US2308743A - Barge - Google Patents

Barge Download PDF

Info

Publication number
US2308743A
US2308743A US295327A US29532739A US2308743A US 2308743 A US2308743 A US 2308743A US 295327 A US295327 A US 295327A US 29532739 A US29532739 A US 29532739A US 2308743 A US2308743 A US 2308743A
Authority
US
United States
Prior art keywords
barge
platform
legs
well
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US295327A
Inventor
William P Bulkley
Joseph E Gough
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US295327A priority Critical patent/US2308743A/en
Application granted granted Critical
Publication of US2308743A publication Critical patent/US2308743A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0818Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with racks actuated by pinions

Definitions

  • This invention relates to a barge and has particular relation to means whereby the barge may be supported, at a selected position, and at the desired elevation relative to the surface of the water.
  • the type of barge herein disclosed is particularly useful for transporting well drilling equipment and for firmly supporting said equipment at the well location.
  • Figure 1 shows a side elevation of the barge showing a derrick mounted thereon.
  • Figure 2 shows a plan view
  • Figure 3 shows a side elevation, showing the barge located at the selected location and supported in elevated position from the bottom.
  • Figure 4 shows a fragmentary, horizontal, sectional view of the elevating mechanism.
  • Figure 5 shows a fragmentary, vertical, sectional view thereof.
  • Figure 6 shows a fragmentary, side elevation thereof.
  • Figure 7 shows a fragmentary, side view of another embodiment of the invention.
  • Figure 8 shows a side view thereof showing the supporting platform elevated
  • Figure 9 shows an end view
  • the numeral l designates a barge which, at one end, is divided forming the spaced wings la, la with a tunnel or recess 2 between them.
  • the free ends of the wings la, la may be connected, or anchored together, by means of a suitable crossbeam as 3.
  • the derrick 4 may be located on the barge over the inner end of the tunnel 2 as illustrated in Figures 1 and 2.
  • Suitable well drilling equipment may be installed on the barge at the base of the derrick in the usual manner for carrying on said drilling operations.
  • the necessary equipment for carrying on the drilling operations, including the derrick, may be installed on the barge while it is at shore and then transported out to the desired location. When the desired location is reached the barge then should be anchored firmly in place.
  • the derrick 4 may be built after the barge has been located in position at the well location.
  • the barge is equipped with a suitable number of upstanding bearings as 5 preferably rectangular in horizontal crosssection as shown more accurately in Figure 4. These bearings are firmly secured to the deck of the barge and are reinforced and supported by the braces 6. Elevating legs 1 extend through said bearings and on downwardly through aligned bearings through the barge. They extend the required distance above the deck of the barge and their lower ends are equipped with the downwardly flared supporting footings 8. The construction of the legs and of the footings is more clearly illustrated in Figure 5.
  • the underside of the barge is formed with cavities 9 into which the footings are withdrawn while the barge is being transported.
  • the barge is indicated by the numeral lb. It is substantially similar in general design to the barge I shown in Figure 2. Mounted on it is a platform ID to support the derrick and drilling equipment. As clearly illustrated in Figure 9, the platform i0 is wider than the barge and the bearings 5, and the legs 7 are mounted on the side margins of the platform so that said legs will be out beyond the sides of the barge as clearly shown in Figure 9.
  • the legs While the bargeof this type is being transported, the legs will be in their upper position as shown in Figure 7 and the footings 8 will be in their upper position seated in the side cavities 9a of the barge lb.
  • the platform l0 When the location for drilling has been reached the platform l0 may be elevated into the position'shown in Figure 8 in the manner hereinafter described and the barge lb then removed passing between the legs I, until the well has been completed and it is desired to remove the drilling equipment whereupon the barge may be floated into position between said legs 1 underneath the platform and the platform lowered onto the barge and the drilling rig thus removed from the location.
  • Each leg 1 has the vertical rack members I l, l l fixed on opposite sides thereof and in mesh with in mesh with-and driven bya spur gear II which 7 is iixedon the shaftof a driving motor ll.
  • each leg is equipped with this lifting and lowering mechanism as shown in Figure 2.
  • the motors I 8 may be started and turned in a direction to move the legs downwardly until the footings 8 land on bottom. A continuation of the rotation of the motors in the same direction will thereafter cause the barge, of the form shown in Figure 1, to be elevated to the position shown in Figure 3. If the form shown in Figure 7 is being used, a continuation of the rotation of the motors will cause the platform l0 and the equipment thereon to be elevated as shown in Figures 8 and 9.
  • the direction of rotation of the motor may be reversed and after the barge has landed on the water, or after the platform III has landed on the barge, a continucavities provided for them in the bottom of the.
  • legs I are independently operated so that the footings 8 may I be located at variable distances from the barge to accommodate them to the uneven surface of the bottom as illustrated in Figure 8 when the barge or platform is raised.
  • the bearings 5 are provided with horizontal tapped bearings to receive the required number of clamp bolts I 8 which are threaded through said bearings.
  • these clamp bolts l8 may be screwed inwardly against the corresponding legs so as to maintain the platform, or barge elevated. A sufficient number of clamp screws will be provided to sustain the load carried by the legs.
  • each footing accordingly, is provided with an air inlet opening I! which is normally closed by a valve II fastened to the stem 2
  • each u surrounds and is spaced from the stem at with its outer end secured to the outer end of the leg and its inner end securedto the inner end of the leg andbeing enlarged to the spider II.
  • the Y valve 20 will be normally closed. When it is desired to force air into a footing the valve 2
  • the legs 1 with their footings, and the means for actuating the same constitute, in effect, lifting jacks for the purposes specified. Itis to be understood, of course, that what is now 'considered a preferred means for lifting said jacks is shown but other suitable means may be employed.
  • the producing equipment attached to the upper end of the well pipe extends up within the tunnel 2, or possibly above it. Therefore, in order to permit the movement of the barge away from the well the tunnel 2 is necessary.
  • the beam 3 may be removed and may thereafter be replaced.
  • the platform It may be also provided with a tunnel 2a which aligns with the tunnel 2 beneath and is provided for the same purpose.
  • the supporting area of the footings may be increased in accordance with the load to be supported and the condition of the formation at the well location.
  • a barge for supporting well drilling equipment and the like having an inde- V pendent load supporting platform thereon, jacks vertically movable relative to theplatform and arranged beyond the extremities and on opposite sides of the barge, said barge and platform having aligned tunnels extending inwardly from the margins thereof, operative connections between the jacks and platform for elevating the platform above the barge to allow the barge to be removed from beneath the platform.
  • jacks arranged on opposite sides of the barge and operatively connected with the platform for elevating the platform above the barge to allow the barge to be removed from-beneath the platform and being operative to lower the platform onto the barge when the barge is beneath the platform, said barge and platform having registering tunnels extending inwardly from corresponding margins thereof.
  • leg I is closed. state

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Description

JaI-l- 1943- w. 'P. BULKLEY ETAL BARGE Filed Sept. 16, 1939 4 Sheets-Sheet 2 Qf Q YWNU fV/u/AM 501L415?" JOJEPH 15 (5 06/1! Jan. 19, 1943. w. P. BULKLEY ETAL BARGE Filed Sept. 16, 1939 4 Sheets-Sheet 3 JOSEPH 6000/! Jan. 19, 1943. w. BULKLEY HAL 2,308,743
BARGE Filed Sept. 16, 1939 4 Sheets-Sheet 4 W/u/A P BULL 1.5K JOSEPH f. 6006/! Patented Jan. 19, 1943 UNITED STATES PATENT OFFICE BADGE William P. Bulkley and Joseph E. Gough, Houston, Tex.
Application September 16, 1939, Serial No. 295,327
2 Claims.
This invention relates to a barge and has particular relation to means whereby the barge may be supported, at a selected position, and at the desired elevation relative to the surface of the water.
The type of barge herein disclosed is particularly useful for transporting well drilling equipment and for firmly supporting said equipment at the well location.
As is well known oil producing land is often submerged and in developing such land for oil or minerals the drilling equipment must be located out a distance from shore. It is one of the principal objects of this invention to provide means for transporting the well drilling equipment out to the location and for securely supporting the rig at said location while carrying on the drilling operations.
It is a further object of the invention to provide a special type of barge for this purpose which is so shaped that it may be readily moved from the location after the well has been completed and the producing equipment installed.
It is a further object of the invention to provide a barge equipped with novel means for elevating the same to the desired level when the barge has been moved to the location at which the well is to be drilled.
With the above and other objects in view the invention has particular relation to certain novel features of construction, operation and arrangement of parts, examples of which are given in this specification and illustrated in the accompanying drawings, wherein:
Figure 1 shows a side elevation of the barge showing a derrick mounted thereon.
Figure 2 shows a plan view.
Figure 3 shows a side elevation, showing the barge located at the selected location and supported in elevated position from the bottom.
Figure 4 shows a fragmentary, horizontal, sectional view of the elevating mechanism.
Figure 5 shows a fragmentary, vertical, sectional view thereof.
Figure 6 shows a fragmentary, side elevation thereof.
Figure 7 shows a fragmentary, side view of another embodiment of the invention.
Figure 8 shows a side view thereof showing the supporting platform elevated, and
Figure 9 shows an end view.
Referring now more particularly to the drawings wherein like numerals of reference designate similar parts in each of the figures, the numeral l designates a barge which, at one end, is divided forming the spaced wings la, la with a tunnel or recess 2 between them. The free ends of the wings la, la may be connected, or anchored together, by means of a suitable crossbeam as 3. The derrick 4 may be located on the barge over the inner end of the tunnel 2 as illustrated in Figures 1 and 2.
Suitable well drilling equipment may be installed on the barge at the base of the derrick in the usual manner for carrying on said drilling operations. The necessary equipment for carrying on the drilling operations, including the derrick, may be installed on the barge while it is at shore and then transported out to the desired location. When the desired location is reached the barge then should be anchored firmly in place.
It is, of course, obvious that the derrick 4 may be built after the barge has been located in position at the well location. The barge is equipped with a suitable number of upstanding bearings as 5 preferably rectangular in horizontal crosssection as shown more accurately in Figure 4. These bearings are firmly secured to the deck of the barge and are reinforced and supported by the braces 6. Elevating legs 1 extend through said bearings and on downwardly through aligned bearings through the barge. They extend the required distance above the deck of the barge and their lower ends are equipped with the downwardly flared supporting footings 8. The construction of the legs and of the footings is more clearly illustrated in Figure 5. The underside of the barge is formed with cavities 9 into which the footings are withdrawn while the barge is being transported. As also illustrated in Figure 5 and as further illustrated in Figure 1 when so withdrawn the footings will not interfere with the movement of the barge through the water. As illustrated in Figures 7 to 9 inclusive, the barge is indicated by the numeral lb. It is substantially similar in general design to the barge I shown in Figure 2. Mounted on it is a platform ID to support the derrick and drilling equipment. As clearly illustrated in Figure 9, the platform i0 is wider than the barge and the bearings 5, and the legs 7 are mounted on the side margins of the platform so that said legs will be out beyond the sides of the barge as clearly shown in Figure 9. While the bargeof this type is being transported, the legs will be in their upper position as shown in Figure 7 and the footings 8 will be in their upper position seated in the side cavities 9a of the barge lb. When the location for drilling has been reached the platform l0 may be elevated into the position'shown in Figure 8 in the manner hereinafter described and the barge lb then removed passing between the legs I, until the well has been completed and it is desired to remove the drilling equipment whereupon the barge may be floated into position between said legs 1 underneath the platform and the platform lowered onto the barge and the drilling rig thus removed from the location.
Each leg 1 has the vertical rack members I l, l l fixed on opposite sides thereof and in mesh with in mesh with-and driven bya spur gear II which 7 is iixedon the shaftof a driving motor ll. Be-
,tweenw the'gear l and theother spur gear l4, and in mesh with both of them, there is an idler gear l]. Accordingly, when the motor is turned in one direction, the corresponding leg will be elevated and when turned in the other direction,
the corresponding leg will be lowered. It is to benoted that each leg is equipped with this lifting and lowering mechanism as shown in Figure 2. .When the barge has reached the location for drilling, the motors I 8 may be started and turned in a direction to move the legs downwardly until the footings 8 land on bottom. A continuation of the rotation of the motors in the same direction will thereafter cause the barge, of the form shown in Figure 1, to be elevated to the position shown in Figure 3. If the form shown in Figure 7 is being used, a continuation of the rotation of the motors will cause the platform l0 and the equipment thereon to be elevated as shown in Figures 8 and 9. When the work is completed and it is desired to move the barge and equipment, the direction of rotation of the motor may be reversed and after the barge has landed on the water, or after the platform III has landed on the barge, a continucavities provided for them in the bottom of the.
barge.
It may be here noted that the legs I are independently operated so that the footings 8 may I be located at variable distances from the barge to accommodate them to the uneven surface of the bottom as illustrated in Figure 8 when the barge or platform is raised.
The bearings 5 are provided with horizontal tapped bearings to receive the required number of clamp bolts I 8 which are threaded through said bearings. When the barge, or platform, has been elevated the required distance these clamp bolts l8 may be screwed inwardly against the corresponding legs so as to maintain the platform, or barge elevated. A sufficient number of clamp screws will be provided to sustain the load carried by the legs.
As hereinabove indicated the footings are downwardly flared, as indicated in Figure 5, to
formed in a footing so that it may be more readily released from the bottom, means have been provided for forcing air into said footings.
The upper end of each footing, accordingly, is provided with an air inlet opening I! which is normally closed by a valve II fastened to the stem 2| which is threaded through of the spider fl.
The outer end of each u surrounds and is spaced from the stem at with its outer end secured to the outer end of the leg and its inner end securedto the inner end of the leg andbeing enlarged to the spider II. On the outer end of each leg there is a connection II through which the valve stem extends and theouter end of said stem has a hand wheel 26 thereon through which said stem is turned and the valve 2. opened or closed. The Y valve 20 will be normally closed. When it is desired to force air into a footing the valve 2| may.
The legs 1 with their footings, and the means for actuating the same constitute, in effect, lifting jacks for the purposes specified. Itis to be understood, of course, that what is now 'considered a preferred means for lifting said jacks is shown but other suitable means may be employed.
When a well has been completed the producing equipment attached to the upper end of the well pipe extends up within the tunnel 2, or possibly above it. Therefore, in order to permit the movement of the barge away from the well the tunnel 2 is necessary. When it is desired to move the barge, the beam 3 may be removed and may thereafter be replaced.
The platform It, of the form shown in Figures '7 and 8, may be also provided with a tunnel 2a which aligns with the tunnel 2 beneath and is provided for the same purpose.
The supporting area of the footings may be increased in accordance with the load to be supported and the condition of the formation at the well location.
The drawings and description are illustrative merely, while the broad principle of the inven-,
tion will be defined by the appended claims. What we claim is: 1. In combination, a barge for supporting well drilling equipment and the like having an inde- V pendent load supporting platform thereon, jacks vertically movable relative to theplatform and arranged beyond the extremities and on opposite sides of the barge, said barge and platform having aligned tunnels extending inwardly from the margins thereof, operative connections between the jacks and platform for elevating the platform above the barge to allow the barge to be removed from beneath the platform.
2. In combination, a barge for supporting well drilling equipment and the like and having an independent load supporting platform thereon,
jacks arranged on opposite sides of the barge and operatively connected with the platform for elevating the platform above the barge to allow the barge to be removed from-beneath the platform and being operative to lower the platform onto the barge when the barge is beneath the platform, said barge and platform having registering tunnels extending inwardly from corresponding margins thereof.
WILLIAM P. BULKLEY.
JOSEPH E. GOUGH.
leg I is closed. state
US295327A 1939-09-16 1939-09-16 Barge Expired - Lifetime US2308743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US295327A US2308743A (en) 1939-09-16 1939-09-16 Barge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US295327A US2308743A (en) 1939-09-16 1939-09-16 Barge

Publications (1)

Publication Number Publication Date
US2308743A true US2308743A (en) 1943-01-19

Family

ID=23137223

Family Applications (1)

Application Number Title Priority Date Filing Date
US295327A Expired - Lifetime US2308743A (en) 1939-09-16 1939-09-16 Barge

Country Status (1)

Country Link
US (1) US2308743A (en)

Cited By (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2430014A (en) * 1945-09-12 1947-11-04 Hillman A Hansen Submersible exploration barge
US2531983A (en) * 1948-11-04 1950-11-28 Noble Drilling Corp Stabilizable vessel for submarine operations and method of operating the same
US2592448A (en) * 1948-06-02 1952-04-08 Raymond Concrete Pile Co Spud method of installing oil well drilling bases
US2597110A (en) * 1949-08-12 1952-05-20 Lacy Robert Marine structure
US2600761A (en) * 1948-12-06 1952-06-17 Erle P Halliburton Offshore drilling means
US2621485A (en) * 1947-02-21 1952-12-16 Stanolind Oil & Gas Co Marine structure
US2699321A (en) * 1949-06-21 1955-01-11 Fred N Nelson Deepwater oil drilling and storage craft
US2740261A (en) * 1950-11-06 1956-04-03 Alexander D Stark Floating hulls for off shore oil well drilling
US2833118A (en) * 1954-03-26 1958-05-06 John A Roebling S Sons Corp Spud driving rig
US2841961A (en) * 1953-04-13 1958-07-08 Delong Corp Off-shore drilling barge
US2870639A (en) * 1953-06-02 1959-01-27 Delong Corp Gripper and jack assembly for platforms and supporting columns
US2909900A (en) * 1954-01-06 1959-10-27 De Long Corp Off-shore working assembly
US2924077A (en) * 1960-02-09 le tourneau
US2936592A (en) * 1956-11-29 1960-05-17 Delong Corp Caisson and detachable pontoon assembly for floating barges and the like
US2947148A (en) * 1954-06-28 1960-08-02 Sun Oil Co Jacking mechanism for seadrome
US2948120A (en) * 1956-09-28 1960-08-09 De Long Corp Supporting leg assembly for marine platform
US2997852A (en) * 1954-12-30 1961-08-29 De Long Corp Apparatus and method for reecting a supporting structure over a body of water
US3001595A (en) * 1954-05-26 1961-09-26 De Long Corp Multi-purpose derrick barge and method of use in oil well drilling and servicing
US3001593A (en) * 1953-11-17 1961-09-26 De Long Corp Off-shore drilling barge
US3001594A (en) * 1954-05-04 1961-09-26 De Long Corp Off-shore drill rig
US3014346A (en) * 1957-09-10 1961-12-26 Jersey Prod Res Co Method and means for raising and lowering a platform
US3044269A (en) * 1957-07-22 1962-07-17 Tourneau Robert G Le Mobile sea platform
US3075252A (en) * 1957-08-12 1963-01-29 Adolph C King Portable blind for hunters and soldiers
US3138932A (en) * 1961-04-14 1964-06-30 Richfield Oil Corp Locating an offshore drilling platform
US3183676A (en) * 1960-10-20 1965-05-18 Robert G Letourneau Mobile sea platform
US3246475A (en) * 1961-08-28 1966-04-19 William M Booth Telescopic marine derrick structure and method of erecting same
US3289419A (en) * 1964-02-03 1966-12-06 Camco Inc Sea raft
US3464466A (en) * 1967-01-24 1969-09-02 Exxon Research Engineering Co Mooring system for tanker vessels
JPS50136904A (en) * 1974-04-19 1975-10-30
USRE29539E (en) * 1969-11-14 1978-02-14 Armco Steel Corporation Leg supported offshore structure with jacking apparatus
DE2913570A1 (en) * 1978-04-04 1979-12-13 Raymond Int Builders OFFSHORE PLATFORM STRUCTURE
FR2436099A1 (en) * 1978-09-14 1980-04-11 Brissonneau & Lotz Lifting mechanism for offshore oil drilling platform - has elastic abutments to ensure equal share of load to each driving pinion
US4255069A (en) * 1979-08-01 1981-03-10 The Offshore Company Jack-up platform locking apparatus
FR2492029A1 (en) * 1980-10-13 1982-04-16 Francois Durand SELF-ALIGNING AND SELF-TURNING PINION BLOCK FOR SELF-LIFTING PLATFORM LEG
WO1983001931A1 (en) * 1981-11-24 1983-06-09 Inoue, Terukazu Work ship for installing large offshore structure
WO1983001932A1 (en) * 1981-11-25 1983-06-09 Inoue, Terukazu Work ship for installing large offshore structure
US4421437A (en) * 1978-12-19 1983-12-20 Shell Oil Company Corrugated buckle arrestor
US4445290A (en) * 1980-12-16 1984-05-01 Hydroconsult, S.A. Appliance for dredging the bottom of a body of water
US4456072A (en) * 1982-05-03 1984-06-26 Bishop Gilbert H Ice island structure and drilling method
US4472083A (en) * 1982-12-20 1984-09-18 Younes David T Oil well rig with water tower
US4512553A (en) * 1982-03-17 1985-04-23 Red Fox Industries, Inc. Jack-up unit
US5486069A (en) * 1994-06-06 1996-01-23 Breeden; John Offshore jack-up rig locking system
FR2753466A1 (en) * 1996-09-19 1998-03-20 Brissonneau & Lotz Powered lifting drive for marine platforms
DE19704967A1 (en) * 1997-01-28 1998-07-30 Mannesmann Ag Portal crane, especially for erecting buildings
US5797703A (en) * 1996-02-02 1998-08-25 Searex, Inc. Elevating unit for use with jack-up rig
US5855455A (en) * 1997-07-09 1999-01-05 Ensco International, Inc. Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform
US5915882A (en) * 1997-06-26 1999-06-29 Letourneau, Inc. Jack-up platform locking apparatus and method
US6523491B1 (en) * 1999-11-12 2003-02-25 Textron Inc. Lift boat
WO2004067375A1 (en) * 2003-01-17 2004-08-12 Textron Inc. Lift boat
FR2865484A1 (en) * 2004-01-28 2005-07-29 Technip France Structure for dismantling and transporting a fixed offshore oil platform with a U-shaped floating hull mounted on at least three lifting legs carrying a shuttle to move the hull along the legs
US7594781B1 (en) 2007-06-01 2009-09-29 Ronald Sanders Lift boat leg
US20110094427A1 (en) * 2008-12-16 2011-04-28 Burns Mark L Fast jack hybrid liftboat hull
US20110206464A1 (en) * 2008-09-17 2011-08-25 Waertsilae Ship Design Germany Gmbh Lifting system
CN102444110A (en) * 2011-09-28 2012-05-09 中国石油大学(华东) Offshore multi-directional self-elevating petroleum drilling platform
US20140161569A1 (en) * 2011-04-26 2014-06-12 Ihc Holland Ie B.V Vessel comprising a moon pool and a hoisting arrangement and method of lowering items into the sea
WO2014098612A1 (en) * 2012-12-19 2014-06-26 Sevan Marine Asa Shallow water platform

Cited By (75)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2924077A (en) * 1960-02-09 le tourneau
US2430014A (en) * 1945-09-12 1947-11-04 Hillman A Hansen Submersible exploration barge
US2621485A (en) * 1947-02-21 1952-12-16 Stanolind Oil & Gas Co Marine structure
US2592448A (en) * 1948-06-02 1952-04-08 Raymond Concrete Pile Co Spud method of installing oil well drilling bases
US2531983A (en) * 1948-11-04 1950-11-28 Noble Drilling Corp Stabilizable vessel for submarine operations and method of operating the same
US2600761A (en) * 1948-12-06 1952-06-17 Erle P Halliburton Offshore drilling means
US2699321A (en) * 1949-06-21 1955-01-11 Fred N Nelson Deepwater oil drilling and storage craft
US2597110A (en) * 1949-08-12 1952-05-20 Lacy Robert Marine structure
US2740261A (en) * 1950-11-06 1956-04-03 Alexander D Stark Floating hulls for off shore oil well drilling
US2841961A (en) * 1953-04-13 1958-07-08 Delong Corp Off-shore drilling barge
US2870639A (en) * 1953-06-02 1959-01-27 Delong Corp Gripper and jack assembly for platforms and supporting columns
US3001593A (en) * 1953-11-17 1961-09-26 De Long Corp Off-shore drilling barge
US2909900A (en) * 1954-01-06 1959-10-27 De Long Corp Off-shore working assembly
US2833118A (en) * 1954-03-26 1958-05-06 John A Roebling S Sons Corp Spud driving rig
US3001594A (en) * 1954-05-04 1961-09-26 De Long Corp Off-shore drill rig
US3001595A (en) * 1954-05-26 1961-09-26 De Long Corp Multi-purpose derrick barge and method of use in oil well drilling and servicing
US2947148A (en) * 1954-06-28 1960-08-02 Sun Oil Co Jacking mechanism for seadrome
US2997852A (en) * 1954-12-30 1961-08-29 De Long Corp Apparatus and method for reecting a supporting structure over a body of water
US2948120A (en) * 1956-09-28 1960-08-09 De Long Corp Supporting leg assembly for marine platform
US2936592A (en) * 1956-11-29 1960-05-17 Delong Corp Caisson and detachable pontoon assembly for floating barges and the like
US3044269A (en) * 1957-07-22 1962-07-17 Tourneau Robert G Le Mobile sea platform
US3075252A (en) * 1957-08-12 1963-01-29 Adolph C King Portable blind for hunters and soldiers
US3014346A (en) * 1957-09-10 1961-12-26 Jersey Prod Res Co Method and means for raising and lowering a platform
US3183676A (en) * 1960-10-20 1965-05-18 Robert G Letourneau Mobile sea platform
US3138932A (en) * 1961-04-14 1964-06-30 Richfield Oil Corp Locating an offshore drilling platform
US3246475A (en) * 1961-08-28 1966-04-19 William M Booth Telescopic marine derrick structure and method of erecting same
US3289419A (en) * 1964-02-03 1966-12-06 Camco Inc Sea raft
US3464466A (en) * 1967-01-24 1969-09-02 Exxon Research Engineering Co Mooring system for tanker vessels
USRE29539E (en) * 1969-11-14 1978-02-14 Armco Steel Corporation Leg supported offshore structure with jacking apparatus
JPS50136904A (en) * 1974-04-19 1975-10-30
JPS5646007B2 (en) * 1974-04-19 1981-10-30
DE2913570A1 (en) * 1978-04-04 1979-12-13 Raymond Int Builders OFFSHORE PLATFORM STRUCTURE
FR2436099A1 (en) * 1978-09-14 1980-04-11 Brissonneau & Lotz Lifting mechanism for offshore oil drilling platform - has elastic abutments to ensure equal share of load to each driving pinion
US4421437A (en) * 1978-12-19 1983-12-20 Shell Oil Company Corrugated buckle arrestor
US4255069A (en) * 1979-08-01 1981-03-10 The Offshore Company Jack-up platform locking apparatus
FR2492029A1 (en) * 1980-10-13 1982-04-16 Francois Durand SELF-ALIGNING AND SELF-TURNING PINION BLOCK FOR SELF-LIFTING PLATFORM LEG
US4445290A (en) * 1980-12-16 1984-05-01 Hydroconsult, S.A. Appliance for dredging the bottom of a body of water
USRE32297E (en) * 1980-12-16 1986-12-02 Hydroconsult, S.A. Appliance for dredging the bottom of a body of water
WO1983001931A1 (en) * 1981-11-24 1983-06-09 Inoue, Terukazu Work ship for installing large offshore structure
WO1983001932A1 (en) * 1981-11-25 1983-06-09 Inoue, Terukazu Work ship for installing large offshore structure
US4512553A (en) * 1982-03-17 1985-04-23 Red Fox Industries, Inc. Jack-up unit
US4456072A (en) * 1982-05-03 1984-06-26 Bishop Gilbert H Ice island structure and drilling method
US4472083A (en) * 1982-12-20 1984-09-18 Younes David T Oil well rig with water tower
US5486069A (en) * 1994-06-06 1996-01-23 Breeden; John Offshore jack-up rig locking system
US5611645A (en) * 1994-06-06 1997-03-18 Breeden; John Offshore jack-up rig locking system
US5797703A (en) * 1996-02-02 1998-08-25 Searex, Inc. Elevating unit for use with jack-up rig
FR2753466A1 (en) * 1996-09-19 1998-03-20 Brissonneau & Lotz Powered lifting drive for marine platforms
DE19704967A1 (en) * 1997-01-28 1998-07-30 Mannesmann Ag Portal crane, especially for erecting buildings
DE19704967C2 (en) * 1997-01-28 1999-08-05 Mannesmann Ag Gantry crane, in particular for the construction of buildings
US5915882A (en) * 1997-06-26 1999-06-29 Letourneau, Inc. Jack-up platform locking apparatus and method
US5855455A (en) * 1997-07-09 1999-01-05 Ensco International, Inc. Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform
US7131388B2 (en) 1999-11-12 2006-11-07 Textron Innovations Inc. Lift boat
US6523491B1 (en) * 1999-11-12 2003-02-25 Textron Inc. Lift boat
US20040237871A1 (en) * 1999-11-12 2004-12-02 Moise Benjamin Clay Lift boat
US6718903B1 (en) * 1999-11-12 2004-04-13 Textron, Inc. Life boat
WO2004067375A1 (en) * 2003-01-17 2004-08-12 Textron Inc. Lift boat
EP1798342A2 (en) * 2004-01-28 2007-06-20 Technip France Device for dismantling and transporting of an offshore platform
WO2005083183A1 (en) * 2004-01-28 2005-09-09 Technip France Structure for transporting, installing and dismantling the elements of a fixed oil platform and methods for using said structure
US8070388B2 (en) 2004-01-28 2011-12-06 Technip France Structure for transporting, commissioning and decommissioning the elements of a fixed oil platform and methods for implementing such a structure
EA008616B1 (en) * 2004-01-28 2007-06-29 Текнип Франс Structure for transporting, installing and dismantling the elements of a fixed oil platform and methods for using said structure
US20080131209A1 (en) * 2004-01-28 2008-06-05 Pierre-Armand Thomas Structure For Transporting, Commissioning and Decommissioning the Elements of a Fixed Oil Platform and Methods For Implementing Such a Structure
EP1798342A3 (en) * 2004-01-28 2008-11-19 Technip France Device for dismantling and transporting of an offshore platform
FR2865484A1 (en) * 2004-01-28 2005-07-29 Technip France Structure for dismantling and transporting a fixed offshore oil platform with a U-shaped floating hull mounted on at least three lifting legs carrying a shuttle to move the hull along the legs
AU2004316316B2 (en) * 2004-01-28 2010-03-11 Technip France Structure for transporting, installing and dismantling the elements of a fixed oil platform and methods for using said structure
KR101230424B1 (en) 2004-01-28 2013-02-06 테크니프 프랑스 Structure for transporting, installing and dismantling the elements of a fixed oil platform and methods for using said structure
US7594781B1 (en) 2007-06-01 2009-09-29 Ronald Sanders Lift boat leg
US20110206464A1 (en) * 2008-09-17 2011-08-25 Waertsilae Ship Design Germany Gmbh Lifting system
US8596907B2 (en) 2008-09-17 2013-12-03 Waertsilae Ship Design Germany Gmbh Lifting system
US20110094427A1 (en) * 2008-12-16 2011-04-28 Burns Mark L Fast jack hybrid liftboat hull
US20140161569A1 (en) * 2011-04-26 2014-06-12 Ihc Holland Ie B.V Vessel comprising a moon pool and a hoisting arrangement and method of lowering items into the sea
US9771131B2 (en) * 2011-04-26 2017-09-26 Ihc Holland Ie B.V. Vessel comprising a moon pool and a hoisting arrangement and method of lowering items into the sea
CN102444110A (en) * 2011-09-28 2012-05-09 中国石油大学(华东) Offshore multi-directional self-elevating petroleum drilling platform
CN102444110B (en) * 2011-09-28 2013-09-25 中国石油大学(华东) Offshore multi-directional self-elevating petroleum drilling platform
WO2014098612A1 (en) * 2012-12-19 2014-06-26 Sevan Marine Asa Shallow water platform
NO336982B1 (en) * 2012-12-19 2015-12-07 Sevan Marine Asa Submersible hull with levelable foundation and method of supporting the hull on a seabed

Similar Documents

Publication Publication Date Title
US2308743A (en) Barge
KR101230424B1 (en) Structure for transporting, installing and dismantling the elements of a fixed oil platform and methods for using said structure
US2907172A (en) Method and apparatus for constructing offshore drilling platforms
US2210408A (en) Marine working platform substructure
US8555564B2 (en) Drilling rig assembly method and apparatus
US2691272A (en) Submersible oil well drilling rig
US4973198A (en) Offshore drilling rig transfer
US4007782A (en) Parking device for blowout preventer
JPS6315381Y2 (en)
US2940266A (en) Method of constructing an offshore well drilling island
US9500040B2 (en) Blowout preventer trolley
US2995900A (en) Portable marine structure
US2953904A (en) Submersible barge assembly
BRPI1014431B1 (en) METHOD OF ADDING A TUBE JOINT TO A SEGMENTED RING AND CONDUCTOR RING COLUMN
US2594847A (en) Drilling rig substructure
US2946566A (en) Subaqueous drilling apparatus
US2603068A (en) Offshore working platform and method of erecting same
US3001592A (en) Well drilling and servicing barge including bridge and rig structure and methods
US4417664A (en) Method and apparatus for mounting lift crane on offshore structures
US4041711A (en) Method and apparatus for quickly erecting off-shore platforms
US3593529A (en) Method and apparatus for installing drilling platforms
KR20090101891A (en) Structure for the transport, installation and dismantling of an oil rig deck and method for using one such structure
US2941369A (en) Drilling structures
US3064437A (en) Offshore structure
US4505615A (en) Method of supporting a shallow water drilling barge