US3871299A - Method and apparatus for lining and leveling track - Google Patents

Method and apparatus for lining and leveling track Download PDF

Info

Publication number
US3871299A
US3871299A US410292A US41029273A US3871299A US 3871299 A US3871299 A US 3871299A US 410292 A US410292 A US 410292A US 41029273 A US41029273 A US 41029273A US 3871299 A US3871299 A US 3871299A
Authority
US
United States
Prior art keywords
track
rails
rollers
lining
pairs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US410292A
Other languages
English (en)
Inventor
Franz Plasser
Josef Theurer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3871299A publication Critical patent/US3871299A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • E01B27/17Sleeper-tamping machines combined with means for lifting, levelling or slewing the track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/20Moving rails placed on installed sleepers in the plane track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/10Track-lifting or-lining devices or methods

Definitions

  • the track gage correction is effectuated by rneans of two pairs of clamping rollers which grip the rails.
  • a tension linkage interconnects the outer rollers of the two pairs and presses them against the outer lateral faces of the rails
  • a pressure linkage interconnects the inner rollers of the two pairs and pres'ses'them against the inner rail faces
  • turnbuckle or like means is provided for adjusting the length of the linkages
  • a hydraulic piston-andcylinder drive is mounted in each linkage.
  • the present invention relates to improvements in a method and apparatus for lining and leveling a track.
  • a railroad track comprises two rails fastened to support means resting on ballast, the support means consisting of conventional wooden ties ,or a concrete suping an outer roller for rolling engagement with an outer lateral face of a respective one of the rails and an inner roller for rolling engagement with an inner lateral face of the respective rail.
  • the rollers of each pair are arranged for clamping the respective rail.
  • the rollers of each pair are arranged for clamping the respective rail therebetween in the manner of pliers, and a hydraulically operable lever system acutates the rollers into and v out of clamping engagement with the rails.
  • the fastening of the rails to the support means is loosened, preferably before the track is raised, the track gage is corrected simultaneousely with the lining and tamping, the fastening is tightened, and the track is lowered to the tamped ballast.
  • This method is carried out according to the present invention with a conventional apparatus of the abovedescribed type wherein a tension linkage interconnects the outer rollers of the two pairs and presses them against the outer lateral faces of the rails, a pressure linkage interconnects the inner rollers of the two pairs and presses them against the inner lateral faces of the rails, means is provided for adjusting the length of each linkage, and a hydraulic piston-and-cylinder drive is mounted in each of the linkages.
  • the length of the linkages is adjustable, for instance by a turnbuckle or like element, so that the track gage correction device may be used with different gage norms.
  • FIG. 1 is a schematic front elevational view of the track gage correction apparatus of the invention
  • FIG. 2 is a top view of the essential structural elements of the apparatus of FIG. 1, the carrier frame having been omitted for the sake of clarity;
  • FIG. 3 is a schematic side elevational view of a conventional lining, leveling and tamping machine incor porating the apparatus of FIGS. 1 and 2.
  • FIG. 3 a generally conventional track lining, leveling and tamping machine is shown to comprise frame 1 mounted for mobility on a track which, as is seen in FIG. 1, comprises two rails 17, 17 fastened to ties 18, which are rail support means resting on ballast (now shown), by means of rail fastening means 19.
  • Frame 1 carries at the front thereof a track leveling and lining unit including pairs of rail gripping rollers 8, 9 and 10, 11, the unit being mounted on the frame for vertical and lateral movement for leveling and lining the track in a manner well known per se.
  • a pair of carrier elements 2, 3 are pivotally mounted on frame 1, carrier element 2 pivotally supporting a pair of levers 4, 5 and carrier element 3 pivotally sup? porting a pair of levers 6, 7.
  • Each pair of levers consists of simple lever 4, 7 and a bell crank lever 5, 6, rollers 8 to 10 being mounted at the free ends of the levers.
  • each pair of rollers includes an outer roller 8, 11 for rolling engagement with an outer lateral face of a respective one of rails 17 and an inner roller 9, 10 for rolling engagement with an inner lateral face of the respective rail, the rollers of each pair being arranged for clamping the respective rails therebetween like pliers.
  • Tension linkage 14 interconnects bell crank levers 5, 6 which carry outer rollers 8, 11, thus pressing the outer rollers against the outer lateral faces of the rails.
  • Turnbuckle 13 is mounted in the linkage to enable its length to be adjusted according to different gage norms.
  • hydraulic piston-and-cylinder drive 12 is mounted in linkage 14.
  • pressure linkage 14 interconnects simple levers 4, 7 which carry inner rollers 9, 10, thus pressing the inner rollers against the inner faces of the rails.
  • Turnbuckle 16 is mounted in the linkage to enable its length to be similarly adjusted, and hydraulicn pistonand-cylinder drive 15 is mounted in linkage 14. For the sake of clarity, part of pressure linkage 14 is omitted from FIG. 1.
  • pressure fluid is supplied to drive 15 to spread the rails apart when the track gage is less than that desired.
  • the track gage may also be corrected during the continuous advance of the mobile apparatus during the lining and leveling operation by simply blocking the pistons in a position corresponding to the desired gage.
  • sufficient hydraulic fluid is supplied to each drive to hold the pistons in a lateral position corresponding to the desired track gage.
  • the laterally stationary clamping rollers, which grip the two rails, will then force the same against the resistance of the loosened fastening means 19 to assume the desired track gage during the advance of the machine over the track.
  • a signaling device 18 is connected to the hydraulic drives so that signals are produced which indicate changes in the piston position in the cylinder which correspond to larger gage deviations and thus may automatically produce gage corrections.
  • the signaling device is preferably connected to a recording device 19 which receives the signals therefrom and records the track gage continuously during advance of the machine.
  • An implement for loosening the rail fastening means may be mounted on an advance bogie so that the fastening means may be loosened before the track is raised, lined and leveled. Since the fastening means are not removed but only loosened, minor deviations from the desired gage will be automatically corrected during the continuous lining and leveling of the track when hydraulic drives 12, are blocked in position to establish the desired gage. The rails, which are gripped by the clamping rollers, will thus be moved laterally to assume the desired track gage.
  • FIG. 3 shows a lining, leveling and tamping maching advancing on the track in the direction of machine 20. Equipped with the track gage correction apparatus of the present invention, this machine will automatically correct the gage during or shortly after lifting the track and particularly during the lining and leveling thereof. After the track has been corrected, the rail fastening means are tightened again so that the rails remain in 4 their adjusted position.
  • Track gage correction is particularly required on modern rapid speed tracks requiring gage accuracies down to a range of 10 mm.
  • a method of lining and leveling a track comprising two rails fastened to support means resting on ballast, wherein the track is raised and lined, and the ballast is tamped under the support means to establish a desired level
  • the improvement of loosening the fastening of the rails to the support means correcting the track gage simultaneously with the lining and tamping, tightening the fastening of the rails to the support means, and lowering the track to the tamped ballast.
  • a mobile apparatus for lining and leveling a track which comprises a frame mounted for mobility on the track, two pairs of rollers mounted on the frame, each pair of the rollers including an outer roller for rolling engagement with an outer lateral face of a respective one of the rails and an inner roller for rolling engagement with an inner lateral face of the respective rail, the rollers of each pair being arranged for clam ping the respective rail therebetween, and hydraulically operable lever system for actuating the rollers into and out of clamping engagement with the rails, the improvement of l. a tension linkage interconnecting the outer rollers of the two pairs and pressing them against the outer lateral faces of the rails,
  • a signaling device producing signals indicating changes of the piston position in the cylinder of the hydraulic drive.
  • a recording device receiving the signals.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
US410292A 1972-11-02 1973-10-26 Method and apparatus for lining and leveling track Expired - Lifetime US3871299A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT930072A AT331836B (de) 1972-11-02 1972-11-02 Verfahren und vorrichtung zum richten und nivellieren von eisenbahngleisen

Publications (1)

Publication Number Publication Date
US3871299A true US3871299A (en) 1975-03-18

Family

ID=3612957

Family Applications (1)

Application Number Title Priority Date Filing Date
US410292A Expired - Lifetime US3871299A (en) 1972-11-02 1973-10-26 Method and apparatus for lining and leveling track

Country Status (16)

Country Link
US (1) US3871299A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
JP (1) JPS5721602B2 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
AT (1) AT331836B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
CA (1) CA999784A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
CH (1) CH569838A5 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
DD (1) DD107099A5 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
DE (1) DE2348014C2 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
ES (1) ES420199A1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
FR (1) FR2209008B1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
GB (1) GB1451966A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
HU (1) HU171643B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
IN (1) IN139151B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
IT (1) IT995691B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
PL (1) PL93304B1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
SU (1) SU518153A3 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
ZA (1) ZA738392B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4046079A (en) * 1975-01-31 1977-09-06 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing apparatus
US4064807A (en) * 1975-08-18 1977-12-27 Franz Plasser Bahnbaumaschinen Industriegesellschaft M.B.H. Mobile apparatus for non-stop track leveling and ballast tamping
RU2410485C2 (ru) * 2009-01-26 2011-01-27 Рейлтек Интернейшнел Установка для выравнивания рельсов при их сварке
CN101575832B (zh) * 2009-06-03 2011-07-27 中铁一局集团新运工程有限公司 有砟轨道高速道岔组装平台
CN103452018A (zh) * 2013-08-20 2013-12-18 中铁十七局集团第二工程有限公司 一种双块式无碴轨道施工的轨距校正方法
CN104404842A (zh) * 2013-12-25 2015-03-11 金鹰重型工程机械有限公司 一种轨枕对中装置
CN111663376A (zh) * 2020-06-04 2020-09-15 安徽博晟亿电力科技有限公司 一种铁路轨道枕木对接装置及其实施方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT335503B (de) * 1974-09-27 1977-03-10 Plasser Bahnbaumasch Franz Fahrbare gleisbearbeitungsmaschine
JPS5834605B2 (ja) * 1978-08-14 1983-07-28 芝浦メカトロニクス株式会社 レ−ル整正装置
ZA796444B (en) * 1978-11-30 1980-11-26 Pandrol Ltd Apparatus for performing operations on a railway track
US5269225A (en) * 1991-03-18 1993-12-14 Burlington Northern Railroad Apparatus and method for distributing and applying rail clips and insulators
US5915744A (en) * 1997-04-09 1999-06-29 Harsco Corporation Rail anchor removal
US5927209A (en) * 1997-04-14 1999-07-27 Harsco Corporation Rail heating and clip applicator
CN110846959B (zh) * 2019-11-01 2024-07-19 深圳市圆梦精密技术研究院 轨道螺母检修设备及其自动调整位置的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1607882A (en) * 1923-10-10 1926-11-23 Engelgau Albert Means for recording and gauging the irregularities of railway-track rails
US3274952A (en) * 1964-06-10 1966-09-27 Mannix Internat Inc Railroad track gripping apparatus
US3524624A (en) * 1968-01-23 1970-08-18 George T Blackwell Jr Track gauging method and apparatus
US3552320A (en) * 1968-08-02 1971-01-05 Nordberg Manufacturing Co Rail gaging and renewing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1534021B2 (de) * 1965-03-23 1977-03-03 Canron Ltd. - Canron Limitee, Montreal, Quebec (Kanada) Gleisnivellier- und stopfmaschine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1607882A (en) * 1923-10-10 1926-11-23 Engelgau Albert Means for recording and gauging the irregularities of railway-track rails
US3274952A (en) * 1964-06-10 1966-09-27 Mannix Internat Inc Railroad track gripping apparatus
US3524624A (en) * 1968-01-23 1970-08-18 George T Blackwell Jr Track gauging method and apparatus
US3552320A (en) * 1968-08-02 1971-01-05 Nordberg Manufacturing Co Rail gaging and renewing device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4046079A (en) * 1975-01-31 1977-09-06 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing apparatus
US4064807A (en) * 1975-08-18 1977-12-27 Franz Plasser Bahnbaumaschinen Industriegesellschaft M.B.H. Mobile apparatus for non-stop track leveling and ballast tamping
RU2410485C2 (ru) * 2009-01-26 2011-01-27 Рейлтек Интернейшнел Установка для выравнивания рельсов при их сварке
CN101575832B (zh) * 2009-06-03 2011-07-27 中铁一局集团新运工程有限公司 有砟轨道高速道岔组装平台
CN103452018A (zh) * 2013-08-20 2013-12-18 中铁十七局集团第二工程有限公司 一种双块式无碴轨道施工的轨距校正方法
CN103452018B (zh) * 2013-08-20 2015-07-15 中铁十七局集团第二工程有限公司 一种双块式无碴轨道施工的轨距校正方法
CN104404842A (zh) * 2013-12-25 2015-03-11 金鹰重型工程机械有限公司 一种轨枕对中装置
CN104404842B (zh) * 2013-12-25 2016-03-02 金鹰重型工程机械有限公司 一种轨枕对中装置
CN111663376A (zh) * 2020-06-04 2020-09-15 安徽博晟亿电力科技有限公司 一种铁路轨道枕木对接装置及其实施方法
CN111663376B (zh) * 2020-06-04 2022-01-28 安徽博晟亿电力科技有限公司 一种铁路轨道枕木对接装置及其实施方法

Also Published As

Publication number Publication date
DE2348014A1 (de) 1974-05-16
ES420199A1 (es) 1976-07-01
ZA738392B (en) 1975-02-26
DD107099A5 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1974-07-12
CH569838A5 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1975-11-28
FR2209008A1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1974-06-28
JPS5721602B2 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1982-05-08
HU171643B (hu) 1978-02-28
ATA930072A (de) 1975-12-15
GB1451966A (en) 1976-10-06
SU518153A3 (ru) 1976-06-15
AT331836B (de) 1976-08-25
PL93304B1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1977-05-30
AU6047673A (en) 1975-03-20
CA999784A (en) 1976-11-16
IT995691B (it) 1975-11-20
FR2209008B1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1977-09-23
IN139151B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1976-05-15
JPS49100709A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1974-09-24
DE2348014C2 (de) 1982-04-01

Similar Documents

Publication Publication Date Title
US3871299A (en) Method and apparatus for lining and leveling track
US3687081A (en) Method of continuously correcting a track position
US5343810A (en) Switch tamper
US4046079A (en) Track surfacing apparatus
US3919943A (en) Track surfacing method
US5419259A (en) Machine for compacting track ballast with variable gauge track stabilizer
US3595170A (en) Mobile track tamper
US3910195A (en) Track tamper and leveler
ES450777A1 (es) Perfeccionamientos en maquinas moviles sobre ruedas para la nivelacion continua y la compactacion del lecho de balasto de vias.
US3968752A (en) Mobile track working machine
US4825768A (en) Mobile machine for leveling, lining and tamping a track switch
US3534687A (en) Mobile track tamper
US4928599A (en) Continuously advancing track leveling, lining and tamping machine
SE9003432D0 (sv) Kontinuierlich verfahrbare gleisbaumaschine zum verdichten der schotterbettung
US4046078A (en) Track surfacing apparatus
US4881467A (en) Continuously advancing track maintenance or rehabilitation machine
US2847943A (en) Mobile railway ballast tamping machine with track lifting mechanism
AU642803B2 (en) A track maintenance machine for the controlled lowering of a track
US4449459A (en) Pivoting head continuous tamper
US4170942A (en) Mobile leveling, lining and ballast packing machine
US3486461A (en) Method and apparatus for aligning track
US3895583A (en) Method and apparatus for tamping and leveling track
US4625651A (en) Mobile track switch leveling, lining and tamping machine
US3690262A (en) Track correction and tamping machine
US3972292A (en) Track renewal apparatus