US3326003A - Method of forming ground cut-off wall - Google Patents

Method of forming ground cut-off wall Download PDF

Info

Publication number
US3326003A
US3326003A US83817A US8381761A US3326003A US 3326003 A US3326003 A US 3326003A US 83817 A US83817 A US 83817A US 8381761 A US8381761 A US 8381761A US 3326003 A US3326003 A US 3326003A
Authority
US
United States
Prior art keywords
trench
wall
tool
forming
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US83817A
Inventor
Marconi Guglielmo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ING GIOVANNI RODIO AND C SpA
Original Assignee
ING GIOVANNI RODIO AND C SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ING GIOVANNI RODIO AND C SpA filed Critical ING GIOVANNI RODIO AND C SpA
Application granted granted Critical
Publication of US3326003A publication Critical patent/US3326003A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Definitions

  • This invention relates to the process for constructing a wall and, in particular to the forming of a wall in the ground.
  • This application is a continuation-in-part of my application Ser. No. 414,447, filed Mar. 5, 1954, now abandoned.
  • Ground walls are constructed for various reasons, as for extending a darn into the adjoining bank to increase the length of the seepage path around the ends of the dam, for forming water-tight panels below the banks of a canal to prevent seepage, for stopping the seepage of ground water into excavations extending beneath the ground water table, for isolating springs to prevent both water loss and pollution, for forming retaining walls prior to making an excavation, for forming walls for docks, basins and canals, and for forming retaining Walls for preventing earth slides.
  • long and narrow walls are desired, such as can be obtained by the use of metal sheet piling.
  • concrete is used, with the wall being formed of a plurality of adjoined cylindrical piles.
  • the object of this invention is to produce a process by which a long and narrow wall can be formed, said wall being of uniform cross-section. (FIGS. 3 and 4.)
  • this and other objects are obtained by digging a long and narrow trench, with the Width of the trench being too small to make the use of wood or metal shoring practical.
  • the trench is being dug, it is kept filled with liquid mud in order to keep the walls of the hole from collapsing.
  • a trench of the required length and depth is dug, it is filled with wall forming material, thereby displacing the liquid mud.
  • successive panels can be constructed in alignment with each other to make a wall of any desired length and curvature.
  • FIGURE 1 is a perspective view of a wall formed according to the prior art
  • FIGURE 2 is a cross-sectional view generally on the line 2--2 of FIGURE 1;
  • FIGURE 3 is a perspective view of a wall formed according to this invention.
  • FIGURE 4 is a cross-sectional view generally on the line 4--4 of FIGURE 3;
  • FIGURE 5 is a schematic view of an apparatus excavating a trench for a wall according to the process of this invention.
  • FIGURE 1 a plurality of piles, either pre-cast and driven or poured into bore holes, were used by the prior art to form a long and narrow wall in the sense of being a curtain, membrane, or diaphragm wall.
  • the bore holes will drift apart so that the lower portions B of the piles are in some instances separated from each other.'Obviously these spaces destroy the utility of the wall as a barrier against the seepage of water through the wall.
  • a wall C of uniform cross-section is formed according to this invention.
  • This wall is constructed of individual panels of any desired length.
  • the wall has a thickness of from 20 to centimeters and can have a depth as great as from 50 to 100 meters.
  • the extreme thinness of the wall means that the shoring of the trench or the hole being excavated is a practical impossibility.
  • the width of the excavation is substantially equal to the width or diameter of the tool used to dig the trench.
  • a digging rig 10 is mounted on wheels 12 for longitudinal movement on track 14, the rig being self-propelled by a motor M.
  • a hoisting cable 16 joined to a winch 18 suspends the pipe 20 having a cutting head 22 joined to its lower end.
  • the upper end of pipe 29 is connected by a flexible tube 24 to one or the other of alternate mud separators 26.
  • a suction pump 28 is also connected to the separators 26.
  • a shallow trench 30 is first excavated and filled with thixotropic drilling mud from an outside source, as through pipe 32.
  • a diaphragm wall panel is then excavated downwardly over a given length of the trench, as from 6 to 10 meters. This is done by vertically dropping the cutting head in an impact stroke to fracture and break the ground, then lifting the cutting head in the same vertical path.
  • Suction pump 28 draws the liquid mud with the fractured ground fragments up through pipe 20 and deposits the material in either of the separators 26 from which the liquid mud is drained back into the trench.
  • the rig 10 is moved longitudinally on the track 14 a distance not greater than the diameter of cutting head 22, then the cutting head is dropped for another impact stroke, and the material removed as before.
  • These impact strokes are continued over the length of the wall panel being formed and when the end is reached, the direction of the rig 10 is reversed so that a second cut is taken in a reverse direction in the trench.
  • the cutting head is raised but slightly above the unexcavated bottom portion of the trench and drops, due to the weight of the head itself and the pipe 20. Each impact stroke makes a very small cut in the bottom of the trench, the depth depending upon whether the ground is hard or soft.
  • joint forms 33 as indicated by the dotted lines in FIGURE 5, are inserted against the ends of the trench, and then the trench filled with wall forming material such as concrete; as the concrete is poured into the trench, the liquid mud is displaced and removed from the top of the trench.
  • wall forming material such as concrete
  • the cutting head is not a rotating drill bit, but simply a vertical impact tool which digs somewhat in the nature of a hoe.
  • the width of the trench and therefor of the wall panel formed is substantially equal to the diameter of the cutting head 22 and therefor can be as narrow as 20 centimeters or even less. All the panels formed are of uniform cross-section and the individual panels are joined to make an impervious wall of any desired length and curvature.
  • a methodfor constructing in the ground a vertical wall of long length and narrow width comprising forming a first wall panel section by digging a trench with a hollow percussion tool of the same width as the wall by moving the tool in successive vertical impact strokes while moving the tool between strokes longitudinally back and forth on the bottom of the trench along the length of the panel section to form a trench of 20 the width of said tool, said trench being maintained with vertical sides as thetrench deepens to a great depth, the dug material from the trench through said tool, constantly filling the trench with thixotropic drilling mud as the trench is dug without the sides of the trench being shored, pouring wall forming material into the mud-filled trench and thereby displacing the mud from the trench and forming the first wall panel section, and then extending the length of the wall by similarly forming trenches and panel sections joined, respectively, to each precedingly formed panel section.

Description

June 20, 1967 MARCON;
METHOD OF FORMING GROUND CUT-OFF WALL 2 Sheets-Sheet 1 Filed Jan. 19, 1961 A R m R P W VE N TOR:
June 20, 1967 5. MARCONI METHOD OF FORMING GROUND CUT-OFF WALL 2 Sheets-Sheet 2 Filed Jan. 19 1961 M T W w M M o ATTORMWS United States Patent ()fitice Patented June 20, 1967 3,326,003 METHOD OF FORMING GROUND CUT-()FF WALL Guglielmo Marconi, Milan, Italy, assignor to lug. Giovanni Rodio 8: C., S.p.A., Milan, Italy Filed Jan. 19, 1961, Ser. No. 83,817 Claims priority, application Italy, Mar. 5, 1953, 16,048/ 53 2 Claims. (Cl. 6l35) This invention relates to the process for constructing a wall and, in particular to the forming of a wall in the ground. This application is a continuation-in-part of my application Ser. No. 414,447, filed Mar. 5, 1954, now abandoned.
Ground walls are constructed for various reasons, as for extending a darn into the adjoining bank to increase the length of the seepage path around the ends of the dam, for forming water-tight panels below the banks of a canal to prevent seepage, for stopping the seepage of ground water into excavations extending beneath the ground water table, for isolating springs to prevent both water loss and pollution, for forming retaining walls prior to making an excavation, for forming walls for docks, basins and canals, and for forming retaining Walls for preventing earth slides. In these cases, long and narrow walls are desired, such as can be obtained by the use of metal sheet piling. When a wall of cheaper and more durable material is desired, concrete is used, with the wall being formed of a plurality of adjoined cylindrical piles. These piles (FIG. 1) are either pre-cast and driven into the soil or individual bore holes are made with the piles cast therein. Such a wall is not entirely satisfactory as the piles cannot be altogether joined to each other. (FIG. 2.) This difficulty is not altogether avoided by staggering the bore holes for the piles as bore holes are not all absolutely vertical. (FIG. 2.)
The object of this invention is to produce a process by which a long and narrow wall can be formed, said wall being of uniform cross-section. (FIGS. 3 and 4.)
In general, this and other objects are obtained by digging a long and narrow trench, with the Width of the trench being too small to make the use of wood or metal shoring practical. As the trench is being dug, it is kept filled with liquid mud in order to keep the walls of the hole from collapsing. After a trench of the required length and depth is dug, it is filled with wall forming material, thereby displacing the liquid mud. After a wall panel has been formed, successive panels can be constructed in alignment with each other to make a wall of any desired length and curvature.
The means by which the objects of the invention are obtained are disclosed more fully with reference to the accompanying drawings, in which:
FIGURE 1 is a perspective view of a wall formed according to the prior art;
FIGURE 2 is a cross-sectional view generally on the line 2--2 of FIGURE 1;
FIGURE 3 is a perspective view of a wall formed according to this invention;
FIGURE 4 is a cross-sectional view generally on the line 4--4 of FIGURE 3; and
FIGURE 5 is a schematic view of an apparatus excavating a trench for a wall according to the process of this invention.
As shown in FIGURE 1, a plurality of piles, either pre-cast and driven or poured into bore holes, were used by the prior art to form a long and narrow wall in the sense of being a curtain, membrane, or diaphragm wall. In forming the individual piles, even though their upper ends A are joined together, the bore holes will drift apart so that the lower portions B of the piles are in some instances separated from each other.'Obviously these spaces destroy the utility of the wall as a barrier against the seepage of water through the wall.
According to FIGURES 3 and 4, a wall C of uniform cross-section is formed according to this invention. This wall is constructed of individual panels of any desired length. Experience has shown that it is advisable to form a panel having a length and depth which can be formed in one days working time, as a panel from 6 to 10 meters in length, depending upon the type of soil being excavated and the depth of the wall being constructed. The wall has a thickness of from 20 to centimeters and can have a depth as great as from 50 to 100 meters. The extreme thinness of the wall means that the shoring of the trench or the hole being excavated is a practical impossibility. According to the process of this invention, the width of the excavation is substantially equal to the width or diameter of the tool used to dig the trench.
As shown in FIGURE 5, a digging rig 10 is mounted on wheels 12 for longitudinal movement on track 14, the rig being self-propelled by a motor M. A hoisting cable 16 joined to a winch 18 suspends the pipe 20 having a cutting head 22 joined to its lower end. The upper end of pipe 29 is connected by a flexible tube 24 to one or the other of alternate mud separators 26. A suction pump 28 is also connected to the separators 26.
In the process of constructing a diaphragm wall, a shallow trench 30 is first excavated and filled with thixotropic drilling mud from an outside source, as through pipe 32. A diaphragm wall panel is then excavated downwardly over a given length of the trench, as from 6 to 10 meters. This is done by vertically dropping the cutting head in an impact stroke to fracture and break the ground, then lifting the cutting head in the same vertical path. Suction pump 28 draws the liquid mud with the fractured ground fragments up through pipe 20 and deposits the material in either of the separators 26 from which the liquid mud is drained back into the trench. After the cutting head 22 has been raised, the rig 10 is moved longitudinally on the track 14 a distance not greater than the diameter of cutting head 22, then the cutting head is dropped for another impact stroke, and the material removed as before. These impact strokes are continued over the length of the wall panel being formed and when the end is reached, the direction of the rig 10 is reversed so that a second cut is taken in a reverse direction in the trench. The cutting head is raised but slightly above the unexcavated bottom portion of the trench and drops, due to the weight of the head itself and the pipe 20. Each impact stroke makes a very small cut in the bottom of the trench, the depth depending upon whether the ground is hard or soft. As the trench deepens, additional liquid mud is poured into the trench through pipe 32 to keep the trench full of liquid mud which prevents the walls of the trench from collapsing. After a trench of sufiicient length and depth has been dug, joint forms 33 as indicated by the dotted lines in FIGURE 5, are inserted against the ends of the trench, and then the trench filled with wall forming material such as concrete; as the concrete is poured into the trench, the liquid mud is displaced and removed from the top of the trench. When the poured wall has solidified, adjoining panels can be dug. The joint forms 33 become exposed and are removed so that, when an adjacent panel is poured, it becomes joined to the previously formed panel.
By means of this process, a long and very narrow diaphragm wall can be quickly and cheaply constructed. In practice, it has been found advisable to construct a plurality of panels separated from each other by one panel space. After these panels have solidified, the intermediate alternate panel trenches can then be excavated. The
cutting head is not a rotating drill bit, but simply a vertical impact tool which digs somewhat in the nature of a hoe. The width of the trench and therefor of the wall panel formed is substantially equal to the diameter of the cutting head 22 and therefor can be as narrow as 20 centimeters or even less. All the panels formed are of uniform cross-section and the individual panels are joined to make an impervious wall of any desired length and curvature.
Having now described the means by which the objects of the invention are obtained,
I claim:
1. A methodfor constructing in the ground a vertical wall of long length and narrow width, the steps comprising forming a first wall panel section by digging a trench with a hollow percussion tool of the same width as the wall by moving the tool in successive vertical impact strokes while moving the tool between strokes longitudinally back and forth on the bottom of the trench along the length of the panel section to form a trench of 20 the width of said tool, said trench being maintained with vertical sides as thetrench deepens to a great depth, the dug material from the trench through said tool, constantly filling the trench with thixotropic drilling mud as the trench is dug without the sides of the trench being shored, pouring wall forming material into the mud-filled trench and thereby displacing the mud from the trench and forming the first wall panel section, and then extending the length of the wall by similarly forming trenches and panel sections joined, respectively, to each precedingly formed panel section.
2. A method as in claim 1, further comprising vertically moving the tool into one impact stroke against the ground to loosen the ground material, removing the loosened and dug material by suction, lifting and moving said tool longitudinally a distance not greater than the 10 width of said tool, and then successively repeating these steps.
References Cited UNITED STATES PATENTS 518,394 4/1894 Coyle 37-495 X 2,057,691 10/1936 Ranney 6134 X 2,643,096 6/1956 Bates 37-195 X 2,791,886 5/1957 Veder 6135 X FOREiGN PATENTS 750,102 6/1956 Great Britain. 461,343 1/1951 Italy. 560,263 4/ 1957 Italy.
25 DAVID J. WILLIAMOWSKY, Primary Examiner.
JACOB SHAPIRO, JACOB NACKENOFF, CHARLES E. OCONNELL, Examiners.

Claims (1)

1. A METHOD FOR CONSTRUCTING IN THE GROUND A VERTICAL WALL OF LONG LENGTH AND NARROW WIDTH, THE STEPS COMPRISING FORMING A FIRST WALL PANEL SECTION BY DIGGING A TRENCH WITH A HOLLOW PRECUSSION TOOL OF THE SAME WIDTH AS THE WALL BY MOVING THE TOOL IN SUCCESSIVE VERTICAL IMPACT STROKES WHILE MOVING THE TOOL BETWEEN STROKES LONGITUDINALLY BACK AND FORTH ON THE BOTTOM OF THE TRENCH ALONG THE LENGTH OF THE PANEL SECTION TO FORM A TRENCH OF THE WIDTH OF SAID TOOL, SAID TRENCH BEING MAINTAINED WITH VERTICAL SIDES AS THE TRENCH DEEPENS TO A GREAT DEPTH, THE DUG MATERIAL FROM THE TRENCH THROUGH SAID TOOL, CONSTANTLY FILLING THE TRENCH WITH THIXOTROPIC DRILLING MUD AS THE
US83817A 1953-03-05 1961-01-19 Method of forming ground cut-off wall Expired - Lifetime US3326003A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT1604853 1953-03-05

Publications (1)

Publication Number Publication Date
US3326003A true US3326003A (en) 1967-06-20

Family

ID=11148465

Family Applications (1)

Application Number Title Priority Date Filing Date
US83817A Expired - Lifetime US3326003A (en) 1953-03-05 1961-01-19 Method of forming ground cut-off wall

Country Status (1)

Country Link
US (1) US3326003A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3645101A (en) * 1970-11-04 1972-02-29 James L Sherard Method and apparatus for constructing impervious underground walls
US3800544A (en) * 1970-11-30 1974-04-02 W Nakanishi Method for forming an underground wall comprising a plurality of columns in the earth and soil formation
US3839871A (en) * 1973-05-14 1974-10-08 Dresser Ind Earthen dam repair
US4180350A (en) * 1978-03-30 1979-12-25 Early California Industries, Inc. Method for forming foundation piers
US4213653A (en) * 1978-04-17 1980-07-22 Bechtel International Corporation Method of mining of thick seam materials
US4705431A (en) * 1983-12-23 1987-11-10 Institut Francais Du Petrole Method for forming a fluid barrier by means of sloping drains, more especially in an oil field
US4867240A (en) * 1987-01-23 1989-09-19 Soil Jet Co., Inc. Method and apparatus for molding underground diaphragms
US5106233A (en) * 1989-08-25 1992-04-21 Breaux Louis B Hazardous waste containment system
US5259705A (en) * 1989-08-25 1993-11-09 Breaux Louis B Guide box assembly system for in-ground barrier installation
US5934840A (en) * 1997-10-03 1999-08-10 Geocon Excavation support structure
US20110103899A1 (en) * 2009-11-02 2011-05-05 Zhengzhou Uretek Technology Ltd. Process for grouting a curtain with polymer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US518394A (en) * 1894-04-17 coyle
US2057691A (en) * 1933-12-20 1936-10-20 Ranney Leo Method of and apparatus for excavating
US2643096A (en) * 1948-05-17 1953-06-23 Harry H Bates Trench making machine and the like
GB750102A (en) * 1952-11-18 1956-06-06 I C O S Impresa Costruzioni Op An improved method of producing diaphragms in subsoil excavations
US2791886A (en) * 1950-05-30 1957-05-14 I C O S Impresa Costruzioni Op Method for the construction of a cut-off wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US518394A (en) * 1894-04-17 coyle
US2057691A (en) * 1933-12-20 1936-10-20 Ranney Leo Method of and apparatus for excavating
US2643096A (en) * 1948-05-17 1953-06-23 Harry H Bates Trench making machine and the like
US2791886A (en) * 1950-05-30 1957-05-14 I C O S Impresa Costruzioni Op Method for the construction of a cut-off wall
GB750102A (en) * 1952-11-18 1956-06-06 I C O S Impresa Costruzioni Op An improved method of producing diaphragms in subsoil excavations

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3645101A (en) * 1970-11-04 1972-02-29 James L Sherard Method and apparatus for constructing impervious underground walls
US3800544A (en) * 1970-11-30 1974-04-02 W Nakanishi Method for forming an underground wall comprising a plurality of columns in the earth and soil formation
US3839871A (en) * 1973-05-14 1974-10-08 Dresser Ind Earthen dam repair
US4180350A (en) * 1978-03-30 1979-12-25 Early California Industries, Inc. Method for forming foundation piers
US4213653A (en) * 1978-04-17 1980-07-22 Bechtel International Corporation Method of mining of thick seam materials
US4705431A (en) * 1983-12-23 1987-11-10 Institut Francais Du Petrole Method for forming a fluid barrier by means of sloping drains, more especially in an oil field
US4867240A (en) * 1987-01-23 1989-09-19 Soil Jet Co., Inc. Method and apparatus for molding underground diaphragms
US5106233A (en) * 1989-08-25 1992-04-21 Breaux Louis B Hazardous waste containment system
US5259705A (en) * 1989-08-25 1993-11-09 Breaux Louis B Guide box assembly system for in-ground barrier installation
US5360293A (en) * 1989-08-25 1994-11-01 Barrier Member Containment Corporation In-ground barrier member interlocking joint and seal system
US5934840A (en) * 1997-10-03 1999-08-10 Geocon Excavation support structure
US20110103899A1 (en) * 2009-11-02 2011-05-05 Zhengzhou Uretek Technology Ltd. Process for grouting a curtain with polymer
US8272811B2 (en) * 2009-11-02 2012-09-25 Zhengzhou U-Trust Infrastructure Rehabilitation Ltd. Process for grouting a curtain with polymer

Similar Documents

Publication Publication Date Title
CN105464686B (en) Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility
CH615236A5 (en)
US3326003A (en) Method of forming ground cut-off wall
JPS62288218A (en) Settlement caisson
CN105649000A (en) Back pressure backfilling shallow-buried excavation construction method for tunnel undercrossing gully
CN108842802A (en) Piles in Karst Region base construction method
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
US3839871A (en) Earthen dam repair
CN111608174A (en) Karst area karst cave treatment method based on punched cast-in-place pile
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
US3468131A (en) Retaining structures placed into the ground and their procedures of execution
US3245222A (en) Construction of underground dams
CN111042144B (en) Excavation method for foundation pit of underground beam under condition of continuous flow of riverway in cold region
JPS6158640B2 (en)
KR100708408B1 (en) Construction method of a stone wall for reinforcement
CN111636440A (en) Structure for supporting and waterproof curtain to penetrate through old bottom plate obstacle and construction method thereof
CN110284506A (en) A kind of foundation pit enclosure method for the expansion construction that deep basal pit is cheated to shallow foundation
JP2607966B2 (en) Expanded connecting wall construction method
KR102625776B1 (en) Construction method of CIP retaining wall with improved water protection and ground subsidence prevention function
GB2232701A (en) Mini-piled retaining wall and a method for its construction
CN107059839A (en) A kind of construction method of armored concrete waveform sheet pile underground structure
CN109137944B (en) Construction method of water-stop wall in deep-water bottom-sealing-free steel cofferdam
US1835665A (en) Method of installing sheet piling
KR970007378B1 (en) Open shield machine
JPS601451B2 (en) Water stop mountain stop wall construction method using Benoto pile excavator