WO2006036088A2 - Rail fastening - Google Patents
Rail fastening Download PDFInfo
- Publication number
- WO2006036088A2 WO2006036088A2 PCT/RU2005/000481 RU2005000481W WO2006036088A2 WO 2006036088 A2 WO2006036088 A2 WO 2006036088A2 RU 2005000481 W RU2005000481 W RU 2005000481W WO 2006036088 A2 WO2006036088 A2 WO 2006036088A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rail
- anchor
- head
- base
- brackets
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/02—Fastening rails, tie-plates, or chairs directly on sleepers or foundations; Means therefor
- E01B9/28—Fastening on wooden or concrete sleepers or on masonry with clamp members
- E01B9/30—Fastening on wooden or concrete sleepers or on masonry with clamp members by resilient steel clips
- E01B9/303—Fastening on wooden or concrete sleepers or on masonry with clamp members by resilient steel clips the clip being a shaped bar
Definitions
- Rail fastening refers to the upper structure of a railway track and is intended for fastening rails to reinforced concrete, polymer concrete or composite rail bases, such as sleepers, beams, slabs, blocks, lodges and others, and can be used on main railway lines, including high-speed ones, in tunnels, subways and on access roads of industrial enterprises.
- a rail fastening comprising a U-shaped anchor with a downward-facing shank, rigidly mounted in a reinforced concrete sleepers, spring terminals, each of which is connected to the corresponding end of the anchor through a terminal voltage regulator, while one branch of each terminal is installed with the possibility of interaction with the rail, and the other with a lining mounted on the rail, a shock-absorbing lining mounted under the rail, each end of the anchor has two hook-shaped brackets spaced along the rail, covering trimmer, the latter surfaces cooperating with the regulator, a curve formed by the two radii (a.c. SU 1401095A1, EOlB 9/00, 07.08.1988).
- the vertical shelf of the insulating rail laying is located both in the area of the vertical surfaces of the brackets and in the area of the inner sides of the base of the heads (with slopes).
- the rail sags and turns.
- the end of the rail sole is in contact with the shelf in both zones; therefore, under pressure from lateral force in the vertical shelf of the rail strip, dents are formed from this protrusion or dent if the rail strip is made of ductile material, or cracking occurs if it is made of harder and less ductile material.
- the technical result of the claimed invention is to eliminate these drawbacks, namely the elimination of the noted damage and, accordingly, ensuring reliable bonding, the possibility of using harder and more wear-resistant rail insulating gaskets, with the exception of their rapid failure, especially in curved sections of the track where the side forces from the wheel on the rail are much larger and practically constantly acting, in contrast to the straight sections of the track.
- a rail fastener which contains an anchor with downward-facing shanks, rigidly mounted in a reinforced concrete sleepers, each head of which has two brackets spaced along the rail and made with protrusions for interacting with the upper surface of the sleepers, a shock-absorbing rail laying located between the heads of the anchor on the rail track parts of the sleepers, two spring terminals worn on the anchor heads and configured to interact with the end mustache through a voltage regulator with the corresponding brackets of the anchor head, with the possibility of supporting their rounded parts on the terminal block lining located on the sleeper, and with the possibility of pressing the rail to the sleeper through the rail insulating gasket with its straight parts, and the rail insulating gasket is made in the form of a corner with a protrusion in the middle part, located between the brackets anchor lugs, and the vertical shelf of each rail insulating gasket is located between the side edge of the rail sole and the anchor head brackets with the possibility of pairing with the base of the anchor head, while the inner side
- Figure l shows the rail fastening, General view; figure 2 is the same top view; in Fig.Z - anchor with a protrusion (prototype); figure 4 - anchor without a protrusion in the interface with the shelf rail insulating strip (according to the invention).
- a rail fastener comprises an anchor 1 with downward facing shanks 2, rigidly mounted in a reinforced concrete sleepers 3.
- Each head of the anchor 1 has two brackets 5 spaced along the rail 4 and is made with protrusions 6 for interaction with the upper surface of the sleepers 3.
- Shock absorbing rail gasket 7 is located between the anchor heads 1 on the rail track part of the railroad tie 3.
- Two spring terminals 8 are mounted on the anchor heads 1 and are configured to interact with the end mustache through the voltage regulator 9 with the corresponding brackets 5 of the anchor head 1. Terminal 8 rests its rounded parts on the terminal strip 10 located on the railroad tie 3, and the rail 4 is pressed in a straight line to the railroad tie 3 through a rail insulating gasket 11.
- the rail insulating gasket 11 is made in the form of a corner with a protrusion 12 in the middle part, located between the bracket They have 5 anchor heads 1.
- the vertical shelf of the rail insulating strip 11 is located between the side edge of the sole of the rail 4 and the brackets 5 with the possibility of interfacing with the base 13 of the head of the anchor 1.
- the anchor 1 of the rail fastening is made with the outline of the base 13 of the head symmetrical in only one plane.
- the inner side 14 of the base 13 of the heads of the anchor 1 is made almost rectilinear, as a continuation of the vertical surfaces of the brackets 5.
- the outer side 15 of the base 13 of the heads of the anchor 1 is made with casting slopes 16 from the plane of the mold connector, the sides of the base 13 are made straight, the mating is at the corners of the sides, the outer and inner sides are made in a radius of 4-7 mm.
- casting slopes can be used only in the area projecting 8-10 mm to the side of the brackets 5.
- Assembly of the node is as follows. An under-rail rubber gasket 7 is placed on the rail track area of sleepers 3. Then, after the rail 4 is laid, rail insulating gaskets 1 1 are inserted between the side faces of the rail 4 base and the brackets 5, while the protrusion 12 is placed in the middle part between the brackets 5 of the anchor head 1.
- Spring terminal 8 put on the head of the anchor 1 from above, placing its rectilinear part on the rail insulating strip 11, and the mounting whiskers located above the base 13 of the head of the anchor 1. Under the fillet rounded sections of terminal 8, protective sub-terminal pads 10 are placed, placing the turns of terminal 8 on their plane.
- the voltage regulator 9 is brought into engagement with the hooks of the brackets 5 and, by turning on one of their faces, the tension of the terminal 8 is regulated.
- section 14 of the interface between the base 13 of the head of the anchor 1 and the vertical shelf of the rail insulating strip 11 is made almost straightforward, as is the continuation of the vertical surfaces of the brackets and without sharp protrusions between the brackets and the base of the head of the anchor, then during operation, when the wheel pressure on the rail, from lateral force dents do not form in the vertical shelf of the rail track and no cracking occurs.
- the quicker failure of harder and more wear-resistant insulating gaskets is excluded, especially in the curved sections of the track, where the lateral forces from the wheel to the rail practically constantly act and are significantly higher than in the straight sections of the track.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Railway Tracks (AREA)
Abstract
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EA200601919A EA008658B1 (en) | 2004-09-27 | 2005-09-23 | Rail fastening |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2004128639/11A RU2267568C1 (en) | 2004-09-27 | 2004-09-27 | Intermediate rail fastening |
RU2004128639 | 2004-09-27 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2006036088A2 true WO2006036088A2 (en) | 2006-04-06 |
WO2006036088A3 WO2006036088A3 (en) | 2006-06-22 |
Family
ID=35872562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/RU2005/000481 WO2006036088A2 (en) | 2004-09-27 | 2005-09-23 | Rail fastening |
Country Status (4)
Country | Link |
---|---|
EA (1) | EA008658B1 (en) |
RU (1) | RU2267568C1 (en) |
TR (1) | TR200700924T2 (en) |
WO (1) | WO2006036088A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102301070A (en) * | 2009-02-04 | 2011-12-28 | 阿姆斯特德铁路有限公司 | Railway clip insulator with two stable positions for standby, parked or preloaded position and installed, loaded or final position |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2468133C1 (en) * | 2011-07-04 | 2012-11-27 | Федеральное государственное образовательное учреждение высшего профессионального образования "Уральский государственный университет путей сообщения" (УрГУПС) | Anchor clip-bolt rail joint (versions) |
RU2695944C1 (en) * | 2018-10-15 | 2019-07-29 | Общество с ограниченной ответственностью "Холдинг АРС" | Anchor rail fastening, sub-terminal pad and shock-absorbing under-rail gasket of anchor rail fastening (versions) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2116612A (en) * | 1982-02-15 | 1983-09-28 | Pandrol Ltd | Electrically insulating railway rails |
SU1401095A1 (en) * | 1986-05-30 | 1988-06-07 | Московский Институт Инженеров Железнодорожного Транспорта | Intermediate hail joint |
RU2189415C2 (en) * | 2000-04-06 | 2002-09-20 | Гучков Александр Кириллович | Rail fastening anchor |
-
2004
- 2004-09-27 RU RU2004128639/11A patent/RU2267568C1/en active
-
2005
- 2005-09-23 TR TR2007/00924T patent/TR200700924T2/en unknown
- 2005-09-23 EA EA200601919A patent/EA008658B1/en not_active IP Right Cessation
- 2005-09-23 WO PCT/RU2005/000481 patent/WO2006036088A2/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2116612A (en) * | 1982-02-15 | 1983-09-28 | Pandrol Ltd | Electrically insulating railway rails |
SU1401095A1 (en) * | 1986-05-30 | 1988-06-07 | Московский Институт Инженеров Железнодорожного Транспорта | Intermediate hail joint |
RU2189415C2 (en) * | 2000-04-06 | 2002-09-20 | Гучков Александр Кириллович | Rail fastening anchor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102301070A (en) * | 2009-02-04 | 2011-12-28 | 阿姆斯特德铁路有限公司 | Railway clip insulator with two stable positions for standby, parked or preloaded position and installed, loaded or final position |
Also Published As
Publication number | Publication date |
---|---|
TR200700924T2 (en) | 2007-04-24 |
EA008658B1 (en) | 2007-06-29 |
RU2267568C1 (en) | 2006-01-10 |
EA200601919A1 (en) | 2007-02-27 |
WO2006036088A3 (en) | 2006-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH059564B2 (en) | ||
MXPA05005891A (en) | An abrasion assembly for supporting railroad ties related. | |
WO2006036088A2 (en) | Rail fastening | |
RU103364U1 (en) | ANCHOR RAIL BOND AND ITS MONOREGULATOR | |
US3920183A (en) | Pad for positioning under a railway rail and an assembly including the pad | |
RU2530831C1 (en) | Boltless rail fastening and under-rail plate of boltless rail fastening | |
RU2695944C1 (en) | Anchor rail fastening, sub-terminal pad and shock-absorbing under-rail gasket of anchor rail fastening (versions) | |
RU43554U1 (en) | INTERMEDIATE RAIL BOND | |
GB2121461A (en) | A pad for positioning under a railway rail and an assembly including the pad | |
JP4856449B2 (en) | Tie plate wear prevention rail fastening device | |
RU2254407C1 (en) | Internal rail fastening | |
RU2335593C1 (en) | Anchor rail clamp and sub-rail shock pad for rail clamp | |
WO2022126535A1 (en) | Boltless fastener system for heavy-haul railways | |
RU2244777C1 (en) | Intermediate rail fastening with insulating member (versions) | |
RU2747891C1 (en) | Anchor-type rail fixing with components | |
US20140231533A1 (en) | Track assembly | |
CN219586467U (en) | Vibration damping fastener for rail brace of turnout zone | |
CN214831541U (en) | Rail fastener and sleeper system | |
US2215104A (en) | Rail fastener and tie plate | |
RU213783U1 (en) | Rail anchor | |
RU171469U1 (en) | NAREL LAYING OF ANCHOR RAIL FASTENING | |
RU48539U1 (en) | INTERMEDIATE RAIL BOND, ITS TERMINAL VOLTAGE REGULATOR AND ANCHOR | |
RU212683U1 (en) | ADJUSTING GASKET FOR INTERMEDIATE RAIL FASTENING OF ZHBR TYPE | |
JP3827985B2 (en) | Rail insulation device and connecting method for insulation material on articulated track | |
RU2228980C2 (en) | Anchor rail fastening |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KM KP KR KZ LC LK LR LS LT LU LV LY MA MD MG MK MN MW MX MZ NA NG NI NO NZ OM PG PH PL PT RO SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU LV MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
DPE2 | Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 200601919 Country of ref document: EA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2007/00924 Country of ref document: TR |
|
NENP | Non-entry into the national phase in: |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1148/KOLNP/2007 Country of ref document: IN |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 05802923 Country of ref document: EP Kind code of ref document: A2 |