WO2007115387A1 - Ancre pour structure flottante et ses procedes d'installation et de retrait - Google Patents
Ancre pour structure flottante et ses procedes d'installation et de retrait Download PDFInfo
- Publication number
- WO2007115387A1 WO2007115387A1 PCT/BR2007/000091 BR2007000091W WO2007115387A1 WO 2007115387 A1 WO2007115387 A1 WO 2007115387A1 BR 2007000091 W BR2007000091 W BR 2007000091W WO 2007115387 A1 WO2007115387 A1 WO 2007115387A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- anchor
- floating structures
- soil
- anchorage
- plain
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B21/29—Anchors securing to bed by weight, e.g. flukeless weight anchors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B2021/262—Anchors securing to bed by drag embedment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B2021/265—Anchors securing to bed by gravity embedment, e.g. by dropping a pile-type anchor from a certain height
Definitions
- the present invention relates to an anchor for floating structures positioned in a definitive or provisional way in non-profound, profound or ultra-profound seas .
- the invention has particular application in the anchorage of floating structures related to the exploitation and production of offshore petroleum resources .
- anchorage of floating structures such as ships, semi-submersibles, floats or rafts used in support, drilling or production services of offshore petroleum is made through conventional anchors (with catenary anchorage line) or vertical anchors (with rigid anchorage line) , both fixed in the bottom of the sea by drilling, or even through fixed, drilled and cemented stakes, or suction stakes.
- anchors or stakes are used to fix anchors in the bottom of the sea by drilling, or even through fixed, drilled and cemented stakes, or suction stakes.
- special equipments such as tugboats, crane barge, submersed hammers, drilling equipments and/or special pumps, etc.
- dragging anchors for example, needs to pass through a long distance to be fixed for its installation, because in most cases they are sent to the bottom of the sea linked to fastening cable (s) and are pulled by a tugboat in order to be slanted in relation to the marine soil and to be buried therein.
- a new stack named torpedo stack due to the shape similar to a torpedo, was developed (Brazilian Patent No. PI 9603599-4, granted in December 26, 2000) .
- This stack comprises a tubular elongated body with a sharpened tip in its inferior edge and a closing disc in its superior edge and further vertical fins at the top of the tubular body.
- the torpedo stack In the interior of its tubular part there is a ballast formed by high specific weight material distributed in a pattern that the center of gravity of the stack is below its floating center.
- the torpedo stack is installed by free fall with the assistance of simple and lower cost devices. Nevertheless, the torpedo stack presents as a disadvantage the impossibility of easily removal during the movements of the floating structures .
- the purpose of the present invention is to make available an anchor of very easy installation and removal, with the application in a vast area of sea depth that does not need to reach large penetration due to its dimensions and areas.
- the anchor of the present invention in comparison with the dragging anchors, enables the same advantages in the concern of having a great capacity of horizontal load, but without the requirement of a preload, that is, it reaches the bottom of the sea only using its own weight and without the need of a long trail for installation.
- the anchor of the present invention is equivalent regarding the simple process of installation but independent of the capacity of the required load, also shows facility to uninstall because it demands low loads and simple equipments, and mainly has lower cost and weight since the anchor now claimed is much more light than the equivalent torpedo in terms of the same load capacity.
- New anchorage techniques have been developed in order to facilitate the process of installation and uninstallation of the anchors or stacks and also to allow the anchorage of a great load capacity leading to cost reductions .
- PI 9603599-4 (granted in December 26, 2000) , already mentioned above, related to torpedo stack; by the Brazilian patent application PI 9603600-1 (filed in August 30, 1996) which refers to a plate anchor that uses a stack to its release to the bottom of the sea and by the Brazilian patent application PI 9906153-8 (filed in November 08, 1999) which refers to a stack that is fixed in the bottom of the sea by free fall.
- the present invention uses the concept of torpedo stacks extending it to conventional anchors, allying in a novel way the advantages of having a great load capacity, easiness in handling and low installation and recuperation costs.
- the anchor of the present invention incorporating the advantages of the torpedo stack with the conventional anchor, is a plate anchor, that is released to the bottom of the sea by vertical free fall, and whose balance among its weight, releasing height and area of attack assures the penetration required by the anchorage design of the floating structure.
- the present invention refers to a plain anchor composed by. a) an attack board (1) located in the inferior edge of the anchor that composes the heaviest part of it and has a pointed format in order to facilitate its penetration in the bottom of the sea; b) a predominantly plain surface (2) that composes the main plane of the anchor and is lighter than the attack tack
- the referred ribs are not required; d) a plain and slant surface (6) in relation to the main plane of the anchor (2) located in its superior edge, opposed to the attack board, being this plain and slant surface (6) smaller than the plain surface (2) ; e) one or more longitudinal bars (7) located along the plain surfaces (2) and (6) in the posterior part of the anchor and; f) four fixing points installed in the structural ribs (3) in which the four cables of the halter (4) are fixed.
- the disposal of the fixing points of the halter in the structural ribs (3) and the length of the halter's cables (4) are defined in such a way that the anchor keeps its frontal area ((1) + (2)) approximately of 90° with the anchorage line when the same is under tension.
- the fixing points can be substituted and, consequently, the halter (4) by an eye (5) assembled in a superstructure in the main plain surface (2) of the anchor.
- the cited elements that compose the anchor of the present invention give it such a shape and different weight distribution that enable its installation being simply made by vertical free fall, that is, the anchor falls until it reaches the bottom of the sea using, thus, the potential energy of gravity to become fixed in the marine soil.
- the main parameters used to the installation of the anchor are its own weight and the height from which it falls .
- Such parameters are defined in accordance with the type of marine soil and with the required penetration to reach the load capacity of the design of the anchorage system.
- the anchor In order to install the anchor of the present invention, the anchor is fastened to the anchorage line by the halter (4) or by the eye (5) and is sustained by only one boat and is released from a certain height defined by the anchorage's design.
- the attack board (1) and the plain surface (2) guide the anchor to always stand vertical during its fall.
- the anchor increases its vertical speed till the moment in which it collides against the marine soil.
- the inferior part of the anchor (1) which concentrates the greatest part of its weight and inertia, rips and penetrates the soil while it speeds down until the anchor stops inside the soil, leaving behind a vertical passage in the format of an aperture.
- the anchor is pulled out by the anchorage line.
- the anchor starts rising and rotating inside the soil, becoming traversed in relation to the aperture where it entered.
- the plain and slant surface (6) is responsible for guiding the anchor' s rotation after the penetration in the soil and during the time it is pulled upwards.
- This surface (6) has a dimension which does not interfere in the fixation of the anchor, and which, on the other hand, is able to rotate the same.
- the surface (6) has a chamfered finishing in its final edge to assist with the cut of the soil during the rotation of the anchor.
- the frontal area ((1) + (2)) formed after the anchor's rotation inside the soil must be vast enough to attend the required capacity of supporting the tension of the anchorage line in which it will work.
- the structural ribs (3) assist the frontal area ((1) + (2)) to support the strength applied by the anchorage line.
- the structural ribs (3) presents fixing points that assist in an important way the installation of the anchor, in the final rotating step during the ascension, penetrating and beginning the soil split, removing the anchor from the inside of the aperture formed in the initial penetration. After the end of the rotation, the anchor is positioned with its plain surface (2) making approximately 90° with the tensioned anchorage line.
- the halter (4) determines the plain angle of the anchor with the anchorage line. If the anchorage line is pulled making any angle with the vertical, the anchor will get positioned until it stays again approximately 90° in relation to the anchorage line. During all the time established for the lifetime of the project, it is in this position of approximately 90° in relation to the anchorage line that the anchor will work, supporting the tension of the anchorage line.
- the installation method dispenses alignments of the anchor in relation to the final direction of tension of the anchorage line.
- a conventional device for the opening of hook escape lines, pelican hook lines or a similar one is activated to release the frontal part of the halter lines.
- the anchor is pulled only by the lines fixed from the behind, so as the anchor rotates again in the direction to be aligned with the traction of the anchorage line and easily leaves the soil.
- Another option of uninstallation is to simply pull the anchorage line into the vertical position until it overcomes the resistance limit of the soil, when the anchor will get out from the same. If the anchor has the eye (5) instead of the halter (4) , the uninstallation must only be by overloading with shearing of the soil.
- the anchor of the present invention can be manufactured from welded steel sheets by melting, forging or boiling.
- This invention can be applied to any anchorage system, permanent or provisional, from flat seas to ultra profound seas (more than 3.000 m of water depth) .
- the loading test for the anchor of the present invention is practically vertical in a simple tension-rotation operation.
- connection accessories of the halter's cables were also not shown because they are not objects of this invention.
- FIGURE 1 Frontal perspective view. Shows the general and conceptual aspects of the anchor, beneath the pointed and very heavy attack board (1) to rip the soil during the penetration; above the surface predominantly plane (2) with the fixed halter (4) and with structural ribs (3) to resist the efforts of the anchorage line and of the soil; at the top, the plain and slant surface (6) in relation to the main plane (2) with longitudinal bars (7) so as to force the anchor's departure from the inside of the aperture formed in its descent, that is, to force the rotation of the same inside the soil during the tensioning of the anchorage line.
- FIGURE 2 - Rear perspective view Shows the details of the longitudinal bars (7) that rip the aperture's wall and assist in the beginning of the rotation.
- FIGURE 3 Frontal perspective view with the option of the eye (5) substituting the halter (4) .
- FIGURE 4 Shows the anchor, before its free fall releasing. It stays fastened in the anchorage line, in vertical position, sustained by a single boat, with the attack board completely positioned to the bottom of the sea.
- FIGURE 5 Shows the anchor's outline, immediately after the fall and the penetration in the soil.
- FIGURE 6 - Shows the anchor after its anchorage line being tensioned in the end of its rotation inside the soil, with its main plane (2) approximately 90° in relation to the anchorage line.
- FIGURE 7 Shows the alternative of removing the anchor from the inside of the soil, by the opening of the frontal cables of the halter (4) , showing only one disconnection point, because they can be in such many places and using so many different devices that is not possible to put the description of all of them.
- FIGURE 8 - Shows the end of the anchor's removal from the inside of the soil, by the opening of the frontal cables of the halter (4) , showing that the anchor shape and the fixing position of the rear cables is that impose the rotation of the same from the inside of the soil to its outlet .
- FIGURE 9 Shows the alternative of removing the anchor from the inside of the soil by overloading, with soil shearing .
- FIGURE 10 - Shows the anchor in use, in this case, holding an oil platform, showing its capacity of auto-alignment with the connected anchorage line.
- FIGURE 11 - Shows three frontal view alternatives of the attack board of the anchor (1) -.
- FIGURE 11a the first alternative with the plain surface practically straight;
- FIGURE lib the second alternative with the plain surface forming a dihedral, similar to that formed by airplane wings.
- This resource is recommended basically for heterogeneous soils where the dihedral helps the halter to stabilize the anchor in approximately 90° in relation to the tensioned anchorage line;
- FIGURE lie - the last represents an alternative to the halter, where the same is substituted by an eye assembled in a superstructure.
- the eye height substitutes the halter, and to assist in the
Abstract
L'invention concerne une ancre pour une structure flottante et ses procédés d'installation et de retrait. Le procédé d'installation consiste à lâcher l'ancre pour qu'elle entre au contact du sol marin, l'arrache et s'y enfonce en formant une tranchée derrière elle ; à tirer sur le câble d'ancrage depuis la structure flottante pour communiquer à l'ancre un mouvement de rotation dans le sol et la placer à environ 90° par rapport au câble d'ancrage. Le procédé de retrait de l'ancre consiste à exercer une force de surcharge sur le sol marin ou à utiliser des dispositifs servant à lui communiquer un deuxième mouvement de rotation visant à l'aligner sur la tranchée formée lors de son installation pour permettre sa remontée, ou à l'en déloger.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BRPI0601146 BRPI0601146A (pt) | 2006-04-10 | 2006-04-10 | áncora para estruturas flutuantes, método de instalação e de remoção da mesma |
BRPI0601146-2 | 2006-04-10 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2007115387A1 true WO2007115387A1 (fr) | 2007-10-18 |
Family
ID=38580654
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/BR2007/000091 WO2007115387A1 (fr) | 2006-04-10 | 2007-04-10 | Ancre pour structure flottante et ses procedes d'installation et de retrait |
Country Status (2)
Country | Link |
---|---|
BR (1) | BRPI0601146A (fr) |
WO (1) | WO2007115387A1 (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012021067A1 (fr) * | 2010-08-10 | 2012-02-16 | Deep Sea Anchors As | Ancre installée par gravité |
WO2017113025A1 (fr) * | 2015-12-28 | 2017-07-06 | Walter Francisco Alfredo Buschmann Schirmer | Poids mort pour détenir et retenir dans un endroit prédéfini au moins une structure flottante dans un plan d'eau, conçu comme une seule pièce |
CN110525600A (zh) * | 2019-08-19 | 2019-12-03 | 天津市水产研究所 | 一种简易锚石运输投放装置及使用方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5542368A (en) * | 1994-08-01 | 1996-08-06 | Yoshioka; Kenji | Lightweight anchor with tail fin |
WO1998008734A1 (fr) * | 1996-08-30 | 1998-03-05 | Petróleo Brasileiro S.A. - Petrobrás | Ancre du type a plaque et son procede d'installation |
WO2004011327A1 (fr) * | 2002-07-26 | 2004-02-05 | Francois Bernard | Ancre de veille |
-
2006
- 2006-04-10 BR BRPI0601146 patent/BRPI0601146A/pt not_active IP Right Cessation
-
2007
- 2007-04-10 WO PCT/BR2007/000091 patent/WO2007115387A1/fr active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5542368A (en) * | 1994-08-01 | 1996-08-06 | Yoshioka; Kenji | Lightweight anchor with tail fin |
WO1998008734A1 (fr) * | 1996-08-30 | 1998-03-05 | Petróleo Brasileiro S.A. - Petrobrás | Ancre du type a plaque et son procede d'installation |
WO2004011327A1 (fr) * | 2002-07-26 | 2004-02-05 | Francois Bernard | Ancre de veille |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012021067A1 (fr) * | 2010-08-10 | 2012-02-16 | Deep Sea Anchors As | Ancre installée par gravité |
NO331792B1 (no) * | 2010-08-10 | 2012-04-02 | Deep Sea Anchors As | Et gravitasjonsinstallert anker og fremgangsmate for installasjon av ankeret |
WO2017113025A1 (fr) * | 2015-12-28 | 2017-07-06 | Walter Francisco Alfredo Buschmann Schirmer | Poids mort pour détenir et retenir dans un endroit prédéfini au moins une structure flottante dans un plan d'eau, conçu comme une seule pièce |
CN110525600A (zh) * | 2019-08-19 | 2019-12-03 | 天津市水产研究所 | 一种简易锚石运输投放装置及使用方法 |
CN110525600B (zh) * | 2019-08-19 | 2024-04-05 | 天津市水产研究所 | 一种简易锚石运输投放装置及使用方法 |
Also Published As
Publication number | Publication date |
---|---|
BRPI0601146A (pt) | 2007-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2630027B1 (fr) | Ancre installée à l'aide de la gravité | |
NL1009277C2 (nl) | Werkwijze en inrichting voor het nauwkeurig plaatsen van relatief zware voorwerpen op en wegnemen van zware voorwerpen van de zeebodem. | |
EP2691291B1 (fr) | Ensemble ancrage | |
WO2013084545A1 (fr) | Dispositif générateur d'énergie éolienne à corps flottant et procédé de mouillage d'un dispositif générateur d'énergie éolienne à corps flottant | |
US20080141922A1 (en) | Folding torpedo anchor for marine moorings | |
CN107600326B (zh) | 一种用于深海浮标的可释放式重力锚系统 | |
EP1234978B1 (fr) | Eolienne marine | |
JP2020172872A (ja) | セミサブ浮体、及びセミサブ浮体を用いた風車の洋上設置方法 | |
US6106199A (en) | Pile for anchoring floating structures and process for installing the same | |
WO2007115387A1 (fr) | Ancre pour structure flottante et ses procedes d'installation et de retrait | |
CN114086592A (zh) | 一种装配式海上风电浮动基础结构及其施工方法 | |
US11713098B2 (en) | Multiline ring anchor and installation method | |
JP2013529736A (ja) | 1以上の水中支柱又は杭を設置するための表面突出型再利用可能水中テンプレート | |
AU715529B2 (en) | Plate-type anchor and the respective process for installing it | |
JP2012523346A (ja) | アンカー位置決めシステム | |
AU2020323950B2 (en) | Hybrid dynamically installed anchor with a folding shank and control method for keep anchor verticality during free fall in water | |
JPH0656076A (ja) | 海底ケーブル敷設工法及びその敷設作業船 | |
AU763997B2 (en) | Anchor | |
JPH06507585A (ja) | 改良した船用アンカー | |
EP3943380A2 (fr) | Structure flottante comprenant un système d'amarrage pour amarrer une seconde structure flottante et procédé d'amarrage de la seconde structure flottante | |
KR101605620B1 (ko) | 오일펜스 전개판 | |
MXPA01007553A (en) | Anchor | |
BR102016017394A2 (pt) | Âncora cavilha por gravidade para estruturas marinhas e método de instalação | |
KR20100038171A (ko) | 정박 시스템 | |
GB2353016A (en) | Pile anchor system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 07719259 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 07719259 Country of ref document: EP Kind code of ref document: A1 |