Entrees montees sur palier permettant de reduire le temps d'installation total d'un ascenseur Download PDFInfo
- Publication number
- WO2006011871A2 WO2006011871A2 PCT/US2004/020743 US2004020743W WO2006011871A2 WO 2006011871 A2 WO2006011871 A2 WO 2006011871A2 US 2004020743 W US2004020743 W US 2004020743W WO 2006011871 A2 WO2006011871 A2 WO 2006011871A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- landing surface
- sill member
- assembly
- sill
- relative
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B13/00—Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
- B66B13/30—Constructional features of doors or gates
- B66B13/301—Details of door sills
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B13/00—Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
- B66B13/30—Constructional features of doors or gates
- B66B13/306—Details of door jambs
Definitions
- This invention relates to door frames for elevator systems. More particularly, this invention relates to an adjustable door frame. Description of the Related Art
- Elevator systems typically require an intricate installation process that is very time consuming.
- Each floor in a building has a least one elevator landing entrance way.
- the overall dimensions and location of each entrance way in relation to the elevator shaft or hoistway varies with the tolerances inherent to the building trade.
- Each door frame which includes a sill support, a set of side jambs or uprights and a headjamb, is anchored to fixing angles which are mounted to the hoistway walls.
- the orientation of each door frame is critical to provide proper alignment of the door frames with the elevator car.
- the installation of the individual entrance ways require that each door frame be installed only after the guide rails have been installed to ensure the alignment required for elevator system performance. Once the door frame is properly aligned and secured, the elevator entrance way is then installed to the door frame. The serial fashion in which these installations must occur contributes significantly to the total elevator installation time.
- This invention provides an alternative that permits installing door frames and guide rails in a variety of orders. This invention also allows the entrances to be installed from the landing side (i.e., not in the hoistway), thus significantly reducing the total elevator installation time.
- this invention is an adjustable door frame for an elevator entrance way that can be installed from the landing.
- the inventive frame has a sill that is mounted to a landing surface.
- the sill is attached to the base floor at the landing and is adjustable to accommodate varying floor height.
- the entrance can now be installed from the landing, eliminating any need for an installation platform in the hoistway.
- plumb lines can be utilized for alignment purposes, thus eliminating the need for the guide rails to have been installed prior to installing the entrance.
- the guide rails can be installed subsequent to, in parallel with, or before the elevator entrances, significantly enhancing opportunities for reducing the total time required for elevator system installation.
- the sill is mounted directly to the frame uprights. The uprights in this example are secured to the landing surface.
- Figure 1 is a general perspective view of selected portions of an elevator hoistway.
- Figure 2 is a schematic view of an example door frame assembly designed according to this invention.
- Figure 3 is a schematic view of a second example door frame assembly designed according to this invention.
- Figure 4 is a closer view of the portion of Figure 2 encircled at 4.
- Figure 5 is an exploded front view of the embodiment of Figure 4.
- Figure 6 is a schematic view of an adjustable header member.
- Figure 7 schematically illustrates the inventive method of installation utilizing plumb lines.
- FIG 1 is a general perspective view of an elevator hoistway 10.
- An elevator car 12 travels along guide rails 20 in a conventional manner.
- the elevator car has doors 14, that cooperate with landing doors (not shown) supported at entrance ways 16 at each landing 18.
- the landing doors and the finish doorway surfaces 21 are supported by a door frame assembly 22 ( Figure 2).
- the door frame assembly 22 includes a head jamb member 24, a sill support member 26 and a plurality of side jamb members 28 extending between the header member 24 and the sill member 26.
- the illustrated door frame assembly 22 is supported on the landing surface 18 A.
- the sill member 26 is attached to the landing surface 18 by adjusters 30.
- the door frame assembly 22 in its entirety is mounted in an entrance way of the building structure.
- the door frame assembly 22 is supported on the landing surface 18 with the side members 28 mounted directly to the landing surface 18 using anchors 29.
- the sill member 26 is adjustably mounted relative to side members 28 using connections 31.
- each adjuster 30 comprises a bracket 32 having an anchor 34.
- the anchor 34 is secured to the landing surface 18 in a conventional manner appropriate for the sub-floor construction of the landing surface 18.
- a slot 35 in the bracket 32 facilitates horizontally adjusting a position of the bracket 32 to align the sill member 26 as needed.
- multiple holes may be used in place of slots.
- the sill member 26 is attached to the adjuster 30 by a threaded member 36, which is a carriage bolt in one example.
- Figure 5 shows a slot 38 through one example sill member 26 that allows access to the threaded member 36 for adjustably securing the sill member 26 in place.
- the example bracket 32 includes a cutout 40.
- the threaded member 36 is received through a hole 42 and secured in place with a nut 44.
- At least one threaded member 36 received at least partially through the slot 38, hole 42 and the cutout 40 secures the sill support member 26 to each bracket 32 and provides for vertically adjusting of the position of the sill member 26 relative to the bracket 32 and the landing surface 18 as may be needed.
- a threaded member 37 is received by the bracket 32 with one end abutting the landing surface 18.
- the adjuster 30 is vertically adjustable in relation to the landing surface by rotating the threaded member 37. Coordinating the position of the anchor 34 and the height of the member 37 allows for setting the adjuster 30 to facilitate leveling the sill 26 and aligning it with an elevator car position or the finish floor height at the landing 18 as needed.
- Figure 6 shows selected details of an example header member 50.
- the head jamb 24 may be secured to the header 50 in a variety of ways.
- the adjustability of the header allows for easier sill placement and adjustment.
- One example method of mounting the illustrated door frame assembly 22 includes first assembling the head jamb 24, header 50, side jambs 28 and the sill member 26 together. The fixing angles 52 are secured in place. The brackets 32 of the adjusters 30 are also set.
- the assembled frame which can be laying flat on the floor 18, can be rotated upward so that the bolts 36 slide into the cutouts 40.
- the fixing angles 52 act as stops at the top of the frame and engage the header 50 to prevent the frame from tipping over into the hoistway.
- the sill member 26 and the frame are installed from a position on the landing surface 18 (i.e., not from the hoistway side of the entrance 16).
- the other frame members may be pre-attached to the sill, subsequently attached or a combination of the two options.
- Plumb lines 60 are positioned in the hoistway 10 to provide a reference for placement of the adjustors 30.
- the position of the sill member 26 is adjusted to align the side members 28 and to level the sill 26 by disengaging or further engaging the threaded members of the adjusters 30.
- the position of the header member 50 may also be adjusted as needed.
- the frame installation process advantageously is conducted entirely from the landing surface 18. Aligning the door frame assembly 22 with the plumb lines 60 ensures proper orientation of the doorways relative to elevator car travel without having to rely on previously mounted guide rails for support during installation or for accurate sill placement. After the car assembly is in place on the guide rails, further adjustment of the door assembly is possible to achieve precise alignment.
- the side members 28 are first mounted to the landing surface 18 using known anchors 29.
- the plumb lines 60 provide a reference for side member alignment.
- the sill member 26 and the header member 24 are subsequently adjusted relative to the side members 28.
- the sill member 26 and the header member 50 are selectively adjustable in relation to one another and the side members as needed.
Landscapes
- Elevator Door Apparatuses (AREA)
Abstract
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2004/020743 WO2006011871A2 (fr) | 2004-06-28 | 2004-06-28 | Entrees montees sur palier permettant de reduire le temps d'installation total d'un ascenseur |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2004/020743 WO2006011871A2 (fr) | 2004-06-28 | 2004-06-28 | Entrees montees sur palier permettant de reduire le temps d'installation total d'un ascenseur |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2006011871A2 true WO2006011871A2 (fr) | 2006-02-02 |
WO2006011871A3 WO2006011871A3 (fr) | 2006-07-13 |
Family
ID=35786602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2004/020743 WO2006011871A2 (fr) | 2004-06-28 | 2004-06-28 | Entrees montees sur palier permettant de reduire le temps d'installation total d'un ascenseur |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2006011871A2 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019123541A1 (fr) * | 2017-12-19 | 2019-06-27 | 三菱電機株式会社 | Dispositif de palier d'ascenseur |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3735539A (en) * | 1971-10-26 | 1973-05-29 | Dahltstrom Corp | Mounting assembly for elevator door sill |
US3740907A (en) * | 1971-08-27 | 1973-06-26 | C Loomis | Gauge frame for elevator shaft entrance opening |
US3948358A (en) * | 1974-08-16 | 1976-04-06 | Dover Corporation | Elevator rail mounting bracket |
US5794746A (en) * | 1996-05-28 | 1998-08-18 | Kone Oy | Door sill arrangement in an elevator car |
US6540048B1 (en) * | 1999-07-12 | 2003-04-01 | Inventio Ag | Elevator installation with hoistway doors |
US20030111297A1 (en) * | 2001-12-14 | 2003-06-19 | Friedman Harold S. | Elevator entrance sill structure and installation method |
US6609849B2 (en) * | 1998-11-20 | 2003-08-26 | Kone Corporation | Hold block |
-
2004
- 2004-06-28 WO PCT/US2004/020743 patent/WO2006011871A2/fr active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3740907A (en) * | 1971-08-27 | 1973-06-26 | C Loomis | Gauge frame for elevator shaft entrance opening |
US3735539A (en) * | 1971-10-26 | 1973-05-29 | Dahltstrom Corp | Mounting assembly for elevator door sill |
US3948358A (en) * | 1974-08-16 | 1976-04-06 | Dover Corporation | Elevator rail mounting bracket |
US5794746A (en) * | 1996-05-28 | 1998-08-18 | Kone Oy | Door sill arrangement in an elevator car |
US6609849B2 (en) * | 1998-11-20 | 2003-08-26 | Kone Corporation | Hold block |
US6540048B1 (en) * | 1999-07-12 | 2003-04-01 | Inventio Ag | Elevator installation with hoistway doors |
US20030111297A1 (en) * | 2001-12-14 | 2003-06-19 | Friedman Harold S. | Elevator entrance sill structure and installation method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019123541A1 (fr) * | 2017-12-19 | 2019-06-27 | 三菱電機株式会社 | Dispositif de palier d'ascenseur |
Also Published As
Publication number | Publication date |
---|---|
WO2006011871A3 (fr) | 2006-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6446762B1 (en) | Elevator machine support frame mounted to hoistway wall | |
EP1313661B1 (fr) | Ensemble de montage pour rails de guidage d'ascenseur | |
US6422352B1 (en) | Procedure and apparatus for the installation of an elevator | |
RU2414411C2 (ru) | Система домкратов для направляющих | |
US5479754A (en) | Method and apparatus for installing an elevator shaft door | |
EP1812328B1 (fr) | Installation de rails de guidage dans un systeme d'ascenseurs | |
RU2671071C2 (ru) | Лифтовая система, блок дверного порога и способ установки дверного блока лестничной площадки лифта | |
US20030226315A1 (en) | Device for holding panels and separating element | |
US11498812B2 (en) | Elevator landing door assembly and its installation method | |
EP2406166B1 (fr) | Dormant de porte d'un système élévateur soutenant des rails de guidage | |
WO2006011871A2 (fr) | Entrees montees sur palier permettant de reduire le temps d'installation total d'un ascenseur | |
WO2006080633A1 (fr) | Dispositif permettant de detecter la position d'une cabine d'ascenseur | |
KR101410539B1 (ko) | 엘리베이터의 엘리베이터칸 실 및 엘리베이터의 엘리베이터칸 | |
EP2406164B1 (fr) | Système d'ascenseur avec support de rail de guidage | |
KR20230113308A (ko) | 설치 브래킷을 갖는 엘리베이터 시스템 | |
CN1281416A (zh) | 楼层平台门的安装方法和相应的安装系统 | |
JPS60242282A (ja) | エレベ−タの乗場側出入口装置 | |
KR100944619B1 (ko) | 승강기 시스템의 가이드 레일 설치 | |
JPH089469B2 (ja) | 乗場出入口装置の取付方法 | |
WO2024213591A1 (fr) | Ensemble cuvette pour un système d'ascenseur et son procédé d'installation | |
JPS59149287A (ja) | 鉄骨式昇降路 | |
JP2003276973A (ja) | エレベータ乗場の敷居取付装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
NENP | Non-entry into the national phase in: |
Ref country code: DE |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: DE |
|
122 | Ep: pct application non-entry in european phase |