WO1999029614A1 - Travelling mechanism for an extensively overhanging working device such as a building crane - Google Patents

Travelling mechanism for an extensively overhanging working device such as a building crane Download PDF

Info

Publication number
WO1999029614A1
WO1999029614A1 PCT/EP1998/007955 EP9807955W WO9929614A1 WO 1999029614 A1 WO1999029614 A1 WO 1999029614A1 EP 9807955 W EP9807955 W EP 9807955W WO 9929614 A1 WO9929614 A1 WO 9929614A1
Authority
WO
WIPO (PCT)
Prior art keywords
crane
chassis
working device
running gear
axle
Prior art date
Application number
PCT/EP1998/007955
Other languages
German (de)
French (fr)
Inventor
Karel Mojzis
Original Assignee
Köck, Elke
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Köck, Elke filed Critical Köck, Elke
Priority to EP98962421A priority Critical patent/EP1037848B1/en
Priority to SI9830467T priority patent/SI1037848T1/en
Priority to AT98962421T priority patent/ATE238225T1/en
Priority to AU17592/99A priority patent/AU1759299A/en
Priority to DE59808095T priority patent/DE59808095D1/en
Priority to DK98962421T priority patent/DK1037848T3/en
Priority to DE19881861T priority patent/DE19881861D2/en
Publication of WO1999029614A1 publication Critical patent/WO1999029614A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/344Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes adapted for transport purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/78Supports, e.g. outriggers, for mobile cranes
    • B66C23/80Supports, e.g. outriggers, for mobile cranes hydraulically actuated

Definitions

  • Chassis for a wide-reaching working device in particular for a construction crane
  • the invention relates to a chassis for a wide-reaching working device, whereby "wide-reaching” is to be understood to mean that this working device is wide-reaching, at least in the state to be transported.
  • the invention relates to a trolley for a high-rise construction crane, particularly preferably for a non-rotating construction crane, the trolley having a double or tandem axle which comprises a front and rear axle.
  • high-rise construction cranes in particular low-speed construction cranes, with a trolley are known, in which the trolley, after the high-rise crane has been transported to the installation site by means of the same, is dismantled before the high-rise construction crane is erected. Because due to the relatively very long length of such a high-rise construction crane when folded, it is extremely difficult and in many cases even impossible to maneuver the high-rise construction crane in the built-up area due to the tightness of the available space when it is installed the construction crane is still in the collapsed state.
  • the erection and dismantling of the high-rise crane causes relatively high costs and a corresponding time planning, which can lead to construction work independent of the high-rise crane.
  • the undercarriage must be accommodated elsewhere during the erection of the high-rise crane, what a corresponding space requirement and possibly additional transport costs.
  • the object of the invention is to provide a trolley, in particular for a construction crane, preferably a non-rotating construction crane, which makes it possible to erect widely protruding working devices, such as construction cranes in particular, in quick assembly and under relatively restricted space.
  • trolley in particular for a construction crane, in that the trolley according to the invention comprises the following:
  • chassis and the traction device are designed such that
  • both the wheels of the first axle and the wheels of the second axle are provided with bogie or steering knuckle steering;
  • the bogie or steering knuckle steering of the wheels of the first axle is connected to the bogie steering or steering knuckle steering of the wheels of the second axle in such a way that the steering of the wheels of the first and second axles takes place synchronously with the steering geometry;
  • the wheels of the first and second axles are preferably arranged in the region of the support surface of the crane.
  • the traction device is formed separately from the chassis and on a to be transported on the chassis and can be attached to the chassis to form a structural unit, in particular on a crane, preferably a construction crane, and can be connected to the chassis via it.
  • a high-rise construction crane according to the invention in particular a non-rotating construction crane, with an attached running gear of the above type, which has a double or tandem axle, which comprises a first and second axle, is characterized in that
  • both the wheels of the first axle and the wheels of the second axle are provided with a bogie or steering knuckle steering
  • the bogie or steering knuckle steering of the wheels of the first axle is connected to the bogie steering or steering knuckle steering of the wheels of the second axle in such a way that the steering of the wheels of the two axles takes place synchronously with the steering geometry;
  • the wheels of the first and second axles are preferably arranged in the region of the support surface of the crane.
  • the invention provides a trolley and a construction crane designed as a quick-assembly crane, which means that the construction crane according to the invention can be erected quickly and easily with the trolley, so that time-consuming removal and later reassembly of the trolley is not necessary. In addition, it is not necessary to remove the necessary crane counterweights for driving on the road.
  • the undercarriage according to the invention and the high-rise construction crane according to the invention with the attached undercarriage can be supplied in several speed versions, for example in two speed versions for 25 and 100 km / h.
  • the undercarriage and the high-rise construction crane are designed in accordance with the invention such that the traction device comprises a traction tube and / or a saddle pin.
  • the high construction crane forms a rigid drawbar trailer or a semi-trailer in the collapsed state, which can be driven to the construction site with a corresponding towing vehicle, namely in particular a truck or a semi-trailer tractor, and can be maneuvered to the exact installation site on the construction site.
  • the special features of the chassis are above all the steering, by means of which both axles can be steered in maneuvering mode, and the towing device specially designed for the chassis, which can be coupled to a towing vehicle, and in that it can be connected to the working device 1 mounted on the chassis 2 (in the preferred use of the undercarriage 2 is a construction crane 1) is connected to the undercarriage 2, which makes the working device 1 functionally part of the entire undercarriage when driving, which is then formed by the undercarriage 15 and the working device 1.
  • the draw tube and / or the saddle pin is attached to the crane tower, the draw tube preferably being designed to be able to be pushed in and pushed out, in the latter case that Draw tube does not need to be removed or pivoted when the high construction crane is erected.
  • the pulling device can be designed such that it has a guide tube for the pull-in and push-out pull tube, the guide tube, preferably rigid, being attached to the crane, in particular to the crane tower.
  • Another special feature of the undercarriage according to the invention and of the high-rise crane according to the invention is that, in a preferred embodiment, the saddle pin with the grinding plate is firmly attached to the guide tube of the draw tube.
  • the high-rise crane can be pulled to the construction site both as a rigid drawbar trailer and as a semi-trailer.
  • the first and second axles in a preferred embodiment of the chassis and of the mobile construction crane according to the invention can each be designed as steering axles with bogie steering, or in another embodiment it is also possible that the front and rear axles are each formed by two stub axles.
  • the two axles or the stub axles of the front wheels on the one hand and the stub axles of the rear edges on the other hand are connected to one another for steering-geometrical synchronous movement by a power transmission, preferably by a steering rod, the steering preferably being hydraulically actuable.
  • the steering device is preferably designed such that it can be locked in the straight-ahead driving position, since maneuvering of the crane is not necessary here.
  • the undercarriage according to the invention can advantageously be designed in such a way that the hydraulically operated steering device can be remotely controlled via a hydraulic unit, preferably attached to the undercarriage, this remote control in particular via Bowden cable or electrically can be done.
  • FIG. 1 shows a side elevation view of an embodiment of the undercarriage according to the invention with a high construction crane mounted thereon, which is designed as a non-rotating construction crane;
  • Figure 2 is a plan view of the undercarriage with the construction crane of Figure 1;
  • FIG. 3 shows a section along the line A-A through the chassis of Figure 2;
  • FIG. 4 shows a side elevation view of the undercarriage with high construction crane of FIG. 1 in the state in which the support feet are in the active position and the high construction crane is just being unfolded from its folded state into the installation state;
  • Figure 5 is a plan view of the lower part of the high-rise crane with the trolley, with the illustration of Support, which is to be shown mainly in this figure, other parts omitted or shown only schematically;
  • Figure 6 is a side elevation view of the trolley with high construction crane of Figures 1 and 4 in the erected state;
  • FIG. 7 shows a top view corresponding to FIG. 5, which illustrates the ability to pivot the support feet in and out;
  • FIG. 8 shows a view of the front end in the direction of travel when transporting the crane with an additional double-axle front axle chassis
  • FIG. 9 shows a view corresponding to FIG. 8 with a single-axle front axle chassis.
  • the undercarriage furthermore has a traction device 28 which is formed separately from the chassis 15 and which is fastened to the crane 1 or another working device and can be coupled to a towing vehicle.
  • the chassis 15 is fastened to the construction crane 1 by means of a rocker 5, which has bolts 60 (see FIG. 2).
  • the high-rise construction crane 1 has an undercarriage 6, a slewing ring 7 and an uppercarriage 8 in a manner customary for rotating construction cranes, the crane tower 9 and the crane boom 10 on the uppercarriage are attached.
  • the crane tower 9 consists of a lower crane tower section 9a and an upper crane tower section 9b
  • the crane boom 10 comprises an inner crane boom section 10a and an outer crane boom section 10b.
  • the remaining parts of the construction crane 1 are, unless they are mentioned below, the usual parts and equipment of a non-rotating construction crane.
  • the first axle 3 and the second axle 4 of the chassis 2 according to the invention are each designed as steering axles, for which purpose wheels provided with tires in the present embodiment, namely both the wheels 11a of the first axle 3 and the wheels 11b of the second axle 4 with a bogie -Steering are provided.
  • Each bogie steering comprises, as can be seen in particular from Figures 1 and 3, a bogie 12, on which the axle 3 or 4 is attached via leaf springs 13, and a steering ring 14, which is designed here as a ball steering ring and via which associated bogie 12 is attached to the chassis 15 of the chassis 2.
  • Each of the two bogies 12 is provided with a connecting and stiffening structure 16 and 17, respectively, and these two connecting and stiffening structures 16 and 17 are by means of a force transmission 18, which is designed here as a handlebar, via joints 18a and 18b connected to each other to form a steering geometry synchronous steering movement.
  • the steering can be actuated hydraulically, specifically by means of a steering or hydraulic cylinder 19 (indicated by dashed lines in FIG. 2), which has a first joint 20a on the chassis 15 and a second joint 20b on one 16 of the two connecting and stiffening structures 16 , 17 is attached.
  • This steering or hydraulic cylinder 19 is supplied by a hydraulic unit 58 attached to the chassis 15 and can be controlled by means of a steering or remote control 23, for example via a Bowden cable or via electrical cables.
  • the pump (not shown) of the hydraulic unit 58 is powered by vehicle batteries 24, for example by two 12-volt vehicle batteries, powered by electricity. When the construction crane is in use and is thus connected to the construction site power source, the vehicle batteries 24 are charged by an installed charger. With 21 a compressed air tank for the brake system is designated.
  • the above structure allows the first and second axles 3 and 4 to be adjusted synchronously in terms of the steering geometry, and with the aid of this steering an excellent maneuvering of the undercarriage 2 according to the invention, in the present case high-rise crane 1, is made possible at the construction site. Driveways are accomplished.
  • the steering device is e.g. In the present case for crane transport, can be locked in the straight-ahead position by a lock 62 (see FIG. 2), in the embodiment shown by a securing bolt 25 (see FIG. 1), which can be inserted into two sleeves 26 and 27, of which the a sleeve 26 on the chassis 15 and the other sleeve 27 is fixedly attached to one of the two bogies 12a, 12b, so that when the securing bolt 25 is inserted, both bogies which are positively coupled to one another via the power transmission 16 and which are collectively denoted by 12, are locked in the straight-ahead driving position are.
  • the pulling device 28 forms a part of the undercarriage 2 that is separate from the chassis 15 and is attached overall to the construction crane 1, in the present case at the lower crane tower section 9a, and connected to the undercarriage 2 by the same. If instead of the crane 1 another, similarly wide-reaching working device, such as an extremely long fire ladder, a long-barrel gun, a rocket launcher or the like. is equipped with the undercarriage 2 according to the invention, then the pulling device is also attached to the front end region of the working device in the direction of travel, and the working device, like the crane 1 in the present case, forms part of the functional part entire "chassis" by connecting the traction device with the chassis 2 or its chassis 15.
  • similarly wide-reaching working device such as an extremely long fire ladder, a long-barrel gun, a rocket launcher or the like.
  • the pulling device 28 in the present embodiment essentially consists of a guide tube 42, a pulling tube 29, a grinding plate 30 and a saddle pin 31.
  • the pulling tube 29 is guided by means of the guide tube 42 to an insertion and removal movement, as shown in FIG is where the draw tube 29 is shown by dash-dotted lines in the extended position and by solid lines in the inserted position.
  • At the front end of the pulling tube 29 there is a pulling eye 32 which is screwed onto the pulling tube 29, so that the working device 1, in the presently preferred embodiment, that is to say the construction crane shown, can be connected via the pulling eye 32 to the bolt coupling of a truck.
  • the pull tube 29 can be locked on the guide tube 42, in the present case by means of two plug pins 33; and the guide tube 42 is fastened to the working device 1, in the present case to the crane tower section 9a, via fastening plates 43.
  • the grinding plate 30 is fixed, for example by welding, and on this grinding plate 30 the saddle pin 31 is attached, for example screwed, so that the working device 1 can thereby be connected to the fifth wheel coupling on a truck or a tractor after the draw tube 29 has been brought into the inserted position and has been locked in this by means of the plug pins 33.
  • the working device 1 in the present case the high-rise crane, is supported by means of support feet 36, four of which, as shown in FIG. 5, are provided in a centrally symmetrical arrangement, the latter preferably being designed as hydraulic support feet which are supplied by a hydraulic unit 22 (see Figure 2).
  • support feet 36 four of which, as shown in FIG. 5, are provided in a centrally symmetrical arrangement, the latter preferably being designed as hydraulic support feet which are supplied by a hydraulic unit 22 (see Figure 2).
  • these enable one quick and automatic leveling and setting up of the working device 1, such as the construction crane, by means of an electronic leveling device (not shown), without great effort by only a single operator, in particular flexible assembly and disassembly on the most difficult terrain or construction site.
  • the wheels 3, 4 of the undercarriage 2 are arranged within the area of the support surface of the working device 1, that is to say here of the construction crane, i.e. the area which is enclosed by a line connecting the support feet 36 to one another.
  • the hydraulic support feet 36 have an unlockable check valve integrated and, as an additional safety feature, a shut-off valve per support foot 36.
  • the support feet 36 are supplied with hydraulic oil by the hydraulic unit 22 and can also be controlled independently of the automatic electronic leveling device individually by means of manual control valves 37 (see FIG. 2), the first control valves 37a for the support feet on one side of the chassis 2 and the second Control valves 37b for the support feet on the other side of the chassis 2 include (see Figure 2).
  • the power supply of the hydraulic unit 22 is carried out from the control cabinet of the construction crane 1 during work.
  • the support feet can be folded out sideways from a transport position (dashed line) folded into the chassis 15 into their working position (solid lines) and folded back for transport.
  • connections 57 for supply lines, a main switch 59 and a storage box 61 are also provided on the chassis 15.
  • the pulling tube 29 for setting up the working device 1 in this case the construction crane, only needs to be brought into the pushed-in position, in order not to interfere with part of the working device 1, as in the present case with the crane boom 10 or the provided drive 34 to come.
  • the guide tube 42 in which the draw tube 29 is guided, can be rigidly attached to the working device 1, such as, for example, the crane tower 9, and in this state can remain on the fully erected working device 1 or the high-rise construction crane, as illustrated in FIG. 6.
  • arrows 39, 40 and 41 indicate the pivoting movements of the lower and upper crane tower sections 9a, 9b and the crane boom sections 10a, 10b when the crane is erected.
  • the crane counterweights 35 can remain on the folded construction crane 1 during its transportation.
  • a foldable and height-adjustable support foot 38 can be attached (FIG. 1) or folded (FIGS. 8 and 9) in order to attach the working device 1, which projects far beyond the chassis 2, such as the high-rise crane, in the state in which it is not coupled to a truck or a tractor. 8 and 9, this support foot 38 has a wheel 39 with which it can also be supported when maneuvering the working device 1.
  • FIGS. 8 and 9 show the front end of the same in the transport direction of the folded crane with a double-axle front axle chassis 43 (FIG. 8) that can be attached to it and a single-axle front axle chassis 44 (FIG. 9) attached to it.
  • the load on the draw tube exceeds one ton. Since more than a tonne is not permitted by law, a train no longer use the tube. An additional (braked) front axle construction 43 or 44 is therefore used.
  • the crane 1 can be pulled as a semi-trailer or as a multi-axle drawbar trailer.
  • the, preferably braked, front axle construction 43 comprises two axles 45 and 46 with wheels 47 and suspension 55 (leaf or air suspension), a chassis 48, a rotating crane 49 (spherical steering wheel) thereon and a body frame 50 on the Tabs 51 for bolting the front axle undercarriage 43 to the traction device 28 of the working machine 1, as in the present case of the crane, are attached.
  • Receiving devices 52 for the tabs 51 are attached to the grinding plate 30 of the traction device 28, and both the tabs 51 and the receiving devices 52 are provided with through holes or bores 53 for plug bolts (not shown).
  • the entire front axle structure 43 is fastened to the working device 1, in the example on the crane, by means of the bores or through holes 53 and the plug pins.
  • FIG. 9 shows a - also preferably braked - single-axle front axle construction 44 in the state already attached to the working device 1, in the present case on the crane. Apart from the only axle 54 and the modification resulting therefrom, this is otherwise designed as the front axle construction 43 of FIG. 8, so that reference is made to the description thereof.
  • the front axle construction 43, 44 can be coupled to a towing vehicle by means of a drawbar 56.
  • the front axle construction can be attached to the saddle pin 31 by means of a fifth wheel coupling; in this construction, a double axis 45, 46 is absolutely necessary.
  • the fifth wheel coupling then also replaces the turntable 49, since the rotary movement takes place via the grinding plate 30 or the saddle pin 31.

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)
  • Control And Safety Of Cranes (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention relates to a travelling mechanism (2) for an extensively overhanging working device (1) such as a tall building crane, preferably a tower slewing crane, in addition to a travelling mechanism (2) on which such a crane (1) or working device is mounted. The travelling mechanism (2) consists of a chassis (15) with a tandem or twin axle (3, 4) comprising a first (3) and a second (4) axle, whereby the wheels (11a) of both the first (3) and second (4) axle are provided with bogie or axle pivot steering. The bogie or axle pivot steering of the wheels (11a) of the first axle (3) is connected to the bogie or axle pivot steering of the wheels (11b) of the second axle (4) so that the wheels of the first (3) and second axle (4) are geometrically and synchronously steered. Preferably, the wheels of the first (3) and second (4) axle are arranged in a supporting area of the working device (1), as in a crane (1). The travelling mechanism (2) also comprises a traction device (28) which is separate from the chassis (15) and which is joined to a tractor vehicle. Said tractor device (28) is attached to the working device (1) and thus connected to the travelling mechanism (2), whereby the working device, in its preferred embodiment as a crane, functions as part of the chassis (15) during transport and manoeuvring.

Description

BESCHREIBUNG DESCRIPTION
Fahrwerk für eine weitausladende Arbeitsvorrichtung, insbesondere für einen BauhochkranChassis for a wide-reaching working device, in particular for a construction crane
Die Erfindung betrifft ein Fahrwerk für eine weit ausladende Arbeitsvorrichtung, wobei unter "weitausladend" zu verstehen ist, daß diese Arbeitsvorrichtung zumindest im zu transportierenden Zustand weitausladend ist. Insbesondere betrifft die Erfindung ein Fahrwerk für einen Bauhochkran, besonders bevorzugt für einen untendrehenden Baukran, wobei das Fahrwerk eine Doppel- oder Tandemachse besitzt, die eine vordere und hintere Achse umfaßt .The invention relates to a chassis for a wide-reaching working device, whereby "wide-reaching" is to be understood to mean that this working device is wide-reaching, at least in the state to be transported. In particular, the invention relates to a trolley for a high-rise construction crane, particularly preferably for a non-rotating construction crane, the trolley having a double or tandem axle which comprises a front and rear axle.
Nach dem Stand der Technik sind Bauhochkräne, insbesondere untendrehende Baukräne, mit Fahrwerk bekannt, bei denen das Fahrwerk, nachdem der Bauhochkran mittels desselben an den Aufstellungsort transportiert worden ist, vor dem Aufstellen des Bauhochkrans abmontiert wird. Denn wegen der relativ sehr großen Länge, die ein solcher Bauhochkran im zusammengelegten Zustand hat, ist es äußerst schwierig und in vielen Fällen sogar unmöglich, den Bauhochkran im bebauten Gelände aufgrund der Enge des zur Verfügung stehenden Platzes an den genauen Aufstellungsort zu rangieren, wenn sich der Bauhochkran noch im zusammengelegten Zustand befindet.According to the prior art, high-rise construction cranes, in particular low-speed construction cranes, with a trolley are known, in which the trolley, after the high-rise crane has been transported to the installation site by means of the same, is dismantled before the high-rise construction crane is erected. Because due to the relatively very long length of such a high-rise construction crane when folded, it is extremely difficult and in many cases even impossible to maneuver the high-rise construction crane in the built-up area due to the tightness of the available space when it is installed the construction crane is still in the collapsed state.
Da das Ab- und Anmontieren des Fahrwerks zeitaufwendig ist, verursacht das Aufstellen und Abbauen des Bauhochkrans relativ hohe Kosten und eine entsprechende zeitliche Planung, wobei es zur Behinderung vom Bauhochkran unabhängigen Bauarbeiten kommen kann. Außerdem muß das Fahrwerk während der Aufstellungs- zeit des Bauhochkrans anderweitig untergebracht werden, was einen entsprechenden Platzbedarf und gegebenenfalls zusätzliche Transportkosten erfordert .Since the dismantling and removal of the undercarriage is time-consuming, the erection and dismantling of the high-rise crane causes relatively high costs and a corresponding time planning, which can lead to construction work independent of the high-rise crane. In addition, the undercarriage must be accommodated elsewhere during the erection of the high-rise crane, what a corresponding space requirement and possibly additional transport costs.
Aufgabe der Erfindung ist es, ein Fahrwerk, insbesondere für einen Bauhochkran, vorzugsweise einen untendrehenden Baukran, zur Verfügung zu stellen, das es ermöglicht, weit ausladende Arbeitsvorrichtungen, wie insbesondere Bauhochkräne, in Schnellmontage und unter relativ beengten Platzverhältnissen praktisch problemlos aufzustellen.The object of the invention is to provide a trolley, in particular for a construction crane, preferably a non-rotating construction crane, which makes it possible to erect widely protruding working devices, such as construction cranes in particular, in quick assembly and under relatively restricted space.
Diese Aufgabe wird mit einem Fahrwerk, insbesondere für einen Bauhochkran, dadurch gelöst, daß das Fahrwerk erfindungsgemäß folgendes umfaßt :This object is achieved with a trolley, in particular for a construction crane, in that the trolley according to the invention comprises the following:
(A) ein Fahrgestell mit einer Doppel- oder Tandemachse, die eine erste und zweite Achse aufweist; und(A) a chassis with a double or tandem axle that has first and second axles; and
(B) eine mit einem Zugfahrzeug verbindbare Zugeinrichtung;(B) a towing device which can be connected to a towing vehicle;
wobei das Fahrgestell und die Zugeinrichtung derart ausgebildet sind, daßwherein the chassis and the traction device are designed such that
(a) sowohl die Räder der ersten Achse als auch die Räder der zweiten Achse mit einer Drehgestell- oder Achsschenkellenkung versehen sind;(a) both the wheels of the first axle and the wheels of the second axle are provided with bogie or steering knuckle steering;
(b) die Drehgestell- oder Achsschenkellenkung der Räder der ersten Achse derart mit der Drehgestell- oder Achsschenkellenkung der Räder der zweiten Achse verbunden ist, daß die Lenkung der Räder der ersten und der zweiten Achse lenkgeometrisch synchron erfolgt;(b) the bogie or steering knuckle steering of the wheels of the first axle is connected to the bogie steering or steering knuckle steering of the wheels of the second axle in such a way that the steering of the wheels of the first and second axles takes place synchronously with the steering geometry;
(c) die Räder der ersten und zweiten Achse vorzugsweise im Bereich der Abstützflache des Krans angeordnet sind; und(c) the wheels of the first and second axles are preferably arranged in the region of the support surface of the crane; and
(d) die Zugeinrichtung gesondert vom Fahrgestell ausgebildet und an einer auf dem Fahrgestell zu transportierenden und mit dem Fahrgestell zu einer baulichen Einheit verbindbaren Arbeitsvorrichtung, insbesondere an einem Kran, vorzugsweise einem Bauhochkran, anbringbar und darüber mit dem Fahrwerk verbindbar ist .(d) the traction device is formed separately from the chassis and on a to be transported on the chassis and can be attached to the chassis to form a structural unit, in particular on a crane, preferably a construction crane, and can be connected to the chassis via it.
Ein erfindungsgemäßer Bauhochkran, insbesondere ein untendrehender Baukran, mit einem angebautem Fahrwerk der vorstehenden Art, das eine Doppel- oder Tandemachse besitzt, die eine erste und zweite Achse umfaßt, zeichnet sich dadurch aus, daßA high-rise construction crane according to the invention, in particular a non-rotating construction crane, with an attached running gear of the above type, which has a double or tandem axle, which comprises a first and second axle, is characterized in that
(a) sowohl die Räder der ersten Achse als auch die Räder der zweiten Achse mit einer Drehgestell- oder Achsschenkel - lenkung versehen sind;(a) both the wheels of the first axle and the wheels of the second axle are provided with a bogie or steering knuckle steering;
(b) die Drehgestell- oder Achsschenkellenkung der Räder der ersten Achse derart mit der Drehgestell- oder Achsschenkellenkung der Räder der zweiten Achse verbunden ist, daß die Lenkung der Räder der beiden Achsen lenkgeometrisch synchron erfolgt;(b) the bogie or steering knuckle steering of the wheels of the first axle is connected to the bogie steering or steering knuckle steering of the wheels of the second axle in such a way that the steering of the wheels of the two axles takes place synchronously with the steering geometry;
(c) die Räder der ersten und der zweiten Achse vorzugsweise im Bereich der Abstützflache des Krans angeordnet sind; und(c) the wheels of the first and second axles are preferably arranged in the region of the support surface of the crane; and
(d) die Zugeinrichtung am Kran angebracht und durch den Kran mit dem Fahrwerk verbunden ist.(d) the drawbar is attached to the crane and connected to the undercarriage by the crane.
Auf diese Weise wird mit der Erfindung ein Fahrwerk und ein als Schnellmontage-Kran ausgebildeter Bauhochkran zur Verfügung gestellt, wodurch der erfindungsgemäße Bauhochkran schnell und problemlos mit dem Fahrwerk aufgestellt werden kann, so daß ein zeitaufwendiges Abnehmen und späteres Wiederanmontieren des Fahrwerks nicht erforderlich ist. Außerdem ist auch das Abnehmen der notwenigen Kran-Gegengewichte für die Fahrt auf der Straße nicht erforderlich. Das Fahrwerk nach der Erfindung und der erfindungsgemäße Bauhochkran mit angebautem Fahrwerk können in mehreren Geschwindigkeitsausführungen geliefert werden, z.B. in zwei Geschwin- digkeitsausführungen für 25 bzw. 100 km/h.In this way, the invention provides a trolley and a construction crane designed as a quick-assembly crane, which means that the construction crane according to the invention can be erected quickly and easily with the trolley, so that time-consuming removal and later reassembly of the trolley is not necessary. In addition, it is not necessary to remove the necessary crane counterweights for driving on the road. The undercarriage according to the invention and the high-rise construction crane according to the invention with the attached undercarriage can be supplied in several speed versions, for example in two speed versions for 25 and 100 km / h.
In einer bevorzugten Ausführungsform sind das Fahrwerk und der Bauhochkran nach der Erfindung so ausgebildet, daß die Zugeinrichtung ein Zugrohr und/oder einen Sattelzapfen umfaßt. Auf diese Weise bildet der Bauhochkran im zusammengelegten Zustand einen Starrdeichselanhänger bzw. einen Sattelanhänger, der mit einem entsprechenden Zugfahrzeug, nämlich insbesondere einem Lastkraftwagen oder einem Sattelschlepper zur Baustelle gefahren und auf der Baustelle zu dem genauen Aufstellungsort rangiert werden kann.In a preferred embodiment, the undercarriage and the high-rise construction crane are designed in accordance with the invention such that the traction device comprises a traction tube and / or a saddle pin. In this way, the high construction crane forms a rigid drawbar trailer or a semi-trailer in the collapsed state, which can be driven to the construction site with a corresponding towing vehicle, namely in particular a truck or a semi-trailer tractor, and can be maneuvered to the exact installation site on the construction site.
Das Besondere am Fahrwerk sind vor allem die Lenkung, durch welche beide Achsen im Rangierbetrieb lenkbar sind, und die vom Fahrgestell gesondert ausgebildete Zugeinrichtung, die an ein Zugfahrzeug ankuppelbar ist und dadurch, daß sie über die auf dem Fahrwerk 2 montierte Arbeitsvorrichtung 1 (die in der bevorzugten Verwendung des Fahrwerks 2 ein Bauhochkran 1 ist) mit dem Fahrwerk 2 verbunden ist, die Arbeitsvorrichtung 1 funktioneil beim Fahren zu einem Teil des Gesamtfahrgestells macht, das dann von dem Fahrgestell 15 und der Arbeitsvorrichtung 1 gebildet wird.The special features of the chassis are above all the steering, by means of which both axles can be steered in maneuvering mode, and the towing device specially designed for the chassis, which can be coupled to a towing vehicle, and in that it can be connected to the working device 1 mounted on the chassis 2 (in the preferred use of the undercarriage 2 is a construction crane 1) is connected to the undercarriage 2, which makes the working device 1 functionally part of the entire undercarriage when driving, which is then formed by the undercarriage 15 and the working device 1.
Mit Hilfe der vorgenannten Lenkung wird das träge Verhalten, das sich insbesondere durch einen sehr langen Radstand der Bauhochkräne nach dem Stand der Technik ergibt, beim Rangieren erheblich verbessert. Dadurch ist es möglich, den Bauhochkran im zusammengelegten Zustand leicht in enge Baustellen- Einfahrten einzurangieren.With the help of the aforementioned steering, the sluggish behavior, which results in particular from a very long wheelbase of the high-rise construction cranes according to the prior art, is considerably improved when maneuvering. This makes it possible to easily maneuver the high-rise construction crane in narrow construction site entrances.
In einer bevorzugten Ausführungsform des erfindungsgemäßen Bauhochkrans ist das Zugrohr und/oder der Sattelzapfen am Kranturm angebracht, wobei das Zugrohr vorzugsweise ein- und ausschiebbar ausgebildet ist, in welchem letzteren Fall das Zugrohr nicht abgenommen oder verschwenkt zu werden braucht, wenn der Bauhochkran aufgestellt wird.In a preferred embodiment of the high-rise construction crane according to the invention, the draw tube and / or the saddle pin is attached to the crane tower, the draw tube preferably being designed to be able to be pushed in and pushed out, in the latter case that Draw tube does not need to be removed or pivoted when the high construction crane is erected.
Insbesondere kann die Zugeinrichtung so ausgebildet sein, daß sie ein Führungsrohr für das ein- und ausschiebbare Zugrohr aufweist, wobei das Führungsrohr, vorzugsweise starr, am Kran, insbesondere am Kranturm, befestigt ist.In particular, the pulling device can be designed such that it has a guide tube for the pull-in and push-out pull tube, the guide tube, preferably rigid, being attached to the crane, in particular to the crane tower.
Eine weitere Besonderheit des erfindungsgemäßen Fahrwerks und des Bauhochkrans nach der Erfindung besteht darin, daß in einer bevorzugten Ausführungsform der Sattelzapfen mit Schleifplatte fest am Führungsrohr des Zugrohrs angebracht ist. Der Bauhochkran kann auf diese Weise sowohl als Starrdeichselanhänger als auch als Sattelanhänger zur Baustelle gezogen werden.Another special feature of the undercarriage according to the invention and of the high-rise crane according to the invention is that, in a preferred embodiment, the saddle pin with the grinding plate is firmly attached to the guide tube of the draw tube. The high-rise crane can be pulled to the construction site both as a rigid drawbar trailer and as a semi-trailer.
Was die Ausbildung der Lenkung der ersten und zweiten Achse anbetrifft, so kann die erste und zweite Achse in einer bevorzugten Ausführungsform des Fahrgestells und des fahrbaren Bauhochkrans nach der Erfindung je als Lenkachse mit Drehgestell- Lenkung ausgebildet sein, oder in einer anderen Ausführungsform ist es auch möglich, daß die vordere und hintere Achse von je zwei Achsstummeln gebildet wird.As far as the design of the steering of the first and second axles is concerned, the first and second axles in a preferred embodiment of the chassis and of the mobile construction crane according to the invention can each be designed as steering axles with bogie steering, or in another embodiment it is also possible that the front and rear axles are each formed by two stub axles.
Hierbei sind die beiden Achsen bzw. die Achsstummel der vorderen Räder einerseits und die Achsstummel der hinteren Ränder andererseits durch eine Kraftübertragung, bevorzugt durch eine Lenkstange, miteinander zur lenkgeometrischen Synchronbewegung verbunden, wobei die Lenkung vorzugsweise hydraulisch betätigbar ist.Here, the two axles or the stub axles of the front wheels on the one hand and the stub axles of the rear edges on the other hand are connected to one another for steering-geometrical synchronous movement by a power transmission, preferably by a steering rod, the steering preferably being hydraulically actuable.
Für die Fahrt des erfindungsgemäßen Fahrwerks und den Transport des Bauhochkrans nach der Erfindung auf der Straße ist die Lenkeinrichtung vorzugsweise so ausgeführt, daß sie in der Geradeausfahrposition feststellbar ist, da hier ein Rangieren des Krans nicht erforderlich ist. Zum Rangieren des Fahrwerks am Bestimmungsort, insbesondere mit darauf montiertem Bauhochkran, auf der Baustelle kann das erfindungsgemäße Fahrwerk vorteilhafterweise so ausgebildet sein, daß die hydraulisch betätigte Lenkeinrichtung über ein, vorzugsweise am Fahrgestell angebrachtes, Hydraulikaggregat fernsteuerbar ist, wobei diese Fernsteuerung insbesondere über Bowdenzug oder elektrisch erfolgen kann.For the travel of the undercarriage according to the invention and the transport of the construction crane according to the invention on the road, the steering device is preferably designed such that it can be locked in the straight-ahead driving position, since maneuvering of the crane is not necessary here. For maneuvering the undercarriage at the destination, in particular with a construction crane mounted thereon, on the construction site, the undercarriage according to the invention can advantageously be designed in such a way that the hydraulically operated steering device can be remotely controlled via a hydraulic unit, preferably attached to the undercarriage, this remote control in particular via Bowden cable or electrically can be done.
Noch andere Merkmale der Erfindung sind in den Patentansprüchen angegeben, deren Wortlaut durch diese Bezugnahme mit zum Inhalt der vorliegenden Beschreibung gemacht wird.Still other features of the invention are set forth in the claims, the wording of which is hereby incorporated by reference into the content of the present description.
Die vorstehenden sowie weitere Vorteile und Merkmale der Erfindung werden nachfolgenden anhand einer besonders bevorzugten Auεführungsform eines erfindungsgemäßen Fahrwerks in der Ausführungsform mit darauf montiertem Bauhochkran näher beschrieben und erläutert; es zeigen:The above and further advantages and features of the invention are described and explained in more detail below with reference to a particularly preferred embodiment of a trolley according to the invention in the embodiment with a construction crane mounted thereon; show it:
Figur 1 eine Seitenaufrißansicht einer Ausführungsform des Fahrwerks nach der Erfindung mit einem darauf montierten Bauhochkran, der als untendrehender Baukran ausgeführt ist;1 shows a side elevation view of an embodiment of the undercarriage according to the invention with a high construction crane mounted thereon, which is designed as a non-rotating construction crane;
Figur 2 eine Aufsicht auf das Fahrwerk mit dem Bauhochkran der Figur 1;Figure 2 is a plan view of the undercarriage with the construction crane of Figure 1;
Figur 3 einen Schnitt längs der Linie A-A durch das Fahrwerk der Figur 2 ;3 shows a section along the line A-A through the chassis of Figure 2;
Figur 4 eine Seitenaufrißansicht des Fahrwerks mit Bauhochkran der Figur 1 in dem Zustand, in welchem die Abstützfüße in der aktiven Position sind und der Bauhochkran aus seinem zusammengelegten Zustand gerade in den Aufstellungszustand entfaltet wird;FIG. 4 shows a side elevation view of the undercarriage with high construction crane of FIG. 1 in the state in which the support feet are in the active position and the high construction crane is just being unfolded from its folded state into the installation state;
Figur 5 eine Aufsicht auf den unteren Teil des Bauhochkrans mit dem Fahrwerk, wobei zur Veranschaulichung der Abstützung, die in dieser Figur hauptsächlich gezeigt werden soll, andere Teile weggelassen oder nur schematisch dargestellt sind;Figure 5 is a plan view of the lower part of the high-rise crane with the trolley, with the illustration of Support, which is to be shown mainly in this figure, other parts omitted or shown only schematically;
Figur 6 eine Seitenaufrißansicht des Fahrwerks mit Bauhochkran der Figuren 1 und 4 im aufgestellten Zustand;Figure 6 is a side elevation view of the trolley with high construction crane of Figures 1 and 4 in the erected state;
Figur 7 eine der Figur 5 entsprechende Aufsicht, welche die seitliche Ein- und Ausschwenkbarkeit der Abstützfüße veranschaulicht ;FIG. 7 shows a top view corresponding to FIG. 5, which illustrates the ability to pivot the support feet in and out;
Figur 8 eine Ansicht des in Fahrtrichtung beim Transport des Krans vorderen Endes mit einem zusätzlichen dop- pelachsigen Vorderachsenfahrwerk; undFIG. 8 shows a view of the front end in the direction of travel when transporting the crane with an additional double-axle front axle chassis; and
Figur 9 eine der Figur 8 entsprechende Ansicht mit einem einachsigen Vorderachsenfahrwerk .9 shows a view corresponding to FIG. 8 with a single-axle front axle chassis.
Der in den Figuren 1, 4 und 6 insgesamt dargestellte Bauhochkran 1, der in der vorliegenden Ausführungsform als untendrehender Baukran ausgeführt ist, ist mit einem daran angebauten erfindungsgemäßen Fahrwerk 2 versehen, das einen Fahrgestellrahmen bzw. ein Fahrgestell 15 mit einer Doppel- oder Tandemachse besitzt, die eine erste Achse 3 und eine zweite Achse 4 umfaßt, wobei die erste Achse 3 in der zusammengelegten Konfiguration des Bauhochkrans 1 gemäß der Figur 1 die vordere Achse und die zweite Achse 4 die hintere Achse bildet. Das Fahrwerk weist weiterhin eine gesondert von dem Fahrgestell 15 ausgebildete Zugeinrichtung 28 auf, welche an dem Kran 1 oder einer anderen Arbeitsvorrichtung befestigt und an ein Zugfahrzeug ankuppelbar ist .The construction crane 1 shown overall in FIGS. 1, 4 and 6, which in the present embodiment is designed as a non-rotating construction crane, is provided with an undercarriage 2 according to the invention, which has a chassis frame or a chassis 15 with a double or tandem axle , which comprises a first axis 3 and a second axis 4, the first axis 3 in the folded configuration of the construction crane 1 according to FIG. 1 forming the front axis and the second axis 4 forming the rear axis. The undercarriage furthermore has a traction device 28 which is formed separately from the chassis 15 and which is fastened to the crane 1 or another working device and can be coupled to a towing vehicle.
Das Fahrgestell 15 ist mittels einer Wippe 5 am Bauhochkran 1 befestigt, die Bolzen 60 (siehe Figur 2) hat. Der Bauhochkran 1 weist in einer für untendrehende Baukräne üblichen Weise einen Unterwagen 6, einen Drehkranz 7 und einen Oberwagen 8 auf, wobei an dem Oberwagen der Kranturm 9 und der Kranausleger 10 angebracht sind. Vorliegend besteht der Kranturm 9 aus einem unteren Kranturmabschnitt 9a und einem oberen Kranturmabschnitt 9b, und der Kranausleger 10 umfaßt einen inneren Kranauslegerabschnitt 10a und einen äußeren Kranauslegerabschnitt 10b. Die übrigen Teile des Bauhochkrans 1 sind, sofern sie weiter unten nicht genannt werden, übliche Teile und Ausrüstungen eines untendrehenden Baukrans .The chassis 15 is fastened to the construction crane 1 by means of a rocker 5, which has bolts 60 (see FIG. 2). The high-rise construction crane 1 has an undercarriage 6, a slewing ring 7 and an uppercarriage 8 in a manner customary for rotating construction cranes, the crane tower 9 and the crane boom 10 on the uppercarriage are attached. In the present case, the crane tower 9 consists of a lower crane tower section 9a and an upper crane tower section 9b, and the crane boom 10 comprises an inner crane boom section 10a and an outer crane boom section 10b. The remaining parts of the construction crane 1 are, unless they are mentioned below, the usual parts and equipment of a non-rotating construction crane.
Die erste Achse 3 und die zweite Achse 4 des erfindungsgemäßen Fahrwerks 2 sind je als Lenkachse ausgeführt, wozu in der vorliegenden Ausführungsform mit Bereifung versehenen Räder, nämlich sowohl die Räder 11a der ersten Achse 3 als auch die Räder 11b der zweiten Achse 4 mit einer Drehgestell-Lenkung versehen sind. Jede Drehgestell-Lenkung umfaßt, wie insbesondere aus den Figuren 1 und 3 ersichtlich ist, ein Drehgestell 12, an dem die Achse 3 bzw. 4 über Blattfedern 13 angebracht ist, sowie einen Lenkkranz 14, der vorliegend als Kugellenkkranz ausgebildet ist und über den das zugehörige Drehgestell 12 am Fahrgestell 15 des Fahrwerks 2 befestigt ist . Jedes der beiden Drehgestelle 12 ist mit je einer Verbindungs- und Versteifungskonstruktion 16 bzw. 17 versehen, und diese beiden Verbindungs- und Versteifungskonstruktionen 16 und 17 sind durch eine Kraft-Übertragung 18, die vorliegend als Lenkstange ausgeführt ist, über Gelenke 18a bzw. 18b miteinander zu einer lenkgeometrisch synchronen Lenkbewegung miteinander verbunden.The first axle 3 and the second axle 4 of the chassis 2 according to the invention are each designed as steering axles, for which purpose wheels provided with tires in the present embodiment, namely both the wheels 11a of the first axle 3 and the wheels 11b of the second axle 4 with a bogie -Steering are provided. Each bogie steering comprises, as can be seen in particular from Figures 1 and 3, a bogie 12, on which the axle 3 or 4 is attached via leaf springs 13, and a steering ring 14, which is designed here as a ball steering ring and via which associated bogie 12 is attached to the chassis 15 of the chassis 2. Each of the two bogies 12 is provided with a connecting and stiffening structure 16 and 17, respectively, and these two connecting and stiffening structures 16 and 17 are by means of a force transmission 18, which is designed here as a handlebar, via joints 18a and 18b connected to each other to form a steering geometry synchronous steering movement.
Die Lenkung ist hydraulisch betätigbar, und zwar mittels eines Lenk- bzw. Hydraulikzylinders 19 (in Figur 2 gestrichelt angedeutet) , der über ein erstes Gelenk 20a am Fahrgestell 15 und über ein zweites Gelenk 20b an der einen 16 der beiden Verbindungs- und Versteifungskonstruktionen 16, 17 angebracht ist. Dieser Lenk- bzw. Hydraulikzylinder 19 wird von einem am Fahrgestell 15 angebrachten Hydraulikaggregat 58 versorgt und ist mittels einer Lenkungs- bzw. Fernsteuerung 23, beispielsweise über Bowdenzug oder über elektrische Kabel, steuerbar. Die nicht gezeigte Pumpe des Hydraulikaggregats 58 wird von Fahrzeugbatterien 24, beispielsweise von zwei 12 -Volt-Fahrzeug- batterien, mit elektrischem Strom versorgt. Wenn sich der Bauhochkran im Arbeitseinsatz befindet und somit an die Baustellen-Stromquelle angeschlossen ist, werden die Fahrzeugbatterien 24 durch ein montiertes Ladegerät aufgeladen. Mit 21 ist ein Druckluftbehälter für die Bremsanlage bezeichnet.The steering can be actuated hydraulically, specifically by means of a steering or hydraulic cylinder 19 (indicated by dashed lines in FIG. 2), which has a first joint 20a on the chassis 15 and a second joint 20b on one 16 of the two connecting and stiffening structures 16 , 17 is attached. This steering or hydraulic cylinder 19 is supplied by a hydraulic unit 58 attached to the chassis 15 and can be controlled by means of a steering or remote control 23, for example via a Bowden cable or via electrical cables. The pump (not shown) of the hydraulic unit 58 is powered by vehicle batteries 24, for example by two 12-volt vehicle batteries, powered by electricity. When the construction crane is in use and is thus connected to the construction site power source, the vehicle batteries 24 are charged by an installed charger. With 21 a compressed air tank for the brake system is designated.
Durch den vorstehenden Aufbau sind die erste und zweite Achse 3 bzw. 4 lenkgeometrisch synchron verstellbar, und mit Hilfe dieser Lenkung wird ein ausgezeichnetes Rangieren des erfindungsgemäßen Fahrwerks 2, vorliegend Bauhochkran 1, an der Baustelle ermöglicht, insbesondere kann ein leichtes Einrangieren in enge Baustellen-Einfahrten bewerkstelligt werden.The above structure allows the first and second axles 3 and 4 to be adjusted synchronously in terms of the steering geometry, and with the aid of this steering an excellent maneuvering of the undercarriage 2 according to the invention, in the present case high-rise crane 1, is made possible at the construction site. Driveways are accomplished.
Die Lenkeinrichtung ist, z.B. vorliegend für den Krantransport, in der Geradeausfahrposition durch eine Arretierung 62 (siehe Figur 2) arretierbar, und zwar in der dargestellten Ausführungsform durch einen Sicherungsbolzen 25 (siehe Figur 1) , der in zwei miteinander fluchtende Hülsen 26 und 27 einsteckbar ist, von denen die eine Hülse 26 am Fahrgestell 15 und die andere Hülse 27 an dem einen der beiden Drehgestelle 12a, 12b fest angebracht ist, so daß bei eingefügtem Sicherungsbolzen 25 beide über die Kraftübertragung 16 miteinander zwangsgekoppelten Drehgestelle, die zusammenfassend mit 12 bezeichnet werden, in der Geradeausfahrposition arretiert sind.The steering device is e.g. In the present case for crane transport, can be locked in the straight-ahead position by a lock 62 (see FIG. 2), in the embodiment shown by a securing bolt 25 (see FIG. 1), which can be inserted into two sleeves 26 and 27, of which the a sleeve 26 on the chassis 15 and the other sleeve 27 is fixedly attached to one of the two bogies 12a, 12b, so that when the securing bolt 25 is inserted, both bogies which are positively coupled to one another via the power transmission 16 and which are collectively denoted by 12, are locked in the straight-ahead driving position are.
Die Zugeinrichtung 28 (siehe insbesondere Figur 1) bildet einen vom Fahrgestell 15 gesonderten Teil des Fahrwerks 2 und ist insgesamt am Bauhochkran 1, vorliegend am unteren Kranturmabschnitt 9a, angebracht und durch denselben mit dem Fahrwerk 2 verbunden. Wenn anstelle des Krans 1 eine andere, ähnlich weit ausladende Arbeitsvorrichtung, wie beispielsweise eine extrem lange Feuerwehrleiter, ein Langrohrgeschütz, eine Raketenabschußrampe oder dgl . mit dem erfindungsgemäßen Fahrwerk 2 ausgerüstet ist, dann ist auch hier die Zugeinrichtung an dem in Transportfahrtrichtung vorderen Endbereich der Arbeitsvorrichtung angebracht, und die Arbeitsvorrichtung bildet ebenso wie vorliegend der Kran 1 funktioneil einen Teil des gesamten "Fahrgestells", indem sie die Zugeinrichtung mit dem Fahrwerk 2 bzw. dessen Fahrgestell 15 verbindet.The pulling device 28 (see in particular FIG. 1) forms a part of the undercarriage 2 that is separate from the chassis 15 and is attached overall to the construction crane 1, in the present case at the lower crane tower section 9a, and connected to the undercarriage 2 by the same. If instead of the crane 1 another, similarly wide-reaching working device, such as an extremely long fire ladder, a long-barrel gun, a rocket launcher or the like. is equipped with the undercarriage 2 according to the invention, then the pulling device is also attached to the front end region of the working device in the direction of travel, and the working device, like the crane 1 in the present case, forms part of the functional part entire "chassis" by connecting the traction device with the chassis 2 or its chassis 15.
Die Zugeinrichtung 28 besteht in der vorliegenden Ausführungs- form im wesentlichen aus einem Führungsrohr 42, einem Zugrohr 29, einer Schleifplatte 30 und einem Sattelzapfen 31. Das Zugrohr 29 ist mittels des Führungsrohrs 42 zu einer Ein- und Ausschiebebewegung geführt, wie in Figur 1 dargestellt ist, wo das Zugrohr 29 durch strichpunktierte Linien in der herausgeschobenen Position und durch ausgezogene Linien in der eingeschobenen Position dargestellt ist. Am vorderen Ende des Zugrohrs 29 befindet sich eine Zugöse 32, die am Zugrohr 29 angeschraubt ist, so daß die Arbeitsvorrichtung 1, in der vorliegend bevorzugten Ausführungsform, also der gezeigte Bauhochkran, über die Zugöse 32 mit der Bolzenkupplung eines Lastkraftwagens verbunden werden kann. Das Zugrohr 29 ist an dem Führungsrohr 42 arretierbar, und zwar vorliegend mittels zweier Steckbolzen 33; und das Führungsrohr 42 ist über Befestigungsplatten 43 an der Arbeitsvorrichtung 1, vorliegend am Kranturmabschnitt 9a, befestigt.The pulling device 28 in the present embodiment essentially consists of a guide tube 42, a pulling tube 29, a grinding plate 30 and a saddle pin 31. The pulling tube 29 is guided by means of the guide tube 42 to an insertion and removal movement, as shown in FIG is where the draw tube 29 is shown by dash-dotted lines in the extended position and by solid lines in the inserted position. At the front end of the pulling tube 29 there is a pulling eye 32 which is screwed onto the pulling tube 29, so that the working device 1, in the presently preferred embodiment, that is to say the construction crane shown, can be connected via the pulling eye 32 to the bolt coupling of a truck. The pull tube 29 can be locked on the guide tube 42, in the present case by means of two plug pins 33; and the guide tube 42 is fastened to the working device 1, in the present case to the crane tower section 9a, via fastening plates 43.
Unter dem Führungsrohr 28 ist die Schleifplatte 30 befestigt, beispielsweise durch Anschweißen, und an dieser Schleifplatte 30 ist der Sattelzapfen 31 angebracht, beispielsweise angeschraubt, so daß die Arbeitsvorrichtung 1 dadurch mit der Sattelkupplung an einem Lastkraftwagen oder einem Sattelschlepper verbunden werden kann, nachdem das Zugrohr 29 in die eingeschobene Position gebracht und in dieser mittels der Steckbolzen 33 arretiert worden ist.Under the guide tube 28, the grinding plate 30 is fixed, for example by welding, and on this grinding plate 30 the saddle pin 31 is attached, for example screwed, so that the working device 1 can thereby be connected to the fifth wheel coupling on a truck or a tractor after the draw tube 29 has been brought into the inserted position and has been locked in this by means of the plug pins 33.
Die Abstützung der Arbeitsvorrichtung 1, vorliegend des Bauhochkrans, erfolgt mittels Abstützfüßen 36, von denen, wie die Figur 5 zeigt, vier in zentralsymmetrischer Anordnung vorgesehen sind, wobei dieselben vorzugsweise als Hydraulik-Abstutz- füße ausgebildet sind, die durch ein Hydraulikaggregat 22 versorgt werden (siehe Figur 2) . Diese ermöglichen - im Gegensatz zu den herkömmlichen mechanischen Abstützspindeln - ein schnelles und mittels einer elektronischen Nivelliereinrichtung (nicht gezeigt) automatisches Ausnivellieren und Aufstellen der Arbeitsvorrichtung 1, wie des Bauhochkrans, ohne großen Kraftaufwand durch nur eine einzige Bedienungsperson, insbesondere eine flexible Montage und Demontage auf schwierigstem Gelände bzw. Baugelände.The working device 1, in the present case the high-rise crane, is supported by means of support feet 36, four of which, as shown in FIG. 5, are provided in a centrally symmetrical arrangement, the latter preferably being designed as hydraulic support feet which are supplied by a hydraulic unit 22 (see Figure 2). In contrast to the conventional mechanical support spindles, these enable one quick and automatic leveling and setting up of the working device 1, such as the construction crane, by means of an electronic leveling device (not shown), without great effort by only a single operator, in particular flexible assembly and disassembly on the most difficult terrain or construction site.
Wie die Figur 5 weiter zeigt, sind die Räder 3, 4 des Fahrwerks 2 innerhalb des Bereichs der Abstützflache der Arbeitsvorrichtung 1, also hier des Bauhochkrans, angeordnet, d.h. der Fläche, welche von einer die Abstützfüße 36 miteinander verbindenden Linie umschlossen wird.As FIG. 5 further shows, the wheels 3, 4 of the undercarriage 2 are arranged within the area of the support surface of the working device 1, that is to say here of the construction crane, i.e. the area which is enclosed by a line connecting the support feet 36 to one another.
Die Hydraulik-Abstützfüße 36 haben ein entsperrbares Rückschlagventil integriert und als zusätzliche Sicherheit einen Absperrhahn pro Abstützfuß 36 eingebaut.The hydraulic support feet 36 have an unlockable check valve integrated and, as an additional safety feature, a shut-off valve per support foot 36.
Die Abstützfüße 36 werden durch das Hydraulik-Aggregat 22 mit Hydrauliköl versorgt und können auch unabhängig von der automatischen elektronischen Nivelliereinrichtung einzeln mittels Handsteuerventilen 37 (siehe Figur 2) angesteuert werden, die erste Steuerventile 37a für die Abstützfüße auf der einen Seite des Fahrwerks 2 und zweite Steuerventile 37b für die Abstützfüße auf der anderen Seite des Fahrwerks 2 umfassen (siehe Figur 2) . Die Stromversorgung des Hydraulikaggregats 22 erfolgt im Arbeitseinsatz vom Schaltschrank des Bauhochkrans 1 aus .The support feet 36 are supplied with hydraulic oil by the hydraulic unit 22 and can also be controlled independently of the automatic electronic leveling device individually by means of manual control valves 37 (see FIG. 2), the first control valves 37a for the support feet on one side of the chassis 2 and the second Control valves 37b for the support feet on the other side of the chassis 2 include (see Figure 2). The power supply of the hydraulic unit 22 is carried out from the control cabinet of the construction crane 1 during work.
Wie Figur 7 durch die dortigen vier Pfeile veranschaulicht, sind die Abstützfüße aus einer an das Fahrgestell 15 beigeklappten Transportposition (gestrichelte Darstellung) in ihre Arbeitsposition (ausgezogene Linien) seitlich ausklappbar und zum Transport wieder beiklappbar.As illustrated by the four arrows there, the support feet can be folded out sideways from a transport position (dashed line) folded into the chassis 15 into their working position (solid lines) and folded back for transport.
Außerdem sind noch, wie Figur 2 zeigt, Anschlüsse 57 für Versorgungsleitungen, ein Hauptschalter 59 und ein Staukasten 61 auf dem Fahrgestell 15 vorgesehen. Wie die Figur 4 veranschaulicht, braucht das Zugrohr 29 zum Aufstellen der Arbeitsvorrichtung 1, vorliegend des Bauhochkrans, nur in die eingeschobene Position gebracht zu werden, um nicht in störenden Eingriff mit einem Teil der Arbeitsvorrichtung 1, wie vorliegend mit dem Kranausleger 10 bzw. dem daran vorgesehenen Laufwerk 34, zu kommen. Infolgedessen kann das Führungsrohr 42, in dem das Zugrohr 29 geführt ist, starr an der Arbeitsvorrichtung 1, wie z.B. am Kranturm 9, angebracht sein und in diesem Zustand an der vollständig aufgestellten Arbeitsvorrichtung 1 bzw. dem Bauhochkran verbleiben, wie die Figur 6 veranschaulicht. In Figur 4 sind durch Pfeile 39, 40 und 41 die VerSchwenkbewegungen des unteren und oberen Kranturmabschnitts 9a, 9b und der Kranauslegerabschnitte 10a, 10b beim Aufstellen des Krans angedeutet.In addition, as FIG. 2 shows, connections 57 for supply lines, a main switch 59 and a storage box 61 are also provided on the chassis 15. As illustrated in FIG. 4, the pulling tube 29 for setting up the working device 1, in this case the construction crane, only needs to be brought into the pushed-in position, in order not to interfere with part of the working device 1, as in the present case with the crane boom 10 or the provided drive 34 to come. As a result, the guide tube 42, in which the draw tube 29 is guided, can be rigidly attached to the working device 1, such as, for example, the crane tower 9, and in this state can remain on the fully erected working device 1 or the high-rise construction crane, as illustrated in FIG. 6. In FIG. 4, arrows 39, 40 and 41 indicate the pivoting movements of the lower and upper crane tower sections 9a, 9b and the crane boom sections 10a, 10b when the crane is erected.
Die Kran-Gegengewichte 35 können, wie die Figur 1 zeigt, am zusammengelegten Bauhochkran 1 während dessen Transport verbleiben.As shown in FIG. 1, the crane counterweights 35 can remain on the folded construction crane 1 during its transportation.
Schließlich kann am Kranturm 9, insbesondere am unteren Kranturmabschnitt 9a, ein klappbarer und in der Höhe veränderbarer Stützfuß 38 abnehmbar (Fig. 1) oder beiklappbar (Fig. 8 und 9) angebracht sein, um die weit über das Fahrwerk 2 hinausragende Arbeitsvorrichtung 1, wie den Bauhochkran, in dem Zustand derselben, in dem sie nicht an einen Lastkraftwagen oder eine Zugmaschine angekuppelt ist, abzustützen. Dieser Stützfuß 38 hat in Fig. 8 und 9 ein Rad 39, mit dem er auch beim Rangieren der Arbeitsvorrichtung 1 abgestützt werden kann.Finally, on the crane tower 9, in particular on the lower crane tower section 9a, a foldable and height-adjustable support foot 38 can be attached (FIG. 1) or folded (FIGS. 8 and 9) in order to attach the working device 1, which projects far beyond the chassis 2, such as the high-rise crane, in the state in which it is not coupled to a truck or a tractor. 8 and 9, this support foot 38 has a wheel 39 with which it can also be supported when maneuvering the working device 1.
Die Figuren 8 und 9 zeigen das in Transportrichtung des zusammengelegten Krans vordere Ende desselben mit einem daran befestigbaren doppelachsigen Vorderachsenfahrwerk 43 (Figur 8) und einem daran befestigten einachsigen Vorderachsenfahrwerk 44 (Figur 9) . Denn bei Baukränen schwerer Ausführungen überschreitet die Belastung am Zugrohr eine Tonne. Da mehr als eine Tonne vom Gesetzgeber nicht erlaubt ist, kann man ein Zug- röhr nicht mehr einsetzen. Es kommt deshalb eine zusätzliche (gebremste) Vorderachsenkonstruktion 43 oder 44 zum Einsatz. Entsprechendes gilt für andere Arbeitsvorrichtungen, wie Lang- rohrgeεchütze etc. (siehe oben) .FIGS. 8 and 9 show the front end of the same in the transport direction of the folded crane with a double-axle front axle chassis 43 (FIG. 8) that can be attached to it and a single-axle front axle chassis 44 (FIG. 9) attached to it. For heavy-duty construction cranes, the load on the draw tube exceeds one ton. Since more than a tonne is not permitted by law, a train no longer use the tube. An additional (braked) front axle construction 43 or 44 is therefore used. The same applies to other work devices, such as long-barrel guns, etc. (see above).
Der Kran 1 kann, je nach Zugfahrzeug, als Sattelanhänger oder als mehrachsiger Deichselanhänger gezogen werden.Depending on the towing vehicle, the crane 1 can be pulled as a semi-trailer or as a multi-axle drawbar trailer.
Im einzelnen umfaßt die, vorzugsweise gebremste, Vorderachsenkonstruktion 43 gemäß Figur 8 zwei Achsen 45 und 46 mit Rädern 47 und Federung 55 (Blatt- oder Luftfederung) , einem Fahrgestell 48, einem darauf befindlichen Drehkran 49 (Kugellenkkranz) und einem Aufbaurahmen 50, an den Laschen 51 zum Anbol- zen des Vorderachsenfahrwerks 43 an die Zugeinrichtung 28 der Arbeitsmaschine 1, wie vorliegend des Krans, angebracht sind. An der Schleifplatte 30 der Zugeinrichtung 28 sind Aufnahmevorrichtungen 52 für die Laschen 51 angebracht, und sowohl die Laschen 51 als auch die Aufnahmevorrichtungen 52 sind mit Durchgangslöchern oder Bohrungen 53 für Steckbolzen (nicht dargestellt) versehen. Mittels der Bohrungen oder Durchgangs- löcher 53 und der Steckbolzen wird die gesamte Vorderachsenkonstruktion 43 an der Arbeitsvorrichtung 1, im Beispiel am Kran, befestigt.Specifically, the, preferably braked, front axle construction 43 according to FIG. 8 comprises two axles 45 and 46 with wheels 47 and suspension 55 (leaf or air suspension), a chassis 48, a rotating crane 49 (spherical steering wheel) thereon and a body frame 50 on the Tabs 51 for bolting the front axle undercarriage 43 to the traction device 28 of the working machine 1, as in the present case of the crane, are attached. Receiving devices 52 for the tabs 51 are attached to the grinding plate 30 of the traction device 28, and both the tabs 51 and the receiving devices 52 are provided with through holes or bores 53 for plug bolts (not shown). The entire front axle structure 43 is fastened to the working device 1, in the example on the crane, by means of the bores or through holes 53 and the plug pins.
In Fig. 9 ist eine - ebenfalls bevorzugt gebremste - einachsige Vorderachsenkonstruktion 44 im bereits an der Arbeitsvorrichtung 1, vorliegend am Kran, befestigten Zustand gezeigt. Diese ist, abgesehen von der nur einzigen Achse 54 und der daraus resultierenden Modifikation, im übrigen so ausgebildet wie die Vorderachsenkonstruktion 43 der Figur 8, so daß insoweit auf deren Beschreibung Bezug genommen wird.FIG. 9 shows a - also preferably braked - single-axle front axle construction 44 in the state already attached to the working device 1, in the present case on the crane. Apart from the only axle 54 and the modification resulting therefrom, this is otherwise designed as the front axle construction 43 of FIG. 8, so that reference is made to the description thereof.
Die Vorderachsenkonstruktion 43, 44 ist mittels einer Zugdeichsel 56 an ein Zugfahrzeug ankuppelbar.The front axle construction 43, 44 can be coupled to a towing vehicle by means of a drawbar 56.
Als Alternative kann die Befestigung der Vorderachsenkonstruktion mittels einer Sattelkupplung am Sattelzapfen 31 erfolgen; bei dieser Konstruktion ist eine Doppelachse 45, 46 unbedingt erforderlich. Die Sattelkupplung ersetzt dann auch den Drehkranz 49, da die Drehbewegung über die Schleifplatte 30 bzw. den Sattelzapfen 31 erfolgt. As an alternative, the front axle construction can be attached to the saddle pin 31 by means of a fifth wheel coupling; in this construction, a double axis 45, 46 is absolutely necessary. The fifth wheel coupling then also replaces the turntable 49, since the rotary movement takes place via the grinding plate 30 or the saddle pin 31.

Claims

PATENTANSPRÜCHE PATENT CLAIMS
1. Fahrwerk für weitausladende Arbeitsvorrichtungen, insbesondere für einen Bauhochkran, umfassend1. chassis for extensive working devices, in particular for a construction crane, comprehensive
(A) ein Fahrgestell (15) mit einer Doppel- oder Tandemachse(A) a chassis (15) with a double or tandem axle
(3, 4), die eine erste und zweite Achse aufweist; und(3, 4) having first and second axes; and
(B) eine mit einem Zugfahrzeug verbindbare Zugeinrichtung(B) a towing device which can be connected to a towing vehicle
(28) ;(28);
wobei das Fahrgestell (15) und die Zugeinrichtung (28) derart ausgebildet sind, daßwherein the chassis (15) and the traction device (28) are designed such that
(a) sowohl die Räder (11a) der ersten Achse (3) als auch die Räder (11b) der zweiten Achse (4) mit einer Drehgestelloder Achsschenkellenkung versehen sind;(a) both the wheels (11a) of the first axle (3) and the wheels (11b) of the second axle (4) are provided with a bogie or axle steering;
(b) die Drehgestell- oder Achsschenkellenkung der Räder (11a) der ersten Achse (3) derart mit der Drehgestell- oder Achsschenkellenkung der Räder (11b) der zweiten Achse (4) verbunden ist, daß die Lenkung der Räder (11a, 11b) der ersten und der zweiten Achse (3, 4) lenkgeometrisch synchron erfolgt ;(b) the bogie or axle steering of the wheels (11a) of the first axle (3) is connected to the bogie or axle steering of the wheels (11b) of the second axle (4) such that the steering of the wheels (11a, 11b) the first and the second axis (3, 4) take place in synchronism with the steering geometry;
(c) die Räder (11a, 11b) der ersten und zweiten Achse (3, 4) vorzugsweise im Bereich der Abstützflache der Arbeitsvorrichtung (1), vorzugsweise des Krans, angeordnet sind; und(c) the wheels (11a, 11b) of the first and second axles (3, 4) are preferably arranged in the region of the support surface of the working device (1), preferably the crane; and
(d) die Zugeinrichtung (28) gesondert vom Fahrgestell (15) ausgebildet und an der auf dem Fahrgestell (15) zu transportierenden und mit dem Fahrgestell (15) zu einer baulichen Einheit verbindbaren Arbeitsvorrichtung (1) , insbe- sondere an einem Kran, vorzugsweise einem Bauhochkran, anbringbar und darüber mit dem Fahrwerk verbindbar ist .(d) the traction device (28) is formed separately from the chassis (15) and in particular on the working device (1) to be transported on the chassis (15) and connected to the chassis (15) to form a structural unit, in particular is in particular on a crane, preferably a construction crane, attachable and connectable to the chassis.
2. Fahrwerk nach Anspruch 1 , dadurch g e k e n n z e i c h n e t , daß die Zugeinrichtung (28) ein Zugrohr (29) und/oder einen Sattelzapfen (31) umfaßt.2. Running gear according to claim 1, characterized in that the traction device (28) comprises a traction tube (29) and / or a saddle pin (31).
3. Fahrwerk nach Anspruch 2 , dadurch g e k e n n z e i c h n e t , daß der Sattelzapfen (31) an einer Schleifplatte (30) vorgesehen ist.3. Running gear according to claim 2, characterized in that the saddle pin (31) is provided on a grinding plate (30).
4. Fahrwerk nach Anspruch 2 oder 3 , dadurch g e k e n n z e i c h n e t , daß das Zugrohr (29) ein- und aus- schiebbar ausgebildet ist.4. Running gear according to claim 2 or 3, characterized in that the draw tube (29) is designed to be able to be pushed in and pushed out.
5. Fahrwerk nach Anspruch 4 , dadurch g e k e n n z e i c h n e t , daß die Zugeinrichtung (28) ein Führungsrohr (42) für das ein- und ausschiebbare Zugrohr (29) aufweist .5. Running gear according to claim 4, characterized in that the pulling device (28) has a guide tube (42) for the pull-in and push-out pulling tube (29).
6. Fahrwerk nach Anspruch 5 , dadurch g e k e n n z e i c h n e t , daß das Führungsrohr (42) , vorzugsweise starr, an der Arbeitsvorrichtung (1) , insbesondere am Kran, bevorzugt an einem Kranturm (9), befestigbar ist.6. Running gear according to claim 5, characterized in that the guide tube (42), preferably rigid, can be fastened to the working device (1), in particular to the crane, preferably to a crane tower (9).
7. Fahrwerk nach einem der Ansprüche 3 bis 6, dadurch g e k e n n z e i c h n e t , daß die Schleifplatte (30) mit dem Sattelzapfen (31) am Führungsrohr (42) angebracht ist und/oder direkt an der Arbeitsvorrichtung (1) , insbesondere am Kran, bevorzugt am Kranturm (9), anbringbar ist.7. Running gear according to one of claims 3 to 6, characterized in that the grinding plate (30) with the saddle pin (31) is attached to the guide tube (42) and / or directly on the working device (1), in particular on the crane, preferably on Crane tower (9), can be attached.
8. Fahrwerk nach einem der Ansprüche 1 bis 7, dadurch g e k e n n z e i c h n e t , daß die erste und zweite Achse8. Chassis according to one of claims 1 to 7, characterized in that the first and second axles
(3, 4) je als Lenkachse mit Drehgestell-Lenkung ausgebildet und beide Achsen (3, 4) zur lenkgeometrischen Synchronbewegung durch eine Kraftübertragung (18) , bevorzugt eine Lenkstange, miteinander verbunden sind, wobei die Lenkung vorzugsweise hydraulisch betätigbar ist.(3, 4) each designed as a steering axle with bogie steering and both axles (3, 4) for steering-geometrical synchronous movement by means of a power transmission (18), preferably a steering rod, are interconnected, wherein the steering is preferably hydraulically actuated.
9. Fahrwerk nach einem der Ansprüche 1 bis 7, dadurch g e k e n n z e i c h n e t , daß die erste und zweite Achse9. Chassis according to one of claims 1 to 7, characterized in that the first and second axles
(3, 4) von je zwei Achsstummeln gebildet ist und die Achsstummel der vorderen Räder (11a) zur lenkgeometrischen Synchronbewegung durch eine Kraftübertragung (18), bevorzugt eine Lenkstange, mit den Achsstummeln der hinteren Räder (11b) verbunden sind, wobei die Lenkung vorzugsweise hydraulisch betätigbar ist .(3, 4) is formed by two stub axles and the stub axles of the front wheels (11a) are connected to the stub axles of the rear wheels (11b) by a power transmission (18), preferably a handlebar, for steering-geometrical synchronous movement, the steering preferably is hydraulically actuated.
10. Fahrwerk nach Anspruch 8 oder 9, dadurch e k e n n z e i c h n e t , daß die Lenkeinrichtung für den Transport in der Geradeausfahrposition, vorzugsweise mittels eines Steckbolzens (33), feststellbar ist.10. Running gear according to claim 8 or 9, characterized in that the steering device for transport in the straight-ahead driving position, preferably by means of a plug pin (33), can be ascertained.
11. Fahrwerk nach Anspruch 8, 9 oder 10, dadurch g e k e n n z e i c h n e t , daß die hydraulisch betätigte Lenkeinrichtung über ein, vorzugsweise am Fahrgestell (15) angebrachtes, Hydraulikaggregat (22) fernsteuerbar ist.11. Chassis according to claim 8, 9 or 10, characterized in that the hydraulically actuated steering device can be remotely controlled via a hydraulic unit (22), preferably attached to the chassis (15).
12. Fahrwerk nach einem der Ansprüche 1 bis 11, g e k e n n z e i c h n e t durch ein an der Zugeinrichtung (28) lösbar befestigbares zusätzliches Vorderachsenfahrwerk (43, 44), das an ein Zugfahrzeug ankuppelbar ist.12. Running gear according to one of claims 1 to 11, g e k e n n z e i c h n e t by a detachably attachable to the traction device (28) additional front axle chassis (43, 44) which can be coupled to a towing vehicle.
13. Fahrwerk nach Anspruch 12, dadurch g e k e n n z e i c h n e t , daß das zusätzliche Vorderachsenfahrwerk (43, 44) durch Steckbolzen und/oder durch einen oder den Sattelzapfen (31) an der Zugeinrichtung (28) befestigbar ist.13. Running gear according to claim 12, characterized in that the additional front axle running gear (43, 44) can be fastened to the pulling device (28) by plug pins and / or by one or the saddle pin (31).
14. Fahrwerk nach Anspruch 12 oder 13 , dadurch g e k e n n z e i c h n e t , daß das zusätzliche Vorderachsen- fahrwerk (43, 44) mehrachsig, insbesondere doppelachsig, ausgebildet und über eine Horizontaldrehvorrichtung (31, 49) an der Zugeinrichtung (28) befestigbar ist. 14. Running gear according to claim 12 or 13, characterized in that the additional front axle running gear (43, 44) is multi-axis, in particular double-axis, and can be attached to the pulling device (28) via a horizontal rotating device (31, 49).
15. Fahrwerk nach einem der Ansprüche 1 bis 14, dadurch g e k e n n z e i c h n e t , daß das Fahrwerk (15, 28) und eine weitausladende Arbeitsvorrichtung (1) , vorzugsweise ein Bauhochkran (1) , insbesondere ein untendrehender Baukran, zu einer fahrbaren Arbeitsvorrichtung, bevorzugt einem fahrbaren Kran, zusammengebaut sind, wobei die Arbeitsvorrichtung (1) , vorzugsweise der Kran, auf dem Fahrgestell (15) montiert ist und die Zugeinrichtung (28) entfernt vom Fahrgestell (15) an der Arbeitsvorrichtung (1) , bevorzugt am Kran, angebracht und durch die Arbeitsvorrichtung (1) , bevorzugt den Kran, mit dem Fahrgestell (15) verbunden ist.15. Running gear according to one of claims 1 to 14, characterized in that the running gear (15, 28) and a wide-reaching working device (1), preferably a construction crane (1), in particular a non-rotating construction crane, to a mobile working device, preferably a mobile one Crane, are assembled, the working device (1), preferably the crane, being mounted on the chassis (15) and the pulling device (28) being removed from the chassis (15) on the working device (1), preferably on the crane, and by the working device (1), preferably the crane, is connected to the chassis (15).
16. Fahrwerk mit Arbeitsvorrichtung, insbesondere mit Kran, nach Anspruch 15, dadurch g e k e n n z e i c h n e t , daß das Zugrohr (29) und/oder der Sattelzapfen (31) am Kranturm (9) angebracht ist.16. Running gear with working device, in particular with crane, according to claim 15, characterized in that the draw tube (29) and / or the saddle pin (31) is attached to the crane tower (9).
17. Fahrwerk mit Arbeitsvorrichtung, insbesondere mit Kran, nach Anspruch 15 oder 16, dadurch g e k e n n z e i c h n e t , daß die Zugeinrichtung (28) mittels des Führungs- rohrs (42) am Kran (1) , vorzugsweise am Kranturm (9) , befestigt ist, wobei das Führungsrohr (42) bevorzugt starr am Kran (1) oder Kranturm (9) angebracht ist.17. Running gear with working device, in particular with crane, according to claim 15 or 16, characterized in that the traction device (28) by means of the guide tube (42) on the crane (1), preferably on the crane tower (9), is attached, wherein the guide tube (42) is preferably rigidly attached to the crane (1) or crane tower (9).
18. Fahrwerk mit Arbeitsvorrichtung, insbesondere mit Kran, nach Anspruch 15, 16 oder 17, dadurch g e k e n n z e i c h n e t , daß die Schleifplatte (30) mit dem Sattelzapfen (31) am Führungsrohr (42) und/oder direkt an der Arbeitsvorrichtung (1) , insbesondere dem Kran, bevorzugt am Kranturm (9), angebracht ist.18. Running gear with working device, in particular with crane, according to claim 15, 16 or 17, characterized in that the grinding plate (30) with the saddle pin (31) on the guide tube (42) and / or directly on the working device (1), in particular the crane, preferably attached to the crane tower (9).
19. Fahrwerk mit Arbeitsvorrichtung, insbesondere mit Kran, nach Anspruch 15, 16, 17 oder 18, dadurch g k e n n z e i c h n e t , daß an dem auf dem Fahrgestell19. Running gear with working device, in particular with a crane, according to claim 15, 16, 17 or 18, characterized in that on the chassis
(15) angebrachten Unterbau, insbesondere Unterwagen (6) , des Krans (1) Abstützfüße (36), bevorzugt Hydraulik-Abstützfüße, angebracht sind.(15) attached substructure, in particular undercarriage (6), the Crane (1) support feet (36), preferably hydraulic support feet, are attached.
20. Fahrwerk mit Arbeitsvorrichtung, insbesondere mit Kran, nach einem der Ansprüche 15 bis 19, dadurch g e k e n n z e i c h n e t , daß an der Arbeitsvorrichtung (1) , vorzugsweise am Kranturm (9) , wenigstens ein, vorzugsweise beiklappbarer, Stützfuß (38) angebracht ist.20. Running gear with working device, in particular with crane, according to one of claims 15 to 19, characterized in that at least one, preferably foldable, support foot (38) is attached to the working device (1), preferably on the crane tower (9).
21. Fahrwerk mit Arbeitsvorrichtung, insbesondere mit Kran, nach einem der Ansprüche 15 bis 20, dadurch g e k e n n z e i c h n e t , daß der Unterbau, insbesondere der Unterwagen (6) , der Arbeitsvorrichtung (1) , insbesondere des Krans, über eine Wippe (5) auf dem Fahrgestell (15) angebracht ist .21. Running gear with working device, in particular with crane, according to one of claims 15 to 20, characterized in that the substructure, in particular the undercarriage (6), the working device (1), in particular the crane, via a rocker (5) on the Chassis (15) is attached.
22. Fahrwerk mit Arbeitsvorrichtung (1), insbesondere mit Kran, nach einem der Ansprüche 15 bis 21, dadurch g e k e n n z e i c h n e t , daß das Fahrgestell (15) derart ausgelegt ist, daß Gegengewichte, insbesondere die Kran- Gegengewichte (35) , während des Transports an der Arbeitsvorrichtung (1) bzw. dem Kran verbleiben können.22. Chassis with working device (1), in particular with a crane, according to one of claims 15 to 21, characterized in that the chassis (15) is designed such that counterweights, in particular the crane counterweights (35), during transport the working device (1) or the crane can remain.
23. Fahrwerk mit Arbeitsvorrichtung (1), insbesondere mit Kran, nach einem der Ansprüche 15 bis 22, dadurch g k e n n z e i c h n e t , daß an der Zugeinrichtung (28) ein zusätzliches Vorderachsenfahrwerk (43, 44) befestigt ist. 23. Running gear with working device (1), in particular with crane, according to one of claims 15 to 22, characterized in that an additional front axle running gear (43, 44) is attached to the traction device (28).
PCT/EP1998/007955 1997-12-09 1998-12-08 Travelling mechanism for an extensively overhanging working device such as a building crane WO1999029614A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
EP98962421A EP1037848B1 (en) 1997-12-09 1998-12-08 Travelling mechanism for an extensively overhanging working device such as a building crane
SI9830467T SI1037848T1 (en) 1997-12-09 1998-12-08 Travelling mechanism for an extensively overhanging working device such as a building crane
AT98962421T ATE238225T1 (en) 1997-12-09 1998-12-08 CHASSIS FOR A WIDE-RANGE WORK EQUIPMENT, ESPECIALLY FOR A HIGH CONSTRUCTION CRANE
AU17592/99A AU1759299A (en) 1997-12-09 1998-12-08 Travelling mechanism for an extensively overhanging working device such as a building crane
DE59808095T DE59808095D1 (en) 1997-12-09 1998-12-08 UNDERCARRIAGE FOR A LARGE LOADING WORKING DEVICE, ESPECIALLY FOR A HOUSING CRANE
DK98962421T DK1037848T3 (en) 1997-12-09 1998-12-08 A base for a long-hanging work device, especially for a construction crane
DE19881861T DE19881861D2 (en) 1997-12-09 1998-12-08 Chassis for a wide-reaching working device, in particular for a construction crane

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19754643.9 1997-12-09
DE19754643 1997-12-09

Publications (1)

Publication Number Publication Date
WO1999029614A1 true WO1999029614A1 (en) 1999-06-17

Family

ID=7851271

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP1998/007955 WO1999029614A1 (en) 1997-12-09 1998-12-08 Travelling mechanism for an extensively overhanging working device such as a building crane

Country Status (9)

Country Link
EP (1) EP1037848B1 (en)
AT (1) ATE238225T1 (en)
AU (1) AU1759299A (en)
DE (3) DE19881861D2 (en)
DK (1) DK1037848T3 (en)
ES (1) ES2198086T3 (en)
PT (1) PT1037848E (en)
WO (1) WO1999029614A1 (en)
YU (1) YU34600A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012088858A1 (en) * 2010-12-28 2012-07-05 湖南三一智能控制设备有限公司 Truck crane
US20210300733A1 (en) * 2020-03-30 2021-09-30 Manitowoc Crane Group France Self-erecting crane comprising a removable ballasting element for a transport on a fifth wheel

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19958691A1 (en) * 1999-12-06 2001-06-07 Koeck Elke Chassis for a wide-reaching working device, in particular for a construction crane
DE19959176C2 (en) * 1999-12-08 2002-11-28 Karel Mojzis Chassis for wide-reaching work devices
IT1396632B1 (en) * 2009-11-27 2012-12-14 Gelco Di Corradi Franco AUTOMATIC CRANE WITH SIMPLIFIED POSITIONING MEANS.
CN105129634B (en) * 2015-08-12 2017-08-29 中联重科股份有限公司 Walking mechanism and crane for roofing crane
CN106400698A (en) * 2016-12-01 2017-02-15 长沙科达智能装备股份有限公司 Landing leg arrangement structure of arch erection machine
FR3108597B1 (en) 2020-03-30 2023-07-21 Manitowoc Crane Group France Trailer assembly and associated self-erecting crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1352261A (en) * 1963-01-04 1964-02-14 Crane or similar device with telescopic mast and folding boom
DE1280519B (en) * 1966-05-20 1968-10-17 Otto Kaiser Kommanditgesellsch Tower crane
DE1531179A1 (en) * 1966-09-28 1969-11-27 Potain & Cie Ets F Foldable crane and method of erecting the same
FR2155850A1 (en) * 1971-10-11 1973-05-25 Ts Konstruktors
DE29721756U1 (en) * 1997-12-09 1998-03-05 Köck, Elke, 83620 Feldkirchen-Westerham Construction crane, in particular a non-rotating construction crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1352261A (en) * 1963-01-04 1964-02-14 Crane or similar device with telescopic mast and folding boom
DE1280519B (en) * 1966-05-20 1968-10-17 Otto Kaiser Kommanditgesellsch Tower crane
DE1531179A1 (en) * 1966-09-28 1969-11-27 Potain & Cie Ets F Foldable crane and method of erecting the same
FR2155850A1 (en) * 1971-10-11 1973-05-25 Ts Konstruktors
DE29721756U1 (en) * 1997-12-09 1998-03-05 Köck, Elke, 83620 Feldkirchen-Westerham Construction crane, in particular a non-rotating construction crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012088858A1 (en) * 2010-12-28 2012-07-05 湖南三一智能控制设备有限公司 Truck crane
US20210300733A1 (en) * 2020-03-30 2021-09-30 Manitowoc Crane Group France Self-erecting crane comprising a removable ballasting element for a transport on a fifth wheel
US11565917B2 (en) * 2020-03-30 2023-01-31 Manitowoc Crane Group France Self-erecting crane comprising a removable ballasting element for a transport on a fifth wheel

Also Published As

Publication number Publication date
DE19881861D2 (en) 2000-11-30
EP1037848A1 (en) 2000-09-27
EP1037848B1 (en) 2003-04-23
DK1037848T3 (en) 2003-08-11
YU34600A (en) 2003-01-31
AU1759299A (en) 1999-06-28
ES2198086T3 (en) 2004-01-16
DE19856593A1 (en) 1999-06-17
DE59808095D1 (en) 2003-05-28
ATE238225T1 (en) 2003-05-15
PT1037848E (en) 2003-09-30

Similar Documents

Publication Publication Date Title
DE4027480C1 (en)
DE202013104703U1 (en) Heavy duty vehicle module
EP1235734B1 (en) Travelling mechanism for an overhanging working device, especially for a building crane
EP0038954A2 (en) Self-propelled concrete pump
DE60104955T2 (en) Reconfigurable crane carrier
WO2004113646A1 (en) Movable concrete pump comprising a distribution boom
EP1037848B1 (en) Travelling mechanism for an extensively overhanging working device such as a building crane
DE1605068C3 (en) Tractor for use on rail and road
WO2020030521A1 (en) Vehicle crane system for transporting an attachment part, in particular a main jib of a vehicle crane
DE60310787T2 (en) Independent wheel module and vehicle using such a module
DE102008006119B3 (en) Mobile crane has upper structure, on which boom is hinged to teeter around horizontal axis, and cabin that is provided for crane operator, which is arranged on upper structure pivoting over sluing mechanism
EP3483004B1 (en) Salvaging device for a military vehicle
DE68906611T2 (en) AUTOMATIC ASSEMBLY OF BRIDGES AND RAMPS.
EP0127146A2 (en) Trackless mine vehicle
DE19850902C2 (en) Quick assembly assembly for a tower crane
DE29821880U1 (en) Chassis for a wide-reaching working device, in particular for a construction crane
DE19959176C2 (en) Chassis for wide-reaching work devices
DE29721756U1 (en) Construction crane, in particular a non-rotating construction crane
EP2457767B1 (en) A semi-trailer load carriage for rail-bound vehicles and method of loading the rail car
EP1284207B1 (en) Bimodal rail-road crane and rail engagement method
EP2875971A1 (en) Trailer train with a tractor and at least one towed trailer
DE10145330A1 (en) Modular and integrated vehicle structure has axle modules with rail and road wheel axles, to give a change of configuration between road and rail traffic, with a coupling module for attachment to a train or a truck
DE2509442C3 (en) Semi-trailer truck for transporting swap bodies or containers
WO2017211440A1 (en) Vehicle and method for transporting a mobile welding apparatus
DE29904441U1 (en) Quick assembly axis for tower crane

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: P-346/00

Country of ref document: YU

AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT UA UG US UZ VN YU ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW SD SZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: KR

WWE Wipo information: entry into national phase

Ref document number: 1998962421

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1998962421

Country of ref document: EP

REF Corresponds to

Ref document number: 19881861

Country of ref document: DE

Date of ref document: 20001130

WWE Wipo information: entry into national phase

Ref document number: 19881861

Country of ref document: DE

WWG Wipo information: grant in national office

Ref document number: 1998962421