WO2007105471A1 - 資源情報管理装置、システム、方法、及びプログラム - Google Patents
資源情報管理装置、システム、方法、及びプログラム Download PDFInfo
- Publication number
- WO2007105471A1 WO2007105471A1 PCT/JP2007/053481 JP2007053481W WO2007105471A1 WO 2007105471 A1 WO2007105471 A1 WO 2007105471A1 JP 2007053481 W JP2007053481 W JP 2007053481W WO 2007105471 A1 WO2007105471 A1 WO 2007105471A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- resource information
- time
- generation
- resource
- provision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/27—Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
- G06F16/273—Asynchronous replication or reconciliation
Definitions
- the present invention relates to a resource information management device, a resource information management system, a resource information management method, a resource information management program, and a resource information generation program, and in particular, resource information for managing distributed computer resource information in time series.
- the present invention relates to a management apparatus, a resource information management system, a resource information management method, a resource information management program, and a resource information generation program.
- Patent Document 1 in order to identify the cause of a failure when a business system failure occurs, log information output by products of multiple vendors when the failure occurs is collected, organized in time series, and determined for each product.
- error log collection and analysis agent system that organizes log information according to the importance criteria of the business system as a whole, not the specified importance, and generates a report of the essential cause of the failure that occurred and how to deal with it. It is disclosed.
- This system is based on the premise that time synchronization is achieved in a force distribution system that points out the importance of managing log information output by different products in time series. It is specified that the system has means for time synchronization, and specifically, means using a technique such as NTP (Ne twork Time Protocol; see Non-Patent Document 1) can be considered.
- NTP Ne twork Time Protocol
- Patent Document 2 and Patent Document 3 show a method for managing log information and event data in time series in an environment without taking time synchronization.
- Patent Document 2 is a system composed of a plurality of computers that are not synchronized in time, and has a problem of managing event trace data in a time series. An offset value indicating a time lag between computers is used. A method for correcting the event generation time using the method is disclosed.
- Patent Document 3 aims at enabling logs to be collected and analyzed at the time of failure on computers distributed in multiple countries and time zones, and the time difference between the log collection device and the log collection device. Discloses a method for correcting the time of log information using time zone information and locale information.
- the management server has a hierarchical configuration or a distributed configuration (P2P (Peer to Peer) configuration).
- P2P Peer to Peer
- the DNS Domain Name System
- the method of managing offset values between all management targets in a large-scale system is a mechanism that can manage distributed information in a time series even when a management server that is not realistic has a multi-stage configuration. is required. It is also assumed that the time is not managed in the first place for non-contact resources such as small terminals and IC chips connected wirelessly. This For management targets like this, it is necessary to estimate the information generation time on the server that collects the information.
- Patent Document 1 Japanese Patent Application Laid-Open No. 2003-216457
- Patent Document 2 Japanese Patent Laid-Open No. 2005-235054
- Patent Document 3 Japanese Patent Laid-Open No. 2005-284520
- Non-Patent Document 1 David L. Mills, “Internet Time Synchronization”, [online], March 1992, IETF, [February 28, 2005] Search], Internet URL http://www.faqs.org/rfcs/rfcl305.html Disclosure of Invention
- a first problem of the present invention is a distributed system in which time synchronization is not achieved, and a time lag is different for each management target, and is collected from the management target when the degree of deviation changes during operation. It is to be able to manage resource information in time series.
- a second problem of the present invention is to enable management of resource information collected from a management target in a time series in a system including a management target that does not have a time synchronization function.
- a third problem of the present invention is to enable management of resource information to be managed in a time series when a plurality of management servers are managed in a multistage configuration in a large-scale distributed system. It is.
- a first aspect of the present invention is to check time synchronization with a predetermined device when collecting or referring to resource information of a predetermined device power in a resource information management device that manages resource information.
- the time correction unit records the generation time corrected based on its own time in the resource information when not synchronized (mode 1).
- a second aspect of the present invention provides a resource information management system for managing resource information, wherein one or a plurality of resources including a code and one or a plurality of resource information in which the code is converted into data are generated.
- a resource information generating device one or more resource information collecting devices that collect the resource information from the resource information generating device, and a resource information reference device that references the resource information from the resource information collecting device.
- the resource information collection device collects resource information from the resource information generation device
- the resource information collection device confirms time synchronization with the resource information generation device and corrects based on its own time if it is not synchronized.
- a first time correction unit that records the generated first generation time in the resource information, and the resource information reference device collects the resource information when collecting the resource information from the resource information collection device. Same time with device A second time correction unit that records a second generation time corrected based on its own time in the resource information when the period is confirmed and not synchronized (Mode 2).
- a third aspect of the present invention provides a resource information management method for managing resource information using a resource information management device, wherein when the resource information having a predetermined device capability is collected or referenced, the predetermined device To check the time synchronization with, and if not synchronized, collect or And a step of recording the generation time corrected based on the time of the device to be referenced in the resource information (mode 3).
- a fourth aspect of the present invention is to collect or refer to resource information from a predetermined device in a resource information management program executed by a resource information management device that manages (including collection and reference) resource information.
- a process for confirming time synchronization with the predetermined device and a generation time corrected in synchronization with V are recorded in the resource information. Processing to
- a code included in the resource is received when request information requesting the resource information is received.
- Processing for generating resource information converted into data processing for checking the time when providing the resource information, recording the resource information using the time as provision time, and a device that has transmitted the request information And a process for providing the resource information (form 5).
- the predetermined device is a device that has a timekeeping function and generates or collects resource information (form 1-2).
- the transmission time when request information requesting resource information is transmitted to the predetermined device is measured, and the resource information from the predetermined device is received.
- a time measuring unit that measures a reception time when the information is received, and the time correction unit uses the transmission time, the reception time, and the provision time when the resource information includes the provision time of the predetermined device. Determining the time synchronization with the predetermined device, and when the resource information includes a generation time, an intermediate value between the transmission time and the reception time is determined.
- a correction generation time obtained by subtracting an elapsed time from the generation time to the provision time is calculated, and the correction generation time is recorded in the resource information (Mode 13).
- the time correction unit may determine the transmission time, the reception time, and the provision time when the resource information includes the provision time of the predetermined device. In the case where the time synchronization with the predetermined device is determined and the generation time is included in the resource information when there is no synchronization, the intermediate time between the transmission time and the reception time. A correction generation time is calculated as a value, and the correction generation time is recorded in the resource information (Mode 1-4).
- the predetermined device is a device that generates resource information having no timekeeping function (Mode 15).
- the transmission time when request information requesting resource information is transmitted to the predetermined device is measured, and the resource information from the predetermined device is received.
- a time measuring unit that measures the reception time when the information is received, and the time correction unit is an intermediate value between the transmission time and the reception time when the resource information does not include the provision time of the predetermined device!
- the correction generation time is calculated, and the correction generation time is recorded in the resource information (Mode 16).
- the resource information collection device includes a first resource information collection device and a second resource information collection device
- the first resource information collection device includes:
- the first time correction unit checks the time synchronization with the second resource information collection device when collecting the resource information from the second resource information collection device.
- the third generation time corrected based on the time is recorded in the resource information (Mode 2-1).
- the resource information generation device includes a first resource information generation device having a timekeeping function and a second resource information generation device having no timekeeping function. It is characterized by including one or both of these (form 2-2).
- the step of determining time synchronization with the predetermined device using the time, the reception time, and the provision time, and recording the generation time in the resource information is synchronous.
- the resource information has a generation time A correction generation time obtained by subtracting an elapsed time from the generation time to the provision time from an intermediate value between the transmission time and the reception time, and the correction generation time is calculated as the resource information. (Step 3 1).
- the third aspect in the step of confirming the time synchronization, when the resource information includes a provision time of the predetermined device, the transmission time, the reception time, and the In the step of determining the synchronization of the time with the predetermined device using the provision time, and recording the generation time in the resource information, the generation time is included in the resource information in synchronization.
- the method includes a step of calculating a correction generation time that is an intermediate value between the transmission time and the reception time, and a step of recording the correction generation time in the resource information. (Form 3-2).
- a step of measuring a transmission time when transmitting request information for requesting resource information to the predetermined device a step of transmitting the request information, Measuring the reception time when resource information of a predetermined device power is received, and recording the generation time in the resource information, the resource information does not include a provision time of the predetermined device.
- the method includes: calculating a correction generation time that is an intermediate value between the transmission time and the reception time; and recording the correction generation time in the resource information. 3— 3).
- a process of measuring a transmission time when request information requesting resource information is transmitted to the predetermined device and resource information from the predetermined device are received.
- the transmission time and the reception time are not synchronized and the resource information includes the generation time.
- a third aspect in the process of confirming the time synchronization, when the resource information includes a provision time of the predetermined device, the transmission time, the reception time, and the provision time
- the generation time is not included in the resource information.
- a process of calculating a correction generation time that is an intermediate value between the transmission time and the reception time and a process of recording the correction generation time in the resource information are executed. Characteristic (form 3-6).
- a process of measuring a transmission time when request information requesting resource information is transmitted to the predetermined device and resource information from the predetermined device are received.
- a process of measuring a reception time sometimes, and in a process of recording the generation time in the resource information, when the resource information does not include a provision time of the predetermined device, the transmission time and A process of calculating a correction generation time that is an intermediate value of the reception time and a process of recording the correction generation time in the resource information are executed (mode 3-7).
- a process of presenting the resource information is executed (mode 3-8).
- mode 3 after the correction generation time is recorded in the resource information, a process of storing the resource information is executed (mode 3-9).
- the first effect is that in a distributed system that is not synchronized in time, the resource information collected from the management target is different when the time lag is different for each management target and the degree of deviation changes during operation. It is possible to manage in time series. This results in a broader system. Resource information distributed in a system environment can be managed in chronological order, making it easier to identify the cause of failure and detect signs of system abnormalities. The reason is that the information generation time is corrected by checking the time synchronization when collecting information, and no offset is prepared.
- the second effect is that the resource information collected from the management target can be managed in time series in a system including the management target that does not have the time synchronization function.
- resource information can be managed in time series for applications such as wireless terminal networks and integrated monitoring of terminals and server devices, making it easier to identify the cause of failures and detect signs of system abnormalities.
- the reason is that the resource information generation time is recorded at the time of the device that collects the information at the time of information collection.
- the third effect is that, in a large-scale distributed system, when a plurality of management servers are configured and managed in multiple stages, it becomes possible to manage resource information to be managed in time series. . As a result, it is possible to selectively collect information from a large amount of management targets in a wide-area distributed network via the Internet, and manage that information in time series, identifying the cause of failure and predicting system anomalies. Detection is easy. This is because the information generation time correction method is solved between the collection device and the collection target device and is not restricted to the overall configuration.
- FIG. 1 is a block diagram schematically showing the configuration of a resource information management system according to Embodiment 1 of the present invention.
- FIG. 2 is a flow chart schematically showing an example of information collection processing performed between a resource information collection device and a resource information generation device of the resource information management system according to Embodiment 1 of the present invention.
- FIG. 3 is a flowchart schematically showing an example of synchronization determination processing of the resource information collection device in the resource information management system according to the first exemplary embodiment of the present invention.
- FIG. 4 is a flowchart schematically showing an example of time correction processing of the resource information collection device in the resource information management system according to Embodiment 1 of the present invention.
- FIG. 5 is a flowchart schematically showing an example of processing performed between the resource information collection device and the resource information reference device of the resource information management system according to the first embodiment of the present invention.
- FIG. 6 is a flowchart schematically showing an example of synchronization determination processing of the resource information reference device in the resource information management system according to the first exemplary embodiment of the present invention.
- FIG. 7 is a flowchart schematically showing an example of time correction processing of the resource information reference device in the resource information management system according to the first exemplary embodiment of the present invention.
- FIG. 8 is a block diagram schematically showing the configuration of the resource information management system according to the second embodiment of the present invention.
- FIG. 9 A block diagram schematically showing a serial connection configuration of the resource information collection device of the resource information management system according to the second embodiment of the present invention.
- FIG. 10 is a block diagram schematically showing a single connection configuration of the resource information collection device of the resource information management system according to the second exemplary embodiment of the present invention.
- FIG. 11 is a block diagram schematically showing a P2P type connection configuration of the resource information collection device of the resource information management system according to the second exemplary embodiment of the present invention.
- FIG. 13 is a flowchart schematically showing an example of the synchronization determination process of the resource information collection device (7) in the resource information management system according to the second embodiment of the present invention.
- FIG. 14 is a flowchart schematically showing an example of time correction processing of the resource information collection device (7) in the resource information management system according to Embodiment 2 of the present invention.
- FIG. 15 is a block diagram schematically showing the configuration of the resource information management system according to the third embodiment of the present invention.
- FIG. 16 is a flow chart schematically showing an example of information collection processing performed between the resource information collection device and the resource information generation device of the resource information management system according to Embodiment 3 of the present invention.
- ⁇ 17 A block diagram schematically showing the configuration of the resource information management system according to the first embodiment of the present invention.
- An example of time series data (expected data) expected when each monitoring server is referred to by the management terminal of the resource information management system according to Embodiment 1 of the present invention is schematically shown. It is a table.
- FIG. 22 is a block diagram schematically showing the configuration of a resource information management system (with offset management) according to Comparative Example 1.
- V23 A table schematically showing an example of the processing procedure of the resource information management system according to Comparative Example 1.
- FIG. 1 is a block diagram schematically showing the configuration of the resource information management system according to the first embodiment of the present invention.
- the resource information management system is a system for managing information (resource information) related to resource 3, and includes resource 3, resource information generation device 6, resource information collection.
- resource information generation device 6 resource information collection.
- a collection device 5 resource information reference device 4, and a program 2.
- Resource 3 is hardware, software, content, or data to be managed. Typically, hardware such as a server, a PC machine, a portable terminal, or a home appliance, or software embedded therein , Content, or data.
- Resource 3 holds the code (eg, identifier, creation time) that is the basis of the resource information. This code may include the generation time Tg when the resource 3 itself is generated, such as log information and event information. Further, the resource 3 may be configured as a resource information generating device 6. The resource 3 can be connected to the resource information generating device 6 through wired or wireless.
- the resource information generation device 6 is a computer device that generates information (resource information) related to the resource 3.
- the resource information generating device 6 is connected to the resource information collecting device 5 via the network 10. It has been continued.
- the hardware, software, content, or data attached to the resource information generating device 6 may become the resource 3.
- the resource information generation device 6 operates based on a resource information generation program, and includes a data generation unit 61, a communication unit 62, and a clock unit 63 as main functional units.
- the data generation unit 61 When the data generation unit 61 receives the collection request information from the resource information collection device 5, the data generation unit 61 reads the code from the resource 3 connected to the resource information generation device 6 through a wired or wireless connection, and the read code Based on the above, resource information (including generation time Tg) is generated by converting the configuration information, performance information, status information, log information, etc. of hardware, software, content, or data related to resource 3 into data.
- the communication unit 62 receives the collection request information from the resource information collection device 5 and transmits the generated resource information (including the provision time Tp and may include the generation time Tg) to the resource information collection device 5.
- the time measuring unit 63 measures the provision time Tp immediately before the generated resource information is provided (at the time of deemed provision or at the time of deemed creation), and the measured provision time Tp is determined as the resource information (the generation time Tg). Recorded).
- the resource information collection device 5 is a computer device that collects resource information from the plurality of resource information generation devices 6 and provides the resource information to the plurality of resource information reference devices 4, and is a device that manages the resource information. .
- the resource information collection device 5 is connected to the resource information generation device 6 via the network 10 and is connected to the resource information reference device 4 via the network 9.
- the resource information collection device 5 operates based on a collection resource information management program, and includes an information storage unit 51, a time correction unit 52, a time measurement unit 53, and a communication unit 54 as main functional units. .
- the information storage unit 51 stores resource information.
- the time correction unit 52 determines whether or not the obtained transmission time Ts, information provision time Tp, and result reception time Te are synchronized, and when it is determined that they are synchronized, the resource information (the provision time Tp is determined). Including the generation time Tg) is stored in the information storage unit 51. A method for determining synchronization will be described later.
- the time correction unit 52 determines that they are not synchronized, the transmission time Ts, the provision time Tp, the reception time Te, the generation time Tg (when the generation time Tg is not included in the resource information, The time is corrected based on the provided time TP), and the corrected generation time Tg 'is corrected to the resource information.
- the resource information is recorded and stored in the information storage unit 51.
- the time correction method will be described later.
- the time measuring unit 53 measures and stores the transmission time Ts immediately before transmitting the collection request information (at the time of deemed transmission), and includes the resource information (provided time Tp) from the resource information generating device 6 , The reception time Te immediately after receiving the generation time Tg (when deemed reception) is measured and stored.
- the time counting unit 53 reads the corresponding resource information from the information storage unit 51 based on the reference request information
- the time measuring unit 53 immediately before providing the read resource information based on the clock function (at the time of deemed provision).
- the provision time Tp-1 is measured, and the measured provision time Tp-1 is recorded in the resource information.
- the communication unit 54 transmits the collection request information to the resource information generation device 6 and receives the resource information from the resource information generation device 6 (including the provision information Tp and may include the generation time Tg). Further, the communication unit 54 receives the reference request information from the resource information reference device 4 and receives the resource information (including the provision time Tp-1 and the provision time Tp, and may include the corrected generation time Tg and the generation time Tg). Sent to the corresponding resource information reference device 4.
- the resource information reference device 4 (4a, 4b) is a computer device for referring to the resource information provided from the resource information collection device 5, and is a device that manages the resource information.
- the resource information reference device 4a is a device capable of providing resource information to an administrator (person).
- the resource information reference device 4b is a device capable of providing resource information to a program 2 that manages and uses resource information (a program that operates on an arbitrary terminal that is connected to the resource information reference device 4b wirelessly or by wire). is there.
- the resource information reference device 4 (4a, 4b) is connected to the resource information collection device 5 via the network 9.
- the resource information reference device 4a operates based on a reference resource information management program, and includes a communication unit 41, a time measurement unit 42, a time correction unit 43, and a display unit 44 as main functional units.
- the resource information reference device 4b operates based on a predetermined program, and includes a communication unit 41, a timing unit 42, a time correction unit 43, and an information disclosure unit 45 as main functional units.
- the communication unit 41 transmits reference request information to the resource information collection device 5 and receives resource information (including provision time Tp-1) from the resource information collection device 5.
- the timer 42 is based on the clock function! / Measures and stores the transmission time Ts-2 immediately before the reference request information is transmitted (at the time of deemed transmission) and stores the resource information (including provision time Tp-1) from the resource information collection device 5.
- the reception time Te-2 immediately after reception is measured and stored.
- the time correction unit 43 determines whether the obtained transmission time Ts-2, provision time Tp-1, and reception time Te-2 are synchronized. A method for determining synchronization will be described later.
- the time correction unit 43 corrects the time based on the transmission time Ts-2, the provision time Tp-1, the reception time Te-2, and the generation time Tg'_1 when it determines that they are not synchronized.
- the corrected amendment provision time Tg'-2 is recorded in the resource information.
- the generation time Tg, _1 corresponds to the corrected generation time Tg, and when Tg 'is included in the resource information, when the generation time Tg is used, and when Tg is included in the resource information, Uses the provided time Tp.
- the time correction method will be described later.
- the display unit 44 displays the resource information (if the time is corrected, the corrected information).
- the information disclosure unit 45 releases the resource information (if the time is corrected, the corrected one). (Make it accessible).
- the “collection request information” is information for the resource information collection device 5 to request the resource information generation device 6 to collect resource information, and the resource 3 to be collected is designated. ing.
- the “reference request information” is information for the resource information reference device 4 to request the resource information collection device 5 to refer to the resource information, and resource information to be referred to is designated.
- time correction is performed by a method independent of other time synchronization systems and offset values for managing time differences. Do not include an initial processing unit or a time offset table as described in Patent Document 3.
- FIG. 2 is a flowchart schematically showing an example of information collection processing performed between the resource information collection device and the resource information generation device of the resource information management system according to Embodiment 1 of the present invention.
- FIG. 3 shows a resource information collection device in the resource information management system according to Embodiment 1 of the present invention. It is the flowchart figure which showed typically an example of the synchronous determination process.
- FIG. 4 is a flowchart schematically showing an example of time correction processing of the resource information collection device in the resource information management system according to Embodiment 1 of the present invention. Refer to Fig. 1 for the configuration of the resource information collection device 5 and the resource information generation device 6. Further, even when there are a plurality of resource information generation devices 6 and when there are a plurality of resource information collection devices 5, processing is performed based on the basic flow shown in FIG.
- the resource information collection device 5 performs processing for collecting resource information when processing for collecting resource information is started periodically or when reference request information is received from the resource information reference device 4. Start (Step Al). Next, the resource information collection device 5 measures the transmission time Ts at the timer 53 immediately before transmitting the collection request information to the resource information generation device 6 (at the time of deemed transmission), and stores the measured transmission time Ts. (Step A2). Next, the resource information collection device 5 transmits the collection request information to the resource information generation device 6 (step A3).
- the resource information generating device 6 receives the collection request information from the resource information collecting device 5 (step A4).
- the resource information generation device 6 accesses the resource 3 to be managed by the data generation unit 61, reads the code of the configuration information, status information, etc. of the resource 3, and converts it into data based on the read code.
- Generate resource information step A5). For example, a process that outputs configuration information to a text file in accordance with the CIM (Common Information Model) schema, a process that outputs the latest performance information to a binary file, and an updated log in another log format. The process of converting to is performed.
- the code of resource 3 may include the generation time Tg when resource 3 itself was generated, such as log information and event information.
- the generation time Tg is included in the resource information.
- the resource information generation device 6 measures the provision time Tp at the time measuring unit 63 immediately before providing the generated resource information (at the time of deemed provision or at the time of deemed creation) (step ⁇ 6).
- the resource information generating device 6 records the provision time Tp in the resource information (step A7).
- the provision time Tp is used in place of the generation time when the generation time Tg is not included in the resource information.
- the resource information generation device 6 transmits the information result (including the provision time Tp and may include the generation time Tg) to the resource information collection device 5 (step A8).
- the resource information collection device 5 receives the resource information (including the provision time Tp and may include the generation time Tg) from the resource information generation device 6 (step ⁇ 9).
- the resource information collection device 5 measures the reception time ⁇ e immediately after receiving the resource information (at the time of deemed reception) in the timekeeping unit 53, and stores the reception time Te (step A10).
- the resource information collection device 5 determines whether the resource information collection device 5 and the resource information generation device 6 are based on the stored transmission time Ts and reception time Te and the provision time Tp in the resource information. It is determined whether or not the time is synchronized (step All).
- the synchronization judgment process is as follows.
- the provision time Tp of the collected resource information is determined by whether or not it is included between the transmission time Ts and the reception time Te (see FIG. 3). This condition is always true if the time is synchronized. Precisely, an error occurs between the communication time between the resource information collecting device 5 and the resource information generating device 6 and the time for generating the resource information, but it is assumed that the error is small. If the error is significant, measure the communication delay time and information generation time in advance, and narrow down the range of time available for the provision time Tp.
- the method shown in FIG. 3 has an advantage that the generation time can be corrected even if the resource information generation device 6 does not have a function of measuring the communication time and the information generation time.
- the resource information collection device 5 corrects the generation time Tg using the clock function of the resource information collection device 5, and The corrected generation time Tg is recorded in the resource information (step A12).
- the time correction process is as follows.
- step A12 when it is determined that synchronization is correct as a result of the synchronization determination (FIG. 3), the time correction process of the generation time Tg is performed (FIG. 4).
- the time correction of the generation time Tg is performed when the generation time Tg is included in the resource information such as log data, and when the generation time Tg is included in the resource information such as configuration information and performance information. And the method is different. Therefore, when the generation time Tg is not included in the resource information, the provision time Tp that is always included in the resource information is treated as the generation time Tg.
- Tg Tp or not, and the generation time Tg of resource information is specified (step A12-1).
- Tg Tp (YES in step A12-1)
- the transmission time Ts and the reception time are determined by the resource information collection device 5 time. Since it is determined that resource information has been generated between Te, the intermediate value between Ts and Te is set as the corrected generation time Tg '(step A12-2).
- Tg Tp is not satisfied (NO in step A12-1)
- the time until the resource 3 itself is generated and the resource information is provided is obtained by “Tp ⁇ Tg” and estimated by the resource information collecting device 5
- the time before the “Tp-Tg” time from the provision time (here, the intermediate value of Ts and Te) is the corrected generation time Tg (step A12-3).
- the obtained correction generation time Tg is recorded in the resource information (step A12-4).
- the method shown in FIG. 4 has an advantage that the generation time can be corrected even if the resource information generation device 6 does not have a function for measuring the communication time and the information generation time.
- step Al 1 When synchronization is established (YES in step Al 1) and when the correction of the information generation time (step A12) is completed, the resource information collection device 5 stores the resource information in the information storage unit 51. Is stored (step A13), and the process ends.
- the resource information collection device 5 determines the generation time based on the time lag at the time when the resource information is collected, when the time lags or is synchronized during the measurement period However, there is no risk of incorrect time correction being performed on information stored in the information storage unit 51.
- the resource information collection device 5 corrects the generation time Tg based on the time of the resource information collection device 5, even when there are multiple management targets with time lag, the resource information generation time (or correction) Generation time) can be stored in the information storage unit 51 in time series. However, the accuracy depends on the synchronization determination method (see Fig. 3) and the generation time correction method (see Fig. 4).
- FIG. 5 is a flowchart schematically showing an example of processing performed between the resource information collection device and the resource information reference device of the resource information management system according to the first exemplary embodiment of the present invention.
- FIG. 6 is a flowchart schematically showing an example of the synchronization determination process of the resource information reference device in the resource information management system according to Embodiment 1 of the present invention.
- FIG. 7 schematically shows an example of time correction processing of the resource information reference device in the resource information management system according to the first embodiment of the present invention. It is the shown flowchart figure. The process for referencing information is executed in the same procedure as the basic flow of the information collection process shown in Fig. 2.
- the resource information reference device 4 starts the reference process when a process for referring to information periodically starts or when a reference request is received from the administrator or the program 2 (step Bl).
- the resource information reference device 4 measures the transmission time Ts-2 at the time measuring unit 42 immediately before transmitting the reference request information to the resource information collecting device 5 (at the time of deemed transmission), and the measured transmission.
- Memorize time Ts_2 step B2.
- the resource information reference device 4 transmits the reference request information to the resource information collection device 5 (step B3).
- the resource information collection device 5 receives the reference request information from the resource information reference device 4 (step B4).
- the resource information collection device 5 reads the resource information corresponding to the reference request information from the information storage unit 51 (step B5).
- the resource information collection device 5 measures the provision time Tp-1 immediately before provision of the read resource information (at the time of provisional provision) by the timer 53 (step ⁇ 6).
- the resource information collecting device 5 records the measured provision time ⁇ _1 in the resource information (step ⁇ 7).
- the resource information collection device 5 transmits the resource information to the resource information reference device 4 (step ⁇ 8).
- the resource information reference device 4 receives the resource information from the resource information collection device 5 (step ⁇ 9).
- the resource information reference device 4 measures the reception time Te_2 immediately after receiving the resource information (at the time of deemed reception), and stores the reception time Te_2 (step B10).
- the resource information reference device 4 and the resource information reference device 4 collect resource information based on the stored transmission time Ts-2, reception time Te-2, and the provision time Tp-1 in the resource information. It is determined whether or not the time between the devices 5 is synchronized (step Bl). The time synchronization determination is performed based on whether or not the provision time Tp-1 in the resource information is included between the transmission time Ts-2 and the reception time Te-2 (see Fig. 6).
- Step B12 the resource information reference device 4 corrects the generation time Tg′-1 (Step B12).
- time correction referring to Fig. 7, the time until resource 3 itself is generated and resource information is provided is also measured by "Tp-1-Tg'-1".
- the time here, the intermediate value between Ts-2 and Te-2 is “Tp —1 -Tg'_lj hours before the generation time Tg′-2 (Step B12-1).
- the corrected generation time Tg'-2 is recorded in the resource information (step B12-2).
- the generation time Tg'-1 the corrected generation time Tg 'in the resource information is used, and Tg' is included in the resource information. If not, the generation time Tg is used and Tg is included in the resource information. In some cases, the provision time Tp is used.
- the resource information reference device 4 If synchronized (YES in step B11) and after step B12, the resource information reference device 4 provides (displays and discloses) the information as it is (step B13) and ends. .
- the administrator or another program 2 generates the resource information generation time at the time of the resource information reference device 4. It is possible to grasp distributed resource information in time series.
- the resource information generation device 5 and the resource information reference device 4 are estimated and corrected by estimating the generation time of the resource information. Therefore, even when the resource information reference device 4, the resource information collection device 5, and the plurality of resource information generation devices 6 are out of time, all the resource information is transferred by the resource information reference device 4. Can be acquired in time series.
- the method of managing the time difference between devices as an offset it is configured to measure the time at the time of collection and to correct the information generation time only when necessary, so that time synchronization is possible. Even if the offset value changes due to or correction, there is no problem of correcting the data generated after the change with an incorrect offset value.
- FIG. 8 is a block diagram schematically showing the configuration of the resource information management system according to Embodiment 2 of the present invention.
- 9 to 11 are block diagrams schematically showing connection examples of the resource information collection device of the resource information management system according to the second exemplary embodiment of the present invention.
- the first embodiment (FIG. In the configuration of reference), another resource information collection device 7 that collects resource information from the resource information collection device 5 and provides the information to the resource information reference device 4 is added.
- the configuration of the resource information collection device 7 is the same as the configuration of the resource information collection device 5.
- a serial connection configuration as shown in FIG. 9 a tree connection configuration as shown in FIG. 10, and a P2P connection configuration as shown in FIG. .
- the resource information collection device 5 collects resource information from a plurality of resource information generation devices 6 via the network 10 and performs time synchronization determination. If not synchronized, corrects the generation time in the resource information and obtains the resource information. Stored in the information storage unit 51.
- the resource information collection device 7 collects the resource information from the resource information collection device 5 through the network 11, performs time synchronization determination, and if not synchronized, corrects the generation time in the resource information and obtains the resource information. Store in the information storage unit 71.
- the operation between the resource information collection device 5 and the resource information generation device 6 is as shown in the first embodiment (FIGS. 2 to 4).
- the operation between the resource information reference device 4 and the resource information collection device 7 is as shown in the first embodiment (FIGS. 5 to 7).
- the operation between the resource information collection device 7 and the resource information collection device 5 will be described.
- FIG. 12 is a flowchart schematically showing an example of an operation performed between two resource information collection devices of the resource information management system according to the second embodiment of the present invention.
- FIG. 13 is a flowchart schematically showing an example of the synchronization determination process of the resource information collection device (7) in the resource information management system according to the second embodiment of the present invention.
- FIG. 14 is a flowchart schematically showing an example of time correction processing of the resource information collection device (7) in the resource information management system according to Embodiment 2 of the present invention.
- FIG. 8 for the configuration of resource information collection device 5 and resource information collection device 7.
- FIG. 12 shows processing performed between one resource information collection device 7 and one resource information collection device 5. The process for referencing information is executed in the same procedure as the basic flow of the information collection process shown in Fig. 2.
- the resource information collection device 7 starts when a process for collecting information periodically starts, The collection process starts when there is a collection request from the administrator or program 2 (step Cl).
- the resource information collection device 7 measures the transmission time Ts-2 at the time measuring unit 73 immediately before transmitting the collection request information to the resource information collection device 5 (at the time of deemed transmission), and measures the measured transmission.
- the time Ts—2 is stored (step C2).
- the resource information collection device 7 transmits the collection request information to the resource information collection device 5 (step C3).
- the resource information collection device 5 receives the collection request information from the resource information collection device 7 (step C4).
- the resource information collection device 5 reads the resource information corresponding to the collection request information from the information storage unit 51 (step C5).
- the resource information collecting device 5 measures the providing time Tp-1 immediately before providing the read resource information (at the time of deemed provision) by the time measuring unit 53 (step C6).
- the resource information collecting device 5 records the measured provision time Tp-1 in the resource information (step C7).
- the resource information collection device 5 transmits the resource information to the resource information collection device 7 (step C8).
- the resource information collection device 7 receives the resource information from the resource information collection device 5 (step C9).
- the resource information collection device 7 measures the reception time Te_2 immediately after receiving the resource information (at the time of deemed reception), and stores the reception time Te_2 (step C10).
- the resource information collection device 7 and the resource information collection device 7 collect the resource information based on the stored transmission time Ts-2, reception time Te-2, and the provision time Tp-1 in the resource information. Judgment is made as to whether or not the time between devices 5 is synchronized (step C1). The time synchronization determination is performed based on whether the provision time Tp-1 in the resource information is included between the transmission time Ts-2 and the reception time Te-2 (see Fig. 13).
- the resource information collection device 7 corrects the generation time Tg′-1 (step C12).
- time correction referring to FIG. 14, the resource information generation time recorded in the resource information collecting device 5 is Tg'-l, and the time from when the resource 3 itself is generated until the resource information is provided is shown. Also stop at “Tp-1-Tg'-1”, and “Tp-1 -Tg'_lj hours before the estimated provision time (here, the intermediate value between Ts-2 and Te-2) in the resource information collection device 7.
- Is the generation time Tg, _ 2 (step C12—1), and the obtained corrected generation time Tg′—2 is recorded in the resource information (step C 12—2). 1 uses the corrected generation time Tg 'in the resource information, and Tg' is included in the resource information.
- the generation time Tg is used, and when Tg is included in the resource information, the provision time Tp is used.
- step C12 If synchronization is established, and after step C12, the resource information collection device 7 stores information in the information storage unit 71 (step C13), and the process ends.
- the resource information reference device 4 generates all resource information at the time of the resource information collection device 7.
- the time can be referred to, and the distributed resource information can be grasped in time series.
- the resource information reference device and all the resource information collection devices are configured to estimate and correct the generation time of the resource information based on the time of the device. Therefore, even when the time is different between devices, the resource information reference device 4 can acquire all resource information in time series.
- the method of managing the time difference between devices as an offset it is configured to measure the time at the time of collection, and to correct the information generation time only when necessary. Even if the offset value changes due to or correction, there is no problem of correcting the data generated after the change with an incorrect offset value. Further, it is not necessary for the resource information collection device 7 to manage the time difference from the resource information generation device 6.
- the resource information collection device manages information in time series without depending on the time of other devices, the resource information collection device has a serial connection configuration, a tree connection configuration, and a P2P connection configuration. It is possible to manage the information of a larger number of resource information generation devices.
- the information collection can be performed regardless of which information collection device collects information on any management target. It is possible to obtain time-series information based on the device time, and it is possible to deal with a large-scale system having a large number of management targets.
- FIG. 15 is a block diagram schematically showing the configuration of the resource information management system according to the third embodiment of the present invention.
- the resource information management system according to the third embodiment one (or all) of the resource information generation devices (6 in FIG. 1) of the first embodiment is replaced with the resource information generation device 8.
- the resource information generation device 8 When the resource information collection device 5 requests the resource information generation device 8 for resource information, the resource information generation device 8 connects to the resource 3 and the data generation unit 81 generates resource information. The generated data is transmitted to the resource information collection device 5 by the communication unit 82. At this time, since the resource information generation device 8 does not have a timekeeping unit (63 in FIG. 1), the generation time and the provision time are not attached to the data. Typically, information devices such as RFID and IC chips that do not have a timekeeping function are applicable.
- FIG. 16 is a flowchart schematically showing an example of information collection processing performed between the resource information collection device and the resource information generation device of the resource information management system according to the third embodiment of the present invention. Further, even when there are a plurality of resource information generation devices 8 or a plurality of resource information collection devices 5, processing is performed based on the flow of FIG.
- the resource information collection device 5 starts the collection process when a process for collecting information is started periodically or when a reference request is received from the administrator or the program 2 (step Dl). .
- the resource information collection device 5 measures the transmission time Ts at the time measuring unit 53 immediately before transmitting the collection request information from the resource information generation device 8 (at the time of deemed transmission), and stores the measured transmission time Ts. (Step D2).
- the resource information collection device 5 transmits the collection request information to the resource information generation device 8 (step D3).
- the resource information generating device 8 receives the collection request information from the resource information collecting device 5 (step D4).
- the resource information generation device 8 accesses the resource 3 to be managed by the data generation unit 81, reads the code of the configuration information, status information, etc. of the resource 3 and converts it into data based on the read code. Generate resource information (step D5).
- the resource information generation device 8 transmits the generated resource information to the resource information collection device 5 (step D6).
- the resource information collecting device 5 receives the resource information from the resource information generating device 8 (schedule Step D7).
- the resource information collecting device 5 measures the reception time Te immediately after receiving the resource information (at the time of deemed reception) at the time measuring unit 53, and stores the reception time Te (step D8).
- the resource information collection device 5 uses the time correction unit 52 to set the generation time Tg ′ of the collected resource information as an intermediate value between Ts and Te based on the stored transmission time Ts and reception time Te. Estimate and record the generation time Tg 'in the resource information (step D9).
- the resource information collection device 5 stores the resource information in the information storage unit 51 (step D10).
- the resource information generation device (6 in Fig. 1) having a timekeeping unit (63 in Fig. 1) also collects resource information based on the operation of the flowchart shown in Fig. 2. Data can be managed using the estimated time as the generation time.
- the resource information collection device 5 estimates the generation time and records it in the resource information even in a situation where resource information generation devices 8 that do not have a timekeeping part coexist.
- the information reference device 4 can acquire all resource information in time series. In particular, it is effective as a method for adding generation time to information when managing performance information, status information, and configuration information that change in real time.
- FIG. 17 is a block diagram schematically illustrating the configuration of the resource information management system according to the first embodiment of the present invention.
- a monitoring server 105a serving as a resource information collecting device is connected to a server 106a serving as a resource information generating device (including resources) and a network device (NW device) 106b.
- a monitoring server 105b serving as a resource information collecting device is connected to a server 106c and a server 106d serving as resource information generating devices (including resources).
- the monitoring servers 105a and 105b at each site are connected to a management terminal 104 serving as a resource information reference device.
- the administrator monitors the status of resources (resources included in the servers 106a, 106c, 106d, and the network device 106b) by referring to the Web browser screen.
- the current time of each device, server, and terminal is different as shown in FIG. 17, and the server 10 6a force 5:00, the monitoring server 105a is 15:00, the NW device 106b force 4:58, and the management terminal 104 15:00, Server 106c 15:05, Monitoring Server 105b 15:05, Server 106d 15:
- the monitoring server 105a collects the resource information of the server 106a at 15:01, and the monitoring server 105a acquires the resource of the NW device 106b at 15:02.
- the monitoring server 105b collects the resource information of the server 106c at 15:03, the monitoring server 105b collects the resource information of the server 106d at 15:04,
- the management terminal 104 refers to the resource information collected by the monitoring servers 105a and 105b at 15:05, it is assumed that the process is performed according to the following procedure.
- the network device 106b, the servers 106c, and 106d which differ from the current time of the management terminal 104, record the provided time Tp in the resource information at different times. I cannot get the data. Specifically, if the procedure shown in FIG. 18 is performed, the provision time Tp of each resource information is 15:01 when the latest resource information of the server 106a is 15:01, as shown in FIG. The latest resource information of NW device 106b should be 15:00, the latest resource information of server 106c should be 15:08, and the latest resource information of server 106d should be 15:09. This result is very different from the expected data (see Figure 19). In particular, the order of the latest resource information of the server 106a and the latest resource information of the NW device 106b is reversed, making it difficult to analyze the causal relationship.
- time correction is performed based on the flowcharts of FIGS. 2, 3, and 4 shown in the first embodiment of the present invention.
- the results of the time correction performed by the monitoring servers 105a and 105b are as follows.
- the latest resource information of the server 106a is 15:01
- the latest resource information of the NW device 106b is 15:02.
- the latest resource information of the server 106c is 15:08
- the latest resource information of the server 106d is 15:09.
- the time required for collection is about 1 second and that the time is corrected with sufficient accuracy.
- the generation time of the resource information of the NW device 106b is corrected and switched to the correct order.
- the information collected by the monitoring server 105b is different from the result of FIG. 19, but in the process in which the management terminal 104 refers to the resource information, the flowchart of FIG. 5 shown in the first embodiment of the present invention is shown. Since the process is executed, this time will be further corrected.
- the administrator using the management terminal 104 can obtain the time-series data shown in FIG. In this way, even if the time is different between the devices that provide resource information and the devices that collect them, it is possible to obtain time-series data without changing the time in those devices.
- the monitoring server 105a can perform the same correction process by measuring the time difference from the NW device 106b in advance and managing it as an offset. Since there is no guarantee that the time is the same as that of the monitoring server 105a, the time correction is required in the resource information reference device of the present invention.
- FIG. 22 (Comparative Example 1), which shows a state one hour after the state of FIG.
- the monitoring server 105a collects the resource information of the server 106a at 16:01, and the monitoring server 105a collects the resource of the NW device 106b at 16:02. At 16:03, the monitoring server 105b collects the resource information of the server 106c. At 16:04, the monitoring server 105b collects the resource information of the server 106d.
- the management terminal 104 refers to the resource information collected by the monitoring servers 105a and 105b at 16:05, it is assumed that the process is performed according to the following procedure.
- Latest resource information, latest resource information of NW device 106b related to 16:02, server related to 16:03 1 The latest resource information of 06c and the latest resource information of the server 106d related to 16:04.
- the monitoring server 105a corrects the time using an offset and the offset value “— 0:02” for the NW device 106b of the monitoring server 105a at 15:00 has not been updated, the monitoring server In 105a, the resource information generation time of the NW device 106b is erroneously corrected. Therefore, as shown in FIG. 25, the latest resource information of the server 106a is 16: 1, and the latest resource information capability S16: 00 of the NW device 106b.
- the present invention is a system in which a large number of information devices that are not synchronized in time are connected via a network, and a computer that identifies a cause of a failure or a load change or a device that identifies a cause is realized in a computer. It can be applied to the program and the intended use.
- the load status and configuration status of the entire system are monitored, and the load on the system is detected in advance.
- the present invention can be applied to applications such as a program for realizing a prediction device and a prediction device in a computer.
Landscapes
- Engineering & Computer Science (AREA)
- Databases & Information Systems (AREA)
- Theoretical Computer Science (AREA)
- Computing Systems (AREA)
- Data Mining & Analysis (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer And Data Communications (AREA)
- Debugging And Monitoring (AREA)
Abstract
本発明の目的は、時刻同期のとれていない大規模分散システムや情報端末ネットワークにおいても資源情報を時系列に管理できるようにすることである。本発明では、資源情報収集装置5は、資源情報生成装置6から資源情報を収集する際に、資源情報生成装置6との時刻同期を確認し、同期していない場合に、資源情報収集装置5の時刻に基づいて補正した生成時刻を資源情報に記録する。資源情報参照装置4は、資源情報収集装置5の資源情報を参照する際に、資源情報収集装置5との時刻同期を確認し、同期していない場合に、資源情報参照装置4の時刻に基づいて補正した生成時刻を資源情報に記録する。
Description
明 細 書
資源情報管理装置、システム、方法、及びプログラム
技術分野
[0001] 本発明は、資源情報管理装置、資源情報管理システム、資源情報管理方法、資源 情報管理プログラム、及び資源情報生成プログラムに関し、特に、分散した計算機資 源情報を時系列に管理する資源情報管理装置、資源情報管理システム、資源情報 管理方法、資源情報管理プログラム、及び資源情報生成プログラムに関する。
背景技術
[0002] 有線ネットワークや無線ネットワークを介して多数の情報機器やプログラムが接続す る分散システム環境ではシステムの管理が複雑である。分散システムを構成する資 源 (情報機器やプログラム)から集められる大量の構成情報、性能情報、状態情報、 ログ情報等の資源情報を管理しなければならない。特に、システム管理のために適 切な制御を決定するためには、収集した情報力 現在のシステムの状態を正確に把 握することが必要不可欠である。そのためには、個々の資源が生成する情報を時系 列にし、発生した事象や数値的な変化の因果関係を特定する必要がある。
[0003] 特許文献 1では、業務システムの障害発生時に障害原因を特定するため、障害発 生時に複数ベンダの製品が出力するログ情報を収集し、それらを時系列で整理し、 製品毎に定められた重要度ではなぐ業務システム全体としての重要度の基準に従 つて、ログ情報を整理し、発生した障害の本質的な原因と、その対策方法をレポート として生成するエラーログ収集解析エージェントシステムが開示されて 、る。このシス テムは、複数の異なる製品が出力するログ情報を時系列に管理することの重要性を 指摘している力 分散システムの中で時刻同期がとれていることを前提としている。シ ステム内に時刻同期を取る手段を備えることが明記されており、具体的には NTP (Ne twork Time Protocol ;非特許文献 1参照)などの技術を利用する手段が考えられる。
[0004] し力しながら、グリッドコンピューティングなど、多数の計算機力 Sインターネットを介し て接続される大規模なシステムや、ュビキタスコンピューティングなど、大量の携帯端 末やチップがワイヤレスに接続されるシステムなどでは、全ての管理対象で時刻同期
をとることが本質的に難しい。このような環境では、収集した情報を時系列に管理でき るとは限らず、因果関係が逆転して、誤った判断をする危険性も生じる。このような問 題を回避するために、時刻同期がとれて 、な 、環境でログ情報やイベントデータを時 系列に管理する手法が特許文献 2や特許文献 3で示されている。
[0005] 特許文献 2は、時刻同期のとれていない複数の計算機で構成されるシステムで、ィ ベントトレースデータを時系列に管理することを課題とし、計算機間の時刻のずれを 示すオフセット値を用いてイベント生成時刻を補正する手法を開示して 、る。
[0006] 特許文献 3は、複数の国やタイムゾーンに分散されたコンピュータで障害発生時の ログの収集と分析を可能にすることを課題とし、ログ収集装置と被ログ収集装置の時 刻差分、タイムゾーン情報、ロケール情報を用いて、ログ情報の時刻補正を行う手法 を開示している。
[0007] これらの手法は、管理対象で時刻の同期が取れていない環境で資源情報を時系 列に管理することを課題としており、管理対象と情報を収集する計算機の間の時刻 差をオフセットとして算出し、オフセットを用いて情報の生成時刻を補正することで解 決している。
[0008] し力しながら、継続して稼動するシステム環境では、 、つ時刻のズレが発生し、 V、つ 別の管理者によって部分的な時刻補正が行われるかの予測ができな 、。したがって 、オフセットの値は一定ではなぐ常に変動する可能性があり、開示されている手法で は古 、オフセット値によって誤った時刻補正を行ってしまう危険性がある。この問題 に加え、大規模な分散システムの管理では、単一の集中管理サーバを用意すること は難しい。そのため、管理サーバの階層構成や分散構成(P2P (Peer to Peer)構成) がとられる。例えば、インターネットの名前解決を行うサービス DNS (Domain Name Sy stem)では階層的な構成をとることで、世界中のシステムのドメイン名を管理して 、る
[0009] したがって、大規模なシステムで全ての管理対象との間のオフセット値を管理する 方法は、現実的ではなぐ管理サーバが多段構成になった場合でも分散した情報を 時系列に管理できる仕組みが必要である。また、無線接続される小型端末や ICチッ プなど非接触型の資源では、そもそも時刻が管理されていないことも想定される。こ
のような管理対象については、情報を収集するサーバで情報の生成時刻を推定する 必要がある。
[0010] 特許文献 1 :特開 2003— 216457号公報
特許文献 2:特開 2005 - 235054号公報
特許文献 3:特開 2005 - 284520号公報
非特許文献 1:デビッド ·ミルズ (David L. Mills)著、「インターネット ·タイム ·シンクロナ ィゼーシヨン(Internet Time Synchronization)」、 [online] , 1992年 3月、 IETF、 [平 成 17年 2月 28日検索]、インターネット URL http://www.faqs.org/rfcs/rfcl305.html 発明の開示
発明が解決しょうとする課題
[0011] 上記の特許文献、非特許文献の各開示を、本書に引用をもって繰り込むものとする 以上の従来技術、及びその背景から、以下のような問題が挙げられる。
[0012] 第 1に、時刻同期がとれていない分散システムで、時刻のずれが管理対象毎に異 なり、ずれの度合いが稼動中に変化する場合に、管理対象から集められる資源情報 を時系列に管理することが難しいことに問題がある。その理由は、管理対象と管理サ ーバの間の時間差であるオフセット値が常に正しいとは限らず、オフセット値による時 刻補正では正しく情報を時系列化できないからである。
[0013] 第 2に、時刻同期機能を持たない管理対象を含むシステムで、管理対象から集めら れる資源情報を時系列に管理することが難しいことに問題がある。その理由は、時刻 同期機能を持たない管理対象力 生成される情報には情報の生成時刻が存在しな い、もしくは、不正確である可能性があり、全ての管理対象の情報を時系列化できな いからである。
[0014] 第 3に、大規模分散システムで、複数の管理サーバが多段構成されて管理されて いる場合に、管理対象の資源情報を時系列に管理することが難しいことに問題があ る。その理由は、全ての管理対象との時刻のずれをオフセットとして管理することが困 難であり、また、多段に構成される管理サーバ間の時刻のずれも無視できないからで ある。
[0015] 本発明の第 1の課題は、時刻同期がとれていない分散システムで、時刻のずれが 管理対象毎に異なり、ずれの度合いが稼動中に変化する場合に、管理対象から集 められる資源情報を時系列に管理できるようにすることである。
[0016] 本発明の第 2の課題は、時刻同期機能を持たない管理対象を含むシステムで、管 理対象から集められる資源情報を時系列に管理できるようにすることである。
[0017] 本発明の第 3の課題は、大規模分散システムで、複数の管理サーバが多段構成さ れて管理されている場合に、管理対象の資源情報を時系列に管理できるようにする ことである。
課題を解決するための手段
[0018] 本発明の第 1の視点は、資源情報を管理する資源情報管理装置において、所定の 装置力 の資源情報を収集又は参照する際に、前記所定の装置との時刻同期を確 認し、同期していない場合に、自己の時刻に基づいて補正した生成時刻を前記資源 情報に記録する時刻補正部を有することを特徴とする (形態 1)。
[0019] 本発明の第 2の視点は、資源情報を管理する資源情報管理システムにおいて、コ ードを含む 1又は複数の資源と、前記コードをデータ化した資源情報を生成する 1又 は複数の資源情報生成装置と、前記資源情報生成装置から前記資源情報を収集す る 1又は複数の資源情報収集装置と、前記資源情報収集装置から前記資源情報を 参照する資源情報参照装置と、を備え、前記資源情報収集装置は、前記資源情報 生成装置からの資源情報を収集する際に、前記資源情報生成装置との時刻同期を 確認し、同期していない場合に、自己の時刻に基づいて補正した第 1の生成時刻を 前記資源情報に記録する第 1の時刻補正部を有し、前記資源情報参照装置は、前 記資源情報収集装置からの資源情報を収集する際に、前記資源情報収集装置との 時刻同期を確認し、同期していない場合に、自己の時刻に基づいて補正した第 2の 生成時刻を前記資源情報に記録する第 2の時刻補正部を有することを特徴とする( 形態 2)。
[0020] 本発明の第 3の視点は、資源情報管理装置を用いて資源情報を管理する資源情 報管理方法において、所定の装置力もの資源情報を収集又は参照する際に、前記 所定の装置との時刻同期を確認するステップと、同期していない場合に、収集又は
参照する装置の時刻に基づいて補正した生成時刻を前記資源情報に記録するステ ップと、を含むことを特徴とする(形態 3)。
[0021] 本発明の第 4の視点は、資源情報を管理 (収集、参照を含む)する資源情報管理 装置に実行させる資源情報管理プログラムにおいて、所定の装置からの資源情報を 収集又は参照する際に、前記所定の装置との時刻同期を確認する処理と、同期して V、な 、場合に、収集又は参照する装置の時刻に基づ!/、て補正した生成時刻を前記 資源情報に記録する処理と、
を実行させることを特徴とする (形態 4)。
[0022] 本発明の第 5の視点は、資源情報を生成する資源情報生成装置に実行させる資源 情報生成プログラムにおいて、資源情報を要求する要求情報を受信したときに、資 源に含まれるコードをデータ化した資源情報を生成する処理と、前記資源情報を提 供する際に時刻を確認して、当該時刻を提供時刻として前記資源情報を記録する処 理と、前記要求情報を送信してきた装置に前記資源情報を提供する処理と、を実行 させることを特徴とする (形態 5)。
[0023] 以下に、本発明の各視点における可能な形態を示す。
第 1の視点 (形態 1)において、前記所定の装置は、計時機能を有するとともに資源 情報を生成又は収集する装置であることを特徴とする (形態 1-2)。
[0024] 第 1の視点 (形態 1)において、前記所定の装置に対し資源情報を要求する要求情 報を送信する時の送信時刻を測定し、かつ、前記所定の装置からの資源情報を受 信した時の受信時刻を測定する計時部を備え、前記時刻補正部は、前記資源情報 が前記所定の装置の提供時刻を含むときに、前記送信時刻、前記受信時刻、及び 前記提供時刻を用いて、前記所定の装置との時刻の同期を判定し、同期していない ときであって前記資源情報に生成時刻が含まれているときに、前記送信時刻と前記 受信時刻の中間値カゝら前記生成時刻から前記提供時刻までの経過時間を引いた補 正生成時刻を計算し、前記補正生成時刻を前記資源情報に記録するように構成さ れることを特徴とする (形態 1 3)。
[0025] 第 1の視点 (形態 1)において、前記時刻補正部は、前記資源情報が前記所定の装 置の提供時刻を含むときに、前記送信時刻、前記受信時刻、及び前記提供時刻を
用いて、前記所定の装置との時刻の同期を判定し、同期していない場合であって前 記資源情報に生成時刻が含まれて 、な 、場合に、前記送信時刻と前記受信時刻の 中間値とした補正生成時刻を計算し、前記補正生成時刻を前記資源情報に記録す るように構成されることを特徴とする(形態 1—4)。
[0026] 第 1の視点 (形態 1)において、前記所定の装置は、計時機能を有さない資源情報 を生成する装置であることを特徴とする (形態 1 5)。
[0027] 第 1の視点 (形態 1)において、前記所定の装置に対し資源情報を要求する要求情 報を送信する時の送信時刻を測定し、かつ、前記所定の装置からの資源情報を受 信した時の受信時刻を測定する計時部を備え、前記時刻補正部は、前記資源情報 が前記所定の装置の提供時刻を含まな!/ヽときに、前記送信時刻と前記受信時刻の 中間値となる補正生成時刻を計算し、前記補正生成時刻を前記資源情報に記録す ることを特徴とする (形態 1 6)。
[0028] 第 2の視点 (形態 2)において、前記資源情報収集装置は、第 1の資源情報収集装 置と、第 2の資源情報収集装置とを含み、前記第 1の資源情報収集装置の第 1の時 刻補正部は、前記第 2の資源情報収集装置から資源情報を収集する際に、前記第 2 の資源情報収集装置との時刻同期を確認し、同期していない場合に、自己の時刻に 基づ 、て補正した第 3の生成時刻を前記資源情報に記録することを特徴とする (形 態 2 - 1)。
[0029] 第 2の視点 (形態 2)にお 、て、前記資源情報生成装置は、計時機能を有する第 1 の資源情報生成装置、及び、計時機能を有さない第 2の資源情報生成装置の一方 又は両方を含むことを特徴とする(形態 2— 2)。
[0030] 第 3の視点 (形態 3)において、前記所定の装置に対し資源情報を要求する要求情 報を送信する時に送信時刻を測定するステップと、前記要求情報を送信するステツ プと、前記所定の装置力 の資源情報を受信した時に受信時刻を測定するステップ と、を含み、前記時刻同期を確認するステップでは、前記資源情報が前記所定の装 置の提供時刻を含むときに、前記送信時刻、前記受信時刻、及び前記提供時刻を 用いて、前記所定の装置との時刻の同期を判定し、前記生成時刻を前記資源情報 に記録するステップでは、同期して 、な 、ときであって前記資源情報に生成時刻が
含まれているときに、前記送信時刻と前記受信時刻の中間値から前記生成時刻から 前記提供時刻までの経過時間を引いた補正生成時刻を計算するステップと、前記補 正生成時刻を前記資源情報に記録するステップと、を含むことを特徴とする (形態 3 1)。
[0031] 第 3の視点 (形態 3)において、前記時刻同期を確認するステップでは、前記資源情 報が前記所定の装置の提供時刻を含むときに、前記送信時刻、前記受信時刻、及 び前記提供時刻を用いて、前記所定の装置との時刻の同期を判定し、前記生成時 刻を前記資源情報に記録するステップでは、同期して 、な 、場合であって前記資源 情報に生成時刻が含まれて 、な 、場合に、前記送信時刻と前記受信時刻の中間値 とした補正生成時刻を計算するステップと、前記補正生成時刻を前記資源情報に記 録するステップと、を含むことを特徴とする(形態 3— 2)。
[0032] 第 3の視点 (形態 3)において、前記所定の装置に対し資源情報を要求する要求情 報を送信する時に送信時刻を測定するステップと、前記要求情報を送信するステツ プと、前記所定の装置力 の資源情報を受信した時に受信時刻を測定するステップ と、を含み、前記生成時刻を前記資源情報に記録するステップでは、前記資源情報 が前記所定の装置の提供時刻を含まな!/ヽときに、前記送信時刻と前記受信時刻の 中間値となる補正生成時刻を計算するステップと、前記補正生成時刻を前記資源情 報に記録するステップと、を含むことを特徴とする (形態 3— 3)。
[0033] 第 3の視点 (形態 3)において、資源情報を管理する資源情報管理装置に実行させ る資源情報管理プログラムにおいて、所定の装置力 の資源情報を収集又は参照す る際に、前記所定の装置との時刻同期を確認する処理と、同期していない場合に、 収集又は参照する装置の時刻に基づいて補正した生成時刻を前記資源情報に記 録する処理と、を実行させることを特徴とする(形態 3— 4)。
[0034] 第 3の視点 (形態 3)において、前記所定の装置に対し資源情報を要求する要求情 報を送信する時に送信時刻を測定する処理と、前記所定の装置からの資源情報を 受信した時に受信時刻を測定する処理と、を実行させ、前記時刻同期を確認する処 理では、前記資源情報が前記所定の装置の提供時刻を含むときに、前記送信時刻 、前記受信時刻、及び前記提供時刻を用いて、前記所定の装置との時刻の同期を
判定する処理を実行させ、前記生成時刻を前記資源情報に記録する処理では、同 期していないときであって前記資源情報に生成時刻が含まれているときに、前記送 信時刻と前記受信時刻の中間値から前記生成時刻から前記提供時刻までの経過時 間を引いた補正生成時刻を計算する処理と、前記補正生成時刻を前記資源情報に 記録する処理と、を実行させることを特徴とする(形態 3— 5)。
[0035] 第 3の視点 (形態 3)において、前記時刻同期を確認する処理では、前記資源情報 が前記所定の装置の提供時刻を含むときに、前記送信時刻、前記受信時刻、及び 前記提供時刻を用いて、前記所定の装置との時刻の同期を判定する処理を実行さ せ、前記生成時刻を前記資源情報に記録するステップでは、同期していない場合で あって前記資源情報に生成時刻が含まれて ヽな ヽ場合に、前記送信時刻と前記受 信時刻の中間値とした補正生成時刻を計算する処理と、前記補正生成時刻を前記 資源情報に記録する処理と、を実行させることを特徴とする (形態 3— 6)。
[0036] 第 3の視点 (形態 3)において、前記所定の装置に対し資源情報を要求する要求情 報を送信する時に送信時刻を測定する処理と、前記所定の装置からの資源情報を 受信した時に受信時刻を測定する処理と、を実行させ、前記生成時刻を前記資源情 報に記録する処理では、前記資源情報が前記所定の装置の提供時刻を含まな 、と きに、前記送信時刻と前記受信時刻の中間値となる補正生成時刻を計算する処理と 、前記補正生成時刻を前記資源情報に記録する処理と、を実行させることを特徴と する (形態 3— 7)。
[0037] 第 3の視点 (形態 3)において、前記補正生成時刻を前記資源情報に記録した後に 、当該資源情報を提示する処理を実行させることを特徴とする (形態 3— 8)。
[0038] 第 3の視点 (形態 3)において、前記補正生成時刻を前記資源情報に記録した後に 、当該資源情報を格納する処理を実行させることを特徴とする (形態 3— 9)。
発明の効果
[0039] 本発明によれば、以下のような効果を奏する。
[0040] 第 1の効果は、時刻同期がとれていない分散システムで、時刻のずれが管理対象 毎に異なり、ずれの度合いが稼動中に変化する場合に、管理対象から集められる資 源情報を時系列に管理することが可能となることである。この結果、より広範なシステ
ム環境で分散した資源情報を時系列に管理することが可能となり、障害原因の特定 や、システム異常の予兆検出が容易になる。その理由は、情報収集時に時刻同期を 確認することで、情報生成時刻の補正を行い、オフセットを用意しないためである。
[0041] 第 2の効果は、時刻同期機能を持たない管理対象を含むシステムで、管理対象か ら集められる資源情報を時系列に管理することが可能となることである。この結果、無 線端末ネットワークや端末とサーバ機器の統合監視などの用途において、資源情報 を時系列に管理することが可能となり、障害原因の特定や、システム異常の予兆検出 が容易になる。その理由は、情報収集時に情報を収集する装置の時刻で資源情報 生成時刻を記録するためである。
[0042] 第 3の効果は、大規模分散システムで、複数の管理サーバが多段構成されて管理 されている場合に、管理対象の資源情報を時系列に管理することが可能となることで ある。この結果、インターネットを介した広域分散ネットワークにおいて大量の管理対 象から、選択的に情報を収集し、それらの情報を時系列に管理することが可能となり 、障害原因の特定や、システム異常の予兆検出が容易になる。その理由は、情報の 生成時刻の補正方法が、収集装置と被収集装置との間で解決し、全体の構成に束 縛されないためである。
図面の簡単な説明
[0043] [図 1]本発明の実施形態 1に係る資源情報管理システムの構成を模式的に示したブ ロック図である。
[図 2]本発明の実施形態 1に係る資源情報管理システムの資源情報収集装置と資源 情報生成装置との間で行われる情報収集処理の一例を模式的に示したフローチヤ ート図である。
[図 3]本発明の実施形態 1に係る資源情報管理システムにおける資源情報収集装置 の同期判定処理の一例を模式的に示したフローチャート図である。
[図 4]本発明の実施形態 1に係る資源情報管理システムにおける資源情報収集装置 の時刻補正処理の一例を模式的に示したフローチャート図である。
[図 5]本発明の実施形態 1に係る資源情報管理システムの資源情報収集装置と資源 情報参照装置の間で行われる処理の一例を模式的に示したフローチャート図である
[図 6]本発明の実施形態 1に係る資源情報管理システムにおける資源情報参照装置 の同期判定処理の一例を模式的に示したフローチャート図である。
[図 7]本発明の実施形態 1に係る資源情報管理システムにおける資源情報参照装置 の時刻補正処理の一例を模式的に示したフローチャート図である。
圆 8]本発明の実施形態 2に係る資源情報管理システムの構成を模式的に示したブ ロック図である。
圆 9]本発明の実施形態 2に係る資源情報管理システムの資源情報収集装置の直列 型接続構成を模式的に示したブロック図である。
圆 10]本発明の実施形態 2に係る資源情報管理システムの資源情報収集装置のッリ 一型接続構成を模式的に示したブロック図である。
圆 11]本発明の実施形態 2に係る資源情報管理システムの資源情報収集装置の P2 P型接続構成を模式的に示したブロック図である。
圆 12]本発明の実施形態 2に係る資源情報管理システムの 2つの資源情報収集装 置の間で行われる動作の一例を模式的に示したフローチャート図である。
圆 13]本発明の実施形態 2に係る資源情報管理システムにおける資源情報収集装 置(7)の同期判定処理の一例を模式的に示したフローチャート図である。
圆 14]本発明の実施形態 2に係る資源情報管理システムにおける資源情報収集装 置(7)の時刻補正処理の一例を模式的に示したフローチャート図である。
圆 15]本発明の実施形態 3に係る資源情報管理システムの構成を模式的に示したブ ロック図である。
[図 16]本発明の実施形態 3に係る資源情報管理システムの資源情報収集装置と資 源情報生成装置との間で行われる情報収集処理の一例を模式的に示したフローチ ヤート図である。
圆 17]本発明の実施例 1に係る資源情報管理システムの構成を模式的に示したプロ ック図である。
圆 18]本発明の実施例 1に係る資源情報管理システムの処理手順の一例を模式的 に示した表である。
圆 19]本発明の実施例 1に係る資源情報管理システムの管理端末で各監視サーバ の参照処理が行われた際に期待される時系列のデータ (期待データ)の一例を模式 的に示した表である。
圆 20]本発明の実施例 1に係る資源情報管理システムにおける各資源情報の提供 時刻(時刻補正なし)の一例を模式的に示した表である。
圆 21]本発明の実施例 1に係る資源情報管理システムにおける各資源情報の提供 時刻(時刻補正あり)の一例を模式的に示した表である。
圆 22]比較例 1に係る資源情報管理システム (オフセット管理あり)の構成を模式的に 示したブロック図である。
圆 23]比較例 1に係る資源情報管理システムの処理手順の一例を模式的に示した表 である。
圆 24]本発明の実施例 1に係る資源情報管理システムの管理端末で各監視サーバ の参照処理が行われた際に期待される時系列のデータ (期待データ)の一例を模式 的に示した表である。
圆 25]本発明の実施例 1に係る資源情報管理システムにおける各資源情報の提供 時刻(オフセット補正あり)の一例を模式的に示した表である。
符号の説明
2 プログラム
3 資源
4、 4a、4b 資源情報参照装置 (資源情報管理装置)
41 通信部
42 計時部
43 時刻補正部
44 表示部
45 情報公開部
5、 7 資源情報収集装置 (資源情報管理装置)
51、 71 情報記憶部
52、 72 時刻補正部
53、 73 計時部
54、 74 通信部
6、 8 資源情報生成装置
61、 81 データ生成部
62、 82 通信部
63 計時部
9、 10、 11 ネットワーク
104 管理端末
105a, 105b 監視サーバ
106a, 106c, 106d サーノ
106b 丽機器
発明を実施するための最良の形態
[0045] (実施形態 1)
本発明の実施形態 1に係る資源情報管理システムについて図面を用いて説明する 。図 1は、本発明の実施形態 1に係る資源情報管理システムの構成を模式的に示し たブロック図である。
[0046] 図 1を参照すると、実施形態 1に係る資源情報管理システムは、資源 3に係る情報( 資源情報)を管理するシステムであり、資源 3と、資源情報生成装置 6と、資源情報収 集装置 5と、資源情報参照装置 4と、プログラム 2と、を有する。
[0047] 資源 3は、管理対象となるハードウェア、ソフトウェア、コンテンツ、あるいはデータで あり、典型的には、サーバ、 PC機、携帯端末、家電などのハードウェア、又はその中 に組み込まれたソフトウェア、コンテンツ、あるいはデータである。資源 3は、資源情報 の基礎となるコード (例えば、識別子、生成時間)を保持する。このコードには、ログ情 報やイベント情報などのように資源 3自体が生成されたときの生成時刻 Tgが予め含ま れている場合がある。また、資源 3は、資源情報生成装置 6の構成となる場合がある。 資源 3は、有線又は無線を通じて資源情報生成装置 6と接続可能である。
[0048] 資源情報生成装置 6は、資源 3に係る情報 (資源情報)を生成するコンピュータ装 置である。資源情報生成装置 6は、ネットワーク 10を介して資源情報収集装置 5と接
続されている。資源情報生成装置 6に付属するハードウェア、ソフトウェア、コンテンツ 、あるいはデータが、資源 3となることがある。資源情報生成装置 6は、資源情報生成 プログラムに基づいて動作し、主な機能部として、データ生成部 61と、通信部 62と、 計時部 63とを有する。
[0049] データ生成部 61は、資源情報収集装置 5からの収集要求情報を受信したときに、 有線又は無線を通じて資源情報生成装置 6に接続された資源 3からコードを読み出 し、読み出したコードに基づいて、資源 3に係るハードウェア、ソフトウェア、コンテンツ 、あるいはデータの構成情報、性能情報、状態情報、ログ情報などをデータ化した資 源情報 (生成時刻 Tgを含む場合あり)を生成する。通信部 62は、資源情報収集装置 5からの収集要求情報を受信し、生成した資源情報 (提供時刻 Tpを含む、生成時刻 Tgを含む場合あり)を資源情報収集装置 5に向けて送信する。計時部 63は、時計機 能に基づいて、生成した資源情報を提供する直前 (みなし提供時、みなし生成時)に 提供時刻 Tpを測定し、測定した提供時刻 Tpを資源情報 (生成時刻 Tgを含む場合あ り)に記録する。
[0050] 資源情報収集装置 5は、複数の資源情報生成装置 6から資源情報を収集し、複数 の資源情報参照装置 4に資源情報を提供するコンピュータ装置であり、資源情報を 管理する装置である。資源情報収集装置 5は、ネットワーク 10を介して資源情報生成 装置 6と接続されており、ネットワーク 9を介して資源情報参照装置 4と接続されている 。資源情報収集装置 5は、収集用の資源情報管理プログラムに基づいて動作し、主 な機能部として、情報記憶部 51と、時刻補正部 52と、計時部 53と、通信部 54とを有 する。
[0051] 情報記憶部 51は、資源情報を記憶する。時刻補正部 52は、得られた送信時刻 Ts 、情報提供時刻 Tp、及び結果受信時刻 Teが同期しているか否かを判定し、同期し ていると判定したときに資源情報 (提供時刻 Tpを含む、生成時刻 Tgを含む場合あり) を情報記憶部 51に格納する。なお、同期判定の方法については後述する。また、時 刻補正部 52は、同期していないと判定したときに、送信時刻 Ts、提供時刻 Tp、受信 時刻 Te、生成時刻 Tg (生成時刻 Tgが資源情報に含まれて ヽな ヽときは提供時刻 T Pを用いる)に基づいて時刻補正し、時刻補正した補正生成時刻 Tg'を資源情報に
記録し、資源情報を情報記憶部 51に格納する。なお、時刻補正の方法については 後述する。計時部 53は、時計機能に基づいて、収集要求情報を送信する直前 (みな し送信時)の送信時刻 Tsを測定して記憶し、資源情報生成装置 6からの資源情報( 提供時刻 Tpを含む、生成時刻 Tgを含む場合あり)を受信した直後 (みなし受信時) の受信時刻 Teを測定して記憶する。また、計時部 53は、参照要求情報に基づいて 情報記憶部 51から対応する資源情報を読み出したときに、時計機能に基づいて、読 み出した資源情報を提供する直前 (みなし提供時)の提供時刻 Tp— 1を測定し、測 定した提供時刻 Tp—1を資源情報に記録する。通信部 54は、収集要求情報を資源 情報生成装置 6に向けて送信し、資源情報生成装置 6からの資源情報 (提供情報 Tp を含む、生成時刻 Tgを含む場合あり)を受信する。また、通信部 54は、資源情報参 照装置 4からの参照要求情報を受信し、資源情報 (提供時刻 Tp—1、提供時刻 Tpを 含む、補正生成時刻 Tg 生成時刻 Tgを含む場合あり)を対応する資源情報参照装 置 4に向けて送信する。
[0052] 資源情報参照装置 4 (4a、 4b)は、資源情報収集装置 5から提供された資源情報を 参照するためのコンピュータ装置であり、資源情報を管理する装置である。資源情報 参照装置 4aは、管理者 (人)に資源情報の提供が可能な装置である。資源情報参照 装置 4bは、資源情報を管理、利用するプログラム 2 (資源情報参照装置 4bと無線又 は有線を通じて接続される任意の端末にて動作するプログラム)に資源情報の提供 が可能な装置である。資源情報参照装置 4 (4a、 4b)は、ネットワーク 9を介して資源 情報収集装置 5と接続されている。資源情報参照装置 4aは、参照用の資源情報管 理プログラムに基づいて動作し、主な機能部として、通信部 41と、計時部 42と、時刻 補正部 43と、表示部 44とを有する。資源情報参照装置 4bは、所定のプログラムに基 づいて動作し、主な機能部として、通信部 41と、計時部 42と、時刻補正部 43と、情 報公開部 45とを有する。
[0053] 通信部 41は、参照要求情報を資源情報収集装置 5に向けて送信し、資源情報収 集装置 5からの資源情報 (提供時刻 Tp—1を含む)を受信する。計時部 42は、時計 機能に基づ!/ヽて、参照要求情報を送信する直前 (みなし送信時)の送信時刻 Ts— 2 を測定して記憶し、資源情報収集装置 5からの資源情報 (提供時刻 Tp—1を含む)を
受信した直後の受信時刻 Te— 2を測定して記憶する。時刻補正部 43は、得られた 送信時刻 Ts— 2、提供時刻 Tp— 1、及び受信時刻 Te— 2が同期している力否かを 判定する。なお、同期判定の方法については後述する。時刻補正部 43は、同期して いないと判定したときに、送信時刻 Ts— 2、提供時刻 Tp— 1、受信時刻 Te— 2、生成 時刻 Tg'_ 1に基づ 、て時刻補正し、時刻補正した補正提供時刻 Tg'—2を資源情 報に記録する。なお、生成時刻 Tg,_ 1は、補正生成時刻 Tg こ対応し、 Tg'が資源 情報に含まれて 、な 、ときは生成時刻 Tgを用い、 Tgが資源情報に含まれて 、な ヽ ときは提供時刻 Tpを用いる。また、時刻補正の方法については後述する。表示部 44 は、時刻補正部 43にて同期していると判定したとき、又は、時刻補正部 43にて時刻 補正した後、資源情報 (時刻補正された場合は補正後のもの)を表示する。情報公開 部 45は、時刻補正部 43にて同期していると判定したとき、又は、時刻補正部 43にて 時刻補正した後、資源情報 (時刻補正された場合は補正後のもの)を公開 (アクセス 可能な状態に)する。
[0054] ここで、「収集要求情報」とは、資源情報収集装置 5が資源情報生成装置 6に対して 資源情報の収集を要求するための情報であり、収集対象となる資源 3が指定されて いる。「参照要求情報」とは、資源情報参照装置 4が資源情報収集装置 5に対して資 源情報の参照を要求するための情報であり、参照対象となる資源情報が指定されて いる。
[0055] なお、実施形態 1では、他の時刻同期システムや時刻差を管理するためのオフセッ ト値に依存しな 、方法で時刻補正を行うため、特許文献 1に記載されるような時刻同 期処理部や、特許文献 3に記載されるような時刻オフセット表を含まな 、。
[0056] 次に、本発明の実施形態 1に係る資源情報管理システムの動作について説明する
[0057] まず、 1つの資源情報収集装置 5と 1つの資源情報生成装置 6との間で行われる情 報収集処理の基本的なフローについて図面を用いて説明する。図 2は、本発明の実 施形態 1に係る資源情報管理システムの資源情報収集装置と資源情報生成装置と の間で行われる情報収集処理の一例を模式的に示したフローチャート図である。図 3 は、本発明の実施形態 1に係る資源情報管理システムにおける資源情報収集装置
の同期判定処理の一例を模式的に示したフローチャート図である。図 4は、本発明の 実施形態 1に係る資源情報管理システムにおける資源情報収集装置の時刻補正処 理の一例を模式的に示したフローチャート図である。なお、資源情報収集装置 5と資 源情報生成装置 6の構成については、図 1を参照されたい。また、複数の資源情報 生成装置 6がある場合や複数の資源情報収集装置 5がある場合でも図 2に示す基本 フローに基づいて処理される。
[0058] まず、資源情報収集装置 5では、定期的に資源情報を収集する処理が起動した場 合や、資源情報参照装置 4から参照要求情報を受信した場合に資源情報を収集す る処理を開始する (ステップ Al)。次に、資源情報収集装置 5は、資源情報生成装置 6に対し収集要求情報を送信する直前(みなし送信時)に、計時部 53にて送信時刻 Tsを測定し、測定した送信時刻 Tsを記憶する (ステップ A2)。次に、資源情報収集 装置 5は、収集要求情報を資源情報生成装置 6に向けて送信する (ステップ A3)。
[0059] 次に、資源情報生成装置 6は、資源情報収集装置 5からの収集要求情報を受信す る (ステップ A4)。次に、資源情報生成装置 6は、データ生成部 61にて管理対象の 資源 3にアクセスし、資源 3の構成情報、状態情報等のコードを読み出して、読み出 したコードに基づいてデータ化した資源情報を生成する (ステップ A5)。例えば、構 成情報を CIM (Common Information Model)のスキーマに従った形でテキストフアイ ルに出力する処理や、最新の性能情報をバイナリファイルに出力する処理や、更新 されたログを別のログフォーマットに変換する処理が行われる。ここで、資源 3のコード には、ログ情報やイベント情報などのように資源 3自体が生成されたときの生成時刻 T gが含まれている場合があるが、その場合には、生成された資源情報に生成時刻 Tg が含まれることになる。次に、資源情報生成装置 6は、生成した資源情報を提供する 直前(みなし提供時、みなし生成時)に計時部 63にて提供時刻 Tpを測定する (ステツ プ Α6)。次に、資源情報生成装置 6は、資源情報に提供時刻 Tpを記録する (ステツ プ A7)。なお、提供時刻 Tpは、資源情報に生成時刻 Tgが含まれていないときは、生 成時刻の代わりとして用いられる。次に、資源情報生成装置 6は、情報結果 (提供時 刻 Tpを含む、生成時刻 Tgを含む場合あり)を資源情報収集装置 5に向けて送信す る(ステップ A8)。
[0060] 次に、資源情報収集装置 5は、資源情報生成装置 6からの資源情報 (提供時刻 Tp を含む、生成時刻 Tgを含む場合あり)を受信する (ステップ Α9)。次に、資源情報収 集装置 5は、計時部 53にて、資源情報を受信した直後 (みなし受信時)の受信時刻 Τ eを測定し、受信時刻 Teを記憶する (ステップ A10)。
[0061] 次に、資源情報収集装置 5は、記憶された送信時刻 Tsと受信時刻 Te、及び資源 情報中の提供時刻 Tpに基づいて、資源情報収集装置 5と資源情報生成装置 6の間 の時刻が同期している力否かを判定する(ステップ Al l)。同期判定処理は以下の通 りである。
[0062] ステップ Al 1の同期判定処理では、収集した資源情報の提供時刻 Tpが、送信時 刻 Tsと受信時刻 Teの間に含まれるカゝ否かで行う(図 3参照)。少なくとも、時刻が同 期していれば必ずこの条件は成り立つ。正確には、資源情報収集装置 5と資源情報 生成装置 6の間の通信時間と資源情報を生成する時間の誤差が生じるが、誤差が小 さい範囲で済むことを前提としている。仮に誤差が大き力つた場合は、通信遅延時間 や情報生成時間を事前に測定し、提供時刻 Tpの取りうる時間の範囲を狭めて判定 すればよい。ただし、図 3に示す方法は、資源情報生成装置 6に通信時間や情報生 成時間を測定する機能がな 、場合でも、生成時刻の補正が可能な利点がある。
[0063] 同期して!/、な 、と判断された場合 (ステップ Al 1の NO)、資源情報収集装置 5は、 生成時刻 Tgを資源情報収集装置 5の時計機能を用いて時刻補正し、補正された補 正生成時刻 Tgを資源情報に記録する (ステップ A12)。時刻補正処理は以下の通り である。
[0064] ステップ A12の時刻補正処理では、同期判定(図 3)の結果、同期して ヽな 、と判 定された場合、生成時刻 Tgの時刻補正処理を行う(図 4)。生成時刻 Tgの時刻補正 は、ログデータのように生成時刻 Tgが資源情報に含まれている場合と、構成情報、 性能情報等のように生成時刻 Tgが資源情報に含まれて 、な 、場合とで方法が異な る。そのため、生成時刻 Tgが資源情報に含まれていない場合は、資源情報に常に 含まれている提供時刻 Tpを生成時刻 Tgとして扱う。まず、 Tg=Tpであるカゝ否かを判 定し、資源情報の生成時刻 Tgを特定する (ステップ A12— 1)。 Tg=Tpである場合( ステップ A12—1の YES)は、資源情報収集装置 5の時間で送信時刻 Tsと受信時刻
Teの間に資源情報が生成されたと判断されることから、 Tsと Teの中間値を補正生成 時刻 Tg'とする(ステップ A12— 2)。一方、 Tg=Tpでない場合 (ステップ A12—1の NO)は、資源 3自体が生成されて力も資源情報が提供されるまでの時間を「Tp—Tg 」で求め、資源情報収集装置 5における推定提供時刻 (ここでは Tsと Teの中間値)か ら「Tp— Tg」時間前の時刻を補正生成時刻 Tg,とする (ステップ A12— 3)。得られた 補正生成時刻 Tg ま、資源情報に記録される (ステップ A12— 4)。同様に、通信時 間や情報生成時間による誤差が生じるが、これらの値を事前に測定しておくことで精 度を向上させることは可能である。ただし、図 4に示す方法は、資源情報生成装置 6 に通信時間や情報生成時間を測定するための機能がな 、場合でも、生成時刻の補 正が可能な利点がある。
[0065] 同期が取れて 、た場合 (ステップ Al 1の YES)、及び、情報生成時刻の補正 (ステ ップ A12)が終了した場合、資源情報収集装置 5は、情報記憶部 51に資源情報を格 納し (ステップ A13)、終了する。
[0066] なお、資源情報収集装置 5では、資源情報を収集する時点での時刻のずれに基づ いて生成時刻を判定するため、測定期間中に時刻がずれた場合や同期が取られた 場合でも、情報記憶部 51に格納される情報に誤った時刻補正が行われる危険性は ない。また、資源情報収集装置 5では、資源情報収集装置 5の時刻を基準にして生 成時刻 Tgの補正を行うため、時刻のずれがある管理対象が複数ある場合でも資源 情報の生成時刻(又は補正生成時刻)を時系列にして情報記憶部 51に格納できる。 ただし、精度は、同期判定方法 (図 3参照)と生成時刻補正方法 (図 4参照)に依存す る。
[0067] 次に、 1つの資源情報参照装置 4と 1つの資源情報収集装置 5の間で行われる処 理の基本的なフローについて図面を用いて説明する。図 5は、本発明の実施形態 1 に係る資源情報管理システムの資源情報収集装置と資源情報参照装置の間で行わ れる処理の一例を模式的に示したフローチャート図である。図 6は、本発明の実施形 態 1に係る資源情報管理システムにおける資源情報参照装置の同期判定処理の一 例を模式的に示したフローチャート図である。図 7は、本発明の実施形態 1に係る資 源情報管理システムにおける資源情報参照装置の時刻補正処理の一例を模式的に
示したフローチャート図である。なお、情報を参照する処理は、図 2に示す情報収集 処理の基本フローと同様な手順で実行される。
[0068] まず、資源情報参照装置 4は、定期的に情報を参照する処理が起動した場合や、 管理者やプログラム 2から参照要求があった場合に、参照処理を開始する (ステップ Bl)。次に、資源情報参照装置 4は、資源情報収集装置 5に対して参照要求情報を 送信する直前(みなし送信時)に、計時部 42にて送信時刻 Ts— 2を測定し、測定し た送信時刻 Ts_2を記憶する (ステップ B2)。次に、資源情報参照装置 4は、参照要 求情報を資源情報収集装置 5に向けて送信する (ステップ B3)。
[0069] 次に、資源情報収集装置 5は、資源情報参照装置 4からの参照要求情報を受信す る (ステップ B4)。次に、資源情報収集装置 5は、情報記憶部 51から参照要求情報に 対応する資源情報を読み出す (ステップ B5)。次に、資源情報収集装置 5は、読み出 した資源情報を提供する直前 (みなし提供時)の提供時刻 Tp—1を計時部 53で測定 する (ステップ Β6)。次に、資源情報収集装置 5は、測定した提供時刻 Τρ_1を資源 情報に記録する (ステップ Β7)。次に、資源情報収集装置 5は、資源情報を資源情報 参照装置 4に向けて送信する (ステップ Β8)。
[0070] 次に、資源情報参照装置 4は、資源情報収集装置 5からの資源情報を受信する (ス テツプ Β9)。次に、資源情報参照装置 4は、資源情報を受信した直後 (みなし受信時 )の受信時刻 Te_2を測定し、受信時刻 Te_2を記憶する (ステップ B10)。
[0071] 次に、資源情報参照装置 4は、記憶した送信時刻 Ts— 2と受信時刻 Te— 2、及び 資源情報中の提供時刻 Tp—1に基づいて、資源情報参照装置 4と資源情報収集装 置 5の間の時刻が同期している力否かの判定を行う(ステップ Bl l)。時刻同期判定 は、資源情報中の提供時刻 Tp—1が、送信時刻 Ts— 2と受信時刻 Te— 2の間に含 まれるか否かで行う(図 6参照)。
[0072] 同期して!/、な 、場合 (ステップ Bl 1の NO)、資源情報参照装置 4は、生成時刻 Tg' —1の補正を行う (ステップ B12)。時刻補正では、図 7を参照すると、資源 3自体が生 成されて力も資源情報が提供されるまでの時間を「Tp— 1— Tg'— 1」でもとめ、資源 情報参照装置 4における推定提供時刻 (ここでは Ts— 2と Te— 2の中間値)カゝら「Tp —1 -Tg'_lj時間前の時刻を生成時刻 Tg'— 2とする (ステップ B12— 1)。得られ
た補正生成時刻 Tg'— 2は、資源情報に記録される (ステップ B 12— 2)。なお、生成 時刻 Tg'— 1には、資源情報中の補正生成時刻 Tg'を用い、 Tg'が資源情報に含ま れて 、な 、ときは生成時刻 Tgを用い、 Tgが資源情報に含まれて 、な 、ときは提供 時刻 Tpを用いる。
[0073] 同期している場合 (ステップ B11の YES)、及び、ステップ B12の後、資源情報参照 装置 4は、そのままの情報を結果として提供 (表示、公開)し (ステップ B13)、終了す る。
[0074] これにより、資源情報参照装置 4と資源情報収集装置 5の間に時間のずれがある場 合でも、管理者や別のプログラム 2は資源情報参照装置 4の時刻で資源情報の生成 時刻を参照でき、分散した資源情報を時系列に把握することが可能となる。
[0075] 実施形態 1によれば、資源情報を収集、及び参照する際に、資源情報収集装置 5、 及び資源情報参照装置 4の時間で資源情報の生成時刻を推定して修正するように 構成されているため、資源情報参照装置 4、資源情報収集装置 5、及び複数の資源 情報生成装置 6でそれぞれ時刻がずれて 、る場合でも、資源情報参照装置 4によつ て全ての資源情報を時系列に取得することができる。
[0076] また、装置間の時刻差をオフセットとして管理する方法ではなぐ収集時に時刻を 測定して、必要のある場合だけ情報の生成時刻を修正するように構成されて ヽるた め、時刻同期や補正が行われてオフセット値が変化した場合でも、変化後に生成さ れたデータを誤ったオフセット値で補正してしまう問題は発生しな 、。
[0077] なお、情報を提供する装置に格納されるデータは時間軸について一貫性が保たれ ていることを前提とする。具体的には、情報を提供する装置の時刻補正が行われた 際には、既に格納されているデータの生成時刻も補正する必要がある。
[0078] (実施形態 2)
次に、本発明の実施形態 2に係る資源情報管理システムについて図面を用いて説 明する。図 8は、本発明の実施形態 2に係る資源情報管理システムの構成を模式的 に示したブロック図である。図 9〜11は、本発明の実施形態 2に係る資源情報管理シ ステムの資源情報収集装置の接続例を模式的に示したブロック図である。
[0079] 図 8を参照すると、実施形態 2に係る資源情報管理システムでは、実施形態 1 (図 1
参照)の構成において、資源情報収集装置 5から資源情報を集めて資源情報参照装 置 4に情報を提供するもう一つの資源情報収集装置 7を追加したものである。
[0080] 資源情報収集装置 7の構成は、資源情報収集装置 5の構成と同じである。資源情 報収集装置 5と資源情報収集装置 7の接続構成以外にも、図 9に示すような直列型 接続構成、図 10に示すツリー型接続構成、図 11に示す P2P型接続構成を取りうる。 いずれの場合においても、図 8に示す構成の拡張として捉えることができるため、ここ では図 8の構成について詳細を説明する。資源情報収集装置 5は、ネットワーク 10を 介して、複数の資源情報生成装置 6から資源情報を収集し、時刻同期判定を行い、 同期しない場合は資源情報中の生成時刻を補正し、資源情報を情報記憶部 51に格 納する。一方、資源情報収集装置 7は、ネットワーク 11を介して資源情報収集装置 5 から資源情報を収集し、時刻同期判定を行い、同期しない場合は資源情報中の生 成時刻を補正し、資源情報を情報記憶部 71に格納する。
[0081] 次に、本発明の実施形態 2に係る資源情報管理システムの動作について説明する 。資源情報収集装置 5と資源情報生成装置 6間の動作は、実施形態 1 (図 2〜4)で 示したとおりである。また、資源情報参照装置 4と資源情報収集装置 7の間の動作は 、実施形態 1 (図 5〜7)で示したとおりである。ここでは、資源情報収集装置 7と資源 情報収集装置 5の間の動作を説明する。
[0082] 図 12は、本発明の実施形態 2に係る資源情報管理システムの 2つの資源情報収集 装置の間で行われる動作の一例を模式的に示したフローチャート図である。図 13は 、本発明の実施形態 2に係る資源情報管理システムにおける資源情報収集装置 (7) の同期判定処理の一例を模式的に示したフローチャート図である。図 14は、本発明 の実施形態 2に係る資源情報管理システムにおける資源情報収集装置 (7)の時刻 補正処理の一例を模式的に示したフローチャート図である。なお、資源情報収集装 置 5と資源情報収集装置 7の構成については、図 8を参照されたい。また、図 12では 、 1つの資源情報収集装置 7と 1つの資源情報収集装置 5の間で行われる処理を示 している。また、情報を参照する処理は、図 2に示す情報収集処理の基本フローと同 様な手順で実行される。
[0083] まず、資源情報収集装置 7は、定期的に情報を収集する処理が起動した場合や、
管理者やプログラム 2から収集要求があった場合に、収集処理を開始する (ステップ Cl)。次に、資源情報収集装置 7は、資源情報収集装置 5に対して収集要求情報を 送信する直前(みなし送信時)に、計時部 73にて送信時刻 Ts— 2を測定し、測定し た送信時刻 Ts— 2を記憶する (ステップ C2)。次に、資源情報収集装置 7は、収集要 求情報を資源情報収集装置 5に向けて送信する (ステップ C3)。
[0084] 次に、資源情報収集装置 5は、資源情報収集装置 7からの収集要求情報を受信す る (ステップ C4)。次に、資源情報収集装置 5は、情報記憶部 51から収集要求情報 に対応する資源情報を読み出す (ステップ C5)。次に、資源情報収集装置 5は、読み 出した資源情報を提供する直前 (みなし提供時)の提供時刻 Tp—1を計時部 53で測 定する (ステップ C6)。次に、資源情報収集装置 5は、測定した提供時刻 Tp—1を資 源情報に記録する (ステップ C7)。次に、資源情報収集装置 5は、資源情報を資源情 報収集装置 7に向けて送信する (ステップ C8)。
[0085] 次に、資源情報収集装置 7は、資源情報収集装置 5からの資源情報を受信する (ス テツプ C9)。次に、資源情報収集装置 7は、資源情報を受信した直後 (みなし受信時 )の受信時刻 Te_2を測定し、受信時刻 Te_2を記憶する (ステップ C10)。
[0086] 次に、資源情報収集装置 7は、記憶した送信時刻 Ts— 2と受信時刻 Te— 2、及び 資源情報中の提供時刻 Tp—1に基づいて、資源情報収集装置 7と資源情報収集装 置 5の間の時刻が同期している力否かの判定を行う(ステップ Cl l)。時刻同期判定 は、資源情報中の提供時刻 Tp—1が、送信時刻 Ts— 2と受信時刻 Te— 2の間に含 まれるカゝ否かで行う(図 13参照)。
[0087] 同期して!/、な 、場合 (ステップ CI 1の NO)、資源情報収集装置 7は、生成時刻 Tg' —1の補正を行う (ステップ C12)。時刻補正では、図 14を参照すると、資源情報収集 装置 5において記録済みの資源情報生成時刻を Tg'—lとし、資源 3自体が生成さ れてカも資源情報が提供されるまでの時間を「Tp— 1— Tg'— 1」でもとめ、資源情 報収集装置 7における推定提供時刻(ここでは Ts— 2と Te— 2の中間値)から「Tp— 1 -Tg'_lj時間前の時刻を生成時刻 Tg,_ 2とする (ステップ C12— 1)。得られた 補正生成時刻 Tg'— 2は、資源情報に記録される (ステップ C 12— 2)。なお、生成時 刻 Tg'— 1には、資源情報中の補正生成時刻 Tg'を用い、 Tg'が資源情報に含まれ
て!、な 、ときは生成時刻 Tgを用い、 Tgが資源情報に含まれて 、な 、ときは提供時 刻 Tpを用いる。
[0088] 同期が取れている場合、及び、ステップ C12の後、資源情報収集装置 7は、情報記 憶部 71に情報を格納し (ステップ C13)、終了する。
[0089] これにより、資源情報収集装置 7と資源情報収集装置 5の間に時間のずれがある場 合でも、資源情報参照装置 4は資源情報収集装置 7の時刻で全ての資源情報の生 成時刻を参照でき、分散した資源情報を時系列に把握することが可能となる。
[0090] 実施形態 2によれば、資源情報参照装置、及び全ての資源情報収集装置にお!、 て、該装置の時間で資源情報の生成時刻を推定して修正するように構成されて 、る ため、装置間で時刻がずれている場合でも、資源情報参照装置 4によって全ての資 源情報を時系列に取得することができる。
[0091] また、装置間の時刻差をオフセットとして管理する方法ではなぐ収集時に時刻を 測定して、必要のある場合だけ情報の生成時刻を修正するように構成されて ヽるた め、時刻同期や補正が行われてオフセット値が変化した場合でも、変化後に生成さ れたデータを誤ったオフセット値で補正してしまう問題は発生しない。また、資源情報 収集装置 7が資源情報生成装置 6との時刻差を管理する必要がない。
[0092] また、資源情報収集装置が他の装置の時刻に依存せずに時系列に情報を管理す るため、資源情報収集装置の直列型接続構成やツリー型接続構成、 P2P型接続構 成を取ることが可能となり、より多数の資源情報生成装置の情報を管理することが可 能となる。
[0093] さらに、同様の時刻補正を情報収集装置間や情報参照装置と情報収集装置の間 で行うことにより、何れの情報収集装置が何れの管理対象の情報を収集した場合で も、情報収集装置の時間に基づいた時系列情報を得ることが可能であり、多数の管 理対象を持つ大規模なシステムにも対応することが可能となる。
[0094] (実施形態 3)
次に、本発明の実施形態 3に係る資源情報管理システムについて図面を用いて詳 細に説明する。図 15は、本発明の実施形態 3に係る資源情報管理システムの構成を 模式的に示したブロック図である。
[0095] 実施形態 3に係る資源情報管理システムでは、実施形態 1の資源情報生成装置( 図 1の 6)の 1つ (全部でもよい)を資源情報生成装置 8に置き換えたものである。
[0096] 資源情報生成装置 8は、資源情報収集装置 5が資源情報生成装置 8に対して資源 情報を要求したときに、資源 3に接続し、データ生成部 81で資源情報を生成する。生 成されたデータは、通信部 82によって資源情報収集装置 5に送信される。この際、資 源情報生成装置 8には計時部(図 1の 63)がないため、生成時刻や提供時刻はデー タに付与されない。典型的には、 RFIDや ICチップなど、計時機能を持たない情報機 器が該当する。
[0097] 次に、本発明の実施形態 3に係る資源情報管理システムの動作について説明する 。ここでは、 1つの資源情報収集装置 5と 1つの資源情報生成装置 8との間で行われ る情報収集処理の基本的なフローについて図面を用いて説明する。図 16は、本発 明の実施形態 3に係る資源情報管理システムの資源情報収集装置と資源情報生成 装置との間で行われる情報収集処理の一例を模式的に示したフローチャート図であ る。なお、複数の資源情報生成装置 8がある場合や複数の資源情報収集装置 5があ る場合でも図 16のフローに基づ!/、て処理される。
[0098] まず、資源情報収集装置 5では、定期的に情報を収集する処理が起動した場合や 、管理者やプログラム 2から参照要求があった場合に、収集処理を開始する (ステツ プ Dl)。次に、資源情報収集装置 5は、資源情報生成装置 8から収集要求情報を送 信する直前(みなし送信時)に、計時部 53にて送信時刻 Tsを測定し、測定した送信 時刻 Tsを記憶する (ステップ D2)。次に、資源情報収集装置 5は、収集要求情報を 資源情報生成装置 8に向けて送信する (ステップ D3)。
[0099] 次に、資源情報生成装置 8は、資源情報収集装置 5からの収集要求情報を受信す る (ステップ D4)。次に、資源情報生成装置 8は、データ生成部 81にて管理対象の 資源 3にアクセスし、資源 3の構成情報、状態情報等のコードを読み出して、読み出 したコードに基づいてデータ化した資源情報を生成する (ステップ D5)。次に、資源 情報生成装置 8は、生成された資源情報を資源情報収集装置 5に向けて送信する( ステップ D6)。
[0100] 次に、資源情報収集装置 5は、資源情報生成装置 8からの資源情報を受信する (ス
テツプ D7)。次に、資源情報収集装置 5は、計時部 53にて、資源情報を受信した直 後(みなし受信時)の受信時刻 Teを測定し、受信時刻 Teを記憶する (ステップ D8)。 次に、資源情報収集装置 5は、時刻補正部 52にて、記憶された送信時刻 Tsと受信 時刻 Teに基づ ヽて、収集した資源情報の生成時刻 Tg'を Tsと Teの中間値と推定し 、生成時刻 Tg'を資源情報に記録する (ステップ D9)。次に、資源情報収集装置 5は 、資源情報を情報記憶部 51に格納する (ステップ D10)。
[0101] なお、計時部(図 1の 63)を有する資源情報生成装置 (図 1の 6)力も資源情報を収 集する場合は、図 2に示すフローチャートの動作に基づく。このようにして推定された 時刻を生成時刻としてデータを管理することが可能となる。
[0102] 実施形態 3によれば、計時部を有さない資源情報生成装置 8が混在する状況にお いても、資源情報収集装置 5で生成時刻を推定して資源情報に記録するため、資源 情報参照装置 4によって全ての資源情報を時系列に取得することができる。特に、リ アルタイムに変化する性能情報や状態情報、構成情報を管理する場合に、情報に生 成時間を付与する方法として有効である。
実施例
[0103] (実施例 1)
次に、本発明の実施例 1について図面を用いて説明する。図 17は、本発明の実施 例 1に係る資源情報管理システムの構成を模式的に示したブロック図である。
[0104] 複数の拠点を持つ企業が各拠点のシステムの構成と性能情報を統合監視している 状況を想定する。第 1拠点では、資源情報収集装置となる監視サーバ 105aが、資源 情報生成装置 (資源を含む)となるサーバ 106a及びネットワーク機器 (NW機器) 10 6bと接続されている。第 2拠点では、資源情報収集装置となる監視サーバ 105bが、 資源情報生成装置 (資源を含む)となるサーバ 106c及びサーバ 106dと接続されて いる。各拠点の監視サーバ 105a、 105bは、資源情報参照装置となる管理端末 104 に接続されている。管理端末 104では、管理者が Webブラウザ画面を参照して、資 源(サーバ 106a、 106c, 106d、ネットワーク機器 106bに含まれる資源)の状態を監 視している。各機器、サーバ、端末の現在時刻は図 17に示す通り異なり、サーバ 10 6a力 5 : 00、監視サーバ 105aが 15 : 00、 NW機器 106b力 4 : 58、管理端末 104
が 15:00、サーバ 106cが 15:05、監視サーバ 105bが 15:05、サーバ 106dが 15:
05であるものとする。
[0105] ここで、管理端末 104の時刻で、図 18に示すように、 15:01に監視サーバ 105aが サーバ 106aの資源情報を収集し、 15 :02に監視サーバ 105aが NW機器 106bの 資源情報を収集し、 15:03に監視サーバ 105bがサーバ 106cの資源情報を収集し 、 15 :04に監視サーバ 105bがサーバ 106dの資源情報を収集し、
15 :05に管理端末 104が監視サーバ 105a、 105bに収集された資源情報を参照す ると 、う手順で処理が行われるとする。
[0106] 全ての資源情報は、参照されたときにデータ化されるとすると、管理端末 104で監 視サーバ 105a、 105bの参照処理が行われた際に期待される時系列のデータ (期待 データ)は、図 19に示すように、 15 :01に係るサーバ 106aの最新資源情報、 15:02 に係る NW機器 106bの最新資源情報、 15 :03に係るサーバ 106cの最新資源情報 、 15: 04に係るサーバ 106dの最新資源情報になる。
[0107] ところが、管理端末 104の現在時刻とずれている NW機器 106b、サーバ 106c、 10 6dでは異なる時刻で提供時刻 Tpを資源情報に記録してしまうため、補正をしなけれ ば正確な時系列のデータを得ることができない。具体的に、図 18に示す手順で行わ れるとすると、各資源情報の提供時刻 Tpは、時刻補正のない状態では、図 20に示 すように、サーバ 106aの最新資源情報が 15 :01、 NW機器 106bの最新資源情報 力 15:00、サーバ 106cの最新資源情報が 15:08、サーバ 106dの最新資源情報が 15 :09のようになるはずである。この結果は、期待データ(図 19参照)と大きく異なる 。特に、サーバ 106aの最新資源情報と NW機器 106bの最新資源情報の順序が逆 転しており、因果関係の分析が困難になる。
[0108] そこで、本発明の実施形態 1で示した図 2、図 3、図 4のフローチャートに基づいて 時刻補正を行う。監視サーバ 105a、 105bで時刻補正を行った場合の結果は、図 21 に示すように、監視サーバ 105aでは、サーバ 106aの最新資源情報が 15:01、 NW 機器 106bの最新資源情報が 15 :02となり、監視サーバ 105bでは、サーバ 106cの 最新資源情報が 15:08、サーバ 106dの最新資源情報が 15:09となる。ただし、収 集に力かる時間は 1秒程度で、十分な精度で時刻が補正されることを前提とする。
[0109] この結果、 NW機器 106bの資源情報の生成時刻が補正され、正しい順序に入れ 替わったことが確認できる。この場合、監視サーバ 105bで収集される情報は図 19の 結果とは異なることになるが、管理端末 104が資源情報を参照する過程で、本発明 の実施形態 1で示した図 5のフローチャートの処理が実行されるため、この時刻はさら にネ ΐ正されること〖こなる。
[0110] 最終的に、管理端末 104を使用する管理者は、図 21に示す時系列データを得るこ とができる。このように、資源情報を提供する機器や、収集する機器で時刻がずれて いる場合でも、それら機器内の時刻を変更することなぐ時系列のデータを得ることが 可能となる。
[0111] なお、監視サーバ 105aは、 NW機器 106bとの時刻差を予め測定し、オフセットとし て管理しておくことで同様の補正処理を行うことができるが、資源情報を参照するシス テムが必ずしも監視サーバ 105aと同じ時刻であるという保障がないため、本発明の 資源情報参照装置での時刻補正が必要となる。
[0112] また、オフセットを管理する方法ではシステム時刻が変更された場合に問題がある 。そのことを示すため、図 17の状態から 1時間後の状態を示す図 22 (比較例 1)を考 える。
[0113] 1時間の間に別の管理者 (例えばネットワーク管理者)がシステム時刻のずれを発 見して、時刻を補正したとする。このとき、図 22に示す通り、監視サーバ 105aと管理 対象であるサーバ 106aと NW機器 106bは時刻同期が取れた状態となる。
[0114] ここで、管理端末 104の時刻で、図 23に示すように、 16 : 01に監視サーバ 105aが サーバ 106aの資源情報を収集し、 16 : 02に監視サーバ 105aが NW機器 106bの 資源情報を収集し、 16 : 03に監視サーバ 105bがサーバ 106cの資源情報を収集し 、 16 : 04に監視サーバ 105bがサーバ 106dの資源情報を収集し、
16 : 05に管理端末 104が監視サーバ 105a、 105bに収集された資源情報を参照す ると 、う手順で処理が行われるとする。
[0115] このとき、管理者が管理端末 104を用いて資源情報を参照したときに期待される時 系列のデータ (期待データ)は、図 24に示すように、 16 : 01に係るサーバ 106aの最 新資源情報、 16 : 02に係る NW機器 106bの最新資源情報、 16 : 03に係るサーバ 1
06cの最新資源情報、 16 : 04に係るサーバ 106dの最新資源情報になる。
[0116] 監視サーバ 105aがオフセットによる時刻補正を行っており、 15 : 00の時点での監 視サーバ 105aの NW機器 106bに対するオフセット値「— 0 : 02」が更新されていな い場合、監視サーバ 105aでは NW機器 106bの資源情報の生成時刻を誤って補正 してしまう。そのため、図 25に示すように、サーバ 106aの最新資源情報が 16 : 01、 N W機器 106bの最新資源情報力 S16: 00のようになる。
[0117] 一方、本発明の用いた場合は時刻のずれがないと判断するため、補正は行わない 。本発明では、オフセット値がいつ、どのような要因で変化するかわ力もない場合に おいても、オフセット値の変化に依存せず、生成時刻の補正を行うことが可能である 産業上の利用可能性
[0118] 本発明は、時刻同期のとれていない多数の情報機器がネットワークで接続されたシ ステムで、障害や負荷変動の原因特定を行う装置や、原因特定を行う装置をコンビュ ータに実現するためのプログラムと 、つた用途に適用できる。
[0119] また、時刻同期のとれて ヽな 、多数の情報機器がネットワークで接続されたシステ ムで、システム全体の負荷状態や構成状態を監視して、システムにかかる負荷ゃ異 常を事前に予測する装置や予測を行う装置をコンピュータに実現するためのプロダラ ムといった用途に適用できる。
[0120] 本発明の全開示 (請求の範囲を含む)の枠内において、さらにその基本的技術思 想に基づいて、実施形態ないし実施例の変更 '調整が可能である。また、本発明の 請求の範囲の枠内において種々の開示要素の多様な組み合わせないし選択が可 能である。
Claims
[1] 所定の装置からの資源情報を収集又は参照する際に、前記所定の装置との時刻 同期を確認し、同期していない場合に、自己の時刻に基づいて補正した生成時刻を 前記資源情報に記録する時刻補正部を有することを特徴とする資源情報管理装置。
[2] 前記所定の装置は、計時機能を有するとともに資源情報を生成又は収集する装置 であることを特徴とする請求項 1記載の資源情報管理装置。
[3] 前記所定の装置に対し資源情報を要求する要求情報を送信する時の送信時刻を 測定し、かつ、前記所定の装置力 の資源情報を受信した時の受信時刻を測定する 計時部を備え、
前記時刻補正部は、
前記資源情報が前記所定の装置の提供時刻を含むときに、前記送信時刻、前記 受信時刻、及び前記提供時刻を用いて、前記所定の装置との時刻の同期を判定し、 同期していないときであって前記資源情報に生成時刻が含まれているときに、前記 送信時刻と前記受信時刻の中間値から前記生成時刻から前記提供時刻までの経過 時間を引いた補正生成時刻を計算し、
前記補正生成時刻を前記資源情報に記録するように構成されることを特徴とする請 求項 2記載の資源情報管理装置。
[4] 前記時刻補正部は、
前記資源情報が前記所定の装置の提供時刻を含むときに、前記送信時刻、前記 受信時刻、及び前記提供時刻を用いて、前記所定の装置との時刻の同期を判定し、 同期して!/、な 、場合であって前記資源情報に生成時刻が含まれて 、な 、場合に、 前記送信時刻と前記受信時刻の中間値とした補正生成時刻を計算し、
前記補正生成時刻を前記資源情報に記録するように構成されることを特徴とする請 求項 3記載の資源情報管理装置。
[5] 前記所定の装置は、計時機能を有さな!/、資源情報を生成する装置であることを特 徴とする請求項 1記載の資源情報管理装置。
[6] 前記所定の装置に対し資源情報を要求する要求情報を送信する時の送信時刻を 測定し、かつ、前記所定の装置力 の資源情報を受信した時の受信時刻を測定する
計時部を備え、
前記時刻補正部は、
前記資源情報が前記所定の装置の提供時刻を含まないときに、前記送信時刻と前 記受信時刻の中間値となる補正生成時刻を計算し、
前記補正生成時刻を前記資源情報に記録することを特徴とする請求項 5記載の資 源情報管理装置。
[7] コードを含む 1又は複数の資源と、
前記コードをデータ化した資源情報を生成する 1又は複数の資源情報生成装置と 前記資源情報生成装置から前記資源情報を収集する 1又は複数の資源情報収集 装置と、
前記資源情報収集装置から前記資源情報を参照する資源情報参照装置と、 を備え、
前記資源情報収集装置は、前記資源情報生成装置からの資源情報を収集する際 に、前記資源情報生成装置との時刻同期を確認し、同期していない場合に、自己の 時刻に基づいて補正した第 1の生成時刻を前記資源情報に記録する第 1の時刻補 正部を有し、
前記資源情報参照装置は、前記資源情報収集装置からの資源情報を収集する際 に、前記資源情報収集装置との時刻同期を確認し、同期していない場合に、自己の 時刻に基づいて補正した第 2の生成時刻を前記資源情報に記録する第 2の時刻補 正部を有することを特徴とする資源情報管理システム。
[8] 前記資源情報収集装置は、第 1の資源情報収集装置と、第 2の資源情報収集装置 とを含み、
前記第 1の資源情報収集装置の第 1の時刻補正部は、前記第 2の資源情報収集装 置から資源情報を収集する際に、前記第 2の資源情報収集装置との時刻同期を確 認し、同期していない場合に、自己の時刻に基づいて補正した第 3の生成時刻を前 記資源情報に記録することを特徴とする請求項 7記載の資源情報管理システム。
[9] 前記資源情報生成装置は、計時機能を有する第 1の資源情報生成装置、及び、計
時機能を有さない第 2の資源情報生成装置の一方又は両方を含むことを特徴とする 請求項 7又は 8記載の資源情報管理システム。
[10] 資源情報管理装置を用いて資源情報を管理する資源情報管理方法において、 所定の装置からの資源情報を収集又は参照する際に、前記所定の装置との時刻 同期を確認するステップと、
同期して!/、な 、場合に、収集又は参照する装置の時刻に基づ 、て補正した生成時 刻を前記資源情報に記録するステップと、
を含むことを特徴とする資源情報管理方法。
[11] 前記所定の装置に対し資源情報を要求する要求情報を送信する時に送信時刻を 測定するステップと、
前記要求情報を送信するステップと、
前記所定の装置力 の資源情報を受信した時に受信時刻を測定するステップと、 を含み、
前記時刻同期を確認するステップでは、前記資源情報が前記所定の装置の提供 時刻を含むときに、前記送信時刻、前記受信時刻、及び前記提供時刻を用いて、前 記所定の装置との時刻の同期を判定し、
前記生成時刻を前記資源情報に記録するステップでは、
同期していないときであって前記資源情報に生成時刻が含まれているときに、前記 送信時刻と前記受信時刻の中間値から前記生成時刻から前記提供時刻までの経過 時間を引いた補正生成時刻を計算するステップと、
前記補正生成時刻を前記資源情報に記録するステップと、
を含むことを特徴とする請求項 10記載の資源情報管理方法。
[12] 前記時刻同期を確認するステップでは、前記資源情報が前記所定の装置の提供 時刻を含むときに、前記送信時刻、前記受信時刻、及び前記提供時刻を用いて、前 記所定の装置との時刻の同期を判定し、
前記生成時刻を前記資源情報に記録するステップでは、
同期して!/、な 、場合であって前記資源情報に生成時刻が含まれて 、な 、場合に、 前記送信時刻と前記受信時刻の中間値とした補正生成時刻を計算するステップと、
前記補正生成時刻を前記資源情報に記録するステップと、
を含むことを特徴とする請求項 11記載の資源情報管理方法。
[13] 前記所定の装置に対し資源情報を要求する要求情報を送信する時に送信時刻を 測定するステップと、
前記要求情報を送信するステップと、
前記所定の装置力 の資源情報を受信した時に受信時刻を測定するステップと、 を含み、
前記生成時刻を前記資源情報に記録するステップでは、
前記資源情報が前記所定の装置の提供時刻を含まないときに、前記送信時刻と前 記受信時刻の中間値となる補正生成時刻を計算するステップと、
前記補正生成時刻を前記資源情報に記録するステップと、
を含むことを特徴とする請求項 10記載の資源情報管理方法。
[14] 資源情報を管理する資源情報管理装置に実行させる資源情報管理プログラムに おいて、
所定の装置からの資源情報を収集又は参照する際に、前記所定の装置との時刻 同期を確認する処理と、
同期して!/、な 、場合に、収集又は参照する装置の時刻に基づ 、て補正した生成時 刻を前記資源情報に記録する処理と、
を実行させることを特徴とする資源情報管理プログラム。
[15] 前記所定の装置に対し資源情報を要求する要求情報を送信する時に送信時刻を 測定する処理と、
前記所定の装置力 の資源情報を受信した時に受信時刻を測定する処理と、 を実行させ、
前記時刻同期を確認する処理では、前記資源情報が前記所定の装置の提供時刻 を含むときに、前記送信時刻、前記受信時刻、及び前記提供時刻を用いて、前記所 定の装置との時刻の同期を判定する処理を実行させ、
前記生成時刻を前記資源情報に記録する処理では、
同期していないときであって前記資源情報に生成時刻が含まれているときに、前記
送信時刻と前記受信時刻の中間値から前記生成時刻から前記提供時刻までの経過 時間を引いた補正生成時刻を計算する処理と、
前記補正生成時刻を前記資源情報に記録する処理と、
を実行させることを特徴とする請求項 14記載の資源情報管理プログラム。
[16] 前記時刻同期を確認する処理では、前記資源情報が前記所定の装置の提供時刻 を含むときに、前記送信時刻、前記受信時刻、及び前記提供時刻を用いて、前記所 定の装置との時刻の同期を判定する処理を実行させ、
前記生成時刻を前記資源情報に記録するステップでは、
同期して!/、な 、場合であって前記資源情報に生成時刻が含まれて 、な 、場合に、 前記送信時刻と前記受信時刻の中間値とした補正生成時刻を計算する処理と、 前記補正生成時刻を前記資源情報に記録する処理と、
を実行させることを特徴とする請求項 15記載の資源情報管理プログラム。
[17] 前記所定の装置に対し資源情報を要求する要求情報を送信する時に送信時刻を 測定する処理と、
前記所定の装置力 の資源情報を受信した時に受信時刻を測定する処理と、 を実行させ、
前記生成時刻を前記資源情報に記録する処理では、
前記資源情報が前記所定の装置の提供時刻を含まないときに、前記送信時刻と前 記受信時刻の中間値となる補正生成時刻を計算する処理と、
前記補正生成時刻を前記資源情報に記録する処理と、
を実行させることを特徴とする請求項 14記載の資源情報管理プログラム。
[18] 前記補正生成時刻を前記資源情報に記録した後に、当該資源情報を提示する処 理を実行させることを特徴とする請求項 14乃至 17のいずれか一に記載の資源情報 管理プログラム。
[19] 前記補正生成時刻を前記資源情報に記録した後に、当該資源情報を格納する処 理を実行させることを特徴とする請求項 14乃至 17のいずれか一に記載の資源情報 管理プログラム。
[20] 資源情報を生成する資源情報生成装置に実行させる資源情報生成プログラムに
おいて、 資源情報を要求する要求情報を受信したときに、資源に含まれるコードを データ化した資源情報を生成する処理と、
前記資源情報を提供する際に時刻を確認して、当該時刻を提供時刻として前記資 源情報を記録する処理と、
前記要求情報を送信してきた装置に前記資源情報を提供する処理と、 を実行させることを特徴とする資源情報生成プログラム。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/281,971 US8307120B2 (en) | 2006-03-07 | 2007-02-26 | Resource information managing device, system, method, and program |
| JP2008505036A JP5093099B2 (ja) | 2006-03-07 | 2007-02-26 | 資源情報管理装置、システム、方法、及びプログラム |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006061385 | 2006-03-07 | ||
| JP2006-061385 | 2006-03-07 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2007105471A1 true WO2007105471A1 (ja) | 2007-09-20 |
Family
ID=38509307
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2007/053481 Ceased WO2007105471A1 (ja) | 2006-03-07 | 2007-02-26 | 資源情報管理装置、システム、方法、及びプログラム |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US8307120B2 (ja) |
| JP (1) | JP5093099B2 (ja) |
| WO (1) | WO2007105471A1 (ja) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010004768A1 (ja) * | 2008-07-10 | 2010-01-14 | 国立大学法人名古屋大学 | 通信装置、通信システム及び通信方法 |
| JP2011130486A (ja) * | 2011-02-08 | 2011-06-30 | Nagoya Univ | 通信装置、通信システム及び通信方法 |
| WO2013069078A1 (ja) * | 2011-11-07 | 2013-05-16 | 株式会社 日立製作所 | 時系列データ処理装置、時系列データ処理方法、及び時系列データ処理プログラムを格納したコンピュータ読み取り可能な記録媒体 |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8730832B2 (en) * | 2011-05-19 | 2014-05-20 | Electronics And Telecommunications Research Institute | Method and terminal for performing direct communication between terminals |
| US10942786B2 (en) * | 2015-03-13 | 2021-03-09 | Comptel Corporation | Network management |
| GB201810478D0 (en) * | 2018-06-26 | 2018-08-08 | Nordic Semiconductor Asa | Precision timing between systems |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0380797A (ja) * | 1989-08-24 | 1991-04-05 | Nec Corp | 時刻同期方式 |
| JPH05189385A (ja) * | 1992-01-09 | 1993-07-30 | Fuji Xerox Co Ltd | 分散処理環境系におけるタイマ同期方式 |
| JP2005235054A (ja) * | 2004-02-23 | 2005-09-02 | Nec Corp | イベントトレースデータの時刻補正装置,時刻補正方法及び時刻補正プログラム |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6041344A (ja) * | 1983-08-15 | 1985-03-05 | Fuji Facom Corp | 発生デ−タの発生時刻管理方式 |
| JPH0717780B2 (ja) | 1991-08-05 | 1995-03-01 | 工業技術院長 | 微生物崩壊性熱可塑性樹脂発泡体及びその製造方法 |
| US5537101A (en) * | 1993-12-07 | 1996-07-16 | Casio Computer Co., Ltd. | Time data receiving apparatus |
| JPH10228330A (ja) * | 1997-02-18 | 1998-08-25 | Meidensha Corp | コンピュータの時刻修正方式 |
| JP2002202389A (ja) * | 2000-10-31 | 2002-07-19 | Sony Corp | 時計情報内容配信処理システム、情報配信装置、情報配信システム、携帯端末装置、情報記録媒体及び情報処理方法 |
| US20020078243A1 (en) * | 2000-12-15 | 2002-06-20 | International Business Machines Corporation | Method and apparatus for time synchronization in a network data processing system |
| US20020147649A1 (en) * | 2001-04-04 | 2002-10-10 | White Daniel F. | System and method of managing time-sensitive items |
| JP2003216457A (ja) | 2002-01-23 | 2003-07-31 | Hitachi Ltd | エラーログ収集解析エージェントシステム |
| JP2004157739A (ja) * | 2002-11-06 | 2004-06-03 | Canon Inc | 記録装置、通信装置およびそのデータ転送方法 |
| JP2004198290A (ja) * | 2002-12-19 | 2004-07-15 | Casio Comput Co Ltd | 時刻データ送信装置 |
| US20050182856A1 (en) * | 2003-12-22 | 2005-08-18 | Mcknett Charles L. | Systems and methods for creating time aware networks using independent absolute time values in network devices |
| JP2005284520A (ja) | 2004-03-29 | 2005-10-13 | Nec Corp | ログ収集方法/プログラム/プログラム記録媒体/装置/システム |
| JP2005327053A (ja) | 2004-05-13 | 2005-11-24 | Ricoh Co Ltd | ログ情報管理装置、ログ情報生成装置、ログ情報管理プログラム及び記録媒体 |
| KR100909302B1 (ko) * | 2004-10-21 | 2009-07-24 | 가부시키가이샤 메디아식 | 동기 통신 방법 및 동기 통신 장치 |
| US7904615B2 (en) * | 2006-02-16 | 2011-03-08 | Vns Portfolio Llc | Asynchronous computer communication |
-
2007
- 2007-02-26 JP JP2008505036A patent/JP5093099B2/ja not_active Expired - Fee Related
- 2007-02-26 WO PCT/JP2007/053481 patent/WO2007105471A1/ja not_active Ceased
- 2007-02-26 US US12/281,971 patent/US8307120B2/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0380797A (ja) * | 1989-08-24 | 1991-04-05 | Nec Corp | 時刻同期方式 |
| JPH05189385A (ja) * | 1992-01-09 | 1993-07-30 | Fuji Xerox Co Ltd | 分散処理環境系におけるタイマ同期方式 |
| JP2005235054A (ja) * | 2004-02-23 | 2005-09-02 | Nec Corp | イベントトレースデータの時刻補正装置,時刻補正方法及び時刻補正プログラム |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010004768A1 (ja) * | 2008-07-10 | 2010-01-14 | 国立大学法人名古屋大学 | 通信装置、通信システム及び通信方法 |
| JP2010021804A (ja) * | 2008-07-10 | 2010-01-28 | Univ Nagoya | 通信装置、通信システム及び通信方法 |
| US8626869B2 (en) | 2008-07-10 | 2014-01-07 | National University Corporation Nagoya University | Communication apparatus, communication system, and communication method |
| JP2011130486A (ja) * | 2011-02-08 | 2011-06-30 | Nagoya Univ | 通信装置、通信システム及び通信方法 |
| WO2013069078A1 (ja) * | 2011-11-07 | 2013-05-16 | 株式会社 日立製作所 | 時系列データ処理装置、時系列データ処理方法、及び時系列データ処理プログラムを格納したコンピュータ読み取り可能な記録媒体 |
| JPWO2013069078A1 (ja) * | 2011-11-07 | 2015-04-02 | 株式会社日立製作所 | 時系列データ処理装置、時系列データ処理方法、及び時系列データ処理プログラムを格納したコンピュータ読み取り可能な記録媒体 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP5093099B2 (ja) | 2012-12-05 |
| JPWO2007105471A1 (ja) | 2009-07-30 |
| US20090077264A1 (en) | 2009-03-19 |
| US8307120B2 (en) | 2012-11-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6397359B1 (en) | Methods, systems and computer program products for scheduled network performance testing | |
| US9554292B2 (en) | Methods and systems for performance monitoring for mobile applications | |
| US20140214896A1 (en) | Information processing apparatus and method for determining time correction values | |
| JP5093099B2 (ja) | 資源情報管理装置、システム、方法、及びプログラム | |
| CN105765907A (zh) | 用于提供实时或接近实时的纠正反馈的性能监测 | |
| JP6977650B2 (ja) | 異常検出方法、異常検出プログラム、及び異常検出装置 | |
| CN107704387B (zh) | 用于系统预警的方法、装置、电子设备及计算机可读介质 | |
| US9588544B2 (en) | Time synchronization across computers in a distributed system | |
| JP2009033811A (ja) | 計測・監視システム、その電力品質計測装置、プログラム | |
| CN102868685A (zh) | 一种判定自动扫描行为的方法及装置 | |
| KR101824924B1 (ko) | 실시간 부하량에 따른 웹 사이트 성능 측정을 위한 시스템 및 방법 | |
| CN112445697B (zh) | 用于测试应用的方法和装置 | |
| CN110309032A (zh) | 数据管理方法、装置及电子设备 | |
| JP5707263B2 (ja) | 障害発生箇所診断システムおよび障害発生箇所診断方法 | |
| CN102932400B (zh) | 一种识别统一资源定位符主链接的方法及装置 | |
| CN112333758B (zh) | 电视网关系统的稳定性监测管理方法、系统及应用 | |
| JP2017062619A (ja) | 蓄電池システム、蓄電池監視システム及び蓄電池情報収集方法 | |
| CN110298001B (zh) | 日志数据包的获取方法和装置及计算机可读存储介质 | |
| US12579248B2 (en) | Systems, devices, and methods for tracking remote equipment location and utilization of computing devices | |
| US12019467B2 (en) | Estimation of event generation times to synchronize recordation data | |
| JP2017215912A (ja) | 施設管理装置 | |
| US20250068546A1 (en) | Actions by sensors at different time offsets | |
| CN106445935B (zh) | 点击数据的误判处理方法和装置 | |
| JP7442751B1 (ja) | 制御プログラム、監視制御システム、ゲートウェイ装置及び制御方法 | |
| TW201037470A (en) | System and method for obtaining data from a remote end |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| DPE2 | Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101) | ||
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| ENP | Entry into the national phase |
Ref document number: 2008505036 Country of ref document: JP Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 12281971 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 07714913 Country of ref document: EP Kind code of ref document: A1 |