US3626855A - Method and track section for laying track in tunnel driving - Google Patents

Method and track section for laying track in tunnel driving Download PDF

Info

Publication number
US3626855A
US3626855A US835165A US3626855DA US3626855A US 3626855 A US3626855 A US 3626855A US 835165 A US835165 A US 835165A US 3626855D A US3626855D A US 3626855DA US 3626855 A US3626855 A US 3626855A
Authority
US
United States
Prior art keywords
tunnel
track
tracks
track section
haulage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US835165A
Other languages
English (en)
Inventor
Gosta Fogelstroem
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Atlas Copco AB
Original Assignee
Atlas Copco AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Atlas Copco AB filed Critical Atlas Copco AB
Application granted granted Critical
Publication of US3626855A publication Critical patent/US3626855A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Definitions

  • the tunnel haulage tracks are 61/84 238/10 R tended by laying additional tracks on the tunnel floor underly- [51] Int. Cl 7. E018 3/00, ing the intermediate Subsection
  • the track portions f the Eolg 3/06 Eolb 29/00 termediate subsection may be swung up for increasing the ac- [50] Field Of Search cessibility to the undeflaying tunnel floor during a aying.
  • This invention relates to a method for laying a track way during boring and to a track section to be used in connection with the track laying method in question. More particularly the instant method and track section is intended for tunnel boring by means of track supported equipment such as drilling units mounted on a drill wagon, at least one loading machine, and muck cars. In the tunnel boring process this equipment is moved along track portions connected with the tunnel haulage tracks to and from working position on the track section.
  • track supported equipment such as drilling units mounted on a drill wagon, at least one loading machine, and muck cars.
  • this equipment is moved along track portions connected with the tunnel haulage tracks to and from working position on the track section.
  • one aspect of the invention contemplates a method for laying track during tunnel boring whereby track supported equipment and an advanceable track section therefore are utilized and along which track section said equipment, which comprises drilling units mounted on a drill wagon, at least one loading machine, and muck cars, is moved along track portions connected to the tunnel haulage tracks to and from working position on the track section at the tunnel head, said method comprising the steps of supporting said track section longitudinally displaceably at the forward and rear end subsections thereof, respectively, on the tunnel floor in front of the tunnel haulage tracks and on the tunnel tracks, advancing said track section as a whole relative to the tunnel haulage tracks so as to expose a portion of the tunnel floor under the intermediate subsection of said track section ahead of the tunnel haulage tracks, moving said drilling units forward to working position at the tunnel face and extending said tunnel haulage tracks in forward direction by laying additional track on the tunnel floor under said intermediate portion while simultaneously working said drilling units at the tunnel head.
  • a track section for laying track during tunnel boring wherein track supported equipment is used and in which said track section is advanceable relative to the tunnel haulage tracks towards the tunnel head and includes track portions connected to said tunnel haulage tracks for movement of said equipment to and from working position on said track section at the tunnel head, said track section comprising the following longitudinally fixedly interconnected parts a. a front supporting frame resting on the tunnel floor in front of the tunnel haulage tracks, and including track portions disposed on a higher level above the tunnel floor than said tunnel haulage tracks,
  • a transfer subsection resting on said tunnel haulage tracks and including track portions connecting the track portions of said intermediate subsection with said tunnel haulage tracks for movement of said equipment therebetween, and means for advancing said track section as a whole relative to said tunnel haulage tracks thereby to open a tracklaying space on the tunnel floor between said carrying frame and said tunnel haulage tracks and underlying said intermediate subsection when said track section has been advanced relative to said tunnel haulage tracks.
  • FIG. I shows a top view and section of the forward end of a tunnel in which is applied a track section according to the invention.
  • FIG. 2a and 2b are fragmentary vertical sections through the tunnel part in FIG. I with the devices therein shown in side view.
  • FIG. 3 shows a side view of the track section before advancement.
  • FIG. 4 shows the track section in FIG. 3 having been advanced a distance corresponding to the advance per round of shots.
  • FIG. 5 shows a fragmentary enlarged side view corresponding to FIG. 4 during the process of advancement.
  • FIG. 6 is a fragmentary top view of the track section in FIG. 5.
  • FIG. 7 is an enlarged section on the line 7-7 in FIG. 6.
  • FIG. 8 shows a section on the line 8-8 in FIG. 6 with the track portions on the intermediate subsection of the track section swung up for tracklaying purposes.
  • FIG. 9, finally, is a section on the line 9-9 in FIG. 6.
  • the tunnel haulage tracks consist of a single haulage track 16 which at the forward end of the tunnel is connected with triple tracks laid on the tunnel floor and comprising a central track 17 and two side tracks 18, I9.
  • On the tunnel tracks 17-19 rests extensibly and slidably a triple tracked switch part 20 for cross connecting the portions of the side tracks 18, 19 in front of and behind the switch part 20 and for connecting them to the corresponding parts of the central track 17.
  • the haulage track 16 is via a switch 21 connected with the central track 17 and with the side track 18.
  • a track section On the tunnel floor in front of the tunnel haulage tracks "-19 rests extensibly a track section, generally designated by 22, which is adapted to advance towards the tunnel head 23 and carries track portions connected with the tunnel tracks 17-19 and intended for movement of the equipment used for the tunnel boring from the tunnel tracks to working position on the forward end of the track section 22 at the tunnel head.
  • the equipment in question consists of conventional drilling units 24 for example drill booms carried by a drill wagon designed as a portal and moving along the four rails included in the side tracks 18, 19.
  • the track section 22, FIG. 6, consists of a forward supporting frame 30 which by means of skids 31 rests on the tunnel floor and consists of two rail portions 32, 33 kept together by a suitable number of cross girders 34.
  • the rails of the track portions 32, 33 are disposed on a higher level than the rails of the tunnel tracks "-19.
  • the track section 22 furthermore consists of a rear transfer subsection 37 which is designed as a switch part.
  • the transfer subsection 37 has track portions which connect the track portions 32, 33 of the supporting frame 30 with the respective side tracks 18, 19 or with the central track 17.
  • the forward end of the transfer subsection 37 has its track portions level with the track portions 32, 33 of the supporting frame 30 while the rearward portion thereof connects with the level of the tunnel tracks 17, 19. .
  • the transfer subsection 37 rests slidably on the tunnel haulage tracks 17-19.
  • the track section 22 has rearwardly thereon supporting planes 35 aligned with the track portions 32, 33 from which planes 35 an intermediate subsection 40 extends rearwardly and connects the supporting frame 30 with the transfer subsection 37.
  • the intermediate subsection 40 includes longitudinal girders 41 which are affixed to the track portions 32, 33 of the supporting frame 30 level with the tunnel tracks and extend rearwardly to the forward ends of the side tracks 18, 19 where they are connected by means of chains 56 to the forward edge of the transfer subsection 37.
  • Longitudinal axles 42 extend between the supporting frame 30 and the transfer subsection 37 and are supported on the girders 41 in the central plane of the track portions 32, 33.
  • the rear end faces 50 of the supporting frame 30 rearwardly of the track portions 32, 33 are provided with channels 51 for extension girders 53 of a pair of hydraulic jacks 52, the cxtension girders 53, FIG. being provided with a plurality of transverse longitudinally spaced anchoring holes.
  • the channels 51 are disposed each below one of the rails 43-46, and with the extension girders 53 passing through channels 51, the four power jacks 52 can be braced against the ends of the rails on the side tracks 18, 19.
  • the extension girders 53 are anchored to the end faces 50'of the supporting frame 30 by cross pins 54 inserted into one of the anchoring holes in the extension girders 53.
  • the supporting frame 30 thus can be advanced, which means that the'track section Has a whole is advanced stepwise with respect to the tunnel tracks by using the working stroke of the hydraulic jacks 52 and -one anchoring hole after the other in the extension girders 53.
  • the drill wagon 25 with the drilling units 24 stands on the switch part 20 and empty cars 27 are moved forward from the track 16 via the switch 21 and the central track 17 to the loading machines 26-working on the track section 22 at the tunnel head.
  • Loaded muck cars are moved back from the track portions 32, 33 and the rails 43, and 45, 46, respectively, via the transfer subsection 37 to the side tracks l8, l9 and, via the central track of the switch part 20, away through the portal of the drill wagon 25 via the switch 21 and the rearrnost part of the side track 18 to the haulage track 16.
  • the loading machines 26 are moved back via the central track 17 and the switch part 20 to the rearrnost part of the side track 19.
  • the track section 22 is advanced into the space made free by the loading in front of the tunnel face 23.
  • the advancement is made by means of the power jacks 52 and the extension girders 53 as described above.
  • the loading machines 26 may be driven forward immediately behind the transfer subsection 37 for weighting down the foremost rails of the tunnel haulage tracks 18, 19.
  • a space 55 underlying the intermediate subsection 40 becomes exposed.
  • the rails 43-46 of the intermediate subsection 40 are resting against the tunnel floor by means of ties. This may be facilitated by swinging up and subsequent felling down of the rails 43-46 by the aid of the maneuvering cylinders 48.
  • the drill wagon 25 is moved forward via the track portions of track section 22 to working position for drilling at the tunnel head 23.
  • Tracklaying for advancing the tunnel tracks 17-19 is performed while drilling is in progress and this operation is thus performed without time loss while the main working cycle is running.
  • Track is laid in the space 55 cleared from the ties under the rails 43-46 of the intermediate subsection 40.
  • the track portions of the intermediate subsection 40 consisting of the rails 43-46 are swung up about the axles 42 by means of the maneuvering cylinders 48. Obviously such swinging up may be abandoned and track may be laid directly below the intermediate subsection 40, the swinging up, however, offering more convenience.
  • the longitudinal girders 41 included in the intermediate subsection 40 can in case of need be anchored to the transfer part 37 by means of chains 56 of adjustable length in order to introduce an angular deviation between on the one hand the supporting frame 30 and on the other the parts resting on the tunnel tracks during advancement, that is to say the intermediate subsection 40 and the transfer subsection 37.
  • the supporting frame and intermediate subsection will, of course, be single tracked and the transfer subsection will be made as a double switch slidably straddling the main haulage track and representing the only multitracked element in the system.
  • a track section for laying track during tunnel boring wherein track-bound equipment is used and in which said track section is advanceable relative to the tunnel haulage tracks towards the tunnel face and includes track portions connected with said tunnel haulage tracks for movement of said equipment to and from working position on said track section at the tunnel face, said track section comprising the following longitudinally fixedly interconnected parts a. a front supporting frame resting on the tunnel floor in front of the tunnel haulage tracks, and including track portions disposed on a higher level above the tunnel floor than said tunnel haulage tracks,
  • a transfer subsection resting on said tunnel haulage tracks and including track portions connecting the track portions of said intermediate subsection with said tunnel haulage tracks for movement of said equipment therebetween, and means for advancing said track section as a whole relative to said tunnel haulage tracks thereby to open a tracklaying space on the tunnel floor between said carrying frame and said tunnel haulage track and underlying said intermediate subsection when said track section has been ad vanced relative to said tunnel haulage tracks.
  • a track section according to claim 1 in which there are provided axles on said intermediate subsection parallel with said track portions thereof, and means for mounting said track portions of said intermediate subsection swingably on said axles for swinging movement transversely of said intermediate subsection.
  • a track section according to claim 2 in which said track sections of said intermediate subsection are rails individually swingably mounted on said axles, transverse arms pivotally joumaled on said axles and connected to said rails for mounting them thus, and hydraulic cylinder means connected to said arms for selectively swinging up and felling down said rails by power.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)
US835165A 1968-07-01 1969-06-20 Method and track section for laying track in tunnel driving Expired - Lifetime US3626855A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE9070/68A SE321692B (de) 1968-07-01 1968-07-01

Publications (1)

Publication Number Publication Date
US3626855A true US3626855A (en) 1971-12-14

Family

ID=20275753

Family Applications (1)

Application Number Title Priority Date Filing Date
US835165A Expired - Lifetime US3626855A (en) 1968-07-01 1969-06-20 Method and track section for laying track in tunnel driving

Country Status (4)

Country Link
US (1) US3626855A (de)
CH (1) CH501779A (de)
NO (1) NO121726B (de)
SE (1) SE321692B (de)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3939777A (en) * 1974-03-04 1976-02-24 Moran Raymond D Mobile trackway
US3990371A (en) * 1975-05-16 1976-11-09 Ewing-Records & Associates, Inc. California type platform

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3365895A (en) * 1965-03-02 1968-01-30 Jacobs Associates Inc Multiple level movable roadway for tunnels

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3365895A (en) * 1965-03-02 1968-01-30 Jacobs Associates Inc Multiple level movable roadway for tunnels

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3939777A (en) * 1974-03-04 1976-02-24 Moran Raymond D Mobile trackway
US3990371A (en) * 1975-05-16 1976-11-09 Ewing-Records & Associates, Inc. California type platform

Also Published As

Publication number Publication date
NO121726B (de) 1971-04-05
SE321692B (de) 1970-03-16
CH501779A (de) 1971-01-15

Similar Documents

Publication Publication Date Title
CN106837392A (zh) 隧道用门架式多功能支护台车
CN105604558B (zh) 适用于软岩掘进的超前支护式联合机组
DE102005040272A1 (de) Verfahren zum Pfeilerrückbau beim Kammer-Pfeilerbau und Ausbaueinheit für den Pfeilerrückbau
CN206419048U (zh) 隧道用门架式多功能支护台车
US4387798A (en) Cascading conveyor system
US4589701A (en) Cutting machine
US3314722A (en) Mining machine with rotary cutter horizontally slidable on vertically adjustable guide
US3951215A (en) Mobile drilling and bolting machine
US4149604A (en) Mining equipment
CN209892217U (zh) 快速掘进系统
JP2820854B2 (ja) トンネル工事用桟橋及びインバート施工方法並びにトンネル工法
CN214403640U (zh) 一种架空轨式牵引超前支护装置
CN102383793A (zh) 一种巷道钻孔装载两用机
US3626855A (en) Method and track section for laying track in tunnel driving
DE2656703A1 (de) Abbaumaschine
US3365895A (en) Multiple level movable roadway for tunnels
US3856356A (en) Method of mining mineral
US4358224A (en) Continuous sliding support gantry for a large passage
CN202250071U (zh) 一种巷道钻孔装载两用机
CN210768752U (zh) 一种前掘后锚的掘进系统
US2164753A (en) Apparatus for tunneling in consolidated material
DE2908452A1 (de) Ausbausetzvorrichtung
CN208473900U (zh) 一种双层轮式移动多功能隧道作业台架
US3138327A (en) Movable trackways for tunnels and method for moving tunnel flooring
RU2151297C1 (ru) Комплекс для проходки горных выработок