WO2005034555A1 - コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置 - Google Patents

コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置 Download PDF

Info

Publication number
WO2005034555A1
WO2005034555A1 PCT/JP2004/014059 JP2004014059W WO2005034555A1 WO 2005034555 A1 WO2005034555 A1 WO 2005034555A1 JP 2004014059 W JP2004014059 W JP 2004014059W WO 2005034555 A1 WO2005034555 A1 WO 2005034555A1
Authority
WO
WIPO (PCT)
Prior art keywords
section
cqi
downlink
transmission gap
quality information
Prior art date
Application number
PCT/JP2004/014059
Other languages
English (en)
French (fr)
Inventor
Tetsuya Ikeda
Ryutaro Yamanaka
Hidetoshi Suzuki
Original Assignee
Matsushita Electric Industrial Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co., Ltd. filed Critical Matsushita Electric Industrial Co., Ltd.
Priority to EP04788155A priority Critical patent/EP1670272A1/en
Priority to JP2005514415A priority patent/JPWO2005034555A1/ja
Priority to US10/541,066 priority patent/US7496048B2/en
Publication of WO2005034555A1 publication Critical patent/WO2005034555A1/ja

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/06Optimizing the usage of the radio link, e.g. header compression, information sizing, discarding information

Definitions

  • the present invention relates to a method and apparatus for transmitting downlink channel quality information in a compressed mode.
  • the present invention relates to a method for transmitting data to a data transmission side communication apparatus in a compressed mode (Compressed Mode) state in an automatic repeat request (ARQ) technique.
  • the present invention relates to a method and an apparatus for reporting quality.
  • a HS-PDSCH High Speed Physical Data
  • DL Downlink Shared Channel
  • HS-SCCH High Speed Shared Control Channel
  • HS-DPCCH High Speed Dedicated Physical Control Channel
  • UL uplink
  • the ACKZNACK signal indicating whether or not the HS-PDSCH radio signal has been correctly received by the mobile station
  • CQI Channel Quality Indicator
  • This CQI is generated based on an SNR (Signal to Noise Ratio) calculated from a common pilot channel CPICH (Common Pilot Channel), which is one of the DL channels, and the measurement reference section of the SNR is a measurement reference interval.
  • SNR Signal to Noise Ratio
  • FIG. 1 shows the frame format of each of HS-SCCH, HS-PDSCH, and HS-DPCCH.
  • HS-SCCH, HS-PDSCH and HS-DPCCH a subframe unit is configured by three slots. Since one subframe of these channels is 2 ms, five subframes of these channels are included in one frame (10 ms) of a normal reception channel such as DL-DPCH (Down Link Dedicated Physical CHannel) or CPICH. Frame will be included.
  • FIG. 2 shows a CPICH frame format and a more specific HS-DPCCH frame format.
  • CPICH is composed of 15 slots, and its unit is called a frame.
  • One frame of CPICH is 10 ms.
  • the first slot of an arbitrary subframe is an ACKZNACK field in which an ACKZNACK signal is stored, and the subsequent two slots are a CQI field in which a CQI is stored.
  • the HS-DPCCH corresponding to one CPICH frame is composed of five packet data units or subframes. Each of the five subframes of HS-DPCCH will be referred to as Subframe # 0, Subframe # 1, Subframe # 2, Subframe # 3, and Subframe # 4.
  • FIG. 3 shows a timing relationship between a CPICH measurement reference section, which is a reference unit when measuring SNR, and subframes of HS-SCCH, HS-PDSCH, and HS-DPCCH.
  • the HS-SCCH slot boundary and the CPICH slot boundary are always transmitted from the base station in a state of coincidence, and the HS-SCCH and HS-PDSCH are transmitted in subframe units with a 2-slot offset. Is done.
  • the ACKZNACK signal for the HS-PDSCH subframe is stored in the ACKZNACK field of the HS-DPCCH after 7.5 slots from the start of reception of the subframe by the mobile station, and transmitted to the mobile station base station. Sent.
  • the CQI stored in the CQI field of the HS-DPCCH subframe and transmitted is measured at intervals specified by the upper layer, that is, regardless of the reception of the HS-PDSCH by the mobile station.
  • the CPICH force included in the DL is also generated based on the calculated SNR value.
  • the CQI transmitted in the CQI field (n) refers to the measurement of three slots that end one slot before the start of the CQI field (n). Generated based on the SNR calculated from the CPICH of the section.
  • the cycle at which the mobile station actually transmits the CQI to the base station in the CQI field of the HS-DPCCH is specifically specified by the upper layer power.
  • the cycle at which this CQI is actually transmitted is called a feedback cycle (k).
  • CQI is stored in the CQI field of all subframes of HS-DPCCH.
  • the section of the HS-DP CCH where the CQI specified in the feedback cycle k is actually transmitted is called the ⁇ scheduled section '' (in the figure, sometimes called the ⁇ Scheduled pattern of CQI reports ''),
  • different frequency bands may be used between cells of different communication systems, such as a W-CDMA system cell and a GSM system cell, or between cells of the same system.
  • the mobile station In order for the mobile station to perform a handover between cells having different frequency bands, the mobile station must transmit another frequency band transmitted from the base station of another cell during communication with the base station of the cell to which the mobile station currently belongs. , It is necessary to obtain control information on base stations of other cells in advance.
  • a section where the DL is not used (DL transmission gap section) is provided within a range in which the base station communicating with the mobile station does not adversely affect the communication, and the mobile station sets a section in the DL transmission gap section. Stipulates that control information on base stations of other cells be obtained.
  • a compressed mode In the compressed mode, a transmission gap section may be provided only in UL, or a transmission gap section may be provided in both UL and DL. Also, in the compressed mode in a scheme other than the HSDPA scheme, the downlink channel quality information is transmitted from the mobile station to the base station in a manner substantially similar to the above description.
  • the SNR cannot be accurately calculated for the measurement reference section even if the overlap is only a part of the measurement reference section. Therefore, the CPICH measurement reference period Reference Periods_C shown in Fig. 6 is not used.
  • a CQI is generated based on the measurement reference period Reference Periods_B immediately before overlapping with the DL transmission gap period, and the generated CQI is UL HS after the end of the transmission gap.
  • the first scheduled section of the DPCCH, CQLC transmitted from the mobile station to the base station.
  • DTX Discontinuous Transmission
  • the appearance frequency of the scheduled section with respect to the measurement reference section is 1Z4. Therefore, in FIG. 7, as an alternative to the Measurement Reference Period Reference Periods_E, which partially overlaps with the DL transmission gap period, based on the received signal of the immediately preceding Measurement Reference Period Reference Periods_B, which does not overlap with the DL transmission gap period.
  • the CQI is generated, and the generated CQI is also transmitted to the base station in the first scheduled section CQI_E of the HS-DPCCH after the end of the UL transmission gap section.
  • the CQI is generated based on the received signal of the measurement reference period Reference Periods_B, which should not be used for generating the CQI, and the received signal of the measurement period Reference Periods—F immediately after the measurement reference period Reference Periods.E Based on! /, The CQI is specially generated and the mobile station power is also transmitted to the base station in the assumed section CQLF which is not the scheduled section.
  • the CQI transmitted from the mobile station to the base station in the assumed section CQLF that is not the scheduled section is called extra CQI.
  • Non-Patent Document 1 describes a timing relationship among a DL transmission gap section, a measurement reference section, and a UL transmission gap section as shown in FIGS.
  • Non-Patent Document 1 Title: CQI reporting in DL Compressed Mode, source: Philips, 3GPP TSG RAN WG1 # 33, Agenda Item: 5.3, Document No: Tdoc Rl-030742, New York, USA, 25th-29th August 2003
  • the scheduling is performed immediately after the UL transmission gap. If there is a section, the CQI based on the received signal cannot be generated because the measurement reference section for the scheduled section overlaps with the DL gap, so the reception of the measurement reference section that ended immediately before the start of this DL transmission gap section The CQI generated based on the signal is also transmitted to the base station. Therefore, the CQI transmitted first after the end of the DL transmission gap section and the UL transmission gap section indicates the channel state at the time of transmission, considering that the channel state is dynamically changing from time to time. This is hardly reflected, and it is considered that the use value at the base station is low even when transmitted from the mobile station to the base station.
  • the CQI generated based on the received signal of the measurement reference section that ended immediately before the start of the DL transmission gap section is converted to the UL transmission gap section. Therefore, there is a problem that the configuration of the device for implementing this CQI transmission method and the control of the components thereof become very complicated, since it must be maintained until transmission in the first assumed section after the transmission. [0017] Furthermore, in the conventional CQI transmission method in the compressed mode, if the value of the feedback cycle k in the compressed mode is 2 or more, it does not correspond to the scheduled section and is not originally used for generating the CQI.
  • CQI may be generated based on the received signal in the expected measurement reference section, especially when the DL transmission gap section starts, since the CQI based on the measurement reference section is generated retroactively from the start.
  • the management of the received signal for each measurement reference section and the control of the process of generating the CQI based on the received signal become complicated.
  • An object of the present invention is to enable a mobile station to secure reception performance substantially equal to that of a conventional method for transmitting downlink channel quality information in a compressed mode, and to obtain downlink channel quality information transmitted by UL.
  • a method of transmitting downlink channel quality information in a compressed mode that facilitates control of measurement of received signals required for generation, and a CQI transmission device with a simple configuration capable of implementing this method of transmitting downlink channel quality information It is to provide.
  • a method for transmitting downlink channel quality information in a compressed mode includes a receiving step of receiving a radio signal, and a downlink for generating downlink channel quality information for each measurement reference section based on the received signal.
  • Propagation channel quality information generation step extraction step of extracting control parameters from the received signal, and calculating and calculating downlink transmission gap section and uplink transmission gap section based on the extracted control parameters.
  • the downlink channel quality information transmitting apparatus provides a compressed mode radio signal.
  • An assumed section in which transmission of the downlink propagation path quality information generated based on the signal is assumed, and the assumed section that does not overlap with the uplink transmission gap section are the downlink transmission gap section and the uplink.
  • a timing generating means for generating timing, based on the reception signal of the measurement reference section after the transmission gap section of the downlink ends without overlapping with the transmission gap section of the downlink. And transmitting means for transmitting the generated downlink propagation path quality information at the timing generated by the timing generating means.
  • a mobile station it is possible for a mobile station to secure reception performance substantially equal to that of a conventional method of transmitting downlink channel quality information in a compressed mode, and to obtain downlink channel quality information transmitted by UL. It is possible to easily control the operation of each component of the mobile station with respect to measurement of a received signal required for generation.
  • FIG. 1 is a diagram showing a frame format of a plurality of channels in the HSDPA method.
  • FIG. 5 is a timing chart showing an outline of a CQI transmission method in the conventional HSDPA method
  • FIG. 8 is a block diagram showing a configuration of a CQI transmitting apparatus according to an embodiment of the present invention.
  • FIG. 9 is a block diagram showing a configuration of a CQI transmitting apparatus according to an embodiment of the present invention.
  • FIG. 10 is a timing chart showing an overview of a CQI transmission method in a compressed mode according to Embodiment 1.
  • FIG. 11 is a timing chart showing an overview of a CQI transmission method in a compressed mode according to Embodiment 2.
  • the gist of the present invention is that, in a compressed mode in which a transmission gap section appears in each of DL and UL, that is, when a packet data signal transmitted discontinuously in DL is received, the DL transmission gap section starts.
  • the mobile station does not transmit the downlink channel quality information generated based on the previous received signal to the base station after the DL transmission gap section and the UL transmission gap section have both ended.
  • the gist of the present invention is generated based on the received signal before the start of the DL transmission gap section in the compressed mode in which the transmission gap section appears in the DL and the UL, respectively.
  • the CQI is discarded after the DL transmission gap section starts.
  • FIG. 8 shows the configuration of CQI transmitting apparatus 100 according to Embodiment 1 of the present invention.
  • the CQI transmitting apparatus 100 is used by being incorporated in a mobile station that performs communication in a compressed mode of the HSDP A system.
  • CQI transmitting apparatus 100 includes antenna element 111, antenna duplexer 112, RxRF section 113, receiving section 114, CQI generating section 115, transmitting section 116, parameter extracting section 117, CQI transmission timing generating section 118, TxRF A unit 119 and a data output terminal 120 are provided.
  • Antenna element 111 includes CPICH, HS-SCCH and HS-PDSCH of various frequency bands transmitted from the base station of the cell to which the mobile station currently belongs and the base station of another cell. The radio signal is captured, and the captured signal is input to the antenna duplexer 112. In addition, antenna element 111 transmits the HS-DPCCH transmission signal input from antenna duplexer 112 to the base station. [0029] Antenna duplexer 112 inputs the received signal input from antenna element 111 to RxRF section 113, and also inputs the transmission signal input from TxRF section 119 to antenna element 111.
  • the RxRF unit 113 includes a known band-pass filter, a low-noise amplifier, and the like, and converts a received signal input from the antenna duplexer 112 into CPICH, HS-SCCH, and HS-PDSCH for each channel. And amplifies the separated reception signals for the respective channels, and then inputs the amplified signals to the reception unit 114.
  • Receiving section 114 demodulates the received signal for each channel input from RxRF section 113, and then inputs the CPICH received signal to CQI generating section 115, and receives the HS-SCCH received signal. Is input to the parameter extraction unit 117, and the HS-PDSCH reception signal is input to a baseband unit (not shown) via the data output terminal 120.
  • CQI generation section 115 calculates the SNR for each measurement reference section by a known means based on the CPICH reception signal input from reception section 114, and converts the CQI bit based on the calculated SNR. Generate. The generated CQI is sequentially input to the transmission unit 116 for each measurement reference section.
  • the transmission section 116 includes a band-pass filter, a modulator, a register, and the like, temporarily stores the CQI input from the CQI generation section 115 in a built-in register, and provides the CQI transmission timing generation section 118
  • the CQI held in this register is stored in the CQI field of the HS-DP CCH according to the timing given, and then the transmission signal of this HS-DPCCH is modulated and input to the TxRF section 119.
  • the transmission section 116 When the transmission section 116 receives the timing from the CQI transmission timing generation section 118 as described above, the transmission section 116 stores the CQI held in the built-in register in the CQI field of the HS-DPCCH according to the timing, modulates the CQI, and then transmits it to the TxRF section 119. input.
  • transmitting section 116 when timing is not provided from CQI transmission timing generating section 118 even when the assumed section of HS-DPCCH arrives, transmitting section 116 stores DTX in the CQI field, modulates it, and transmits it to TxRF section 119. input.
  • the transmitting section 116 stores the CQI input from the CQI generating section 115 in the CQI field of the HS-DPCCH in the next supposed section, the transmitting section 116 discards the CQI at the same time as the storage so as not to retain the CQI. Even when not storing in the CQI field, use the CQI in the future. Therefore, when the next CQI is input from the CQI generation unit 115, the register is overwritten and discarded.
  • Parameter extracting section 117 is a channelization section necessary for ascertaining the mode of the compressed mode from the HS-SCCH received signal input from receiving section 114 and for generating the timing for transmitting the CQI.
  • a control parameter indicating information such as a code, the number of multiplexing, and a modulation scheme is extracted, and the extracted control parameter is input to CQI transmission timing generating section 118.
  • CQI transmission timing generation section 118 Based on the control parameters input from parameter extraction section 117, CQI transmission timing generation section 118 generates the start and end times of the DL transmission gap section and the UL transmission gap section in the compressed mode and the feedback cycle k. Get information such as the value of. In addition, CQI transmission timing generating section 118 transmits a CQI generated based on the received signal in the measurement reference section that starts after the DL transmission gap section ends after the DL transmission gap section and the UL transmission gap section have ended. This timing is provided to the transmitting unit 116.
  • TxRF section 119 includes a band-pass filter, a low-noise amplifier, and frequency conversion, and performs predetermined signal processing such as frequency conversion and amplification on the HS-DPCCH transmission signal input from transmission section 116. After that, the signal is input to the antenna duplexer 112.
  • FIG. 9 shows a configuration of CQI transmission timing generating section 118 in CQI transmitting apparatus 100 according to the present embodiment.
  • CQI transmission timing generation section 118 includes scheduled section derivation section 211, DL state determination section 212, UL state determination section 213, and CQI transmission timing determination section 214.
  • Scheduled section deriving section 211 identifies the value of feedback cycle k for the UL during communication based on the control parameter input from parameter extracting section 117, and responds to the value of feedback cycle k.
  • a signal for notifying the arrival of the scheduled section is input to the DL state determination unit 212 and the UL state determination unit 213 at regular intervals.
  • the DL state determination unit 212 performs the following operation when the notification signal of the scheduled section is input from the scheduled section derivation unit 211.
  • DL state determination section 212 calculates a DL transmission gap section based on the control parameters input from parameter extraction section 117, and calculates the calculated DL transmission gap section. By comparing the information of the transmission gap section with the notification signal of the scheduled section from the scheduled section deriving section 211, it is determined whether the measurement reference section corresponding to the scheduled section does not overlap with the DL transmission gap section.
  • the DL state determination unit 212 determines the CQI generated by the CQI generation unit 115 and held in the transmission unit 116 almost simultaneously with the comparison operation based on the received signal in the measurement reference section where the CQI does not overlap with the DL transmission gap section. Determine whether the generated CQI is force or not.
  • DL state determining section 212 determines that the determination result is positive, that is, the CQI held in transmitting section 116 is a CQI generated based on the received signal in the measurement reference section that does not overlap with the DL transmission gap section. When it is determined, a signal notifying that the determination result is positive is input to CQI transmission timing determining section 214.
  • the DL state determination unit 212 determines that the determination result is negative, that is, the CQI generated based on the reception signal of the measurement reference section where the CQI held in the transmission unit 116 overlaps the DL transmission gap section. , The CQI transmission timing determination unit 214 is notified that the determination result is negative, and then generated based on the received signal of the measurement reference section that does not overlap with the DL transmission gap section. The same operation is performed until it is determined to be CQI. That is, once the DL state determination unit 212 makes a negative determination, the measurement reference section corresponding to the next scheduled section (the assumed section if the feedback cycle k is 2 or more) is the DL transmission gap section.
  • DL state determination section 212 It is determined whether or not they are superimposed, and the determination is repeated until a positive determination result is obtained. Then, DL state determination section 212 outputs a signal notifying that the determination result is positive in the scheduled section or assumed section corresponding to the measurement reference section in which the positive determination result was obtained, to the CQI transmission timing determination section. Enter 214. Also, DL state determination section 212 normally does not perform the above series of operations until a notification signal of the scheduled section is input from scheduled section derivation section 211, but receives a determination request signal from CQI transmission timing determination section 214. If this is done, it is determined whether the next incoming measurement reference section does not overlap with the DL transmission gap section. The determination request signal input from CQI transmission timing determination section 214 will be described later.
  • the UL state determination unit 213 performs the following operation when the notification signal of the scheduled section is input from the scheduled section derivation unit 211.
  • UL state determination section 213 calculates a UL transmission gap section based on the control parameters input from parameter extraction section 117, and determines whether the calculated UL transmission gap section and the next scheduled section will not overlap. .
  • UL condition judgment If the determination result is positive, that is, if the UL transmission gap section and the next scheduled section do not overlap, the determining section 213 outputs a signal notifying that the determination result is positive to the CQI transmission timing determining section. Enter 214.
  • the UL state determination unit 213 determines that the determination result is negative, that is, the UL transmission gap section and the next scheduled section overlap, the determination result is negative for the CQI transmission timing determination unit 214. The same operation is performed until it is determined that the target section does not overlap with the UL transmission gap. That is, once a negative determination is made, the UL state determination unit 213 determines whether the next scheduled section (the assumed section if the feedback cycle k is 2 or more) does not overlap with the UL transmission gap section. The determination is repeated until a positive determination result is obtained.
  • UL state determination section 213 inputs to CQI transmission timing determination section 214 a signal notifying that the determination result is positive in the scheduled section or the assumed section in which the positive determination result was obtained. Further, the UL state determination unit 213 normally does not perform the above series of operations until the notification signal of the scheduled section is input from the scheduled section derivation unit 211, but receives the determination request signal from the CQI transmission timing determination unit 214. If this is done, it is determined whether the next expected section does not overlap with the UL transmission gap section. The determination request signal input from CQI transmission timing determining section 214 will be described later.
  • the CQI transmission timing determination unit 214 determines whether the result of the determination by the DL state determination unit 212 and the result of the determination by the UL state determination unit 213 are both positive, that is, the determination is both positive from the DL state determination unit 212 and the UL state determination unit 213. Only when a signal notifying that the CQI has been input is received, a decision is made to generate a timing for transmitting the CQI held in transmitting section 116, and the generated timing is provided to transmitting section 116. I do. Further, when a signal notifying that the determination result is negative is input from DL state determining section 212 or UL state determining section 213, CQI transmission timing determining section 214 transmits the next state to DL state determining section 212.
  • the UL state determination unit 213 determines whether the next assumed section is superimposed on the UL transmission gap section so that the measurement reference section is overlapped with the DL transmission gap section and the determination result is input. Then, a determination request signal requesting input of the determination result is simultaneously input to the DL state determination unit 212 and the UL state determination unit 213. When the feedback cycle k is 2 or more, the judgment request signal is transmitted until the next CQI is transmitted. It is repeatedly input to the L state determination unit 212 and the UL state determination unit 213.
  • measurement reference period Reference Periods_C since a part of measurement reference period Reference Periods_C overlaps with DL transmission gap period, measurement reference period
  • CQI generating section 115 generates a CQI field in CQI field CQI_C of HS-DPCCH and transmits it to base station based on a reception signal of measurement reference section Reference Periods_B.
  • transmitting section 116 Since the set CQI is automatically discarded by transmitting section 116 after the start of the DL gap section, this CQI cannot be stored in the CQI field CQLC and transmitted to the base station. Therefore, in the CQI transmission method according to the present embodiment, transmitting section 116 stores DTX in the CQI field of the assumed section corresponding to CQI field CQLC in FIG. 6, and transmits the DTX to the base station. Therefore, in the CQI transmission method according to the present embodiment, the CQI transmitted first after the DL transmission gap interval ends is the measurement reference interval Reference
  • the CQI transmission method according to the present embodiment although the CQI is not transmitted to the mobile station power base station until the power CQI field CQLD arrives at the start of the DL transmission gap section, in the conventional CQI transmission method shown in FIG. 6, since the CQI transmitted in the CQI field CQLC was practically of low utility value, the CQI transmission method according to this embodiment is the same as the conventional CQI transmission method. Compared with the method, the reception performance of the mobile station is not noticeably reduced. Next, regarding the CQI transmission method in the compressed mode according to the present embodiment, the operation of each component included in CQI transmission timing generating section 118 will be specifically described.
  • the DL state determination section 212 and the UL state determination section 213 both start and end the DL transmission gap section and the UL transmission gap section in the manner shown in FIG. 10 based on the control parameters input from the parameter extraction section 117. I know this in advance.
  • DL state determination section 212 previously specifies a DL CPICH subframe that partially overlaps the DL transmission gap section by calculation.
  • UL state determination section 213 also preliminarily specifies a UL HS-DPCCH subframe or scheduled section that partially overlaps with the UL transmission gap.
  • the scheduled period deriving unit 211 determines a force in which the CQI field CQI_A in the UL HS—DPCCH corresponds to the scheduled period, and sets the CQI field CQI_A to If it corresponds to the scheduled section, a signal indicating that the next arriving CQI field CQLA corresponds to the scheduled section is input to the DL state determining section 212 and the UL state determining section 213.
  • the feedback cycle is 1, all CQI fields arriving after the CQI field CQLA correspond to the scheduled section.
  • the UL state determination unit 213 transmits a signal indicating that the CQI field CQLA coming next from the scheduled period derivation unit 211 corresponds to the scheduled period. Is input, it is determined whether the CQI field CQLA arriving next does not overlap even with a part of the UL transmission gap section. If the determination result is positive, that is, the UL transmission gap section and the next arriving When it is determined that the CQI field CQI_A does not overlap, a signal notifying that the determination result is positive is input to CQI transmission timing determination section 214.
  • scheduled section deriving section 211 and UL state determining section 213 determine whether or not CQI can be transmitted in a CQI field in a subframe next to this measurement reference section within an arbitrary measurement reference section.
  • DL state determination section 212 determines whether or not measurement reference section Reference Periods-A partially overlaps DL transmission gap section. When the determination result is affirmative, that is, when the measurement reference When it is determined that the reference interval Period_A does not overlap with the DL transmission gap period, a signal notifying that the determination result is positive is input to the CQI transmission timing determination unit 214. As described above, the DL state determination unit 212 determines whether the CQI generated based on the received signal in this measurement reference section accurately reflects the propagation path condition at an arbitrary time in a certain measurement reference section. It will be determined.
  • the UL state determination unit 213 determines that the CQI field CQI_A is It is determined that transmission is possible, and the positive determination result is input to CQI transmission timing determination section 214.
  • the measurement reference section shown in Fig. 10 The measurement reference section shown in Fig. 10
  • the measurement reference period Reference Periods_A is superimposed with DL transmission gap interval! /, It! /, This and force al, based on the measurement reference period Reference Period S _A received signal It is determined that the generated CQI is usable enough to reflect the propagation path condition, and the positive determination result is input to CQI transmission timing determination section 214. Therefore, for the measurement reference section Reference Periods_A shown in FIG.
  • the CQI transmission timing determination section 214 receives a positive determination result from both the DL state determination section 212 and the UL state determination section 213, so that the transmission section A decision is made to generate the timing for transmitting the CQI generated based on the received signal of the measurement reference period Reference Periods_A held in 116, and the generated timing is provided to the transmission unit 116. I do. Then, transmitting section 116 stores the held CQI in UL CQI field CQLA according to the timing provided from CQI transmission timing determining section 214, and transmits it to the base station.
  • the UL state determination unit 213 determines that the CQI field CQI_B overlaps with the UL transmission gap period (the CQI field CQI_B is not shown). Judge that CQI cannot be sent in field CQLB. Therefore, for this measurement reference period Reference Periods_B, UL state determination section 213 inputs a signal indicating that the determination result is negative to CQI transmission timing determination section 214. Therefore, for the measurement reference period Reference Periods_B shown in FIG. 10, the CQI transmission timing determination unit 214 determines that the determination result from the UL state determination unit 213 is positive.
  • the transmission unit 116 stores DTX in the CQI field CQLB of the UL HS—DPCCH since the timing is not provided from the CQI transmission timing determination unit 214 for the measurement reference period Reference Periods_B shown in FIG. It will be transmitted to the base station.
  • the DL state determination unit 212 determines that the measurement reference period Reference Periods_C because a part of the measurement reference period Reference Periods_C overlaps with the DL transmission gap period. It is determined that the CQI generated based on the received signal is unusable. Therefore, this measurement reference section
  • DL state determination section 212 inputs a signal to the CQI transmission timing determination section 214 that the determination result is negative. Accordingly, for the measurement reference period Reference Periods_C shown in FIG. 10, the CQI transmission timing determination unit 214 receives the signal based on the positive determination result from the DL state determination unit 212, and the signal is held by the transmission unit 116. It is not possible to make a decision to generate the timing to transmit the generated CQI based on the received signal of the measurement reference section Reference Periods_C. Therefore, transmitting section 116 stores DTX in CQI field CQLC (see FIG. 6) and transmits to base station since no timing is provided from CQI transmission timing determining section 214 for measurement reference section Reference Periods_C shown in FIG. Will do.
  • the UL state determination unit 213 transmits the CQI in the CQI field CQLD since the CQI field CQI_D does not overlap with the UL transmission gap period. Is determined to be possible, and the positive determination result is input to CQI transmission timing determination section 214. Further, with respect to the measurement reference period Reference Periods_D shown in FIG. 10, the DL state determination unit 212 determines that the measurement reference period Reference Periods_D is superimposed on the DL transmission gap period! / ⁇ . It is determined that the CQI generated based on the CQI is usable, and the positive determination result is input to CQI transmission timing determination section 214.
  • the CQI transmission timing generation unit When the DL transmission gap interval starts, the CQI generation unit 115 does not need to generate the CQI based on the received signal of the measurement reference interval Reference Periods_B even when the DL transmission gap interval starts, and The CQI generator 115 does not need to hold the CQI generated based on the received signal of the measurement reference section up to the start after the start, so the CQI generator 115 prepares multiple It is no longer necessary to hold the received signal of the measurement reference section of the CQI, and the transmission section 116 transmits the CQI input from the CQI generation section 115 for each measurement reference section until the next CQI is input.
  • the CQI generation unit 115 has a register or the like so that the CQI generation unit 115 keeps holding the received signals of a plurality of measurement reference sections or the transmission unit 116 keeps holding multiple CQIs. It is not necessary to perform these operations, and the components can be simplified, and the operations of the components can be easily controlled.
  • the CQI is generated based on the reception signal of Measurement Reference Period Reference Period_B, which ends immediately before the DL transmission gap period starts.
  • the CQI is generated based on the reception signal of the measurement reference period Reference Periods_B because it is possible to avoid transmitting the CQI in the scheduled period CQLC after the DL transmission gap period and the UL transmission gap period are completed. Since the CQI does not need to be kept after the DL transmission gap section starts, the CQI generated sequentially for each measurement reference section can be easily managed. Power!
  • the reception signal in the measurement reference period Reference Periods_B is Even if the generated CQI is discarded at the beginning of the DL transmission gap interval, the CQI will not be generated retroactively based on the received signal in the Reference Periods_B retroactively.
  • the management of CQIs generated sequentially for each section becomes even easier.
  • the CQI is generated based on the received signal of the measurement reference period Reference Periods_D that starts after the DL transmission gap period ends. Since the CQI is transmitted from the mobile station to the base station in the CQI field CQLD, which is a scheduled section, one subframe later than the end of the DL transmission gap section and the UL transmission gap section, the reception performance of the mobile station is reduced. It can be kept almost the same as the conventional CQI transmission method.
  • FIG. 11 shows an outline of the CQI transmission method in the compressed mode according to Embodiment 2 of the present invention, according to FIG.
  • the CQI transmitting apparatus according to the present embodiment has the same configuration as CQI transmitting apparatus 100 used in the first embodiment. Therefore, in the present embodiment, only the points different from the first embodiment will be specifically described below in order to avoid redundant description.
  • the scheduled section appears at a frequency of once in four times of the assumed section in UL HS—DPCC H.
  • the assumed section immediately after the end of the UL transmission gap section becomes the scheduled section, and this assumed section is set as CQI field CQI_E.
  • the corresponding measurement reference period is referred to as Reference Periods_E. Therefore, the operation of CQI transmitting apparatus 100 up to CQI field CQI_E and measurement reference section Reference Periods_E shown in FIG. 11 is substantially the same as the operation of CQI transmitting apparatus 100 up to CQI field CQLC and measurement reference section Reference Periods_C shown in FIG. Are identical.
  • the DL state determination section 212 sets the measurement reference section Refernce Period_E A signal indicating that the result of! / Is negative is input to CQI transmission timing determination section 214. Therefore, a determination request signal is input from the CQI transmission timing determination unit 214 to the DL state determination unit 212 and the UL state determination unit 213 after the measurement reference section Refernce Period_F and before the transmission of the etastra CQI.
  • DL state determination section 212 determines the determination results for measurement reference section Reference Periods_F to measurement reference section Reference PeriodsJ "[ Are sequentially input to the CQI transmission timing determination section 214.
  • UL state determination section 213 in response to the determination request signal input from CQI transmission timing determining section 214 for measurement reference section Refernce Period-E, UL state determination section 213 first determines the measurement reference section Refernce. It is determined whether the CQI field CQLF of the assumed section corresponding to Period_F does not overlap with the UL transmission gap section. As is clear from FIG. 11, since the CQI field CQI_F is superimposed on the UL transmission gap section, the UL state determination unit 213 inputs a signal notifying that the determination result is negative to the CQI transmission timing determination unit 214. I do.
  • the CQI transmission timing determination unit 214 having received this signal inputs the determination request signal to the UL state determination unit 213 so as to determine whether the next CQI field CQI_G overlaps the UL transmission gap section, At the same time, a determination request signal is input to the DL state determination unit 212 to determine whether the measurement reference section Refernce Period corresponding to the CQI field CQLG does not overlap with the DL transmission gap section.
  • the UL state determination unit 213 that has received the determination request signal performs the same determination on the CQI field CQI-G in the assumed section as described above, and also determines the CQI field CQI_G as apparent from FIG. A signal notifying that the result is negative is input to CQI transmission timing determining section 214.
  • the CQI transmission timing determination section 214 to which this signal has been input again transmits a determination request signal to the UL state determination section 213 so as to determine whether the next CQI field CQI_H does not overlap with the UL transmission gap section!
  • a determination request signal is input to the DL state determination unit 212 so as to determine whether the measurement reference section Refernce Period_H corresponding to the CQI field CQLH overlaps the DL transmission gap section.
  • the UL state determination unit 213 that has received the determination request signal performs the same determination as above for the CQI field CQLH of the assumed section, and, as apparent from FIG.
  • the CQI transmission timing determining unit 214 makes a decision to transmit the extra CQI in the CQI field CQLH, which is the assumed section, generates a timing for notifying the decision, and provides the generated timing to the transmitting unit 116. I do.
  • the transmission section 116 stores and transmits DTX in these CQI fields, and transmits the CQI field Sending CQI to CQLH!
  • the value of feedback cycle k is 2 or more, and the DL transmission gap section and UL Even if a new UL transmission gap section is added after the transmission gap section is completed, the propagation path conditions should be sufficiently set in the CQI field CQI_H, which is the assumed section before the CQI field CQIJ of the scheduled section arrives. Since the reflected CQI is transmitted from the mobile station to the base station, it is possible to quickly recover from a decrease in the reception performance of the mobile station caused by the appearance of the DL transmission gap section and the UL transmission gap section in the compressed mode.
  • Embodiments 1 and 2 describe the case where packet communication is performed by the HSDPA scheme in the W-CDMA scheme, the present invention is not limited to this case.
  • the method is applicable to all communication systems as long as there is feedback of downlink channel quality information and a compression mode exists.
  • the present invention is based on Japanese Patent Application No. 2003-341719, filed on September 30, 2003. This content And include it here.
  • the downlink channel quality information transmitting method and the downlink channel quality information transmitting device in the compressed mode according to the present invention can ensure that the mobile station has almost the same reception performance as the conventional downlink channel quality information transmitting method, and This has the effect of easily controlling the operation of the components of the mobile station with respect to the measurement of the received signal necessary for generating the downlink channel quality information transmitted by UL, and has the effect that the downlink channel quality can be easily controlled. This is useful for mobile stations that require an information transmission device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

 移動局が従来のコンプレストモードでの下り伝搬路品質情報送信方法とほぼ同等の受信性能を確保でき、かつ、アップリンクで送信される下り伝搬路品質情報を生成するために必要な受信信号の測定等に関する制御が容易なコンプレストモードでの下り伝搬路品質情報送信方法、並びに簡素な構成からなる下り伝搬路品質情報送信装置を開示する。ダウンリンクとアップリンクとにそれぞれ送信ギャップ区間が出現するコンプレストモードおいて、移動局がそのダウンリンクの送信ギャップ区間が始まる前の受信信号に基づいて生成された下り伝搬路品質情報を、そのダウンリンクの送信ギャップ区間及びアップリンクの送信ギャップ区間が共に終わるまで持ち越さないようにする。

Description

コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置 技術分野
[0001] 本発明は、自動再送信要求(Automatic Repeat reQuest :ARQ)技術におけるコン プレスモード(Compressed Mode :圧縮モード)状態において、データ受信側通信装 置がデータ送信側通信装置に対して伝送チャネルの品質を報告する方法及びその 装置に関する。
背景技術
[0002] 近年、 3GPP(3rd Generation Partnership Project)では、無線通信の伝送速度を飛 躍的に向上させる HSDP A方式が検討されている。 HSDP A方式において、 HSDP A用のチャネルとしては基地局力も移動局に無線信号を送信するダウンリンク(以下 、「DL」と称する)として、パケットデータ用のチャネルである HS—PDSCH(High Speed Physical Downlink Shared Channel)と、この HS— PDSCHを受信するために必 要なチヤネライゼーシヨンコード、多重数及び変調方式等の情報を伝送する制御チヤ ネルである HS— SCCH(High Speed Shared Control Channel)と、が規定されており、 これらのチャネルがセットで送信される。
[0003] また、 HSDP A方式において、移動局力 基地局に無線信号を送信するアップリン ク(以下、「UL」と称する)として、 HS— DPCCH(High Speed Dedicated Physical Control Channel)が規定されており、この HS— DPCCHでは、 HS— PDSCHの無線 信号が移動局に正しく受信されたカゝ否カゝを表す ACKZNACK信号と、移動局と基 地局との間の下り伝搬路品質情報、具体的には CQI : Channel Quality Indicatorが送 信される。この CQIは、 DLチャネルの一つである共通パイロットチャネル CPICH (Common Pilot Channel)から算出される SNR(Signal to Noise Ratio)に基づいて生成 されるものであり、その SNRの測定参照区間は Measurement Reference Periodと呼ば れる。 SNRは伝搬路状況を示す尺度であるから、基地局は、高い SNRに基づいて 生成された CQIを受信したときには、 HS— PDSCHの伝送レートを上げることができ る。 [0004] 図 1に、 HS— SCCH、 HS— PDSCH及び HS— DPCCHそれぞれのフレームフォー マットを示す。 HS— SCCH、 HS— PDSCH及び HS— DPCCHでは、 3スロットでサブ フレーム単位が構成される。これらのチャネルの 1サブフレームは 2msであるから、 D L-DPCH(Down Link Dedicated Physical CHannel)や CPICH等の通常の受信チヤ ネルの 1フレーム(10ms)中には、これらのチャネルの 5つのサブフレームが含まれる ことになる。
[0005] 図 2に、 CPICHのフレームフォーマットと HS— DPCCHのより具体的なフレームフォ 一マットとを示す。 CPICHは 15スロットから構成されており、その単位はフレームと呼 ばれる。なお、 CPICHの 1フレームは 10msである。一方、 HS— DPCCHは、任意の サブフレームの最初の 1スロットが ACKZNACK信号の格納される ACKZNACK フィールドであり、その後ろの 2スロットが CQIの格納される CQIフィールドである。ま た、 CPICHの 1フレームに対応する HS— DPCCHは、 5つのパケットデータ単位即 ちサブフレームで構成される。 HS— DPCCHの 5つのサブフレームのそれぞれを Subframe#0、 Subframe#l、 Subframe#2、 Subframe#3及び Subframe#4と標記することに する。
[0006] 図 3に、 SNRを測定する際の基準単位となる CPICHの測定参照区間と、 HS— SC CH、 HS— PDSCH及び HS— DPCCHそれぞれのサブフレームと、のタイミング関係 を示す。 HS—SCCHのスロットバウンダリと CPICHのスロットバウンダリは常に一致し た状態で基地局から送信され、また HS— SCCHと HS— PDSCHとは、 2スロットのォ フセットをつけてサブフレーム単位のセットで送信される。また、 HS— PDSCHのサブ フレームに対する ACKZNACK信号は、移動局によってそのサブフレームの受信 が開始されてから 7. 5スロット経過後に、 HS— DPCCHの ACKZNACKフィールド に格納されて、移動局力 基地局に送信される。
[0007] 一方で、 HS— DPCCHのサブフレームの CQIフィールドに格納されて送信される C QIは、移動局による HS— PDSCHの受信とは無関係に、上位レイヤーから指定され る周期毎に即ち測定参照区間毎に、 DLに含まれる CPICH力も算出された SNRの 値に基づいて生成される。図 3において、例えば CQIフィールド (n)で送信される CQ Iは、 CQIフィールド (n)の開始時から 1スロット前に終了する 3スロット分の測定参照 区間の CPICHから算出される SNRに基づいて生成される。
[0008] また、 HS— DPCCHの CQIフィールドで移動局が実際に CQIを基地局に送信する 周期は、上位レイヤー力 具体的に指定される。この CQIが実際に送信される周期 は、フィードバックサイクル (Feedback Cycle)kと称される。
[0009] 図 4に、フィードバックサイクル k= lの場合における HS—DPCCHのサブフレーム の構成と、そのサブフレームの CQIフィールドに対応する測定参照区間と、のタイミン グ関係を示す。図 4より明らかなように、フィードバックサイクル k= lの場合には、 HS — DPCCHの全サブフレームの CQIフィールドに CQIが格納される。また、図 5に、フ イードバックサイクル k= 3の場合における HS— DPCCHのサブフレームの構成と、そ のサブフレームの CQIフィールドに対応する測定参照区間と、のタイミング関係を示 す。図 5より明らかなように、フィードバックサイクル k= 3の場合には、 HS-DPCCH のサブフレーム単位につ!、て 3回に 1度の頻度で CQIが移動局から基地局に送信さ れる。なお、フィードバックサイクル kで規定された CQIが実際に送信される HS-DP CCHの区間を「予定区間」 (なお、図中では「Scheduled pattern of CQI reports」と称 することがある)と称し、またフィードバックサイクル kによる規定とは無関係に HS-DP CCHの全てのサブフレームにおける CQIフィールドを「想定区間」と称す。従って、フ イードバックサイクル k= lでは、想定区間の全てが予定区間となるが、フィードバック サイクル k= 3では、 3つの想定区間の中のいずれ力 1つが予定区間となる。
[0010] 次いで、 HSDPA方式を具体例にして、コンプレストモードについて説明する。セル ラー方式の無線通信では、 W— CDMA方式のセルと GSM方式のセルとのように異 なる通信方式のセル同士で、或いは同一方式のセル同士で異なる周波数帯域を使 用する場合があり、このような周波数帯域の異なるセルの間を移動局がハンドオーバ 一するには、移動局は現在所属するセルの基地局との通信中に他のセルの基地局 力 送信されてくる他の周波数帯域の信号を受信して、他のセルの基地局に関する 制御情報を予め取得しておく必要がある。そこで、 HSDPA方式では、移動局と通信 中の基地局が通信に悪影響を及ぼさない範囲で DLを使用しない区間 (DL送信ギヤ ップ区間)を設けること、並びに移動局がこの DL送信ギャップ区間中に他のセルの 基地局に関する制御情報を取得すること、が規定されている。このように、 HSDPA 方式の無線通信において、基地局と移動局との間でその通信を中止する区間を設 ける方式をコンプレストモードという。なお、コンプレストモードでは、 ULにだけ送信ギ ヤップ区間が設けられる場合や ULと DLとに共に送信ギャップ区間が設けられる場 合もある。また、 HSDPA方式以外の方式におけるコンプレストモードでも、前記の説 明とほぼ同様の手法により、移動局から基地局に下り伝搬路品質情報が送信される
[0011] 図 6に、 3GPPで策定中のコンプレストモードでのフィードバックサイクル k= lの場 合における DL送信ギャップ区間と、測定参照区間と、 UL送信ギャップ区間と、のタ イミング関係の一例を示す。なお、 DL送信ギャップ区間と UL送信ギャップ区間との タイミング関係は、必ずしも図 6に示す態様となるわけではなぐコンプレストモードの 規定に依存する。
[0012] 測定参照区間と DL送信ギャップ区間とが重畳する場合は、その重畳が測定参照 区間の一部だけであっても、その測定参照区間については SNRを正確に算出でき ない。そのため、図 6に示す CPICHの測定参照区間 Reference Periods_Cは使用さ れず、その代替として DL送信ギャップ区間と重畳しない直前の測定参照区間 Reference Periods_Bに基づいて CQIが生成され、この生成された CQIが UL送信ギヤ ップ区間が終わった後の HS— DPCCHの最初の予定区間 CQLCで移動局から基地 局に送信される。なお、 UL送信ギャップ区間中の予定区間では、 CQIの代替として DTX(Discontinuous Transmission)が CQIフィールドに格納される。
[0013] 続いて、図 7に、コンプレストモードにおけるフィードバックサイクル k=4の場合での DL送信ギャップ区間と、測定参照区間と、 UL送信ギャップ区間と、のタイミング関係 の一例を示す。図 7では、フィードバックサイクル k= 4であるため、測定参照区間に 対する予定区間の出現頻度が 1Z4となっている。そのため、図 7では、 DL送信ギヤ ップ区間と一部重畳する測定参照区間 Reference Periods_Eの代替として、 DL送信ギ ヤップ区間と重畳しな 、直前の測定参照区間 Reference Periods_Bの受信信号に基 づいて CQIが生成され、この生成された CQIが UL送信ギャップ区間が終わった後の HS— DPCCHの最初の予定区間 CQI_Eで移動局力も基地局に送信される。これら点 については図 6とほぼ同様であるが、図 7では、フィードバックサイクル k=4であれば 本来 CQIの生成には使用されないはずの測定参照区間 Reference Periods_Bの受信 信号に基づいて CQIが生成されており、さらには測定参照区間 Reference Periods.E の直後の測定参照区間 Reference Periods— Fの受信信号に基づ!/、て CQIが特別に生 成されて予定区間ではない想定区間 CQLFで移動局力も基地局にこの CQIが送信 されている。なお、このように予定区間ではない想定区間 CQLFで移動局から基地局 に送信される CQIをェクストラ CQIと称す。
[0014] 図 6及び図 7に示すような DL送信ギャップ区間と、測定参照区間と、 UL送信ギヤッ プ区間と、のタイミング関係は、非特許文献 1に記載されている。
非特干文献 1: Title: CQI reporting in DL Compressed Mode , source: Philips, 3GPP TSG RAN WG1#33, Agenda Item: 5.3, Document No: Tdoc Rl- 030742, New York, USA, 25th - 29th August 2003
発明の開示
発明が解決しょうとする課題
[0015] しかしながら、図 6及び図 7に示すような従来のコンプレストモードでの CQI送信方 法では、 DL送信ギャップ区間と UL送信ギャップ区間が同時に出現する場合におい て、 UL送信ギャップ直後に予定区間がある場合、その予定区間に対する測定参照 区間が DLギャップと重畳しているために、受信信号に基づく CQIを生成できないこと から、この DL送信ギャップ区間が始まる直前に終わった測定参照区間の受信信号 に基づいて生成された CQIが移動局力も基地局に送信されることになる。そのため、 この DL送信ギャップ区間と UL送信ギャップ区間とが終わった後に最初に送信される CQIは、伝搬路状況が随時動的に変化していることに鑑みれば、その送信時の伝搬 路状況を殆ど反映しておらず、移動局から基地局に送信されても基地局での利用価 値が低いものと考えられる。
[0016] また、従来のコンプレストモードでの CQI送信方法では、 DL送信ギャップ区間が始 まる直前に終わった測定参照区間の受信信号に基づいて生成された CQIを、 UL送 信ギャップ区間が終わった後の最初の想定区間で送信するまで保持し続けなければ ならな 、ため、この CQI送信方法を実施するための装置の構成及びその構成部の制 御が非常に複雑になる問題がある。 [0017] さらに、従来のコンプレストモードでの CQI送信方法では、コンプレストモードでのフ イードバックサイクル kの値が 2以上であれば、予定区間に対応しないため CQIの生 成に本来使用されないはずの測定参照区間の受信信号に基づいて CQIが生成され る場合が生じ、特に DL送信ギャップ区間が始まったときには、その開始時から遡って 測定参照区間に基づく CQIが生成されることになるため、測定参照区間毎の受信信 号の管理やこの受信信号に基づいて CQIを生成する工程の制御が複雑になる問題 もめる。
[0018] 本発明の目的は、移動局が従来のコンプレストモードでの下り伝搬路品質情報送 信方法とほぼ同等の受信性能を確保でき、かつ、 ULで送信される下り伝搬路品質 情報を生成するために必要な受信信号の測定等に関する制御が容易なコンプレスト モードでの下り伝搬路品質情報送信方法、並びにこの下り伝搬路品質情報送信方 法を実施可能で構成が簡素な CQI送信装置を提供することである。
課題を解決するための手段
[0019] 本発明に係るコンプレストモードでの下り伝搬路品質情報送信方法は、無線信号を 受信する受信ステップと、受信信号に基づいて測定参照区間毎に下り伝搬路品質情 報を生成する下り伝搬路品質情報生成ステップと、前記受信信号から制御パラメ一 タを抽出する抽出ステップと、抽出された前記制御パラメータに基づいてダウンリンク の送信ギャップ区間及びアップリンクの送信ギャップ区間を算出し、算出された前記 ダウンリンクの送信ギャップ区間と重畳しない前記測定参照区間の前記受信信号に 基づいて生成された前記下り伝搬路品質情報の送信が想定される想定区間と、前記 アップリンクの送信ギャップ区間と重畳しな 、前記想定区間と、が前記ダウンリンクの 送信ギャップ区間及び前記アップリンクの送信ギャップ区間が共に終わった後で最 初に一致するときに、前記下り伝搬路品質情報を送信するタイミングを生成するタイミ ング生成ステップと、前記ダウンリンクの送信ギャップ区間と重畳せず、かつ、前記ダ ゥンリンクの送信ギャップ区間が終わった後の前記測定参照区間の前記受信信号に 基づ 、て生成された前記下り伝搬路品質情報を、前記タイミング生成ステップにお ヽ て生成された前記タイミングで送信する送信ステップと、を具備するようにした。
[0020] また、本発明に係る下り伝搬路品質情報送信装置は、コンプレストモードの無線信 号を受信する受信手段と、前記受信手段による受信信号に基づいて測定参照区間 毎に下り伝搬路品質情報を生成する下り伝搬路品質情報生成手段と、前記受信信 号力 制御パラメータを抽出する抽出手段と、抽出された前記制御パラメータに基づ いてダウンリンクの送信ギャップ区間及びアップリンクの送信ギャップ区間を算出し、 算出された前記ダウンリンクの送信ギャップ区間と重畳しない前記測定参照区間の 前記受信信号に基づいて生成された前記下り伝搬路品質情報の送信が想定される 想定区間と、前記アップリンクの送信ギャップ区間と重畳しない前記想定区間と、が 前記ダウンリンクの送信ギャップ区間及び前記アップリンクの送信ギャップ区間が共 に終わった後で最初に一致するときに、前記下り伝搬路品質情報を送信するタイミン グを生成するタイミング生成手段と、前記ダウンリンクの送信ギャップ区間と重畳せず 、かつ、前記ダウンリンクの送信ギャップ区間が終わった後の前記測定参照区間の前 記受信信号に基づ 、て生成された前記下り伝搬路品質情報を、前記タイミング生成 手段によって生成された前記タイミングで送信する送信手段と、を具備する構成を採 る。
発明の効果
[0021] 本発明によれば、移動局が従来のコンプレストモードでの下り伝搬路品質情報送 信方法とほぼ同等の受信性能を確保でき、かつ、 ULで送信される下り伝搬路品質 情報を生成するために必要な受信信号の測定等に関する移動局の各構成部の動作 制御を容易に行うことができる。
図面の簡単な説明
[0022] [図 1]HSDPA方式における複数のチャネルのフレームフォーマットを示す図
[図 2]HSDPA方式における HS— DPCCHのフレームフォーマットを示す図
[図 3]HSDPA方式の複数チャネルのサブフレーム間の対応関係を示すタイミング図 [図 4]従来の HSDPA方式における CQI送信方法の概要を示すタイミング図
[図 5]従来の HSDPA方式における CQI送信方法の概要を示すタイミング図
[図 6]従来のコンプレストモードでの CQI送信方法の概要を示すタイミング図
[図 7]従来のコンプレストモードでの CQI送信方法の概要を示すタイミング図
[図 8]本発明の実施の形態に係る CQI送信装置の構成を示すブロック図 [図 9]本発明の実施の形態に係る CQI送信装置の構成を示すブロック図
[図 10]実施の形態 1に係るコンプレストモードでの CQI送信方法の概要を示すタイミ ング図
[図 11]実施の形態 2に係るコンプレストモードでの CQI送信方法の概要を示すタイミ ング図
発明を実施するための最良の形態
[0023] 本発明の骨子は、 DLと ULとにそれぞれ送信ギャップ区間が出現するコンプレスト モード即ち非連続的に DLで送信されたパケットデータ信号を受信した場合において 、その DL送信ギャップ区間が始まる前の受信信号に基づいて生成された下り伝搬 路品質情報を、その DL送信ギャップ区間及び UL送信ギャップ区間が共に終わった 後に、移動局が基地局に送信しない、ことである。
[0024] 換言すれば、本発明の骨子は、 DLと ULとにそれぞれ送信ギャップ区間が出現す るコンプレストモードお 、て、その DL送信ギャップ区間が始まる前の受信信号に基 づいて生成された CQIを、その DL送信ギャップ区間が始まった後に破棄する、こと である。
[0025] 以下、本発明の実施の形態について、図面を参照しつつ詳細に説明する。
[0026] (実施の形態 1)
図 8に、本発明の実施の形態 1に係る CQI送信装置 100の構成を示す。 CQI送信 装置 100は、 HSDP A方式のコンプレストモードで通信を行う移動局に組み込まれて 使用される。
[0027] CQI送信装置 100は、アンテナ素子 111、アンテナ共用器 112、 RxRF部 113、受 信部 114、 CQI生成部 115、送信部 116、パラメータ抽出部 117、 CQI送信タイミン グ生成部 118、 TxRF部 119及びデータ出力端子 120を具備する。
[0028] アンテナ素子 111は、移動局が現在所属しているセルの基地局及び他のセルの基 地局から送信されてくる様々な周波数帯域の CPICH、 HS— SCCH及び HS— PDS CH等の無線信号を捕捉し、捕捉された信号をアンテナ共用器 112に入力する。ま た、アンテナ素子 111は、アンテナ共用器 112から入力されてくる HS— DPCCHの 送信信号を基地局に対して送信する。 [0029] アンテナ共用器 112は、アンテナ素子 111から入力されてくる受信信号を RxRF部 113に入力すると伴に、 TxRF部 119から入力されてくる送信信号をアンテナ素子 1 11に入力する。
[0030] RxRF部 113は、公知のバンドパスフィルタ及び低雑音増幅器等を具備して、アン テナ共用器 112から入力されてくる受信信号を、チャネル別に CPICHと HS-SCC Hと HS— PDSCHとに分離して、分離されたチャネル別の受信信号をそれぞれ増幅 した後に受信部 114に入力する。
[0031] 受信部 114は、 RxRF部 113から入力されてくるチャネル別の受信信号に復調処 理を施した後に、 CPICHの受信信号を CQI生成部 115に入力し、 HS— SCCHの受 信信号をパラメータ抽出部 117に入力し、 HS— PDSCHの受信信号をデータ出力端 子 120を介して図示しないベースバンド部に入力する。
[0032] CQI生成部 115は、受信部 114から入力されてくる CPICHの受信信号に基づいて 測定参照区間毎にその SNRを公知の手段によって算出し、算出された SNRに基づ いて CQIビットを生成する。生成された CQIは、測定参照区間毎に順次送信部 116 に入力される。
[0033] 送信部 116は、バンドパスフィルタ、変調器及びレジスタ等を具備し、 CQI生成部 1 15から入力されてくる CQIを内蔵するレジスタに一時保持し、 CQI送信タイミング生 成部 118から提供されるタイミングに従ってこのレジスタに保持された CQIを HS— DP CCHの CQIフィールドに格納し、その後この HS— DPCCHの送信信号に変調処理 を施して TxRF部 119に入力する。送信部 116は、このように CQI送信タイミング生成 部 118からタイミングが提供されたときには、そのタイミングに従って内蔵するレジスタ に保持された CQIを HS— DPCCHの CQIフィールドに格納し変調した後に TxRF部 119に入力する。一方で、送信部 116は、 HS— DPCCHの想定区間が到来しても C QI送信タイミング生成部 118からタイミングが提供されないときには、その CQIフィー ルドに DTXを格納して変調した後に TxRF部 119に入力する。また、送信部 116は、 CQI生成部 115から入力されてくる CQIを次に到来する想定区間で HS— DPCCH の CQIフィールドに格納したときには、その格納と同時に CQIを破棄して保持しない ようにし、またその CQIフィールドに格納しないときでも、その CQIを以後使用すること はないため、 CQI生成部 115から次の CQIが入力されてくる際にレジスタを上書きす ること〖こよって破棄する。
[0034] パラメータ抽出部 117は、受信部 114から入力されてくる HS— SCCHの受信信号 からコンプレストモードの態様を把握するためや CQIを送信するタイミングを生成する ために必要なチヤネライゼーシヨンコード、多重数及び変調方式等の情報を示す制 御パラメータを抽出し、抽出された制御パラメータを CQI送信タイミング生成部 118に 入力する。
[0035] CQI送信タイミング生成部 118は、パラメータ抽出部 117から入力されてくる制御パ ラメータに基づいてコンプレストモードにおける DL送信ギャップ区間及び UL送信ギ ヤップ区間の始めと終わりの時刻やフィードバックサイクル kの値等の情報を取得する 。また、 CQI送信タイミング生成部 118は、 DL送信ギャップ区間が終わった後に始ま る測定参照区間の受信信号に基づいて生成された CQIを DL送信ギャップ区間及び UL送信ギャップ区間が終わった後に最初に送信するタイミングを生成して、このタイ ミングを送信部 116に提供する。
[0036] TxRF部 119は、バンドパスフィルタ、低雑音増幅器及び周波数変 等を具備し 、送信部 116から入力されてくる HS— DPCCHの送信信号に周波数変換 '増幅等の 所定の信号処理を施した後に、アンテナ共用器 112に入力する。
[0037] また、図 9に、本実施の形態に係る CQI送信装置 100における CQI送信タイミング 生成部 118の構成を示す。 CQI送信タイミング生成部 118は、予定区間導出部 211 、 DL状態判定部 212、 UL状態判定部 213及び CQI送信タイミング決定部 214を具 備する。
[0038] 予定区間導出部 211は、パラメータ抽出部 117から入力されてくる制御パラメータ に基づいて通信中の ULについてのフィードバックサイクル kの値を識別し、このフィ ードバックサイクル kの値に応じた周期で DL状態判定部 212及び UL状態判定部 21 3に予定区間の到来を通知する信号を入力する。
[0039] DL状態判定部 212は、予定区間導出部 211から予定区間の通知信号を入力され たときに、以下の動作を行う。 DL状態判定部 212は、パラメータ抽出部 117から入力 されてくる制御パラメータに基づいて DL送信ギャップ区間を算出し、算出された DL 送信ギャップ区間の情報と、予定区間導出部 211からの予定区間の通知信号と、を 対比することによって、その予定区間に対応する測定参照区間が DL送信ギャップ区 間と重畳しないか判定する。即ち、 DL状態判定部 212は、この対比動作とほぼ同時 刻に CQI生成部 115で生成されて送信部 116に保持される CQIが DL送信ギャップ 区間と重畳しない測定参照区間の受信信号に基づいて生成された CQIである力否 かを判定する。 DL状態判定部 212は、この判定結果が肯定的即ち送信部 116に保 持されている CQIが DL送信ギャップ区間と重畳しない測定参照区間の受信信号に 基づ 、て生成された CQIであると判定したときには、判定結果が肯定的である旨を通 知する信号を CQI送信タイミング決定部 214に入力する。一方で、 DL状態判定部 2 12は、この判定結果が否定的即ち送信部 116に保持されている CQIが DL送信ギヤ ップ区間と重畳する測定参照区間の受信信号に基づいて生成された CQIであると判 定したときには、 CQI送信タイミング決定部 214に対して判定結果が否定的である旨 を通知し、その後 DL送信ギャップ区間と重畳しない測定参照区間の受信信号に基 づいて生成された CQIであると判断されるまで、同様の動作を行う。即ち、 DL状態判 定部 212は、一度否定的な判定を行うと、その次の予定区間(フィードバックサイクル kが 2以上の場合は、想定区間)に対応する測定参照区間が DL送信ギャップ区間と 重畳していないか判定し、肯定的な判定結果が得られるまで判定を繰り返す。そして 、 DL状態判定部 212は、その肯定的な判定結果が得られた測定参照区間に対応 する予定区間又は想定区間で、判定結果が肯定的である旨を通知する信号を CQI 送信タイミング決定部 214に入力する。また、 DL状態判定部 212は、通常は予定区 間導出部 211から予定区間の通知信号を入力されるまで上記一連の動作を行わな いが、 CQI送信タイミング決定部 214から判定要請信号を入力されたときには、次に 到来する測定参照区間が DL送信ギャップ区間と重畳しないか判定する。なお、 CQI 送信タイミング決定部 214から入力されてくる判定要請信号については後述する。
UL状態判定部 213は、予定区間導出部 211から予定区間の通知信号を入力され たときに、以下の動作を行う。 UL状態判定部 213は、パラメータ抽出部 117から入力 されてくる制御パラメータに基づいて UL送信ギャップ区間を算出し、算出された UL 送信ギャップ区間と次に到来する予定区間とが重畳しないか判定する。 UL状態判 定部 213は、この判定結果が肯定的即ち UL送信ギャップ区間と次に到来する予定 区間とが重畳しないと判定したときには、判定結果が肯定的である旨を通知する信号 を CQI送信タイミング決定部 214に入力する。一方で、 UL状態判定部 213は、この 判定結果が否定的即ち UL送信ギャップ区間と次に到来する予定区間とが重畳する と判定したときには、 CQI送信タイミング決定部 214に対して判定結果が否定的であ る旨を通知し、 UL送信ギャップと重畳しない予定区間と判断されるまで、同様の動作 を行う。即ち、 UL状態判定部 213では、一度否定的な判定を行うと、その次の予定 区間(フィードバックサイクル kが 2以上の場合は、想定区間)が UL送信ギャップ区間 と重畳してないか判定し、肯定的な判定結果が得られるまで判定を繰り返す。そして 、 UL状態判定部 213は、その肯定的な判定結果が得られた予定区間又は想定区 間で、判定結果が肯定的である旨を通知する信号を CQI送信タイミング決定部 214 に入力する。また、 UL状態判定部 213は、通常は予定区間導出部 211から予定区 間の通知信号を入力されるまで上記一連の動作を行わな 、が、 CQI送信タイミング 決定部 214から判定要請信号を入力されたときには、次に到来する想定区間が UL 送信ギャップ区間と重畳しないか判定する。なお、 CQI送信タイミング決定部 214か ら入力されてくる判定要請信号については後述する。
CQI送信タイミング決定部 214は、 DL状態判定部 212による判定及び UL状態判 定部 213による判定の結果が共に肯定的であるとき即ち DL状態判定部 212及び U L状態判定部 213から共に肯定的である旨を通知する信号が入力されてきたときに 限り、送信部 116に保持されて ヽる CQIを送信するタイミングを生成する決定を行うと 伴に、その生成されたタイミングを送信部 116に提供する。また、 CQI送信タイミング 決定部 214は、 DL状態判定部 212又は UL状態判定部 213から判定結果が否定的 である旨を通知する信号が入力されてきたときには、 DL状態判定部 212に対して次 の測定参照区間が DL送信ギャップ区間と重畳する力判定してその判定結果を入力 するように、同様に UL状態判定部 213に対して次の想定区間が UL送信ギャップ区 間と重畳するか判定してその判定結果を入力するように要請する判定要請信号を、 DL状態判定部 212及び UL状態判定部 213に同時に入力する。この判定要請信号 は、フィードバックサイクル kが 2以上であるときに、ェクストラ CQIが送信されるまで D L状態判定部 212及び UL状態判定部 213に繰り返し入力される。
[0042] 次 、で、本実施の形態に係る CQI送信装置の動作にっ ヽて、本実施の形態に係 るコンプレストモードでの CQI送信方法の実施態様と共に詳細に説明する。図 10に 、本実施の形態に係る CQI送信方法の概要を図 6に準じて示す。なお、本実施の形 態では、コンプレストモードによってフィードバックサイクル k= 1と規定されているもの とする。
[0043] 図 10に示す本実施の形態に係る CQI送信方法では、測定参照区間 Reference Periods_Cの一部が DL送信ギャップ区間と重畳して 、るため、測定参照区間
Reference Periods_Cの受信信号に基づ!/、て生成された CQIを ULの HS—DPCCH における CQIフィールド CQI_Cに格納して基地局に送信することができない。図 6に 示す従来のコンプレストモードでの CQI送信方法であれば、 DL送信ギャップ区間が 始まる直前に終わった測定参照区間 Reference Periods_Bの受信信号に基づ!/、て生 成された CQIを ULの HS—DPCCHにおける CQIフィールド CQI_Cに格納して基地 局に送信するところである力 本実施の形態に係る CQI送信装置 100では、 CQI生 成部 115によって測定参照区間 Reference Periods_Bの受信信号に基づいて生成さ れた CQIは DLギャップ区間が始まった後に送信部 116によって自動的に破棄され るため、この CQIを CQIフィールド CQLCに格納して基地局に送信することはできな い。そこで、本実施の形態に係る CQI送信方法では、図 6における CQIフィールド CQLCに相当する想定区間の CQIフィールドに送信部 116によって DTXを格納して 基地局に送信する。従って、本実施の形態に係る CQI送信方法では、 DL送信ギヤッ プ区間が終わった後に最初に送信される CQIは、測定参照区間 Reference
Periods_Dの受信信号に基づいて生成された CQIとなる。
[0044] このように本実施の形態に係る CQI送信方法では、 DL送信ギャップ区間が始まつ て力 CQIフィールド CQLDが到来するまで移動局力 基地局に CQIが送信されな いことになるが、図 6に示す従来の CQI送信方法において、 CQIフィールド CQLCで 送信されていた CQIは実質的に利用価値の低いものであったことから、本実施の形 態に係る CQI送信方法が従来の CQI送信方法と比較して移動局の受信性能を目立 つて低下させることはない。 [0045] 続いて、本実施の形態に係るコンプレストモードでの CQI送信方法について、 CQI 送信タイミング生成部 118に具備される各構成部の動作を具体的に説明する。 DL状 態判定部 212及び UL状態判定部 213はどちらも、パラメータ抽出部 117から入力さ れてくる制御パラメータに基づいて図 10に示す態様で DL送信ギャップ区間及び UL 送信ギャップ区間が始まりまた終わることを予め把握している。また、 DL状態判定部 212は、 DL送信ギャップ区間と一部でも重畳する DLの CPICHのサブフレームを計 算によって予め特定している。同様に、 UL状態判定部 213も、 UL送信ギャップと一 部でも重畳する ULの HS— DPCCHのサブフレーム又は予定区間を計算によって予 め特定している。
[0046] 図 10に示す測定参照区間 Reference Periods_A内の任意の時刻において、予定区 間導出部 211は、 ULの HS— DPCCHにおける CQIフィールド CQI_Aが予定区間に 該当する力判定し、 CQIフィールド CQI_Aが予定区間に該当するときには、次に到来 する CQIフィールド CQLAが予定区間に該当する旨の信号を DL状態判定部 212及 び UL状態判定部 213に入力する。なお、本実施の形態では、フィードバックサイク ル = 1であるから、 CQIフィールド CQLA以後に到来する全ての CQIフィールドが予 定区間に該当することになる。
[0047] また、図 10に示す測定参照区間 Reference Periods_A内の任意の時刻において、 U L状態判定部 213は、予定区間導出部 211から次に到来する CQIフィールド CQLA が予定区間に該当する旨の信号を入力されたときに、次に到来する CQIフィールド CQLAがその一部でも UL送信ギャップ区間と重畳しな 、か判定し、その判定結果が 肯定的であるとき即ち UL送信ギャップ区間と次に到来する CQIフィールド CQI_Aとが 重畳しないと判定されたときに、判定結果が肯定的である旨を通知する信号を CQI 送信タイミング決定部 214に入力する。このように、予定区間導出部 211及び UL状 態判定部 213は、任意の測定参照区間内において、この測定参照区間の次のサブ フレームにおける CQIフィールドで CQIを送信できるか判定することになる。
[0048] 一方で、図 10に示す測定参照区間 Reference Periods_A内の任意の時刻において 、 DL状態判定部 212は、測定参照区間 Reference Periods— Aが DL送信ギャップ区間 と一部でも重畳しないか判定し、この判定結果が肯定的であるとき即ち測定参照区 間 Reference Periods_Aが DL送信ギャップ区間と重畳しな!、と判定されたときに、判 定結果が肯定的である旨を通知する信号を CQI送信タイミング決定部 214に入力す る。このように、 DL状態判定部 212は、ある測定参照区間内の任意の時刻において 、この測定参照区間の受信信号に基づいて生成された CQIが伝搬路状況を正確に 反映したものであるかを判定することになる。
[0049] 図 10に示す測定参照区間 Reference Periods_Aについて、 UL状態判定部 213は、 CQIフィールド CQI_Aが UL送信ギャップ区間と重畳して!/、な!/、ことから、 CQIフィー ルド CQI_Aで CQIを送信することが可能であると判定し、その肯定的な判定結果を C QI送信タイミング決定部 214に入力する。また、図 10に示す測定参照区間
Reference Periods— Aについて、 DL状態判定部 212は、測定参照区間 Reference Periods_Aが DL送信ギャップ区間と重畳して!/、な!/、こと力ら、測定参照区間 Reference PeriodS_Aの受信信号に基づいて生成された CQIが伝搬路状況を十分に反映した 使用可能なものであると判定し、その肯定的な判定結果を CQI送信タイミング決定部 214に入力する。従って、図 10に示す測定参照区間 Reference Periods_Aについて、 CQI送信タイミング決定部 214は、 DL状態判定部 212及び UL状態判定部 213から 共に肯定的な判定結果を入力されることになるため、送信部 116に保持されている 測定参照区間 Reference Periods_Aの受信信号に基づ ヽて生成された CQIを送信す るタイミングを生成する決定を行うと伴に、その生成されたタイミングを送信部 116〖こ 提供する。そして、送信部 116は、 CQI送信タイミング決定部 214から提供されるタイ ミングに従って、保持する CQIを ULの CQIフィールド CQLAに格納して基地局に対 して送信すること〖こなる。
[0050] 続いて、図 10に示す測定参照区間 Reference Periods_Bについて、 UL状態判定部 213は、 CQIフィールド CQI_Bが UL送信ギャップ区間と重畳することから(CQIフィー ルド CQI_Bは図示されていない)、 CQIフィールド CQLBで CQIを送信することはでき ないと判定する。そのため、この測定参照区間 Reference Periods_Bについて、 UL状 態判定部 213は、 CQI送信タイミング決定部 214に判定結果が否定的ある旨の信号 を入力する。従って、図 10に示す測定参照区間 Reference Periods_Bについて、 CQI 送信タイミング決定部 214は、 UL状態判定部 213から判定結果が肯定的である旨 の信号が入力されな!、ため、送信部 116に保持されて ヽる測定参照区間 Reference Periods_Bの受信信号に基づいて生成された CQIを送信するタイミングを生成する決 定を行うことができない。そのため、送信部 116は、図 10に示す測定参照区間 Reference Periods_Bについて、 CQI送信タイミング決定部 214からタイミングが提供さ れな 、ことから、 ULの HS— DPCCHの CQIフィールド CQLBに DTXを格納して基地 局に送信することになる。
[0051] 続いて、図 10に示す測定参照区間 Reference Periods_Cについて、 DL状態判定部 212は、測定参照区間 Reference Periods_Cの一部が DL送信ギャップ区間と重畳し ていることから、測定参照区間 Reference Periods_Cの受信信号に基づいて生成され た CQIは使用できないものであると判定する。そのため、この測定参照区間
Reference Periods_Cについて、 DL状態判定部 212は、 CQI送信タイミング決定部 2 14に判定結果が否定的である旨の信号を入力する。従って、図 10に示す測定参照 区間 Reference Periods_Cについて、 CQI送信タイミング決定部 214は、 DL状態判定 部 212から肯定的な判定結果に基づく信号が入力されないため、送信部 116に保持 されて!/、る測定参照区間 Reference Periods_Cの受信信号に基づ!/、て生成された CQ Iを送信するタイミングを生成する決定を行うことができない。そのため、送信部 116は 、図 10に示す測定参照区間 Reference Periods_Cについて CQI送信タイミング決定 部 214からタイミングが提供されないことから、 CQIフィールド CQLC (図 6を参照)に DTXを格納して基地局に送信することになる。
[0052] 続いて、図 10に示す測定参照区間 Reference Periods_Dについて、 UL状態判定部 213は、 CQIフィールド CQI_Dが UL送信ギャップ区間と重畳していないことから、 CQ Iフィールド CQLDで CQIを送信することが可能であると判定し、その肯定的な判定結 果を CQI送信タイミング決定部 214に入力する。また、図 10に示す測定参照区間 Reference Periods_Dについて、 DL状態判定部 212は、測定参照区間 Reference Periods_Dが DL送信ギャップ区間と重畳して!/ヽな 、ことから、測定参照区間 Reference Periods_Dの受信信号に基づいて生成された CQIが使用可能なものであると判定し 、その肯定的な判定結果を CQI送信タイミング決定部 214に入力する。従って、図 1 0に示す測定参照区間 Reference Periods_Dについて、 CQI送信タイミング決定部 21 4は、 DL状態判定部 212及び UL状態判定部 213から共に肯定的な判定結果を入 力されることになるため、送信部 116に保持されている測定参照区間 Reference Periods_Dの受信信号に基づいて生成された CQIを送信するタイミングを生成する決 定を行うと伴に、その生成されたタイミングを送信部 116に提供する。そして、送信部 116は、 CQI送信タイミング決定部 214から提供されるタイミングに従って、 CQIフィ 一ルド CQI_Dで送信部 116に保持されている CQIを基地局に対して送信することに なる。
[0053] このように、本実施の形態に係る CQI送信装置 100によれば、コンプレストモードの 規定に応じて CQIを送信するタイミングが必要なときに限り、そのタイミングが CQI送 信タイミング生成部 118によって生成され、また DL送信ギャップ区間が始まったとき には、その開始時力も遡ってまで CQI生成部 115が測定参照区間 Reference Periods_Bの受信信号に基づく CQIを生成する必要がなくなり、かつ、送信部 116が その開始時までの測定参照区間の受信信号に基づいて生成された CQIをその開始 時以後保持しておく必要がなくなるため、 CQI生成部 115は遡及的な CQIの生成に 備えて複数の測定参照区間の受信信号を保持しておく必要がなくなり、また送信部 1 16は CQI生成部 115から測定参照区間毎に入力されてくる CQIを次の CQIが入力 されてくるまでに送信しない場合には単に破棄するだけでよくなることから、 CQI生成 部 115が複数の測定参照区間の受信信号を保持し続けるため又は送信部 116が複 数の CQIを保持し続けるためのレジスタ等を具備する必要がなくなり、それら構成部 を簡素化できると伴に、それら構成部を容易に動作制御することができるようになる。
[0054] また、本実施の形態に係るコンプレストモードでの CQI送信方法によれば、 DL送信 ギャップ区間が始まる直前で終了する測定参照区間 Reference Periods_Bの受信信 号に基づ 、て生成された CQIが、この DL送信ギャップ区間と UL送信ギャップ区間と が終了した後の予定区間 CQLCで送信されることを回避できるため、測定参照区間 Reference Periods_Bの受信信号に基づ!/ヽて生成された CQIを DL送信ギャップ区間 が始まった後は保持しておく必要がなくなることから、測定参照区間毎に順次生成さ れる CQIを容易に管理できるようになる。力!]えて、本実施の形態に係るコンプレストモ ードでの CQI送信方法によれば、測定参照区間 Reference Periods_Bの受信信号に 基づいて生成された CQIを DL送信ギャップ区間が始まったときに破棄してしまっても 、その後遡及的に測定参照区間 Reference Periods_Bの受信信号に基づいて CQIを 再度生成することはないため、測定参照区間毎に順次生成される CQIの管理がより 一層容易になる。
[0055] さらに、本実施の形態に係るコンプレストモードでの CQI送信方法によれば、 DL送 信ギャップ区間が終わった後に始まる測定参照区間 Reference Periods_Dの受信信 号に基づ 、て生成された CQIが、 DL送信ギャップ区間と UL送信ギャップ区間とが 終わった時から 1サブフレーム分だけ遅れて予定区間である CQIフィールド CQLDで 移動局から基地局に送信されるため、移動局の受信性能を従来の CQI送信方法と ほぼ同等に保つことができる。
[0056] (実施の形態 2)
図 11に、本発明の実施の形態 2に係るコンプレストモードでの CQI送信方法の概 要を図 7に準じて示す。本実施の形態に係る CQI送信方法は、フィードバックサイク ル k= 1がフィードバックサイクル k = 4に変更された点と、 ULの HS—DPCCHにおい て UL送信ギャップ区間が終わった後に 2サブフレーム分の UL送信ギャップ区間が 新たに付加された点と、で実施の形態 1に係るコンプレストモードでの CQI送信方法 と相違する。また、本実施の形態に係る CQI送信装置は、実施の形態 1で使用され た CQI送信装置 100と同一の構成力もなる。従って、本実施の形態では、重複説明 を避けるため、実施の形態 1と相違する点についてのみ以下で具体的に説明する。
[0057] 本実施の形態では、フォードバックサイクル k = 4であることから、 ULの HS— DPCC Hにおける想定区間の 4回に 1度の頻度で予定区間が出現することになる。図 11で は、実施の形態 1における CQI送信方法と対比し易くするため、 UL送信ギャップ区 間が終わった直後の想定区間が予定区間となるように、この想定区間を CQIフィー ルド CQI_Eとし、またこれに対応する測定参照区間を Reference Periods_Eとする。従つ て、図 11に示す CQIフィールド CQI_E及び測定参照区間 Reference Periods_Eまでの CQI送信装置 100の動作は、図 10に示す CQIフィールド CQLC及び測定参照区間 Reference Periods_Cまでの CQI送信装置 100の動作と実質的に同一である。
[0058] そこで、本実施の形態では、図 11に示す測定参照区間 Reference Periods_F以後に おけるコンプレストモードでの CQI送信方法及び CQI送信装置 100の各構成部の動 作について具体的に説明する。
[0059] 図 11に示すように、予定区間 CQI_Eに対応する測定参照区間 Refernce Period_Eが DL送信ギャップ区間と一部重畳しているために、 DL状態判定部 212は、測定参照 区間 Refernce Period_Eにつ!/、ての判定結果が否定的である旨の信号を CQI送信タ イミング決定部 214に入力する。従って、測定参照区間 Refernce Period_F以後でエタ ストラ CQIが送信されるまでは、 CQI送信タイミング決定部 214から DL状態判定部 2 12及び UL状態判定部 213に判定要請信号が入力されることになる。
[0060] DL状態判定部 212は、 CQI送信タイミング決定部 214から入力されてくる判定要 請信号に応じて、測定参照区間 Reference Periods_Fから測定参照区間 Reference PeriodsJ" [までにつ 、て、判定結果が肯定的である旨の信号を CQI送信タイミング決 定部 214に逐次入力する。
[0061] 一方で、 UL状態判定部 213は、測定参照区間 Refernce Period— Eにつ!/、ての CQI 送信タイミング決定部 214から入力されてくる判定要請信号に応じて、先ず測定参照 区間 Refernce Period_Fに対応する想定区間の CQIフィールド CQLFが UL送信ギヤッ プ区間と重畳しないか判定する。図 11より明らかなように、 CQIフィールド CQI_Fは U L送信ギャップ区間と重畳するため、 UL状態判定部 213は、その判定結果が否定的 である旨を通知する信号を CQI送信タイミング決定部 214に入力する。そして、この 信号を入力された CQI送信タイミング決定部 214は、次の CQIフィールド CQI_Gが U L送信ギャップ区間と重畳しな ヽか判定するように UL状態判定部 213に判定要請信 号を入力し、同時に CQIフィールド CQLGに対応する測定参照区間 Refernce PeriocLGが DL送信ギャップ区間と重畳しな 、か判定するように DL状態判定部 212 に判定要請信号を入力する。この判定要請信号を入力された UL状態判定部 213は 、想定区間の CQIフィールド CQI—Gについても上記同様の判定を行い、図 11より明ら かなように、 CQIフィールド CQI_Gにつ 、ても判定結果が否定的である旨を通知する 信号を CQI送信タイミング決定部 214に入力することになる。そして、再度この信号を 入力された CQI送信タイミング決定部 214は、次の CQIフィールド CQI_Hが UL送信 ギャップ区間と重畳しな!、か判定するように UL状態判定部 213に判定要請信号を 入力し、同時に CQIフィールド CQLHに対応する測定参照区間 Refernce Period_Hが DL送信ギャップ区間と重畳しな ヽか判定するように DL状態判定部 212に判定要請 信号を入力する。この判定要請信号を入力された UL状態判定部 213は、想定区間 の CQIフィールド CQLHにつ!/、ても上記同様の判定を行 、、図 11より明らかなように 、 CQIフィールド CQLHにつ 、て判定結果が肯定的である旨を通知する信号を CQI 送信タイミング決定部 214に入力することになる。また、このとき CQI送信タイミング決 定部 214には、 DL状態判定部 212からも測定参照区間 Refernce Period_Hについて は判定結果が肯定的である旨を通知する信号が入力されてくる。従って、 CQI送信 タイミング決定部 214は、想定区間である CQIフィールド CQLHにおいてェクストラ C QIを送信する決定を行い、その決定を通知するタイミングを生成して、生成されたタ イミングを送信部 116に提供する。
[0062] 送信部 116は、想定区間である CQIフィールド CQI_F及び CQIフィールド CQLGに ついては、 CQI送信タイミング生成部 118からタイミングが提供されないため、これら の CQIフィールドに DTXを格納して送信し、 CQIフィールド CQLHにお!/、て CQIを送 信すること〖こなる。
[0063] このように、本実施の形態に係るコンプレストモードでの CQI送信方法及び CQI送 信装置 100によれば、フィードバックサイクル kの値が 2以上で、かつ、 DL送信ギヤッ プ区間及び UL送信ギャップ区間が終わった後に新たに UL送信ギャップ区間が付 カロされた場合でも、予定区間の CQIフィールド CQIJが到来する前の想定区間である CQIフィールド CQI_Hにお 、て、伝搬路状況を十分に反映した CQIが移動局から基 地局に送信されるため、コンプレストモードにおける DL送信ギャップ区間や UL送信 ギャップ区間の出現によって生じる移動局の受信性能の低下を逸早く回復すること ができる。
[0064] なお、実施の形態 1及び実施の形態 2では、 W— CDMA方式における HSDPA方 式でパケット通信が行われる場合について説明したが、本発明はこの場合に限定さ れるものではなぐ ULで下り伝搬路品質情報のフィードバックがあり、かつ、コンプレ スモードが存在する方式であれば、全ての通信システムに適用可能である。
[0065] 本発明 ίま、 2003年 9月 30曰出願の特願 2003— 341719に基づく。この内容を全 てここに含めておく。
産業上の利用可能性
本発明にかかるコンプレストモードでの下り伝搬路品質情報送信方法及び下り伝搬 路品質情報送信装置は、移動局が従来の下り伝搬路品質情報送信方法とほぼ同等 の受信性能を確保でき、かつ、 ULで送信される下り伝搬路品質情報を生成するため に必要な受信信号の測定等に関する移動局の構成部の動作制御等を容易に行うこ とができるという効果を有し、下り伝搬路品質情報送信装置を必要とする移動局等に 有用である。

Claims

請求の範囲
[1] 無線信号を受信する受信ステップと、
受信信号に基づいて測定参照区間毎に下り伝搬路品質情報を生成する下り伝搬 路品質情報生成ステップと、
前記受信信号力 制御パラメータを抽出する抽出ステップと、
抽出された前記制御パラメータに基づいてダウンリンクの送信ギャップ区間及びァ ップリンクの送信ギャップ区間を算出し、算出された前記ダウンリンクの送信ギャップ 区間と重畳しない前記測定参照区間の前記受信信号に基づいて生成された前記下 り伝搬路品質情報の送信が想定される想定区間と、前記アップリンクの送信ギャップ 区間と重畳しない前記想定区間と、が前記ダウンリンクの送信ギャップ区間及び前記 アップリンクの送信ギャップ区間が共に終わった後で最初に一致するときに、前記下 り伝搬路品質情報を送信するタイミングを生成するタイミング生成ステップと、 前記ダウンリンクの送信ギャップ区間と重畳せず、かつ、前記ダウンリンクの送信ギ ヤップ区間が終わった後の前記測定参照区間の前記受信信号に基づいて生成され た前記下り伝搬路品質情報を、前記タイミング生成ステップにお!、て生成された前記 タイミングで送信する送信ステップと、を具備するコンプレストモードでの下り伝搬路 品質情報送信方法。
[2] 前記タイミング生成ステップでは、抽出された前記制御パラメータに基づいて前記 ダウンリンクの送信ギャップ区間及び前記アップリンクの送信ギャップ区間を算出し、 算出された前記ダウンリンクの送信ギャップ区間と重畳しない前記測定参照区間を川頁 次特定し、順次特定された前記測定参照区間の前記受信信号に基づいて生成され る前記下り伝搬路品質情報の送信が想定される想定区間と、前記アップリンクの送 信ギャップ区間と重畳しない想定区間と、が最初に一致するときに、前記タイミングを 生成する、請求項 1記載のコンプレストモードでの下り伝搬路品質情報送信方法。
[3] 前記受信ステップで受信される無線信号が非連続的に送信されたパケットデータ 信号である、請求項 1記載のコンプレスモードでの下り伝搬路品質情報送信方法。
[4] コンプレストモードの無線信号を受信する受信手段と、
前記受信手段による受信信号に基づいて測定参照区間毎に下り伝搬路品質情報 を生成する下り伝搬路品質情報生成手段と、
前記受信信号から制御パラメータを抽出する抽出手段と、
抽出された前記制御パラメータに基づいてダウンリンクの送信ギャップ区間及びァ ップリンクの送信ギャップ区間を算出し、算出された前記ダウンリンクの送信ギャップ 区間と重畳しない前記測定参照区間の前記受信信号に基づいて生成された前記下 り伝搬路品質情報の送信が想定される想定区間と、前記アップリンクの送信ギャップ 区間と重畳しない前記想定区間と、が前記ダウンリンクの送信ギャップ区間及び前記 アップリンクの送信ギャップ区間が共に終わった後で最初に一致するときに、前記下 り伝搬路品質情報を送信するタイミングを生成するタイミング生成手段と、
前記ダウンリンクの送信ギャップ区間と重畳せず、かつ、前記ダウンリンクの送信ギ ヤップ区間が終わった後の前記測定参照区間の前記受信信号に基づいて生成され た前記下り伝搬路品質情報を、前記タイミング生成手段によって生成された前記タイ ミングで送信する送信手段と、を具備する下り伝搬路品質情報送信装置。
[5] 前記タイミング生成手段は、抽出された前記制御パラメータに基づいて前記アップ リンクの送信ギャップ区間の終始を監視して、前記下り伝搬路品質情報の送信が想 定される想定区間で前記下り伝搬路品質情報を前記アップリンクに送信可能か判定 するアップリンク状態判定手段と、
抽出された前記制御パラメータに基づいて前記ダウンリンクの送信ギャップ区間の 終始を監視して、前記下り伝搬路品質情報の送信が想定される想定区間に対応す る前記測定参照区間が前記ダウンリンクの送信ギャップ区間と重畳しないか判定する ダウンリンク状態判定手段と、
前記アップリンク状態判定手段による判定及び前記ダウンリンク状態判定手段によ る判定の結果が共に肯定的であるときに、前記下り伝搬路品質情報を送信する前記 タイミングを生成する決定を行う決定手段と、を具備する請求項 4記載の下り伝搬路 品質情報送信装置。
[6] 前記タイミング生成手段は、抽出された前記制御パラメータに基づいて前記コンプ レストモードで前記下り伝搬路品質情報の送信が予定される予定区間を導出する予 定区間導出手段と、 抽出された前記制御パラメータに基づいて前記アップリンクの送信ギャップ区間の 終始を監視しつつ、前記アップリンクの送信ギャップ区間と前記予定区間又は前記 想定区間とが重畳しないか判定するアップリンク状態判定手段と、
抽出された前記制御パラメータに基づいて前記ダウンリンクの送信ギャップ区間の 終始を監視しつつ、前記ダウンリンクの送信ギャップ区間と前記測定参照区間とが重 畳しな!、か判定するダウンリンク状態判定手段と、
前記アップリンク状態判定手段による判定及び前記ダウンリンク状態判定手段によ る判定の結果が共に肯定的であるときに、前記下り伝搬路品質情報を送信する前記 タイミングを生成する決定を行う決定手段と、を具備する請求項 4記載の下り伝搬路 品質情報送信装置。
PCT/JP2004/014059 2003-09-30 2004-09-27 コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置 WO2005034555A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP04788155A EP1670272A1 (en) 2003-09-30 2004-09-27 Method and apparatus for transmitting downstream propagation path quality information in compressed mode
JP2005514415A JPWO2005034555A1 (ja) 2003-09-30 2004-09-27 コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置
US10/541,066 US7496048B2 (en) 2003-09-30 2004-09-27 Method and apparatus for transmitting downstream propagation path quality information in compressed mode

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003341719 2003-09-30
JP2003-341719 2003-09-30

Publications (1)

Publication Number Publication Date
WO2005034555A1 true WO2005034555A1 (ja) 2005-04-14

Family

ID=34419216

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2004/014059 WO2005034555A1 (ja) 2003-09-30 2004-09-27 コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置

Country Status (5)

Country Link
US (1) US7496048B2 (ja)
EP (1) EP1670272A1 (ja)
JP (1) JPWO2005034555A1 (ja)
CN (1) CN100474961C (ja)
WO (1) WO2005034555A1 (ja)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007024560A1 (en) * 2005-08-25 2007-03-01 Lucent Technologies Inc. Method for reducing discarded slots and frames in a wireless communications system
WO2007111185A1 (ja) * 2006-03-20 2007-10-04 Ntt Docomo, Inc. 移動局、基地局及び方法
JP2008141313A (ja) * 2006-11-30 2008-06-19 Fujitsu Ltd 干渉電力推定装置及び干渉電力推定方法
WO2008149534A1 (ja) * 2007-05-31 2008-12-11 Panasonic Corporation ギャップ支援測定方法
JP2010505369A (ja) * 2006-09-27 2010-02-18 クゥアルコム・インコーポレイテッド 無線通信システムにおける動的チャネル品質報告
JP2010508727A (ja) * 2006-10-26 2010-03-18 クゥアルコム・インコーポレイテッド 不連続な送信及び/または受信を伴う圧縮モード(compressedmode)動作及び電力制御
JP2011501546A (ja) * 2007-10-22 2011-01-06 テレフオンアクチーボラゲット エル エム エリクソン(パブル) 適応受信機方法及び装置
JP5437243B2 (ja) * 2008-06-24 2014-03-12 株式会社Nttドコモ 基地局装置及び通信制御方法
US9219571B2 (en) 2010-04-13 2015-12-22 Qualcomm Incorporated Aperiodic CQI reporting in a wireless communication network

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4929590B2 (ja) * 2004-12-17 2012-05-09 富士通株式会社 移動局および移動局の通信方法
JP4756314B2 (ja) * 2005-01-05 2011-08-24 日本電気株式会社 通信制御方法、無線通信システム、移動局、基地局並びに基地局制御装置。
US7813312B2 (en) * 2005-05-06 2010-10-12 Interdigital Technology Corporation Method and system for preventing high speed downlink packet access transmissions loss
EP2020823B1 (en) * 2006-05-23 2017-04-19 Sharp Kabushiki Kaisha Mobile communication method, mobile station device, base station device, and mobile communication system
KR100934664B1 (ko) 2007-02-02 2009-12-31 엘지전자 주식회사 이동 통신 시스템에서 제어 채널 송신 방법
US7961672B2 (en) * 2007-02-23 2011-06-14 Texas Instruments Incorporated CQI feedback for OFDMA systems
JP4869997B2 (ja) * 2007-03-20 2012-02-08 株式会社エヌ・ティ・ティ・ドコモ チャネル品質情報報告方法、基地局及びユーザ端末
JP5164976B2 (ja) * 2007-05-01 2013-03-21 株式会社エヌ・ティ・ティ・ドコモ 受信周期制御方法、無線基地局及び移動局
PL2129181T3 (pl) 2007-06-08 2012-12-31 Sharp Kk System komunikacji ruchomej, urządzenie stacji bazowej oraz urządzenie stacji ruchomej
CN101873200A (zh) 2007-09-06 2010-10-27 夏普株式会社 通信设备和通信方法
US7949005B2 (en) * 2007-09-25 2011-05-24 Intel Corporation Device, system, and method of wireless communication of base stations
EP2242302A1 (en) * 2008-01-30 2010-10-20 Sharp Kabushiki Kaisha Relay device, communication system, and communication method
PL3002881T5 (pl) 2008-02-01 2022-10-03 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Układ i sposób synchronizacji taktowania dla łącza w górę w połączeniu z nieciągłym odbiorem
US8121045B2 (en) * 2008-03-21 2012-02-21 Research In Motion Limited Channel quality indicator transmission timing with discontinuous reception
CN101547513B (zh) * 2008-03-25 2011-09-14 华为技术有限公司 一种多频点系统中控制用户设备接入的方法及网络设备
US8199725B2 (en) 2008-03-28 2012-06-12 Research In Motion Limited Rank indicator transmission during discontinuous reception
US8179828B2 (en) 2008-03-28 2012-05-15 Research In Motion Limited Precoding matrix index feedback interaction with discontinuous reception
US8310963B2 (en) * 2008-06-24 2012-11-13 Adc Telecommunications, Inc. System and method for synchronized time-division duplex signal switching
US8385373B2 (en) * 2008-06-24 2013-02-26 Adc Telecommunications, Inc. Method and apparatus for frame detection in a communications system
US7961689B2 (en) * 2008-08-18 2011-06-14 Adc Telecommunications, Inc. Method and apparatus for determining an end of a subframe in a TDD system
KR20100097830A (ko) * 2009-02-27 2010-09-06 삼성전자주식회사 무선통신 시스템에서 채널품질지시 정보 검출 장치 및 방법
US8638682B2 (en) * 2009-10-01 2014-01-28 Qualcomm Incorporated Method and apparatus for conducting measurements when multiple carriers are supported
US8565143B2 (en) 2009-10-16 2013-10-22 At&T Mobility Ii, Llc Dynamic content distribution in mobile telecommunications network
CN102960027B (zh) * 2010-07-20 2015-12-16 中兴通讯股份有限公司 一种传输间隙样式序列的处理方法和系统
US8693342B2 (en) 2011-10-28 2014-04-08 Adc Telecommunications, Inc. Distributed antenna system using time division duplexing scheme
US10064210B2 (en) * 2015-02-12 2018-08-28 Qualcomm Incorporated Channel quality reporting for deterministic null scheduling

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003204298A (ja) * 2001-11-02 2003-07-18 Lucent Technol Inc 無線通信システムにおけるチャネル品質情報を送信する方法
JP2003264862A (ja) * 2002-03-11 2003-09-19 Matsushita Electric Ind Co Ltd 基地局装置、端末装置及び通信方法
JP2003318861A (ja) * 2002-04-24 2003-11-07 Nec Corp 移動通信システム、移動局、基地局及びそれらに用いる通信路品質推定方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100487245B1 (ko) * 2001-11-28 2005-05-03 삼성전자주식회사 고속 순방향 패킷 접속 방식을 사용하는 이동 통신시스템에서압축 모드에 따른 전송 불능 구간을 최소화하는장치 및 방법
KR100630128B1 (ko) * 2002-03-23 2006-09-27 삼성전자주식회사 고속 순방향 패킷 접속 방식을 사용하는 이동통신시스템에서 역방향 전력 제어를 위한 파일럿 신호필드 위치정보 결정장치 및 방법
CN100452677C (zh) 2002-04-03 2009-01-14 日本电气株式会社 移动通信系统、移动台、基站及它们所用的通信路径质量估算方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003204298A (ja) * 2001-11-02 2003-07-18 Lucent Technol Inc 無線通信システムにおけるチャネル品質情報を送信する方法
JP2003264862A (ja) * 2002-03-11 2003-09-19 Matsushita Electric Ind Co Ltd 基地局装置、端末装置及び通信方法
JP2003318861A (ja) * 2002-04-24 2003-11-07 Nec Corp 移動通信システム、移動局、基地局及びそれらに用いる通信路品質推定方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007024560A1 (en) * 2005-08-25 2007-03-01 Lucent Technologies Inc. Method for reducing discarded slots and frames in a wireless communications system
US7558229B2 (en) 2005-08-25 2009-07-07 Alcatel-Lucent Usa Inc. Method for reducing discarded slots and frames in a wireless communications system
US8189521B2 (en) 2006-03-20 2012-05-29 Ntt Docomo, Inc. Mobile station, base station, and method
WO2007111185A1 (ja) * 2006-03-20 2007-10-04 Ntt Docomo, Inc. 移動局、基地局及び方法
JP2007258845A (ja) * 2006-03-20 2007-10-04 Ntt Docomo Inc 移動局、基地局及び方法
CN101449500B (zh) * 2006-03-20 2013-07-31 株式会社Ntt都科摩 移动台、基站以及方法
US8068427B2 (en) 2006-09-27 2011-11-29 Qualcomm, Incorporated Dynamic channel quality reporting in a wireless communication system
JP2010505369A (ja) * 2006-09-27 2010-02-18 クゥアルコム・インコーポレイテッド 無線通信システムにおける動的チャネル品質報告
JP2010508727A (ja) * 2006-10-26 2010-03-18 クゥアルコム・インコーポレイテッド 不連続な送信及び/または受信を伴う圧縮モード(compressedmode)動作及び電力制御
US9888492B2 (en) 2006-10-26 2018-02-06 Qualcomm Incorporated Compressed mode operation and power control with discontinuous transmission and/or reception
JP2013157990A (ja) * 2006-10-26 2013-08-15 Qualcomm Inc 不連続な送信及び/または受信を伴う圧縮モード(compressedmode)動作及び電力制御
US8971181B2 (en) 2006-10-26 2015-03-03 Qualcomm Incorporated Compressed mode operation and power control with discontinuous transmission and/or reception
JP2008141313A (ja) * 2006-11-30 2008-06-19 Fujitsu Ltd 干渉電力推定装置及び干渉電力推定方法
WO2008149534A1 (ja) * 2007-05-31 2008-12-11 Panasonic Corporation ギャップ支援測定方法
US8165175B2 (en) 2007-05-31 2012-04-24 Panasonic Corporation Gap support measuring method
JP2011501546A (ja) * 2007-10-22 2011-01-06 テレフオンアクチーボラゲット エル エム エリクソン(パブル) 適応受信機方法及び装置
JP5437243B2 (ja) * 2008-06-24 2014-03-12 株式会社Nttドコモ 基地局装置及び通信制御方法
US9219571B2 (en) 2010-04-13 2015-12-22 Qualcomm Incorporated Aperiodic CQI reporting in a wireless communication network

Also Published As

Publication number Publication date
CN1860816A (zh) 2006-11-08
JPWO2005034555A1 (ja) 2007-11-22
US7496048B2 (en) 2009-02-24
US20060087980A1 (en) 2006-04-27
CN100474961C (zh) 2009-04-01
EP1670272A1 (en) 2006-06-14

Similar Documents

Publication Publication Date Title
WO2005034555A1 (ja) コンプレストモードでの下り伝搬路品質情報送信方法及び送信装置
EP1811690B1 (en) Radio communication system, mobile station, base station, radio communication system control method used for the same, and program of the same
US8014343B2 (en) Method for enhanced dedicated channel (E-DCH) transmission overlap detection for compressed mode gap slots
EP2819338B1 (en) Method and device for sending, receiving, and determining timing reference information
US7362741B2 (en) Method and apparatus for wireless communication network operating in compressed mode
WO2001078292A2 (en) Method and apparatus for declaring correctness of reception of transport channels
CN101809927B (zh) 电信系统中的方法和装置
CN101426224A (zh) 测量结果上报方法、系统及设备
CN101026400B (zh) 无线通信系统的功率控制装置
CN103312474A (zh) 定时参考信息发送、接收、确定方法、设备及系统
US20060293008A1 (en) Mobile station apparatus and channel quality indicator control method
EP2180604A1 (en) Methods and systems for selecting the number of mimo data streams
EP1944897A1 (en) Communication device, radio communication terminal, radio base station and communication method
EP1653637A1 (en) Mobile station apparatus and receiving method
JP5024288B2 (ja) 移動通信装置及び受信品質情報作成方法
JP2006229382A (ja) 移動通信システム、基地局、移動局及びそれらに用いる通信制御方法
CN101588593A (zh) 一种信道测量信息的处理方法、系统及设备
JP5343354B2 (ja) 無線通信システム、無線通信装置
CN100505609C (zh) 配置无线链路控制层中确认传输模式参数的方法
JP2007267263A (ja) 無線アクセスネットワーク及び無線通信方法
CN113133048A (zh) 一种信道质量处理方法、基站、终端及介质
JP2008167164A (ja) 通信システム、基地局、通信方法、およびプログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200480028476.0

Country of ref document: CN

AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 2006087980

Country of ref document: US

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 10541066

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2005514415

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 2004788155

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 10541066

Country of ref document: US

WWP Wipo information: published in national office

Ref document number: 2004788155

Country of ref document: EP