US8601852B2 - Method of manufacturing seamless pipe and tube - Google Patents

Method of manufacturing seamless pipe and tube Download PDF

Info

Publication number
US8601852B2
US8601852B2 US12/232,926 US23292608A US8601852B2 US 8601852 B2 US8601852 B2 US 8601852B2 US 23292608 A US23292608 A US 23292608A US 8601852 B2 US8601852 B2 US 8601852B2
Authority
US
United States
Prior art keywords
temperature
less
reheating
seamless
seamless pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related, expires
Application number
US12/232,926
Other versions
US20090038358A1 (en
Inventor
Hajime Osako
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Assigned to SUMITOMO METAL INDUSTRIES, LTD. reassignment SUMITOMO METAL INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: OSAKO, HAJIME
Publication of US20090038358A1 publication Critical patent/US20090038358A1/en
Assigned to NIPPON STEEL & SUMITOMO METAL CORPORATION reassignment NIPPON STEEL & SUMITOMO METAL CORPORATION MERGER (SEE DOCUMENT FOR DETAILS). Assignors: SUMITOMO METAL INDUSTRIES, LTD.
Application granted granted Critical
Publication of US8601852B2 publication Critical patent/US8601852B2/en
Assigned to NIPPON STEEL CORPORATION reassignment NIPPON STEEL CORPORATION CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: NIPPON STEEL & SUMITOMO METAL CORPORATION
Expired - Fee Related legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B23/00Tube-rolling not restricted to methods provided for in only one of groups B21B17/00, B21B19/00, B21B21/00, e.g. combined processes planetary tube rolling, auxiliary arrangements, e.g. lubricating, special tube blanks, continuous casting combined with tube rolling
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B17/00Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling
    • B21B17/14Tube-rolling by rollers of which the axes are arranged essentially perpendicular to the axis of the work, e.g. "axial" tube-rolling without mandrel, e.g. stretch-reducing mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B19/00Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work
    • B21B19/02Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work the axes of the rollers being arranged essentially diagonally to the axis of the work, e.g. "cross" tube-rolling ; Diescher mills, Stiefel disc piercers or Stiefel rotary piercers
    • B21B19/04Rolling basic material of solid, i.e. non-hollow, structure; Piercing, e.g. rotary piercing mills

Definitions

  • Japan Patent Application No. 2006-088462 filed Mar. 28, 2006 including specification, drawings and claims is incorporated herein by reference in its entirety.
  • the present invention relates to a manufacturing technique of seamless pipes and tube (hereinafter described as “pipes”) and, more particularly, to a method of manufacturing high-strength and high-toughness seamless pipes.
  • Patent document 1 Republished patent application WO 1996/12574-B
  • Patent document 2 Japanese Unexamined Patent Publication No. 1996-311551-A
  • Patent document 3 Japanese Unexamined Patent Publication No. 2001-240913-A
  • An object of the present invention is to provide a method of manufacturing seamless pipes with continuous process from pierce-rolling process to heat treatment.
  • the present invention is completed by optimally selecting each condition from pierce-rolling process to heat treatment on the basis of the above-mentioned findings.
  • the subject matter of the present invention is a method of manufacturing seamless pipes described below.
  • a method of manufacturing a seamless pipe and tube comprising the steps of a pierce rolling process, elongation rolling process, sizing process, reheating process, quenching process and tempering process, wherein the sizing process is completed with a temperature of the seamless pipe not less than 600° C. but less than 800° C., the seamless pipe is charged into a reheating furnace with a temperature not less than 400° C. and is reheated with a temperature not less than Ac 3 transformation temperature but not greater than 1000° C. in the reheating process.
  • high-strength and high-toughness seamless pipes can be manufactured in the continuous process from pierce rolling process to heat treatment.
  • FIG. 1 is a view showing a line configuration for carrying out the method according to the present invention. As shown in FIG. 1 , apparatuses from a billet heating furnace 1 to a straightening machine 8 are laid out in a single continuous line. While referring to FIG. 1 , each process of the present invention is described.
  • a billet is heated in the heating furnace 1 and pierced by a piercing mill, for example, an inclined roll piercing machine (piercer) 2 to become a hollow shell.
  • a pierce-rolling process other various pierce-rolling processes including Mannesmann type pierce-rolling method can be applied.
  • the pierce-rolling requirements are not subject to any constraints.
  • a billet may be manufactured from an ingot by a stabbing mill or, for example, a so-called round billet, which is continuously cast using a casting mold of circular section, may be used.
  • the pierced hollow shell is rolled using a continuous elongation rolling machine 3 and a sizing machine 4 .
  • the continuous elongation rolling machine includes a mandrel mill, and the sizing machine 4 includes a sizer, and a stretch reducer.
  • the temperature must be in a range of not less than 600° C. but less than 800° C. Because, under the condition that the temperature of the seamless pipe is lower than 600° C. when the sizing process is completed, an excessive load is applied to the sizing facility, resulting in the difficulty of sizing process.
  • the temperature of the seamless pipe is not 800° C. or greater, there is insufficient structural refinement of crystal grains of the products even if the seamless pipes are carried out reheating described below and “direct quenching-tempering”. If the temperature of the seamless pipe can be adjusted so as to be in a range not less than 600° C. but less than 800° C. when the sizing process is completed, the growth of the grains of the product structure is inhibited and extremely fine crystal grain structure is obtained. Accordingly, as hereinafter described in the embodiments, it is possible to obtain the products with excellent properties such as toughness.
  • the seamless pipes are reheated in a reheating furnace 5 .
  • the temperature of the seamless pipes is lowered from completing the sizing process to shifting to the reheating process, the temperature shall be in a range not less than 400° C. but less than 800° C.
  • the seamless pipes must be charged into the reheating furnace while the temperature of the seamless pipes is in a range not less than 400° C. but less than 800° C.
  • the reheating furnace is disposed in a single line, since it is possible to prevent the temperature of the seamless pipe from being dropped as little as possible after completing the sizing process to shifting to reheating, the requirements of the above-mentioned reheating furnace charging temperature can easily be realized. Besides, the temperature of the seamless pipe may be prevented from being dropped by providing a transportation facility, which connects the sizing process and the reheating, with a thermal insulation cover.
  • the reheating temperature shall be not less than Ac 3 transformation point and not more than 1000° C. Preferably, it shall be in a range of 850 to 1000° C.
  • the temperature of not less than Ac 3 transformation point is required to transform the product structure to austenite before proceeding to the following quenching process.
  • 1000° C. is set as an upper limit is described as follows: because the crystal grain in the product structure becomes coarse when the product is heated at greater than 1000° C., and this causes product toughness to be lowered after the quenching process.
  • the heating time may be enough to form austenite structure all over the product according to product thickness and so forth.
  • the seamless pipes taken out of the reheating furnace are brought to be not less than Ac 3 transformation point by means of reheating. Accordingly, the seamless pipes are immediately introduced into a quenching machine 6 , for example, “water-cooling apparatus”, before quenching. Besides, it is preferable to use a quenching apparatus capable of simultaneously cooling both inside and outside of the seamless pipes, in order to evenly quench thick seamless pipes.
  • a quenching machine 6 for example, “water-cooling apparatus”
  • the seamless pipes are tempered by a tempering machine 7 after quenching.
  • the tempering condition may be decided depending on the material and the required quality of the seamless pipe.
  • the seamless pipes are straightened by the straightening machine 8 after the above-mentioned heat treatment. Besides, this straightening treatment may be performed offline.
  • a billet of the composition consisting of C: 0.27%, S: 0.2%, Mn: 0.6%, Cr: 0.6%, Mo: 0.05%, V: 0.05%, and the balance being Fe and impurities was used to manufacture the seamless pipes of 177.8 mm in O.D. and 10.36 mm in thickness in a manufacturing line as shown in FIG. 1 .
  • the heating temperature of the billet, the temperature of the seamless pipe when the sizing was completed, the temperature of the seamless pipe when the seamless pipe was charged into the reheating furnace, the reheating temperature and tempering temperature were changed as shown in Table 1.
  • the seamless pipe picked out from the reheating furnace was immediately quenched by water-cooling. Crystal grain size number (according to JIS G 0551) and mechanical property of the manufactured seamless pipe is shown in Table 1.
  • Nos. 1 to 3 were the conditions of sizing process and subsequent heating treatments which meet the present invention. These crystal grain size numbers are in a range of 7.5 to 8.0, i.e. the crystals are structurally refined. Therefore, the seamless pipes are superior in toughness as well as high strength.
  • a seamless pipe consisting of fine crystal grain and having significantly superior mechanical property can be manufactured. Moreover, according to the method of the present invention, energy consumption can be reduced and manufacturing cost can greatly be curtailed, since all processes from billet heating to heat treatment are continuously performed in a single manufacturing line.
  • the seamless pipes manufactured according to the method of the present invention are preferably used for oil well tubular and so forth requiring superior low-temperature toughness.
  • FIG. 1 is a view showing an example of a row of facilities according to the method of the present invention.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Heat Treatment Of Articles (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

It is a problem of the present invention to provide a method of manufacturing the seamless pipes having better mechanical properties, by means of a pipe manufacturing method with large energy-saving effect to continuously carry out processes from pierce-rolling to heat treatment.
A method of manufacturing a seamless pipe comprising the steps of a pierce-rolling process, elongation rolling process, sizing process, reheating process, quenching process and tempering process, wherein the sizing process is completed with a temperature of the seamless pipe not less than 600° C. but less than 800° C., the seamless pipe is charged into a reheating furnace with a temperature not less than 400° C. and is reheated with a temperature not less than Ac3 transformation temperature but not greater than 1000° C. in the reheating process.

Description

This application is a continuation of International Patent Application No. PCT/JP2007/055074 filed Mar. 14, 2007. This PCT application was not in English as published under PCT Article 21(2).
The disclosure of Japan Patent Application No. 2006-088462 filed Mar. 28, 2006 including specification, drawings and claims is incorporated herein by reference in its entirety.
TECHNICAL FIELD
The present invention relates to a manufacturing technique of seamless pipes and tube (hereinafter described as “pipes”) and, more particularly, to a method of manufacturing high-strength and high-toughness seamless pipes.
BACKGROUND ART
Steel industries, having large facilities and large amounts of energy consumption, are under necessity of a continuous process, for the purpose of process-saving and energy-saving. In a field of seamless pipes, for example, a technology that heat treatment, such as “quenching” and “tempering”, which was so far provided by a facility of another line is continuously carried out after rolling process, is under consideration.
It is necessary to carefully select process conditions in order to materialize the continuous process, since the seamless pipes have extremely severe demands for reliability of the products. The following present applicants disclose some process conditions in terms of energy-saving.
[Patent document 1] Republished patent application WO 1996/12574-B
[Patent document 2] Japanese Unexamined Patent Publication No. 1996-311551-A
[Patent document 3] Japanese Unexamined Patent Publication No. 2001-240913-A
In recent years, excellent performance has been required for the seamless pipes. At a relatively high rolling finishing temperature as described in the above-mentioned documents, however, it becomes apparent that crystal grain is still coarse even when subsequent concurrent heating and heat treatment is conducted and that it is difficult to cope with higher demands especially concerning toughness of the products.
DISCLOSURE OF THE INVENTION Problems to be solved by the Invention
An object of the present invention is to provide a method of manufacturing seamless pipes with continuous process from pierce-rolling process to heat treatment.
Means for solving the Problems
As the above mentioned, the present inventors examined the conventional techniques as described in the patent documents 1 to 3 in detail and found that the grain size in products, manufactured in the continuous process, could not be refined sufficiently.
The present invention is completed by optimally selecting each condition from pierce-rolling process to heat treatment on the basis of the above-mentioned findings. The subject matter of the present invention is a method of manufacturing seamless pipes described below.
A method of manufacturing a seamless pipe and tube comprising the steps of a pierce rolling process, elongation rolling process, sizing process, reheating process, quenching process and tempering process, wherein the sizing process is completed with a temperature of the seamless pipe not less than 600° C. but less than 800° C., the seamless pipe is charged into a reheating furnace with a temperature not less than 400° C. and is reheated with a temperature not less than Ac3 transformation temperature but not greater than 1000° C. in the reheating process.
Effect of the invention
According to the present invention, high-strength and high-toughness seamless pipes can be manufactured in the continuous process from pierce rolling process to heat treatment.
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 is a view showing a line configuration for carrying out the method according to the present invention. As shown in FIG. 1, apparatuses from a billet heating furnace 1 to a straightening machine 8 are laid out in a single continuous line. While referring to FIG. 1, each process of the present invention is described.
(1) Pierce-rolling process, elongation rolling process, and sizing process
A billet is heated in the heating furnace 1 and pierced by a piercing mill, for example, an inclined roll piercing machine (piercer) 2 to become a hollow shell. As a pierce-rolling process, other various pierce-rolling processes including Mannesmann type pierce-rolling method can be applied. The pierce-rolling requirements are not subject to any constraints. A billet may be manufactured from an ingot by a stabbing mill or, for example, a so-called round billet, which is continuously cast using a casting mold of circular section, may be used.
The pierced hollow shell is rolled using a continuous elongation rolling machine 3 and a sizing machine 4. The continuous elongation rolling machine includes a mandrel mill, and the sizing machine 4 includes a sizer, and a stretch reducer.
(2) Temperature of the seamless pipe when the sizing process is completed
The temperature must be in a range of not less than 600° C. but less than 800° C. Because, under the condition that the temperature of the seamless pipe is lower than 600° C. when the sizing process is completed, an excessive load is applied to the sizing facility, resulting in the difficulty of sizing process.
On the one hand, when the temperature of the seamless pipe is not 800° C. or greater, there is insufficient structural refinement of crystal grains of the products even if the seamless pipes are carried out reheating described below and “direct quenching-tempering”. If the temperature of the seamless pipe can be adjusted so as to be in a range not less than 600° C. but less than 800° C. when the sizing process is completed, the growth of the grains of the product structure is inhibited and extremely fine crystal grain structure is obtained. Accordingly, as hereinafter described in the embodiments, it is possible to obtain the products with excellent properties such as toughness.
(3) Cooling and reheating after the sizing process
After the sizing process is completed, the seamless pipes are reheated in a reheating furnace 5. Although the temperature of the seamless pipes is lowered from completing the sizing process to shifting to the reheating process, the temperature shall be in a range not less than 400° C. but less than 800° C. In other words, the seamless pipes must be charged into the reheating furnace while the temperature of the seamless pipes is in a range not less than 400° C. but less than 800° C.
When the temperature of the seamless pipe is lowered below 400° C. after the sizing process, martensite transformation is yielded in the product structure and then reversely transformed into austenite during successive reheating. Therefore, the seamless pipes are bent and deformed. Besides, since the seamless pipes must be stayed longer in the reheating furnace, not only productivity is lowered, but also the amount of energy required for reheating is increased.
With the assumption that the reheating furnace is disposed in a single line, since it is possible to prevent the temperature of the seamless pipe from being dropped as little as possible after completing the sizing process to shifting to reheating, the requirements of the above-mentioned reheating furnace charging temperature can easily be realized. Besides, the temperature of the seamless pipe may be prevented from being dropped by providing a transportation facility, which connects the sizing process and the reheating, with a thermal insulation cover.
The reheating temperature shall be not less than Ac3 transformation point and not more than 1000° C. Preferably, it shall be in a range of 850 to 1000° C. The temperature of not less than Ac3 transformation point is required to transform the product structure to austenite before proceeding to the following quenching process. Besides, the reason why 1000° C. is set as an upper limit is described as follows: because the crystal grain in the product structure becomes coarse when the product is heated at greater than 1000° C., and this causes product toughness to be lowered after the quenching process. Moreover, since ferrite is separated out in the product structure prior to water cooling treatment when the initiation temperature of the quenching process is less than Ac3 transformation point, sufficient quench hardening is not obtained, and this causes strength and toughness of the product to be deteriorated. The reason why 850° C. is preferable as a lower limit of reheating temperature is to prevent the above-mentioned harmful effects.
The heating time may be enough to form austenite structure all over the product according to product thickness and so forth.
(4) Quenching process and tempering process
The seamless pipes taken out of the reheating furnace are brought to be not less than Ac3 transformation point by means of reheating. Accordingly, the seamless pipes are immediately introduced into a quenching machine 6, for example, “water-cooling apparatus”, before quenching. Besides, it is preferable to use a quenching apparatus capable of simultaneously cooling both inside and outside of the seamless pipes, in order to evenly quench thick seamless pipes.
The seamless pipes are tempered by a tempering machine 7 after quenching. The tempering condition may be decided depending on the material and the required quality of the seamless pipe. The seamless pipes are straightened by the straightening machine 8 after the above-mentioned heat treatment. Besides, this straightening treatment may be performed offline.
(5) Chemical composition of seamless pipe
There is not any constraint on chemical composition of seamless pipe manufactured according to the present invention. In general, every type of steel used for oil well tubular and line pipe can be employed.
Embodiments
A billet of the composition consisting of C: 0.27%, S: 0.2%, Mn: 0.6%, Cr: 0.6%, Mo: 0.05%, V: 0.05%, and the balance being Fe and impurities was used to manufacture the seamless pipes of 177.8 mm in O.D. and 10.36 mm in thickness in a manufacturing line as shown in FIG. 1. The heating temperature of the billet, the temperature of the seamless pipe when the sizing was completed, the temperature of the seamless pipe when the seamless pipe was charged into the reheating furnace, the reheating temperature and tempering temperature were changed as shown in Table 1. Besides, the seamless pipe picked out from the reheating furnace was immediately quenched by water-cooling. Crystal grain size number (according to JIS G 0551) and mechanical property of the manufactured seamless pipe is shown in Table 1.
TABLE 1
The Temp.
(° C.) of the
seamless pipe
The Temp. when the
(° C.) of the seamless pipe The Transition
The Heating seamless pipe was charged Crystal strength Temp. of the
Temp. (° C.) of when a sizing into reheating The Reheating The Tempering Grain size YS TS Charpy Impact
division No. the Billet was completed furnace Temp. (° C.) Temp. (° C.) Number* (ksi) (ksi) Test
Present 1 1250 790 695 950 700 7.5 96.3 113.0 −80
Invention 2 1250 702 601 950 700 7.8 95.5 111.8 −82
3 1250 750 505 950 700 8.0 96.3 112.5 −95
Comparative 4 1250 951 848 950 700 5.5 96.2 116.1 −46
Example 5 1250 1033 911 950 700 5.6 97.0 117.1 −42
*Crystal Grain size Number defined by JIS G 0551
As shown in Table 1, Nos. 1 to 3 were the conditions of sizing process and subsequent heating treatments which meet the present invention. These crystal grain size numbers are in a range of 7.5 to 8.0, i.e. the crystals are structurally refined. Therefore, the seamless pipes are superior in toughness as well as high strength.
In the comparative examples, in which the temperature of the seamless pipe is excessively high when the sizing process is completed and when the seamless pipes are charged into the reheating furnace, shows that the transition temperature of the Charpy impact test is significantly high because of coarse crystal size. That is to say, the physical property is inferior in toughness.
Although only some exemplary embodiments of this invention have been described in detail above, those skilled in the art will readily appreciated that many modifications are possible in the exemplary embodiments without materially departing from the novel teachings and advantages of this invention. Accordingly, all such modifications are intended to be included within the scope of this invention.
INDUSTRIAL APPLICABILITY
According to the method of the present invention, a seamless pipe consisting of fine crystal grain and having significantly superior mechanical property can be manufactured. Moreover, according to the method of the present invention, energy consumption can be reduced and manufacturing cost can greatly be curtailed, since all processes from billet heating to heat treatment are continuously performed in a single manufacturing line. The seamless pipes manufactured according to the method of the present invention are preferably used for oil well tubular and so forth requiring superior low-temperature toughness.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a view showing an example of a row of facilities according to the method of the present invention.
Description of the Reference Numerals
1. Billet heating furnace
2. Inclined roll piercing machine (piercer)
3. Continuous elongation rolling machine
4. Sizing machine
5. Reheating furnace
6. Quenching machine
7. Tempering machine
8. Straightening machine

Claims (2)

The invention claimed is:
1. A method of manufacturing a seamless steel pipe or tube comprising the steps of a pierce-rolling process, elongation rolling process, sizing process, reheating process, quenching process and tempering process, wherein the sizing process is completed with a temperature of the seamless steel pipe or tube not less than 600° C. but less than 790° C., the seamless steel pipe or tube is charged into a reheating furnace with a temperature not less than 400° C. and is reheated with a temperature not less than Ac3 transformation temperature but not greater than 1000° C. in the reheating process.
2. The method of claim 1, wherein the sizing process is completed with a temperature of the seamless steel pipe or tube not less than 702° C. but less than 790° C.
US12/232,926 2006-03-28 2008-09-26 Method of manufacturing seamless pipe and tube Expired - Fee Related US8601852B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2006-088462 2006-03-28
JP2006088462 2006-03-28
PCT/JP2007/055074 WO2007111131A1 (en) 2006-03-28 2007-03-14 Process for production of seamless pipes

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/055074 Continuation WO2007111131A1 (en) 2006-03-28 2007-03-14 Process for production of seamless pipes

Publications (2)

Publication Number Publication Date
US20090038358A1 US20090038358A1 (en) 2009-02-12
US8601852B2 true US8601852B2 (en) 2013-12-10

Family

ID=38541052

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/232,926 Expired - Fee Related US8601852B2 (en) 2006-03-28 2008-09-26 Method of manufacturing seamless pipe and tube

Country Status (9)

Country Link
US (1) US8601852B2 (en)
EP (1) EP2006396B1 (en)
JP (1) JP4894855B2 (en)
CN (1) CN101410536B (en)
AR (1) AR059967A1 (en)
BR (1) BRPI0710119B1 (en)
MX (1) MX2008012240A (en)
RU (1) RU2375470C1 (en)
WO (1) WO2007111131A1 (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT507596B1 (en) * 2008-11-20 2011-04-15 Voestalpine Tubulars Gmbh & Co Kg METHOD AND DEVICE FOR PRODUCING STEEL TUBES WITH SPECIAL CHARACTERISTICS
JP5262949B2 (en) * 2009-04-20 2013-08-14 新日鐵住金株式会社 Manufacturing method and equipment for seamless steel pipe
EP2521626B1 (en) * 2010-01-05 2014-12-17 SMS Innse S.p.A. Tube rolling plant and method for rolling seamless tubes
DE102010008389A1 (en) * 2010-02-17 2011-08-18 Kocks Technik GmbH & Co. KG, 40721 Rolling system for producing seamless metallic pipe, has induction system provided between front rolling device and rear rolling device for influencing temperature of intermediate product before product is supplied to rear rolling device
JP2013129879A (en) 2011-12-22 2013-07-04 Jfe Steel Corp High-strength seamless steel tube for oil well with superior sulfide stress cracking resistance, and method for producing the same
CN102632078A (en) * 2012-05-03 2012-08-15 无锡西姆莱斯石油专用管制造有限公司 Production method of J55 steel-grade oil casing capable of resisting impact load
CN102716910B (en) * 2012-06-29 2015-03-25 衡阳华菱钢管有限公司 Steel tube for die-casting die and preparation method thereof
CN103464507B (en) * 2013-07-25 2015-11-11 攀钢集团成都钢钒有限公司 A kind of method of producing high-precision austenite seamless steel pipe
DE102013108803A1 (en) 2013-08-14 2015-02-19 Vallourec Deutschland Gmbh Process for producing a tempered seamless hot-worked steel tube
JP6008062B1 (en) * 2014-11-27 2016-10-19 Jfeスチール株式会社 Method for producing duplex stainless steel seamless pipe
US11045853B2 (en) * 2016-02-22 2021-06-29 Aalto University Foundation Sr Method and tools for manufacturing of seamless tubular shapes, especially tubes
CN112680585B (en) * 2019-10-17 2022-01-25 杰森能源技术有限公司 Method for straightening heat treatment deformation of continuous oil pipe
CN112620388B (en) * 2020-12-01 2022-08-02 中色科技股份有限公司 Online continuous rolling annealing stretching production line for copper alloy pipe
EP4324941A1 (en) * 2022-08-19 2024-02-21 Benteler Steel/Tube GmbH Method for producing a tubular semi-finished product

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4075041A (en) 1976-06-14 1978-02-21 Nippon Steel Corporation Combined mechanical and thermal processing method for production of seamless steel pipe
AR230652A1 (en) 1981-07-09 1984-05-31 Mannesmann Ag PROCEDURE FOR THE MANUFACTURE OF HIGH QUALITY SEAMLESS STEEL CANES
JPS59150019A (en) 1983-02-14 1984-08-28 Sumitomo Metal Ind Ltd Production of seamless steel pipe having high toughness
GB2137539A (en) 1983-03-28 1984-10-10 Mannesmann Ag Manufacturing seamless steel pipe
JPS59182919A (en) 1983-03-31 1984-10-17 Sumitomo Metal Ind Ltd Production of high-tensile low-alloy steel pipe
SU1183552A1 (en) 1983-12-16 1985-10-07 Inst Litya An Ussr Method of producing casing pipes and tubing springs
JPH01168814A (en) 1987-12-24 1989-07-04 Sumitomo Metal Ind Ltd Manufacture of seamless steel pipe
US4991419A (en) * 1988-11-18 1991-02-12 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless tube formed of titanium material
JPH03146206A (en) * 1989-10-31 1991-06-21 Nkk Corp Method for rolling seamless steel pipe
JPH0598350A (en) 1990-12-06 1993-04-20 Nippon Steel Corp Production of line pipe material having high strength and low yield ratio for low temperature use
WO1996012574A1 (en) 1994-10-20 1996-05-02 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless steel pipes and manufacturing equipment therefor
JPH08311551A (en) 1995-05-15 1996-11-26 Sumitomo Metal Ind Ltd Production of high strength seamless steel pipe excellent in sulfide stress cracking resistance
RU2086670C1 (en) 1996-06-10 1997-08-10 Акционерное общество "Северский трубный завод" Method of heat treatment of pipes
AR001416A1 (en) 1995-04-03 1997-10-22 Mannesmann Ag A procedure for the manufacture of a stretched product.
JPH09287028A (en) 1996-04-19 1997-11-04 Sumitomo Metal Ind Ltd Production of seamless steel pipe and producing equipment
AR001655A1 (en) 1996-04-18 1997-11-26 Sumitomo Metal Ind Procedure for manufacturing seamless steel tubes and provision for the use of said procedure
WO1998001589A1 (en) 1996-07-08 1998-01-15 Mannesmann Ag Process for producing weldless steel pipes
JP2001240913A (en) 2000-03-01 2001-09-04 Sumitomo Metal Ind Ltd Method for producing high strength seamless steel pipe having excellent toughness
US20010027831A1 (en) 1997-06-26 2001-10-11 Kawasaki Steel Corporation Super fine granular steel pipe and method for producing the same
JP2003225705A (en) 2002-02-05 2003-08-12 Kenji Abiko Method of working soft copper material
RU2210604C2 (en) 2001-10-11 2003-08-20 Открытое акционерное общество "Волжский трубный завод" Method of manufacture of seamless pipes from low- carbon steel
AR035035A1 (en) 2001-05-28 2004-04-14 Ypf S A STEEL WITH LOW ALLOY CARBON FOR THE MANUFACTURE OF PIPES FOR EXPLORATION AND PRODUCTION OF PETROLEUM AND / OR NATURAL GAS, WITH IMPROVED CORROSION RESISTANCE AND LOW LEVEL OF DEFECTOLOGY AND PROCEDURE FOR MANUFACTURING PIPES WITHOUT SEWING

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5891123A (en) * 1981-11-27 1983-05-31 Kawasaki Steel Corp Production of seamless steel pipe for 80kg/mm2 class structure having excellent toughness of weld zone
JP2003225701A (en) * 2002-01-30 2003-08-12 Jfe Steel Kk Device for continuously rolling seamless steel tube

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4075041A (en) 1976-06-14 1978-02-21 Nippon Steel Corporation Combined mechanical and thermal processing method for production of seamless steel pipe
AR230652A1 (en) 1981-07-09 1984-05-31 Mannesmann Ag PROCEDURE FOR THE MANUFACTURE OF HIGH QUALITY SEAMLESS STEEL CANES
JPS59150019A (en) 1983-02-14 1984-08-28 Sumitomo Metal Ind Ltd Production of seamless steel pipe having high toughness
GB2137539A (en) 1983-03-28 1984-10-10 Mannesmann Ag Manufacturing seamless steel pipe
JPS59182919A (en) 1983-03-31 1984-10-17 Sumitomo Metal Ind Ltd Production of high-tensile low-alloy steel pipe
SU1183552A1 (en) 1983-12-16 1985-10-07 Inst Litya An Ussr Method of producing casing pipes and tubing springs
JPH01168814A (en) 1987-12-24 1989-07-04 Sumitomo Metal Ind Ltd Manufacture of seamless steel pipe
US4991419A (en) * 1988-11-18 1991-02-12 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless tube formed of titanium material
JPH03146206A (en) * 1989-10-31 1991-06-21 Nkk Corp Method for rolling seamless steel pipe
JPH0598350A (en) 1990-12-06 1993-04-20 Nippon Steel Corp Production of line pipe material having high strength and low yield ratio for low temperature use
WO1996012574A1 (en) 1994-10-20 1996-05-02 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless steel pipes and manufacturing equipment therefor
AR001416A1 (en) 1995-04-03 1997-10-22 Mannesmann Ag A procedure for the manufacture of a stretched product.
JPH08311551A (en) 1995-05-15 1996-11-26 Sumitomo Metal Ind Ltd Production of high strength seamless steel pipe excellent in sulfide stress cracking resistance
AR001655A1 (en) 1996-04-18 1997-11-26 Sumitomo Metal Ind Procedure for manufacturing seamless steel tubes and provision for the use of said procedure
JPH09287028A (en) 1996-04-19 1997-11-04 Sumitomo Metal Ind Ltd Production of seamless steel pipe and producing equipment
US6024808A (en) * 1996-04-19 2000-02-15 Sumitomo Metal Industries, Ltd. Seamless steel pipe manufacturing method and equipment
RU2086670C1 (en) 1996-06-10 1997-08-10 Акционерное общество "Северский трубный завод" Method of heat treatment of pipes
WO1998001589A1 (en) 1996-07-08 1998-01-15 Mannesmann Ag Process for producing weldless steel pipes
US20010027831A1 (en) 1997-06-26 2001-10-11 Kawasaki Steel Corporation Super fine granular steel pipe and method for producing the same
JP2001240913A (en) 2000-03-01 2001-09-04 Sumitomo Metal Ind Ltd Method for producing high strength seamless steel pipe having excellent toughness
AR035035A1 (en) 2001-05-28 2004-04-14 Ypf S A STEEL WITH LOW ALLOY CARBON FOR THE MANUFACTURE OF PIPES FOR EXPLORATION AND PRODUCTION OF PETROLEUM AND / OR NATURAL GAS, WITH IMPROVED CORROSION RESISTANCE AND LOW LEVEL OF DEFECTOLOGY AND PROCEDURE FOR MANUFACTURING PIPES WITHOUT SEWING
RU2210604C2 (en) 2001-10-11 2003-08-20 Открытое акционерное общество "Волжский трубный завод" Method of manufacture of seamless pipes from low- carbon steel
JP2003225705A (en) 2002-02-05 2003-08-12 Kenji Abiko Method of working soft copper material

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Kondo/Exhibit A: "Basic-Abstract" retrieved from Derwent database, 1991, pp. 1-3. *

Also Published As

Publication number Publication date
JPWO2007111131A1 (en) 2009-08-13
MX2008012240A (en) 2008-10-07
WO2007111131A1 (en) 2007-10-04
AR059967A1 (en) 2008-05-14
EP2006396B1 (en) 2018-05-16
BRPI0710119A2 (en) 2011-08-02
JP4894855B2 (en) 2012-03-14
RU2375470C1 (en) 2009-12-10
BRPI0710119B1 (en) 2019-04-02
CN101410536A (en) 2009-04-15
EP2006396A9 (en) 2009-07-22
CN101410536B (en) 2011-05-18
US20090038358A1 (en) 2009-02-12
EP2006396A2 (en) 2008-12-24
EP2006396A4 (en) 2012-03-28

Similar Documents

Publication Publication Date Title
US8601852B2 (en) Method of manufacturing seamless pipe and tube
US5938865A (en) Process for producing high-strength seamless steel pipe having excellent sulfide stress cracking resistance
US11313005B2 (en) Seamless steel pipe and method for producing the seamless steel pipe
US6846371B2 (en) Method for making high-strength high-toughness martensitic stainless steel seamless pipe
EP3354756B1 (en) Online-controlled seamless steel tube cooling process and seamless steel tube manufacturing method with effective grain refinement
US9175360B2 (en) Method for manufacturing seamless steel pipe for line pipe and seamless steel pipe for line pipe
US6896746B2 (en) Hot-rolled steel wire rods and bars usable for machine structural use without annealing and method for producing the same
US11466333B2 (en) Continuous hot rolled coil for high collapse-resistant sew petroleum casing and manufacturing method thereof
US20130004787A1 (en) Seamless steel pipe for steam injection and method for manufacturing the same
CN101328559B (en) Steel for low yield ratio petroleum case pipe, petroleum case pipe and manufacturing method thereof
US10233520B2 (en) Low-alloy steel pipe for an oil well
JP4123672B2 (en) Manufacturing method of high strength seamless steel pipe with excellent toughness
CN101578381A (en) Processes for production of steel sheets for cans
JP5020690B2 (en) High strength steel pipe for machine structure and manufacturing method thereof
JP3965708B2 (en) Manufacturing method of high strength seamless steel pipe with excellent toughness
JP3785828B2 (en) Steel pipe drawing method
JP2000096143A (en) Manufacture of steel tube
JP3896647B2 (en) Manufacturing method of high-strength steel pipe with excellent workability
JP2000096144A (en) Production of steel tube
JP2000094009A (en) Manufacture of steel tube
KR20030054946A (en) A method for manufacturing the dual phase carbon steel wire by using controlled rolling and rapid cooling

Legal Events

Date Code Title Description
AS Assignment

Owner name: SUMITOMO METAL INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:OSAKO, HAJIME;REEL/FRAME:021881/0361

Effective date: 20080725

AS Assignment

Owner name: NIPPON STEEL & SUMITOMO METAL CORPORATION, JAPAN

Free format text: MERGER;ASSIGNOR:SUMITOMO METAL INDUSTRIES, LTD.;REEL/FRAME:029885/0001

Effective date: 20130104

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

AS Assignment

Owner name: NIPPON STEEL CORPORATION, JAPAN

Free format text: CHANGE OF NAME;ASSIGNOR:NIPPON STEEL & SUMITOMO METAL CORPORATION;REEL/FRAME:049257/0828

Effective date: 20190401

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20211210