US3921362A - Method of and means for multi-story building construction - Google Patents
Method of and means for multi-story building construction Download PDFInfo
- Publication number
- US3921362A US3921362A US489030A US48903074A US3921362A US 3921362 A US3921362 A US 3921362A US 489030 A US489030 A US 489030A US 48903074 A US48903074 A US 48903074A US 3921362 A US3921362 A US 3921362A
- Authority
- US
- United States
- Prior art keywords
- lift
- wall panels
- floor
- slab
- stack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 17
- 238000009435 building construction Methods 0.000 title description 2
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 13
- 238000005266 casting Methods 0.000 claims description 27
- 230000000087 stabilizing effect Effects 0.000 claims description 6
- 238000009428 plumbing Methods 0.000 claims description 4
- 230000006641 stabilisation Effects 0.000 claims description 4
- 238000011105 stabilization Methods 0.000 claims description 4
- 238000011065 in-situ storage Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 5
- 239000003381 stabilizer Substances 0.000 description 6
- 239000003566 sealing material Substances 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 229920005830 Polyurethane Foam Polymers 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000011496 polyurethane foam Substances 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3533—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the raising of hingedly-connected building elements, e.g. arches, portal frames
- E04B1/3538—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the raising of hingedly-connected building elements, e.g. arches, portal frames the elements being a floor slab with hingedly-connected wall panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
- E04G21/168—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements used for tilting, e.g. from horizontal to vertical position or vice versa
Definitions
- ABSTRACT There is shown the preforming of walls and floor slabs as a stack wherein the walls of each story are connected to the next floor slab thereabove by lift pick-up cables spaced along the to be top edge of each wall.
- Lift apparatus forming no part of the building is provided for attaching lift fixtures to elements cast in the edges of the floor slabs.
- the lift apparatus includes pairs of columns as necessary supporting a repositionable upward bridge therebetween having lifting jacks operating lift rods connected with the floor slabs below by the removable lift fixtures.
- FIG I40 FIG. l6
- An object of the invention is to provide a building by self-erecting walls precast in a horizontal position on a floor or casting bed, casting a ceiling slab thereabove to which the walls are hangingly connected by pick-up cables and lifting the slab while swinging the walls outwardly with their bottom ends sliding'along the floor below thereby adding to stabilization of the self-erection.
- Another object of the invention is to provide for erecting successively cast sets of load bearing walls connected to ceiling slabs cast thereabove into a multistory building and adding to the stability of the erected building by installing vertical reinforcing rods in cast in aligned apertures in the walls and ceiling slabs.
- a further object of the invention is to provide overload protection for each lifting fixture by lifting in seand its walls to occur at the initial part of a lift of the stack.
- Yet another object of the invention is to provide lift fixtures to be detachably attached to the slabs of a stack of sets of slabs and walls and to each other fixture that can be removed insequence from the bottom slab after it has been lifted and lowered'onto its connected supporting'walls.
- Still another object of the invention' is to provide lifting apparatus for sets of slabs and connected walls in a stack that has pairs of externally positioned columns supporting a bridge member and 'lift jacks thereon that is repositionable upward for making successive lifts after connecting and disconnecting lift rods from'the jacks to lift fixtures provided for the respective successive stacked slabs.
- Another object of the invention is to provide stabilization in lifting a stack of sets of ceiling slabs and connected support walls by installing temporary pairs of erecting columns, installing a bridge member between the pairs of columns and temporarily securing it in a stabilizing manner in successive lift positions and applying a stabilizer between a lifted ceiling or floor slab and the adjacent column.
- a further object of the invention is to provide a connection between a horizontally precast wall on a floor and a ceiling slab 'cast thereabove consisting of a pieceof cable that is formed with a loop at its lower end cast in the walls top edge with the loop lying in a plane ex tending transverse to the top edge of the wall and extending the ends of the cable upward for casting into the ceiling slab adjacent its edge in such a position that the top edge of the wall aligns to support the edge of the slab above and there is a spacing of approximately /2 to inch between the slab and the hanging wall as the slab is lifted,
- the support by the'cable is from the leg end thereof that is positioned nearer the edge of the shifts to the other leg of the cable and to its portion of the loop directly therebelow whereby breaking and spauling of the concrete is avoided.
- FIG. 1 is a perspective view of a typical ground floor slab having cast thereon the necessary to be lifted and swung into position supporting walls with their ceiling slab thereabove to which they are attached along their to be top edges by pick-up cables cast therein illustrative for a three story building, the topmost ceiling slab being fragmentally shown;
- FIG. 2 is a fragmentary perspective view of the edge of a floor and/or ceiling slab with a lift attaching member cast therein and a recess therebelow in the lower face at the slab edge both for receiving and attaching a lift fixture;
- FIG. 3 is a perspective view of the three story building with lifting apparatus in position, the supporting walls for the third story being swung into position as their ceiling slab to which they are attached by pick-up cables is lifted into position and precast wall panels ready for lift by a crane to fill the void wall'spaces;
- FIG. 4 is a cross sectional fragmentary side view of the ground floor slab, the horizontallycast supporting walls connected by cast in pick-up cables to their .ceiling slabs thereabove and a side view of the lift attaching members cast in the slabs with the lift fixturesattached;
- FIG. 5 is a left hand end view of FIG. 4 showing the attached lift fixtures and their connection with each other for successive pick-up from top fixture on down;
- FIG. 6 is a view similar to FIG. 4 showing the initiation of the lift with the ceiling slabs and their supporting walls successively peeled-off and separated starting with the top most ceiling slab and its attached walls;
- FIG. 7 is a side view of a vertical support column whose lower end is secured to a foundation support, one end of a bridge member hoisted into position by a hand winch and secured to the column, a lifting jack on the bridge and a lift rod attached to the lift fixtures, the slabs and walls having been peeled-off beginning with the roof slab and then separating each slab and its supporting wall in sequence;
- FIG. 8 is a view similar to FIG. 7 showing the first floor support walls swinging slowly outwardly towards their vertical supporting position as the lift progresses and an aperture in the wall and in its ceiling slab above is typically shown ready to receive a stabilizing pin which will be replaced by permanent reinforcing rods;
- FIG. 9 is similar to FIG. 8 showing the first floor supporting walls supporting their ceiling slab which has its lift fixture removed and a stabalizer installed between the ceiling slab and the column and separating wedges in position between the respective ceiling slabs;
- FIG. 10 is similar to FIG. 9 showing the bridge having been hoisted to its next upward position and secured to the column and the second floor supporting walls being swung outwardly into load bearing position as the lifting continues; 7
- FIG. 11 is similar to FIG. 10 the second story walls are now in load bearing position supporting their ceiling slab whose lift fixture has been removed and a stabilizer member installed between the second story ceiling slab and the column;
- FIG. 12 is similar to FIG. 11 showing the bridge hoisted to its next lift position and secured to the column and the roof slab which is the third story ceiling slab being lifted with its load bearing walls being swung outwardly;
- FIG. 13 is a view similar to FIG. 12 with the third story ceiling slab in position supported by its load bearing walls, the top lift fixture has been detached and the temporary stabilizers are removed and the lift apparatus is ready to be dismantled and moved to another site;
- FIG. 14a is a fragmentary showing of a floor slab and its attached wall and the lift pick-up cable at start of lift;
- FIG. 14b shows the wall swung outward about 45, installation of sealing material and the relatively small spacing between wall and supporting slab and the shift in cable portion support;
- FIG. 140 shows the wall having been laterally aligned and in load bearing position under the edge of the slab
- FIG. 15 is a showing of the erected walls and slabs and the aligned apertures formed in the walls and slabs with seismic reinforcement grouted in place;
- FIG. 16 is a showing of a form that the stabilizer between slab and erecting column may take
- FIG. 1 a typical ground floor slab l0-has been provided on suitable foundations and in the illustration it extends outward to provide foundation supports for floor slab could; extend only to the perimeter of the walls of the building and separate foundations would then be provided for each vertical support column.
- On the ground floor slab or casting bed 10 are successively cast load bearing walls and their ceiling slabs.
- a separating layer of bond-preventing material (not shown) is placed on the top of the ground floor slab 10.
- Suitable forms are provided on the ground floor slab for first story walls 1141,1211, 13a and 14a to be poured similar to the third story walls 110, 12c, 13c and showing in FIG. 1.
- FIG. 8 shows a temporary holding pin 48 inserted through a hole in the ceiling slab that is in alignmentwith the aperture 18. After overnight curing the walliforms are removed and used again. Any voids between the walls such as at 19, see FIG. 1, are filled with like interio'r load-bearing pickup walls or waste material such as soil and perhaps finished with a thin waste-slab of concrete.
- a separating'layer of bond-preventing material (not shown) is placed-over the cured first story walls.
- the ceilingslab for the first story is next to be cast over the first story now cured walls.
- a slab perimeter form (not I shown) overhanging the wall'edges is installed.
- the pe rimeter overhang see at,-20 in FIG. 1, is at least the width of the load bearing wall cast below whose to be top 'edge will support the ceiling slab; underneath this overhanging portion.
- the projecting-ends of the pickup cables l6. are placed in position within the forms for the ceiling slab. Also lift attaching members. 21 such as U-bolts, see FIG.
- the form is providedwith a filler block (not shown) so as to form a recess 22a extending in from the edge of the slab at its bottom face.
- FIGS. 4 and 5 receive a web of an angle bar on a lift.
- two L-shaped members could be cast in the slab with the legs threaded and projecting spaced apart at the edge of the slab to receive the lift fixtures.
- the next two stories above have their sets of supporting walls and ceiling slabs likewise cast and connected.
- the walls are respectively numbered 11a, 12a, 13a and 14a for the first story.
- the second story walls are numbered 11b. 12b, 13b and 14b and as noted above the third story walls are respectively 110, 12c. 13c and 14:.
- the first story ceiling slab as indicated above is 22, the second story ceiling slab is 23 and the third story ceiling slab or roof slab is 24.
- Ceiling slab 22 is the floor slab for the second story and ceiling slab 23 is the floor slab for the third floor.
- the void wall spaces are filled by separately cast wall slabs indicated in the piles 25 and 26. These are lifted and set in place by a separate crane.
- foundation supports a for the vertical support columns 27 On the ground floor slab there is provided foundation supports a for the vertical support columns 27. These columns are about three feet longer than the total height of the building. For the particular three story building to be erected three pairs of temporary support columns 27 are placed on their support foundations 10a and secured by hold down bolts and grouting (not shown). Each column has a one ton hand operated winch 28 installed near its lower end. This is for hoisting the cross bridges 29 into their successive lift positions above the pile of cast slabs and their load bearing connected walls to be swung outwardly into position during the lifting operation.
- Each winch has a cable 28a that is led up the column and over sheaves 28b mounted at the top of the column and then down to where it is secured to the cross bridge 29.
- the number of pairs of support columns 27 and the center-to-center spacing between the three pairs is a function of the separate jack or separate lift means capacity and convenience.
- Each bridge 29 is bifurcated at its ends to receive the columns 27 and be guided thereby in their sliding engagement with the columns.
- Means are provided at fixed points along the columns for supporting the cross bridge for one lift per each ceiling slab or floors.
- a connection shown is provided by having through apertures through which is inserted a support pin 30.
- a welded-in tube (not shown) to reinforce the through apertures 27a could be provided, appropriate saddles (not shown) are used to provide fixity and to distribute the load on the support pins 30.
- jack lift means 31 such as lift-slab jacks such as shown in US. Pat. Nos. 2,758,467 and 3,201,088.
- Each separate lift means is vertically above the projecting lift attaching members 21 projecting from the slabs below.
- lift fixtures which are detachably attached to the slabs and detachably attached to each other are provided.
- a top lift fixture is generally indicated as 33. It has a cross head 33a of four welded together plates to form a box like member, square in cross section.
- the cross head 33a has vertically extending apertures 33b through each end to receive the two depending lift rods 32 that are secured by a nut 32a or a quick release hinged type nut used on lift rods in lift-slab work.
- a depending tension bar 33c is welded to the cross head 33a and it has a pair of lugs or bosses 33d welded to its opposite inner faces adjacent its lower end.
- An angle bar 34 has its vertically extending web welded to the tension bar 330 adjacent the lugs 33d thereon and its vertically extending web has apertures therethrough spaced to each side of the tension bar 33c to receive the threaded legs of the U-bolt lift attaching member 21 to which it is secured by nuts 21a.
- the transversely extending web or flange of the angle bar 34 projects into the formed recess 24 a in the top most ceiling slab for lift engagement to avoid interference at erection with wall 11c.
- a second lift fixture is generally indicated as 35. It is made up of a pair of spaced apart tension bars 35a held spaced apart by a pair of spaced apart reinforcing cross pieces 35b welded thereto. A pair of lugs 350 is welded to the inside faces adjacent the top end of the spaced apart bars while another pair of lugs is welded to the inside faces adjacent the bottom end. Likewise an angle bar 36 is welded to the tension bar 35a adjacent its lower end and adjacent the lower pair of lugs 35d. The upper web of the angle bar is attached to the projecting threaded legs of the lift attaching member in ceiling slab 23 and its lower web is received in the recess 23a of the ceiling slab 23 for lift engagement. Referring to FIG.
- top pair of lugs 35c on second lift fixture 35 are spaced above the pair of lugs 33d on the top lift fixture 33 so that the roof slab 24 is first lifted and its attached walls peeled-out. This spacing is of the order of /z to about /1 inches.
- a third lift fixture is generally indicated as 37. It is made up of a tension bar 37a that'has a pair of lugs or bosses 37b welded to its opposite faces adjacent its top end.
- the tension bar 37a is slidably received between the spaced tension bars 35a on the lift fixture 35 thereabove and the pair of lugs 37b are spaced above the lugs 35d on lift fixture 35 for like engagement as explained above for the top lift fixture 33 and the second lift fixture 35.
- a pair of lugs 376 which are for engagement with a type of lift fixture 35 that would be attached to a slab therebelow if a building with a greater number of stories was being built.
- An angle bar 38 has its vertical web welded to the tension bar at the bars lower end and has apertures therethrough like the other lift fixtures to receive the extending threaded ends of the lift attaching member in slab 22. The transverse web of the angle bar 38 is received in the adjacent recess 22a for lift engagement with slab 22.
- FIG. 14a shows the slab and the wall W in their cast position with the lift pick up cable 16 looped around reinforcing bars 17.
- the reinforcing bars 17 help position the cable but they are not necessary for anchorage.
- the unique installation and cable path geometry avoids breaks and spauling of the concrete.
- cable portion A pulls in such a direct line that there is no concrete spauling.
- cable portion B takes over and finishes the job with vertical pulling.
- a sealing sheet or sealing material 41 may be installed at the top edge of the wall to provide a seal in its load bearing contact with the slab portion thereabove.
- the sealing material may be a strip of polyurethane foam, a smear of asphalt or any suitable sealing material. As the wall swings into position a certain amount of lateral alignment is required. The lift pick-up cable does not act as a hinge.
- FIG. 15 there is shown the seismic reinforcement between walls and slabs.
- the ground floor slab 10 has formed therein vertically extending apertures 9 along its perimeter where it receives the bottom of the load bearing wall.
- the wall has an aperture 18, see FIG. 8, formed therein during casting and vertically aligned aperatures 22b, 23b and 24b are formed in the respective slabs 22, 23 and 24.
- Reinforcing seismic rods 42 are installed and grouted in position in the aligned apertures.
- a stabilizer 39 may take between an erecting column 27 and the adjacent lift attaching member 21 projecting from the lifted slab 22 after the lifting fixture 37 has been removed.
- a U-bolt 43 is slipped over the column 27 and its threaded legs receive a clamping piece 44 that is secured by nuts 45 received on this threaded legs.
- the clamping piece 44 has welded thereto threaded studs 46 spaced the same distance apart as the projecting threaded legs of the lift attaching member 21.
- Turnbuckle members 47 secure the aligned threaded legs.
- the column 27 oppositely positioned has the same installation and by setting up of the respective turn-buckle members 47, the lifted slab 22 is set off and stabilizes the column 27 from slab 22 for a successive next lift of slab 23 there above all as more fully described hereinafter.
- the entire stack above is now supported by the completed first story load bearing walls and their ceiling slab, i.e., the second floor or story slab 22.
- the jacking means is disengaged by removing their continuously threaded lift rod attaching jack nuts if standard lift-slab jacking equipment is used. Using the winches 28, the bridges 29 and jacks 31 are lifted to the second station and the column support or shear pins 30 reinstalled at the next higher lift station. The lifting rods, attached to the top lift fixture 33, need no attention. The jacking 8 nuts of the lift system are installed and their drive system is adjusted.
- the lift fixtures designated by the reference number 37 are removed and set aside for reuse.
- the slab 22 now in place is stable.
- Installation of the stabilizers 39 shown in FIG. 16 fix the columns 27, see FIG. 9, ready for the next lift.
- the jacks 31 through their control console and connections (not shown) are actuated until the second slab 23 is in place,'and the load bearing second story walls 11b are resting on the second floor slab or first floor ceiling slab 22. Again, see FIG. 11, the stack (roof slab 24 and third story walls 11c) are lowered onto the fixed third story floor slab 23 on wedges 49 already in place from the previous lift. The jacks are unloaded and disconnected. The lift fixtures 35 are removed and set aside for further usuage and the columns stabilized as necessary. The bridge 29 and jacks 31 are hoisted into the final lift position and secured for stability. The roof slab 24 is lifted, see FIG. 12, as the attached third story walls 11c become substantially self-erecting.
- the narrow voids in the walls are closed with the conventional precast panels such as shown in stacks 25 and 26 in FIG. 3 as referred to above.
- Steel reinforcing bars, see FIG. 15, are placed in the aligned vertical apertures or ducts 18 in the walls and vertical apertures in the floor slabs and grouted in to complete the vertical continuity and integrity of the structure.
- the building is finished in conventional manner.
- the method of erecting single or multiple story concrete columnless buildings which comprises the steps of: forming a permanent base for a building to be erected, said base forming a first casting bed;
- step of attaching said lift fixtures to said lift attaching members includes the step of interconnecting said lift fixtures to one another with slight vertical freedom so that as said stack is initially lifted said lift fixtures cause each said set of wall panels and floor slabs to separate slightly while still at ground level, whereby the connections of all of said wall panels to said floor slabs and the connection of all of said floor slabs to said lift means may be checked prior to further lifting of said stack.
- steps of attaching said wall panels to their corresponding floor slabs comprises securing diverging double-stranded pick-up cables between the wall panels and the floor slabs, said strands converging at the pivot lines so that the weight of each wall panel is transferred from one to the other strand of each of its pick-up cables as the wall panels swing toward the vertical, said cables permitting said panels to spaul along said pivot lines to compensate for slight pivot line misalignment or for slab deflectron.
- first floor slab for a building to be erected, said first floor slab forming a first casting bed;
- first set of load supporting, downwardly swingable wall panels in a generally horizontal position on said first casting bed and embedding portions of spaced apart flexible pick-up cables across the periphery pivot line of said first set of wall panels, said wall panels representing substantial portions of at least two pairs of walls approximately at right angles to each other;
- each layer utilizing the preceding layer as a casting bed, each said set of wall panels being attached to its corresponding above floor slab to form a stack of said wall panels and floor slabs corresponding to the stories of building;
- each of said bridge members supporting one floor height above the poured stack a movable bridge member between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent to each column;
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
There is shown the preforming of walls and floor slabs as a stack wherein the walls of each story are connected to the next floor slab thereabove by lift pick-up cables spaced along the to be top edge of each wall. Lift apparatus forming no part of the building is provided for attaching lift fixtures to elements cast in the edges of the floor slabs. The lift apparatus includes pairs of columns as necessary supporting a repositionable upward bridge therebetween having lifting jacks operating lift rods connected with the floor slabs below by the removable lift fixtures. The whole stack is lifted and starting with the first floor the ceiling slab lifts the walls therebelow which swing out and are guided into position under the slab thereabove and become load bearing walls. Successive like lifts are made to position the respective ceiling slabs and load bearing walls. Suitable vertically aligned apertures are formed in the walls and slabs above for installation of reinforcing rods.
Description
United States Patent Cortina 51 Nov. 25, 1975 [76] Inventor: Pablo Ortego Cortina, Taine 229,
Despachos 601-602, Mexico 5, D.F., Mexico [22] Filed: July 16, 1974 [211 Appl. No.: 489,030
[30] Foreign Application Priority Data Mar. 18, 1974 Mexico 149914 [52] U.S. Cl. 52/745; 52/126; 52/236; 52/714 [51] Int. Cl. E048 1/343; 5048 l/35 [58] Field of Search 52/126, 236, 745
[56] References Cited UNITED STATES PATENTS 1,362,069 12/1920 Witzel 52/745 3,490,191 l/197O Ekblon 52/236 3,593,482 7/1971 Johnson 52/745 3,600,870 8/1971 Greenhalgh 52/745 3,713,265 1/1973 Wysocki 52/126 3,724,157 4/1973 Miram 52/745 FOREIGN PATENTS OR APPLICATIONS 82,772 5/1957 Denmark 52/745 1,441,324 4/1966 France 52/745 Primary Examiner-Henry C. Sutherland Attorney, Agent, or Firm.lones, Tullar & Cooper [5 7] ABSTRACT There is shown the preforming of walls and floor slabs as a stack wherein the walls of each story are connected to the next floor slab thereabove by lift pick-up cables spaced along the to be top edge of each wall. Lift apparatus forming no part of the building is provided for attaching lift fixtures to elements cast in the edges of the floor slabs. The lift apparatus includes pairs of columns as necessary supporting a repositionable upward bridge therebetween having lifting jacks operating lift rods connected with the floor slabs below by the removable lift fixtures. The whole stack is lifted and starting with the first floor the ceiling slab lifts the walls therebelow which swing out and are guided into position under the slab thereabove and be- 7 Claims, 18 Drawing Figures US. Patent N0v.25, 1975 Sheet10f7 3,921,362
U.S, Patent Nov. 25, 1975 Sheet 4 of7 3,921,362
FIG. 7
FIG. 6
US. Patent Nov. 25, 1975 shw 5 of7 3,921,362
2 t mm mm) w A h F rm 0: g m
mdE
i/ Em US. Patent Nov. 25, 1975 Sheet 6 0f 7 US. Patent Nov. 25, 1975 Sheet 7 of7 3,921,362
HG, I40
FIG, l4b
FIG. l5
FIG I40 FIG. l6
METHOD OF AND MEANS FOR MULTI-STORY BUILDING CONSTRUCTION BACKGROUND OF THE INVENTION 1. Field of the Invention An on site erected structure consisting of setsjof horizontally cast walls connected by lift pick-up cables to a ceiling slab cast thereabove and externally erected lift means. The stack of cast sets are lifted as a whole and the lowest most ceiling slab lifts the walls attached therebelow that each swing simultaneously outward and are plumbed into position as load bearing walls followed by successive lifts to position the ceiling or floor slabs and their walls after which reinforcing rods are grouted in aligned vertical apertures cast in the walls and slabs.
2. Description of the Prior'Art Buildings have been erected by forming floor slabs one upon the other at ground level with spaced apart.
vertical columns extending up through the floors and lifting apparatus applied to the columns that are partially formed as the slabs are raised into position and completion of the pouring of the columns takes place as the lifting of the floors progresses such as shown in U.S. Pat. No. 1,066,436. In U.S. Pat. 2,720,0l7 the columns are set completely in place and the lifting gear placed on their tops to lift floor slabs cast one above the other with lift collars about the columns cast with each floor.
There have also been precast walls and floors in the same plane and connected together by hinge members. The units are lifted by crane into position with the walls hinging on their hinge members downward and inward such as in U.S. Pat. Nos. 3,494,092 and 3,727,157. Danish Pat. No. 82,772 of 1957 shows forming walls or column elements in horizontal position under a slab on ascaffold and letting the walls or column elements hinge down into position or forming the walls or column elements on the ground or a floor and casting a floor slab thereabove and connecting them by a thin steel band that acts as a hinge. There is no lifting gear disclosed. The disclosure seems to be to individual houses and'separate stories of buildings. A translation of the patent appears to say that the invention is to avoid referred to larger or smaller lifting-gear and cranes together with the work associated with them.
SUMMARY OF THE INVENTION An object of the invention is to provide a building by self-erecting walls precast in a horizontal position on a floor or casting bed, casting a ceiling slab thereabove to which the walls are hangingly connected by pick-up cables and lifting the slab while swinging the walls outwardly with their bottom ends sliding'along the floor below thereby adding to stabilization of the self-erection.
Another object of the invention is to provide for erecting successively cast sets of load bearing walls connected to ceiling slabs cast thereabove into a multistory building and adding to the stability of the erected building by installing vertical reinforcing rods in cast in aligned apertures in the walls and ceiling slabs.
A further object of the invention is to provide overload protection for each lifting fixture by lifting in seand its walls to occur at the initial part of a lift of the stack.
Yet another object of the invention is to provide lift fixtures to be detachably attached to the slabs of a stack of sets of slabs and walls and to each other fixture that can be removed insequence from the bottom slab after it has been lifted and lowered'onto its connected supporting'walls.
Still another object of the invention'is to provide lifting apparatus for sets of slabs and connected walls in a stack that has pairs of externally positioned columns supporting a bridge member and 'lift jacks thereon that is repositionable upward for making successive lifts after connecting and disconnecting lift rods from'the jacks to lift fixtures provided for the respective successive stacked slabs.
Another object of the invention is to provide stabilization in lifting a stack of sets of ceiling slabs and connected support walls by installing temporary pairs of erecting columns, installing a bridge member between the pairs of columns and temporarily securing it in a stabilizing manner in successive lift positions and applying a stabilizer between a lifted ceiling or floor slab and the adjacent column.
A further object of the invention is to provide a connection between a horizontally precast wall on a floor and a ceiling slab 'cast thereabove consisting of a pieceof cable that is formed with a loop at its lower end cast in the walls top edge with the loop lying in a plane ex tending transverse to the top edge of the wall and extending the ends of the cable upward for casting into the ceiling slab adjacent its edge in such a position that the top edge of the wall aligns to support the edge of the slab above and there is a spacing of approximately /2 to inch between the slab and the hanging wall as the slab is lifted, The support by the'cable is from the leg end thereof that is positioned nearer the edge of the shifts to the other leg of the cable and to its portion of the loop directly therebelow whereby breaking and spauling of the concrete is avoided.
DESCRIPTION OF THE DRAWINGS For a more complete understanding of the nature and scope of the invention reference is had to the drawings, the description and the claims that follow.
, FIG. 1 is a perspective view of a typical ground floor slab having cast thereon the necessary to be lifted and swung into position supporting walls with their ceiling slab thereabove to which they are attached along their to be top edges by pick-up cables cast therein illustrative for a three story building, the topmost ceiling slab being fragmentally shown;
FIG. 2 is a fragmentary perspective view of the edge of a floor and/or ceiling slab with a lift attaching member cast therein and a recess therebelow in the lower face at the slab edge both for receiving and attaching a lift fixture; FIG. 3 is a perspective view of the three story building with lifting apparatus in position, the supporting walls for the third story being swung into position as their ceiling slab to which they are attached by pick-up cables is lifted into position and precast wall panels ready for lift by a crane to fill the void wall'spaces;
FIG. 4 is a cross sectional fragmentary side view of the ground floor slab, the horizontallycast supporting walls connected by cast in pick-up cables to their .ceiling slabs thereabove and a side view of the lift attaching members cast in the slabs with the lift fixturesattached; FIG. 5 is a left hand end view of FIG. 4 showing the attached lift fixtures and their connection with each other for successive pick-up from top fixture on down;
FIG. 6 is a view similar to FIG. 4 showing the initiation of the lift with the ceiling slabs and their supporting walls successively peeled-off and separated starting with the top most ceiling slab and its attached walls;
FIG. 7 is a side view of a vertical support column whose lower end is secured to a foundation support, one end of a bridge member hoisted into position by a hand winch and secured to the column, a lifting jack on the bridge and a lift rod attached to the lift fixtures, the slabs and walls having been peeled-off beginning with the roof slab and then separating each slab and its supporting wall in sequence;
FIG. 8 is a view similar to FIG. 7 showing the first floor support walls swinging slowly outwardly towards their vertical supporting position as the lift progresses and an aperture in the wall and in its ceiling slab above is typically shown ready to receive a stabilizing pin which will be replaced by permanent reinforcing rods;
FIG. 9 is similar to FIG. 8 showing the first floor supporting walls supporting their ceiling slab which has its lift fixture removed and a stabalizer installed between the ceiling slab and the column and separating wedges in position between the respective ceiling slabs;
FIG. 10 is similar to FIG. 9 showing the bridge having been hoisted to its next upward position and secured to the column and the second floor supporting walls being swung outwardly into load bearing position as the lifting continues; 7
FIG. 11 is similar to FIG. 10 the second story walls are now in load bearing position supporting their ceiling slab whose lift fixture has been removed and a stabilizer member installed between the second story ceiling slab and the column; I
FIG. 12 is similar to FIG. 11 showing the bridge hoisted to its next lift position and secured to the column and the roof slab which is the third story ceiling slab being lifted with its load bearing walls being swung outwardly;
FIG. 13 is a view similar to FIG. 12 with the third story ceiling slab in position supported by its load bearing walls, the top lift fixture has been detached and the temporary stabilizers are removed and the lift apparatus is ready to be dismantled and moved to another site;
FIG. 14a is a fragmentary showing of a floor slab and its attached wall and the lift pick-up cable at start of lift;
FIG. 14b shows the wall swung outward about 45, installation of sealing material and the relatively small spacing between wall and supporting slab and the shift in cable portion support;
FIG. 140 shows the wall having been laterally aligned and in load bearing position under the edge of the slab;
FIG. 15 is a showing of the erected walls and slabs and the aligned apertures formed in the walls and slabs with seismic reinforcement grouted in place; and
FIG. 16 is a showing of a form that the stabilizer between slab and erecting column may take;
DESCRIPTION OF A PREFERRED EMBODIMENT In FIG. 1 a typical ground floor slab l0-has been provided on suitable foundations and in the illustration it extends outward to provide foundation supports for floor slab could; extend only to the perimeter of the walls of the building and separate foundations would then be provided for each vertical support column. On the ground floor slab or casting bed 10 are successively cast load bearing walls and their ceiling slabs. A separating layer of bond-preventing material (not shown) is placed on the top of the ground floor slab 10. Suitable forms (not shown) are provided on the ground floor slab for first story walls 1141,1211, 13a and 14a to be poured similar to the third story walls 110, 12c, 13c and showing in FIG. 1. As many full or partial length perimeter load-bearing'structu'ral walls are precast as geometry will allow. There isplaced within the forms unglazed windows 15, whose frames are of a wall thickproject along their to be top edge at spaced apart posi- I tions. They are formed with a loop at their lower end that passes around securing and reinforcing bars-l7, see FIG.4 and 5,"andthe two ends extend out to'be cast in the ceiling slab thereabove to be'described. Greased rods (not shown) are placed in the walls in their to be vertical direction and removed 2 to 3 hours after the concrete is cast. These provide apertures such 'as typically shown at 18 in FIG. 8 and as'illustrated in FIG. 15 to receive reinforcing rods that are later installed between walls and floors and grouted in. FIG. 8 shows a temporary holding pin 48 inserted through a hole in the ceiling slab that is in alignmentwith the aperture 18. After overnight curing the walliforms are removed and used again. Any voids between the walls such as at 19, see FIG. 1, are filled with like interio'r load-bearing pickup walls or waste material such as soil and perhaps finished with a thin waste-slab of concrete.
A separating'layer of bond-preventing material (not shown) is placed-over the cured first story walls..The ceilingslab for the first story is next to be cast over the first story now cured walls. A slab perimeter form (not I shown) overhanging the wall'edges is installed. The pe rimeter overhang, see at,-20 in FIG. 1, is at least the width of the load bearing wall cast below whose to be top 'edge will support the ceiling slab; underneath this overhanging portion. The projecting-ends of the pickup cables l6.are placed in position within the forms for the ceiling slab. Also lift attaching members. 21 such as U-bolts, see FIG. 2, are placedin the form and their threaded ends project out from the edge of the ceiling slab 22 for the first story, see FIGS. 1 and 2. Just below tlielift attaching member '21. the form is providedwith a filler block (not shown) so as to form a recess 22a extending in from the edge of the slab at its bottom face.
FIGS. 4 and 5, receive a web of an angle bar on a lift.
fixture to be described. Instead of the 'U-shaped bolt 21, two L-shaped members could be cast in the slab with the legs threaded and projecting spaced apart at the edge of the slab to receive the lift fixtures.
Referring to FIGS. 1 and 3 and the other applicable figures the next two stories above have their sets of supporting walls and ceiling slabs likewise cast and connected. The walls are respectively numbered 11a, 12a, 13a and 14a for the first story. The second story walls are numbered 11b. 12b, 13b and 14b and as noted above the third story walls are respectively 110, 12c. 13c and 14:. The first story ceiling slab as indicated above is 22, the second story ceiling slab is 23 and the third story ceiling slab or roof slab is 24. Ceiling slab 22 is the floor slab for the second story and ceiling slab 23 is the floor slab for the third floor.
After the erection as will hereinafter be described the void wall spaces are filled by separately cast wall slabs indicated in the piles 25 and 26. These are lifted and set in place by a separate crane.
The matter of erecting the building and lifting into position the designated ceiling slabs and their load bearing walls will be described. On the ground floor slab there is provided foundation supports a for the vertical support columns 27. These columns are about three feet longer than the total height of the building. For the particular three story building to be erected three pairs of temporary support columns 27 are placed on their support foundations 10a and secured by hold down bolts and grouting (not shown). Each column has a one ton hand operated winch 28 installed near its lower end. This is for hoisting the cross bridges 29 into their successive lift positions above the pile of cast slabs and their load bearing connected walls to be swung outwardly into position during the lifting operation. Each winch has a cable 28a that is led up the column and over sheaves 28b mounted at the top of the column and then down to where it is secured to the cross bridge 29. The number of pairs of support columns 27 and the center-to-center spacing between the three pairs is a function of the separate jack or separate lift means capacity and convenience. Each bridge 29 is bifurcated at its ends to receive the columns 27 and be guided thereby in their sliding engagement with the columns. Means are provided at fixed points along the columns for supporting the cross bridge for one lift per each ceiling slab or floors. A connection shown is provided by having through apertures through which is inserted a support pin 30. A welded-in tube (not shown) to reinforce the through apertures 27a could be provided, appropriate saddles (not shown) are used to provide fixity and to distribute the load on the support pins 30.
Near the ends of the support bridge 29 adjacent the columns are placed jack lift means 31 such as lift-slab jacks such as shown in US. Pat. Nos. 2,758,467 and 3,201,088. Each separate lift means is vertically above the projecting lift attaching members 21 projecting from the slabs below. To attach the lift rods 32 depending from the jacks, lift fixtures which are detachably attached to the slabs and detachably attached to each other are provided.
A top lift fixture is generally indicated as 33. It has a cross head 33a of four welded together plates to form a box like member, square in cross section. The cross head 33a has vertically extending apertures 33b through each end to receive the two depending lift rods 32 that are secured by a nut 32a or a quick release hinged type nut used on lift rods in lift-slab work. A depending tension bar 33c is welded to the cross head 33a and it has a pair of lugs or bosses 33d welded to its opposite inner faces adjacent its lower end. An angle bar 34 has its vertically extending web welded to the tension bar 330 adjacent the lugs 33d thereon and its vertically extending web has apertures therethrough spaced to each side of the tension bar 33c to receive the threaded legs of the U-bolt lift attaching member 21 to which it is secured by nuts 21a. The transversely extending web or flange of the angle bar 34 projects into the formed recess 24 a in the top most ceiling slab for lift engagement to avoid interference at erection with wall 11c.
A second lift fixture is generally indicated as 35. It is made up of a pair of spaced apart tension bars 35a held spaced apart by a pair of spaced apart reinforcing cross pieces 35b welded thereto. A pair of lugs 350 is welded to the inside faces adjacent the top end of the spaced apart bars while another pair of lugs is welded to the inside faces adjacent the bottom end. Likewise an angle bar 36 is welded to the tension bar 35a adjacent its lower end and adjacent the lower pair of lugs 35d. The upper web of the angle bar is attached to the projecting threaded legs of the lift attaching member in ceiling slab 23 and its lower web is received in the recess 23a of the ceiling slab 23 for lift engagement. Referring to FIG. 5 it will be noted that the top pair of lugs 35c on second lift fixture 35 are spaced above the pair of lugs 33d on the top lift fixture 33 so that the roof slab 24 is first lifted and its attached walls peeled-out. This spacing is of the order of /z to about /1 inches.
A third lift fixture is generally indicated as 37. It is made up of a tension bar 37a that'has a pair of lugs or bosses 37b welded to its opposite faces adjacent its top end. The tension bar 37a is slidably received between the spaced tension bars 35a on the lift fixture 35 thereabove and the pair of lugs 37b are spaced above the lugs 35d on lift fixture 35 for like engagement as explained above for the top lift fixture 33 and the second lift fixture 35. At the lower end of the tension bar 37a and on its opposite faces is welded a pair of lugs 376 which are for engagement with a type of lift fixture 35 that would be attached to a slab therebelow if a building with a greater number of stories was being built. Likewise another lift fixture like the second lift fixture 35 would be required for the next below successive slab of such a larger building. An angle bar 38 has its vertical web welded to the tension bar at the bars lower end and has apertures therethrough like the other lift fixtures to receive the extending threaded ends of the lift attaching member in slab 22. The transverse web of the angle bar 38 is received in the adjacent recess 22a for lift engagement with slab 22.
Reference to FIG. 14a shows the slab and the wall W in their cast position with the lift pick up cable 16 looped around reinforcing bars 17. The reinforcing bars 17 help position the cable but they are not necessary for anchorage. The unique installation and cable path geometry avoids breaks and spauling of the concrete. At the start of the lift, see FIG. 14a, cable portion A pulls in such a direct line that there is no concrete spauling. After the wall W is swung outwardly by lifting of the slab S so that the wall angle passes approximately 45 inclination, see FIG. 14b, cable portion B takes over and finishes the job with vertical pulling. Reference to FIG. 14b shows that a sealing sheet or sealing material 41 may be installed at the top edge of the wall to provide a seal in its load bearing contact with the slab portion thereabove. The sealing material may be a strip of polyurethane foam, a smear of asphalt or any suitable sealing material. As the wall swings into position a certain amount of lateral alignment is required. The lift pick-up cable does not act as a hinge.
In FIG. 15 there is shown the seismic reinforcement between walls and slabs. The ground floor slab 10 has formed therein vertically extending apertures 9 along its perimeter where it receives the bottom of the load bearing wall. The wall has an aperture 18, see FIG. 8, formed therein during casting and vertically aligned aperatures 22b, 23b and 24b are formed in the respective slabs 22, 23 and 24. Reinforcing seismic rods 42 are installed and grouted in position in the aligned apertures.
Referring to FIG. 16 there is illustrated a form that a stabilizer 39, see FIG. 9, may take between an erecting column 27 and the adjacent lift attaching member 21 projecting from the lifted slab 22 after the lifting fixture 37 has been removed. A U-bolt 43 is slipped over the column 27 and its threaded legs receive a clamping piece 44 that is secured by nuts 45 received on this threaded legs. The clamping piece 44 has welded thereto threaded studs 46 spaced the same distance apart as the projecting threaded legs of the lift attaching member 21. Turnbuckle members 47 secure the aligned threaded legs. The column 27 oppositely positioned has the same installation and by setting up of the respective turn-buckle members 47, the lifted slab 22 is set off and stabilizes the column 27 from slab 22 for a successive next lift of slab 23 there above all as more fully described hereinafter.
LIFTING After the jacks 31 and their lifting rods 32 are installed and hooked up to control means such as a console, see for example US. Pat. No. 2,758,467, placed on the roof slab, the lifting can begin. The stack of slabs and their walls are peeled-out, i.e. the slabs and their walls are separated, see FIGS. 6 and 7. After the roof slab 24 is elevated say, for example with the lift fixtures described above, approximately /2 or A; of an inch, the slack in the second lift fixture 35 is taken up and the second floor ceiling or roof slab 23 is lifted. Following this after lifting a fraction of an inch the second floor slab 22 is lifted, a sequence for limiting each fixtures load. Lifting then progresses at the normal rate and the first floor or story walls 11a, 12a, 13a and 14a swing slowly outward as their tops are elevated by lifting with their multiple pick-up cables 16. The bottom edges of the walls slide without damage across the ground floor slab l laterally, see FIG. 8, unassisted by rollers or other devices almost to their final vertical position. The walls offer considerable friction along their length thus imparting additional stability to the lift.
At the end of the first lift the walls are manually plumbed and laterally aligned. Manual means or temporary pointed pins 48, see FIG. 8, are inserted in the apertures in the slab 22 aligned with the apertures 18 in the walls. This alignment is permitted because of the slack in the pick-up cables 16, see FIG. 14b. Before the stack is set down after the alignment of the walls the sealing material 41 as referred to above is installed.
The entire stack is now set down on the erected first story. As a technique for temporarily parking the stack and to allow the lifting equipment to be relocated, see FIG. 9, and to prevent the slabs and walls from closing again, wedges 49 are inserted from slab-to-slab substantially over the load bearing walls. Since these slabs overhang the erected load bearing walls, this weight of the stack above is directly transmitted through the load bearing walls to the ground floor slab 10.
The entire stack above is now supported by the completed first story load bearing walls and their ceiling slab, i.e., the second floor or story slab 22. The jacking means is disengaged by removing their continuously threaded lift rod attaching jack nuts if standard lift-slab jacking equipment is used. Using the winches 28, the bridges 29 and jacks 31 are lifted to the second station and the column support or shear pins 30 reinstalled at the next higher lift station. The lifting rods, attached to the top lift fixture 33, need no attention. The jacking 8 nuts of the lift system are installed and their drive system is adjusted.
The lift fixtures designated by the reference number 37, their job done, are removed and set aside for reuse. The slab 22 now in place is stable. Installation of the stabilizers 39 shown in FIG. 16 fix the columns 27, see FIG. 9, ready for the next lift. By making the initial lift on very short effective length columns and by stabilizing the columns higher up as the building gains height, as referred to above, bracing, guying and deadmen are eliminated.
The jacks 31 through their control console and connections (not shown) are actuated until the second slab 23 is in place,'and the load bearing second story walls 11b are resting on the second floor slab or first floor ceiling slab 22. Again, see FIG. 11, the stack (roof slab 24 and third story walls 11c) are lowered onto the fixed third story floor slab 23 on wedges 49 already in place from the previous lift. The jacks are unloaded and disconnected. The lift fixtures 35 are removed and set aside for further usuage and the columns stabilized as necessary. The bridge 29 and jacks 31 are hoisted into the final lift position and secured for stability. The roof slab 24 is lifted, see FIG. 12, as the attached third story walls 11c become substantially self-erecting.
This completes this building unit, see FIG. 13. The casting and lifting sequence would merely be repeated for units having additional floors. The lifting equipment, columns, bridges, jacks, lifting rods, lift fixtures, wedges, stabilizing clamps, etc., are moved on to erect the next building unit.
The narrow voids in the walls are closed with the conventional precast panels such as shown in stacks 25 and 26 in FIG. 3 as referred to above. Steel reinforcing bars, see FIG. 15, are placed in the aligned vertical apertures or ducts 18 in the walls and vertical apertures in the floor slabs and grouted in to complete the vertical continuity and integrity of the structure. The building is finished in conventional manner.
What is claimed is:
1. The method of erecting single or multiple story concrete columnless buildings which comprises the steps of: forming a permanent base for a building to be erected, said base forming a first casting bed;
pouring a first set of load supporting, downwardly swingable wall panels in a generally horizontal position on said first casting bed;
filling any voids in or between said wall panels to provide a second casting bed;
pouring a first floor slab in horizontal position on said second casting bed;
securing lift attaching members to the periphery of said first floor slab;
attaching said first set of wall panels to said first fioor slab by securing spaced apart, flexible pick-up cables across a pivot line between each said wall panel and said floor slab;
pouring alternating additional sets of wall panels and floor slabs one above the other in layers with each layer utilizing the preceding layer as a casting bed, securing lift attaching members to each of said floor slabs and attaching each set of wall panels to its corresponding floor slab to form a stack of said wall panels and floor slabs corresponding to the stories of the building;
erecting pairs of spaced columns exteriorly of said base and adjacent said lift attaching members, said columns being slightly greater in height than the height of the erected building; 7 movably supporting a bridge member between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent each column; attaching lift fixtures to said lift attaching members on said floor slabs; connecting said lift fixtures to said lift means; actuating said lift means to raise said stack whereby each of the wall panels in said first set of wall panels swing downwardly on said pick-up cables about said pivot lines to a vertical, load supporting position; lowering said stack to support said first floor slab and said stack on said downwardly swung walls;
disconnecting said lift fixtures from the lift attaching members on said first floor slab, disengaging said lift means, and raising said bridges on said columns the height of an additional story;
engaging said lift means with said lift fixtures, and repetitively and alternately raising said stack to allow succeeding sets of wall panels to swing into position, and raising said bridges and lift means to peel out successive layers of said wall panels and floor slabs to erect each additional story of said building; and
dismantling and removing said bridge members and columns after said building has been erected.
2. In the method of claim 1 the further step of connecting stabilizing means between each said column and each floor slab once the floor slab has been positioned atop a corresponding set of downwardly swung wall panels, said stabilization providing short effective working length columns during said lifting.
3. In the method of claim 1 the further steps of providing aligned vertical apertures in each of said wall panels and corresponding apertures in said floor slabs, and inserting and grouting reinforcing bars in said apertures once said building is erected.
4. The method of claim 1 wherein the step of attaching said lift fixtures to said lift attaching members includes the step of interconnecting said lift fixtures to one another with slight vertical freedom so that as said stack is initially lifted said lift fixtures cause each said set of wall panels and floor slabs to separate slightly while still at ground level, whereby the connections of all of said wall panels to said floor slabs and the connection of all of said floor slabs to said lift means may be checked prior to further lifting of said stack.
5. In the method of claim 4, the further step of inserting vertically disposed multiple wedge means between said floor slabs after said initial lifting to prevent said wall panels and said floor slabs from returning to their cast position upon said disengagement of said lift means from said lift fixtures.
6. In the method of claim 1 wherein the steps of attaching said wall panels to their corresponding floor slabs comprises securing diverging double-stranded pick-up cables between the wall panels and the floor slabs, said strands converging at the pivot lines so that the weight of each wall panel is transferred from one to the other strand of each of its pick-up cables as the wall panels swing toward the vertical, said cables permitting said panels to spaul along said pivot lines to compensate for slight pivot line misalignment or for slab deflectron.
10 7. The method of erecting singleor multiple story concrete columnless buildings which "comprises the steps of:
forming in situ a permanent first floor slab for a building to be erected, said first floor slab forming a first casting bed;
pouring a first set of load supporting, downwardly swingable wall panels in a generally horizontal position on said first casting bed and embedding portions of spaced apart flexible pick-up cables across the periphery pivot line of said first set of wall panels, said wall panels representing substantial portions of at least two pairs of walls approximately at right angles to each other;
filling any voids in or between said wall panels to provide a second casting bed;
pouring a second floor slab in horizontal position on said second casting bed, completing the attachment of said first set of wall panels to said second floor slab by securing said flexible pick-up cables across said pivot line between each said wall panel and said second floor slab;
pouring alternating additional sets of wall panels and floor slabs one above the other in layers with each layer utilizing the preceding layer as a casting bed, each said set of wall panels being attached to its corresponding above floor slab to form a stack of said wall panels and floor slabs corresponding to the stories of building;
allowing the concrete to cure to acceptable strength;
securing lift attaching members to the periphery of an uppermost one of said floor slabs and to each said floor slabs in sequence;
erecting pairs of spaced columns exteriorly positioned to said first floor slab and adjacent said lift attaching members, said columns being slightly greater in height than the height of the erected building;
supporting one floor height above the poured stack a movable bridge member between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent to each column;
attaching lift fixtures to said lift attaching members;
connecting said lift fixtures to said lift means;
actuating said lift means to raise said stack whereby each of said two pairs of wall panels at approximately right angles to each other in said first set of wall panels swing downwardly on said pick-up cable about said pivot lines to a near vertical position;
plumbing the nearly vertical walls by laterally positioning the bottoms of said walls into a load supporting laterally stable structure;
lowering said stack to support said second floor slab and said above stack on said downwardly swung plumbed walls;
disconnecting said second floor slab lift fixtures from the above lift fixtures, disengaging said lift means, and raising and securing said bridges on said columns the height of an additional story;
engaging said lift means with said remaining lift attaching members, and repetitively and alternately raising said stack to allow succeeding sets of wall panels to swing into near vertical position, plumbing said wall panels and securing said bridges and lift means to erect each additional story of said building; and
1 1 dismanteling and removing said bridge members and columns after said building has been erected.
Claims (7)
1. The method of erecting single or multiple story concrete columnless buildings which comprises the steps of: forming a permanent base for a building to be erected, said base forming a first casting bed; pouring a first set of load supporting, downwardly swingable wall panels in a generally horizontal position on said first casting bed; filling any voids in or between said wall panels to provide a second casting bed; pouring a first floor slab in horizontal position on said second casting bed; securing lift attaching members to the periphery of said first floor slab; attaching said first set of wall panels to said first floor slab by securing spaced apart, flexible pick-up cables across a pivot line between each said wall panel and said floor slab; pouring alternating additional sets of wall panels and floor slabs one above the other in layers with each layer utilizing the preceding layer as a casting bed, securing lift attaching members to each of said floor slabs and attaching each set of wall panels to its corresponding floor slab to form a stack of said wall panels and floor slabs corresponding to the stories of the building; erecting pairs of spaced columns exteriorly of said base and adjacent said lift attaching members, said columns being slightly greater in height than the height of the erected building; movably supporting a bridge member between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent each column; attaching lift fixtures to said lift attaching members on said floor slabs; connecting said lift fixtures to said lift means; actuating said lift means to raise said stack whereby each of the wall panels in said first set of wall panels swing downwardly on said pick-up cables about said pivot lines to a vertical, load supporting position; lowering said stack to support said first floor slab and said stack on said downwardly swung walls; disconnecting said lift fixtures from the lift attaching members on said first floor slab, disengaging said lift means, and raising said bridges on said columns the height of an additional story; engaging said lift means with said lift fixtures, and repetitively and alternately raising said stack to allow succeeding sets of wall panels to swing into position, and raising said bridges and lift means to peel out successive layers of said wall panels and floor slabs to erect each additional story of said building; and dismantling and removing said bridge members and columns after said building has been erected.
2. In the method of claim 1 the further step of connecting stabilizing means between each said column and each floor slab once the floor slab has been positioned atop a corresponding set of downwardly swung wall panels, said stabilization providing short effective working length columns during said lifting.
3. In the method of claim 1 the further steps of providing aligned vertical apertures in each of said wall panels and corresponding apertures in said floor slabs, and inserting and grouting reinforcing bars in said apertures once said building is erected.
4. The method of claim 1 wherein the step of attaching said lift fixtures to said lift attaching members includes the step of interconnecting said lift fixtures to one another with slight vertical freedom so that as said stack is initially lifted said lift fixtures cause each said set of wall panels and floor slabs to separate slightly while still at ground level, whereby the connections of all of said wall panels to said floor slabs and the connection of all of said floor slabs to said lift means may be checked prior to further lifting of said stack.
5. In the method of claim 4, the further step of inserting vertically disposed multiple wedge means between said floor slabs after said initial lifting to prevent said wall panels and said floor slabs from returning to their cast position upon said disengagement of said lift means from said lift fixtures.
6. In the method of claim 1 wherein the steps of attaching said wall panels to their corresponding floor slabs comprises securing diverging double-stranded pick-up cables between the wall panels and the floor slabs, said strands converging at the pivot lines so that the weight of each wall panel is transferred from one to the other strand of each of its pick-up cables as the wall panels swing toward the vertical, said cables permitting said panels to spaul along said pivot lines to compensate for slight pivot line misalignment or for slab deflection.
7. The method of erecting single or multiple story concrete columnless buildings which comprises the steps of: forming in situ a permanent first floor slab for a building to be erected, said first floor slab forming a first casting bed; pouring a first set of load supporting, downwardly swingable wall panels in a generally horizontal position on said first casting bed and embedding portions of spaced apart flexible pick-up cables across the periphery pivot line of said first set of wall panels, said wall panels representing substantial portions of at least two pairs of walls approximately at right angles to each other; filling any voids in or between said wall panels to provide a second casting bed; pouring a second floor slab in horizontal position on said second casting bed, completing the attachment of said first set of wall panels to said second floor slab by securing said flexible pick-up cables across said pivot line between each said wall panel and said second floor slab; pouring alternating additional sets of wall panels and floor slabs one above the other in layers with each layer utilizing the preceding layer as a casting bed, each said set of wall panels being attached to its corresponding above floor slab to form a stack of said wall panels and floor slabs corresponding to the stories of building; allowing the concrete to cure to acceptable strength; securing lift attaching members to the periphery of an uppermost one of said floor slabs and to each said floor slabs in sequence; erecting pairs of spaced columns exteriorly positioned to said first floor slab and adjacent said lift attaching members, said columns being slightly greater in height than the height of the erected building; supporting one floor height above the poured stack a movable bridge member between each said pair of columns, each of said bridge members extending over said stack of wall panels and floor slabs and carrying lift means adjacent to each column; attaching lift fixtures to said lift attaching members; connecting said lift fixtures to said lift means; actuating said lift means to raise said stack whEreby each of said two pairs of wall panels at approximately right angles to each other in said first set of wall panels swing downwardly on said pick-up cable about said pivot lines to a near vertical position; plumbing the nearly vertical walls by laterally positioning the bottoms of said walls into a load supporting laterally stable structure; lowering said stack to support said second floor slab and said above stack on said downwardly swung plumbed walls; disconnecting said second floor slab lift fixtures from the above lift fixtures, disengaging said lift means, and raising and securing said bridges on said columns the height of an additional story; engaging said lift means with said remaining lift attaching members, and repetitively and alternately raising said stack to allow succeeding sets of wall panels to swing into near vertical position, plumbing said wall panels and securing said bridges and lift means to erect each additional story of said building; and dismanteling and removing said bridge members and columns after said building has been erected.
Priority Applications (16)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US489030A US3921362A (en) | 1974-03-18 | 1974-07-16 | Method of and means for multi-story building construction |
CA213,233A CA1021590A (en) | 1974-03-18 | 1974-11-07 | Method of and means for multi-story building construction |
IN2524/CAL/74A IN144450B (en) | 1974-03-18 | 1974-11-15 | |
AU75435/74A AU475095B2 (en) | 1974-03-18 | 1974-11-15 | Method and means for multi-story building construction |
ES432569A ES432569A1 (en) | 1974-03-18 | 1974-12-04 | A method of eriguing a building. (Machine-translation by Google Translate, not legally binding) |
IT7061274A IT1027058B (en) | 1974-03-18 | 1974-12-12 | Cast-slab multi-storey building erection - with temporary paired columns containing permanent base slabs covered by separating layer |
AR25678774A AR209086A1 (en) | 1974-03-18 | 1974-12-15 | METHOD AND ARRANGEMENT OF ELEMENTS TO RAISE A BUILDING |
NL7416486A NL7416486A (en) | 1974-03-18 | 1974-12-18 | METHOD AND EQUIPMENT FOR ESTABLISHING MULTI-STOREY BUILDINGS AND CONSTRUCTION WORK OBTAINED BY THE METHOD. |
BR1068774A BR7410687A (en) | 1974-03-18 | 1974-12-20 | PROCESS TO BUILD A LIFTING APPLIANCE BUILDING LIFT ACCESSORIES AND CABLE CONNECTION FOR THE SAME |
PH16687A PH11385A (en) | 1974-07-16 | 1975-01-08 | Method of and means for multi-story building constitution |
DE19752501207 DE2501207A1 (en) | 1974-03-18 | 1975-01-14 | METHOD AND DEVICE FOR THE CONSTRUCTION OF A MULTI-FLOOR BUILDING |
GB6104/75A GB1497321A (en) | 1974-03-18 | 1975-02-13 | Building construction and apparatus therefor |
YU39675A YU39675A (en) | 1974-03-18 | 1975-02-19 | Device for building multiple-floor buildings |
JP2448275A JPS5323131B2 (en) | 1974-03-18 | 1975-02-26 | |
FR7508238A FR2273127B1 (en) | 1974-03-18 | 1975-03-17 | |
US05/601,789 US3974618A (en) | 1974-03-18 | 1975-08-04 | Method of and means for multi-story building construction |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MX14991474 | 1974-03-18 | ||
US489030A US3921362A (en) | 1974-03-18 | 1974-07-16 | Method of and means for multi-story building construction |
US05/601,789 US3974618A (en) | 1974-03-18 | 1975-08-04 | Method of and means for multi-story building construction |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US05/601,789 Division US3974618A (en) | 1974-03-18 | 1975-08-04 | Method of and means for multi-story building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
US3921362A true US3921362A (en) | 1975-11-25 |
Family
ID=27350929
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US489030A Expired - Lifetime US3921362A (en) | 1974-03-18 | 1974-07-16 | Method of and means for multi-story building construction |
US05/601,789 Expired - Lifetime US3974618A (en) | 1974-03-18 | 1975-08-04 | Method of and means for multi-story building construction |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US05/601,789 Expired - Lifetime US3974618A (en) | 1974-03-18 | 1975-08-04 | Method of and means for multi-story building construction |
Country Status (7)
Country | Link |
---|---|
US (2) | US3921362A (en) |
AU (1) | AU475095B2 (en) |
CA (1) | CA1021590A (en) |
DE (1) | DE2501207A1 (en) |
FR (1) | FR2273127B1 (en) |
GB (1) | GB1497321A (en) |
NL (1) | NL7416486A (en) |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4391070A (en) * | 1980-02-29 | 1983-07-05 | Babcock-Bau Gmbh | Chimney |
US4539788A (en) * | 1982-05-13 | 1985-09-10 | Adviesbureau D3Bn Civiel Ingenieurs | Method of building a house starting from a packaged structure, a packaged structure for use in said method, a method of making a foundation, and a pile cap for use therein |
US4766708A (en) * | 1985-12-27 | 1988-08-30 | Peter Sing | Shock and vibration resistant structures |
US4942701A (en) * | 1989-07-24 | 1990-07-24 | Complete Hydraulic Building Systems, Inc. | Hydraulic winch system for use in erecting clear-span, pole-type buildings |
US4980999A (en) * | 1988-07-27 | 1991-01-01 | Terenzoni Robert S | System for raising a roof |
US5182886A (en) * | 1988-08-02 | 1993-02-02 | National Research Development Corporation | Building elements and joints therefor |
US5839239A (en) * | 1996-04-04 | 1998-11-24 | Jang; Byung K. | Apparatus and method for building construction |
US5867950A (en) * | 1995-11-23 | 1999-02-09 | Claisse; Patrick | Device for lifting a framework, optionally together with a portion of a building resting on said framework |
US5881504A (en) * | 1995-05-15 | 1999-03-16 | Obayashi Corporation | Temporary frame system for construction |
US20020124466A1 (en) * | 2001-03-06 | 2002-09-12 | J. Kelly Kindig | Method for the treatment of coal |
EP1520944A2 (en) * | 2003-10-01 | 2005-04-06 | Vierck Udo | Method for constructing houses |
US20090249708A1 (en) * | 2005-11-28 | 2009-10-08 | Flyport Development Entwicklungs Und Betreuungsgesellchaft Mbh | Passenger Terminal Consisting of Mobile Room Units |
WO2011155992A1 (en) * | 2010-06-08 | 2011-12-15 | Collins Arlan E | Lift-slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
US20120023840A1 (en) * | 2009-04-10 | 2012-02-02 | Bin Yuan | Main Work Construction Method for Reinforced Concrete Building and Building Construction Machine |
CN103225422A (en) * | 2013-04-10 | 2013-07-31 | 北京筑福国际工程技术有限责任公司 | Existing masonry structure using light steel structure direct storey-adding technology and construction method of existing masonry structure |
CN103225423A (en) * | 2013-04-10 | 2013-07-31 | 北京筑福国际工程技术有限责任公司 | Existing building surrounding type story-adding structure and construction method thereof |
CN103790393A (en) * | 2014-01-17 | 2014-05-14 | 上海建工四建集团有限公司 | Construction method for integrated replacement of existing building structure |
US8950132B2 (en) | 2010-06-08 | 2015-02-10 | Innovative Building Technologies, Llc | Premanufactured structures for constructing buildings |
US8978324B2 (en) | 2010-06-08 | 2015-03-17 | Innovative Building Technologies, Llc | Pre-manufactured utility wall |
US9027307B2 (en) | 2010-06-08 | 2015-05-12 | Innovative Building Technologies, Llc | Construction system and method for constructing buildings using premanufactured structures |
US20150211205A1 (en) * | 2014-01-29 | 2015-07-30 | Guangzhou Jishi Construction Group Co., Ltd. | Construction system for subway station |
WO2018057792A1 (en) * | 2016-09-21 | 2018-03-29 | Skyrise Global, Llc | Structure and method of making the same |
CN108153972A (en) * | 2017-12-22 | 2018-06-12 | 腾达建设集团股份有限公司 | A kind of cable hoisting full-range analysis methods |
US10041289B2 (en) | 2014-08-30 | 2018-08-07 | Innovative Building Technologies, Llc | Interface between a floor panel and a panel track |
US10260250B2 (en) | 2014-08-30 | 2019-04-16 | Innovative Building Technologies, Llc | Diaphragm to lateral support coupling in a structure |
US10323428B2 (en) | 2017-05-12 | 2019-06-18 | Innovative Building Technologies, Llc | Sequence for constructing a building from prefabricated components |
US10329764B2 (en) | 2014-08-30 | 2019-06-25 | Innovative Building Technologies, Llc | Prefabricated demising and end walls |
US10364572B2 (en) | 2014-08-30 | 2019-07-30 | Innovative Building Technologies, Llc | Prefabricated wall panel for utility installation |
CN110306714A (en) * | 2019-07-04 | 2019-10-08 | 艺墙之格建筑发展(上海)有限公司 | A kind of assembling type partition wall ceiling structure |
US20190309508A1 (en) * | 2016-05-30 | 2019-10-10 | Aleksandr Aleksandrovich TITOV | Method for erecting framework of structures |
US10487493B2 (en) | 2017-05-12 | 2019-11-26 | Innovative Building Technologies, Llc | Building design and construction using prefabricated components |
US10508442B2 (en) | 2016-03-07 | 2019-12-17 | Innovative Building Technologies, Llc | Floor and ceiling panel for slab-free floor system of a building |
US10676923B2 (en) | 2016-03-07 | 2020-06-09 | Innovative Building Technologies, Llc | Waterproofing assemblies and prefabricated wall panels including the same |
US10724228B2 (en) | 2017-05-12 | 2020-07-28 | Innovative Building Technologies, Llc | Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls |
US10900224B2 (en) | 2016-03-07 | 2021-01-26 | Innovative Building Technologies, Llc | Prefabricated demising wall with external conduit engagement features |
US10961710B2 (en) | 2016-03-07 | 2021-03-30 | Innovative Building Technologies, Llc | Pre-assembled wall panel for utility installation |
US11054148B2 (en) | 2014-08-30 | 2021-07-06 | Innovative Building Technologies, Llc | Heated floor and ceiling panel with a corrugated layer for modular use in buildings |
US11098475B2 (en) | 2017-05-12 | 2021-08-24 | Innovative Building Technologies, Llc | Building system with a diaphragm provided by pre-fabricated floor panels |
US11193287B2 (en) * | 2016-09-23 | 2021-12-07 | Sh Technologies Pte Ltd | Construction system and method |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4284840A (en) * | 1977-06-15 | 1981-08-18 | The Wiremold Company | Service pole assembly |
FR2405337A1 (en) * | 1977-10-06 | 1979-05-04 | Parica | Construction method for small dwelling - with concrete wall panels cast on floor slab and lifted and pivoted into place using hoist on gantry frame |
US4301565A (en) * | 1980-03-19 | 1981-11-24 | Irwin Weinbaum | Method and system for the removal and replacement of a bridge |
DE3239816A1 (en) * | 1982-05-24 | 1983-11-24 | Dvt Deutsch Verfahrenstech | METHOD FOR DISTILLING SEAWATER FROM SEAWATER |
DE3219456A1 (en) * | 1982-05-24 | 1983-12-01 | Dvt Deutsch Verfahrenstech | CONTAINER FOR PRESSURE-SEALING A PACKING COLUMN |
NO159184C (en) * | 1986-03-07 | 1990-12-28 | Torodd Eeg Olsen | PROCEDURE FOR BUILDING LARGE MODULES AND THE MODULE MANUFACTURED BY THE PROCEDURE. |
US4782634A (en) * | 1987-02-12 | 1988-11-08 | G. & M. Fry Pty. Ltd. | Building construction |
DE3718436A1 (en) * | 1987-06-02 | 1988-12-22 | Wolfgang Keuser | Process for producing tower-like structures |
AU651616B2 (en) * | 1990-10-08 | 1994-07-28 | Kajima Corporation | Process for constructing frame and erection |
DE4121295A1 (en) * | 1991-06-27 | 1993-01-07 | Thomas Tibitanzl | System type of building construction - uses walls and floors formed from prefab components and tensioned together on site to form integral unit |
US5460499A (en) * | 1993-08-27 | 1995-10-24 | Franklin; James W. | Concrete building frame construction apparatus |
JP3255628B2 (en) * | 1999-09-24 | 2002-02-12 | 株式会社 松本工務店 | Rebuilding equipment for joining long members |
US6679025B1 (en) * | 2000-12-08 | 2004-01-20 | Process Marketing, Inc. | Modular tower |
JP5059357B2 (en) * | 2006-08-03 | 2012-10-24 | 株式会社日立プラントテクノロジー | Construction method of boiler cage section floor |
ES2308934B1 (en) * | 2007-05-29 | 2009-09-25 | Navarra Intelligent Concrete System, S.L | AUTOMATIC BUILDING CONSTRUCTION SYSTEM. |
CA2750765C (en) * | 2009-02-09 | 2016-07-19 | 3L-Innogenie Inc. | Construction system and method for multi-floor buildings |
US20100281818A1 (en) * | 2009-05-07 | 2010-11-11 | Southworth George L | Method for building wind turbine tower |
ES2625980B1 (en) * | 2015-12-21 | 2018-05-03 | Francisco José SAENZ SAENZ | Method of construction of buildings of reticular structure and building constructed by said method |
ES2911709T3 (en) * | 2016-02-26 | 2022-05-20 | Nordex Energy Spain S A | Manufacturing procedure of concrete towers for wind turbines |
BR102016007926B1 (en) * | 2016-04-08 | 2018-02-06 | Rinaldo Zaina, Engenharia, Consultoria E Projetos Industriais S/S Ltda Me | INDUSTRIAL PROCESS FOR BUILDING BUILDINGS |
DE102021124665A1 (en) * | 2021-09-23 | 2023-03-23 | tfc tools for composite GmbH | Single module, building kit and building |
GB202211586D0 (en) * | 2022-08-09 | 2022-09-21 | Kiss House Ltd | Kit of parts and method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1362069A (en) * | 1919-05-06 | 1920-12-14 | Joseph R Witzel | Building construction |
US3490191A (en) * | 1966-09-28 | 1970-01-20 | Ingf Hans Hansson & Co | Method for erecting buildings |
US3593482A (en) * | 1968-12-12 | 1971-07-20 | Delp W Johnson | Process for erecting folding slab construction |
US3600870A (en) * | 1970-05-06 | 1971-08-24 | William Greenhalgh | Building erection method |
US3713265A (en) * | 1970-12-14 | 1973-01-30 | J Wysocki | Method for construction and erection of floor slabs |
US3724157A (en) * | 1971-04-16 | 1973-04-03 | O Miram | Method of multi-level building construction |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2720017A (en) * | 1948-11-30 | 1955-10-11 | Inst Of Inventive Res | Method of erecting buildings |
US2964143A (en) * | 1953-05-15 | 1960-12-13 | Henri Lefaure | Method of erecting buildings |
US3036816A (en) * | 1956-03-20 | 1962-05-29 | Allan H Stubbs | Apparatus for lift-slab building construction |
US3053015A (en) * | 1959-06-26 | 1962-09-11 | George T Graham | Method of building construction |
US3494092A (en) * | 1967-07-05 | 1970-02-10 | Delp W Johnson | Integrated folding slab construction |
-
1974
- 1974-07-16 US US489030A patent/US3921362A/en not_active Expired - Lifetime
- 1974-11-07 CA CA213,233A patent/CA1021590A/en not_active Expired
- 1974-11-15 AU AU75435/74A patent/AU475095B2/en not_active Expired
- 1974-12-18 NL NL7416486A patent/NL7416486A/en unknown
-
1975
- 1975-01-14 DE DE19752501207 patent/DE2501207A1/en active Pending
- 1975-02-13 GB GB6104/75A patent/GB1497321A/en not_active Expired
- 1975-03-17 FR FR7508238A patent/FR2273127B1/fr not_active Expired
- 1975-08-04 US US05/601,789 patent/US3974618A/en not_active Expired - Lifetime
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1362069A (en) * | 1919-05-06 | 1920-12-14 | Joseph R Witzel | Building construction |
US3490191A (en) * | 1966-09-28 | 1970-01-20 | Ingf Hans Hansson & Co | Method for erecting buildings |
US3593482A (en) * | 1968-12-12 | 1971-07-20 | Delp W Johnson | Process for erecting folding slab construction |
US3600870A (en) * | 1970-05-06 | 1971-08-24 | William Greenhalgh | Building erection method |
US3713265A (en) * | 1970-12-14 | 1973-01-30 | J Wysocki | Method for construction and erection of floor slabs |
US3724157A (en) * | 1971-04-16 | 1973-04-03 | O Miram | Method of multi-level building construction |
Cited By (57)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4391070A (en) * | 1980-02-29 | 1983-07-05 | Babcock-Bau Gmbh | Chimney |
US4539788A (en) * | 1982-05-13 | 1985-09-10 | Adviesbureau D3Bn Civiel Ingenieurs | Method of building a house starting from a packaged structure, a packaged structure for use in said method, a method of making a foundation, and a pile cap for use therein |
US4766708A (en) * | 1985-12-27 | 1988-08-30 | Peter Sing | Shock and vibration resistant structures |
US4980999A (en) * | 1988-07-27 | 1991-01-01 | Terenzoni Robert S | System for raising a roof |
US5182886A (en) * | 1988-08-02 | 1993-02-02 | National Research Development Corporation | Building elements and joints therefor |
US4942701A (en) * | 1989-07-24 | 1990-07-24 | Complete Hydraulic Building Systems, Inc. | Hydraulic winch system for use in erecting clear-span, pole-type buildings |
US5881504A (en) * | 1995-05-15 | 1999-03-16 | Obayashi Corporation | Temporary frame system for construction |
US5867950A (en) * | 1995-11-23 | 1999-02-09 | Claisse; Patrick | Device for lifting a framework, optionally together with a portion of a building resting on said framework |
US5839239A (en) * | 1996-04-04 | 1998-11-24 | Jang; Byung K. | Apparatus and method for building construction |
US20020124466A1 (en) * | 2001-03-06 | 2002-09-12 | J. Kelly Kindig | Method for the treatment of coal |
EP1520944A2 (en) * | 2003-10-01 | 2005-04-06 | Vierck Udo | Method for constructing houses |
EP1520944A3 (en) * | 2003-10-01 | 2006-03-15 | Vierck Udo | Method for constructing houses |
US20090249708A1 (en) * | 2005-11-28 | 2009-10-08 | Flyport Development Entwicklungs Und Betreuungsgesellchaft Mbh | Passenger Terminal Consisting of Mobile Room Units |
US8863474B2 (en) * | 2009-04-10 | 2014-10-21 | Bin Yuan | Main work construction method for reinforced concrete building and building construction machine |
US20120023840A1 (en) * | 2009-04-10 | 2012-02-02 | Bin Yuan | Main Work Construction Method for Reinforced Concrete Building and Building Construction Machine |
US9493940B2 (en) * | 2010-06-08 | 2016-11-15 | Innovative Building Technologies, Llc | Slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
WO2011155992A1 (en) * | 2010-06-08 | 2011-12-15 | Collins Arlan E | Lift-slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
US10190309B2 (en) * | 2010-06-08 | 2019-01-29 | Innovative Building Technologies, Llc | Slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
US10145103B2 (en) | 2010-06-08 | 2018-12-04 | Innovative Building Technologies, Llc | Premanufactured structures for constructing buildings |
US20130067832A1 (en) * | 2010-06-08 | 2013-03-21 | Sustainable Living Technology, Llc | Lift-slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
US8950132B2 (en) | 2010-06-08 | 2015-02-10 | Innovative Building Technologies, Llc | Premanufactured structures for constructing buildings |
US8978324B2 (en) | 2010-06-08 | 2015-03-17 | Innovative Building Technologies, Llc | Pre-manufactured utility wall |
US9027307B2 (en) | 2010-06-08 | 2015-05-12 | Innovative Building Technologies, Llc | Construction system and method for constructing buildings using premanufactured structures |
US9382709B2 (en) | 2010-06-08 | 2016-07-05 | Innovative Building Technologies, Llc | Premanufactured structures for constructing buildings |
CN103225423B (en) * | 2013-04-10 | 2015-10-14 | 北京筑福建筑事务有限责任公司 | A kind of existing building encloses shell type adding storey structure and construction method thereof |
CN103225422B (en) * | 2013-04-10 | 2015-07-01 | 北京筑福国际工程技术有限责任公司 | Existing masonry structure using light steel structure direct storey-adding technology and construction method of existing masonry structure |
CN103225422A (en) * | 2013-04-10 | 2013-07-31 | 北京筑福国际工程技术有限责任公司 | Existing masonry structure using light steel structure direct storey-adding technology and construction method of existing masonry structure |
CN103225423A (en) * | 2013-04-10 | 2013-07-31 | 北京筑福国际工程技术有限责任公司 | Existing building surrounding type story-adding structure and construction method thereof |
CN103790393B (en) * | 2014-01-17 | 2016-06-08 | 上海建工四建集团有限公司 | A kind of construction method of existing building structure integral replacement |
CN103790393A (en) * | 2014-01-17 | 2014-05-14 | 上海建工四建集团有限公司 | Construction method for integrated replacement of existing building structure |
US20150211205A1 (en) * | 2014-01-29 | 2015-07-30 | Guangzhou Jishi Construction Group Co., Ltd. | Construction system for subway station |
US9822506B2 (en) * | 2014-01-29 | 2017-11-21 | Guangzhou Jishi Construction Group Co., Ltd. | Construction system for subway station |
US10041289B2 (en) | 2014-08-30 | 2018-08-07 | Innovative Building Technologies, Llc | Interface between a floor panel and a panel track |
US11060286B2 (en) | 2014-08-30 | 2021-07-13 | Innovative Building Technologies, Llc | Prefabricated wall panel for utility installation |
US10975590B2 (en) | 2014-08-30 | 2021-04-13 | Innovative Building Technologies, Llc | Diaphragm to lateral support coupling in a structure |
US10260250B2 (en) | 2014-08-30 | 2019-04-16 | Innovative Building Technologies, Llc | Diaphragm to lateral support coupling in a structure |
US11054148B2 (en) | 2014-08-30 | 2021-07-06 | Innovative Building Technologies, Llc | Heated floor and ceiling panel with a corrugated layer for modular use in buildings |
US10329764B2 (en) | 2014-08-30 | 2019-06-25 | Innovative Building Technologies, Llc | Prefabricated demising and end walls |
US10364572B2 (en) | 2014-08-30 | 2019-07-30 | Innovative Building Technologies, Llc | Prefabricated wall panel for utility installation |
US10676923B2 (en) | 2016-03-07 | 2020-06-09 | Innovative Building Technologies, Llc | Waterproofing assemblies and prefabricated wall panels including the same |
US10508442B2 (en) | 2016-03-07 | 2019-12-17 | Innovative Building Technologies, Llc | Floor and ceiling panel for slab-free floor system of a building |
US10900224B2 (en) | 2016-03-07 | 2021-01-26 | Innovative Building Technologies, Llc | Prefabricated demising wall with external conduit engagement features |
US10961710B2 (en) | 2016-03-07 | 2021-03-30 | Innovative Building Technologies, Llc | Pre-assembled wall panel for utility installation |
US20190309508A1 (en) * | 2016-05-30 | 2019-10-10 | Aleksandr Aleksandrovich TITOV | Method for erecting framework of structures |
US11002004B2 (en) * | 2016-05-30 | 2021-05-11 | Titov Aleksandr Aleksandrovich | Method for erecting framework of structures |
US10392794B2 (en) | 2016-09-21 | 2019-08-27 | Skyrise Global, Llc | Structure and method of making the same |
WO2018057792A1 (en) * | 2016-09-21 | 2018-03-29 | Skyrise Global, Llc | Structure and method of making the same |
US10550566B2 (en) | 2016-09-21 | 2020-02-04 | Skyrise Global, Llc | Structure and method of making the same |
US10731327B2 (en) | 2016-09-21 | 2020-08-04 | Skyrise Global, Llc | Structure and method of making the same |
US11193287B2 (en) * | 2016-09-23 | 2021-12-07 | Sh Technologies Pte Ltd | Construction system and method |
US10323428B2 (en) | 2017-05-12 | 2019-06-18 | Innovative Building Technologies, Llc | Sequence for constructing a building from prefabricated components |
US10724228B2 (en) | 2017-05-12 | 2020-07-28 | Innovative Building Technologies, Llc | Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls |
US10487493B2 (en) | 2017-05-12 | 2019-11-26 | Innovative Building Technologies, Llc | Building design and construction using prefabricated components |
US11098475B2 (en) | 2017-05-12 | 2021-08-24 | Innovative Building Technologies, Llc | Building system with a diaphragm provided by pre-fabricated floor panels |
CN108153972B (en) * | 2017-12-22 | 2021-05-28 | 腾达建设集团股份有限公司 | Analysis method for whole process of cable hoisting |
CN108153972A (en) * | 2017-12-22 | 2018-06-12 | 腾达建设集团股份有限公司 | A kind of cable hoisting full-range analysis methods |
CN110306714A (en) * | 2019-07-04 | 2019-10-08 | 艺墙之格建筑发展(上海)有限公司 | A kind of assembling type partition wall ceiling structure |
Also Published As
Publication number | Publication date |
---|---|
AU7543574A (en) | 1976-05-20 |
DE2501207A1 (en) | 1975-09-25 |
FR2273127A1 (en) | 1975-12-26 |
CA1021590A (en) | 1977-11-29 |
US3974618A (en) | 1976-08-17 |
FR2273127B1 (en) | 1979-03-16 |
AU475095B2 (en) | 1976-08-12 |
NL7416486A (en) | 1975-09-22 |
GB1497321A (en) | 1978-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3921362A (en) | Method of and means for multi-story building construction | |
US3782061A (en) | Concrete building construction with improved post tensioning means | |
US3828513A (en) | Method of erecting a multi-story building and apparatus therefor | |
AU2019409113B2 (en) | Building site device having a climbing formwork and an elevator system | |
US3692446A (en) | Apparatus for forming and lifting multi-story columns in one story increments | |
US10829927B2 (en) | Vertical slip form construction system with multi-function platform, and method of constructing a building therewith | |
CN116289491A (en) | String beam formula foundation ditch steel landing stage | |
KR101232704B1 (en) | The installation and dismantlement method of main girder for bridge temporary | |
US3156071A (en) | Building structure | |
CN108019040B (en) | A kind of high-rise building transfer floor Bailey bracket platform construction method | |
CN115627912A (en) | Construction method of assembled externally-mounted flower basket type overhanging scaffold | |
US3552080A (en) | Method for erecting multistory buildings | |
JP7134133B2 (en) | Bridge railing construction method | |
US3295266A (en) | Suspended floor system for a multi-level building | |
JP5437876B2 (en) | Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct | |
JPH11140892A (en) | Method for excavating ground and method for constructing underground structure using the same | |
KR20210068283A (en) | Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing | |
KR100617395B1 (en) | Building repairing system through column raising | |
JPH08239906A (en) | Construction of building | |
CN214996287U (en) | Assembled frame construction elevator well | |
JPH0932295A (en) | Construction method for concrete structure | |
JP3445419B2 (en) | Double slab construction method | |
JP3020023B2 (en) | Structure removal method | |
JP2003172046A (en) | Floor board for base isolation building and base isolation structuralization method of the existing building used thereof | |
JP2761527B2 (en) | How to build structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCF | Information on status: patent grant |
Free format text: PATENTED FILE - (OLD CASE ADDED FOR FILE TRACKING PURPOSES) |
|
AS | Assignment |
Owner name: CORTINA SYSTEM, INCORPORATED, A CORP OF TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:PABLO CORTINA;REEL/FRAME:004441/0701 Effective date: 19850630 |