US3692364A - Method of open-pit mining - Google Patents

Method of open-pit mining Download PDF

Info

Publication number
US3692364A
US3692364A US84963A US3692364DA US3692364A US 3692364 A US3692364 A US 3692364A US 84963 A US84963 A US 84963A US 3692364D A US3692364D A US 3692364DA US 3692364 A US3692364 A US 3692364A
Authority
US
United States
Prior art keywords
open
pit
ramp
tunnel
tunnel system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US84963A
Inventor
Sune Torsten Henriksson
Ragnar Ludvig Muotka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3692364A publication Critical patent/US3692364A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/30Methods of surface mining; Layouts therefor for ores, e.g. mining placers

Definitions

  • ABSTRACT A method of open-pit mining according to which a transport ramp system is provided in a tunnel system outside the open pit and the body of materials which is mined for establishing communication between the surface and the different mining levels.
  • the present invention relates to mining and, in particular, to a method of open-pit mining.
  • an open-pit mine which is used when the deposit of ore or minerals to be mined starts from or lies adjacent to the surface of the ground it is known to establish communications between the working site or the mining level in question and the surface by means of a transport track or ramp which extends from the surface downwardly along the walls of the open-pit mine which are formed accordingly as the mining progresses.
  • a transport track or ramp which extends from the surface downwardly along the walls of the open-pit mine which are formed accordingly as the mining progresses.
  • a transport track or ramp For each new mining level a new transport ramp must be established, and ore or other materials which are mined must be carried away.
  • the material surrounding the ore or mineral body which is mined must be removed. in that connection such a quantity of the surrounding material must be removed that the slope stability required in each particular case is obtained in the walls of the open-pit mine and that the necessary space is obtained for the inclined track or ramp extending along said walls.
  • the building of the transport ramp entails a substantial increase of the quantity of materials which have to be removed, in addition to the quantity of materials required in order to obtain the necessary slope stability. It will therefore be realized that the quantity of materials which increases in proportion to the distance of the transport ramp from the surface of the ground must be carried away when a length unit of the ramp is built since for obtaining each surface unit of the transport ramp it is necessary to remove a volume .of materials corresponding to the surface unit in question multiplied by its distance to the surface of the ground. In an openpit mine of a great depth the building of the inclined track or ramp will consequently entail considerable building costs.
  • the object of the invention is consequently to provide a method of open-pit mining in which the establishing of communications between various mining levels and the surface of the ground is more inexpensive both with regard to the building costs and with regard to the maintenance costs thanin connection with the known methods of mining.
  • This object is attained according to the invention by building the transport tracks or ramps in tunnels in the mountain outside the body of materials which is mined.
  • the position of the transport ramp must be determined from case to case in view of the shape of the body of materials which is mined, the type of materials in the body and the materials surrounding it, etc.
  • the transport ramp may extend around the body of materials or may be located serpentine-like on one side thereof.
  • Connections are built between the ramp and the working sites on the different levels, and these connections are planned according to the same principles as in a ramp system built in open air.
  • FIGS. la and 1b are diagrammatic views of a manner of arranging a transport ramp according to the invention
  • FIGS. 2a and 2b are also diagrammatic views of another manner of arranging a transport ramp according to the invention.
  • FIG. 3 shows a way of arranging the connection between the inclined track and the surface of the ground
  • FIG. 4 shows another manner of arranging the connection of the inclined track with the surface of the ground.
  • FIGS. 'la and lb are diagrammatic views of an ore body 1 which is to be mined according to the open-pit mining method.
  • the surrounding rock 2 In order to obtain the necessary slope stability the surrounding rock 2 must be removed along the lines 3 and 4 accordingly as the mining progresses.
  • Communications with the mining levels which will be located at longer and longer distances from the surface of the ground is obtained by means of a transport ramp or an inclined track 5 built in a tunnel which extends serpentine-like at the righthand side of the ore body in the figure, i.e., on the so called foot wall side of the ore body, and by means of horizontal tunnels 6 extending from the transport ramp to the working sites.
  • FIGS. 2a and 2b show another ore body 7.
  • the transport ramp 8 extend in a tunnel running helically around the ore body.
  • communication is established between the ramp and the working sites by means of horizontal tunnels 9.
  • the rock surrounding the ore body is removed in the ordinary manner along the lines 10 and 11 in order to achieve the requisite slope stability.
  • FIG. 3 shows the embodiment of a connection between a ramp 12 built in the tunnel and the surface of the ground.
  • the tunnel and consequently the ramp has a section 13 at the orifice which is inclined outwardly downwardly with an angle of inclination in relation to the horizontal plane which preferably amounts to 1 to 3.
  • the purpose of giving the top section of the ramp an inclination which is opposite to the rest of the transport ramp in relation to the horizontal plane is of course to prevent rain and snow from entering the communication system and cause difficulties of various kinds there. Since the tunnel in the case shown opens into an inclined portion of the surface of the ground a roof or cover above the top section of the transport ramp is automatically obtained.
  • FIG. 4 shows how the tunnel opens at a plane part of the surface of the ground and in this case it is necessary to build a special superstructure 14 in order to cover the opening of the tunnel.
  • a method for transporting ore upwardly from a deep open-pit mine to the ground surface comprises the steps of:

Abstract

A method of open-pit mining according to which a transport ramp system is provided in a tunnel system outside the open pit and the body of materials which is mined for establishing communication between the surface and the different mining levels.

Description

United States Patent Henriksson et a1.
METHOD OF OPEN-PIT MINING Inventors: Sune Torsten Henrikson, Kvartsvagen 6; Ragnar Ludvig Muotka, Kyrkogatan 46, both of 981 00 Kimna, Sweden Filed: Oct. 29, 1970 App1.No.: 84,963
Foreign Application Priority Data Oct. 31, 1969 Sweden ..l4945/69 US. Cl ..299/l8, 299/19 Int. Cl ..E21c 41/00 Field of Search ..299/18, 19; 37/195; 61/5,
[4 Sept. 19, 1972 t [56.] References Cited UNITED STATES PATENTS 3,167,354 1/1965 Macaul et a1. ..299/l8 X 3,582,138 6/1971 Loofbourow et a1. ..299/l8 Primary Examiner-Emest Purser Attorney-Jones & Lockwood [57] ABSTRACT A method of open-pit mining according to which a transport ramp system is provided in a tunnel system outside the open pit and the body of materials which is mined for establishing communication between the surface and the different mining levels.
6 Claims, 6 Drawing Figures mg n! SmEmgnl g PATENTEB 19 I912 3.692.364
sum 2 or 3 Fig.2a
Fig.2b
PKTENTED 19 3.692.364
sum 3 OF 3 Fig.3
METHOD OF OPEN-PIT MINING The present invention relates to mining and, in particular, to a method of open-pit mining.
In an open-pit mine which is used when the deposit of ore or minerals to be mined starts from or lies adjacent to the surface of the ground it is known to establish communications between the working site or the mining level in question and the surface by means of a transport track or ramp which extends from the surface downwardly along the walls of the open-pit mine which are formed accordingly as the mining progresses. For each new mining level a new transport ramp must be established, and ore or other materials which are mined must be carried away. Also the material surrounding the ore or mineral body which is mined must be removed. in that connection such a quantity of the surrounding material must be removed that the slope stability required in each particular case is obtained in the walls of the open-pit mine and that the necessary space is obtained for the inclined track or ramp extending along said walls. As the transport ramp must have a width of to 13 meters including the requisite protective wall at the outer side of the ramp, the building of the transport ramp entails a substantial increase of the quantity of materials which have to be removed, in addition to the quantity of materials required in order to obtain the necessary slope stability. It will therefore be realized that the quantity of materials which increases in proportion to the distance of the transport ramp from the surface of the ground must be carried away when a length unit of the ramp is built since for obtaining each surface unit of the transport ramp it is necessary to remove a volume .of materials corresponding to the surface unit in question multiplied by its distance to the surface of the ground. In an openpit mine of a great depth the building of the inclined track or ramp will consequently entail considerable building costs.
Not only the building costs but also the maintenance costs are however very high when using transport ramps of the known kind described above. Thus, for safety reasons it is necessary to clear the rock wall above the transport ramp, which cannot be done once only when the ramp is built but has to be performed at even time intervals due to the fact that the rock wall will weather under the action of the climate. Since the surfaces to be cleared are very large and the work is risky and time consuming especially when there is ice and snow the costs in this connection are substantial.
When the road is very slippery and when great amounts of snow and rain have fallen it may become necessary to interrupt traffic on the transport ramp completely which, as will be realized, makes it necessary to stop the mining after a short time. Such a total stop may entail losses amounting to tens of thousands of dollars per hour. In tropical countries the stop may have to be total for several weeks during the rains, when it may also happen that the transport ramp is completely destroyed.
There is an additional problem in connection with snowfall, as the snow must be conveyed down to the bottom of the pit, where it has to be loaded onto trucks and then carried up to the surface. It will-be realized that this complicated method of removing snow from the transport ramps and roads is very expensive.
The object of the invention is consequently to provide a method of open-pit mining in which the establishing of communications between various mining levels and the surface of the ground is more inexpensive both with regard to the building costs and with regard to the maintenance costs thanin connection with the known methods of mining.
This object is attained according to the invention by building the transport tracks or ramps in tunnels in the mountain outside the body of materials which is mined.
The building costs for an inclined track or a ramp built in a tunnel are considerably lower than for a ramp built in open air in a conventional manner. It is true that the costs per unit of volume of removed'materials will be slightly higher when the ramp or track is built in a tunnel but these increased costs are more than compensated for by the fact that a very much smaller volume of materials has to be removed per built surface unit of the inclined track or ramp when the latter is built in a tunnel. Evidently, there is required for each surface unit of the ramp a constant volume of removed materials independently of the distance of the ramp from the surface, and the costs saved when applying the method according to the invention will consequently become proportionally higher accordingly as the depth of the open-pit-mine increases. Thus, for instance, for an open pit having a depth of 500 meters the costs for building an inclined track in the manner according to the invention have been assessed to amount to only 2.8 per cent of the costs for building a conventional transport ramp in the open air.
As also the maintenance costs of a transport track or ramp built in a tunnel'will for obvious reasons beconsiderably lower than with respect to a conventional 'rampit will be realized that the savings which can be made when applying the mining method according to the invention are considerable. No cleaning of large surfaces is required and besides,the risks of slipping when there is ice and snow as well as the interruptions of the operation due to the action of the climate are completely eliminated.
The position of the transport ramp must be determined from case to case in view of the shape of the body of materials which is mined, the type of materials in the body and the materials surrounding it, etc. Thus, the transport ramp may extend around the body of materials or may be located serpentine-like on one side thereof.
Connections are built between the ramp and the working sites on the different levels, and these connections are planned according to the same principles as in a ramp system built in open air.
The invention will be described in greater detail in the following with reference to the accompanying drawings, where FIGS. la and 1b are diagrammatic views of a manner of arranging a transport ramp according to the invention,
FIGS. 2a and 2b are also diagrammatic views of another manner of arranging a transport ramp according to the invention,
FIG. 3 shows a way of arranging the connection between the inclined track and the surface of the ground, and
FIG. 4 shows another manner of arranging the connection of the inclined track with the surface of the ground.
FIGS. 'la and lb are diagrammatic views of an ore body 1 which is to be mined according to the open-pit mining method. In order to obtain the necessary slope stability the surrounding rock 2 must be removed along the lines 3 and 4 accordingly as the mining progresses. Communications with the mining levels which will be located at longer and longer distances from the surface of the ground is obtained by means of a transport ramp or an inclined track 5 built in a tunnel which extends serpentine-like at the righthand side of the ore body in the figure, i.e., on the so called foot wall side of the ore body, and by means of horizontal tunnels 6 extending from the transport ramp to the working sites. When building the tunnels it is possible, if necessary, to reinforce the tunnel walls by means of rock bolts and the like, whereupon the communication system may be regarded as almost maintenance-free. The only kind of maintenance which is normally required is consequently the maintenance of the transport ramp, which is worn by the vehicle traffic.
FIGS. 2a and 2b show another ore body 7. In this case it has been considered suitable to let the transport ramp 8 extend in a tunnel running helically around the ore body. In this case, too, communication is established between the ramp and the working sites by means of horizontal tunnels 9. The rock surrounding the ore body is removed in the ordinary manner along the lines 10 and 11 in order to achieve the requisite slope stability.
FIG. 3 shows the embodiment of a connection between a ramp 12 built in the tunnel and the surface of the ground. As appears from the figure, the tunnel and consequently the ramp has a section 13 at the orifice which is inclined outwardly downwardly with an angle of inclination in relation to the horizontal plane which preferably amounts to 1 to 3. The purpose of giving the top section of the ramp an inclination which is opposite to the rest of the transport ramp in relation to the horizontal plane is of course to prevent rain and snow from entering the communication system and cause difficulties of various kinds there. Since the tunnel in the case shown opens into an inclined portion of the surface of the ground a roof or cover above the top section of the transport ramp is automatically obtained.
FIG. 4 shows how the tunnel opens at a plane part of the surface of the ground and in this case it is necessary to build a special superstructure 14 in order to cover the opening of the tunnel.
It will be realized that the invention can be modified within the scope of the following claims, and particularly with regard to the extension of the inclined track and consequently of the tunnel system in relation to the body of materials where the mining takes place the application of the invention must be determined from case to case.
We claim:
1. A method for transporting ore upwardly from a deep open-pit mine to the ground surface, which method comprises the steps of:
a. forming a downwardly inclined tunnel system from the ground surface and extending the tunnel s st d nwardl throu h the ater'als 'n oirts i ia ofihe open pit min parts 0 sai out yin tunnel system being formed in communication with the open-pit mine; v
b. providing an inclined transport ramp system throughout said tunnel system;
c. transporting ore on said ramp system from the open-pit mine and through the tunnel formed in the materials lying outside of the open-pit mine; and
d. recovering the ore at the ground surface.
2. The open-pit mining method of claim 1 which the outlying tunnel system is formed helically around the open-pit mine.
3. The open-pit mining method of claim 1 in which the tunnel system is formed serpentine-like at one side of the open-pit mine.
4. The open-pit mining method of claim 1 in which substantially horizontal tunnels are provided in communication between the downwardly inclined tunnel system and the open-pit mine.
5. The open-pit mining method of claim 1 in which the transport ramp system is provided with an outwardly-downwardly sloping ramp section at the junction of the. ramp system and the ground surface.
6. The open-pit mining method of claim 1 in which the downwardly inclined tunnel system is provided with a superstructure at the junction of the tunnel system and the ground surface.
I ii

Claims (6)

1. A method for transporting ore upwardly from a deep open-pit mine to the ground surface, which method comprises the steps of: a. forming a downwardly inclined tunnel system from the ground surface and extending the tunnel system downwardly through the materials lying outside of the open-pit mine, parts of said outlying tunnel system being formed in communication with the open-pit mine; b. providing an inclined transport ramp system throughout said tunnel system; c. transporting ore on said ramp system from the open-pit mine and through the tunnel formed in the materials lying outside of the open-pit mine; and d. recovering the ore at the ground surface.
2. The open-pit mining method of claim 1 which the outlying tunnel system is formed helically around the open-pit mine.
3. The open-pit mining method of claim 1 in which the tunnel system is formed serpentine-like at one side of the open-pit mine.
4. The open-pit mining method of claim 1 in which substantially horizontal tunnels are provided in communication between the downwardly inclined tunnel system and the open-pit mine.
5. The open-pit mining method of claim 1 in which the transport ramp system is provided with an outwardly-downwardly sloping ramp section at the junction of the ramp system and the ground surface.
6. The open-pit mining method of claim 1 in which the downwardly inclined tunnel system is provided with a superstructure at the junction of the tunnel system and the ground surface.
US84963A 1969-10-31 1970-10-29 Method of open-pit mining Expired - Lifetime US3692364A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE6914945A SE330519C (en) 1969-10-31 1969-10-31 SEE FOR MINING WITH ACCORDING TO THE DAYME METHOD

Publications (1)

Publication Number Publication Date
US3692364A true US3692364A (en) 1972-09-19

Family

ID=20299916

Family Applications (1)

Application Number Title Priority Date Filing Date
US84963A Expired - Lifetime US3692364A (en) 1969-10-31 1970-10-29 Method of open-pit mining

Country Status (9)

Country Link
US (1) US3692364A (en)
CA (1) CA972386A (en)
CS (1) CS214848B2 (en)
ES (1) ES385026A1 (en)
FR (1) FR2066713A5 (en)
PL (1) PL81151B1 (en)
SE (1) SE330519C (en)
ZA (1) ZA707338B (en)
ZM (1) ZM11970A1 (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3975053A (en) * 1973-12-03 1976-08-17 Kochanowsky Boris J Mining methods as such and combined with equipment
US4103972A (en) * 1973-12-03 1978-08-01 Kochanowsky Boris J Open pit mine
US20060265342A1 (en) * 2002-10-09 2006-11-23 Froyland Gary A System and method(s) of blended mine planning, design and processing
EA008469B1 (en) * 2005-11-01 2007-06-29 Юрий Григорьевич Желябовский Method for joining inclined haulage bench at the extension of fixing thereof to safety bench
US20070185750A1 (en) * 2004-06-21 2007-08-09 Merab Menabde Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
EA008729B1 (en) * 2006-10-17 2007-08-31 Юрий Григорьевич Желябовский Method of conjunction inclined transportation berms at adjacent sites to a protective berm
US7463415B2 (en) 2002-10-29 2008-12-09 Eugene Lee Shafer System for collecting and displaying images to create a visual effect and methods of use
RU2464422C2 (en) * 2010-12-03 2012-10-20 Общество С Ограниченной Ответственностью "Группа "Магнезит" Open mining method
RU2515649C1 (en) * 2013-02-06 2014-05-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method of combined development of elongated deposits of steeply pitching seams
RU2528704C1 (en) * 2013-05-06 2014-09-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open working out of steep deposits of platform shape
RU2528731C1 (en) * 2013-03-25 2014-09-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open working out of steep deposits with internal spoil disposal
RU2533996C1 (en) * 2013-06-26 2014-11-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open development of steep deposits of area form
RU2534305C1 (en) * 2013-07-16 2014-11-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of opening deep pits
RU2540735C1 (en) * 2013-09-10 2015-02-10 АКЦИОНЕРНАЯ КОМПАНИЯ "АЛРОСА" (открытое акционерное общество) (АК "АЛРОСА" ОАО)) Method for completion of open pit with two closely located ore bodies
RU2612178C2 (en) * 2015-07-27 2017-03-02 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open mining of steep dipping field having round form using temporary nonworking sidewalls
RU2632606C1 (en) * 2016-05-04 2017-10-06 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for depreservation steeply inclined nonactive sidewalls
RU2632604C1 (en) * 2016-05-04 2017-10-06 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for forming and depreserving steep temporary nonactive walls when developing deep laying deposits
RU2652234C1 (en) * 2017-04-17 2018-04-25 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open development of inclined deposits with the use of spoil banks
RU2658420C1 (en) * 2017-08-03 2018-06-21 Акционерная Компания "АЛРОСА" (публичное акционерное общество) (АК "АЛРОСА" (ПАО)) Dumping method during development of upland quarries
RU2676352C1 (en) * 2018-03-30 2018-12-28 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for developing deep open pits in cryolitic zone
RU2685590C1 (en) * 2018-09-04 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steeply-dipping deposits of round shape with internal dumping
RU2685594C1 (en) * 2018-09-04 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steeply dipping deposits of round shape with application of single-stage steeply inclined temporarily non-working sides
RU2685587C1 (en) * 2018-10-03 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steeply-dipping deposits with application of combined temporary non-working sides
RU2685583C1 (en) * 2018-07-13 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steep deposits with application of multistage temporarily non-working sides
RU2693798C1 (en) * 2018-12-19 2019-07-04 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of deep-lying steeply falling mineral deposits
RU2698752C1 (en) * 2019-04-19 2019-08-29 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for driving of inclined shafts and horizontal underground mines in cryolithozone conditions
RU2698750C1 (en) * 2019-04-17 2019-08-29 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for development of deep horizons of diamond-mining pits in cryolithozone conditions
RU2738148C1 (en) * 2019-07-19 2020-12-08 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of deep-lying rounded deposits
WO2021261649A1 (en) * 2020-06-23 2021-12-30 손정락 Tunnel structure for quarrying and quarrying method using same

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2359962A1 (en) * 1976-07-26 1978-02-24 Kochanowsky Boris Open pit mine for mineral extraction from earths crust - has turning point area with radially extending bench and crusher and conveyors
AT378821B (en) * 1983-04-21 1985-10-10 Ilbau Ges M B H & Co Kg METHOD OF PIT PITCHING

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3167354A (en) * 1962-08-24 1965-01-26 Ingersoll Rand Co Drilling method for mining thin ore bodies
US3582138A (en) * 1969-04-24 1971-06-01 Robert L Loofbourow Toroid excavation system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3167354A (en) * 1962-08-24 1965-01-26 Ingersoll Rand Co Drilling method for mining thin ore bodies
US3582138A (en) * 1969-04-24 1971-06-01 Robert L Loofbourow Toroid excavation system

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4103972A (en) * 1973-12-03 1978-08-01 Kochanowsky Boris J Open pit mine
US3975053A (en) * 1973-12-03 1976-08-17 Kochanowsky Boris J Mining methods as such and combined with equipment
US20060265342A1 (en) * 2002-10-09 2006-11-23 Froyland Gary A System and method(s) of blended mine planning, design and processing
US7925474B2 (en) * 2002-10-09 2011-04-12 Bhp Billiton Innovation Pty Ltd. System and methods(s) of blended mine planning, design and processing
US7463415B2 (en) 2002-10-29 2008-12-09 Eugene Lee Shafer System for collecting and displaying images to create a visual effect and methods of use
US20070185750A1 (en) * 2004-06-21 2007-08-09 Merab Menabde Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
US20110227394A1 (en) * 2004-06-21 2011-09-22 Merab Menabde Method, Apparatus And Computer Program For Scheduling The Extraction Of A Resource And For Determining The Net Present Value Of An Extraction Schedule
US8082167B2 (en) * 2004-06-21 2011-12-20 Bhp Billiton Innovation Pty Ltd. Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
EA008469B1 (en) * 2005-11-01 2007-06-29 Юрий Григорьевич Желябовский Method for joining inclined haulage bench at the extension of fixing thereof to safety bench
WO2008048140A1 (en) * 2006-10-17 2008-04-24 Yury Grigoryevich Zhelyabovsky Method for joining inclined haulage berms on a section adjacent to a safety berm
EA008729B1 (en) * 2006-10-17 2007-08-31 Юрий Григорьевич Желябовский Method of conjunction inclined transportation berms at adjacent sites to a protective berm
RU2464422C2 (en) * 2010-12-03 2012-10-20 Общество С Ограниченной Ответственностью "Группа "Магнезит" Open mining method
RU2515649C1 (en) * 2013-02-06 2014-05-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method of combined development of elongated deposits of steeply pitching seams
RU2528731C1 (en) * 2013-03-25 2014-09-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open working out of steep deposits with internal spoil disposal
RU2528704C1 (en) * 2013-05-06 2014-09-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open working out of steep deposits of platform shape
RU2533996C1 (en) * 2013-06-26 2014-11-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open development of steep deposits of area form
RU2534305C1 (en) * 2013-07-16 2014-11-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of opening deep pits
RU2540735C1 (en) * 2013-09-10 2015-02-10 АКЦИОНЕРНАЯ КОМПАНИЯ "АЛРОСА" (открытое акционерное общество) (АК "АЛРОСА" ОАО)) Method for completion of open pit with two closely located ore bodies
RU2612178C2 (en) * 2015-07-27 2017-03-02 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open mining of steep dipping field having round form using temporary nonworking sidewalls
RU2632606C1 (en) * 2016-05-04 2017-10-06 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for depreservation steeply inclined nonactive sidewalls
RU2632604C1 (en) * 2016-05-04 2017-10-06 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for forming and depreserving steep temporary nonactive walls when developing deep laying deposits
RU2652234C1 (en) * 2017-04-17 2018-04-25 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open development of inclined deposits with the use of spoil banks
RU2658420C1 (en) * 2017-08-03 2018-06-21 Акционерная Компания "АЛРОСА" (публичное акционерное общество) (АК "АЛРОСА" (ПАО)) Dumping method during development of upland quarries
RU2676352C1 (en) * 2018-03-30 2018-12-28 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for developing deep open pits in cryolitic zone
RU2685583C1 (en) * 2018-07-13 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steep deposits with application of multistage temporarily non-working sides
RU2685594C1 (en) * 2018-09-04 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steeply dipping deposits of round shape with application of single-stage steeply inclined temporarily non-working sides
RU2685590C1 (en) * 2018-09-04 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steeply-dipping deposits of round shape with internal dumping
RU2685587C1 (en) * 2018-10-03 2019-04-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of steeply-dipping deposits with application of combined temporary non-working sides
RU2693798C1 (en) * 2018-12-19 2019-07-04 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of deep-lying steeply falling mineral deposits
RU2698750C1 (en) * 2019-04-17 2019-08-29 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for development of deep horizons of diamond-mining pits in cryolithozone conditions
RU2698752C1 (en) * 2019-04-19 2019-08-29 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for driving of inclined shafts and horizontal underground mines in cryolithozone conditions
RU2738148C1 (en) * 2019-07-19 2020-12-08 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for open development of deep-lying rounded deposits
WO2021261649A1 (en) * 2020-06-23 2021-12-30 손정락 Tunnel structure for quarrying and quarrying method using same

Also Published As

Publication number Publication date
PL81151B1 (en) 1975-08-30
CA972386A (en) 1975-08-05
SE330519C (en) 1977-01-13
SE330519B (en) 1970-11-23
CS214848B2 (en) 1982-06-25
ZM11970A1 (en) 1972-01-21
ZA707338B (en) 1972-06-28
FR2066713A5 (en) 1971-08-06
ES385026A1 (en) 1973-03-16

Similar Documents

Publication Publication Date Title
US3692364A (en) Method of open-pit mining
Hustrulid et al. Underground mining methods: Engineering fundamentals and international case studies
US4103972A (en) Open pit mine
CN110359914B (en) Safe and low-cost combined sublevel mining method for gently inclined medium-thickness ore body
US3975053A (en) Mining methods as such and combined with equipment
CN110735639B (en) Open pit backfilling method after mining by open pit to underground caving method
CN111561317B (en) Scraping coal mining method for steeply inclined coal seam
CN112796759B (en) Mechanical mining and waste rock filling method for inclined thin vein
CN114562325B (en) Waste rock and ultra-high water material filling mining method based on farmland protection
CN106703809A (en) Method for forming cover layer through induced falling of open-pit-to-underground multi-branched orebody
CN110388210B (en) Stope structure arrangement mode suitable for combined sectional mining of slowly-inclined medium-thickness ore body
CN110107299B (en) Open pit coal mine step mining and stripping and transportation road arrangement system and method and mining method
CN108590652A (en) A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend
US906765A (en) Method of mining.
SU891969A1 (en) Artificial pillar erecting method
SU1696702A1 (en) Method of mining of mineral steep seams
CN112459833B (en) Gangue conveying backfill system and method for laying transmission rubber belt under rail
RU2038479C1 (en) Mineral deposit upland part exploitation method
CA1064528A (en) Open pit mine
Crane Mining methods and practice in the Michigan copper mines
SU1712608A1 (en) Method of mining thick steeply dipping coal seam
Thoenen Underground Limestone Mining
Jackson Waste Filling of Stopes
SU1673731A1 (en) Method for working gently sloping coal seams
Kinver Cut-and-fill mining of base metals at Black Mountain Mine