIG. 20 is a flowchart for explaining the sensor data reflection process.
  • the transport amount calculation unit 208 receives sensor data for all sections of the monitored target line 3 via the sensor data reception unit 201 ( S 401). Next, the transport amount calculation unit 208 sets the counter value n to 1 (S402).
  • the transport amount calculation unit 208 sets the sending flow rate (flow rate at the entrance of the zone) indicated by the sensor data in the nth zone in the target value setting support process shown in Fig. 11. Compare with the target value of the nth section of IN-3 (S403). Based on the comparison result, the loss head (H in Equation 7 above) used in the calculation of the sending flow rate in the nth section is calculated as the sending flow rate to be calculated.
  • the force is adjusted so as to approach the sending flow rate indicated by the sensor data (S404). However, if the difference between the sending flow rate indicated by the sensor data and the target value is greater than or equal to a predetermined threshold, the operator is notified of a message to that effect, and the flow rate and flow velocity at the exit of each section are notified to the operator. And prompts to reset (re-enter) the pressure.
  • the controlled variable may be either pressure or flow rate instead of both pressure and flow rate.
  • Ministerial power It is easy to calculate the other variable.
  • a plurality of accelerations installed in the pipeline 3 so as to obtain a desired delivery flow rate.
  • a target value for each device 32 can be determined.
  • the target value can be corrected so that the difference from the measurement result indicated by the sensor data collected from pipeline 3 is reduced.
  • the present invention is not limited to the above-described embodiment, and various modifications can be made within the scope of the gist thereof.
  • a gas fluid is handled as the chemical product fluid
  • the present invention is not limited to this.
  • the present invention can be similarly applied to liquids such as petroleum and alcohol. In this case, replace each formula above with the formula for fluid.
  • Corrosion data may be collected using measuring instruments installed in each part of pipeline 3, or may be collected by inspection by an operator.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)

Abstract

 腐食が発生しているパイプのパイプライン上における位置を考慮して、所望の流量が得られるように、パイプラインに複数設置された加速装置の目標値を決定する。  目標値設定支援部2は、検査ピグ6が収集したパイプ31の腐食状態の情報を、腐食個所のパイプライン3の区間に対応付けて登録する。また、目標値設定支援部2は、パイプライン3の各区間について、当該区間入口の流量を、オペレータより受付けた当該区間出口の圧力、流量と、当該区間のパイプ31の属性情報と、当該区間の腐食状態による圧力低下とを用いて計算し、計算結果を目標値に設定する。監視制御部1は、パイプライン3の各区間に設置された加速装置32各々に対して、当該区間入口の流量が目標値となるように制御する。

Description

明 細 書
監視制御システム
技術分野
[0001] 本発明は、パイプライン等の輸送設備の状態を監視、制御する技術に関する。
背景技術
[0002] 特許文献 1には、転炉の粉体気送設備等の物体輸送設備において、気送配管や 液送配管等の輸送配管の摩耗孔あきや腐食孔あき等の欠損を検知する技術が開示 されている。この技術では、粉体気送設備の気送配管の特定摩耗部位である輸送方 向変換部分に二重管式輸送配管の異常検出装置を設置し、その二重管の内管と外 管の間の内部圧力が所定の条件を満足するように設定しておく。そして、この内部圧 力を常時監視し、内部圧力が所定の条件を満足しなくなった場合に、気送配管の輸 送方向変換部分に摩耗孔あきが発生したと判定する。そして、警報を出力し、遮断 弁を閉動作させる。
[0003] また、非特許文献 1には、 SCADA (Supervisory Control And Data Acquisition)と GIS (Geographic Information System)との連携技術が開示されている。この技術に おいて、 GISは、 SCADAから送られてきたプロセスダイヤグラムデータを GUI (Grap hical User Interface)に表示する。そして、 GISは、 GUIを介してユーザがプロセスダ ィャグラムの範囲を選択すると、選択された範囲の地図をデータベースから検索し、 GUIに表示する。
[0004] 特許文献 1 :特開 2003-65944号公報
非特許文献 1: Nordic Distribution and Asset Management Conference 2004 [UTILIT Y SYSTEMS INTEGRATION] Lars S. Gundersen, Gorm Sande, Jan Bugge, Svein Va tlana, om-Arild Asbj φ rnsen
発明の開示
発明が解決しょうとする課題
[0005] パイプライン等の輸送設備は、複数の区間(パイプ)が連結され、少なくとも一区間 毎に、ブースターポンプ、コンプレッサ等の加速装置が設置されて構成される。 SCA DAは、ノ ィプラインを構成する各区間の状態 (圧力、流量)を監視する。そして、所 望の流量が得られるように、加速装置に目標値を設定する。
[0006] ところで、ノイブに腐食が発生し、このためにパイプの厚みに変化が生じると、圧力 が低下して流量が減少する。一方で、このようなパイプは、腐食が発生していないパ ィプに比べて、最大許容圧力(MAOP: Maximum Allowable Operation Pressure)が 低下する。従来の技術は、これらの点を考慮していない。
[0007] 本発明は上記事情に鑑みてなされたものであり、本発明の目的は、腐食が発生し ているパイプのパイプライン上における位置を考慮して、所望の流量が得られるよう に、パイプラインに複数設置された加速装置の目標値を決定する技術を提供するこ とにある。
課題を解決するための手段
[0008] 上記課題を解決するために本発明は、パイプラインの各区間の腐食状態の情報を 収集し、腐食個所の位置情報に対応付けて登録する。そして、パイプラインの各区間 について次の処理を行う。当該区間入口の流量を、オペレータより受付けた当該区 間出口の圧力、流量と、当該区間のノイブ情報と、当該区間の腐食状態による圧力 低下とを用いて計算し、計算結果を目標値に設定する。各区間に設置された加速装 置各々に対して、当該区間入口の流量が目標値となるように制御する。
[0009] ここで、パイプラインの各区間の実測値を収集して、当該区間の出口における圧力 の実測値と目標値とを比較し、実測値が目標値に近づくように、 目標値算出に用いる 係数を修正してもよい。そして、修正した係数を用いて、加速装置の目標値を再度計 算する。
[0010] 例えば、本発明の目標値設定支援装置は、
パイプラインの地形データが記憶されたパイプライン地形データ記憶部と、 パイプの腐食部分の腐食データが記憶された腐食データ記憶部と、
パイプの属性情報、前記パイプラインに設置されている制御装置の仕様情報、およ び前記パイプラインを流れる化学製品流体の属性情報が記憶された設備'流体記憶 部と、
パイプが耐えられ得る化学製品流体の圧力の限界値に関する情報が記憶された 限界記憶部と、
前記パイプライン地形データ記憶部に記憶されている地形データより特定される各 ノードの高さ、およびノード間の長さと、前記設備'流体記憶部に記憶されているパイ プの属性情報より特定されるパイプ径、および化学流体の属性情報と、予め設定さ れた化学製品流体の圧力または流量とを用いて、前記パイプラインを構成する各区 間の入口における化学製品流体の圧力または流量を算出する輸送量算出部と、 前記輸送量算出部で算出した前記パイプラインを構成する各区間の入口における 化学製品流体の圧力または流量と、前記設備 ·流体記憶部に記憶されているパイプ の属性情報より特定されるパイプ径と、前記腐食データ記憶部に記憶されている腐 食データおよび前記設備'流体記憶部に記憶されているパイプの属性情報より特定 されるパイプ厚みとを用いて、前記パイプラインを構成する区間毎に、パイプにかか るストレスを算出し、該ストレスが前記限界記憶部に記憶されている情報により特定さ れる圧力の限界値を超えているか否かをチェックするストレスチェック部と、
前記パイプラインを構成する区間毎に、前記ストレスチェック部のチェックをパスす るように、当該区間の入口における化学製品流体の圧力または流量を最適化する最 適化部と、
前記パイプラインを構成する区間毎に、前記最適化部で最適化された当該区間入 口の流量を、当該区間入口に設置された制御装置の目標値として、前記監視制御 装置に送信する目標値送信部と、を有する。
発明の効果
[0011] 本発明によれば、腐食が発生しているパイプのパイプライン上における位置を考慮 して、所望の流量 (送付流量)が得られるように、ノ ィプラインに複数設置された加速 装置各々の目標値を決定することができる。
図面の簡単な説明
[0012] [図 1]図 1は本発明の一実施形態が適用された空間情報制御システムの概略図であ る。
[図 2]図 2は図 1に示す監視制御部 1の概略構成図である。
[図 3]図 3は目標値記憶部 107の登録内容を模式的に表した図である。 [図 4]図 4は図 1に示す目標値設定支援部 1の概略構成図である。
[図 5]図 5は設備 ·流体記憶部 202の登録内容を模式的に表した図である。
[図 6]図 6はパイプライン地形データを模式的に表した図である。
[図 7]図 7は腐食データを模式的に表した図である。
[図 8]図 8は腐食データ記憶部 207の登録内容を模式的に表した図である。
[図 9]図 9は限界圧力 ·流速記憶部 209の登録内容例を模式的に表した図である。
[図 10]図 10はマッピング処理を説明するためのフロー図である。
[図 11]図 11は目標値設定支援処理を説明するためのフロー図である。
[図 12]図 12は入口圧力計算処理(図 11の S203)を説明するためのフロー図である
[図 13]図 13は設定値計算処理(図 11の S204)を説明するためのフロー図である。
[図 14]図 14は加速装置 32の効果を説明するための図である。
[図 15]図 15は送付流量計算処理(図 11の S205)を説明するためのフロー図である
[図 16]図 16は圧力 ·流速チェック処理(図 11の S206)を説明するためのフロー図で ある。
[図 17]図 17はストレスチェック処理(図 11の S207)を説明するためのフロー図である
[図 18]図 18は最適化入口圧力再計算処理(図 11の S209)を説明するためのフロー 図である。
[図 19]図 19は監視制御処理を説明するためのフロー図である。
[図 20]図 20はセンサデータ反映処理を説明するためのフロー図である。
符号の説明
1:監視制御部、 2:目標値設定支援部、 3:パイプライン、 4:センサ、 5:RTU、 6:ピ グ、 101:センサデータ受信部、 102:サンプリング部、 103:センサデータ送信部、 1 04:現在値/トレンド生成部、 105:表示部、 106:比較部、 107:目標値記憶部、 10 8:比較部、 109:判断部、 110:アラーム生成部、 111:制御信号生成部、 201:セン サデータ受信部、 202:設備'流体記憶部、 203:パイプライン地形記憶部、 204:検 索部、 205 :腐食データ受信部、 206 :マッピング部、 207 :腐食データ記憶部、 208 : 輸送量計算、 209 :限界圧力'流速記憶部、 210 :圧力 ·流速チェック部、 211 :ストレ スチェック部、 212 :最適化部、 213 :目標値送信部
発明を実施するための最良の形態
[0014] 以下に、本発明の実施の形態を図面を参照して説明する。
[0015] 図 1は、本発明の一実施形態が適用された空間情報制御システムの概略図である
[0016] 本実施形態の空間情報制御システムは、天然ガス等の化学製品流体を輸送する パイプライン 3を監視、制御する。パイプライン 3は、図示するように、複数のパイプ 31 、図示していない連結バルブや、コンプレッサ、ブースターポンプ等の加速装置 32 で連結されて構成される。本実施形態では、パイプライン 3を加速装置 32で区切られ た区間で管理し、区間の入口に設置されている加速装置 32を当該区間に割り当て ている。
[0017] 図示するように、本実施形態の空間情報制御システムは、監視制御部 1と、 目標値 設定支援部 2と、センサ 4と、 RTU (Remote Terminal Unit) 5と、検査ビグ(内部検査 ロボット) 6と、を有する。
[0018] センサ 4は、パイプライン 3を構成する各区間の出入口を含む複数の個所に設置さ れ、ノイブ 31を流れる化学製品流体の状態 (圧力、流量、温度)を測定する。 RTU5 は、センサ 4毎に設けられ、対応するセンサ 4で得られたセンサデータをデジタル化し 、これを監視制御部 1に送信する。
[0019] 監視制御部 1は、例えば SCADAであり、センサ 4および RTU 5を介して得られた センサデータを用いて、パイプライン 3を構成する各区間の出入口での化学製品流 体の状態を監視する。また、監視制御部 1は、センサデータを目標値設定支援部 2に 送信する。
さらに、監視制御部 1は、 目標値設定支援部 2より受信した各加速装置 32の目標値 に従い、各加速装置 32に制御信号を出力する。
[0020] 検査ビグ 6は、パイプ 31を流れる化学製品流体に押されて、パイプ 31内を走行す る。そして、超音波、漏洩磁気等により腐食状態 (パイプ 31の厚み)を測定し、これを 腐食データとして、検査開始地点(例えばパイプライン 3の入口)からの距離に対応 付けて、 目標値設定支援部 2に送信する。
[0021] 目標値設定支援部 2は、例えば GIS機能を備えたシミュレータであり、検査ビグ 6で 得られた腐食データを、 GIS機能を用いてパイプライン地形データ上にマッピング( 対応付け)する。ここで、パイプライン地形データとは、パイプライン 3を構成する各区 間の位置や 3次元形状を示すデータである。また、 目標値設定支援部 2は、パイプラ イン地形データ上にマッピングされた腐食データを用いて、パイプライン 3を構成する 各区間に割り当てられた加速装置 32の目標値を決定し、監視制御部 1に送信する。 また、監視制御部 1から送られてきた監視データに従い、必要に応じて加速装置 32 の目標値を修正し、監視制御部 1に送信する。
[0022] 図 2は、図 1に示す監視制御部 1の概略構成図である。
[0023] 監視制御部 1は、図示するように、センサデータ受信部 101と、サンプリング部 102 と、センサデータ送信部 103と、現在値/トレンド生成部 104と、表示部 105と、 目標 値受信部 106と、 目標値記憶部 107と、比較部 108と、制御部 109、アラーム生成部 110と、制御信号生成部 111と、を有する。
[0024] センサデータ受信部 101は、各 RTU5からセンサデータを受信する。
[0025] サンプリング部 103は、センサデータ受信部 101を介して各 RTU5から受信したセ ンサデータを、所定のサンプリング周波数でサンプリングする。そして、サンプリングさ れたセンサデータ各々に、このセンサデータ送信元の RTU5によって定まる測定位 置情報 (パイプライン 3の区間情報、区間の出入口情報)を付加して出力する。
[0026] センサデータ送信部 103は、サンプリング部 102から出力されたセンサデータを目 標値設定支援部 2に送信する。
[0027] 現在値/トレンド生成部 104は、サンプリング部 102から出力されたセンサデータを 、測定位置情報毎に、縦軸をセンサ値、横軸を時間とするグラフにプロットすることで 、測定位置情報毎に、現在値/トレンドグラフデータを生成する。
[0028] 表示部 105は、現在値/トレンド生成部 104が生成した現在値/トレンドグラフデータ を表示する。
[0029] 目標値受信部 106は、パイプライン 3に設置された各速装置 32の目標値 (この加速 装置 32を流れる化学製品流体の目標とすべき送付流量)を、 目標値設定支援部 2か ら受信する。
[0030] 目標値記憶部 107には、 目標値受信部 106が目標値設定支援部 2から受信した各 加速装置 32の目標値が記憶される。図 3は目標値記憶部 107の登録内容を模式的 に表した図である。図示するように、パイプライン 3を構成する区間毎にレコード 1070 が登録されている。レコード 1070は、対象区間の識別情報を登録するフィールド 10 71と、送付流量を登録するフィールド 1072と、送付流量の単位を登録するフィール ド 1073と、を有する。
[0031] 比較部 108は、サンプリング部 102から出力されたセンサデータのうち、区間入口 を示す測定位置情報が付されたセンサデータ各々について、当該測定位置情報が 示す区間に対応付けられた加速装置 32の目標値と比較し、その比較結果 (差分)を 当該測定位置情報が示す区間と共に出力する。
[0032] 判断部 109は、パイプライン 3を構成する区間毎に、比較部 108から出力される比 較結果が所定の閾値以内であるか否力を判断する。所定の閾値以内である場合は、 対象区間に割り当てられた加速装置 32を調整することで対応可能と判断し、この比 較結果を対象区間と共に制御信号生成部 111に出力する。一方、上記閾値以内で ない場合は、対象区間に割り当てられた加速装置 32の調整による対応は不可能と 判断し、この比較結果を対象区間と共にアラーム生成部 110に出力する。
[0033] アラーム生成部 110は、判断部 109から比較結果を受信した場合に、この比較結 果およびこれに付加されている区間を示すアラームを生成し出力する。
[0034] 制御信号生成部 111は、判断部 109から比較結果を受信した場合に、この比較結 果(差分)に従レ、、この比較結果に付加されている区間に割り当てられている加速装 置 32の制御信号を生成する。例えば、センサデータの値 (測定値)が目標値より低い ことを比較結果が示している場合、加速装置 32の出力パワーを上げるように制御信 号を生成する。また、センサデータの値 (測定値)が目標値より高いことを比較結果が 示している場合、加速装置 32の出力パワーを下げるように制御信号を生成する。
[0035] 図 4は、図 1に示す目標値設定支援部 2の概略構成図である。
[0036] 目標値設定支援部 1は、図示するように、センサデータ受信部 201と、設備'流体 記憶部 202と、パイプライン地形記憶部 203と、検索部 204と、腐食データ受信部 20 5と、マッピング部 206と、腐食データ記憶部 207と、輸送量計算部 208と、限界圧力 •流速記憶部 209と、圧力'流速チェック部 210と、ストレスチェック部 211と、最適化 部 212と、 目標値送信部 213と、を有する。
[0037] センサデータ受信部 201は、監視制御部 1から送信されたセンサデータを受信する
[0038] 設備'流体記憶部 202には、パイプライン 3に設置された各加速装置 32の性能情 報、および、化学製品流体の成分情報が記憶される。図 5は設備 ·流体記憶部 202 の登録内容を模式的に表した図である。図示するように、パイプライン 3を構成する区 間毎にレコード 2020が登録されている。レコード 2020は、パイプライン 3の識別情報 (パイプライン ID)を登録するフィールド 2021と、対象区間の識別情報を登録するフ ィーノレド 2022と、対象区間のパイプ 31の属性情報を登録するフィールド 2023と、対 象区間に設置された加速装置 32の属性情報を登録するフィールド 2024と、対象区 間を流れる化学製品流体の属性情報を登録するフィールド 2025と、を有する。フィ 一ノレド 2023は、パイプ径を登録するサブフィールド、パイプ肉厚を登録するサブフィ 一ノレド、およびパイプ材質を登録するサブフィールドを有する。フィールド 2023は、 コンプレッサ、ブースターポンプといった加速装置 32の種別を登録するサブフィール ド、および馬力、最大圧力、最大流量といった加速装置 32の仕様を登録するサブフ ィールドを有する。そして、フィールド 2023は、化学製品流体の諸元を登録するサブ フィールド、および化学製品流体の構成期待比率を登録するサブフィールドを有す る。
[0039] パイプライン地形記憶部 203には、パイプライン 3毎に、パイプライン地形データが 登録されている。図 6はパイプライン地形データを模式的に表した図である。図示す るように、パイプライン地形データは、パイプライン 3の識別情報 (パイプライン ID)を 登録するフィールド 2031と、パイプライン 3を構成する区間の区間数を登録するフィ 一ルド 2032と、パイプライン構成する各区間の情報を登録するフィールド 2033と、 パイプライン 3を構成する区間の代替として利用可能な区間 (ノレ一ビングされた区間 の代替区間)の情報を登録するフィールド 2034と、を有する。フィーノレド 2033は、対 象区間の識別情報を登録するサブフィールド 20331と、対象区間の開始ノードの三 次元座標情報を登録するサブフィールド 20332と、対象区間の終了ノードの三次元 座標情報を登録するサブフィールド 20333と、対象区間の長さを登録するサブフィ 一ルド 20334と、代替区間がある場合にその区間の識別情報を登録するサブフィー ルド 20335と、を有する。フィールド 2034は、代替区間の識別情報を登録するサブ フィーノレド 20341と、代替区間の開始ノードの三次元座標情報を登録するサブフィ 一ノレド 20342と、代替区間の終了ノードの三次元座標情報を登録するサブフィール ド 20343と、代替区間の長さを登録するサブフィーノレド 20344と、を有する。
[0040] 検索部 204は、オペレータより受付けたパイプライン IDを持つパイプライン地形デ ータをパイプライン地形記憶部 203から検索する。
[0041] 腐食データ受信部 205は、検查ピグ 6から腐食データを受信する。図 7は腐食デー タを模式的に表した図である。図示するように、腐食データは、ノ ィプライン ID2051 と、検査開始地点からの距離 K2052と、パイプ周上の所定の点を 12 : 00として、腐 食部分のパイプ周上の位置を時間で表した腐食開始時間 T2053と、腐食部分のパ ィプ軸方向の長さである腐食長さ L2054と、腐食部分のパイプ周方向の長さである 腐食幅 W2055と、腐食最大深さ率 D2056と、腐食種別 2057と、を有する。腐食最 大深さ率 D2056は、本来のパイプ肉厚に対する腐食の最大深さの割合(=腐食最 大深さ X 100/本来のパイプ肉厚)で示される。腐食種別 2057には、パイプの内面 力 腐食する内部腐食、およびパイプの外面から腐食する外部腐食がある。
[0042] マッピング部 206は、腐食データ受信部 205から受信した腐食データをパイプライ ン地形データ上にマッピングする。ここで、マッピングとは、腐食データをこの腐食デ ータが示す腐食部分の存在区間に対応付ける処理を指す。
[0043] 腐食データ記憶部 207には、マッピング部 206によりパイプライン地形データ上に マッピングされた腐食データが記憶される。図 8は腐食データ記憶部 207の登録内 容を模式的に表した図である。図示するように、腐食データ毎にレコード 2070が登 録されている。レコード 2070は、腐食が存在するパイプライン 3のパイプライン IDを 登録するフィールド 2071と、腐食が存在する区間の識別情報を登録するフィールド 2072と、腐食開始時間 Tを登録するフィールド 2073と、腐食長さ Lを登録するフィー ルド 2074と、腐食幅 Wを登録するフィールド 2075と、腐食最大深さ率 Dを登録する フィールド 2076と、腐食種別を登録するフィールド 2077と、を有する。腐食データ記 憶部 207に記憶される腐食データは、図 7に示す腐食データにおいて、検査開始地 点からの距離 Kを腐食が存在する区間の識別情報に置き換えたものである。
[0044] 輸送量計算部 208は、検索部 204で検索されたパイプライン 3のパイプライン地形 データと、設備 ·流体記憶部 202に記憶されている当該パイプライン 3を構成する各 区間のノイブ情報、加速装置情報、および流体情報とを用いて、当該パイプライン 3 の区間毎に、当該区間出口で所望の圧力、流量を得るために必要な当該区間入口 での送付流量(目標値)を計算する。
[0045] 限界圧力 *流速記憶部 209には、ノイブ 31の材質毎に、パイプ 31の限界圧力、限 界流速が記憶される。図 9は限界圧力 ·流速記憶部 209の登録内容例を模式的に表 した図である。図示するように、パイプ 31の材質毎にレコード 2090が登録されている レコード 2090は、パイプ 31の材質を登録するフィールド 2091と、パイプ 31の軸方向 圧力の限界値を登録するフィールド 2092と、パイプ 31のせん断方向圧力の限界値 を登録するフィールド 2093と、パイプ 31を流れる化学製品流体の侵食速度を算出 するのに用いる速度係数を登録するフィールド 2094と、を有する。
[0046] 圧力 ·流速チェック部 210は、限界圧力 ·流速記憶部 209に記憶されているパイプ 3 1の限界圧力、限界流速を用いて、検索部 204で検索されたパイプライン 3の区間毎 に、輸送量計算部 208で計算された送付流量を得るために必要な圧力、流速が限 界を超えてレ、るか否かをチェックする。
[0047] ストレスチェック部 211は、腐食データ記憶部 207に記憶されている腐食データを 用いて、検索部 204で検索されたパイプライン 3の区間毎に、当該区間のパイプ 31 が輸送量計算部 208で計算された送付流量を得るために必要な圧力に絶えられる か否かをチェックする。
[0048] 最適化部 212は、検索部 204で検索されたパイプライン 3の区間毎に、圧力'流速 チェック部 210およびストレスチェック部 211の両方のチェックをパスできるように、当 該パイプライン 3の各区間の目標値を最適化する。 [0049] そして、 目標値送信部 213は、監視対象のパイプライン 3の区間毎に、当該パイプ ライン 3のノ ィプライン ID、区間の識別情報、および目標値を含む目標値データを、 監視制御部 1に送信する。
[0050] 上記構成の監視制御部 1、 目標値設定支援部 2は、 CPU、メモリ、 HDD等の外部 記憶装置、 CD-ROMや DVD-ROM等の可搬性を有する記憶媒体から情報を読み 出す読取装置、キーボードやマウスなどの入力装置、ディスプレイなどの出力装置、 通信回線を介して相手装置と通信を行なうための通信装置、およびこれらの各装置 を接続するバスを備えた一般的なコンピュータにおいて、 CPUがメモリ上にロードさ れた所定のプログラムを実行することにより実現できる。ここで、監視制御部 1、 目標 値設定支援部 2の各記憶部には、メモリ、外部記憶装置等が用いられる。また、受信 部、送信部には、入力装置、出力装置、および通信装置が用いられる
次に、上記構成の空間情報制御システムの動作を説明する。
[0051] 先ず、マッピング処理について説明する。マッピング処理とは、 目標値設定支援部
2が検査ビグ 6から収集した腐食データをパイプライン地形データ上にマッピングする 処理のことである。
[0052] 図 10はマッピング処理を説明するためのフロー図である。
[0053] 目標値設定支援部 2において、腐食データ受信部 205は、ビグ 6より腐食データ( 図 7参照)を受信すると(S101で YES)、これをマッピング部 206に出力する。
[0054] これを受けて、マッピング部 206は、腐食データ受信部 205から受信した腐食デー タをパイプライン地形データ上にマッピングする(S102)。具体的には、腐食データ に含まれているパイプライン ID2050を持つパイプライン地形データ(図 6参照)をパ ィプライン地形記憶部 203から検索する。次に、腐食データに含まれている距離 K2 051が、検索したパイプライン地形データのどの区間に属するかを調べる。これは、 1 番目の区間から順番にサブフィールド 20334の区間長を加算して、その加算結果が 距離 Kを越えるか否かを判断する。超えている場合は、最後に加算した区間長を持 つ区間に腐食データをマッピングする。超えていない場合は、更に次の区間の区間 長を加算する。
この処理を加算結果が距離 Kを越えるまで続ける。 [0055] マッピング部 206は、以上のようにしてパイプライン地形データ上にマッピングした 腐食データを腐食データ記憶部 207に記憶する(S103)。
[0056] 次に、 目標値設定支援処理について説明する。 目標値設定支援処理とは、 目標値 設定支援部 2が監視制御部 1に送信する目標値データを生成する処理のことである
[0057] 図 11は目標値設定支援処理を説明するためのフロー図である。
[0058] 先ず、検索部 204は、オペレータから監視対象パイプライン 3のパイプライン IDと、 このパイプライン 3の各区間の出口での流量、流速および圧力を受付ける(S201)。 そして、受付けたパイプライン IDを持つパイプライン地形データをパイプライン地形 記憶部 203から読み出して輸送量計算部 208に送信する(S202)。
[0059] 次に、輸送量計算部 208は、設備 '流体記憶部 202を参照して、検索部 204から受 け取ったパイプライン地形データによって特定されるパイプライン 3の区間毎に、 S20 1で受付けた区間出口での流量および圧力を得るために必要なパイプ区間入口で の圧力(パイプ 31に腐食が発生していないと仮定した場合の理想値)を計算する(S 203)。この処理(入口圧力計算処理)の詳細は後述する。
[0060] 次に、輸送量計算部 208は、設備'流体記憶部 202を参照して、パイプライン 3の 区間毎に、当該区間入口において、 S203で計算した圧力を得るために必要な加速 装置 32の設定値(出力パワー)を計算する(S204)。この処理 (設定値計算処理)の 詳細は後述する。
[0061] 次に、輸送量計算部 208は、設備 ·流体記憶部 202を参照して、ノ ィプライン 3の 各区間の入口での送付流量(目標値)を計算する(S205)。この処理 (送付流量計算 処理)の詳細は後述する。
[0062] 次に、圧力.流速チェック部 210は、パイプライン 3の区間毎に、 S203、 S204で計 算された区間入口での化学製品流体の圧力、流速が限界を越えているか否力、をチ エックする(S206)。この処理 (圧力 ·流速チェック処理)の詳細は後述する。
[0063] 次に、ストレスチェック部 211は、パイプライン 3の区間毎に、パイプ 31のストレスが パイプ 31の腐食を考慮した限界を越えているか否かをチェックする(S207)。
この処理(ストレスチェック処理)の詳細は後述する。 [0064] 次に、最適化部 212は、 S206での圧力.流速チェックおよび S207でのストレスチ エックの結果を基に、パイプライン 3の各区間の送付流量(目標値)を最適化する必 要があるか否かを判断する(S208)。具体的には、 S206での圧力 ·流速チェックで 圧力、流速が限界を越えていると判断された区間がある場合、あるいは、 S207での ストレスチェックで、パイプ 31にかかるストレスが腐食を考慮した限界を越えていると 判断された区間がある場合は、最適化の必要性ありと判断し、そうでない場合に最適 化の必要性なしと判断する。最適化の必要性なしと判断した場合(S208で NO)、最 適化部 212は、ノ ィプライン 3の各区間の送付流量を含む目標値データを生成する 。そして、 目標値送信部 213を介して監視制御部 1にこの目標値データを送信する( S215)。
[0065] 一方、最適化の必要性ありと判断した場合(S208で YES)、最適化部 212は、パイ プライン 3の各区間の入口圧力を再計算する(S209)。この処理 (最適化入口圧力再 計算処理)の詳細は後述する。また、輸送量計算部 208は、最適化部 212で再計算 された各区間の入口圧力を用いて、 S204と同じ要領で、パイプライン 3の区間毎に 加速装置 32の設定値を再計算する(S210)。
[0066] 次に、輸送量計算部 208は、 S210で再計算された各加速装置 32の設定値に基 づいて、最適化可能か否かを判断する(S211)。具体的には、各加速装置 32の設 定値(出力パワー)が、設備 ·流体記憶部 202に記憶されている各加速装置 32の最 大出力範囲内である場合に最適化可能と判断し、そうでない場合に最適化不可能と 判断する。
[0067] 最適化可能と判断した場合(S211で YES)、 S205に戻る。一方、最適化不可能と 判断した場合(S211で N〇)、その旨を輸送量計算部 211に通知する。これを受けて 、輸送量計算部 211は、代替可能なパイプライン 3が存在するか否力 ^判断する(S2 12)。具体的には、パイプライン地形データ(図 6参照)において、サブフィーノレド 203 35に代替区間の識別情報が登録されているフィールド 2033がある場合は、代替可 能なパイプライン 3が存在するものと判断し、そのようなフィールド 2033がない場合は 、代替可能なパイプライン 3が存在しなレ、ものと判断する。代替可能なパイプライン 3 が存在しない場合(S212で NO)、輸送量計算部 211は、オペレータにエラーメッセ ージを出力するなどの所定のエラー処理を行って、このフローを終了する。
[0068] 一方、代替可能なパイプライン 3が存在する場合、輸送量計算部 211は、このパイ プラン 3を構成する各区間の少なくとも一部を代替区間に置き換え (S213)、その後 、 S203に戻る。
[0069] 図 12は入口圧力計算処理(図 11の S203)を説明するためのフロー図である。
[0070] 先ず、輸送量計算部 208は、カウンタ値 nを 1に設定する(S2031)。それから、輸 送量計算部 208は、検索部 204が検索したパイプライン地形データから n番目の区 間に対応するフィールド 2033を読み出す。そして、次式 (数 1)により、 n番目区間の 入口での圧力値 Pを算出する(S2032)。
1
[0071] [数 1] ρ2 = 1.1494 χ !0"3 ■数 1
Figure imgf000016_0001
Figure imgf000016_0003
ここで、 Qは区間出口での流量、 Pは区間出口での圧力値である。これらには、 S
2 2
201でオペレータから受付けた値が用いられる。
[0072] また、 T は基準温度、 P は基準圧力、 T は平均温度である。これらには、予 base base avg
め定められた規定値が用いられる。
[0073] また、 Lは次式 (数 2)により定まる変数である。
[0074] [数 2]
L = ^^ …数 2
二で、 Ltは区間長、 Sは次式 (数 3)により定まる変数である c
[0075] [数 3]
'数 3
Figure imgf000016_0002
ここで、 Hは区間の開始ノードの高さ(z座標値)、 Hは区間の終了ノードの高さ(z
1 2
座標値)、そして、 Gはガス重力である。ガス重力 Gは、設備 ·流体記憶部 202に記憶 されている、対応するパイプラインの n番目区間の流体情報 2025に記憶されている ものを用いる。
[0076] また、数 1におレ、て、 fは次式(数 4)に示す Colebrook-White方程式によって計算さ れる管摩擦係数である。
[0077] [数 4]
•数 4
Figure imgf000017_0001
ここで、 R は内部粗度、 Rはレイカレズ数、そして、 Dはパイプ径である。パイプ径 ou e
Dは、設備 ·流体記憶部 202に記憶されている、対応するパイプラインの n番目区間 のパイプ情報 2023に記憶されているものを用いる。また、内部粗度 R は、予め定め
OU
られた規則により、このパイプ情報 2023に含まれているパイプ材質から求めたものを 用いる。また、レイノルズ数 Rは、公知の式によって定まる値であり、ここでは既知数 e
とする。
[0078] また、数 1において、 Cは次式(数 5)に示す公知の CNGA方程式によって計算され る化学製品流体の区間入口での圧縮率である。
[0079] [数 5]
Γ 1
― X 344400(10)1 ' …数5
I "1 ァ 3.825 ここで、 P は区間の平均圧力である。
avg
さて、数 5において、区間の平均圧力 P を得るためには、未知の値である区間入 avg
口の圧力 Pの値が必要である。また、数 4において、管摩擦係数 fは、右辺および左
1
辺の両方に現われる。そこで、本実施形態では、区間入口の圧力 pおよび管摩擦係 数 fについて仮定値を予め定めておく。輸送量計算部 208は、管摩擦係数 fの仮定 値を数 4の右辺に代入して管摩擦係数 fを算出すると共に、各区間入口の圧力 Pか
1 ら平均圧力 P を求め、これを数 5の右辺に代入して圧縮率 Cを算出する。そして、 avg
算出した管摩擦係数 fおよび圧縮率 Cを数 1に代入して区間入口の圧力 Pを算出す
1 1 る。さらに、新たに算出した圧力 Pおよび管摩擦係数 fを仮定値として、上記の計算 を行う。この処理を所定回数繰り返すことで、区間入口の圧力 Pを算出する。
[0081] さて、輸送量計算部 208は、最後の区間に対して区間入口の圧力 Pを算出したな らば(S2033で YES)、このフローを終了する。そうでないならば(S2033で N〇)、力 ゥンタイ直 nを一つインクリメントして(S2034)、 S2032に戻る。
[0082] 図 13は設定値計算処理(図 11の S204)を説明するためのフロー図である。
[0083] 先ず、輸送量計算部 208は、カウンタ値 nを 1に設定する(S2041)。それから、輸 送量計算部 208は、次式 (数 6)により、 n番目区間の入口に設置された加速装置 32 の設定値(出力パワー) P を算出する(S2042)。
out
[0084] [数 6]
= 4.0639 X '数 6
Figure imgf000018_0001
ここで、 Ίは比熱比(定圧比熱と定積比熱の比)、 βは断熱比である。比熱比 Ίお よび断熱比 βは、設備 ·流体記憶部 202に記憶されている、対応するパイプラインの η番目区間の流体情報 2025に記憶されているものを用いる。
[0085] また、 Cは化学製品流体の区間出口での圧縮率である。上記の数 5に示す公知の
2
CNGA方程式において、区間の平均圧力 Ρ を区間出口の圧力 Ρに置き換えるこ avg 2
とで算出される。
[0086] さて、輸送量計算部 208は、最後の区間に対して区間入口に設置された加速装置 32の設定値(出力パワー) P を算出したならば(S2043で YES)、このフローを終了 out
する。そうでないならば(S2043で NO)、カウンタ値 nを一つインクリメントして(S204 4)、 S2042に戻る。 [0087] 図 14は加速装置 32の効果を説明するための図である。ここで、符号 3201は腐食 がない場合における対象区間の最大許容圧力(MAOP)、符号 3202は腐食がある 場合における対象区間の最大許容圧力、符号 3203は腐食がない場合における圧 力降下曲線、そして、符号 3204は腐食がある場合における圧力降下曲線である。 n 番目の区間に設置された加速装置 32の設定値を S2042で算出した値 P に設定す
out
ることで、 n-1番目の区間での圧力降下により下がった圧力を加圧して、 n番目の区 間入口での圧力を、入口圧力計算処理で算出した n番目の区間入口での圧力にす ること力 Sできる。
[0088] 図 15は送付流量計算処理(図 11の S205)を説明するためのフロー図である。
[0089] 先ず、輸送量計算部 208は、カウンタ値 nを 1に設定する(S2051)。それから、輸 送量計算部 208は、次式 (数 7)に示すベルヌ一ィの式を用いて、 n番目区間入口に おける化学製品流体の平均流速 Vを算出する(S2052)。
[0090] [数 7]
+∑ + H -^ + ^ + H2 + Hioss …数 7
A p2 g ここで、 gは重力、 Vは n番目区間出口における化学製品流体の平均流速である。
2
n番目区間出口における化学製品流体の平均流速 Vには、図 11の S201でォペレ
2
ータより受付けた該当区間出口の流速を用いる。
[0091] また、 H は、損失水頭であり、次式(数 8)に示す既知の Darcy-Weisbach方程式
loss
を用いて算出することができる。
[0092] 園
T T · Ιί · Υ2/ …数 8
n loss— /D * 2ひ また、数 7において、 p は n番目区間入口における化学製品流体の流体密度、 p
1 2 は n番目区間出口における化学製品流体の流体密度である。化学製品流体の流体 密度 (i= 2)は、次式 (数 9)により算出する。
[0093] [数 9]
P^ /^ . R . T …数9 ここで、 Rはガス定数、 T (i= l , 2)は n番目区間の入口あるいは出口における化学 製品流体の温度である。ガス定数 R、温度 Tは、設備 ·流体記憶部 202に記憶されて
1
いる、対応するパイプラインの n番目区間の流体情報 2025に記憶されているものを 用いる。
[0094] 次に、輸送量計算部 208は、以上のようにして算出した n番目区間入口における化 学製品流体の平均流速 Vを用いて、次式 (数 10)により、 n番目区間の入口における 化学製品流体の流量 Qを算出する(S2053)。
[0095] [数 10]
Figure imgf000020_0001
さて、輸送量計算部 208は、最後の区間に対して区間の入口における化学製品流 体の流量 Qを算出したならば(S2054で YES)、このフローを終了する。そうでない ならば(S2054で NO)、カウンタ値 nを一つインクリメントして(S2055)、 S2052に戻 る。
[0096] 図 16は、圧力.流速チェック処理(図 11の S206)を説明するためのフロー図である
[0097] 先ず、圧力 ·流速チェック部 210は、カウンタ値 nを 1に設定する(S2061)。
それから、圧力 ·流速チェック部 210は、次式 (数 11)に示す公知の侵食速度の式を 用いて、 n番目区間入口における侵食速度 V を算出する(S2062)。
lenc
[0098] [数 11] venc = ' -数 1 1
Figure imgf000021_0001
ここで、 Kは速度係数である。圧力 ·流速チェック部 210は、設備'流体記憶部 202 に記憶されている、対応するパイプラインの n番目区間のパイプ情報 2023に登録さ れているパイプ材質を特定する。そして、この特定したパイプ材質に対応付けられて 限界圧力 ·流速記憶 209に記憶されている速度係数をさらに特定し、 Kに代入する。
[0099] 次に、圧力 ·流速チェック部 210は、輸送量計算部 208が送付流量計算処理で算 出したパイプラインの n番目区間の流速 Vを、 S2062で算出した n番目区間入口にお ける侵食速度 V と比較する(S2063)。流速 Vく侵食速度 V ならば(S2063で lenc lenc
N〇)、 S2065に進む。一方、流速 V≥侵食速度 V ならば(S2063で YES)、その
lenc
差分 (侵食度差分と呼ぶ)を、 n番目区間の識別情報に対応付けて登録し (S2064) 、それ力ら、 S2065に進む。
[0100] S2065におレヽて、圧力 ·流速チェック部 210は、最後の区間に対してチェックを行 つたならば(S2065で YES)、このフローを終了する。そうでないならば(S2065で N 0)、カウンタ値 nを一つインクリメントして(S2066)、 S2062に戻る。
[0101] 図 17は、ストレスチェック処理(図 11の S207)を説明するためのフロー図である。
[0102] 先ず、ストレスチェック部 211は、カウンタ値 nを 1に設定する(S2071)。それから、 ストレスチェック部 211は、次式(数 12)に示す公知の Ballow方程式を用いて、 n番目 区間のパイプ 31の引っ張りストレス(Axial Stress) S 、およびせん断ストレス(Hoop St ax
ress) S の双方を算出する(S2072)。
ho
[0103] [数 12]
Sa = P * DI t ^
ax …数 1 2
Sho = P ^ D /2t ここで、 tは腐食を考慮したパイプ厚さである。設備 ·流体記憶部 202に記憶されて いる、対応するパイプラインの n番目区間のパイプ情報 2023に記憶されているパイ プ厚さを t とした場合、パイプ厚さ Wit _ (t X腐食最大深さ率 R)で表される。腐食 最大深さ率 Rは、腐食データ記憶部 207に記憶されている、対応するパイプラインの n番目区間における腐食データのものを用いる。この腐食データが腐食データ記憶 部 207に記憶されていない場合は、腐食最大深さ率 R=0とする。
[0104] 次に、ストレスチェック部 211は、 S2072で算出した引っ張りストレス S 、せん断スト ax
レス S を、それぞれの限界値と比較する(S2073)。ストレスチェック部 211は、設備 ho
'流体記憶部 202に記憶されている、対応するパイプラインの n番目区間のパイプ情 報 2023に登録されているパイプ材質を特定する。そして、この特定したパイプ材質 に対応付けられて限界圧力 ·流速記憶 209に記憶されている軸方向圧力、せん断方 向圧力を、それぞれの限界値に設定する。
[0105] 引っ張りストレス S 、せん断ストレス S の両方共に限界値より小さいならば(S207 ax ho
3で N〇)、 S2075に進む。一方、引っ張りストレス S 、せん断ストレス S の少なくとも ax ho
一つが限界値以上ならば(S2073で YES)、その差分 (ストレス差分と呼ぶ)を、 n番 目区間の識別情報に対応付けて登録し (S2074)、それから、 S2075に進む。
[0106] S2075におレヽて、ストレスチェック部 211は、最後の区間に対してチェックを行った ならば(S2075で YES)、このフローを終了する。そうでないならば(S2075で NO)、 カウンタ値 nを一つインクリメントして (S2076)、 S2072に戻る。
[0107] 図 18は、最適化入口圧力再計算処理(図 11の S209)を説明するためのフロー図 である。
[0108] 先ず、最適化部 212は、カウンタ値 nを 1に設定する(S2091)。
[0109] それから、最適化部 212は、 n番目区分に対応付けられて侵食速度差分が圧力 · 流速チェック部 210に登録されているか否かを調べる(S2092)。登録されている場 合(S2092で YES)、この侵食速度差分を登録から抹消し、 S2094に進む。一方、 登録されていない場合(S2092で N〇)、最適化部 212は、 n番目区分に対応付けら れてストレス差分がストレスチェック部 210に登録されているか否かをさらに調べる(S 2093)。登録されている場合(S2093で YES)、このストレス差分を登録から抹消し、 S2094に進む。一方、登録されてレヽなレヽ場合は(S2093で N〇)、 S2096に進む。
[0110] S2094において、最適化部 212は、 n番目の区間入口の圧力 Pを所定値 Δ Ρ下げ る。次に、最適化部 212は、 n番目以降の区間入口各々の圧力 Pを全体として Δ Ρ 上げる(S2095)。パイプラインの区間数が m (nく m)であるとする。例えば、 n+1番 目〜 m番目の区間入口各々の圧力 Pをそれぞれ A P/ (m-n)上げる。これにより、全
1
体として Δ Ρあげる。あるいは、 n+1番目の区間入口の圧力 Pを、所定値 Δ ρ (但し、
1
A p< A P) J^f5。同様に、 n+2番目の区間入口の圧力 Pを Δ ρ上げる。
1
この処理を全体として Δ Ρ上げるまで(∑ Δ ρ≥ Δ ρとなるまで)繰り返す。
[0111] 図 14は加速装置 32の効果を説明するための図である。ここで、 η番目の区間に腐 食があると ΜΑΟΡが下がる。そこで、 η番目の区間入口の圧力 Ρを Δ Ρ下げ、 n+1番 目以降の区間入口の圧力 Pを Δ ρずつ上げて、 η番目の区間入口の圧力 Ρの落ち
1 1 込みをカバーする。
[0112] S2096におレ、て、最適化部 212は、最後の区間に対してチェックを行ったならば(
S2096で YES)、このフローを終了する。そうでないならば(S2096で NO)、カウンタ 値 nを一つインクリメントして (S2097)、 S2092に戻る。
[0113] 次に、監視制御処理について説明する。監視制御処理とは、監視制御部 1が、 目 的設定支援部 2から受信した目標値通りとなるように、各加速装置 32を制御する処理 のことである。
[0114] 図 19は監視制御処理を説明するためのフロー図である。
[0115] 先ず、 目標値受信部 106は、 目標値設定支援部 2から監視対象パイプライン 3の各 区間の目標値データを受信して、 目標値記憶部 107に記憶する(S301)。 目標値記 憶部 107に記憶された各区間の目標値は、比較部 108を介して判断部 109に送信 される。これを受けて、判断部 109は、監視対象のパイプライン 3の区間毎に、当該 区間の目標値を、当該区間に設置された加速装置 32の制御信号情報 (対応する目 標値が示す送付流量を得るための情報)に変換し、制御信号生成部 111に送信する 。制御信号生成部 111は、判断部 109から受信した制御信号情報に基づレ、て制御 信号を生成し、これを制御対象の加速装置 32に送信する(S302)。
[0116] 次に、センサデータ受信部 101は、パイプライン 3に設置された各センサ 4から RT U5を介してセンサデータを受信する。受信したセンサデータ 303は、サンプリング部 102でサンプリングされ、比較部 108および現在値/トレンド生成部 104に送信される 。また、センサデータ送信部 103を介して、 目標値設定支援部 2に送信される(S303 ) 0
[0117] 現在値/トレンド生成部 104は、サンプリング部 102から受信したセンサデータを、 表示部 105に表示されている区間毎のトレンドグラフにプロットする(S304)。
[0118] また、比較部 108は、監視対象のパイプライン 3の区間毎に、サンプリング部 102か ら受信したセンサデータが示す送付流量と、 目標値記憶部 107に記憶されている目 標値とを比較し、その比較結果を判断部 109に出力する(S305)。
[0119] これを受けて、判断部 109は、比較結果に従い、この比較結果に対応する区間の 加速装置 32に対する制御信号を補正可能か否かを判断する(S306)。具体的には 、センサデータが示す送付流量と目標値との差分が所定の閾値以内の場合に補正 可能と判断し、そうでない場合に補正不可能と判断する。
[0120] 判断部 109は、補正可能と判断した場合(S306で YES)、センサデータが示す送 付流量が目標値よりも低いことを示しているならば、出力パワーを所定値上げる制御 信号を制御信号生成部 111に生成させ、これをこの比較結果に対応する区間の加 速装置 32に送信する。一方、センサデータが示す送付流量が目標値よりも高いこと を示してレ、るならば、出力パワーを所定値下げる制御信号を制御信号生成部 111に 生成させ、これをこの比較結果に対応する区間の加速装置 32に送信する(S307)。
[0121] また、判断部 109は、補正不可能と判断した場合(S306で NO)、アラームを出力し て、この比較結果に対応する区間の加速装置 32を目標値どおりに動作させることが できなレ、旨をオペレータに通知する(S308)。
[0122] 次に、センサデータ反映処理について説明する。センサデータ反映処理とは、 目的 値設定支援部 2が、センサデータが示す測定値が目標値に近づくように目標値算出 に用レ、る係数を修正して、再度目標値を算出する処理である。
[0123] 図 20はセンサデータ反映処理を説明するためのフロー図である。
[0124] 先ず、輸送量計算部 208は、センサデータ受信部 201を介して監視対象のノ イブ ライン 3の全区間についてセンサデータを受信する(S401)。次に、輸送量計算部 2 08は、カウンタ値 nを 1に設定する(S402)。
[0125] それから、輸送量計算部 208は、 n番目区間のセンサデータが示す送付流量(区 間入口の流量)を、図 11に示す目標値設定支援処理で設定した、監視対象パイプラ イン 3の n番目区間の目標値と比較する(S403)。そして、比較結果に応じて、 n番目 区間の送付流量計算に用いる損失水頭 (上記数 7の H )を、算出される送付流量
loss
力 センサデータが示す送付流量に近づく方向に調整する(S404)。但し、センサデ ータが示す送付流量と目標値との差分が所定の閾値以上の場合は、その旨のメッセ ージをオペレータに通知するなどして、オペレータに各区間の出口での流量、流速 および圧力の再設定 (再入力)を促す。
[0126] さて、輸送量計算部 208は、最後の区間に対してセンサデータは示す送付流量と 目標値との比較をしたならば(S405で YES)、図 11のフローを S203から開始する( S406)。そうでないならば(S405で NO)、カウンタ値 nを一つインクリメントして(S40 7)、 S403に戻る。
[0127] 以上、本発明の実施の形態について説明した。ここで、制御量は圧力、流量両方 ではなく圧力、流量の一方でもよい。閣僚力 他方の変数を計算することは容易にで きる。
[0128] 本実施形態によれば、腐食が発生しているパイプ 31のパイプライン 3上における位 置を考慮して、所望の送付流量が得られるように、パイプライン 3に複数設置された 加速装置 32各々の目標値を決定することができる。また、パイプライン 3から収集した センサデータが示す測定結果との差が小さくなるように、 目標値を修正することがで きる。
[0129] なお、本発明は上記の実施形態に限定されるものではなぐその要旨の範囲内で 数々の変形が可能である。例えば、上記の実施形態では、化学製品流体としてガス 流体を取り扱う場合を例に取り説明したが、本発明はこれに限定されない。石油、ァ ルコール等の液体にも、本発明は同様に適用できる。この場合、上記の各数式を流 体の場合の式に置き換えればよレ、。
[0130] また、上記の実施形態では、腐食データの収集に検查ピグ 6を用いた場合を例にと り説明した。しかし、本発明はこれに限定されない。腐食データは、パイプライン 3の 各部に設置された測定器を用いて収集してもよいし、あるいは作業者が検査して収 集してもよい。

Claims

請求の範囲
[1] パイプラインの地形データが記憶されたパイプライン地形データ記憶部と、
パイプの腐食部分の腐食データが記憶された腐食データ記憶部と、
パイプの属性情報、前記パイプラインに設置されている制御装置の仕様情報、およ び前記パイプラインを流れる化学製品流体の属性情報が記憶された設備'流体記憶 部と、
パイプが耐えられ得る化学製品流体の圧力の限界値に関する情報が記憶された 限界記憶部と、
前記パイプライン地形データ記憶部に記憶されている地形データより特定される各 ノードの高さ、およびノード間の長さと、前記設備'流体記憶部に記憶されているパイ プの属性情報より特定されるパイプ径、および化学流体の属性情報と、予め設定さ れた化学製品流体の圧力または流量とを用いて、前記パイプラインを構成する各区 間の入口における化学製品流体の圧力または流量を算出する輸送量算出部と、 前記輸送量算出部で算出した前記パイプラインを構成する各区間の入口における 化学製品流体の圧力または流量と、前記設備 ·流体記憶部に記憶されているパイプ の属性情報より特定されるパイプ径と、前記腐食データ記憶部に記憶されている腐 食データおよび前記設備'流体記憶部に記憶されているパイプの属性情報より特定 されるパイプ厚みとを用いて、前記パイプラインを構成する区間毎に、パイプにかか るストレスを算出し、該ストレスが前記限界記憶部に記憶されている情報により特定さ れる圧力の限界値を超えているか否かをチェックするストレスチェック部と、
前記パイプラインを構成する区間毎に、前記ストレスチェック部のチェックをパスす るように、当該区間の入口における化学製品流体の圧力または流量を最適化する最 適化部と、
前記パイプラインを構成する区間毎に、前記最適化部で最適化された当該区間入 口の流量を、当該区間入口に設置された制御装置の目標値として、前記監視制御 装置に送信する目標値送信部と、を有すること
を特徴とする目標値設定支援装置。
[2] 請求項 1に記載の目標値設定支援装置であって、 前記パイプライン地形データ記憶部には、前記パイプラインを構成する複数区間の 地形データが記憶されており、
前記腐食データ記憶部には、ノイブの腐食部分が属する該パイプラインを構成す る区間に対応付けられて当該腐食部分の腐食データが記憶されており、
前記限界記憶部には、パイプの種別毎に、パイプが耐えられ得る化学製品流体の 圧力の限界値に関する情報が記憶されており、
前記輸送量算出部は、
前記パイプラインを構成する区間毎に、前記パイプライン地形データ記憶部に記憶 されている当該区間の地形データより特定される開始ノードの高さ、終了ノードの高さ 、および区間長と、前記設備 ·流体記憶部に記憶されている当該区間のパイプの属 性情報より特定されるパイプ径、および当該区間を流れる化学流体の属性情報と、 予め設定された当該区間の出口における化学製品流体の圧力または流量とを用い て、当該区間の入口における化学製品流体の圧力および流量を算出し、
前記ストレスチェック部は、
前記パイプラインを構成する区間毎に、前記輸送量算出部で算出した当該区間入 口における化学製品流体の圧力と、前記設備 ·流体記憶部に記憶されている当該区 間のノイブの属性情報より特定されるパイプ径と、前記腐食データ記憶部に記憶さ れてレ、る当該区間の腐食データおよび前記設備 ·流体記憶部に記憶されてレ、る当 該区間のノイブの属性情報より特定されるパイプ厚みとを用いて、当該区間のパイ プに力かるストレスを算出し、該ストレスが前記限界記憶部に記憶されている情報に より特定される圧力の限界値を超えているか否かをチェックすること
を特徴とする目標値設定支援装置。
請求項 2に記載の目標値設定支援装置であって、
前記最適化部は、
前記ストレスチェック部のチェックをパスしなかった区間入口における化学製品流体 の圧力を下げ、前記パスしなかった区間よりも下流側の区間入口各々における化学 製品流体の圧力を、全体で、前記パスしなかった区間入口における化学製品流体の 圧力の下げ幅分増加させて、前記輸送量算出部に、前記パイプラインを構成する区 間入口各々における流量を再計算させること
を特徴とする目標値設定支援装置。
[4] 請求項 2又は 3に記載の目標値設定支援装置であって、
前記限界記憶部は、パイプの種別毎に、パイプが耐えられ得る化学製品流体の流 速の限界値に関する情報をさらに記憶し、
前記輸送量算出部は、前記パイプラインを構成する区間毎に、前記パイプライン地 形データ記憶部に記憶されている当該区間の地形データより特定される開始ノード の高さ、終了ノードの高さ、および区間長と、前記設備'流体記憶部に記憶されてい る当該区間のパイプ属性情報より特定されるパイプ径、および当該区間を流れる化 学製品流体の属性情報と、予め設定された当該区間の出口における化学製品流体 の流速とを用いて、当該区間の入口における化学製品流体の流速をさらに算出し、 前記目標値設定支援装置は、前記パイプラインを構成する区間毎に、前記輸送量 算出部で算出した当該区間入口における化学製品流体の流速が、前記設備,流体 記憶部に記憶されている当該区間のパイプ属性情報より特定されるパイプ材質に対 応付けられて、前記限界圧力 ·流速記憶部に記憶されている情報により特定される 流速の限界を超えているか否かをチェックする圧力 ·流速チェック部をさら有し、 前記最適化部は、
前記パイプラインを構成する区間毎に、前記ストレスチェック部および前記圧力'流 速チェック部の双方のチェックをパスするように、当該区間の入口における化学製品 流体の圧力、流速および流量を最適化すること
を特徴とする目標値設定支援装置。
[5] 請求項 2乃至 4のいずれか一項に記載の目標値設定支援装置であって、
前記監視制御装置から前記パイプラインを構成する各区間の実測情報を受信する 実測情報受信部をさらに有し、
前記輸送量算出部は、
前記パイプラインを構成する区間毎に、当該区間の実測情報が示す流量を当該区 間の目標値と比較し、比較結果に応じて、当該区間の出口における化学製品流体の 圧力および流量を算出するのに用レ、る係数を、算出される流量が、当該実測情報が 示す流量に近づく方向に補正し、補正された係数を用いて、前記パイプラインを構成 する各区間の出口における化学製品流体の圧力および流量を再計算すること を特徴とする目標値設定支援装置。
[6] 請求項 2乃至 5のいずれか一項に記載の目標値設定支援装置であって、
前記パイプラインの腐食データを当該パイプラインの検査開始位置からの距離に 対応付けて出力する検査ビグから、前記腐食データを受信する腐食データ受信部と 前記腐食データ受信部で受信した腐食データを、当該腐食データに対応付けられ てレ、る距離に応じた前記パイプラインの区間に対応付けて前記腐食データ記憶部に 記憶するマッピング部と、を有すること
を特徴とする目標値設定支援装置。
[7] 請求項 2乃至 6のいずれか一項に記載の目標値設定支援装置と、
パイプラインに複数設置された加速装置がそれぞれ目標値どおりに動作するように 、当該パイプラインの監視、制御を行う監視制御装置と、を有すること
を特徴とするパイプラインの監視,制御システム。
[8] パイプラインに複数設置された加速装置がそれぞれ目標値どおりに動作するように 、当該パイプラインの監視、制御を行う監視制御装置に対して、各加速装置の目標 値を設定するための、コンピュータで読取可能なプログラムであって、
前記パイプラインを構成する複数区間の地形データが記憶されたパイプライン地形 データ記憶部、
パイプの腐食部分が属する区間に対応付けられて当該腐食部分の腐食データが 記憶された腐食データ記憶部、
前記パイプラインを構成する区間毎に、当該区間のパイプの属性情報、当該区間 に設置されている加速装置の仕様情報、および当該区間を流れる化学製品流体の 属性情報が記憶された設備 ·流体記憶部、
パイプの種別毎に、パイプが耐えられ得る化学製品流体の圧力の限界値に関する 情報が記憶された限界記憶部、
前記パイプラインを構成する区間毎に、前記パイプライン地形データ記憶部に記憶 されている当該区間の地形データより特定される開始ノードの高さ、終了ノードの高さ 、および区間長と、前記設備 ·流体記憶部に記憶されている当該区間のパイプの属 性情報より特定されるパイプ径、および当該区間を流れる化学製品流体の属性情報 と、予め設定された当該区間の出口における化学製品流体の圧力および流量とを用 いて、当該区間の入口における化学製品流体の圧力および流量を算出する輸送量 算出部、
前記パイプラインを構成する区間毎に、前記輸送量算出部で算出した当該区間入 口における化学製品流体の圧力と、前記設備 ·流体記憶部に記憶されている当該区 間のパイプの属性情報より特定されるパイプ径と、前記腐食データ記憶部に記憶さ れてレ、る当該区間の腐食データおよび前記設備 ·流体記憶部に記憶されてレ、る当 該区間のノイブの属性情報より特定されるパイプ厚みとを用いて、当該区間のパイ プにかかるストレスを算出し、該ストレスが前記限界記憶部に記憶されている情報に より特定される圧力の限界値を超えているか否かをチェックするストレスチェック部、 前記パイプラインを構成する区間毎に、前記ストレスチェック部のチェックをパスす るように、当該区間の入口における化学製品流体の圧力および流量を最適化する最 適化部、および
前記パイプラインを構成する区間毎に、前記最適化部で最適化された当該区間入 口の流量を、当該区間入口に設置された加速装置の目標値として、前記監視制御 装置に送信する目標値送信部として、前記コンピュータを機能させること
を特徴とするコンピュータで読取可能なプログラム。
PCT/JP2007/059647 2006-05-12 2007-05-10 監視制御システム WO2007132725A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008515508A JP4889734B2 (ja) 2006-05-12 2007-05-10 監視制御システム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006134313 2006-05-12
JP2006-134313 2006-05-12

Publications (1)

Publication Number Publication Date
WO2007132725A1 true WO2007132725A1 (ja) 2007-11-22

Family

ID=38693819

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/059647 WO2007132725A1 (ja) 2006-05-12 2007-05-10 監視制御システム

Country Status (2)

Country Link
JP (1) JP4889734B2 (ja)
WO (1) WO2007132725A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009287665A (ja) * 2008-05-29 2009-12-10 Hitachi Ltd パイプライン危険地域監視システム
CN102537663A (zh) * 2012-02-07 2012-07-04 北京康吉森油气工程技术有限公司 基于微粒群算法的液相介质长输管道、优化装置及方法
CN102606886A (zh) * 2012-02-07 2012-07-25 北京康吉森油气工程技术有限公司 基于微粒群算法的气相介质长输管道、优化装置及方法
CN104864269A (zh) * 2015-04-20 2015-08-26 中国石油化工股份有限公司 Cng常规站设备选型方法
JP2019525076A (ja) * 2016-05-10 2019-09-05 サウジ アラビアン オイル カンパニー スマート高保全性保護システム
US11078755B2 (en) 2019-06-11 2021-08-03 Saudi Arabian Oil Company HIPS proof testing in offshore or onshore applications
US11261726B2 (en) 2017-02-24 2022-03-01 Saudi Arabian Oil Company Safety integrity level (SIL) 3 high-integrity protection system (HIPS) fully-functional test configuration for hydrocarbon (gas) production systems

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4899712A (ja) * 1972-03-31 1973-12-17
JP2004138132A (ja) * 2002-10-17 2004-05-13 Osaka Gas Co Ltd 配管情報作成システム及びこれを用いた配管管理システム
JP2005308841A (ja) * 2004-04-19 2005-11-04 Hitachi Ltd パイプライン管理データ処理装置、パイプライン管理データ処理方法、パイプライン管理データプログラム、及びパイプライン管理データ処理システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58140818A (ja) * 1982-02-15 1983-08-20 Mitsubishi Heavy Ind Ltd ガスパイプラインの圧力制御方法
JP2003065944A (ja) * 2001-08-27 2003-03-05 Sumitomo Metal Ind Ltd 輸送配管の異常検出方法、輸送状況安全監視方法および異常検出装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4899712A (ja) * 1972-03-31 1973-12-17
JP2004138132A (ja) * 2002-10-17 2004-05-13 Osaka Gas Co Ltd 配管情報作成システム及びこれを用いた配管管理システム
JP2005308841A (ja) * 2004-04-19 2005-11-04 Hitachi Ltd パイプライン管理データ処理装置、パイプライン管理データ処理方法、パイプライン管理データプログラム、及びパイプライン管理データ処理システム

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009287665A (ja) * 2008-05-29 2009-12-10 Hitachi Ltd パイプライン危険地域監視システム
CN102537663A (zh) * 2012-02-07 2012-07-04 北京康吉森油气工程技术有限公司 基于微粒群算法的液相介质长输管道、优化装置及方法
CN102606886A (zh) * 2012-02-07 2012-07-25 北京康吉森油气工程技术有限公司 基于微粒群算法的气相介质长输管道、优化装置及方法
CN104864269A (zh) * 2015-04-20 2015-08-26 中国石油化工股份有限公司 Cng常规站设备选型方法
JP2019525076A (ja) * 2016-05-10 2019-09-05 サウジ アラビアン オイル カンパニー スマート高保全性保護システム
US11261726B2 (en) 2017-02-24 2022-03-01 Saudi Arabian Oil Company Safety integrity level (SIL) 3 high-integrity protection system (HIPS) fully-functional test configuration for hydrocarbon (gas) production systems
US11078755B2 (en) 2019-06-11 2021-08-03 Saudi Arabian Oil Company HIPS proof testing in offshore or onshore applications

Also Published As

Publication number Publication date
JP4889734B2 (ja) 2012-03-07
JPWO2007132725A1 (ja) 2009-09-24

Similar Documents

Publication Publication Date Title
WO2007132725A1 (ja) 監視制御システム
CN110500511B (zh) 一种城市非金属管道泄漏定位方法
JP5189897B2 (ja) パイプライン危険地域監視システム
CN110197049B (zh) 一种基于瞬变反问题的非金属管道泄漏定位方法
CN1251652A (zh) 带信号处理的涡旋流量计
CN110513603B (zh) 一种基于逆瞬态分析法的非金属管道泄漏定位方法
JP6299025B1 (ja) 管流量計測装置および管下流圧力予測制御装置
CN102562041A (zh) 探砂器校准
EP3749930A1 (en) Systems and methods for finding and solving wet gas venturi meter problems in real-time
JP6436408B1 (ja) ポンプ流量計測装置
CN103870670A (zh) 一种油管腐蚀程度预测方法及装置
US20210262688A1 (en) Multi-split air-conditioning system, and method for calculating heat exchange capacity thereof
CN101826117A (zh) 一种管道系统有限单元法力学计算模型制作方法
JP2012014619A (ja) 計算機システム及びリスク診断方法
WO2005040732A1 (en) Wet gas measurement apparatus and method
CN104034800A (zh) 输送管道水力探测和运载流体管道状态评估方法及系统
JP6922973B2 (ja) 配管診断装置、資産管理装置、配管診断方法、及びプログラム
Zhao et al. Scaling of the wall-normal turbulence component in high-Reynolds-number pipe flow
CN110348112A (zh) 一种计算天然气放空管道最大流速的自适应约束方法
EP3992589B1 (en) Fluid metering/monitoring system using vibration
CN105698877A (zh) 一种管道内流体流速流量测量系统及方法
CN109063368A (zh) 一种基于超声波线矿井回风井的风速测算方法
JP6770288B1 (ja) 評価システム、評価方法、評価システム生産方法、試験装置
CN111125867B (zh) 基于混沌粒子群的化工生产管道实时瞬态模型的建立及计算方法
CN207180781U (zh) 现场流量检测装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07743082

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2008515508

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07743082

Country of ref document: EP

Kind code of ref document: A1