WO2005079098A1 - スケジューリング装置およびスケジューリング方法 - Google Patents

スケジューリング装置およびスケジューリング方法 Download PDF

Info

Publication number
WO2005079098A1
WO2005079098A1 PCT/JP2005/000927 JP2005000927W WO2005079098A1 WO 2005079098 A1 WO2005079098 A1 WO 2005079098A1 JP 2005000927 W JP2005000927 W JP 2005000927W WO 2005079098 A1 WO2005079098 A1 WO 2005079098A1
Authority
WO
WIPO (PCT)
Prior art keywords
transmission
scheduling
power resource
transmission scheme
received power
Prior art date
Application number
PCT/JP2005/000927
Other languages
English (en)
French (fr)
Inventor
Hitoshi Iochi
Hidetoshi Suzuki
Original Assignee
Matsushita Electric Industrial Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co., Ltd. filed Critical Matsushita Electric Industrial Co., Ltd.
Priority to US10/549,313 priority Critical patent/US20060246935A1/en
Publication of WO2005079098A1 publication Critical patent/WO2005079098A1/ja

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/34TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
    • H04W52/346TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading distributing total power among users or channels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling

Definitions

  • the present invention relates to a scheduling device and a scheduling method, and more particularly, to a scheduling device and a scheduling method for uplink data transmission in a wireless communication system.
  • a general configuration of a WCDMA wireless communication system includes a wireless network controller (RNC: Radio Network Controller), a base station apparatus (BS: Base Station), and a mobile station apparatus (BS). MS: Mobile Station).
  • RNC Radio Network Controller
  • BS Base Station
  • MS Mobile Station
  • RNC Radio Network Controller
  • management of received power resources and the like in the uplink is generally performed by the RNC, which is a higher-level device of the BS.
  • the received power at the base station in consideration of thermal noise and interference with other cells is set to a predetermined value. It is necessary to allocate the received power resources to each MS so that it falls within the target value of, that is, assign the transmission rate (or its upper limit) to each MS. To achieve this, it is conceivable to appropriately perform scheduling for uplink data transmission.
  • time and rate scheduling resources are allocated by allocating relatively large received power resources to a relatively small number of MSs (MS-A in Figure 3A) (ie, allocating the transmission rate or its upper limit). Allow MS transmission.
  • MS-A in Figure 3A
  • the MS permitted to transmit performs uplink data transmission within the range of the transmission rate determined at the time of scheduling, and at the transmission timing determined as needed at the time of scheduling. Therefore, time and rate scheduling is a transmission method suitable for high-speed data transmission among the above three transmission methods.
  • the transmission rate request from the MS and the transmission rate permission from the BS are both performed using a signal of about 112 bits indicating, for example, up (UP), down (DOWN), or keep (KEEP). . That is, the allocation of the received power resources to the MS is gradually changed. Therefore, rate scheduling is suitable for medium to low speed data transmission among the above three transmission methods.
  • MS In autonomous transmission, MS (MS-A, MS-B, and MS-C in Fig. 3C) can transmit if the transmission rate is less than a predetermined transmission rate without BS permission. .
  • a low transmission rate is generally used. Therefore, autonomous transmission is suitable for low-delay data transmission at a low transmission rate among the above three transmission methods.
  • Non-Patent Document 1 proposes uplink data transmission based on a combination of time and rate scheduling and autonomous transmission.
  • Non-Patent Document 2 does not describe in detail the combination of time-and-rate scheduling (called time scheduling in this document) and rate scheduling, but it is clear that the combination may be possible. Have been.
  • Non-patented Ai ffl ⁇ l eference Node-B scheduler for EUL, wualcomm Europe, 3rd eneration Partnership Projects, Rl-031246, November 2003
  • Non-Patent Document 2 "Text Proposal: Node B Controlled Scheduling", Ericsson, 3rd ueneration Partnership Projects, Rl-031120, October 2003
  • the present invention has been made in view of the power, and an object of the present invention is to provide a scheduling apparatus and a scheduling method capable of improving user throughput and system throughput in a wireless communication system.
  • the scheduling device of the present invention allocates the received power resource set by the higher-level device to a plurality of transmission methods used in uplink data transmission, and allocates the received power resource to the plurality of transmission methods.
  • the base station apparatus of the present invention includes: a determination unit that determines a transmission scheme to be used by the mobile station apparatus based on information reported from the mobile station apparatus; Allocating means for allocating the reception power resource set by the higher-level device to a plurality of transmission schemes used in uplink data transmission based on the determination result of the determination means; and receiving power allocated to the plurality of transmission schemes.
  • a configuration including scheduling means for executing scheduling of uplink data transmission according to resources and signaling means for signaling a result of the determination by the determining means to the mobile station apparatus is adopted.
  • a mobile station device of the present invention is a mobile station device that performs uplink data transmission to a base station device, and a reporting unit that reports information about the own device to the base station device. And a transmission means for performing uplink data transmission using the detected transmission scheme, based on the information transmitted from the base station apparatus. .
  • the scheduling method includes: an allocation step of allocating a reception power resource set by a higher-level device to a plurality of transmission schemes used in uplink data transmission; and a reception allocated to the plurality of transmission schemes.
  • user throughput and system throughput in a wireless communication system can be improved. Also, the amount of signaling between the higher-level device and the base station device can be significantly reduced.
  • FIG. 1 is a block diagram showing a general configuration of a wireless communication system
  • FIG. 2 is a diagram for explaining an example of distribution of received power resources
  • FIG. 3A Diagram for explaining an example of a transmission method
  • FIG. 3B Diagram for explaining another example of the transmission method
  • FIG. 3C Diagram for explaining still another example of the transmission method
  • FIG. 4 is a block diagram showing a configuration of a wireless communication system having a base station apparatus according to Embodiment 1 of the present invention.
  • FIG. 5 is a flowchart for explaining an operation of a scheduling section in the base station apparatus according to Embodiment 1 of the present invention.
  • Garden 6 A diagram schematically showing a process of distributing the received power resource in Embodiment 1.
  • FIG. 7 A diagram showing a temporal variation state of the mobile station device
  • FIG. 9 is a block diagram showing a configuration of a wireless communication system having a base station apparatus according to Embodiment 2 of the present invention.
  • FIG. 12A is a diagram schematically showing a process of distributing the received power resource in Embodiment 2.
  • FIG. 12A] is a diagram showing the variation of the received power resource allocation to each mobile station device in Embodiment 2.
  • FIG. 13 shows a change in the amount of data in each mobile station device in Embodiment 2.
  • FIG. 13 is a diagram showing a configuration of a wireless communication system having a base station device according to Embodiment 3 of the present invention.
  • FIG. 14A A diagram showing the variation of the allocation of the reception power resource to each mobile station device in the third embodiment.
  • FIG. 15 shows a change in data amount in each mobile station device in Embodiment 3.
  • FIG. 15 Block diagram showing a configuration of a wireless communication system having a base station device according to Embodiment 4 of the present invention
  • Garden 16B A diagram showing a change in the amount of data in each mobile station device in Embodiment 4.
  • Garden 17A A diagram showing switching of a transmission method in each mobile station device according to the transmission power resource in Embodiment 4.
  • FIG. 19 shows a configuration of a wireless communication system having a base station apparatus according to Embodiment 5 of the present invention. Block diagram shown
  • FIG. 20 is a diagram showing a change in received power resource allocation to each mobile station device according to Embodiment 5.
  • FIG. 4 is a block diagram showing a configuration of a wireless communication system having a BS according to Embodiment 1 of the present invention.
  • the wireless communication system of the present embodiment it is assumed that two transmission schemes are used for uplink data transmission.
  • these two transmission schemes are the first transmission scheme S time and rate scheduling and the second transmission scheme is the rate scheduling.
  • the radio communication system shown in FIG. 4 has RNC 10, BS 20 and N MSs 30-1, 30-2,..., 30-N.
  • the BS 20 has a transmitting unit 21, a scheduling unit 22, and a receiving unit 23.
  • Transmitting section 21 performs predetermined transmission processing on DL (DownLink) data 153 from RNC 10 according to first transmission scheme scheduling result information 163 and second transmission scheme scheduling result information 164 from scheduling section 22. Apply. Then, the radio signal including the DL data 172-1-172_N, the first transmission scheme assignment information 170-1-1170-N and the second transmission scheme assignment information 171-1-17-N is transmitted to the MS 30-1-30-N. To send.
  • DL (DownLink) data 153 from RNC 10 according to first transmission scheme scheduling result information 163 and second transmission scheme scheduling result information 164 from scheduling section 22. Apply. Then, the radio signal including the DL data 172-1-172_N, the first transmission scheme assignment information 170-1-1170-N and the second transmission scheme assignment information 171-1-17-N is transmitted to the MS 30-1-30-N. To send.
  • first transmission scheme assignment information 170 -k is transmitted only to MS 30 -k permitted to transmit data in the first transmission scheme, and data is transmitted in the second transmission scheme. It is assumed that the second transmission scheme assignment information 171-h is transmitted only to the MS 30-h permitted to transmit.
  • Receiving section 23 includes UL (UpLink) data 173-1-173_N of the first transmission method and UL data 174 of the second transmission method included in the radio signal transmitted from MS 30-1-30 -N. Specified receiving processing is performed on -1- 17 4-N and reported value 175-1-175-N.
  • UL UpLink
  • a report value 162 obtained as a reception processing result for the report value 175-1—175-N is output to the scheduling unit ⁇ , and the UL data 173-1-173_N, 174-1-174-N
  • the reported values 175-11-175-N contain information within each MS30-1-30-N, such as, for example, available transmit power resources or the amount of data in the transmit buffer or a combination thereof, generally In other words, information related to the communication status of uplink data transmission is included
  • the scheduling section 22 includes a management section 100, a first transmission scheme scheduling section 110, and a second transmission scheme scheduling section 120.
  • the management unit 100 which is a main feature of the present invention, allocates the reception power resource 150 set by the RNC 10 to the first transmission scheme reception power resource 160 and the second transmission scheme reception power resource 161. More specifically, the management unit 100 includes a setting unit 101, and the setting unit 101 is configured to transmit the received power resource 150 and the second transmission scheme scheduling unit 120 based on the past (previous in the present embodiment) second transmission scheme. Based on the scheduling result information 164, the first transmission scheme reception power resource 160 for the current scheduling is set and output to the first transmission scheme scheduling section 110. For example, the second transmission scheme reception power resource 161 is set to the value of the reception power resource used as a result of the previous scheduling by the second transmission scheme scheduling section 120. Then, a value obtained by subtracting the second transmission scheme reception power resource 161 from the reception power resource 150 is set as the first transmission scheme reception power resource 160, and this is output to the first transmission scheme scheduling section 110.
  • the second transmission scheme reception power resource 161 is set based on the past second transmission scheme scheduling result information 164, and then the second transmission scheme reception power resource 161 is set from the reception power resource 150. Is set as the first transmission scheme received power resource 160, the received power resource can be set without complicating the configuration. Further, since the second transmission scheme received power resource 161 is set based on the past second transmission scheme scheduling result information 164, the set second transmission scheme received power resource 161 and the actually used reception power resource The possibility that a large error will occur between them can be reduced.
  • setting section 101 of management section 100 transmits second transmission scheme received power resource 161 to second transmission scheme reception power resource 161.
  • the maximum value that can be used by the transmission method (that is, the received power resource required by the second transmission method when all MSs in the second transmission method are instructed to increase the transmission rate) should be set. May be. In this case, reception power resources can be allocated with priority given to the second transmission scheme.
  • the second transmission scheme received power resource 161 is set to the minimum value that can be used by the second transmission scheme.
  • reception power resources can be allocated with priority given to the first transmission scheme.
  • the second transmission scheme reception power resource 161 may be allocated to the first transmission scheme reception power resource 160 such that the second transmission scheme reception power resource 161 falls within the range of the minimum value and the maximum value that the second transmission scheme can use. . In this case, in the data transmission based on the second transmission scheme, it is possible to reduce the possibility that the reception power resource cannot be used up or run short.
  • First transmission scheme scheduling section 110 performs scheduling for the first transmission scheme in uplink data transmission based on first transmission scheme terminal information 151, first transmission scheme received power resource 160, and report value 162.
  • the receiving power resource is allocated to each MS 30-1-1 30-N, that is, the transmission rate is allocated.
  • the first transmission scheme scheduling result information 163 indicating the result of the scheduling is output to the transmission unit 21.
  • the first transmission method terminal information 151 is information (MS number, number of MSs, etc.) regarding the MS that is the target of the first transmission method. In the present embodiment, for example, the number of MSs is increased or decreased. Is assumed to be managed by RNC10.
  • the first transmission scheme scheduling result information 163 indicates an MS that permits data transmission in the first transmission scheme, a transmission rate (or transmission power) and transmission timing in data transmission, and the like.
  • Second transmission scheme scheduling section 120 performs scheduling for the second transmission scheme in uplink data transmission based on second transmission scheme terminal information 152, second transmission scheme received power resource 161 and report value 162. Then, receive power resources are allocated to each MS 30-1-30-N, that is, a transmission rate is allocated. Then, second transmission scheme scheduling result information 164 indicating the result of the scheduling is output to transmitting section 21.
  • the second transmission scheme terminal information 152 includes information on the MS that is the target of the second transmission scheme. In this embodiment, it is assumed that, for example, an increase or decrease in the number of MSs is managed by the RNC 10.
  • the second transmission scheme scheduling result information 164 indicates an MS that permits data transmission in the second transmission scheme, a transmission rate and a transmission timing in data transmission, and the like.
  • the MS 30-1 has a reception unit 31 and a transmission unit 32.
  • the MS30-230-N has the same internal configuration as the MS30-1. Therefore, for the sake of simplicity, a detailed description of the internal configuration and operation of the MS30_2 30-N is omitted, and only the MS30-1 will be described.
  • Reception section 31 performs a predetermined reception process on a radio signal including one of first transmission scheme allocation information 170-1 and second transmission scheme allocation information 171-1 and DL data 172-1. Is applied. Then, the DL 180-1 obtained as a result of the reception processing for the DL data 172-1 is output. Also, the first transmission scheme assignment information 1811 obtained as a result of the reception processing for the first transmission scheme assignment information 170-1 or the second transmission scheme assignment information 171-1 and the second transmission scheme assignment information 181-2 are obtained. 1 is output to the transmission unit 32.
  • the transmission unit 32 performs a predetermined transmission process on the UL data 183-1 and the report value 184-1 to be transmitted.
  • the first transmission scheme allocation information 181-1 is input, uplink data transmission based on the first transmission scheme is performed, that is, a radio signal including UL data 173-1 is transmitted to the reception unit 23 of the BS 20.
  • the second transmission scheme assignment information 182-1 is input, uplink data transmission based on the second transmission scheme is performed, that is, a radio signal including UL data 174-1 is transmitted to the reception unit 23 of the BS 20.
  • the transmission processing result for report value 184-1 is set as report value 175-1 and a radio signal including the report value is transmitted to receiving section 23.
  • FIG. 5 is a flowchart for explaining the operation of the scheduling unit 22, and FIG. 6 is a diagram schematically showing a process of allocating the reception power resource 150.
  • step ST1000 setting section 101 sets second transmission scheme received power resource (RS_2) 161 based on previous second transmission scheme scheduling result information 164. Then, the second transmission scheme reception power resource (RS_2) 161 is secured in the reception power resource (RS) 150 set by the RNC 10. Then, in step ST1100, the first transmission scheme reception power resource (RS_1) 160 is calculated by subtracting the second transmission scheme reception power resource (RS_2) 161 from the reception power resource (RS) 150. Then, the first transmission scheme scheduling section 110 performs scheduling of the first transmission scheme (ST1200), and the second transmission scheme scheduling section 120 performs scheduling of the second transmission scheme (ST1300).
  • first transmission scheme scheduling in step ST1200 may be performed any time after the first transmission scheme received power resource (RS_1) 160 is determined.
  • second transmission scheme scheduling in step ST1300 may be performed any time after the second transmission scheme received power resource (RS_2) 161 is determined.
  • the number of MSs targeted for the first transmission scheme does not change after time TO, and the number of MSs targeted for the second transmission scheme fluctuates over time. More specifically, as shown in FIG. 7, the number of MSs at time T1 is 1, the number of MSs at time T1 is 4 at time T1, and the number of MSs at time T2 is 2 as shown in FIG. It is assumed that Further, in the following description, attention is particularly paid to the period of time T1 temporary IJT2. During this period, the number of target MSs in the first transmission scheme is two, that is, MS-A and MS-B. Further, the number of target MSs in the second transmission scheme is four, that is, MS_C, MS_D, MS-E, and MS-F.
  • FIG. 8 is a diagram showing a change in allocation of the received power resource to each MS during a period from time T1 to time T2.
  • the period from time T1 to time T2 includes a scheduling period Tsch (l) Tsch (6).
  • the sum of the received power resources allocated to MS_C-MS_F as the scheduling result of scheduling period Tsch (3) ie, the received power resources of the second transmission scheme 161 in scheduling period Tsch (3))
  • the sum of the received power resources allocated to the MS—C MS—F as a scheduling result of the scheduling period Tsch (4) is the second transmission scheme received power resource 161 for the scheduling period Tsch (5). It becomes.
  • the received power resource actually allocated to MS—C—MS—F is only A more than the second transmission scheme received power resource 161. It is getting smaller. Therefore, in the scheduling period Tsch (5), the second transmission scheme received power resource 161 is smaller than in the scheduling period Tsch (4). As a result, the reception power resource 160 of the first transmission scheme in the scheduling period Tsch (5) increases.
  • the reception power resource allocation according to the present embodiment can follow the fluctuation of the allocation of the reception power resource for each scheduling period.
  • the reception power resource allocation can also be performed by the RNC 10.
  • the RNC 10 performs reception power resource allocation according to only the increase / decrease of the number of MSs, it cannot be said that the allocation of the reception power resource 150 is flexibly controlled. This is because the amount of received power resources actually allocated to each MS30-1-30-N is a force that depends on the communication status with each MS30-1-30-N.
  • the RNC 10 it is not easy for the RNC 10 to immediately grasp the report value 162 including information related to the communication status or the scheduling result of the scheduling unit 22 performed based on the report value 162. Les ,.
  • the scheduling period is very short, on the order of a few ms and a few tens of ms, while the signaling between the RNC and the BS has a delay of several hundred ms.
  • the scheduling since the scheduling is performed by the scheduling unit 22 of the BS 20, the allocation of the received power resources can be reliably synchronized with the scheduling cycle, and flexible allocation control can be performed.
  • reception power resource 150 set by RNC 10 is allocated to a plurality of transmission schemes while BS 20 considers report value 162, so that multiple transmission schemes are used. It is possible to control the distribution of the received power resources among the nodes at high speed and flexibly, to improve the utilization efficiency of the received power resources 150, and to improve the user throughput and the system throughput in the radio communication system. Power S can.
  • FIG. 9 is a block diagram showing a configuration of a wireless communication system having BS 20 according to Embodiment 2 of the present invention.
  • the wireless communication system according to the present embodiment it is assumed that two transmission schemes are used for uplink data transmission, as in the above embodiment.
  • the first transmission method is time-and-rate scheduling and the second transmission method is rate scheduling.
  • the wireless communication system described in the present embodiment has the same basic configuration as the wireless communication system described in Embodiment 1, and the same or corresponding components are denoted by the same reference characters. The detailed description is omitted.
  • Scheduling section 22 of the present embodiment has management section 200 instead of management section 100 described in the first embodiment.
  • the management unit 200 includes an addition unit 201 in addition to the setting unit 101. Further, the scheduling unit 22 further includes a monitor unit 202.
  • a main feature of the present embodiment is that when a surplus occurs in the received power resource in the scheduling of the first transmission scheme, the surplus is added to the received power resource of the second transmission scheme.
  • the second transmission scheme received power resource 161 set by the setting unit 101 is sent to the adding unit 201.
  • Monitor section 202 monitors the occurrence of excess received power resources due to the scheduling of first transmission scheme scheduling section 110. When a surplus occurs, the surplus amount is calculated, and at least a part of the surplus amount (hereinafter referred to as “first transmission method surplus received power resource 260”) is added. Output to section 201.
  • Adder 201 calculates the sum of second transmission scheme received power resource 161 and first transmission scheme surplus received power resource 260, and divides second transmission scheme received power resource 261 that is the calculation result into second transmission scheme scheduling. Output to section 120.
  • FIG. 10 is a flowchart for explaining the operation of the scheduling unit 22, and FIG. 11 is a diagram schematically showing a process of allocating the reception power resource 150.
  • step ST1210 monitor 202 checks the reception power resource (RS_1 ′) used in the first transmission scheme scheduling in step ST1200. ) Is subtracted from the first transmission scheme received power resource (RS_1) 160. Thereby, the first transmission method surplus received power resource (RS ⁇ remain) 260 is calculated. Then, in step ST1220, the first transmission scheme surplus received power resource (RS remaining) 260 is calorie-calculated to the second transmission scheme received power resource (RS_2) 161. In this way, the second transmission scheme received power resource (RS_2) 261 is calculated. Then, the process proceeds to Step ST1300 described in the first embodiment.
  • the first transmission scheme scheduling in step ST1200 may be performed any time after the first transmission scheme received power resource (RS_1) 160 is determined.
  • FIG. 12A is a diagram showing a change in received power resource allocation to each MS
  • FIG. 12B is a diagram showing a change in data amount in each MS.
  • attention is paid to the period between time T1 and time T2. That is, the target MSs of the first transmission scheme are MS-A and MS-B, and the target MSs of the second transmission scheme are MS_C, MS_D, MS-E, and MS-F.
  • the surplus of first transmission scheme received power resource 160 generated as a result of scheduling Since one transmission scheme surplus reception power resource 260 is added to the second transmission scheme reception power resource 161, the surplus of the reception power resource in one transmission scheme can be redistributed to the other transmission scheme, and the reception power resource The use efficiency of 150 can be further improved.
  • FIG. 13 is a block diagram showing a configuration of a wireless communication system having BS 20 according to Embodiment 3 of the present invention.
  • the wireless communication system according to the present embodiment it is assumed that two transmission schemes are used for uplink data transmission, as in the above embodiment.
  • the first transmission method is time-and-rate scheduling and the second transmission method is rate scheduling.
  • the wireless communication system described in the present embodiment has a basic configuration similar to that of the wireless communication system described in Embodiment 2, and the same or corresponding components have the same basic configuration. The same reference numeral is attached, and the detailed description is omitted.
  • Scheduling section 22 of the present embodiment has management section 300 instead of management section 200 described in the second embodiment.
  • the management unit 300 includes an addition unit 201, a setting unit 301 instead of the setting unit 101, and further includes a determination unit 302.
  • the main feature of the present embodiment is that among the report values from MS 30-1 30-N to BS 20, reception power resource allocation is performed in consideration of, in particular, fluctuations in the amount of data.
  • the data amount information may be an indirect value such as a requested transmission rate based on the data amount in the transmission buffer of the MS, and further, an absolute value, a relative value, and a difference value (eg, UP / DOWN / K EEP etc.).
  • determination section 302 determines whether first transmission scheme reception power resource 160 or second transmission scheme reception power resource 161 is present. Judge whether to increase or decrease.
  • the data amount of the MS that is the target of the first transmission scheme is referred to. If, for example, a remarkable decrease or increase in the data amount of the first transmission method is observed or expected, the reception of the first transmission method is completed before the data transmission based on the first transmission method is completed.
  • the increase / decrease of the power resource 160 is determined, and this is instructed to the setting unit 301.
  • the determining unit 302 may instruct not only the increase / decrease of the first transmission method received power resource 160 but also the increase / decrease rate and the increase / decrease rate.
  • setting section 301 allocates received power resources 150 according to the instruction. For example, when the determination unit 302 instructs to reduce the first transmission scheme reception power resource 160, an additional amount is added to the second transmission scheme reception power resource 161 at the stage of securing the second transmission scheme reception power resource. .
  • Other operations performed by the setting unit 301 are the same as those of the setting unit 101.
  • FIG. 14A is a diagram showing a change in received power resource allocation to each MS
  • FIG. 14B is a diagram showing a change in data amount in each MS.
  • attention is paid to the period between time T1 and time T2. That is, the target MSs of the first transmission scheme are MS-A and MS-B, and the target MSs of the second transmission scheme are MS-A _C, MS_D, MS-E and MS_F.
  • the first transmission scheme received power resource 160 is reduced in each of the scheduling periods Tsch (2), Tsch (4), and Tsch (5).
  • the received power resource 160 of the first transmission scheme can be reduced, and the second transmission scheme can be reduced.
  • the system received power resource 261 can be increased. 14A and 14B, the case where the first transmission scheme received power resource 160 is decreased with time has been described. Similarly, the case where the first transmission scheme received power resource 160 is increased with time is also described. It is feasible.
  • reception power resource allocation is performed particularly in consideration of data amount fluctuations. Therefore, as long as there is a sufficient amount of transmission data, the probability that the reception power resource 150 can be used up all the time can be greatly improved. Further, the transmission rate of the second transmission method can be increased while minimizing the extension of the data transmission period of the first transmission method.
  • FIG. 15 is a block diagram showing a configuration of a wireless communication system having BS 20 according to Embodiment 4 of the present invention.
  • the wireless communication system according to the present embodiment it is assumed that two transmission schemes are used for uplink data transmission, as in the above embodiment.
  • the first transmission method is time-and-rate scheduling
  • the second transmission method is rate scheduling.
  • the wireless communication system described in the present embodiment has the same basic configuration as the wireless communication system described in Embodiment 3, and the same or corresponding components are denoted by the same reference characters. The detailed description is omitted.
  • the scheduling section 22 of the present embodiment has a management section 400 instead of the management section 300 described in the third embodiment.
  • the management unit 400 includes a judgment / selection unit 401 instead of the judgment unit 302.
  • the wireless communication system of the present embodiment uses MS43 instead of MS30-1 30-N. It has 0-1—430-N. The details of the internal structure of the MS430-1 430-N will be described later in detail.
  • the main feature of the present embodiment is that the BS 20 also switches between a plurality of transmission schemes that can be performed only by allocating received power resources to the plurality of transmission schemes.
  • the determination / selection unit 401 determines the first transmission method terminal information 460 and the second transmission method terminal information 461 based on the report value 162. In other words, the transmission method to be used in each of the MS430-1 and 430-N is selected from the first transmission method and the second transmission method. If the two transmission methods can be used together, determine whether each transmission method can be used (on-Z off) for each MS.
  • the first transmission method terminal information 151 and the second transmission method terminal information 152 were transmitted from the RNC 10, whereas in the present embodiment, the first transmission method terminal information
  • the information 460 and the second transmission method terminal information 461 are determined inside the BS 20.
  • the determined first transmission scheme terminal information 460 and second transmission scheme terminal information 461 are output to first transmission scheme scheduling section 110 and second transmission scheme scheduling section 120, respectively.
  • Other operations performed by the determination / selection unit 401 are the same as those of the determination unit 302. That is, it is determined whether to increase or decrease the first transmission scheme reception power resource 160 or the second transmission scheme reception power resource 161. Furthermore, the range of increase or decrease and the rate of increase / decrease may be specified.
  • the switching operation of the transmission scheme by BS 20 having the above configuration will be described with reference to two examples.
  • One is a switching operation according to the data amount of MS430-1-430-N
  • the other is a switching operation according to the transmission power resource of MS430-11-430-N.
  • attention is paid to the period between time T1 and time T2.
  • the first transmission scheme is time and rate scheduling and signaling on the downlink is multi-bit
  • the number of MSs for which the first transmission scheme is simultaneously permitted is limited to two. Assume that
  • FIG. 16A is a diagram illustrating transmission method switching according to the data amount in each MS
  • FIG. 16B is a diagram illustrating fluctuations in the data amount in each MS.
  • This switching may be performed based on a predetermined priority.
  • the priorities used include, for example, report values such as the data amount and transmission power resources of the MS, data dwell time in the MS, past user throughput, and delay time.
  • the received power resource 150 can be used effectively, and data transmission can be performed after switching to the first transmission method, that is, the transmission method with a high transmission rate in order from the MS with the highest priority. Become.
  • FIG. 17A is a diagram illustrating transmission method switching according to transmission power resources in each MS
  • FIG. 17B is a diagram illustrating fluctuations in transmission power resources in each MS.
  • the received power resources of each MS of the second transmission scheme are the same.
  • the transmission power resources of MS_A and MS_B are the upper two, so that MS-A and MS-B perform data transmission in the first transmission scheme.
  • the top two MSs are replaced by MS—A and MS—E.
  • the MSs are replaced by MS—E and MS—C, and the scheduling period Tsch ( In 5), MS-B and MS-E are replaced. Therefore, in each of these periods, the MSs for which the first transmission scheme is permitted are also switched. This means that a large transmission power resource means that reception is possible even if data transmission is performed with low transmission power, meaning that the conditions of the propagation path are good. .
  • the permitted MS since the first transmission scheme is preferentially granted to an MS having a good propagation path condition, the permitted MS performs data transmission at a low transmission power and a high transmission rate. It becomes possible. In addition, since low transmission power is sufficient, it is possible to reduce interference to other BSs, and it is possible to further improve system throughput. In addition, by exchanging MSs that permit the first transmission scheme, MSs with good channel conditions can perform data transmission at high transmission rates, resulting in a multi-user diversity effect and increased system throughput. Can be done.
  • MS430 Any MS among MS430-1-430-N is called MS430.
  • FIG. 18 is a block diagram showing a configuration of MS430.
  • the MS 430 includes a receiving unit 431, a transmitting unit 432, and a transmission method switching unit 433.
  • Receiving section 431 includes first transmission scheme assignment information receiving section 441, second transmission scheme assignment information receiving section 442, and DL data receiving section 443.
  • the transmission section 432 has a transmission buffer 451, a first transmission scheme transmission section 452, a second transmission scheme transmission section 453, and a report value transmission section 454.
  • First transmission scheme assignment information receiving section 441 demodulates first transmission scheme assignment information 170. Then, it determines whether or not signaling to its own device has been received. If it has been received, it extracts first transmission method allocation information 181 and outputs it to transmission method switching section 433 and transmission section 432.
  • Second transmission scheme assignment information receiving section 442 demodulates second transmission scheme assignment information 171. Then, a determination is made as to whether or not signaling to the own device has been received. If the signaling has been received, second transmission method allocation information 182 is extracted and output to transmission method switching section 433 and transmission section 432.
  • DL data receiving section 443 demodulates DL data 172 and outputs DL data 180.
  • the transmission method switching unit 433 determines that data transmission of the first transmission method has been permitted to the transmission buffer 451 and that the permitted transmission has been performed. Report the rate or its maximum. Also, when the second transmission method allocation information 182 is input, it is determined that the data transmission of the second transmission method is And the allowed transmission rate.
  • the transmission buffer 451 outputs the UL data 183 to the first transmission method transmission unit 452 or the second transmission method transmission unit 453 according to the presence or absence of the notification from the transmission method switching unit 433.
  • First transmission scheme transmission section 452 modulates UL data 183 and transmits data as UL data 173 based on the first transmission scheme.
  • Second transmission scheme transmission section 453 modulates UL data 183 and transmits the data as UL data 174 based on the second transmission scheme.
  • Report value transmitting section 454 modulates report value 184 and transmits it as report value 175.
  • the transmission method can be switched according to the signal from the BS 20.
  • the transmission scheme is switched depending on which of first transmission scheme assignment information 181 and second transmission scheme assignment information 182 has been received.
  • the switching method is not limited to this. For example, whether or not the first transmission method assignment information 170 is received or whether or not the second transmission method assignment information 171 is received, that is, whether the switching is performed based on the signaling on the BS 20 side is acceptable.
  • MS 430 may perform data transmission in both of the two transmission schemes when there is sufficient transmission power resources. .
  • not only distribution of received power resources to a plurality of transmission schemes, but also switching between a plurality of transmission schemes is performed by BS20. It is possible to switch the transmission method so that a transmission method with a high transmission rate is applied to high MSs or MSs with good propagation path conditions, and to perform switching control at high speed in the same way as reception power resource distribution control As a result, it is possible to prioritize MSs that have strict delay requirements, and to further improve user throughput and system throughput.
  • FIG. 19 is a block diagram showing a configuration of a wireless communication system having BS 20 according to Embodiment 5 of the present invention.
  • the wireless communication system of the present embodiment it is assumed that two transmission schemes are used for uplink data transmission as in the above embodiment.
  • an autonomous transmission is adopted as the second transmission method as an example.
  • the wireless communication system described in the present embodiment has the same basic configuration as the wireless communication system described in Embodiment 3, and the same or corresponding components have the same reference characters. And a detailed description thereof will be omitted.
  • the scheduling section 22 of the present embodiment has a management section 500 instead of the management section 200, and has a second transmission scheme rate control section 502 instead of the second transmission scheme scheduling section 120.
  • the management unit 500 may use the first transmission method as in the determination unit 302 based on the setting unit 301, the addition unit 201, and the first transmission method terminal information 151 and the second transmission method terminal information 152.
  • a main feature of the present embodiment is that reception power resource allocation is performed by BS20 in a wireless communication system that employs autonomous transmission for one of a plurality of transmission methods.
  • Second transmission scheme rate control section 502 equally divides second transmission scheme reception power resource 261 by the number of MSs based on second transmission scheme terminal information 152. With this, the received power resource per MS is calculated. Further, the transmission unit 21 converts the transmission rate into the transmission rate and outputs it to the transmission unit 21 as the second transmission scheme rate information 560.
  • the second transmission scheme rate information 560 is information common to one or more target MSs, it is difficult to perform different control for each MS, but the amount of signaling in the downlink is reduced. It becomes possible. If the target MSs of the second transmission method are grouped in advance, the transmission rate can be controlled for each group.
  • FIG. 20 is a diagram showing a change in received power resource allocation to each MS.
  • attention is paid to the period between time T1 and time T2.
  • the number of target MSs in the first transmission scheme is two (MS-A and MS_B), while the number of target MSs in the second transmission scheme is not specified but is plural. .
  • the surplus can be redistributed to the second transmission scheme received power resource.
  • the second transmission scheme received power resource 261 is equally divided for each of the target MSs of the second transmission scheme. Is done.
  • reception power resource allocation is performed by BS 20 in a wireless communication system that employs autonomous transmission for one of a plurality of transmission schemes. Since allocation control can be performed at a high speed, it is possible to give priority to an MS having a strict delay requirement, and to further improve user throughput and system throughput.
  • another scheduling scheme such as power rate scheduling described as an example of time and rate scheduling as the first transmission scheme can be realized.
  • Switching can be performed.
  • three examples of time-and-rate scheduling, rate scheduling, and autonomous transmission have been described, but other transmission methods can be implemented as long as at least two transmission methods are combined.
  • the present invention can also be implemented when the BS combines a transmission scheme that performs scheduling for E-DCH (Enhanced-Dedicated Channel) and a transmission scheme that does not perform scheduling for E-DCH in the BS. is there.
  • E-DCH is a channel used in uplink enhancement.
  • the channel to be scheduled need not be limited to only E-DCH.
  • this method is also used when the BS combines the transmission method in which scheduling is performed for E-DCH and the transmission method in which a higher-level device (for example, RNC) controls the upper limit of the conventional DCH (Dedicated Channel) transmission rate. It is possible.
  • the present invention can also be implemented when a transmission method that does not perform scheduling on H is combined with a transmission method in which the higher-level device controls the upper limit of the DCH transmission rate.
  • a mode in which at least two transmission schemes are combined and referred to as one transmission scheme can be considered.
  • internal transmission power resource allocation or transmission is performed.
  • the present invention can be similarly implemented as long as an operation such as a method switching is included.
  • the received power resource set by the higher-level device to the BS is the target value of the total received power excluding other-cell interference power and thermal noise power as shown in FIG.
  • the force is described as not limited to this.
  • any parameter can be used as long as it is a parameter related to the received power resource.
  • Available parameters include, for example, total received power, ratio of total received power to thermal noise power, ratio of total received power to interference power, ratio of total received power to interference power + thermal noise power, channel for E-DCH
  • Whichever parameter is used, that parameter is converted to a received power resource in the BS.
  • the distribution of the received power resources set by the RNC which is a higher-level device of the BS, that is, the distribution to a plurality of transmission schemes used in uplink data transmission is determined by the RNC.
  • the BS switches between multiple transmission schemes. This makes it possible to control the allocation and switching of the reception power resources among a plurality of transmission schemes at a high speed, improve the utilization efficiency of the reception power resources, and improve the user throughput and the wireless communication system. System throughput can be improved. In addition, the amount of signaling between the host device and the base station device can be significantly reduced.
  • the scheduling device and the scheduling method of the present invention have an effect of improving the user throughput and the system throughput in a wireless communication system, and are useful for data transmission on an up line.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

 無線通信システムにおけるユーザスループットおよびシステムスループットを向上させることができるスケジューリング装置。この装置において、管理部(100)は、移動局装置(30−1~30−N)から報告された情報に基づいて、無線ネットワーク制御装置(10)により設定された受信電力リソースを、上り回線データ伝送において使用される複数の送信方式に配分する。第1送信方式スケジューリング部(110)および第2送信方式スケジューリング部(120)は、前記複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝送のスケジューリングを実行する。  

Description

明 細 書
スケジューリング装置およびスケジューリング方法
技術分野
[0001] 本発明は、スケジューリング装置およびスケジューリング方法に関し、特に、無線通 信システムにおける上り回線データ伝送のためのスケジューリング装置およびスケジ ユーリング方法に関する。
背景技術
[0002] HSDPA (High Speed Downlink Packet Access)の導入により、 WCDMA (
Wideband Code Division Multiple Access)方式における下り回線の高速化が進めら
、上り回線を高速化および低遅延化するための様々な技術の検討が進められている
[0003] WCDMA方式の無線通信システムの一般的な構成は、図 1に示すように、無線ネ ットワーク制御装置(RNC : Radio Network Controller)、基地局装置(BS : Base Station)および移動局装置(MS : Mobile Station)を有する。このような無線通信シス テムにおいて、上り回線における受信電力リソースなどの管理は、一般に、 BSの上 位装置である RNCによって行われる。
[0004] 当該システムにおける上り回線データ伝送を安定的に動作させるためには、例えば 図 2に示すように、熱雑音および他セルとの干渉を考慮した上での基地局における 受信電力が、所定の目標値までの範囲に収まるように各 MSに対して受信電力リソー スを配分する、つまり送信レート(またはその上限値)を各 MSに割り当てる必要があ る。これを実現するために、上り回線データ伝送のためのスケジューリングを適切に 行うことが考えられる。
[0005] また、アップリンクエンハンスメントによる上り回線の高速化 ·低遅延化を実現するに は、スケジューリングを高速に行うことが重要である。このため、スケジューリングと関 連する幾つかの送信方式 (送信方法)が検討されてレ、る。検討されてレ、る代表的な 送信方式としては、例えば、タイムアンドレートスケジューリング(Time and Rate Scheduling) ,レートスケジューリング(Rate Scheduling)およびオートノマストランスミツ シヨン(Autonomous Transmission)が挙げられる。図 3Aは、タイムアンドレートスケジ ユーリングに基づく上り回線データ伝送を示し、図 3Bは、レートスケジューリングに基 づく上り回線データ伝送を示し、図 3Cは、オートノマストランスミッションに基づく上り 回線データ伝送を示す。
[0006] タイムアンドレートスケジューリングでは、比較的大きな受信電力リソースを比較的 少数の MS (図 3Aでは MS— A)に配分する(すなわち送信レートまたはその上限値 を割り当てる)ことによって、リソースを割り当てられた MSの送信を許可する。送信を 許可された MSは、スケジューリングの際に決定された送信レートの範囲内で、また、 スケジューリングの際に必要に応じて決定された送信タイミングにおいて、上り回線の データ伝送を行う。したがって、タイムアンドレートスケジューリングは、上記の三つの 送信方式の中では、高速なデータ伝送に適した送信方式である。
[0007] レートスケジューリングでは、比較的小さめの受信電力リソースを比較的多数の MS
(図 3Bでは MS_A、 MS—Bおよび MS—C)に配分し、よって BSにおける受信電力 の変動が低減される。この場合、 MSからの送信レート要求および BSからの送信レー ト許可はいずれも、例えばアップ(UP)、ダウン(DOWN)またはキープ(KEEP)を示す 約 1一 2ビットの信号を用いて行われる。すなわち、 MSに対する受信電力リソース配 分が徐々に変更される。したがって、レートスケジューリングは、上記の三つの送信方 式の中では、中低速なデータ伝送に適している。
[0008] オートノマストランスミッションでは、予め決められた送信レート以下であれば BSの 許可がなくとも MS (図 3Cでは MS— A、 MS—Bおよび MS—C)は送信を行うことがで きる。この方式では、一般に、低い送信レートが使用される。したがって、オートノマス トランスミッションは、上記の三つの送信方式の中では、低い送信レートで低遅延な データ伝送に適している。
[0009] ところで、アップリンクエンハンスメントにおいては、上記の三つの送信方式を中心と する複数の送信方式の組み合わせに基づく上り回線データ伝送についても検討され ている。例えば非特許文献 1では、タイムアンドレートスケジューリングおよびオートノ マストランスミッションの組み合わせに基づく上り回線データ伝送が提案されている。 また、非特許文献 2では、タイムアンドレートスケジューリング(同文献内ではタイムス ケジユーリングと呼ばれている)およびレートスケジューリングの組み合わせについて 、詳細には述べられていないものの、その組み合わせが有り得るということが明記さ れている。
非特許乂 ffl^l: eference Node-B scheduler for EUL , wualcomm Europe, 3rd eneration Partnership Projects, Rl-031246, November 2003
非特許文献 2 : "Text Proposal: Node B Controlled Scheduling", Ericsson, 3rd ueneration Partnership Projects, Rl-031120, October 2003
発明の開示
発明が解決しょうとする課題
[0010] し力 ながら、従来の上り回線データ伝送においては、複数の送信方式の組み合 わせに基づくデータ伝送が行われる場合に各送信方式に対してどのように受信電力 リソースを配分するかについて、あまり多くの提案がなされていない。一方で、アツプリ ンクエンハンスメントにおいて、高速なスケジューリングに伴って受信電力リソース配 分を効率化することは非常に重要である。それにもかかわらず受信電力リソース配分 に関する議論があまり盛んではないため、受信電力リソース利用の効率化には一定 の限界がある。したがって、無線通信システムにおける MSのユーザスループットおよ びシステム全体のシステムスループットの向上に一定の限界がある。
[0011] 本発明は、力かる点に鑑みてなされたもので、無線通信システムにおけるユーザス ループットおよびシステムスループットを向上させることができるスケジューリング装置 およびスケジューリング方法を提供することを目的とする。
課題を解決するための手段
[0012] 本発明のスケジューリング装置は、上位装置により設定された受信電力リソースを、 上り回線データ伝送において使用される複数の送信方式に配分する配分手段と、前 記複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝送の スケジューリングを実行するスケジューリング手段と、を有する構成を採る。
[0013] 本発明の基地局装置は、移動局装置から報告された情報に基づいて、前記移動 局装置で使用すべき送信方式を決定する決定手段と、前記報告情報および前記決 定手段の決定結果に基づいて、上位装置により設定された受信電力リソースを、上り 回線データ伝送において使用される複数の送信方式に配分する配分手段と、前記 複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝送のス ケジユーリングを実行するスケジューリング手段と、前記決定手段の決定結果を前記 移動局装置にシグナリングするシグナリング手段と、を有する構成を採る。
[0014] 本発明の移動局装置は、基地局装置に対して上り回線データ伝送を行う移動局装 置であって、自装置に関する情報を前記基地局装置に報告する報告手段と、報告さ れた情報に基づく送信方式の決定結果の、前記基地局装置からのシグナリングを検 出する検出手段と、検出された送信方式を使用して上り回線データ伝送を行う伝送 手段と、を有する構成を採る。
[0015] 本発明のスケジューリング方法は、上位装置により設定された受信電力リソースを、 上り回線データ伝送において使用される複数の送信方式に配分する配分ステップと 、前記複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝 送のスケジューリングを実行するスケジューリングステップと、を有するようにした。 発明の効果
[0016] 本発明によれば、無線通信システムにおけるユーザスループットおよびシステムス ループットを向上させることができる。また、上位装置と基地局装置間のシグナリング の量を大幅に削減することができる。
図面の簡単な説明
[0017] [図 1]無線通信システムの一般的な構成を示すブロック図
[図 2]受信電力リソース配分の例を説明するための図
[図 3A]送信方式の一例を説明するための図
[図 3B]送信方式の他の例を説明するための図
[図 3C]送信方式のさらに他の例を説明するための図
[図 4]本発明の実施の形態 1に係る基地局装置を有する無線通信システムの構成を 示すブロック図
[図 5]本発明の実施の形態 1に係る基地局装置におけるスケジューリング部の動作を 説明するためのフロー図 園 6]実施の形態 1において、受信電力リソースを配分する過程を模式的に示す図 [図 7]移動局装置の経時変動状態を示す図
園 8]実施の形態 1において、各移動局装置への受信電力リソース割当ての変動を 示す図
[図 9]本発明の実施の形態 2に係る基地局装置を有する無線通信システムの構成を 示すブロック図
園 10]本発明の実施の形態 2に係る基地局装置におけるスケジューリング部の動作 を説明するためのフロー図
園 11]実施の形態 2において、受信電力リソースを配分する過程を模式的に示す図 園 12A]実施の形態 2におレ、て、各移動局装置への受信電力リソース割当ての変動 を示す図
園 12B]実施の形態 2において、各移動局装置におけるデータ量の変動を示す図 [図 13]本発明の実施の形態 3に係る基地局装置を有する無線通信システムの構成を 示す図
園 14A]実施の形態 3におレ、て、各移動局装置への受信電力リソース割当ての変動 を示す図
園 14B]実施の形態 3において、各移動局装置におけるデータ量の変動を示す図 [図 15]本発明の実施の形態 4に係る基地局装置を有する無線通信システムの構成を 示すブロック図
園 16A]実施の形態 4において、各移動局装置におけるデータ量に応じた送信方式 切り替えを示す図
園 16B]実施の形態 4において、各移動局装置におけるデータ量の変動を示す図 園 17A]実施の形態 4において、各移動局装置における送信電力リソースに応じた送 信方式切り替えを示す図
園 17B]実施の形態 4において、各移動局装置における送信電力リソースの変動を 示す図
園 18]実施の形態 4における移動局装置の構成を示すブロック図
[図 19]本発明の実施の形態 5に係る基地局装置を有する無線通信システムの構成を 示すブロック図
[図 20]実施の形態 5におレヽて、各移動局装置への受信電力リソース割当ての変動を 示す図
発明を実施するための最良の形態
[0018] 以下、本発明の実施の形態について、図面を用いて詳細に説明する。
[0019] (実施の形態 1)
図 4は、本発明の実施の形態 1に係る BSを有する無線通信システムの構成を示す ブロック図である。なお、本実施の形態の無線通信システムでは、上り回線データ伝 送に二つの送信方式が使用されることを前提とする。本実施の形態では例として、こ れら二つの送信方式は、第 1送信方式力 Sタイムアンドレートスケジューリングであり、 第 2送信方式がレートスケジューリングであるとする。
[0020] 図 4に示す無線通信システムは、 RNC10、 BS20および N基の MS30— 1、 30— 2、 · · ·、 30—Nを有する。
[0021] BS20は、送信部 21、スケジューリング部 22および受信部 23を有する。
[0022] 送信部 21は、 RNC10からの DL (DownLink)データ 153に対し、スケジューリング 部 22からの第 1送信方式スケジューリング結果情報 163および第 2送信方式スケジュ 一リング結果情報 164に従って所定の送信処理を施す。そして、 DLデータ 172—1 一 172_N、第 1送信方式割当て情報 170— 1一 170— Nおよび第 2送信方式割当て 情報 171—1 171—Nを含む無線信号を MS30—1— 30—Nに対して送信する。
[0023] なお、本実施の形態では、第 1送信方式でのデータ伝送を許可された MS30— kに 対してのみ第 1送信方式割当て情報 170 - kを送信し、第 2送信方式でのデータ伝送 を許可された MS30— hに対してのみ第 2送信方式割当て情報 171— hを送信するも のとする。
[0024] 受信部 23は、 MS30 - 1一 30 - Nから送信された無線信号に含まれる、第 1送信方 式の UL (UpLink)データ 173— 1一 173_N、第 2送信方式の ULデータ 174-1一 17 4-Nおよび報告値 175-1— 175-Nに対して所定の受信処理を施す。そして、報告 値 175-1— 175-Nに対する受信処理結果として得られた報告値 162としてスケジュ 一リング咅 に出力するとともに、 ULデータ 173—1— 173_N、 174—1— 174—N に対する受信処理結果として得られた ULデータ 154を RNC 10に送る。ここで、報告 値 175— 1一 175— Nには、個々の MS30—1— 30—N内の、例えば使用可能な送信 電力リソースまたは送信バッファにおけるデータ量もしくはこれらの組み合わせなどを 示す情報、概して言えば、上り回線データ伝送の通信状況に関わる情報が含まれる
[0025] スケジューリング部 22は、管理部 100、第 1送信方式スケジューリング部 110および 第 2送信方式スケジューリング部 120を有する。
[0026] 本願発明の主たる特徴部分である管理部 100は、 RNC10により設定された受信 電力リソース 150を第 1送信方式受信電力リソース 160および第 2送信方式受信電 カリソース 161に配分する。より具体的には、管理部 100は設定部 101を有し、設定 部 101は、受信電力リソース 150と第 2送信方式スケジューリング部 120による過去の (本実施の形態では前回の)第 2送信方式スケジューリング結果情報 164とに基づい て、今回のスケジューリングのための第 1送信方式受信電力リソース 160を設定し、こ れを第 1送信方式スケジューリング部 110に出力する。例えば、第 2送信方式受信電 カリソース 161は、第 2送信方式スケジューリング部 120による前回のスケジユーリン グの結果として使用された受信電力リソースの値に設定される。そして、受信電力リソ ース 150から第 2送信方式受信電力リソース 161を減じた値を第 1送信方式受信電 カリソース 160として設定し、これを第 1送信方式スケジューリング部 110に出力する
[0027] このように、先ず第 2送信方式受信電力リソース 161を過去の第 2送信方式スケジュ 一リング結果情報 164に基づいて設定し、続いて受信電力リソース 150から第 2送信 方式受信電力リソース 161を減じた値を第 1送信方式受信電力リソース 160として設 定するため、構成を複雑にすることなく受信電力リソース設定を行うことができる。また 、第 2送信方式受信電力リソース 161を、過去の第 2送信方式スケジューリング結果 情報 164に基づいて設定するため、設定される第 2送信方式受信電力リソース 161と 実際に利用される受信電力リソースとの間に大きな誤差が生じる可能性を低減するこ とができる。
[0028] ここで、管理部 100の設定部 101は、第 2送信方式受信電力リソース 161を、第 2送 信方式が使用可能な最大の値 (つまり第 2送信方式の全ての MSに対して送信レート を上げるように指示したときに第 2送信方式が必要とする受信電力リソース)に設定で きるようにしても良い。この場合、第 2送信方式を優先した受信電力リソース配分を行 うことができる。
[0029] また、第 2送信方式受信電力リソース 161を、第 2送信方式が使用可能な最小の値
(つまり第 2送信方式の全ての MSに対して送信レートを下げるように指示したときに 第 2送信方式が必要とする受信電力リソース)に設定できるようにしても良い。この場 合、第 1送信方式を優先した受信電力リソース配分を行うことができる。
[0030] また、第 2送信方式受信電力リソース 161を、第 2送信方式が使用可能な最小の値 および最大の値の範囲内となるように第 1送信方式受信電力リソース 160を割り当て ても良い。この場合、第 2送信方式に基づくデータ伝送において受信電力リソースを 使い切れなくなることや不足することを少なくすることができる。
[0031] 第 1送信方式スケジューリング部 110は、第 1送信方式端末情報 151、第 1送信方 式受信電力リソース 160および報告値 162に基づいて上り回線データ伝送における 第 1送信方式のためのスケジューリングを行レ、、個々の MS 30— 1一 30—Nに対して 受信電力リソースの割当て、つまり送信レートの割当てを行う。そして、スケジユーリン グの結果を示す第 1送信方式スケジューリング結果情報 163を送信部 21に出力する 。ここで、第 1送信方式端末情報 151は、第 1送信方式の対象である MSに関する情 報(MSの番号や MSの個数など)であり、本実施の形態では、例えば MS個数の増 減などは RNC10にて管理されることを想定している。また、第 1送信方式スケジユー リング結果情報 163は、第 1送信方式でのデータ伝送を許可する MSならびにデータ 伝送における送信レート (もしくは送信電力)および送信タイミングなどを示す。
[0032] 第 2送信方式スケジューリング部 120は、第 2送信方式端末情報 152、第 2送信方 式受信電力リソース 161および報告値 162に基づいて上り回線データ伝送における 第 2送信方式のためのスケジューリングを行レ、、個々の MS30—1— 30—Nに対して 受信電力リソースの割当て、つまり送信レートの割当てを行う。そして、スケジユーリン グの結果を示す第 2送信方式スケジューリング結果情報 164を送信部 21に出力する 。ここで、第 2送信方式端末情報 152は、第 2送信方式の対象である MSに関する情 報(MSの番号や MSの個数など)であり、本実施の形態では、例えば MS個数の増 減などは RNC10にて管理されることを想定している。また、第 2送信方式スケジユー リング結果情報 164は、第 2送信方式でのデータ伝送を許可する MSならびにデータ 伝送における送信レートおよび送信タイミングなどを示す。
[0033] MS30—1は、受信部 31および送信部 32を有する。なお、 MS30—2 30—Nは、 MS30—1と同様の内部構成を有する。したがって、説明の簡略化のために、 MS30 _2 30-Nの内部構成や動作に関する詳細説明を省略し、 MS30—1についての み説明する。
[0034] 受信部 31は、第 1送信方式割当て情報 170— 1および第 2送信方式割当て情報 17 1—1のいずれか一方ならびに DLデータ 172— 1を含む無線信号に対して所定の受 信処理を施す。そして、 DLデータ 172 - 1に対する受信処理結果として得られた DL 180-1を出力する。また、第 1送信方式割当て情報 170-1または第 2送信方式割当 て情報 171 - 1に対する受信処理の結果として得られた第 1送信方式割当て情報 18 1一 1および第 2送信方式割当て情報 182— 1を送信部 32に出力する。
[0035] 送信部 32は、送信すべき ULデータ 183-1および報告値 184-1に対して所定の 送信処理を施す。そして、第 1送信方式割当て情報 181— 1が入力された場合は第 1 送信方式に基づく上り回線データ伝送を行う、すなわち ULデータ 173— 1を含む無 線信号を BS20の受信部 23に送信する。一方、第 2送信方式割当て情報 182-1が 入力された場合は第 2送信方式に基づく上り回線データ伝送を行う、すなわち ULデ ータ 174— 1を含む無線信号を BS20の受信部 23に送信する。また、報告値 184— 1 に対する送信処理結果を報告値 175— 1として、これを含む無線信号を受信部 23に 送信する。
[0036] 次いで、上記構成を有する BS20内のスケジューリング部 22の動作について図 5お よび図 6を用いて説明する。図 5は、スケジューリング部 22の動作を説明するための フロー図であり、図 6は、受信電力リソース 150を配分する過程を模式的に示す図で ある。
[0037] まず、ステップ ST1000では、設定部 101において、前回の第 2送信方式スケジュ 一リング結果情報 164に基づいて第 2送信方式受信電力リソース (RS_2) 161を設定 し、 RNC10にて設定された受信電力リソース(RS) 150において第 2送信方式受信 電力リソース(RS_2) 161を確保する。そして、ステップ ST1100では、受信電力リソー ス (RS) 150から第 2送信方式受信電力リソース (RS_2) 161を減算することにより、第 1 送信方式受信電力リソース (RS_1) 160を算出する。そして、第 1送信方式スケジユー リング部 110で第 1送信方式のスケジューリングを行い(ST1200)、第 2送信方式ス ケジユーリング部 120で第 2送信方式のスケジューリングを行う(ST1300)。なお、ス テツプ ST1200での第 1送信方式スケジューリングは、第 1送信方式受信電力リソー ス(RS_1) 160が決まった後であればいつ行われても良レ、。また、ステップ ST1300で の第 2送信方式スケジューリングは、第 2送信方式受信電力リソース(RS_2) 161が決 まった後であればいつ行われても良レ、。
[0038] 次いで、受信電力リソース 150の配分の経時的な変動について説明する。なお、こ こでは、第 1送信方式の対象となる MSの個数が時刻 TO以降変わらず、第 2送信方 式の対象となる MSの個数が経時的に変動する場合について説明する。より詳細に は、図 7に示すように、時亥 ijTO—時刻 T1の MS個数が 1個であり、時刻 T1一時刻 T2 の MS個数が 4個であり、時刻 T2以降の MS個数が 2個である場合を想定する。また 、以下の説明においては、時刻 T1一時亥 IJT2の期間に特に着目する。この期間おい て、第 1送信方式の対象 MS個数は 2個、すなわち MS— Aおよび MS-Bとする。また 、第 2送信方式の対象 MS個数は 4個、すなわち MS_C、 MS_D、 MS— Eおよび M S— Fとする。
[0039] 図 8は、時刻 T1一時刻 T2の期間における、各 MSへの受信電力リソース割当ての 変動を示す図である。なお、時刻 T1一時刻 T2の期間は、スケジューリング期間 Tsc h (l) Tsch (6)からなる。
[0040] 図 8に示すように、スケジューリング期間 Tsch (3)のスケジューリング結果として MS _C一 MS_Fに割り当てられた受信電力リソースの合計(つまりスケジューリング期間 Tsch (3)における第 2送信方式受信電力リソース 161)が、スケジューリング期間 Tsc h (4)の第 2送信方式受信電力リソース 161となる。そして、スケジューリング期間 Tsc h (4)のスケジューリング結果として MS—C MS— Fに割り当てられた受信電力リソ ースの合計が、スケジューリング期間 Tsch (5)の第 2送信方式受信電力リソース 161 となる。
[0041] ここで注目すべき点は、スケジューリング期間 Tsch (4)においては、実際に MS— C 一 MS— Fに割り当てられた受信電力リソースが第 2送信方式受信電力リソース 161よ りも Aだけ小さくなつているところである。したがって、スケジューリング期間 Tsch (5) においては、第 2送信方式受信電力リソース 161が、スケジューリング期間 Tsch (4) のときと比べて小さくなる。この結果、スケジューリング期間 Tsch (5)の第 1送信方式 受信電力リソース 160が大きくなる。
[0042] よって、 MS— Aまたは MS—Bにおいて十分な量の ULデータがある場合、第 1送信 方式受信電力リソース 160の増加分 Aを、その ULデータの送信に有効利用すること ができるようになる。換言すれば、一方の送信方式においては受信電力リソースが不 足し、他方の送信方式においては受信電力リソースの余剰分が発生するという状況 の発生頻度を低減させることができる。このように、本実施の形態における受信電力リ ソース配分は、スケジューリング期間毎の受信電力リソースの割当ての変動に追従す ること力 Sできる。
[0043] ところで、受信電力リソース 150の設定および MS個数の増減などの管理は、 RNC 10で行われる場合が多いので、受信電力リソース配分を RNC10にて行うことも可能 ではある。ところが、 RNC10にて MS個数の増減のみに応じた受信電力リソース配 分を行ったとしても、受信電力リソース 150の配分が柔軟に制御されているとは言え なレ、。なぜなら、各 MS30-1— 30-Nに実際に割り当てられる受信電力リソースの量 は、各 MS30—1— 30—Nとの通信状況に左右される力 である。
[0044] しかし、 RNC10では、通信状況に関わる情報を含んでいる報告値 162を、または、 その報告値 162に基づいて行われたスケジューリング部 22のスケジューリング結果を 即座に把握することは容易ではなレ、。一般に、 RNC— BS間のシグナリングに数 100 msの遅延があるのに比して、スケジューリング周期は約数 ms 数 10msと非常に短 レ、。本実施の形態では、 BS20のスケジューリング部 22にて行うため、受信電力リソ ース配分をスケジューリング周期に確実に同期させることができ、柔軟な配分制御を 行うことができる。さらに、 RNC10にて配分が行われると仮定すると、 RNC—BS間で のシグナリング量が増加し RNC10の負荷が増大することが予想される。これに対し て、本実施の形態では BS20にて行うため、 RNC—BS間でのシグナリング量を増加 させるおそれがない。
[0045] このように、本実施の形態によれば、 RNC10によって設定された受信電力リソース 150を、 BS20にて報告値 162を考慮しながら複数の送信方式に配分するため、複 数の送信方式間における受信電力リソース配分を高速にかつ柔軟に制御することが できるようになり、受信電力リソース 150の利用効率を向上させることが可能となり、無 線通信システムにおけるユーザスループットおよびシステムスループットを向上させる こと力 Sできる。
[0046] (実施の形態 2)
図 9は、本発明の実施の形態 2に係る BS20を有する無線通信システムの構成を示 すブロック図である。なお、本実施の形態の無線通信システムでは、上記の実施の形 態と同様に、上り回線データ伝送に二つの送信方式が使用されることを前提とする。 本実施の形態では例として、これら二つの送信方式は、第 1送信方式がタイムアンド レートスケジューリングであり、第 2送信方式がレートスケジューリングであるとする。ま た、本実施の形態で説明する無線通信システムは実施の形態 1で説明した無線通信 システムと同様の基本的構成を有しており、同一または対応する構成要素には同一 の参照符号を付し、その詳細な説明を省略する。
[0047] 本実施の形態のスケジューリング部 22は、実施の形態 1で説明した管理部 100の 代わりに管理部 200を有する。管理部 200は、設定部 101の他に加算部 201を有す る。また、スケジューリング部 22は、モニタ部 202をさらに有する。
[0048] 本実施の形態の主たる特徴は、第 1送信方式のスケジューリングにおいて受信電 カリソースに余剰が発生した場合に、その余剰分を第 2送信方式の受信電力リソース に加算することである。
[0049] 設定部 101によって設定された第 2送信方式受信電力リソース 161は、加算部 201 に送られる。
[0050] モニタ部 202は、第 1送信方式スケジューリング部 110のスケジューリングによる受 信電力リソースの余剰の発生を監視する。余剰が発生したときは、余剰の量を算出し 、その少なくとも一部 (以下「第 1送信方式余剰受信電力リソース 260」と言う)を加算 部 201に出力する。
[0051] 加算部 201は、第 2送信方式受信電力リソース 161および第 1送信方式余剰受信 電力リソース 260の和を算出し、算出結果である第 2送信方式受信電力リソース 261 を第 2送信方式スケジューリング部 120に出力する。
[0052] 次いで、上記構成を有する BS20内のスケジューリング部 22の動作について図 10 および図 11を用いて説明する。図 10は、スケジューリング部 22の動作を説明するた めのフロー図であり、図 11は、受信電力リソース 150を配分する過程を模式的に示 す図である。
[0053] 実施の形態 1で説明したステップ ST1000—ステップ ST1200を実行した後、ステ ップ ST1210では、モニタ部 202は、ステップ ST1200での第 1送信方式スケジユー リングで使用した受信電力リソース (RS_1')を、第 1送信方式受信電力リソース (RS_1) 160から減算する。これによつて第 1送信方式余剰受信電力リソース(RS丄 remain) 2 60を算出する。そして、ステップ ST1220では、第 1送信方式余剰受信電力リソース (RS丄 remain) 260を第 2送信方式受信電力リソース(RS_2) 161にカロ算する。これに よって第 2送信方式受信電力リソース (RS_2) 261を算出する。そして、実施の形態 1 で説明したステップ ST1300に進む。
[0054] なお、ステップ ST1200での第 1送信方式スケジューリングは、第 1送信方式受信 電力リソース(RS_1) 160が決まった後であればいつ行われても良い。
[0055] 次いで、受信電力リソース 150の配分の経時的な変動について図 12Aおよび図 12 Bを用いて説明する。図 12Aは、各 MSへの受信電力リソース割当ての変動を示す 図であり、図 12Bは、各 MSにおけるデータ量の変動を示す図である。なお、ここでは 、実施の形態 1と同様に、時刻 T1一時刻 T2の期間に着目する。すなわち、第 1送信 方式の対象 MSは MS - Aおよび MS - Bであり、第 2送信方式の対象 MSは MS_C、 MS_D、 MS—Eおよび MS—Fである。
[0056] 図 12Bに示すように、スケジューリング期間 Tsch (3)において、 MS—Aにおけるデ ータ量がなくなるとともに、 MS—Bにおけるデータ量が著しく減少する。これに伴い、 図 12Aに示すように、スケジューリング期間 Tsch (4)において、 MS—Aに割り当てら れる受信電力リソースがなくなるとともに MS—Bに割り当てられる受信電力リソースが 著しく減少する。この結果、スケジューリング期間 Tsch (4)の第 1送信方式受信電力 リソース 160に余剰が発生する。このような場合に、その余剰の少なくとも一部を第 2 送信方式受信電力リソース 161に加算することにより、受信電力リソース 150の再配 分を行うことができる。なお、図 12Aおよび図 12Bにおいては、第 1送信方式受信電 カリソース 160を時間とともに減少させる場合について説明したが、第 1送信方式受 信電力リソース 160を時間とともに増加させることも同様に実施可能である。
[0057] なお、スケジューリング期間 Tsch (4)、 Tsch (5)において、第 1送信方式受信電力 リソース 160の余剰のうち、第 2送信方式の方に再配分できない部分があるのは、第 2送信方式としてレートスケジューリングの採用を前提としているからである。すなわち 、全ての MSに対して送信レートを例えば 1段階上げるように指示した場合でも、第 2 送信方式が使レ、切ることのできる受信電力リソースに限界があるためである。したが つて、各 MSに対して指示する送信レート増減に制限がないほたは送信レート増減 の制限が緩い)送信方式が採用されている場合には、上記のような事態を回避するこ とができ、受信電力リソース 150の利用効率を一層向上させることができる。
[0058] このように、本実施の形態によれば、第 1送信方式スケジューリング部 110のスケジ ユーリングの結果として発生した、第 1送信方式受信電力リソース 160の余剰の少なく とも一部を、第 1送信方式余剰受信電力リソース 260として第 2送信方式受信電力リ ソース 161に加算するため、一方の送信方式における受信電力リソースの余剰を他 方の送信方式に再配分することができ、受信電力リソース 150の利用効率をさらに向 上させることができる。
[0059] (実施の形態 3)
図 13は、本発明の実施の形態 3に係る BS20を有する無線通信システムの構成を 示すブロック図である。なお、本実施の形態の無線通信システムでは、上記の実施の 形態と同様に、上り回線データ伝送に二つの送信方式が使用されることを前提とする 。本実施の形態では例として、これら二つの送信方式は、第 1送信方式がタイムアン ドレートスケジューリングであり、第 2送信方式がレートスケジューリングであるとする。 また、本実施の形態で説明する無線通信システムは実施の形態 2で説明した無線通 信システムと同様の基本的構成を有しており、同一または対応する構成要素には同 一の参照符号を付し、その詳細な説明を省略する。
[0060] 本実施の形態のスケジューリング部 22は、実施の形態 2で説明した管理部 200の 代わりに管理部 300を有する。管理部 300は、加算部 201を有するほか、設定部 10 1の代わりに設定部 301を有し、さらに判断部 302を有する。
[0061] 本実施の形態の主たる特徴は、 MS30—1 30—Nから BS20への報告値のうち、 特にデータ量の変動を考慮して受信電力リソース配分を行うことである。データ量の 情報は、 MSの送信バッファにあるデータ量でもよぐ要求する伝送レートなどの間接 的な値であってもよく、さらには絶対値、相対値、差分値(例えば UP/DOWN/K EEPなど)などであってもよい。
[0062] 判断部 302は、第 1送信方式端末情報 151、第 2送信方式端末情報 152および報 告値 162に基づいて、第 1送信方式受信電力リソース 160または第 2送信方式受信 電力リソース 161を増加させるか低減させるかを判断する。
[0063] 例えば、報告値 162に示される情報のうち、第 1送信方式の対象である MSのデー タ量を参照する。そして、第 1送信方式のデータ量において例えば顕著な減少傾向 もしくは増加傾向が見られた場合または予想された場合は、第 1送信方式に基づくデ ータ伝送が完了する前に第 1送信方式受信電力リソース 160の増減を決定し、これ を設定部 301に指示する。判断部 302は、第 1送信方式受信電力リソース 160の増 減を指示するだけでなくその増減幅や増減率をも指示して良い。
[0064] 設定部 301は、判断部 302からの指示を受けたとき、その指示に従って受信電力リ ソース 150の配分を行う。例えば、判断部 302から第 1送信方式受信電力リソース 16 0の低減が指示された場合は、第 2送信方式受信電力リソースを確保する段階で第 2 送信方式受信電力リソース 161に追加分を付与する。設定部 301が実行するその他 の動作は、設定部 101と同様である。
[0065] 次いで、受信電力リソース 150の配分の経時的な変動について図 14Aおよび図 14 Bを用いて説明する。図 14Aは、各 MSへの受信電力リソース割当ての変動を示す 図であり、図 14Bは、各 MSにおけるデータ量の変動を示す図である。なお、ここでは 、上記の実施の形態と同様に、時刻 T1一時刻 T2の期間に着目する。すなわち、第 1 送信方式の対象 MSは MS - Aおよび MS - Bであり、第 2送信方式の対象 MSは MS _C、 MS_D、 MS-Eおよび MS_Fである。
[0066] ここに示された例では、スケジューリング期間 Tsch (2)、 Tsch (4)、 Tsch (5)の各 々において、第 1送信方式受信電力リソース 160が低減されている。特にスケジユー リング期間 Tsch (2)では、 MS— Aおよび MS—Bの双方のデータ伝送が完了する前 であるにもかかわらず、第 1送信方式受信電力リソース 160を減らすことができ、第 2 送信方式受信電力リソース 261を増やすことができる。なお、図 14Aおよび図 14Bに おいては、第 1送信方式受信電力リソース 160を時間とともに減少させる場合につい て説明したが、第 1送信方式受信電力リソース 160を時間とともに増加させることも同 様に実施可能である。
[0067] このように、本実施の形態によれば、 MS30—1 30—Nから BS20に報告された情 報を含む報告値 162のうち、特にデータ量の変動を考慮して受信電力リソース配分 を行うため、十分な量の送信データがある限り、受信電力リソース 150を常時使い切 ることができる確率を大幅に向上させることができる。さらに、第 1送信方式のデータ 伝送期間の延長分を最小限に抑えつつ第 2送信方式の送信レートを上げることがで きる。
[0068] (実施の形態 4)
図 15は、本発明の実施の形態 4に係る BS20を有する無線通信システムの構成を 示すブロック図である。なお、本実施の形態の無線通信システムでは、上記の実施の 形態と同様に、上り回線データ伝送に二つの送信方式が使用されることを前提とする 。本実施の形態の例としては、これら二つの送信方式は、第 1送信方式がタイムアン ドレートスケジューリングであり、第 2送信方式がレートスケジューリングであるする。ま た、本実施の形態で説明する無線通信システムは実施の形態 3で説明した無線通信 システムと同様の基本的構成を有しており、同一または対応する構成要素には同一 の参照符号を付し、その詳細な説明を省略する。
[0069] 本実施の形態のスケジューリング部 22は、実施の形態 3で説明した管理部 300の 代わりに管理部 400を有する。管理部 400は、判断部 302の代わりに判断/選択部 401を有する。
[0070] また、本実施の形態の無線通信システムは、 MS30—1 30—Nの代わりに MS43 0-1— 430-Nを有する。 MS430-1一 430—Nの内部構成にっレ、ては後で詳述す る。
[0071] 本実施の形態の主たる特徴は、複数の送信方式への受信電力リソース配分だけで なぐ複数の送信方式間の切り替えをも BS20で行うようにしたことである。
[0072] 判断/選択部 401は、報告値 162に基づいて、第 1送信方式端末情報 460および 第 2送信方式端末情報 461を決定する。換言すれば、各 MS430 - 1一 430 - Nで使 用すべき送信方式を第 1送信方式および第 2送信方式から選択する。二つの送信方 式の併用が可能な場合は、各 MSについて各送信方式の使用可否 (オン Zオフ)を 決定する。
[0073] すなわち、上記の実施の形態では第 1送信方式端末情報 151および第 2送信方式 端末情報 152が RNC10から送られてきていたのに対して、本実施の形態では、第 1 送信方式端末情報 460および第 2送信方式端末情報 461が BS 20の内部で決定さ れる。決定された第 1送信方式端末情報 460および第 2送信方式端末情報 461は、 第 1送信方式スケジューリング部 110および第 2送信方式スケジューリング部 120に それぞれ出力される。判断/選択部 401が実行するその他の動作は、判断部 302と 同様である。すなわち、第 1送信方式受信電力リソース 160または第 2送信方式受信 電力リソース 161を増加させるか低減させるかを判断する。さらにはその増減幅や増 減率をも指示して良い。
[0074] 次いで、上記構成を有する BS20による、送信方式の切り替え動作について、二つ の例を挙げて説明する。一つは、 MS430-1— 430-Nのデータ量に応じた切り替え 動作であり、もう一つは、 MS430— 1一 430— Nの送信電力リソースに応じた切り替え 動作である。なお、ここでは、上記の実施の形態と同様に、時刻 T1一時刻 T2の期間 に着目する。また、本実施の形態では、第 1送信方式がタイムアンドレートスケジユー リングであり下り回線でのシグナリングが多ビットとなるため、同時に第 1送信方式が 許可される MS個数が 2個に限定されたものと仮定する。
[0075] 先ず、データ量に応じた切り替え動作について説明する。図 16Aは、各 MSにおけ るデータ量に応じた送信方式切り替えを示す図であり、図 16Bは、各 MSにおけるデ ータ量の変動を示す図である。 [0076] スケジューリング期間 Tsch (2)において、 MS— Aがデータ伝送を完了する。このた め、スケジューリング期間 Tsch (3)では、 MS-Cが第 2送信方式から第 1送信方式に 切り替えられる。同様に、スケジューリング期間 Tsch (3)において MS-Bおよび MS _Cがデータ伝送を完了する。このため、スケジューリング期間 Tsch (4)において MS - Dおよび MS - Eが第 2送信方式から第 1送信方式に切り替えられる。
[0077] この切り替えは、所定の優先度に基づいて行われるものであっても良レ、。使用され る優先度としては例えば、 MSのデータ量や送信電力リソースなどの報告値、 MSに おけるデータ滞留時間、過去のユーザスループット、遅延時間などが挙げられる。こ の場合、受信電力リソース 150を有効に利用することができるとともに、優先度の高い MSから順に第 1送信方式、つまり高送信レートの送信方式に切り替えてからデータ 伝送を行うことができるようになる。
[0078] 続いて、送信電力リソースに応じた切り替え動作について説明する。図 17Aは、各 MSにおける送信電力リソースに応じた送信方式切り替えを示す図であり、図 17Bは 、各 MSにおける送信電力リソースの変動を示す図である。なお、ここでの説明では、 簡単のために、第 2送信方式の各 MSの受信電力リソースが同じであるものとする。
[0079] 図 17Aおよび図 17Bに示された例では、報告値 162に含まれている情報のうち、 MS430-1— 430-Nの送信電力リソースに関する情報を参照する。そして、送信電 カリソースの大きさにおいて上位二つの MSに対して第 1送信方式を適用するように 制御する。
[0080] スケジューリング期間 Tsch ( l )、 Tsch (2)では、 MS_Aおよび MS_Bの送信電力 リソースが上位二つとしたため、 MS— Aおよび MS— Bが第 1送信方式でデータ伝送 を行う。スケジューリング期間 Tsch (3)では、上位二つの MSが MS—Aおよび MS— Eに入れ替わっており、スケジューリング期間 Tsch (4)では、 MS—Eおよび MS—Cに 入れ替わつており、スケジューリング期間 Tsch (5)では、 MS—Bおよび MS—Eに入 れ替わっている。したがって、これらの各期間では、第 1送信方式が許可される MSも 入れ替わつている。これは、送信電力リソースが大きいということは、小さい送信電力 でデータ伝送が行われても受信が可能ということを意味している、つまり伝搬路の状 況が良好であることを意味している。 [0081] この例においては、伝搬路の状況が良好な MSに対して優先的に第 1送信方式を 許可するため、これを許可された MSは低送信電力で高送信レートのデータ伝送を 行うことが可能となる。また、低送信電力で済むため、他の BSに与える干渉を低減す ること力 Sでき、システムスループットを一層向上させることが可能となる。さらに、第 1送 信方式を許可する MSを入れ替えることにより、伝搬路の状況が良い MSが高送信レ ートでデータ伝送を行うことができるため、マルチユーザダイバーシチ効果が得られ システムスループットを増加させることができる。
[0082] 次いで、 BS20と無線通信を行う MS430—1 430—Nの構成について説明する。
なお、 MS430— 1— 430— Nのうち任意の MSを MS430と言う。
[0083] 図 18は、 MS430の構成を示すブロック図である。 MS430は、受信部 431、送信 部 432および送信方式切替部 433を有する。
[0084] 受信部 431は、第 1送信方式割当て情報受信部 441、第 2送信方式割当て情報受 信部 442および DLデータ受信部 443を有する。送信部 432は、送信バッファ 451、 第 1送信方式送信部 452、第 2送信方式送信部 453および報告値送信部 454を有 する。
[0085] 第 1送信方式割当て情報受信部 441は、第 1送信方式割当て情報 170を復調する 。そして、 自装置に対するシグナリングが受信されたか否かの判定を行レ、、受信され ていた場合は第 1送信方式割当て情報 181を取り出して送信方式切替部 433および 送信部 432に出力する。
[0086] 第 2送信方式割当て情報受信部 442は、第 2送信方式割当て情報 171を復調する 。そして、 自装置に対するシグナリングが受信されたか否かの判定を行レ、、受信され ていた場合は第 2送信方式割当て情報 182を取り出して送信方式切替部 433および 送信部 432に出力する。
[0087] DLデータ受信部 443は、 DLデータ 172を復調して DLデータ 180を出力する。
[0088] 送信方式切替部 433は、第 1送信方式割当て情報 181が入力された場合は、送信 バッファ 451に対して、第 1送信方式のデータ伝送が許可されたことと、許可された送 信レートまたはその最大値を通知する。また、第 2送信方式割当て情報 182が入力さ れた場合は、送信バッファ 451に対して、第 2送信方式のデータ伝送が許可されたこ とと、許可された送信レートとを通知する。
[0089] 送信バッファ 451は、送信方式切替部 433からの通知の有無に応じて、 ULデータ 183を第 1送信方式送信部 452または第 2送信方式送信部 453に出力する。
[0090] 第 1送信方式送信部 452は、 ULデータ 183を変調し ULデータ 173として、第 1送 信方式に基づレ、てデータ伝送する。
[0091] 第 2送信方式送信部 453は、 ULデータ 183を変調し ULデータ 174として、第 2送 信方式に基づレ、てデータ伝送する。
[0092] 報告値送信部 454は、報告値 184を変調し報告値 175として送信する。
[0093] MS430が上記のような構成を有するため、 BS20からの信号に従って送信方式を 切り替えることができる。
[0094] なお、本実施の形態では、第 1送信方式割当て情報 181および第 2送信方式割当 て情報 182のどちらが受信されたかによって送信方式を切り替えている。しかし、切り 替え方法はこれに限定されない。例えば、第 1送信方式割当て情報 170の受信の有 無や第 2送信方式割当て情報 171の受信の有無、つまり BS20側でのシグナリング に基づいて切り替えても良レ、。なお、本実施の形態の無線通信システムが二つの送 信方式の併用を認めているシステムの場合、 MS430は、送信電力リソースに余裕が あるときには二つの送信方式の両方でデータ伝送を行って良い。
[0095] このように、本実施の形態によれば、複数の送信方式への受信電力リソース配分だ けでなく、複数の送信方式間の切り替えをも BS20で行うようにしたため、例えば優先 度の高い MSや伝搬路状況の良好な MSに対して高送信レートの送信方式が適用さ れるよう送信方式を切り替えることが可能となり、しかも切り替え制御を受信電力リソー ス配分制御と同様に高速に行うことができるため、遅延の要求が厳しい MSを優先さ せることができるようになるとともに、ユーザスループットおよびシステムスループットを 一層向上させることができる。
[0096] (実施の形態 5)
図 19は、本発明の実施の形態 5に係る BS20を有する無線通信システムの構成を 示すブロック図である。なお、本実施の形態の無線通信システムでは、上記の実施の 形態と同様に上り回線データ伝送に二つの送信方式が使用されることを前提とする 力 本実施の形態では例として第 2送信方式にオートノマストランスミッションを採用し ている。また、本実施の形態で説明する無線通信システムは実施の形態 3で説明し た無線通信システムと同様の基本的構成を有しており、同一または対応する構成要 素には同一の参照符号を付し、その詳細な説明を省略する。
[0097] 本実施の形態のスケジューリング部 22は、管理部 200の代わりに管理部 500を有 し、第 2送信方式スケジューリング部 120の代わりに第 2送信方式レート制御部 502を 有する。管理部 500は、設定部 301と、加算部 201と、第 1送信方式端末情報 151お よび第 2送信方式端末情報 152を基に、判断部 302と同様に第 1送信方式が使用し てよい受信電力リソースの増減を判断する判断部 501とを有する。
[0098] 本実施の形態の主たる特徴は、受信電力リソース配分を、複数の送信方式の一方 にオートノマストランスミッションを採用した無線通信システムにおける BS20にて行う ようにしたことである。
[0099] 第 2送信方式レート制御部 502は、第 2送信方式受信電力リソース 261を、第 2送 信方式端末情報 152に基づき MS個数で等分する。これによつて MS当たりの受信 電力リソースを計算する。さらに、送信レートに換算して第 2送信方式レート情報 560 として送信部 21に出力する。ここで、第 2送信方式レート情報 560は一つ以上の対 象 MSに対して共通の情報であるため、 MS毎に異なる制御を行うことが困難である ものの、下り回線におけるシグナリング量を削減することが可能となる。また、第 2送信 方式の対象 MSを予めグループ化しておけば、グループ毎に送信レートの制御を行 うことができる。
[0100] 次いで、受信電力リソース 150の配分の経時的な変動について図 20を用いて説明 する。図 20は、各 MSへの受信電力リソース割当ての変動を示す図である。なお、こ こでは、上記の実施の形態と同様に時刻 T1一時刻 T2の期間に着目する。また、本 実施の形態では、第 1送信方式の対象 MS個数は二つ(MS - Aおよび MS_B)であ る一方、第 2送信方式の対象 MS個数は特定されなレ、が複数個である。
[0101] 図 20に示されているとおり、第 1送信方式受信電力リソース 160の余剰が発生する と、その余剰を第 2送信方式受信電力リソースに再配分することができている。また、 第 2送信方式の対象 MSの各々に対して第 2送信方式受信電力リソース 261が等分 される。
[0102] このように、本実施の形態によれば、受信電力リソース配分を、複数の送信方式の 一方にオートノマストランスミッションを採用した無線通信システムにおける BS20にて 行うようにしたため、受信電力リソース配分制御を高速に行うことができるため、遅延 の要求が厳しい MSを優先させることができるようになるとともに、ユーザスループット およびシステムスループットを一層向上させることができる。なお、本実施の形態では 、第 1送信方式としてタイムアンドレートスケジューリングを例にとり説明した力 レート スケジューリングなどの別のスケジューリング方式であっても実現可能である。
[0103] (その他の実施の形態)
上記の各実施の形態においては、二つの送信方式を採用した無線通信システムに ついて説明したが、三つ以上の送信方式を採用した無線通信システムにおいても同 様に、受信電力リソース配分や送信方式切り替えを行うことが可能である。また、タイ ムアンドレートスケジューリング、レートスケジューリング、オートノマストランスミッション の 3つを例に説明したが、これら以外の送信方式であっても少なくとも二つの送信方 式を組み合わせてさえいれば実施可能である。例えば、 BSが E— DCH (Enhanced - Dedicated Channel)に対してスケジューリングを行う送信方式と、 BSにおいて E— DC Hに対してスケジューリングを行わない送信方式と、を組みあわせる場合にも実施可 能である。なお、 E—DCHは、アップリンクエンハンスメントにおいて用いられるチヤネ ルである。
[0104] また、スケジューリングの対象となるチャネルは E—DCHのみに限定される必要はな レ、。例えば、 BSが E— DCHに対してスケジューリングを行う送信方式と、上位装置( 例えば RNC)が従来の DCH (Dedicated Channel)の伝送レートの上限を制御する送 信方式と、を組み合わせる場合にも実施可能である。
[0105] さらには、 BSが E—DCHに対してスケジューリングを行う送信方式と、 BS力
Hに対してスケジューリングを行わない送信方式と、上位装置が DCHの伝送レート の上限を制御する送信方式とを組み合わせる場合にも実施可能である。
[0106] さらには、少なくとも 2つの送信方式を組み合わせて 1つの送信方式と呼ぶような形 態も考えることができるが、この場合も内部的な送信電力リソースの配分もしくは送信 方法の切替えなどの動作を含んでさえいれば同様に実施可能である。
[0107] なお、上記の各実施の形態において、上位装置が BSに設定する受信電力リソース は、図 2に示すように総受信電力の目標値から他セル干渉電力および熱雑音電力を 除いたものとして説明している力 これに限定されるものではなレ、。上位装置が BSに 設定する受信電力リソースは、受信電力リソースに関連するパラメータであれば任意 のものを使用することができる。使用可能なパラメータとしては、例えば、総受信電力 、総受信電力と熱雑音電力の比、総受信電力と干渉電力の比、総受信電力と干渉 電力 +熱雑音電力の比、 E— DCHに関するチャネルの総受信電力、 E— DCHに関 するチャネルの総受信電力と熱雑音電力の比、 E— DCHに関するチャネルの総受信 電力と干渉電力の比、 E— DCHに関するチャネルの総受信電力と干渉電力 +熱雑 音電力の比、総受信電力と E - DCHに関するチャネルの総受信電力の比、総受信 電力と DCHに関するチャネルの総受信電力の比、などが挙げられる。いずれのパラ メータが使用される場合にも、 BS内でそのパラメータが受信電力リソースに換算され る。
[0108] 上記の各実施の形態では、 BSの上位装置である RNCで設定された受信電力リソ ースの配分、すなわち上り回線データ伝送において使用される複数の送信方式への 配分を、 RNCでなく BSにおいて行う。さらには、 BSにおいて、複数の送信方式間の 切り替えをも行う。これにより、複数の送信方式間における受信電力リソース配分およ び切り替えを高速に制御することができるようになり、受信電力リソースの利用効率を 向上させることが可能となり、無線通信システムにおけるユーザスループットおよびシ ステムスループットを向上させることができる。また、上位装置と基地局装置間のシグ ナリング量を大幅に削減することができる。
[0109] 本明糸田書は、 2004年 2月 13曰出願の特願 2004—37082に基づく。この内容はす ベてここに含めておく。
産業上の利用可能性
[0110] 本発明のスケジューリング装置およびスケジューリング方法は、無線通信システム におけるユーザスループットおよびシステムスループットを向上させる効果を有し、上 り回線でのデータ伝送に有用である。

Claims

請求の範囲
[1] 上位装置により設定された受信電力リソースを、上り回線データ伝送において使用 される複数の送信方式に配分する配分手段と、
前記複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝 送のスケジューリングを実行するスケジューリング手段と、
を有するスケジューリング装置。
[2] 前記配分手段は、
前記複数の送信方式の一の送信方式に配分する受信電力リソースを所定値に設 定し、他の送信方式に配分する受信電力リソースを、前記上位装置により設定された 受信電力リソースから前記所定値を減じた値に設定する設定手段を有する、 請求の範囲 1記載のスケジューリング装置。
[3] 前記設定手段は、
前記一の送信方式に配分する受信電力リソースを、前記一の送信方式が使用可能 な最大値に設定する、
請求の範囲 2記載のスケジューリング装置。
[4] 前記設定手段は、
前記一の送信方式に配分する受信電力リソースを、前記一の送信方式が使用可能 な最小値に設定する、
請求の範囲 2記載のスケジューリング装置。
[5] 前記設定手段は、
前記一の送信方式に配分する受信電力リソースを、前記一の送信方式が使用可能 な最小値から最大値までの範囲内に設定する、
請求の範囲 2記載のスケジューリング装置。
[6] 前記配分手段は、
前記スケジューリング手段の過去のスケジューリング結果に基づレ、て、前記複数の 送信方式の少なくとも一の送信方式に配分する受信電力リソースを設定する設定手 段を有する、
請求の範囲 1記載のスケジューリング装置。
[7] 前記スケジューリング手段は、
前記複数の送信方式の一の送信方式に対応するスケジューリングを実行する個別 スケジューリング手段と、
実行されたスケジューリングにおいて余った余剰受信電力リソースを取得する取得 手段と、を有し、
前記配分手段は、
取得された余剰受信電力リソースを、前記複数の送信方式の他の送信方式に配分 する受信電力リソースに加算する加算手段を有する、
請求の範囲 1記載のスケジューリング装置。
[8] 前記配分手段は、
移動局装置から報告される情報であって、前記移動局装置におけるデータ量又は 前記データ量の変動を示す情報に基づいて、受信電力リソースの配分を行う、 請求の範囲 1記載のスケジューリング装置。
[9] 移動局装置から報告される報告情報に基づレ、て、前記移動局装置で使用すべき 少なくとも一の送信方式を前記複数の送信方式の中から選択する選択手段をさらに 有し、
前記配分手段は、
前記選択手段の選択結果に従って、受信電力リソースの配分を行う、 請求の範囲 1記載のスケジューリング装置。
[10] 前記選択手段は、
前記報告情報に基づいて、前記スケジューリング手段の前回のスケジューリング結 果における前記移動局装置の送信方式を他の送信方式に切り替える、
請求の範囲 9記載のスケジューリング装置。
[11] 前記選択手段は、
前記複数の送信方式の各々に関して、前記移動局装置で使用すべきか否かを、 前記報告情報に基づいて決定する、
請求の範囲 9記載のスケジューリング装置。
[12] 請求の範囲 1記載のスケジューリング装置を有する基地局装置。
[13] 請求の範囲 1記載のスケジューリング装置を有する無線通信システム。
[14] 移動局装置から報告された情報に基づいて、前記移動局装置で使用すべき送信 方式を決定する決定手段と、
前記報告情報および前記決定手段の決定結果に基づいて、上位装置により設定 された受信電力リソースを、上り回線データ伝送において使用される複数の送信方 式に配分する配分手段と、
前記複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝 送のスケジューリングを実行するスケジューリング手段と、
前記決定手段の決定結果を前記移動局装置にシグナリングするシグナリング手段 と、
を有する基地局装置。
[15] 基地局装置に対して上り回線データ伝送を行う移動局装置であって、
自装置に関する情報を前記基地局装置に報告する報告手段と、
報告された情報に基づく送信方式の決定結果の、前記基地局装置からのシグナリ ングを検出する検出手段と、
検出された送信方式を使用して上り回線データ伝送を行う伝送手段と、 を有する移動局装置。
[16] 上位装置により設定された受信電力リソースを、上り回線データ伝送において使用 される複数の送信方式に配分する配分ステップと、
前記複数の送信方式に配分された受信電力リソースに従って、上り回線データ伝 送のスケジューリングを実行するスケジューリングステップと、
を有するスケジューリング方法。
PCT/JP2005/000927 2004-02-13 2005-01-25 スケジューリング装置およびスケジューリング方法 WO2005079098A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/549,313 US20060246935A1 (en) 2004-02-13 2005-01-25 Scheduling apparatus and scheduling apparatus method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2004-037082 2004-02-13
JP2004037082 2004-02-13

Publications (1)

Publication Number Publication Date
WO2005079098A1 true WO2005079098A1 (ja) 2005-08-25

Family

ID=34857742

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2005/000927 WO2005079098A1 (ja) 2004-02-13 2005-01-25 スケジューリング装置およびスケジューリング方法

Country Status (2)

Country Link
US (1) US20060246935A1 (ja)
WO (1) WO2005079098A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006129698A1 (ja) * 2005-05-31 2006-12-07 Nec Corporation 移動体通信システム及びその通信制御方法
CN102045853A (zh) * 2009-10-22 2011-05-04 华为技术有限公司 一种信息传递方法、设备及系统
CN102355718A (zh) * 2011-08-08 2012-02-15 中国科学技术大学 一种联合高干扰指示和过载指示的上行干扰协调方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060215604A1 (en) * 2005-03-24 2006-09-28 Jens Mueckenheim Scheduling method for enhanced uplink channels
JP4538366B2 (ja) * 2005-03-29 2010-09-08 株式会社エヌ・ティ・ティ・ドコモ 伝送速度制御方法、移動局及び無線基地局
JP4538357B2 (ja) * 2005-03-29 2010-09-08 株式会社エヌ・ティ・ティ・ドコモ 伝送速度制御方法、移動局、無線基地局及び無線回線制御局
JP2007013489A (ja) * 2005-06-29 2007-01-18 Kyocera Corp 通信システム、通信装置、送信電力制御方法、及びプログラム
KR101223287B1 (ko) * 2006-03-06 2013-01-16 삼성전자주식회사 무선 통신 시스템에서 자원 할당 방법 및 장치
JP2008205869A (ja) 2007-02-21 2008-09-04 Nec Corp データ送信方法及びそれを用いたセルラシステム
JP2011234341A (ja) * 2010-04-09 2011-11-17 Sony Corp 受信装置およびカメラシステム
EP2702812B1 (en) * 2011-04-26 2016-03-30 Telefonaktiebolaget LM Ericsson (publ) Nodes and method for power control
US9282568B2 (en) * 2011-11-18 2016-03-08 Futurewei Technologies, Inc. Method and system for dynamic, joint assignment of power and scheduling of users for wireless systems
US9413479B2 (en) 2014-01-15 2016-08-09 Cisco Technology, Inc. Intelligent wiring in a low power and lossy network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002065664A2 (en) * 2001-02-15 2002-08-22 Qualcomm Incorporated Reverse link channel architecture for a wireless communication system
WO2003039030A1 (en) * 2001-10-31 2003-05-08 Koninklijke Philips Electronics N.V. Radio communication system
JP2003179968A (ja) * 2001-12-10 2003-06-27 Ntt Docomo Inc 通信制御システム、通信制御方法、基地局及び移動局

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6574211B2 (en) * 1997-11-03 2003-06-03 Qualcomm Incorporated Method and apparatus for high rate packet data transmission
US7177658B2 (en) * 2002-05-06 2007-02-13 Qualcomm, Incorporated Multi-media broadcast and multicast service (MBMS) in a wireless communications system
US7227854B2 (en) * 2002-09-06 2007-06-05 Samsung Electronics Co., Ltd. Apparatus and method for transmitting CQI information in a CDMA communication system employing an HSDPA scheme
US7385951B2 (en) * 2003-02-15 2008-06-10 Lucent Technologies Inc. Methods of transmitting and signaling over a reverse link in wireless systems
CA2457285A1 (en) * 2003-02-15 2004-08-15 Samsung Electronics Co., Ltd. Scheduling apparatus and method in a cdma mobile communication system
US7120447B1 (en) * 2003-02-24 2006-10-10 Nortel Networks Limited Selectable mode vocoder management algorithm for CDMA based networks
US7142548B2 (en) * 2003-03-06 2006-11-28 Nortel Networks Limited Communicating in a reverse wireless link information relating to buffer status and data rate of a mobile station
US7046648B2 (en) * 2003-11-05 2006-05-16 Interdigital Technology Corporation Wireless communication method and apparatus for coordinating Node-B's and supporting enhanced uplink transmissions during handover
US7133690B2 (en) * 2004-01-23 2006-11-07 Nokia Corporation Method and apparatus for fast data rate ramp up in Node B scheduling of UE uplink

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002065664A2 (en) * 2001-02-15 2002-08-22 Qualcomm Incorporated Reverse link channel architecture for a wireless communication system
WO2003039030A1 (en) * 2001-10-31 2003-05-08 Koninklijke Philips Electronics N.V. Radio communication system
JP2003179968A (ja) * 2001-12-10 2003-06-27 Ntt Docomo Inc 通信制御システム、通信制御方法、基地局及び移動局

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006129698A1 (ja) * 2005-05-31 2006-12-07 Nec Corporation 移動体通信システム及びその通信制御方法
JP4853732B2 (ja) * 2005-05-31 2012-01-11 日本電気株式会社 移動体通信システム及びその通信制御方法
US8797863B2 (en) 2005-05-31 2014-08-05 Nec Corporation Mobile communication system and communication control method
CN102045853A (zh) * 2009-10-22 2011-05-04 华为技术有限公司 一种信息传递方法、设备及系统
CN102355718A (zh) * 2011-08-08 2012-02-15 中国科学技术大学 一种联合高干扰指示和过载指示的上行干扰协调方法
CN102355718B (zh) * 2011-08-08 2013-12-18 中国科学技术大学 一种联合高干扰指示和过载指示的上行干扰协调方法

Also Published As

Publication number Publication date
US20060246935A1 (en) 2006-11-02

Similar Documents

Publication Publication Date Title
WO2005079098A1 (ja) スケジューリング装置およびスケジューリング方法
JP6382920B2 (ja) 拡張アップリンクのためのmac多重化およびtfc選択手順
TWI388173B (zh) 加強上鏈mac多工及tfc選擇方法
JP3997253B2 (ja) Harq処理制限およびアップリンクチャネルを介するスケジューリング対象外制御データの送信
EP1887828B1 (en) Mobile communication system and communication control method thereof
KR100635245B1 (ko) 통신 방법 및 기지국 자원 할당 변경 방법
EP2117186B1 (en) Scheduling method and system for hsupa
US7801550B2 (en) Radio communication system and method where a radio terminal transmits uplink user data to a base station through an enhanced deticated physical data channel
CN102067697B (zh) 用于在移动通信网络中减小干扰的方法和设备
JP2008520128A (ja) 2つのグループの専用アップリンクチャネル間の負荷バランスを可能とするシステム、装置、及び方法
JP6482689B2 (ja) 音声データのダイナミック・ディレイ・スケジューリング方法及び基地局
US20070258364A1 (en) Resource control for scheduled and non-scheduled traffic
EP1804535B1 (en) Mobile station, mobile communication system, and mobile communication method
JP2009094816A (ja) 無線通信システム、無線通信方法及び基地局
US20040117504A1 (en) Communication channel
EP2045979B1 (en) Radio communication system, radio communication method and base station
WO2007129186A1 (en) Resource control for scheduled and non-scheduled traffic
EP2160054A1 (en) Method for assigning radio resources and radio resource controlling device
GB2413242A (en) Data rate control in soft handover

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

WWE Wipo information: entry into national phase

Ref document number: 2006246935

Country of ref document: US

Ref document number: 10549313

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Country of ref document: DE

WWP Wipo information: published in national office

Ref document number: 10549313

Country of ref document: US

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP