WO1994012728A1 - Construction method - Google Patents
Construction method Download PDFInfo
- Publication number
- WO1994012728A1 WO1994012728A1 PCT/FI1993/000497 FI9300497W WO9412728A1 WO 1994012728 A1 WO1994012728 A1 WO 1994012728A1 FI 9300497 W FI9300497 W FI 9300497W WO 9412728 A1 WO9412728 A1 WO 9412728A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- arch
- units
- arc
- prefabricated
- built
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/38—Arched girders or portal frames
- E04C3/44—Arched girders or portal frames of concrete or other stone-like material, e.g. with reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/22—Masonry; Bricks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Definitions
- the invention relates to building technology and it concerns a method of building arches and prefabricated units for use in the method.
- An arch or vault is a supporting arc-like structure made of pieces and supported by end supports to span an open space and having a bearing capacity based mainly on bearing stresses. Arched constructions have been used for more than 2000 years. In known arch building methods a supporting bottom structure is first made and the arch pieces are then piled on top of it. Upon completion of the arch the suppor ⁇ ting bottom structure is removed.
- the method is intended for building relatively large arches of an approximate minimum length of 5 metres.
- the arch consists of at least three prefabricated units, but there are always considerably more units in practice, for example, no less than eight.
- the units are preferably made of concrete or stone.
- the prefabricated units are lowered into their positions in the arch to rest on end supports all at the same time by using one or several cranes.
- the units are preferably first joined together into bigger arcs, wherein they are supported separately. It must hereby be made sure during hoisting that the units remain in the desired arc-like shape. This can be made, for example, with the aid of a hoisting beam in the direction of the arc, from which beam each unit is suspended with a rope of suitable length.
- the units may also be attached suitably to each other to keep them in the shape of an arc during hoisting. They may be formed first, for example, into arch halves, which are then lowered into position using two cranes.
- the arcs may be formed on a sui ⁇ table base shaped like an arc.
- the prefabricated units are made with suitable means for securing them to the hoisting equipment.
- the units are preferably of such a wedge-like shape that their meeting surfaces are pressed directly against each other in the completed arch structure.
- wedge-shaped seams may also be made between the units, whereby different arcs can be made of similar units. Wedges of some kind can hereby be used between the units to set the units in the desired arc-like shape before seaming.
- the weight of a prefabricated unit could be, for example, in the range of one ton.
- the prefabricated units are preferably made of concrete, but other materials such as stone may also be used.
- Figure 1 shows the manufacture of an arch structure to be used as a casting mould for the concrete arc
- FIG. 2 shows the manufacture of an arch structure formed of prefabricated units to be filled by grouting
- - Figure 3 shows the manufacture of a smaller arch structure formed of units to be filled by grouting
- - Figure 4 shows a vaulted bridge for light traffic.
- an arch structure is formed of prefabricated concrete units 2.1 resting on end supports for use as a casting mould for a concrete arc.
- the units 2.1 are downwardly wedge-shaped, so that by placing them one after another the desired arch can be formed without needing any seaming material between them.
- the units have walls 4 rising upwards at the side edges of the bottom
- This arch structure has three arch units in parallel.
- the unit size may be, for example, about 2x2 metres and the unit weight, for example, about 500 - 2000 kg.
- Each arch 3 in this embodiment is made by lowering the arch halves 5 formed of units 2.1 both at the same time to rest on supports 1.
- Hoisting beams 6 in the longitudinal direction of the arch are used as hoisting means, from which the units are suspended with the aid of ropes 7 of a suitable length, so that the arch half remains in the desired shape during hoisting.
- the units can be attached to one another in a suitable way to prevent them from moving during the hoisting operation.
- the units 2.1 For suspending, the units 2.1 have two holes 8.1 extending through the side walls 4 with bars 9 pushed through the holes. Ropes 7 are attached at the middle of the bars. Using the holes 8.1 it is possible to attach adjoining units 2.1 to one another, for example, by using a through- going bar. The structure is then braced also in the trans ⁇ verse direction.
- the meeting ends of the arch halves 5 may also be attached together just before being lowered into their positions. In this way the ends are made to go immediately into their exact positions.
- Such fastening may be temporary. It can be made, for example, with bolts, a steel bushing or slot joint .
- Figure 2 shows an embodiment where a light arch structure is first made of box-like units 2.2 resting on supports l. Thereafter concrete is cast into the elements to make a strong supporting arch. A hole 8.2 extends through the side walls 4 of the units
- Each unit is suspended from a hoisting beam 6 with a rope 7.2 of suitable length.
- holes 10 also extend through the side walls 4 of the units 2.2.
- the units to be placed side by side in the structure can be attached to each other to form one arch unit. This is preferably done by using a bar, extending through the entire structure.
- Holes 12 extend through the end walls 11 of the prefab ⁇ ricated units 2.2. From these the units can be mounted lightly to one another for hoisting, for example, using bolts.
- the units 2.2 are first placed onto a suitably arc-like base 13, where they are joined together to form arch halves 5.
- seaming may also be done on the arc-like base 13.
- Figure 3 shows the manufacture of a similar structure as in Figure 2.
- the entire arch is lowered into position using one hoisting beam 6.
- This method is suitable for making lighter structures.
- Figure 4 shows a bridge for light traffic formed of prefabricated units 2.3.
- the units are similar to those in Figure 1.
- they have railing units 14, which are joined together in the completed bridge and, for example, coated in a suitable manner to form a railing.
- the arch structure can be made without any supporting bottom structures. To place the units into position one only needs such conventional hoisting equipment which is used normally on building sites.
- the invention may of course also be applied for building arches having several criss-crossing arcs.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6512804A JPH08504009A (en) | 1992-11-25 | 1993-11-24 | Arch construction method |
DE69310205T DE69310205D1 (en) | 1992-11-25 | 1993-11-24 | CONSTRUCTION PROCESS |
EP94900829A EP0670933B1 (en) | 1992-11-25 | 1993-11-24 | Construction method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI925357 | 1992-11-25 | ||
FI925357A FI95305C (en) | 1992-11-25 | 1992-11-25 | Construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1994012728A1 true WO1994012728A1 (en) | 1994-06-09 |
Family
ID=8536274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/FI1993/000497 WO1994012728A1 (en) | 1992-11-25 | 1993-11-24 | Construction method |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0670933B1 (en) |
JP (1) | JPH08504009A (en) |
AT (1) | ATE152197T1 (en) |
DE (1) | DE69310205D1 (en) |
FI (1) | FI95305C (en) |
WO (1) | WO1994012728A1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003078739A1 (en) * | 2002-03-12 | 2003-09-25 | Peter Christie | Pre-assembled units to form an arch bridge or lintel |
WO2004044332A1 (en) * | 2002-11-13 | 2004-05-27 | The Queen's University Of Belfast | Concrete arch and method of manufacture |
US6854928B2 (en) * | 2002-01-30 | 2005-02-15 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
FR2883311A1 (en) * | 2005-03-21 | 2006-09-22 | Andre Scobeltzine | Hollow voussoir for constructing arc of e.g. bridge, has outer and inner U-shaped parts integrated and displaced with each other to form rabbets cased in preceding voussoir with clearance permitting to incline voussoir at few degrees |
CN102425121A (en) * | 2011-09-02 | 2012-04-25 | 大连理工大学 | Arch frame capable of adapting to various arch ring shape parameters |
WO2013063623A1 (en) * | 2011-10-28 | 2013-05-02 | Alethea Rosalind Melanie Hall | Method of constructing a curved structure and apparatus for performing such method |
WO2014200361A1 (en) * | 2013-06-11 | 2014-12-18 | Kelly Wright | Bridge construction kit set and method |
JP2015190122A (en) * | 2014-03-27 | 2015-11-02 | 株式会社竹中工務店 | Beam-like member construction method |
CN110240055A (en) * | 2019-07-22 | 2019-09-17 | 中国公路工程咨询集团有限公司 | A kind of steel box-girder hanging apparatus |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007262654A (en) * | 2006-03-27 | 2007-10-11 | Taisei Corp | Arched bridge, and arched bridge construction method |
CN103306189B (en) * | 2013-07-04 | 2015-06-10 | 重庆交通大学 | Steel truss-prestressed concrete bridge deck combined bridge girder and construction method thereof |
JP6576206B2 (en) * | 2015-10-20 | 2019-09-18 | ケイコン株式会社 | Articulated concrete block and arch bridge for arch bridge structure |
JP6576207B2 (en) * | 2015-10-20 | 2019-09-18 | ケイコン株式会社 | Manufacturing method of block group used for connecting concrete block body for arch bridge structure |
JP6612581B2 (en) * | 2015-10-20 | 2019-11-27 | ケイコン株式会社 | Articulated concrete block and arch bridge for arch bridge structure |
CN105463979B (en) * | 2016-01-07 | 2017-03-08 | 上海市城市建设设计研究总院 | Space trident beam string foot bridge |
CN107338733B (en) * | 2017-08-11 | 2023-06-06 | 中铁上海工程局集团有限公司 | Hoisting device and hoisting method for adjusting and positioning overhead posture of steel box arch rib |
WO2020240695A1 (en) * | 2019-05-28 | 2020-12-03 | 誠 矢内 | Series of box shaped structures, method for constructing and method for erecting convex shaped connected structure, and method for erecting beam |
CN113684760A (en) * | 2021-08-03 | 2021-11-23 | 中交路桥建设有限公司 | Method for hoisting ropeless area beam section of half-through basket arch bridge |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE404002C (en) * | 1921-07-17 | 1924-10-10 | Louis Charles Dalens | Construction method for arches made of reinforced concrete |
DE803116C (en) * | 1949-10-26 | 1951-03-01 | Wayss & Freytag A G | Method for moving articulated reinforced concrete precast elements for vaults and frames |
DE806020C (en) * | 1949-08-23 | 1951-06-11 | Hermann Maier Dipl Ing | Method and auxiliary joint for the production of concrete bridges or the like. |
US3374497A (en) * | 1965-06-01 | 1968-03-26 | Homayoun J. Meheen | Apparatus for erecting a bridge arch |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NZ242122A (en) * | 1991-04-02 | 1995-01-27 | Csr Humes Pty Ltd | Bridge or tunnel construction including at least one arch unit formed from plurality of interconnected reinforced concrete segments |
-
1992
- 1992-11-25 FI FI925357A patent/FI95305C/en not_active IP Right Cessation
-
1993
- 1993-11-24 AT AT94900829T patent/ATE152197T1/en not_active IP Right Cessation
- 1993-11-24 JP JP6512804A patent/JPH08504009A/en active Pending
- 1993-11-24 WO PCT/FI1993/000497 patent/WO1994012728A1/en active IP Right Grant
- 1993-11-24 DE DE69310205T patent/DE69310205D1/en not_active Expired - Lifetime
- 1993-11-24 EP EP94900829A patent/EP0670933B1/en not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE404002C (en) * | 1921-07-17 | 1924-10-10 | Louis Charles Dalens | Construction method for arches made of reinforced concrete |
DE806020C (en) * | 1949-08-23 | 1951-06-11 | Hermann Maier Dipl Ing | Method and auxiliary joint for the production of concrete bridges or the like. |
DE803116C (en) * | 1949-10-26 | 1951-03-01 | Wayss & Freytag A G | Method for moving articulated reinforced concrete precast elements for vaults and frames |
US3374497A (en) * | 1965-06-01 | 1968-03-26 | Homayoun J. Meheen | Apparatus for erecting a bridge arch |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6854928B2 (en) * | 2002-01-30 | 2005-02-15 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
WO2003078739A1 (en) * | 2002-03-12 | 2003-09-25 | Peter Christie | Pre-assembled units to form an arch bridge or lintel |
WO2004044332A1 (en) * | 2002-11-13 | 2004-05-27 | The Queen's University Of Belfast | Concrete arch and method of manufacture |
US7204058B2 (en) | 2002-11-13 | 2007-04-17 | The Queen's University Of Belfast | Concrete arch and method of manufacture |
FR2883311A1 (en) * | 2005-03-21 | 2006-09-22 | Andre Scobeltzine | Hollow voussoir for constructing arc of e.g. bridge, has outer and inner U-shaped parts integrated and displaced with each other to form rabbets cased in preceding voussoir with clearance permitting to incline voussoir at few degrees |
CN102425121A (en) * | 2011-09-02 | 2012-04-25 | 大连理工大学 | Arch frame capable of adapting to various arch ring shape parameters |
CN102425121B (en) * | 2011-09-02 | 2014-06-25 | 大连理工大学 | Arch frame capable of adapting to various arch ring shape parameters |
WO2013063623A1 (en) * | 2011-10-28 | 2013-05-02 | Alethea Rosalind Melanie Hall | Method of constructing a curved structure and apparatus for performing such method |
WO2014200361A1 (en) * | 2013-06-11 | 2014-12-18 | Kelly Wright | Bridge construction kit set and method |
JP2015190122A (en) * | 2014-03-27 | 2015-11-02 | 株式会社竹中工務店 | Beam-like member construction method |
CN110240055A (en) * | 2019-07-22 | 2019-09-17 | 中国公路工程咨询集团有限公司 | A kind of steel box-girder hanging apparatus |
Also Published As
Publication number | Publication date |
---|---|
FI95305B (en) | 1995-09-29 |
FI95305C (en) | 1996-01-10 |
DE69310205D1 (en) | 1997-05-28 |
FI925357A (en) | 1994-05-26 |
EP0670933B1 (en) | 1997-04-23 |
JPH08504009A (en) | 1996-04-30 |
FI925357A0 (en) | 1992-11-25 |
EP0670933A1 (en) | 1995-09-13 |
ATE152197T1 (en) | 1997-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0670933B1 (en) | Construction method | |
JP3885584B2 (en) | Construction method of composite truss bridge | |
JPH11181725A (en) | Method for constructing horizontal beam of main tower made of concrete | |
US4050213A (en) | Method of erecting a multi-story building | |
JPH03172405A (en) | Erection method for arch bridge by precast member | |
CN110761165B (en) | Steel web box girder installation system and construction method thereof | |
GB2074209A (en) | Lattice girder for bridges etc. | |
US6412132B1 (en) | Methods for constructing a bridge utilizing in-situ forms supported by beams | |
JPH04228710A (en) | Road slab for bridge | |
CA2124040A1 (en) | Construction method | |
JPH07300817A (en) | Concrete-filled steel pipe truss pier and construction method | |
CN109838087B (en) | Reusable assembled building supporting device | |
CN211312154U (en) | Steel web box girder installation system | |
JPH01299963A (en) | Method of re-clamping or repairing and reinforcing or load-reducing deformed existing structure | |
JP3908816B2 (en) | Construction method of suspended floor slab bridge | |
JPH01210510A (en) | Method of installation construction of structure such as bridge | |
JPH0325107A (en) | Installation method for strutted rigid-frame bridge | |
JP3171676B2 (en) | Construction method of cast-in-place concrete horizontal member | |
EP0393091B1 (en) | A load-bearing horizontal structural system for a building | |
JPH05148817A (en) | Construction of pc bridge | |
EP0828903B1 (en) | Joint of concrete building elements | |
AU746805B2 (en) | A structural element | |
JPH0339122B2 (en) | ||
JPH09177030A (en) | Bridge of vertically integrated mixed rigid frame structure | |
JP2003313825A (en) | Construction method of overhead crossing and overhead crossing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): JP US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 1994900829 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref country code: US Ref document number: 1995 448512 Date of ref document: 19950731 Kind code of ref document: A Format of ref document f/p: F |
|
WWP | Wipo information: published in national office |
Ref document number: 1994900829 Country of ref document: EP |
|
WWG | Wipo information: grant in national office |
Ref document number: 1994900829 Country of ref document: EP |