WO2006057040A1 - コンピュータ・システム及び情報処理方法 - Google Patents

コンピュータ・システム及び情報処理方法 Download PDF

Info

Publication number
WO2006057040A1
WO2006057040A1 PCT/JP2004/017546 JP2004017546W WO2006057040A1 WO 2006057040 A1 WO2006057040 A1 WO 2006057040A1 JP 2004017546 W JP2004017546 W JP 2004017546W WO 2006057040 A1 WO2006057040 A1 WO 2006057040A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
processing
business
business processing
client terminal
Prior art date
Application number
PCT/JP2004/017546
Other languages
English (en)
French (fr)
Inventor
Nobuo Togahara
Original Assignee
Fujitsu Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Limited filed Critical Fujitsu Limited
Priority to PCT/JP2004/017546 priority Critical patent/WO2006057040A1/ja
Priority to CNB2004800444806A priority patent/CN100461124C/zh
Priority to JP2006546501A priority patent/JP4526539B2/ja
Priority to EP04822476A priority patent/EP1816565B1/en
Publication of WO2006057040A1 publication Critical patent/WO2006057040A1/ja
Priority to US11/749,271 priority patent/US8204993B2/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/505Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/202Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
    • G06F11/2023Failover techniques
    • G06F11/2025Failover techniques using centralised failover control functionality
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1001Protocols in which an application is distributed across nodes in the network for accessing one among a plurality of replicated servers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1001Protocols in which an application is distributed across nodes in the network for accessing one among a plurality of replicated servers
    • H04L67/1004Server selection for load balancing
    • H04L67/1008Server selection for load balancing based on parameters of servers, e.g. available memory or workload
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1001Protocols in which an application is distributed across nodes in the network for accessing one among a plurality of replicated servers
    • H04L67/1004Server selection for load balancing
    • H04L67/1017Server selection for load balancing based on a round robin mechanism
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1001Protocols in which an application is distributed across nodes in the network for accessing one among a plurality of replicated servers
    • H04L67/1034Reaction to server failures by a load balancer
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/202Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
    • G06F11/2023Failover techniques
    • G06F11/203Failover techniques using migration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/202Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
    • G06F11/2048Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant where the redundant components share neither address space nor persistent storage

Definitions

  • the present invention relates to a technology for load balancing and failure handling in a computer system.
  • Japanese Patent Laid-Open No. 2003-196178 discloses the following technique.
  • load balancer B inquires about the operating status of each of server devices C, D, and E, and as a result, the first server device C performs processing.
  • the first server device C starts processing by connecting the client 'server device and starting processing.
  • the server apparatus C instructs the application layer server F to obtain a data acquisition request, and at the same time, restarts the processing for the shared storage means G. Record the necessary process information.
  • the system control device H receives the data and then receives the data from the server devices C, D, and E. Inquire about the operating status and select the server device to resume processing. This selection method is based on the basis of the lightest load of each server device C, D, and E, the number of other processes currently being executed, and the least amount of processing. The server apparatus that performs the above process most efficiently is selected. If the selected server device is the third server device E, the processing is resumed on a server different from the server device C where the processing was originally executed.
  • the system control device H first sends a connection change request to the load distribution device B instructing to change the connection between the client A and the server device C to the connection with the server device E.
  • the load balancer B changes the connection between the client A and the server device according to this connection change request.
  • the system control device H transfers the data acquired by the application layer server F to the server device E and sends a process resumption instruction.
  • the server device E that receives the data transfer and processing resumption request is different from the server device that performed the processing before data acquisition, so it retains the process information necessary for resuming the processing. Not done. Therefore, the server device E refers to the process information necessary for restarting the processing in the shared storage means G, and restarts the processing. In this way, it is possible to realize a more efficient web tier server operation by performing load balancing when data is acquired and processing is resumed after processing is temporarily stopped for data acquisition. It is a thing.
  • Patent Document 1 Japanese Patent Laid-Open No. 2003-196178
  • an object of the present invention is to provide a new technology that can smoothly cope with a failure while distributing a load in a computer system.
  • the computer system allocates a plurality of business processing units each having a processor and a processing request having a client terminal capability to one business processing unit among the plurality of business processing units.
  • a takeover data management computer for management A takeover data management computer for management.
  • the business processing unit to which the request is allocated obtains the corresponding takeover data from the takeover data identification information included in the process request, and executes the business process using the transfer data and the data included in the process request. Then, it generates the takeover data for the business process, sends it to the takeover data management computer, and further generates response data for the client terminal that is the process request source without performing the re-allocation process of the business process unit.
  • Send Send.
  • the load balancer sends a subsequent processing request for the client terminal power to the specific business processing unit. If a failure occurs in a specific business processing unit, processing requests may be allocated to one business processing unit among other business processing units. In this way, for example, there is a possibility that the takeover data can be acquired without requesting the takeover data to the takeover data management computer, so that the response can be speeded up.
  • the load distribution apparatus may allocate the processing request to one business processing unit according to the state of a plurality of business processing units. In this way, the load is further distributed.
  • the takeover data Session identification information may be used as the specific information.
  • the client terminal power receives a processing request again with the same session ID, the succeeding data can be specified by the session ID.
  • the business processing unit to which the processing request is allocated by the load balancer specifies the business processing to be performed using at least one of the takeover data and the data included in the processing request, and executes the business processing. You may make it implement. It is not divided at which stage the failure occurs. For example, if the same processing request is made again for the client terminal, the previous processing request is completed and the processing result is sent to the client terminal. This is because it is necessary to determine whether or not it is necessary to perform the business processing again because the previous processing request has not been completed.
  • the information processing method includes a step of allocating a processing request from a client terminal to a specific business processing unit among a plurality of business processing units by the load balancer, and the processing request Depending on the specific business processing unit to which the client terminal user has been assigned, either the client terminal identification information or the user identification information that is included in the processing request is used, and Requesting the transfer data corresponding to the transfer data management computer that stores and manages the transfer data that is necessary for the continuation of the operation processing performed by the operation processing unit and includes the bow I-join data identification information; and The takeover data management computer specifies the takeover data according to the request for the takeover data for a specific business processing unit.
  • the business process is performed using the received takeover data and the data included in the process request.
  • an information processing method executed by a business processing unit including a processor receives a processing request for load balancer power and client terminal power. Continuation of business processing performed in the past for the user of the client terminal, using the inherited data specifying information that is included in the processing step and at least one of the client terminal identification information and the user identification information. Using the acquisition step to acquire the transfer data that is necessary for the implementation and includes the bow I relay data identification information, the business process is performed using the acquired transfer data and the data included in the processing request, and For business processing
  • V Generates the inherited data, sends it to the takeover data management computer that stores and manages the takeover data, and reassigns the business processing unit to the client terminal that is the processing request source. And a step for generating and transmitting response data.
  • a program for causing a computer to execute the information processing method described above can be created.
  • This program is a storage medium such as a flexible disk, a CD-ROM, a magneto-optical disk, a semiconductor memory, and a hard disk.
  • a storage device such as a CD-ROM, a magneto-optical disk, a semiconductor memory, and a hard disk.
  • it is stored in a storage device.
  • it may be distributed as a digital signal via a network.
  • the intermediate processing result is temporarily stored in a storage device such as a memory.
  • FIG. 1 is a functional block diagram according to one embodiment of the present invention.
  • FIG. 2 is a diagram illustrating an example of data stored in a takeover data storage unit.
  • FIG. 3 is a diagram showing a first processing flow according to the present embodiment.
  • FIG. 4 is a diagram showing a second processing flow according to the present embodiment.
  • FIG. 5 is a diagram showing a third processing flow according to the present embodiment.
  • FIG. 6 is a diagram showing a fourth processing flow according to the present embodiment.
  • FIG. 7 is a diagram showing a fifth processing flow according to the present embodiment.
  • FIG. 8 is a diagram showing a sixth processing flow according to the present embodiment.
  • FIG. 9 is a functional block diagram of a computer. BEST MODE FOR CARRYING OUT THE INVENTION
  • FIG. 1 shows a system configuration diagram according to an embodiment of the present invention.
  • a network 9 such as the Internet is connected with a plurality of client terminals 11 and 13 which are, for example, personal computers and have a Web browser function, and an L7 switch 7 is also connected.
  • the L7 switch 7 is connected to, for example, a plurality of business processing servers 5a to 5d having a Web server function.
  • the business processing servers 5a to 5d may be servers such as blade servers, or may be processing units including each processor unit of a shared memory parallel computer and other processors.
  • the business processing servers 5 a to 5 d are connected to the session management server 1 via a LAN (Local Area Network) 3.
  • LAN Local Area Network
  • the session management server 1 has a takeover data storage unit 101.
  • the takeover data storage unit 101 stores data as shown in FIG. In other words, the session ID for specifying the session with the client terminal 11 or 13, the user ID of the user operating the client terminal 11 or 13, and the state of the business process performed by the business process servers 5a to 5d. (Status) data, the ID of the server that executed the relevant business process, the process completion time, and the data required to continue the business process executed by the current business process servers 5a to 5d are registered. Yes. In this embodiment, the same session ID is used after logging in until logging off. However, it is also possible to switch at the end of an apparent specific job.
  • the data representing the state is a combination of a screen code to be displayed on the client terminal 11 or 13, a code for identifying a step in a specific business process, and a processing state (such as normal end or abnormal end).
  • data necessary for continuing business processing includes data such as customer data input and transmitted to the business processing server on the customer registration screen.
  • This customer data is data necessary for continuing business processing because it is used when, for example, a customer registration confirmation screen is generated and transmitted.
  • the confirmation button is clicked and the customer information book
  • the customer code and the code indicating completion of customer registration are the data necessary to continue the business process. This is the power necessary to notify the completion of customer registration.
  • each record stored in the inherited data storage unit 101, for example, when it is clear that the business process has been completed in a series of business processes, all of the inherited data related to the business process is obtained. Data shall be deleted or deleted when the processing time exceeds a certain period.
  • Each of the business processing servers 5a to 5d includes a communication processing unit 51 that performs communication with the L7 switch 7 and communication with the LAN 3, and a response data storage unit 52 that stores response data to the client terminal 11 or 13.
  • the communication processing unit 51 stores the business process request received from the L7 switch 7 in the processing request data storage unit 54.
  • the control unit 55 refers to the business processing request stored in the processing request data storage unit 54 and causes the communication processing unit 51 to transmit a takeover data acquisition request to the session management server 1.
  • the takeover data storage unit 53 may be referred to.
  • the communication processing unit 51 receives the takeover data from the session management server 1, the communication processing unit 51 stores it in the takeover data storage unit 53.
  • the control unit 55 identifies the business process to be executed based on the takeover data and the business process request, and causes the business process unit 56 to execute the business process.
  • the business processing unit 56 performs processing according to the instruction and outputs the processing result to the control unit 55.
  • the control unit 55 generates takeover data based on the processing result and outputs it to the takeover data storage unit 53 and causes the communication processing unit 51 to transmit it to the session management server 1. Further, the response data is automatically configured and output to the response data storage unit 52, and the communication processing unit 51 is transmitted to the requesting client terminal 11 or 13 via the L7 switch 7.
  • the L7 switch 7 has a load balancer function, and various load balancing algorithms (round robin and static weighting, minimum number of connections, minimum number of clients, minimum data traffic, minimum response time, minimum CPU) Load distribution is performed using load ratio, minimum memory usage ratio, minimum disk load ratio, etc.).
  • load balancing function includes a function to check the status of the business processing servers 5a to 5d at predetermined intervals or at arbitrary timing. In addition to checking whether the status is normal or abnormal, the status check includes checking the load status of each business processing server. It also manages a correspondence table between the IP addresses of client terminals and the IP addresses of business processing servers assigned by the load balancing algorithm.
  • FIG. 3 to FIG. 6 it is assumed that login has already been completed.
  • the client terminal 11 displays a menu screen, for example, and is instructed by the user to start a specific business process.
  • the client terminal 11 transmits a specific job start request A to the L7 switch 7 in accordance with the instruction (step Sl).
  • the business start request A includes a user ID, for example, using a cookie or embedded in a URL.
  • L7 switch 7 receives specific job start request A from client terminal 11 (step S3), and identifies a job processing server (Ml (job processing servers 5a to 5d !, one of them)) according to a predetermined rule (Step S5).
  • the predetermined rule may be a rule that is simply selected according to the load status of the business processing servers 5a to 5d and the presence / absence of a failure, or the same business process request for client terminal power as possible.
  • the rule may be assigned to a processing server and selected from other business processing servers according to the load status when a failure occurs in the business processing server.
  • the L7 switch 7 transmits a specific business start request A to the business processing server (Ml) (step S7).
  • the communication processing unit 51 of the business processing Sano receives a specific business start request A from the L7 switch 7 and stores it in the processing request data storage unit 54 (step S9).
  • the control unit 55 of the business processing server (Ml) generates a new session ID because the business is started (Step S11), and causes the business processing unit 56 to perform the business processing at the start of the business (Step S11). S13). Note that after or before step S11, a process of acquiring the takeover data from the session management server 1 using the user ID as a key may be performed. ⁇ However, if it is clear that the business process has been started in this way, acquisition of the transfer data can be omitted.
  • the control unit 55 receives the processing result, generates transfer data including a session ID and the like, stores it in the transfer data storage unit 53, and stores the session management server 1 in the communication processing unit 51. (Step S15).
  • the user ID the user ID at the time of login shall be conveyed by a cookie or other means.
  • the session management server 1 receives the takeover data including the session processing ID (Ml) force including the session ID and stores it in the takeover data storage unit 101 (step S17).
  • the stored data to be stored is as shown in Fig. 2.
  • the session management server 1 transmits processing completion to the business processing server (M 1).
  • the processing shifts to the processing in FIG. If the specific business process is customer information registration, the Web page 'data for the customer information registration screen will be generated at the beginning. Therefore, the takeover data is the session ID, user ID, and screen ID, for example. Such state information is the main data.
  • the control unit 55 of the business processing server (Ml) generates response data including a session ID and the like, and causes the communication processing unit 51 to transmit it to the L7 switch 7 (FIG. 4: Step S19). ).
  • the session ID and user ID are stored in a cookie, for example. In the above example, the session ID and user ID are transmitted together with the Web page data for the customer information registration screen. Note that it may be embedded in a URL that is not just a cookie.
  • the L7 switch 7 receives the response data including the session ID from the business processing server (Ml) and transfers it to the requesting client terminal 11 (step S21).
  • the client terminal 11 receives the response data including the session ID from the L7 switch 7 and displays it on the display device (step S23).
  • the session ID etc. is transmitted with a single click, it is stored in the storage device.
  • a customer information registration screen is displayed, and the user inputs customer information.
  • the client terminal 11 accepts an input from the user (step S25), and transmits a business process request B including a session ID and input data to the L7 switch 7 by clicking a transmission button, for example (step S27).
  • the L7 switch 7 receives the business processing request B including the session ID and the input data from the client terminal 11 (step S29), and follows the predetermined rule as described above.
  • To identify the business processing server step S31.
  • the business processing server (Ml) is specified.
  • the business process request B including the session ID and input data is transmitted to the identified business process server (Ml) (step S33).
  • the communication processing unit 51 of the business processing server (Ml) receives the business processing request B including the session ID and the input data and stores it in the processing request data storage unit 54 (step S35). Processing shifts to the processing in Fig. 5 via terminal B.
  • the control unit 55 of the business processing server (Ml) reads the session ID and the like included in the business processing request stored in the processing request data storage unit 54, and generates a takeover data request including the session ID and the like. Then, the communication processing unit 51 is transmitted to the session management server 1 (FIG. 5: step S37). In addition, referring to the takeover data storage unit 53 and confirming that the previous takeover data is stored, and only when it is determined that the immediately previous takeover data is not stored, the takeover data request is sent to the session management server 1. May be transmitted. In this way, the response to the client terminal can be accelerated.
  • the session management server 1 receives the takeover data request including the session ID and the like of the business processing server (Ml) (step S39), searches the takeover data storage unit 101 using the session ID etc., and The takeover data is specified and transmitted to the requesting business processing server (Ml) (step S41).
  • the communication processing unit 51 of the business processing server (Ml) receives the takeover data from the session management server 1 (step S43), it stores it in the takeover data storage unit 53. Then, the control unit 55 of the business processing server (Ml) performs the business to be executed from the immediately preceding takeover data stored in the takeover data storage unit 53 and the business processing request B data stored in the processing request data storage unit 54. The process is identified and executed by the business processing unit 56 (step S45). For example, if the takeover data includes the screen ID of the customer information registration screen and the business process request data includes customer information, it should proceed to the next processing stage and confirm customer information registration. Can be judged. Therefore, as a business process to be executed, the Web page data for the customer information registration confirmation screen including the received customer information is generated.
  • the control unit 55 of the business processing server (Ml) generates new takeover data including a session ID and the like, stores the new takeover data in the takeover data storage unit 53, and stores the session management server 1 in the communication processing unit 51.
  • new customer data includes received customer information.
  • the session management server 1 receives the takeover data including the session ID and the like as well as the business processing server (Ml)
  • the session management server 1 stores it in the takeover data storage unit 101 (step S49).
  • a write completion notice is transmitted to the business processing server (Ml).
  • the control unit 55 of the business processing server (Ml) sends response data including the session ID for the client terminal 11 and the like. Is generated and stored in the response data storage unit 52, and the communication processing unit 51 transmits it to the L7 switch 7 (step S51). Session ID etc. are transmitted by cookie or other means as described above.
  • the L7 switch 7 When the L7 switch 7 receives the response data including the business processing Sano (Ml) force session ID or the like, the L7 switch 7 transfers the response data to the requesting client terminal 11 (step S53).
  • the client terminal 11 receives the response data including the session ID from the L7 switch 7 and displays it on the display device (step S55). If the session ID is sent as a cookie, it is stored in the storage device.
  • the connection between the client terminal 11 and the L7 switch 7 is maintained will be described with reference to FIG.
  • the response does not return even after waiting for a certain amount of time. Click the Send button again.
  • the client terminal 11 accepts an instruction from the user and resends the business process request B including the session ID and the input data to the L7 switch 7 (step S61).
  • the L7 switch 7 receives the business processing request B including the session ID and the input data from the client terminal 11 (step S63), and performs the business according to the predetermined rule as described above. Specify the processing server (step S65). However, since a failure has occurred in the business processing server (Ml), the business processing request B cannot be allocated to the business processing server (Ml). Therefore, the business processing sano (M2 (the business processing server excluding the business processing server in which one of the business processing servers 5a to 5d has failed)) is specified here. Then, the business process request B including the session ID and input data is transmitted to the identified business process server (M2) (step S67). The communication processing unit 51 of the business processing server (M2) receives the business processing request B including the session ID and the input data and stores it in the processing request data storage unit 54 (step S69).
  • the control unit 55 of the business process server reads the session ID included in the business process request stored in the process request data storage unit 54, and generates a takeover data request including the session ID. Then, the communication processing unit 51 is transmitted to the session management server 1 (step S71). In addition, referring to the takeover data storage unit 53, it is confirmed whether or not the immediately preceding takeover data is stored, and only when it is determined that the immediately preceding takeover data is not stored, the takeover data request is sent to the session management server 1. You may make it transmit. However, in this case, since the immediately preceding takeover data is not stored in the takeover data storage unit 53, step S71 is executed as it is.
  • the session management server 1 receives the takeover data request including the session ID from the business processing server (M2) (step S73), searches the takeover data storage unit 101 using the session ID etc., and searches for the immediately preceding takeover data. Is transmitted to the requesting business processing server (M2) (step S75).
  • step S77 When the communication processing unit 51 of the business processing server (M2) receives the takeover data from the session management server 1 (step S77), it stores it in the takeover data storage unit 53. Then, the process proceeds to step S45 in FIG.
  • step S45 the business processing server (Ml) fails at any timing. Processing differs depending on whether it occurred. For example, if the business processing server (Ml) stops without executing the required business processing, execute the required business processing using the takeover data and the input data included in the business processing request B There is a need. Therefore, the same processing as when receiving business processing request B for the first time is executed. On the other hand, if the business processing server (Ml) executes the necessary business processing, generates the takeover data, stops after sending the takeover data to the session management server 1, the business processing is not performed on the takeover data. Since there is data indicating completion, response data can be generated using the data included in the takeover data without processing using the data included in business process request B.
  • customer data registration completion data is included in the takeover data
  • customer information registration without re-execution of customer information registration even if business process request B includes a customer registration instruction
  • business process request B includes a customer registration instruction
  • the required business process is substantially equivalent to the generation of response data, such as the generation of a confirmation screen Web page data
  • Similar processing is performed.
  • customer information for customer information registration confirmation is included in the takeover data, and customer information is also included in business process request B
  • the web page 'data for customer information registration confirmation is the first business process request. It is generated in the same way as when B is received.
  • the business processing server (Ml) is stopped during the execution of business processing but before the takeover data is generated or before the takeover data is registered in the session management server 1, the same business Processing will be executed. However, for example, when double registration is detected by executing a confirmation process when there is no double registration in business processing. If post-processing is performed, it is possible to cope with the above case.
  • the connection between the L7 switch 7 and the client terminal 11 is maintained.
  • the response does not return even after waiting for a certain amount of time.
  • the user clicks the stop button of the Web browser and clicks the send button again.
  • the client terminal 11 receives the Web page data requesting re-login as an error and displays it on the display device. Then, the user enters the user ID and password in the input field.
  • the client terminal 11 receives the user ID and password input from the user, and transmits a login request including the user ID and password to the L7 switch 7 (step S81).
  • the L7 switch 7 receives the mouth gin request including the user ID and password (step S83), and identifies the server that performs the authentication process (step S85).
  • the server that performs the authentication process is not shown in FIG. 1, for example, one of the business processing servers 5a to 5d may be identified as a specific business processing server for the authentication process. It may be possible to execute it even by a V, misaligned business processing server, and select according to the load state.
  • a login request including a user ID and a password is transmitted to the specified authentication server (step S87).
  • the authentication server receives the login request including the user ID and password, and performs authentication processing (step S89).
  • the authentication server transmits a business continuation request including the user ID to the L7 switch 7 (step S91).
  • the L7 switch 7 receives the business continuation request including the user ID from the authentication server, the L7 switch 7 identifies the business processing server according to the predetermined rule described above (step S93). Here, it is assumed that the business processing server (M2) is selected. Then, the L7 switch 7 transmits a business continuation request C including a user ID to the business processing server (M2) (step S95).
  • the communication processing unit 51 of the business processing server (M2) receives the business continuation request C including the user ID from the L7 switch 7 (step S97) and stores it in the processing request data storage unit 54. The process proceeds to the process shown in FIG.
  • the control unit 55 of the business processing server reads the user ID included in the business continuation request C stored in the processing request data storage unit 54, generates a takeover data request including the user ID, and performs communication processing.
  • the part 51 is transmitted to the session management Sano 1 (step S99).
  • the takeover data storage unit 53 confirming the power of the last takeover data and determining that the last takeover data is not stored, only the takeover data is stored in the session management server 1.
  • a request may be transmitted. However, in this case, since the immediately preceding takeover data is not stored in the takeover data storage unit 53, step S99 is executed as it is. Furthermore, since the session takeover request does not include the session ID, a session ID is issued.
  • the session management server 1 receives the takeover data request including the user ID from the business processing server (M2) (step S101), searches the takeover data storage unit 101 using the user ID, and immediately before the corresponding one.
  • the takeover data is identified and transmitted to the requesting business processing server (M2) (step S103). Note that the assumption is that it is a re-gain after a failure occurs, so that valid takeover data is stored in the takeover data storage unit 101. In some cases, there is no takeover data in normal login processing.
  • step S 105 When the communication processing unit 51 of the business processing server (M2) receives the takeover data from the session management server 1 (step S 105), the communication processing unit 51 stores it in the takeover data storage unit 53. Then, the process proceeds to step S45 in FIG.
  • step S45 when the takeover data can be received and the content of the takeover data indicates that the business process is in progress, the same process as described in relation to FIG. 6 is performed. carry out. However, in the case of a normal login, there may be no transfer data. In addition, the takeover data may be data indicating completion of business processing. In such a case, the control unit 55 of the business processing server (M2) causes the business processing unit 56 to generate, for example, menu page 'data as the first processing of the business processing. Therefore, business processing can be started as usual according to user instructions.
  • the functional block of the business processing server 5a shown in FIG. 1 may not necessarily correspond to the implementation program module.
  • the network 9 is not limited to the Internet, but may be an in-house intranet, for example.
  • the processing flow described above is also an example, and such a modification may be adopted if the processing result is the same even if the order is changed.
  • the menu screen Web page data is generated and transmitted to the client terminal 11. For example, when the user instructs the business continuation, the processing from step S93 is executed. Make sure it is done.
  • the business processing servers 5a to 5d, the session management server 1, and the client terminals 11 and 13 described above are computer devices, and as shown in FIG. 9, a memory 2501 (memory unit) and a CPU 2503 (Processing unit) and hard disk drive (HDD) Display control unit connected to 2505 and display device 250 9 2507 and drive unit for removable disk 2511 251 3 and input device 2515 and communication control unit to connect to network 2517 is connected by bus 2519.
  • the operating system (OS: Operating System) and the application program for executing the processing in this embodiment are stored in the HDD 2505, and when executed by the CPU 2503, it is read into the memory 2501 from the HDD 2505. It is.
  • OS Operating System
  • the CPU 2503 controls the display control unit 2507, the communication control unit 2517, and the drive device 2513 as necessary to perform necessary operations.
  • data being processed is stored in the memory 2501, and if necessary, stored in the HDD 2505.
  • the application program for executing the processing described above is stored in the removable disk 2511 and distributed, and installed in the HDD 2505 from the drive device 2513. It may be installed in HDD2505 via network such as the Internet and communication control unit 2517.
  • Such a computer apparatus realizes various functions as described above by organically cooperating the hardware such as the CPU 2503 and the memory 2501 described above with the OS and the necessary application program. .

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Quality & Reliability (AREA)
  • Computer Hardware Design (AREA)
  • Information Transfer Between Computers (AREA)
  • Computer And Data Communications (AREA)
  • Hardware Redundancy (AREA)

Abstract

 本発明のコンピュータ・システムは、複数のサーバ5と、クライアント端末11からの処理要求を、複数のサーバのうち1のサーバに割り振るL7スイッチ7と、サーバが実施した業務処理の継続実施に必要なデータであり且つクライアント端末識別情報等である引継データ特定情報を含む引継データを保管且つ管理するセッション管理サーバとを有する。そして、L7スイッチ7により処理要求を割り振られたサーバは、当該処理要求に含まれる引継データ特定情報により該当する引継データを取得して当該引継データと処理要求に含まれるデータとを用いて業務処理を実施し、当該業務処理についての引継データを生成してセッション管理サーバに送信し、さらにサーバの再度の割り振り処理を実施することなく処理要求元であるクライアント端末に対する応答データを生成して送信する。

Description

コンピュータ 'システム及び情報処理方法
技術分野
[0001] 本発明は、コンピュータ 'システムにおける負荷分散及び障害対応技術に関する。
背景技術
[0002] 例えば、特開 2003— 196178号公報には以下のような技術が開示されている。す なわち、クライアント Aからの処理要求に対して、負荷分散装置 Bが、各サーバ装置 C 、 D、 Eの稼動状況の問合せを実施し、その結果力も第 1のサーバ装置 Cを処理の実 行を行うサーバとして選択し、クライアント 'サーバ装置の接続、および処理開始によ り、第 1のサーバ装置 Cが処理を開始する。ここで、当該処理に必要なデータが生じ た場合、サーバ装置 Cは、アプリケーション層サーバ Fに対してデータ取得要求を指 示すると同時に、共有記憶手段 Gに対して、当該処理を再開するために必要なプロ セス情報の記録を行う。アプリケーション層サーバ Fにおいて、当該処理に必要なデ ータの作成が終了し、データ返送要求が送出されると、システム制御装置 Hは、当該 データを受け取った後、サーバ装置 C、 D、 Eの稼動状況の問合せを行い、処理の再 開を行うサーバ装置を選択する。この選択の方法としては、各サーバ装置 C、 D、 Eの 負荷の最も軽 、もの、ある 、は現在実行されて 、る他の処理の数力 Sもっとも少な 、も のなどを根拠に、以後の処理が最も効率良く実行されるサーバ装置を選択する。選 択されたサーバ装置が第 3のサーバ装置 Eであったとすると、当該処理が当初実行さ れていたサーバ装置 Cとは異なるサーバにて処理を再開することになる。この場合、 システム制御装置 Hは、まず、クライアント Aとサーバ装置 Cとの接続を、サーバ装置 Eとの接続へ変更することを指示する接続変更要求を、負荷分散装置 Bに送る。負荷 分散装置 Bはこの接続変更要求にしたがって、クライアント Aとサーバ装置との接続 変更を実施する。その後、システム制御装置 Hはサーバ装置 Eに対してアプリケーシ ヨン層サーバ Fにより取得されたデータの転送を行い、かつ処理再開指示を送る。デ ータの転送、および処理再開要求を受けたサーバ装置 Eは、データ取得前に当該処 理を行っていたサーバ装置とは異なるため、処理再開に必要なプロセス情報は保持 していない。そこで、サーバ装置 Eは、共有記憶手段 Gにある処理を再開するために 必要なプロセス情報の参照を行い、処理を再開する。このように、データ取得のため 処理を一時停止した後、データを取得し処理を再開する際にも負荷分散を実施する ことにより、さらに効率的なウェブ層サーバの運用を実現することができるというもので ある。
特許文献 1:特開 2003—196178号公報
発明の開示
発明が解決しょうとする課題
[0003] し力しながら上記のような技術では、クライアント Aからの要求に応じて初めに処理 を行ったサーバ装置を選択した上、さらに同一要求についてレスポンスを行うサーバ 装置を選択する必要があるため、 1つの要求を処理するのにサーバ選択処理を 2回 も行わなければならず、サーバ装置の負荷がほぼ均等であるならばサーバ選択処理 1回分の余分な時間が力かることになる。また、サーバ選択処理毎に負荷状況を各サ ーバ装置に問い合わせる場合にはそのための負荷も余分にかかる。上記のような技 術では、サーバ装置においてアプリケーション層サーバへ処理を依頼した後に障害 が発生した場合にはクライアントに影響を与えずに処理を完了させることが可能であ る力 サーバ装置において初めに処理を開始した後やアプリケーション層サーノから のデータを処理している間に障害が発生した場合にはクライアントに障害発生の影 響が出てしまうので、障害対策上大きな効果は無い。
[0004] 従って、本発明の目的は、コンピュータ 'システムにおいて負荷分散を図りつつ障 害対応がスムーズになされる新たな技術を提供することである。
課題を解決するための手段
[0005] 本発明の第 1の態様に係るコンピュータ 'システムは、各々プロセッサを有する複数 の業務処理単位と、クライアント端末力もの処理要求を、複数の業務処理単位のうち 1の業務処理単位に割り振る負荷分散装置と、業務処理単位が実施した業務処理の 継続実施に必要なデータであり且つクライアント端末識別情報とユーザ識別情報と のうち少なくともいずれかである引継データ特定情報を含む引継データを保管且つ 管理する引継データ管理コンピュータとを有する。そして、負荷分散装置により処理 要求を割り振られた業務処理単位は、当該処理要求に含まれる引継データ特定情 報により該当する引継データを取得して当該引継データと処理要求に含まれるデー タとを用いて業務処理を実施し、当該業務処理についての引継データを生成して引 継データ管理コンピュータに送信し、さらに業務処理単位の再度の割り振り処理を実 施することなく処理要求元であるクライアント端末に対する応答データを生成して送 信する。
[0006] このような処理を実施することにより、業務処理単位の割り振り処理が必要最低限に 抑えられ、障害時においても引継データ管理コンピュータが保管且つ管理している 引継データにより対処可能となっている。
[0007] なお、負荷分散装置は、クライアント端末との通信開始時において割り振った特定 の業務処理単位が動作している場合には当該特定の業務処理単位に、クライアント 端末力 の後続の処理要求を割り振り、特定の業務処理単位に障害が発生した場合 に、他の業務処理単位のうち 1の業務処理単位に処理要求を割り振るようにしてもよ い。このようにすれば、例えば引継データ管理コンピュータに引継データを要求せず とも引継データを取得できる可能性があるので、レスポンスを高速ィ匕させることができ る。
[0008] また、負荷分散装置は、クライアント端末力もの処理要求を受信する毎に、複数の 業務処理単位の状態に応じて上記処理要求を 1の業務処理単位に割り振るようにし てちよい。このようにすれば、より負荷が分散されることになる。
[0009] さらに、特定のクライアント端末からの処理要求に対して割り振った特定の業務処 理単位に障害が発生しても特定のクライアント端末と負荷分散装置との接続が継続 される場合、引継データ特定情報としてセッション識別情報を用いるようにしてもよい 。このような場合には、クライアント端末力も再度同じセッション IDで処理要求を受け るので、当該セッション IDにより引継データが特定できる。
[0010] また、特定のクライアント端末からの処理要求に対して割り振った特定の業務処理 単位に障害が発生すると特定のクライアント端末と負荷分散装置との接続が切断さ れる場合、引継データ特定情報としてユーザ識別情報を用いるようにしてもよい。こ のような場合ユーザは再度ログインしなければならないこともあり、そのような場合に は前のセッション IDを業務処理単位にぉ 、て取得できな 、場合もあるためである。
[0011] さらに、負荷分散装置により処理要求を割り振られた業務処理単位は、引継データ と処理要求に含まれるデータとの少なくともいずれかを用いて実施すべき業務処理を 特定し、当該業務処理を実施するようにしてもよい。いずれの段階で障害が発生する かは分力 ず、例えばクライアント端末力 再度同じ処理要求がなされた場合には、 前回その処理要求にっ 、ての処理が完了して 、て処理結果をクライアント端末に送 信すればよ!、のか、または前回その処理要求につ!、ての処理が完了しておらず再 度業務処理を行わなければならないのかを判断する必要があるためである。
[0012] 本発明の第 2の態様に係る情報処理方法は、負荷分散装置により、クライアント端 末からの処理要求を複数の業務処理単位のうち特定の業務処理単位に割り振るス テツプと、処理要求を割り振られた特定の業務処理単位により、当該処理要求に含ま れ且つクライアント端末識別情報とユーザ識別情報とのうち少なくともいずれかである 引継データ特定情報を用いて、クライアント端末のユーザについていずれかの業務 処理単位により実施された業務処理の継続実施に必要なデータであり且つ弓 I継デ ータ特定情報を含む引継データを保管且つ管理する引継データ管理コンピュータに 該当する引継データを要求するステップと、引継データ管理コンピュータにより、特定 の業務処理単位力 の引継データの要求に応じて引継データを特定して返信するス テツプと、特定の業務処理単位により、引継データ管理コンピュータから要求に係る 引継データを受信し、受信した引継データと処理要求に含まれるデータとを用いて 業務処理を実施し、当該業務処理についての引継データを生成して引継データ管 理コンピュータに送信するステップと、引継データ管理コンピュータにより、特定の業 務処理単位から引継データを受信し、保管するステップと、業務処理単位の再度の 割り振り処理を実施することなく特定の業務処理単位により、処理要求元であるクライ アント端末に対する応答データを生成して送信するステップと含む。
[0013] このようにすれば、コンピュータ 'システム全体としてレスポンス時間を短縮しつつ、 障害時への対応もスムーズに行うことができるようになる。
[0014] さらに、本発明の第 3の態様に係る、プロセッサを含む業務処理単位により実行さ れる情報処理方法は、負荷分散装置力 クライアント端末力 の処理要求を受信す るステップと、処理要求に含まれ且つクライアント端末識別情報とユーザ識別情報と のうち少なくともいずれかである引継データ特定情報を用いて、クライアント端末のュ 一ザについて過去に実施された業務処理の継続実施に必要なデータであり且つ弓 I 継データ特定情報を含む引継データを取得する取得ステップと、取得された引継デ ータと処理要求に含まれるデータとを用いて業務処理を実施し、当該業務処理につ
V、ての引継データを生成して、引継データを保管且つ管理する引継データ管理コン ピュータに送信するステップと、業務処理単位の再度の割り振り処理を実施すること なぐ処理要求元であるクライアント端末に対する応答データを生成して送信するス テツプとを含む。
[0015] また、上で述べた取得ステップにお 、て、業務処理単位の記憶装置にお!/、て引 «I データを取得できな力つた場合に、引継データ管理コンピュータに要求するようにし てもよい。例えば、できるだけ同じ業務処理単位において連続して業務処理を行うよ うに処理要求の割り振りが行われる場合には、自己の記憶装置に引継データが保持 されている場合もあり、そのような場合には引継データ管理コンピュータに要求する 必要が無 ヽ場合もあるカゝらである。
[0016] 上で述べた情報処理方法をコンピュータに実行させるためのプログラムを作成する ことができ、このプログラムは、例えばフレキシブルディスク、 CD-ROM,光磁気ディ スク、半導体メモリ、ハードディスク等の記憶媒体又は記憶装置に格納される。また、 ネットワークなどを介してデジタル信号として配信される場合もある。尚、中間的な処 理結果はメモリ等の記憶装置に一時保管される。
図面の簡単な説明
[0017] [図 1]図 1は、本発明の一実施の形態に係る機能ブロック図である。
[図 2]引継データ格納部に格納されるデータの一例を示す図である。
[図 3]本実施の形態に係る第 1の処理フローを示す図である。
[図 4]本実施の形態に係る第 2の処理フローを示す図である。
[図 5]本実施の形態に係る第 3の処理フローを示す図である。
[図 6]本実施の形態に係る第 4の処理フローを示す図である。
[図 7]本実施の形態に係る第 5の処理フローを示す図である。 [図 8]本実施の形態に係る第 6の処理フローを示す図である。
[図 9]コンピュータの機能ブロック図である。 発明を実施するための最良の形態
[0018] 図 1に本発明の一実施の形態に係るシステム構成図を示す。例えばインターネット 等のネットワーク 9には、例えばパーソナルコンピュータであってウェブ (Web)ブラウ ザ機能を有する複数のクライアント端末 11及び 13が接続されており、さらに L7スィッ チ 7も接続されている。また L7スィッチ 7には、例えば Webサーバ機能を有する複数 の業務処理サーバ 5a乃至 5dが接続されて!、る。この業務処理サーバ 5a乃至 5dは、 ブレードサーバのようなサーバであってもよ 、し、共有メモリ型並列コンピュータの各 プロセッサユニット、その他のプロセッサを含む処理単位であってもよい。また、業務 処理サーバ 5a乃至 5dは、 LAN (Local Area network) 3を介してセッション管理サー ノ 1に接続されている。
[0019] セッション管理サーバ 1は、引継データ格納部 101を有している。引継データ格納 部 101には、例えば図 2に示すようなデータが格納されている。すなわち、クライアン ト端末 11又は 13とのセッションを特定するためのセッション IDと、クライアント端末 11 又は 13を操作しているユーザのユーザ IDと、業務処理サーバ 5a乃至 5dにより実施 された業務処理のステート (状態)を表すデータと、当該業務処理を実行したサーバ の IDと、処理完了時刻と、今回業務処理サーバ 5a乃至 5dが実行した業務処理を継 続するために必要なデータとが登録されている。本実施の形態では、ログインしてか らログオフするまで同一のセッション IDを用いるようにする。但し、明らかな特定の業 務終了時に切り替えることも可能である。また、ステートを表すデータとしては、クライ アント端末 11又は 13に表示させる画面のコードや特定の業務処理におけるステップ を特定するコードと処理状態 (正常終了又は異常終了など)とを組み合わせたもので ある。業務処理を継続するために必要なデータとは、例えば顧客登録が要求された 場合には、顧客登録画面にお 、て入力され業務処理サーバに送信された顧客デー タ等のデータが含まれる。この顧客データ等は、例えば顧客登録の確認画面を生成 し、送信する際に用いられるため、業務処理を継続するために必要なデータである。 また、例えば顧客登録の確認画面において確認ボタンがクリックされ、顧客情報の本 登録が要求された場合には、顧客コード及び顧客登録完了を表すコード等が、業務 処理を継続するために必要なデータとなる。顧客登録完了を通知するのに必要なデ ータである力 である。
[0020] なお、引継データ格納部 101に格納された引継データ(各レコード)については、 例えば一連の業務処理において当該業務処理が終了したことが明らかな場合に当 該業務処理に関連する全引継データを削除するか、処理時刻が一定期間以上経過 した場合に削除するものとする。
[0021] 業務処理サーバ 5a乃至 5dの各々は、 L7スィッチ 7との通信及び LAN3との通信を 行う通信処理部 51と、クライアント端末 11又は 13へのレスポンスデータを格納するレ スポンスデータ格納部 52と、引継データ格納部 53と、クライアント端末 11又は 13か らの業務処理要求等を格納する処理要求データ格納部 54と、制御部 55と、各種業 務を行うための業務処理部 56とを含む。
[0022] 通信処理部 51は、 L7スィッチ 7から受信した業務処理要求などを処理要求データ 格納部 54に格納する。制御部 55は、処理要求データ格納部 54に格納された業務 処理要求などを参照して引継データの取得要求を通信処理部 51にセッション管理 サーバ 1へ送信させる。なお、この際引継データ格納部 53を参照するようにしても良 い。通信処理部 51は、セッション管理サーバ 1から引継データを受信すると引継デー タ格納部 53に格納する。制御部 55は、引継データ及び業務処理要求等に基づき実 施すべき業務処理を特定し、業務処理部 56に業務処理を実行させる。業務処理部 56は、指示に従って処理を実施し、処理結果を制御部 55に出力する。制御部 55は 、処理結果等に基づき引継データを生成し、引継データ格納部 53に出力すると共に 、通信処理部 51にセッション管理サーノ 1へ送信させる。さらに、自動的にレスボン スデータを構成し、レスポンスデータ格納部 52に出力すると共に、通信処理部 51に L7スィッチ 7を介して要求元のクライアント端末 11又は 13へ送信させる。
[0023] L7スィッチ 7は、ロードバランサの機能を有しており、各種負荷分散アルゴリズム (ラ ゥンドロビンや静的な重み付け、最小コネクション数、最小クライアント数、最小データ 通信量、最小応答時間、最小 CPU負荷率、最小メモリ使用率、最小ディスク負荷率 等)を用いて負荷分散を実施する。なお、このような負荷分散機能は周知であって、 業務処理サーバ 5a乃至 5dについて所定の間隔又は任意のタイミングで状態チェッ クを行う機能を含む。状態チヱックには、正常か異常かのチェックの他に、各業務処 理サーバの負荷状況のチェックも含まれる。また、クライアント端末の IPアドレス等と 負荷分散アルゴリズムにより割り当てられた業務処理サーバの IPアドレス等との対応 テーブルを管理している。
[0024] 次に図 3乃至図 8を用いて図 1に示したコンピュータ 'システムの処理内容を説明す る。なお、図 3乃至図 6においては既にログインが完了しているものとして説明する。 まず、クライアント端末 11は、例えばメニュー画面などを表示しており、ユーザから特 定の業務処理の開始を指示されたものとする。そうすると、クライアント端末 11は、当 該指示に応じて、特定の業務開始要求 Aを L7スィッチ 7に送信する (ステップ Sl)。 なお、業務開始要求 Aには、例えばクッキーを用いて又は URLに埋め込むような形 態にてユーザ IDが含まれるものとする。 L7スィッチ 7は、クライアント端末 11から特定 の業務開始要求 Aを受信し (ステップ S3)、所定のルールに従って業務処理サーバ( Ml (業務処理サーバ 5a乃至 5dの!、ずれか 1つ) )を特定する(ステップ S5)。所定の ルールは、単純に業務処理サーバ 5a乃至 5dの負荷状態及び障害の有無などに応 じて選択するようなルールであっても良いし、クライアント端末力 の業務処理要求等 をできる限り同じ業務処理サーバに割り振り、当該業務処理サーバに障害が発生し た場合に他の業務処理サーバから負荷状態などに応じて選択するようなルールであ つてもよい。なお、レスポンスデータの返信を行うため、いずれの場合であってもクラ イアント端末 11の IPアドレスと特定された業務処理サーバ(Ml)の IPアドレス等との 対応関係を記憶しておく。そして L7スィッチ 7は、業務処理サーバ(Ml)に特定の業 務開始要求 Aを送信する (ステップ S 7)。
[0025] これに対して業務処理サーノ (Ml)の通信処理部 51は、 L7スィッチ 7から特定の 業務開始要求 Aを受信し、処理要求データ格納部 54に格納する (ステップ S9)。そし て、業務処理サーバ(Ml)の制御部 55は、業務開始であるからセッション IDを新た に生成し (ステップ S 11)、業務開始時における業務処理を業務処理部 56に実施さ せる(ステップ S13)。なお、ステップ S11の後又は前に、引継データを、ユーザ IDを キーとしてセッション管理サーバ 1から取得する処理を実施するようにしても良い。伹 し、このように明示的に業務処理開始であることが分かれば、引継データの取得は省 略可能である。制御部 55は、業務処理部 56による業務処理が完了すると処理結果 を受け取り、セッション ID等を含む引継データを生成し、引継データ格納部 53に格 納すると共に通信処理部 51にセッション管理サーノ 1へ送信させる (ステップ S 15)。 ユーザ IDについては、ログイン時のユーザ IDがクッキーその他の手段にて伝えられ るものとする。セッション管理サーバ 1は、業務処理サーノ (Ml)力もセッション ID等 を含む引継データを受信し、引継データ格納部 101に格納する (ステップ S17)。格 納される引継データは、図 2に示したようなデータである。引継データ格納部 101へ の書き込みが完了するとセッション管理サーバ 1は、処理完了を業務処理サーバ(M 1)に送信する。そして処理は端子 Aを介して図 4の処理に移行する。なお、特定の業 務処理が顧客情報登録であるとすると、最初は顧客情報の登録画面用の Webぺー ジ'データを生成することになるので、引継データはセッション IDとユーザ IDと例えば 画面 ID等のステート情報が主なデータとなる。
[0026] 次に、業務処理サーバ(Ml)の制御部 55は、セッション ID等を含むレスポンス 'デ ータを生成し、通信処理部 51に L 7スィッチ 7へ送信させる(図 4 :ステップ S19)。セッ シヨン ID及びユーザ IDは、例えばクッキーに保持させ、上の例では顧客情報の登録 画面用の Webページ ·データと共に送信する。なお、クッキーだけではなぐ URLに 埋め込む形であってもよい。 L7スィッチ 7は、業務処理サーバ(Ml)からセッション I D等を含むレスポンスデータを受信し、要求元のクライアント端末 11に転送する (ステ ップ S21)。クライアント端末 11は、 L7スィッチ 7からセッション ID等を含むレスポンス データを受信し、表示装置に表示する (ステップ S23)。なお、セッション ID等がクッキ 一で送信されてきた場合には、記憶装置に格納する。これにより、例えば顧客情報の 登録画面が表示されるので、ユーザは顧客情報の入力を行う。クライアント端末 11は 、ユーザによる入力を受け付け (ステップ S25)、例えば送信ボタンのクリックにより、 セッション ID等及び入力データ等を含む業務処理要求 Bを L7スィッチ 7に送信する( ステップ S27)。
[0027] L7スィッチ 7は、クライアント端末 11からセッション ID等及び入力データ等を含む業 務処理要求 Bを受信し (ステップ S29)、上で述べたのと同様に所定のルールに従つ て業務処理サーバを特定する (ステップ S31)。ここでは業務処理サーバ(Ml)が、 特定されるものとする。そして、特定された業務処理サーバ (Ml)に、セッション ID及 び入力データ等を含む業務処理要求 Bを送信する (ステップ S33)。業務処理サーバ (Ml)の通信処理部 51は、セッション ID等及び入力データ等を含む業務処理要求 Bを受信し、処理要求データ格納部 54に格納する (ステップ S35)。処理は端子 Bを 介して図 5の処理に移行する。
[0028] 業務処理サーバ(Ml)の制御部 55は、処理要求データ格納部 54に格納された業 務処理要求に含まれるセッション ID等を読み出し、当該セッション ID等を含む引継 データ要求を生成し、通信処理部 51にセッション管理サーノ 1へ送信させる(図 5 :ス テツプ S37)。なお、引継データ格納部 53を参照して、直前の引継データが格納され ている力確認して、直前の引継データが格納されていないと判断した場合のみ、セッ シヨン管理サーバ 1に引継データ要求を送信するようにしても良い。このようにすれば クライアント端末へのレスポンスを早くすることができる。セッション管理サーバ 1は、業 務処理サーバ(Ml)力もセッション ID等を含む引継データ要求を受信し (ステップ S3 9)、セッション ID等を用いて引継データ格納部 101を検索し、該当する直前の引継 データを特定し、要求元の業務処理サーバ (Ml)に送信する (ステップ S41)。
[0029] 業務処理サーバ(Ml)の通信処理部 51は、セッション管理サーバ 1から引継デー タを受信すると (ステップ S43)、引継データ格納部 53に格納する。そして、業務処理 サーバ(Ml)の制御部 55は、引継データ格納部 53に格納された直前の引継データ 及び処理要求データ格納部 54に格納された業務処理要求 Bのデータから実施すベ き業務処理を特定し、業務処理部 56に実行させる (ステップ S45)。例えば、引継デ ータが顧客情報の登録画面の画面 IDを含み、業務処理要求のデータに顧客情報が 含まれる場合には、次の処理段階に進んで顧客情報登録確認を行うべきであると判 断できる。従って、実施すべき業務処理として、受信した顧客情報を含む顧客情報 登録確認画面用の Webページ ·データの生成を実施させる。
[0030] そして、業務処理サーバ(Ml)の制御部 55は、セッション ID等を含む新たな引継 データを生成し、引継データ格納部 53に格納すると共に、通信処理部 51にセッショ ン管理サーノ 1へ当該セッション ID等を含む新たな引継データを送信させる (ステツ プ S47)。例えば新たな引継データとしては、受信した顧客情報を含む。セッション管 理サーバ 1は、業務処理サーバ(Ml)力もセッション ID等を含む引継データを受信 すると、引継データ格納部 101に格納する (ステップ S49)。そして引継データ格納部 101への引継データの書き込みが完了すると、書き込み完了通知を業務処理サー バ(Ml)に送信する。業務処理サーバ(Ml)の通信処理部 51がセッション管理サー ノ 1から書き込み完了通知を受信すると、業務処理サーバ(Ml)の制御部 55は、ク ライアント端末 11に対するセッション ID等を含むレスポンス ·データを生成し、レスポ ンスデータ格納部 52に格納すると共に、通信処理部 51に L 7スィッチ 7へ送信させる (ステップ S51)。セッション ID等は上で述べたようにクッキーその他の手段にて送信 される。
[0031] L7スィッチ 7は、業務処理サーノ (Ml)力 セッション ID等を含むレスポンス'デー タを受信すると、要求元のクライアント端末 11に転送する (ステップ S53)。クライアン ト端末 11は、 L7スィッチ 7からセッション ID等を含むレスポンス 'データを受信し、表 示装置に表示する (ステップ S55)。なお、セッション ID等がクッキーで送信されてき た場合には、記憶装置に格納する。
[0032] このように、引継データをセッション管理サーバ 1の引継データ格納部 101に格納し ておくことにより、障害対応が可能となり、さらに業務処理サーバ間の負荷のバランス も向上するようになる。すなわち、クライアント端末へのレスポンス時間も短くなること が期待される。
[0033] 次に、業務処理サーバ(Ml)に障害が発生した場合について説明する。なお、仮 に業務処理サーバ (Ml)にステップ S37以降に障害が発生したものとする。また、障 害が発生したときには L7スィッチ 7の機能によって多少処理が変わってくる。すなわ ち、処理要求の振り分け先である業務処理サーバ(Ml)に障害が発生しても、クライ アント端末 11と L7スィッチ 7の接続が保持される場合と、保持されない場合とがある。 従って、これらのケースについて分けて説明する。
[0034] まず、クライアント端末 11と L7スィッチ 7の接続が保持される場合について図 6を用 いて説明する。この場合、ユーザは、例えば送信ボタンのクリックの後、ある程度の時 間待ってもレスポンスが帰ってこな 、ため、例えば Webブラウザの中止ボタンをクリツ クし、さらに送信ボタンを再度クリックする。そうすると、クライアント端末 11は、ユーザ 力もの指示を受け付け、セッション ID等及び入力データ等を含む業務処理要求 Bを L7スィッチ 7に再送する(ステップ S61)。
[0035] L7スィッチ 7は、クライアント端末 11からセッション ID等及び入力データ等を含む業 務処理要求 Bを受信し (ステップ S63)、上で述べたのと同様に所定のルールに従つ て業務処理サーバを特定する (ステップ S65)。但し、業務処理サーバ(Ml)では障 害が発生しているので、業務処理サーバ (Ml)には業務処理要求 Bを割り振ることが できない。従って、ここでは業務処理サーノ (M2 (業務処理サーバ 5a乃至 5dのうち 1台の障害が発生した業務処理サーバを除く業務処理サーバ) )が、特定されるもの とする。そして、特定された業務処理サーバ (M2)に、セッション ID及び入力データ 等を含む業務処理要求 Bを送信する (ステップ S67)。業務処理サーバ(M2)の通信 処理部 51は、セッション ID等及び入力データ等を含む業務処理要求 Bを受信し、処 理要求データ格納部 54に格納する(ステップ S69)。
[0036] 業務処理サーバ(M2)の制御部 55は、処理要求データ格納部 54に格納された業 務処理要求に含まれるセッション ID等を読み出し、当該セッション ID等を含む引継 データ要求を生成し、通信処理部 51にセッション管理サーノ 1へ送信させる (ステツ プ S71)。なお、引継データ格納部 53を参照して、直前の引継データが格納されて いるか確認して、直前の引継データが格納されていないと判断した場合のみ、セッシ ヨン管理サーバ 1に引継データ要求を送信するようにしても良い。但し、今回の場合 には引継データ格納部 53には直前の引継データが格納されていないので、ステップ S71はそのまま実行される。セッション管理サーバ 1は、業務処理サーバ(M2)から セッション ID等を含む引継データ要求を受信し (ステップ S73)、セッション ID等を用 いて引継データ格納部 101を検索し、該当する直前の引継データを特定し、要求元 の業務処理サーバ (M2)に送信する (ステップ S75)。
[0037] 業務処理サーバ(M2)の通信処理部 51は、セッション管理サーバ 1から引継デー タを受信すると (ステップ S 77)、引継データ格納部 53に格納する。そして端子 Cを介 して図 5のステップ S45に移行する。
[0038] なお、ステップ S45では、いずれのタイミングにて業務処理サーバ(Ml)に障害が 発生したかによつて処理が異なる。例えば、業務処理サーバ(Ml)が必要な業務処 理を実行せずに停止してしまった場合には、引継データ及び業務処理要求 Bに含ま れる入力データを用いて必要な業務処理を実行する必要がある。従って、初めて業 務処理要求 Bを受信したのと同様の処理を実行する。一方、業務処理サーバ(Ml) が必要な業務処理を実行し、引継データを生成してセッション管理サーバ 1に引継 データを送信した後に停止してしまった場合には、引継データには業務処理が完了 したことを表すデータが存在するため、業務処理要求 Bに含まれるデータを用いて処 理をせずとも、引継データに含まれるデータを用いてレスポンスデータを生成すれば よい。
[0039] 例えば、引継データに顧客情報登録完了というデータが含まれていれば、業務処 理要求 Bが顧客登録指示を含む場合であっても再度顧客情報登録を実行することな ぐ顧客情報登録完了をユーザに通知するための Webページ'データを生成すれば よい。一方、引継データに顧客情報の登録確認のための顧客情報を含み、業務処 理要求 Bが顧客登録指示を含む場合には、顧客情報登録は行われていないので、 顧客情報登録処理を必要な業務処理として実行する。
[0040] 但し、必要な業務処理が例えば確認画面用の Webページ ·データの生成といった ようなレスポンスデータの生成に実質的に等しいような場合には、初めて業務処理要 求 Bを受信した場合と同様の処理を行うことになる。例えば、引継データに顧客情報 の登録確認のための顧客情報を含み、業務処理要求 Bに同じく顧客情報が含まれる 場合には、顧客情報の登録確認用の Webページ'データを、初めて業務処理要求 B を受信した場合と同様に生成することになる。
[0041] なお、業務処理を実行したが引継データを生成する途中で又は引継データをセッ シヨン管理サーバ 1に登録する前に業務処理サーバ(Ml)が停止してしまった場合 には、同じ業務処理を実行することになる。しかし、例えば業務処理において二重登 録がないかといつた確認処理をあわせて実行して、二重登録が検出された場合には
Figure imgf000015_0001
ヽつた後処理を行わせれば、上記のような場合にも対処可 能となる。
[0042] 次に図 7及び図 8を用いて、 L7スィッチ 7とクライアント端末 11との接続が保持され ない場合について説明する。このような場合、ユーザは、例えば送信ボタンのクリック の後、ある程度の時間待ってもレスポンスが帰ってこないため、例えば Webブラウザ の中止ボタンをクリックし、さらに送信ボタンを再度クリックする。しかし、接続が保持さ れて 、な 、ため、クライアント端末 11はエラーとして再ログインを要求する Webぺー ジ'データを受信し、表示装置に表示する。そうすると、ユーザは、ユーザ ID及びパ スワードを入力欄に入力する。クライアント端末 11は、ユーザからのユーザ ID及びパ スワードの入力を受け付け、ユーザ ID及びパスワードを含むログイン要求を L 7スィッ チ 7に送信する(ステップ S81)。 L7スィッチ 7は、ユーザ ID及びパスワードを含む口 グィン要求を受信し (ステップ S83)、認証処理を実施するサーバを特定する (ステツ プ S85)。認証処理を実施するサーバは、図 1には示していないが例えば業務処理 サーバ 5a乃至 5dのうち 、ずれかの特定の業務処理サーバが認証処理用に特定さ れて 、ても良 、し、 V、ずれの業務処理サーバによっても実行できるようにしておき負 荷状態などによって選択するようにしても良い。特定された認証用サーバに、ユーザ I D及びパスワードを含むログイン要求を送信する (ステップ S87)。認証用サーバは、 ユーザ ID及びパスワードを含むログイン要求を受信し、認証処理を実施する (ステツ プ S89)。もし、認証に失敗するようであれば再度ユーザ ID及びパスワードの入力を 促す Webページ'データをクライアント端末 11に L7スィッチ 7を介して送信する。一 方、認証が成功すると、認証用サーバは、ユーザ IDを含む業務継続要求を L7スィッ チ 7に送信する(ステップ S91)。 L7スィッチ 7は、認証用サーノくからユーザ IDを含む 業務継続要求を受信すると、上で述べた所定のルールに従って業務処理サーバを 特定する (ステップ S93)。ここでは業務処理サーバ(M2)が選択されたものとする。 そうすると、 L7スィッチ 7は、業務処理サーバ(M2)にユーザ IDを含む業務継続要 求 Cを送信する(ステップ S95)。業務処理サーバ(M2)の通信処理部 51は、 L7スィ ツチ 7からユーザ IDを含む業務継続要求 Cを受信し (ステップ S97)、処理要求デー タ格納部 54に格納する。処理は端子 Dを介して図 8の処理に移行する。
業務処理サーバ(M2)の制御部 55は、処理要求データ格納部 54に格納された業 務継続要求 Cに含まれるユーザ IDを読み出し、当該ユーザ IDを含む引継データ要 求を生成し、通信処理部 51にセッション管理サーノ 1へ送信させる (ステップ S99)。 なお、引継データ格納部 53を参照して、直前の引継データが格納されている力確認 して、直前の引継データが格納されていないと判断した場合のみ、セッション管理サ ーバ 1に引継データ要求を送信するようにしても良い。但し、今回の場合には引継デ ータ格納部 53には直前の引継データが格納されていないので、ステップ S99はその まま実行される。さらに、業務引継要求にはセッション IDが含まれないのでセッション IDを発行する。そして、セッション管理サーバ 1は、業務処理サーバ(M2)からユー ザ IDを含む引継データ要求を受信し (ステップ S101)、ユーザ IDを用いて引継デー タ格納部 101を検索し、該当する直前の引継データを特定し、要求元の業務処理サ ーバ(M2)に送信する (ステップ S 103)。なお、前提としては障害発生後の再口グイ ンであるから有効な引継データが引継データ格納部 101に格納されている力 通常 のログイン時の処理では引継データが存在しない場合もある。
[0044] 業務処理サーバ(M2)の通信処理部 51は、セッション管理サーバ 1から引継デー タを受信すると (ステップ S 105)、引継データ格納部 53に格納する。そして端子 Cを 介して図 5のステップ S45に移行する。
[0045] なお、ステップ S45では、引継データを受信でき且つ当該引継データの内容が業 務処理が途中であることを示すものである場合には図 6に関連して説明したのと同じ 処理を実施する。しかし、通常のログインである場合には、引継データが存在しない 場合もある。また、引継データが業務処理の完了を表すデータの場合もある。そのよ うな場合には、業務処理サーバ(M2)の制御部 55は、業務処理の最初の処理として 、例えばメニューページ'データの生成を業務処理部 56に実行させる。従って、通常 どおりユーザの指示により業務処理を開始することができるようになる。
[0046] このような処理を行えば、業務処理サーバ間の負荷のアンバランスを是正すること ができ、レスポンス時間の短縮が見込まれ、また障害発生時にも顧客が業務を最初 力もやり直すという手間を削減することができる。なお、 1つのレスポンスをクライアント 端末に返すために L7スィッチ 7は 2回も割り振り処理を実施しないため、割り振り処理 のための負荷も軽減されている。割り振り処理毎に各業務処理サーバに状態を問い 合わせる場合には本実施の形態によればより負荷が削減される。
[0047] 以上本発明の実施の形態を説明したが、本発明はこれに限定されるものではない 。例えば、図 1では 1層のクライアント'サーノ 'システムを例に示した力 3層の場合 であっても、上で述べたような処理を実施すればよ!、。
[0048] さらに、図 1に示した業務処理サーバ 5aの機能ブロックは、必ずしも実施のプロダラ ムモジュールとは対応しない場合もある。また、ネットワーク 9はインターネットだけで はなぐ例えば社内のイントラネットの場合もある。
[0049] さらに上で述べた処理フローも一例であって、順番を入れ替えたりしても処理結果 が同じであれば、そのような変形を採用しても良い。図 7において認証用サーバが認 証成功の後、ー且メニュー画面用の Webページ ·データを生成してクライアント端末 11に送信し、例えばユーザが業務継続を指示すると、ステップ S93以降の処理が実 行されるようにしてちょい。
[0050] また、上で述べた業務処理サーバ 5a乃至 5d、セッション管理サーバ 1及びクライァ ント端末 11及び 13はコンピュータ装置であって、図 9に示すように、メモリ 2501 (記 憶部)と CPU2503 (処理部)とハードディスク ·ドライブ (HDD) 2505と表示装置 250 9に接続される表示制御部 2507とリムーバブル ·ディスク 2511用のドライブ装置 251 3と入力装置 2515とネットワークに接続するための通信制御部 2517とがバス 2519 で接続されている。オペレーティング 'システム(OS : Operating System)及び本実施 の形態における処理を実施するためのアプリケーション ·プログラムは、 HDD2505 に格糸内されており、 CPU2503により実行される際には HDD2505力らメモリ 2501に 読み出される。必要に応じて CPU2503は、表示制御部 2507、通信制御部 2517、 ドライブ装置 2513を制御して、必要な動作を行わせる。また、処理途中のデータに ついては、メモリ 2501に格納され、必要があれば HDD2505に格納される。本発明 の実施の形態では、上で述べた処理を実施するためのアプリケーション 'プログラム はリムーバブル ·ディスク 2511に格納されて頒布され、ドライブ装置 2513から HDD 2505にインストールされる。インターネットなどのネットワーク及び通信制御部 2517 を経由して、 HDD2505にインストールされる場合もある。このようなコンピュータ装置 は、上で述べた CPU2503、メモリ 2501などのハードウェアと OS及び必要なアプリ ケーシヨン'プログラムとが有機的に協働することにより、上で述べたような各種機能を 実現する。

Claims

請求の範囲
[1] 各々プロセッサを有する複数の業務処理単位と、
クライアント端末からの処理要求を、前記複数の業務処理単位のうち 1の業務処理 単位に割り振る負荷分散装置と、
前記業務処理単位が実施した業務処理の継続実施に必要なデータであり且つクラ イアント端末識別情報とユーザ識別情報とのうち少なくともいずれかである引継デー タ特定情報を含む引継データを保管且つ管理する引継データ管理コンピュータと、 を有し、
前記負荷分散装置により処理要求を割り振られた業務処理単位は、
当該処理要求に含まれる引継データ特定情報により該当する引継データを取得し て当該引継データと前記処理要求に含まれるデータとを用いて業務処理を実施し、 当該業務処理についての引継データを生成して前記引継データ管理コンピュータに 送信し、さらに業務処理単位の再度の割り振り処理を実施することなく処理要求元で あるクライアント端末に対する応答データを生成して送信する
ことを特徴とするコンピュータ ·システム。
[2] 前記負荷分散装置は、
前記クライアント端末との通信開始時において割り振った特定の業務処理単位が 動作している場合には当該特定の業務処理単位に、前記クライアント端末からの後 続の処理要求を割り振り、
前記特定の業務処理単位に障害が発生した場合に、他の業務処理単位のうち 1の 業務処理単位に処理要求を割り振る
請求項 1記載のコンピュータ ·システム。
[3] 前記負荷分散装置は、
クライアント端末からの処理要求を受信する毎に、前記複数の業務処理単位の状 態に応じて前記処理要求を 1の業務処理単位に割り振る
請求項 1記載のコンピュータ ·システム。
[4] 特定のクライアント端末力 の処理要求に対して割り振った特定の業務処理単位に 障害が発生しても前記特定のクライアント端末と前記負荷分散装置との接続が継続 される場合、前記引継データ特定情報としてセッション識別情報を用いることを特徴 とする請求項 1記載のコンピュータ 'システム。
[5] 特定のクライアント端末力 の処理要求に対して割り振った特定の業務処理単位に 障害が発生すると前記特定のクライアント端末と前記負荷分散装置との接続が切断 される場合、前記引継データ特定情報としてユーザ識別情報を用いることを特徴とす る請求項 1記載のコンピュータ 'システム。
[6] 前記負荷分散装置により処理要求を割り振られた業務処理単位は、前記引継デー タと前記処理要求に含まれるデータとの少なくともいずれかを用いて実施すべき業務 処理を特定し、当該業務処理を実施することを特徴とする請求項 1記載のコンビユー タ 'システム。
[7] 負荷分散装置により、クライアント端末力 の処理要求を複数の業務処理単位のう ち特定の業務処理単位に割り振るステップと、
前記処理要求を割り振られた特定の業務処理単位により、当該処理要求に含まれ 且つクライアント端末識別情報とユーザ識別情報とのうち少なくともいずれかである引 継データ特定情報を用いて、前記クライアント端末のユーザにっ 、て 、ずれかの業 務処理単位により実施された業務処理の継続実施に必要なデータであり且つ前記 引継データ特定情報を含む引継データを保管且つ管理する引継データ管理コンビ ユータに該当する引継データを要求するステップと、
前記引継データ管理コンピュータにより、前記特定の業務処理単位力 の引継デ ータの要求に応じて引継データを特定して返信するステップと、
前記特定の業務処理単位により、前記引継データ管理コンピュータ力 要求に係 る引継データを受信し、受信した引継データと前記処理要求に含まれるデータとを用 いて業務処理を実施し、当該業務処理についての引継データを生成して前記引継 データ管理コンピュータに送信するステップと、
前記引継データ管理コンピュータにより、前記特定の業務処理単位力 引継デー タを受信し、保管するステップと、
業務処理単位の再度の割り振り処理を実施することなく前記特定の業務処理単位 により、処理要求元であるクライアント端末に対する応答データを生成して送信するス テツプと、
含む情報処理方法。
[8] プロセッサを含む業務処理単位により実行される情報処理方法であって、
負荷分散装置力 クライアント端末力 の処理要求を受信するステップと、 前記処理要求に含まれ且つクライアント端末識別情報とユーザ識別情報とのうち少 なくともいずれかである引継データ特定情報を用いて、前記クライアント端末のユー ザについて過去に実施された業務処理の継続実施に必要なデータであり且つ前記 引継データ特定情報を含む引継データを取得する取得ステップと、
取得された前記引継データと前記処理要求に含まれるデータとを用いて業務処理 を実施し、当該業務処理についての引継データを生成して、前記引継データを保管 且つ管理する引継データ管理コンピュータに送信するステップと、
業務処理単位の再度の割り振り処理を実施することなぐ処理要求元であるクライァ ント端末に対する応答データを生成して送信するステップと、
を含む情報処理方法。
[9] 前記取得ステップにおいて、
前記業務処理単位の記憶装置において前記引継データを取得できなかった場合 に、前記引継データ管理コンピュータに要求することを特徴とする請求項 8記載の情 報処理方法。
[10] 請求項 8又は 9記載の情報処理方法をコンピュータに実行させるためのプログラム。
[11] 負荷分散装置からクライアント端末からの処理要求を受信する手段と、
前記処理要求に含まれ且つクライアント端末識別情報とユーザ識別情報とのうち少 なくともいずれかである引継データ特定情報を用いて、前記クライアント端末のユー ザについて過去に実施された業務処理の継続実施に必要なデータであり且つ前記 引継データ特定情報を含む引継データを取得する手段と、
取得された前記引継データと前記処理要求に含まれるデータとを用いて業務処理 を実施し、当該業務処理についての引継データを生成して前記引継データ管理コン ピュータに送信する手段と、
業務処理単位の再度の割り振り処理を実施することなぐ処理要求元であるクライァ ント端末に対する応答データを生成して送信する手段と、 を有するコンピュータ。
PCT/JP2004/017546 2004-11-26 2004-11-26 コンピュータ・システム及び情報処理方法 WO2006057040A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PCT/JP2004/017546 WO2006057040A1 (ja) 2004-11-26 2004-11-26 コンピュータ・システム及び情報処理方法
CNB2004800444806A CN100461124C (zh) 2004-11-26 2004-11-26 计算机系统和信息处理方法
JP2006546501A JP4526539B2 (ja) 2004-11-26 2004-11-26 コンピュータ・システム及び情報処理方法
EP04822476A EP1816565B1 (en) 2004-11-26 2004-11-26 Computer system and information processing method
US11/749,271 US8204993B2 (en) 2004-11-26 2007-05-16 Computer system and information processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2004/017546 WO2006057040A1 (ja) 2004-11-26 2004-11-26 コンピュータ・システム及び情報処理方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/749,271 Continuation US8204993B2 (en) 2004-11-26 2007-05-16 Computer system and information processing method

Publications (1)

Publication Number Publication Date
WO2006057040A1 true WO2006057040A1 (ja) 2006-06-01

Family

ID=36497789

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2004/017546 WO2006057040A1 (ja) 2004-11-26 2004-11-26 コンピュータ・システム及び情報処理方法

Country Status (5)

Country Link
US (1) US8204993B2 (ja)
EP (1) EP1816565B1 (ja)
JP (1) JP4526539B2 (ja)
CN (1) CN100461124C (ja)
WO (1) WO2006057040A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010064653A1 (ja) * 2008-12-04 2010-06-10 株式会社ソニー・コンピュータエンタテインメント 仮想空間管理システム
JP2012108650A (ja) * 2010-11-16 2012-06-07 Ntt Docomo Inc マルチクラスタ分散処理制御システム、代表クライアント端末、分散処理クラスタ及びマルチクラスタ分散処理制御方法
US8332499B2 (en) 2008-12-04 2012-12-11 Sony Computer Entertainment Inc. Virtual space management system
JP2014089506A (ja) * 2012-10-29 2014-05-15 Nec Corp ノード装置、クラスタシステム、フェイルオーバー方法およびプログラム
EP2928159A1 (en) 2014-03-31 2015-10-07 Fujitsu Limited Information processing apparatus, information processing method and program

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100146409A1 (en) * 2008-12-04 2010-06-10 Sony Computer Entertainment Inc. Virtual Space Management System
JP2010238051A (ja) * 2009-03-31 2010-10-21 Fujitsu Ltd 負荷分散プログラム及び負荷分散装置
US20110307541A1 (en) * 2010-06-10 2011-12-15 Microsoft Corporation Server load balancing and draining in enhanced communication systems
JP5664230B2 (ja) * 2010-12-28 2015-02-04 コニカミノルタ株式会社 画像読み込みシステムおよび読み込み画像処理システム
CN104102475B (zh) * 2013-04-11 2018-10-02 腾讯科技(深圳)有限公司 分布式并行任务处理的方法、装置及系统
CN104216684B (zh) * 2013-06-04 2017-05-31 阿里巴巴集团控股有限公司 一种多核并行系统及其数据处理方法
WO2015014189A1 (zh) * 2013-08-02 2015-02-05 优视科技有限公司 一种访问网站的方法及装置
US20190058767A1 (en) * 2016-01-22 2019-02-21 Nokia Solutions And Networks Oy Application relocation between clouds

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1027146A (ja) * 1996-07-11 1998-01-27 Kyushu Nippon Denki Software Kk 通信処理装置及び通信処理方法
US6128657A (en) 1996-02-14 2000-10-03 Fujitsu Limited Load sharing system
US6128644A (en) 1998-03-04 2000-10-03 Fujitsu Limited Load distribution system for distributing load among plurality of servers on www system
JP2002163241A (ja) * 2000-11-29 2002-06-07 Ntt Data Corp クライアントサーバシステム
US20030084140A1 (en) 2001-10-26 2003-05-01 Hitachi, Ltd. Data relay method
JP2003196178A (ja) * 2001-12-25 2003-07-11 Hitachi Ltd 階層構成サーバシステム
US20040103194A1 (en) 2002-11-21 2004-05-27 Docomo Communicatios Laboratories Usa, Inc. Method and system for server load balancing
JP2004318417A (ja) * 2003-04-15 2004-11-11 Ricoh Co Ltd 情報処理装置及びセッション管理方法

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2309558A (en) * 1996-01-26 1997-07-30 Ibm Load balancing across the processors of a server computer
CA2202572C (en) * 1997-04-14 2004-02-10 Ka Lun Eddie Law A scaleable web server and method of efficiently managing multiple servers
US6070191A (en) * 1997-10-17 2000-05-30 Lucent Technologies Inc. Data distribution techniques for load-balanced fault-tolerant web access
US7127260B1 (en) * 1999-10-18 2006-10-24 Samsung Electronics Co., Ltd. Apparatus and method for determining paging alert mode in a mobile communication system
US6990667B2 (en) * 2001-01-29 2006-01-24 Adaptec, Inc. Server-independent object positioning for load balancing drives and servers
CN1209714C (zh) * 2002-03-12 2005-07-06 中国科学院计算技术研究所 基于网络存储和可扩展体系结构的服务器系统及方法
CN1294509C (zh) * 2002-09-06 2007-01-10 劲智数位科技股份有限公司 具有分布式负载平衡系统的集群计算机
CN1241117C (zh) * 2002-12-31 2006-02-08 联想(北京)有限公司 机群自适应的控制方法
KR20040110633A (ko) * 2003-06-20 2004-12-31 삼성전자주식회사 이동통신 시스템에 있어 핸드오버 수행 방법
KR100568152B1 (ko) * 2003-10-20 2006-04-07 삼성전자주식회사 이동망 환경에서의 크로스오버 라우터 탐색방법,자원예약방법 및 이를 이용하는 자원 예약 시스템
US20070161374A1 (en) * 2006-01-11 2007-07-12 Airnet Communications Corporation Co-channel handover in a cellular network

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6128657A (en) 1996-02-14 2000-10-03 Fujitsu Limited Load sharing system
JPH1027146A (ja) * 1996-07-11 1998-01-27 Kyushu Nippon Denki Software Kk 通信処理装置及び通信処理方法
US6128644A (en) 1998-03-04 2000-10-03 Fujitsu Limited Load distribution system for distributing load among plurality of servers on www system
JP2002163241A (ja) * 2000-11-29 2002-06-07 Ntt Data Corp クライアントサーバシステム
US20030084140A1 (en) 2001-10-26 2003-05-01 Hitachi, Ltd. Data relay method
JP2003196178A (ja) * 2001-12-25 2003-07-11 Hitachi Ltd 階層構成サーバシステム
US20040103194A1 (en) 2002-11-21 2004-05-27 Docomo Communicatios Laboratories Usa, Inc. Method and system for server load balancing
JP2004318417A (ja) * 2003-04-15 2004-11-11 Ricoh Co Ltd 情報処理装置及びセッション管理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1816565A4

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010064653A1 (ja) * 2008-12-04 2010-06-10 株式会社ソニー・コンピュータエンタテインメント 仮想空間管理システム
US8332499B2 (en) 2008-12-04 2012-12-11 Sony Computer Entertainment Inc. Virtual space management system
JP5363505B2 (ja) * 2008-12-04 2013-12-11 株式会社ソニー・コンピュータエンタテインメント 仮想空間管理システム
JP2012108650A (ja) * 2010-11-16 2012-06-07 Ntt Docomo Inc マルチクラスタ分散処理制御システム、代表クライアント端末、分散処理クラスタ及びマルチクラスタ分散処理制御方法
JP2014089506A (ja) * 2012-10-29 2014-05-15 Nec Corp ノード装置、クラスタシステム、フェイルオーバー方法およびプログラム
EP2928159A1 (en) 2014-03-31 2015-10-07 Fujitsu Limited Information processing apparatus, information processing method and program
US9608914B2 (en) 2014-03-31 2017-03-28 Fujitsu Limited Information processing apparatus and information processing method

Also Published As

Publication number Publication date
EP1816565B1 (en) 2011-06-08
CN101065732A (zh) 2007-10-31
US20070213064A1 (en) 2007-09-13
JPWO2006057040A1 (ja) 2008-06-05
EP1816565A1 (en) 2007-08-08
EP1816565A4 (en) 2009-11-18
US8204993B2 (en) 2012-06-19
CN100461124C (zh) 2009-02-11
JP4526539B2 (ja) 2010-08-18

Similar Documents

Publication Publication Date Title
US8204993B2 (en) Computer system and information processing method
US8321530B2 (en) Cloud computing system, server computer, device connection method, and storage medium
KR100343823B1 (ko) 클라이언트와 적응형 동기화 및 변환 서버를 위한 방법, 장치 및 프로그램 저장 장치
US10142425B2 (en) Session reliability for a redirected USB device
TWI344090B (en) Management of a scalable computer system
US11539803B2 (en) Highly available private cloud service
JPH04271454A (ja) 疎結合計算機システム
JPH07302236A (ja) 情報処理システムおよびその方法並びに情報処理システムにおけるサービス提供方法
US7085831B2 (en) Intelligent system control agent for managing jobs on a network by managing a plurality of queues on a client
US7996507B2 (en) Intelligent system control agent for managing jobs on a network by managing a plurality of queues on a client
US11032436B2 (en) Information processing apparatus, information processing system, and non-transitory computer readable medium storing program for workflow generation
JP2002073576A (ja) バッチジョブ制御システム
CN112269628A (zh) 资源调度系统及方法
JP4353036B2 (ja) リモート接続システム、サーバコンピュータ、リモート接続方法及びプログラム
WO2006057061A1 (ja) 分散トランザクション処理方法、装置、及びプログラム
US7165251B2 (en) In-context launch management method, system therefor, and computer-readable storage medium
JP5086820B2 (ja) サービス管理方法とシステムおよびプログラム
US11500622B2 (en) Information processing apparatus, information processing system, and non-transitory computer readable medium for coordinating a switch to an updated program in a cluster to suppress confusion on users
KR100881654B1 (ko) 컴퓨터 시스템 및 정보 처리 방법
TW201500937A (zh) 智慧型雲端化移轉之方法與系統
JP2002251292A (ja) クライアントサーバシステムにおけるジョブ管理方式及びクライアントサーバシステムにおけるジョブ管理方法
JPH11232233A (ja) ネットワークコンピュータ管理方法及びネットワークコンピュータシステム
KR101146742B1 (ko) SaaS의 분산된 세션 관리 방법 및 그 관리 시스템
JP3003596B2 (ja) クライアントサーバシステム
US20110072304A1 (en) Application server and method of controlling operation of same

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2006546501

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 1020077008884

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 11749271

Country of ref document: US

Ref document number: 2004822476

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 200480044480.6

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

WWP Wipo information: published in national office

Ref document number: 2004822476

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 11749271

Country of ref document: US