WO1983001931A1 - Work ship for installing large offshore structure - Google Patents

Work ship for installing large offshore structure Download PDF

Info

Publication number
WO1983001931A1
WO1983001931A1 PCT/JP1982/000446 JP8200446W WO8301931A1 WO 1983001931 A1 WO1983001931 A1 WO 1983001931A1 JP 8200446 W JP8200446 W JP 8200446W WO 8301931 A1 WO8301931 A1 WO 8301931A1
Authority
WO
WIPO (PCT)
Prior art keywords
hull
work
offshore structure
offshore
ship
Prior art date
Application number
PCT/JP1982/000446
Other languages
French (fr)
Japanese (ja)
Inventor
Zosen Corporation Hitachi
Original Assignee
Inoue, Terukazu
Araki, Masao
Yamamoto, Masaharu
Misaki, Koji
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inoue, Terukazu, Araki, Masao, Yamamoto, Masaharu, Misaki, Koji filed Critical Inoue, Terukazu
Priority to BR8207984A priority Critical patent/BR8207984A/en
Priority to GB08316184A priority patent/GB2119322B/en
Priority to NL8220438A priority patent/NL8220438A/en
Priority to IN409/CAL/83A priority patent/IN160806B/en
Publication of WO1983001931A1 publication Critical patent/WO1983001931A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/06Constructions, or methods of constructing, in water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor

Definitions

  • This invention is based on the installation of a large offshore structure installation work ship, and more specifically, a large offshore structure such as a marine plant.
  • offshore oil fields installed on offshore substructures
  • Offshore structures such as various facilities and offshore plants have dimensions and weight
  • a work vessel for installation of a large marine vessel includes a lower hull, a plurality of guide posts standing on both sides of the lower hull, and both sides mounted on a guy post so as to be vertically movable. It is equipped with a lifted upper hull and an elevating device that moves the upper hull up and down along the guidepost. Therefore, the large marine structure or the large block built integrally is placed on the upper hull and transported to the installation site, and the work boat is placed near the 3 ⁇ 4E structure. By lifting the upper hull along the guideposts while being stopped at the same height as the foundation structure 3 ⁇ 4, this large marine structure collision or large block can be It can be easily transferred from the upper hull onto the substructure without being used.
  • Fig. 1 shows the work for installing a large offshore structure according to the present invention.
  • FIG. 2 is a plan view of the same.
  • FIG. 4 is a peripheral plan view.
  • Fig. 5 shows the foundation groove
  • FIG. 3 is a side view showing a state in which a work ship is moored to the structure. No.
  • Figure 6 shows the state immediately before the offshore structure is mounted on the substructure.
  • the offshore structure installation work vessel (1) consists of a lower hull (2) and
  • the upper hull (4) movably mounted and the upper hull
  • a drop-down device (jack-up device) (5).
  • the upper and lower surfaces are formed horizontally.
  • One guide is provided for each guide post (3), and is fixed to the upper deck (6) of the upper lead body (4).
  • the guide post (3) consists of the upper hull (4) and the lifting device.
  • An operation room (8) is provided.
  • the moving device installed on the quay (9) or the moving device on the quay (9) allows the skidway (10) of the quay (9) to start the work (1).
  • the marine structure (11) is drawn in to a predetermined position, it is fixed to the upper hull (4) as necessary, and
  • Work boat (1) is towed to the offshore structure installation site by a single unit.
  • the work boat (1) equipped with the offshore structure (11) arrives at the site, the work boat (1) is moored to the substructure (12) and its position is adjusted ( See Fig. 5>.
  • the upper boat rest (4) is raised along the guide post (3) by the lifting device (5), and the skidway is lifted.
  • the number of doposts (3) is limited to that of the above embodiment.
  • the work vessel for installing a large offshore structure according to the present invention is a sea vessel.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Transportation (AREA)
  • Revetment (AREA)
  • Ship Loading And Unloading (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Work ship used to install a large offshore structure such as a marine plant onto a foundation structure installed in the sea by transporting the structure to the installation field. The ship has a lower hull (2), a plurality of guide posts (3) along both sides of the hull (2), an upper hull (4) mounted on both sides on the posts (3) so that it can be raised, and elevation devices (5) for raising the hull (4) up the posts (3). The hull (4) is raised up the posts (3) to the same height as the foundation structure, thereby enabling the easy moving and positioning of the offshore structure from the hull (4) onto the foundation structure without the use of a crane ship or the like.

Description

明細書 大型海洋構造物据付用 作業船  Description Work boat for installing large offshore structures
5 技術分野 5 Technical fields
こ の発 明 は 、 大型海洋構造物据付用 作業船 、 さ ら に 詳 し く は 、 海上プラ ン 卜 な どの大型海洋構造物 を据付  This invention is based on the installation of a large offshore structure installation work ship, and more specifically, a large offshore structure such as a marine plant.
現場 ま で運搬 し て 海上 に 設置さ れ た 基礎構造物上 に 据  Transported to the site and installed on a substructure installed at sea
付ける た め に 使用 さ れる作業船 に 関 す る 。  Regarding the workboat used to attach.
1 0 背景技術  1 0 Background technology
た と え ば海上の基礎構造物上 に搭載さ れる 海底油田  For example, offshore oil fields installed on offshore substructures
の諸設備や 海上プ ラ ン 卜 な どの 海洋構造物 は 寸法、 重  Offshore structures such as various facilities and offshore plants have dimensions and weight
量が大き い た め 、 こ れを一体に 建造 し て ク レ ー ン鉛な  Due to its large volume, it is built as one and clean lead
どで一括 し て 据付け る こ と は不可 能であ る 。 こ の た め 、 It is not possible to install them all together. For this reason ,
1 5 従来は 、 ク レ ー ン船の能力 に応 じ 、 構造物 を比较的小 型の複数のブ ロ ッ ク に 分割 し て建造 し 、 こ れ ら の ブ ロ 15 Conventionally, in accordance with the capacity of the crane ship, the structure was divided into a plurality of relatively small blocks and built, and these blocks were constructed.
ッ ク を 、 工場の岸壁 ま た は ド ッ ク 内 に 接岸 し た デ ッ キ  A deck docked at the factory quay or dock
パ ー ジ上 に 海上 ク レ ー ン ま た は工場内 の 門形ク レ ー ン.  Marine crane on the page or portal crane in the factory.
な どで搭載 し て 据付現場 ま で運搬 し 、 予 め 設置さ れて  It is transported to the installation site, etc., and installed in advance.
2 0 いる基礎構造物上 に ク レ ー ン船で顒次据付け 、 そ の の ち各ァ ロ ッ ク 間 の配管や配線な ど の接続作業 を行な つ  On a 20-year-old foundation structure, a crane ship will be used for secondary installation, and then connection work such as piping and wiring between each block will be performed.
'4  'Four
て い る 。 し た が っ て 、 工場 か ら の搬出作業、 現地 に お  ing . Therefore, unloading from the factory and sending to the site
ける洋上で の据付作業お よ び据付後の接続作業 の 作業  Installation work at sea and connection work after installation
量が多 く 、 能率が悪い た め 、 ェ期 が長 く 費用 が増大 す  Large volumes and inefficiencies result in longer periods and higher costs
2 5 る と い う 問題が あ る 。  There is a problem that
ΟΜΡΙ この発明の目 的は、 一体に建造された大型海洋構造 物 ま た はその大型のブロ ッ ク を基礎構造物上に容易に 搭載する こ と がでぎ 、 よ っ て大型海洋構造物の建造お よび現地での据付作業のェ期を大幅に短縮できる作業 船を提供するこ と に ある 。 ΟΜΡΙ It is an object of the present invention to be able to easily mount a large offshore structure or a large block integrally built on a substructure, thereby building a large offshore structure. Another object of the present invention is to provide a work boat that can significantly shorten the time required for on-site installation work.
発明の開  Invention opening
この発明に よる大型海洋搆造 据付用作業船は、 下 部船体 と 、 下部船体の両側部に立て ら れた複数本のガ ィ ドポス 卜 と 、 両側部がガイ ポス 卜 に上下動自在に 取付け ら れた上部船体と 、 上部船体をガイ ドポス 卜 に 沿っ て上下動させる昇降装置とを備 ¾て いるちのであ る 。 し たが つ て、 一体に建造さ れた大型海洋構造物 ま た はその大型ブ ロ ヅ ク を上部船体上に載せて据付現場 まで運搬でぎると と も に 、 作業船を ½ ¾E 造物のそば に停めた状態で上部船体をガィ ドポス 卜 に沿っ て基礎 構造 ¾ と周 じ髙さ ま で持上げる こ と に よ り 、 この大型 海洋構造牴または大型プロ ッ ク を、 ク レー ン船などを 使用する こ と な く 、 容易 に上部船体から基礎構造物上 に移 して搭載する こ とがでぎる。 こ のため 、 大型海洋 構造物の一体化ま た はプ ロ ッ クの大型化が可能にな り 管理の行届いた工場内での建造部分が増大するた め 、 品質の高い海洋構造物を得る こ と がでぎ、 かつ海洋構 造物の建造ェ期を短縮する こ と がでぎる 。 ま た 、 現地 における洋上での据付作業が容易で配管お よび配線な どの接続作業が減少するため 、 据付作業のェ期を短縮  A work vessel for installation of a large marine vessel according to the present invention includes a lower hull, a plurality of guide posts standing on both sides of the lower hull, and both sides mounted on a guy post so as to be vertically movable. It is equipped with a lifted upper hull and an elevating device that moves the upper hull up and down along the guidepost. Therefore, the large marine structure or the large block built integrally is placed on the upper hull and transported to the installation site, and the work boat is placed near the ¾E structure. By lifting the upper hull along the guideposts while being stopped at the same height as the foundation structure ¾, this large marine structure collision or large block can be It can be easily transferred from the upper hull onto the substructure without being used. As a result, large-scale offshore structures can be integrated or blocks can be enlarged, and the number of building parts in well-managed factories increases. The benefits are greater and the construction time of offshore structures can be reduced. In addition, installation work on the offshore at the site is easy and connection work such as piping and wiring is reduced, so the installation work is shortened.
OMPI する こ と ができ 、 建造ェ期の短縮とあわせ て海洋構造 OMPI In addition to shortening the construction period,
物のコ ス 卜 ダウ ンが可能である 。  Cost down of things is possible.
ま た 、 こ の発明 に よ る大型海洋構造物据付用 作業船  Further, the work boat for installing a large offshore structure according to the present invention.
は、 上部船体の上甲板上に大型海洋構造物移動用のス  Is located on the upper deck of the upper hull for moving large offshore structures.
キ ッ ド ゥ ヱ イ が設け ら れて いるものである 。 し たが つ  It is provided with a kit. Sword
て、 大型海洋構造物 ま た は大型ブロ ッ ク の積卸 しが容  Loading and unloading of large offshore structures or large blocks
1め o Easy 1 o
図面の簡単な説明  BRIEF DESCRIPTION OF THE FIGURES
第 1 図 はこの発明 に よ る大型海洋構造物据付用作業  Fig. 1 shows the work for installing a large offshore structure according to the present invention.
船の側面図である 。 第 2 図 は同平面図である 。 第 3 図  It is a side view of a ship. FIG. 2 is a plan view of the same. Fig. 3
は作業船に大型海洋構造物を積込んだ状態を示す側面  Is a side view showing a state where a large offshore structure is loaded on the work boat
図であ る 。 第 4 図 は周平面図である 。 第 5 図 は基礎溝  It is a figure. FIG. 4 is a peripheral plan view. Fig. 5 shows the foundation groove
造物 に作.業船を係留 し た状態を示す側面図である 。 第  FIG. 3 is a side view showing a state in which a work ship is moored to the structure. No.
6 図は基礎構造物上に海洋構造物を搭載する直前の状  Figure 6 shows the state immediately before the offshore structure is mounted on the substructure.
態を示す側面図である。 It is a side view which shows a state.
発明を実施するた めの最良の形態  BEST MODE FOR CARRYING OUT THE INVENTION
以卞、 添付図面を参照 し て 、 この発明をよ り 詳細に  The present invention will be described in more detail with reference to the accompanying drawings.
説明する 。 explain .
第 1 図お よび第 2 図 に示さ れて いる よ う に 、 大型海  As shown in Fig. 1 and Fig. 2,
洋構造物据付用作業船 ( 1 ) は、 下部船体 ( 2 ) と 、 The offshore structure installation work vessel (1) consists of a lower hull (2) and
下部船体 ( 2 ) の両側部に立て ら れた複数本のガイ ド Multiple guides standing on both sides of the lower hull (2)
ポス 卜 ( 3 ) と 、 両側部がガ イ ドポス ト ( 3 ) に上下 Both sides of the post (3) and the guide post (3)
動自在 に取付け ら れた上部船体 ( 4 ) と 、 上部船体 The upper hull (4) movably mounted and the upper hull
( 4 ) をガイ ドボス 卜 ( 3 ) に沿 っ て上下動 さ せる昇  (4) is moved up and down along the guide boss (3).
降装置 ( ジ ャ ッ キ ア ッ プ裝置 ) ( 5 ) と を備え て いる 。 A drop-down device (jack-up device) (5).
OMH ' 下部船体 ( 2 ) および上部船体 ( 4 〉 はそれぞれ箱形 OMH ' Lower hull (2) and upper hull (4>) are box-shaped
をな し 、 下部船体 ( 2 ) の上面および上部船体 ( 4 ) The upper hull of the lower hull (2) and the upper hull (4)
の上下両面は水平に形成さ れて いる 。 昇降装置 ( 5 ) The upper and lower surfaces are formed horizontally. Lifting equipment (5)
は、 各ガイ ドポス ト ( 3 ) に対 し て 1 個ずつ設け られ、 上部鉛体 ( 4 ) の上甲板 ( 6 ) に固定されて いる。 各 One guide is provided for each guide post (3), and is fixed to the upper deck (6) of the upper lead body (4). Each
ガイ ドポス ト ( 3 ) は上部船体 ( 4 ) お よび昇降装置 The guide post (3) consists of the upper hull (4) and the lifting device.
( 5 ) を上下に貫通 してお り 、 昇降装置 ( 5 〉 に よ り 、 上部船体 ( 4 ) がガイ ドポス ト ( 3 ) に沿 っ て上下動  (5) penetrates up and down, and the upper hull (4) moves up and down along the guide post (3) by the lifting device (5).
する と と も にガイ ドボス 卜 ( 3 ) の任意の位置に固定 At the same time, it is fixed at any position on the guide boss (3).
される よ う に な つ ている。 It is being done.
上部舱体 ( 4 ) の上甲板 ( 6 〉 上に は、 大型の構造  Large structure on the upper deck (6>) of the upper body (4)
物の積卸 しを容易 に するた めのスキ ッ ドウ ェ イ ( 7 ) 、 スキッ ドウ ェ イ ( 7 ) 上を構造物を移動させるた めの A skidway (7) for facilitating the loading and unloading of goods, and a structure for moving structures on the skidway (7)
油圧式 ま た はウィ ンチ ♦ ワ イ ヤ式の公知の移動装置 Hydraulic or winch known wire type moving device
( 図示略 〉 および昇降装置 ( 5 ) の操作な どを行なう  (Not shown) and operate the lifting device (5)
ための操作室 ( 8 ) が設け ら れている。 An operation room (8) is provided.
た と えばプラン 卜 を構成する大型海洋構造物の据付  For example, installation of large offshore structures that make up a plant
けは、 上記の作業船 ( 1 ) を使用 し て、 次のよ う に行 Using the above-mentioned work boat (1),
なわれる ( 第 3 図〜第 6 図参照 ) 。 It is done (see Fig. 3 to Fig. 6).
まず、 上部船体 ( 4 ) を下部船体 ( 2 ) 上面まで下  First, lower the upper hull (4) to the upper surface of the lower hull (2).
降させた状態で作業鉛 ( 1 ) の舱尾端を工場の岸壁 Lower the tail end of the work lead (1) while it is lowered
( 9 ) に接岸し 、 下部船体 ( 2 ) のパラ ス 卜 謂整に よ  After berthing at (9), the lower hull (2) is called
り 、 作業船 ( 1 ) のスキ ッ ド ゥ I ィ ( 7 ) を岸壁 ( 9 ) 上のスキ ッ ドゥ I ィ ( 10) に合致させる 。 そ し て 、 ェ Then, the skid I (7) of the work boat (1) is matched with the skid I (10) on the quay (9). And,
場で一体に建造 した大型海洋構造物 ( 11〉 を、 作業紛 A large offshore structure (11>) built in
- O PI― ( 1 ) 上の移動装置ま た は岸壁 ( 9 ) に 設置さ れた 移 動装置 に よ り 、 岸壁 ( 9 ) の スキ ッ ド ウ ェ イ ( 10〉 か ら作業盼 ( 1 ) の ス キ ッ ド ウ ェ イ ( 7 ) 上 に 引 入れる -O PI- (1) The moving device installed on the quay (9) or the moving device on the quay (9) allows the skidway (10) of the quay (9) to start the work (1). Draw on the wooden way (7)
( 第 3 図 お よ び第 4 図参照 〉 。  (See Fig. 3 and Fig. 4).
海洋構造抝 ( 11 ) を所定 の 位置 ま で 引 入れた な ら ば 必要に 応 じ て こ れを上部船体 ( 4 ) に 固定 し 、 タ グポ  If the marine structure (11) is drawn in to a predetermined position, it is fixed to the upper hull (4) as necessary, and
一 卜 な ど に よ り 作業船 ( 1 ) を海洋構造物据付現場 ま で曳航 す る 。  Work boat (1) is towed to the offshore structure installation site by a single unit.
現地 の海底に は海洋構造物 ( 11 ) を搭載す る 基礎搆 造物 ( ジ ャ ケ ッ ト ) ( 12〉 が 固定 さ れて お り 、 海面上 に突出 し た 基礎構造物 ( 12) の上端 に キ ャ ッ プ 卜 ラ ス  On the local seabed, a basic structure (jacket) (12>) on which the marine structure (11) is mounted is fixed, and the upper end of the basic structure (12) protruding above the sea surface is fixed. Capsule
( 13) が設 け ら れ て い る 。  (13) has been established.
海洋構造抝 ( 11〉 を搭載 し た作業船 ( 1 ) が現地 に 到着 し た な ら ば、 作業船 ( 1 ) を基礎構造物 ( 12) に 係留 し て 、 そ の位置を調整す る ( 第 5 図参照 〉 。  When the work boat (1) equipped with the offshore structure (11) arrives at the site, the work boat (1) is moored to the substructure (12) and its position is adjusted ( See Fig. 5>.
次 に 、 昇降装置 ( 5 ) に よ り 、 上部船休 ( 4 ) をガ イ ドポ ス ト ( 3 ) に 沿 っ て 上昇さ せ 、 スキ ッ ド ウ ェ イ  Next, the upper boat rest (4) is raised along the guide post (3) by the lifting device (5), and the skidway is lifted.
( 7 ) の 高さ がキ ャ ッ プ 卜 ラ ス ( 13) の 高さ と 一致す る よ う な位置 に 固定 す る 。 そ し て 、 上部船体 ( 4 〉 と キ ャ ッ プ 卜 ラ ス ( 13) と の 間 に 一 時的な ス キ ッ ド を設 置 し 、 作業船 ( ) 上の移動装置を使用 し て 海洋溝造 物 ( 11 ) を上部船体 ( 4 ) か ら キ ャ ッ プ 卜 ラ ス ( 13) 上の所定 の位置ま で移動 さ せ ( 第 6 図参照 ) 、 最後 に 溶接な ど に よ っ て 海洋構造物 ( 11〉 をキ ャ ッ プ 卜 ラ ス  Fix it so that the height of (7) coincides with the height of the cap (13). Then, a temporary skid is installed between the upper hull (4) and the capstrap (13), and the marine vessel is moved using the moving device on the work boat (). The grooved structure (11) is moved from the upper hull (4) to a predetermined position on the capstrap (13) (see Fig. 6), and finally by welding or the like. Capturing offshore structures (11)
( 13) に 固 定 す る 。  Fix to (13).
O PI 下部船体 ( 2 ) および上部紛体 ( 4 ) の構成、 ガイ O PI Configuration of lower hull (2) and upper powder (4)
ドポス 卜 ( 3 ) の本数など は、 上記実施例のもの に限 The number of doposts (3) is limited to that of the above embodiment.
らず、 適宜変更可能である 。 However, it can be changed as needed.
産業上の利用可能性  Industrial applicability
こ の発明 に よる大型海洋構造物据付用作業船は、 海  The work vessel for installing a large offshore structure according to the present invention is a sea vessel.
上プラ ン 卜 な どの大型海洋構造物を据付現場まで運搬 Transport large offshore structures such as upper plants to the installation site
して海上に設置された基礎構造物上に据付けるため に To be installed on a substructure installed at sea
使用 さ れるの に適 し ている 。 Suitable for being used.
' o 一 'o one

Claims

請求の範囲  The scope of the claims
1 . 下部船体 ( 2 〉 と 、 下部船体 ( 2 ) の 両側部に 立  1. Stand on both sides of the lower hull (2) and the lower hull (2).
て ら れた 複数本のガイ ド ボ ス 卜 ( 3 ) と 、 両側部が  The plurality of guide boxes (3) and the two sides
ガ イ ド ボ ス 卜 ( 3 ) に 上下動 自 在 に 取付 け ら れた上  It can be mounted vertically on the guide box (3).
部船体 ( 4 ) と 、 上部船体 ( 4 ) をガ イ ド ボ ス 卜  Guide hull (4) and upper hull (4)
( 3 ) に 沿 っ て 上下動 さ せる昇降装置 ( 5 ) と を備  A lifting device (5) that moves up and down along (3) is provided.
えて い る大型海洋構造物据付用 作業船 。  Large-scale offshore structure installation work vessel.
2. 上部船体 ( 2 ) の上甲 板 ( 6 ) 上に大型海洋構造  2. Large marine structure on the upper deck (6) of the upper hull (2)
物移動 用 の ス キ ッ ド ウ ェ イ ( 7 ) が設け ら れて いる  There is a skidway (7) for moving objects
請求 の範囲 1 記載の大型海洋構造物据付用 作業船 。  The work vessel for installing a large offshore structure according to claim 1.
O PI O PI
f r '。―  f r '. ―
PCT/JP1982/000446 1981-11-24 1982-11-24 Work ship for installing large offshore structure WO1983001931A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BR8207984A BR8207984A (en) 1981-11-24 1982-11-24 OPERATIONAL SHIP FOR INSTALLATION OF LARGE COASTAL STRUCTURES
GB08316184A GB2119322B (en) 1981-11-24 1982-11-24 Work ship for installing large offshore structures
NL8220438A NL8220438A (en) 1981-11-24 1982-11-24 WORKSHIP FOR INSTALLING LARGE CONSTRUCTIONS OUTSIDE.
IN409/CAL/83A IN160806B (en) 1981-11-24 1983-04-08

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP56/175138U811124 1981-11-24
JP17513881U JPS5878296U (en) 1981-11-24 1981-11-24 Work boat for installing large offshore structures

Publications (1)

Publication Number Publication Date
WO1983001931A1 true WO1983001931A1 (en) 1983-06-09

Family

ID=15990950

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP1982/000446 WO1983001931A1 (en) 1981-11-24 1982-11-24 Work ship for installing large offshore structure

Country Status (7)

Country Link
EP (1) EP0094433A4 (en)
JP (1) JPS5878296U (en)
BR (1) BR8207984A (en)
GB (1) GB2119322B (en)
MY (1) MY8600638A (en)
NL (1) NL8220438A (en)
WO (1) WO1983001931A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11142290B2 (en) 2016-10-18 2021-10-12 Ulstein Design & Solutions B.V. Self-propelled jack-up vessel

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5880430U (en) * 1981-11-25 1983-05-31 日立造船株式会社 Work boat for installing large offshore structures
FR2581020A1 (en) * 1985-04-24 1986-10-31 Marion Henri Albert METHOD FOR TRANSPORTING AND TRANSFERRING A LOAD CONSTITUTING A COMPLETE EQUIPMENT OF A BRIDGE OF A MARINE PLATFORM AND MEANS FOR IMPLEMENTING THE PROCESS
GB2165188B (en) * 1985-06-05 1988-10-12 Heerema Engineering Installation and removal vessel
GB2165187A (en) * 1985-06-05 1986-04-09 Heerema Engineering Module installation and removal

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2308743A (en) * 1939-09-16 1943-01-19 William P Bulkley Barge
JPS52110193U (en) * 1976-02-16 1977-08-22
JPS5647035B2 (en) * 1972-03-02 1981-11-06

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL93492C (en) *
US3078680A (en) * 1958-12-15 1963-02-26 Jersey Prod Res Co Floating rig mover
FR1366164A (en) * 1963-05-29 1964-07-10 New offshore drilling and production platforms
US3837309A (en) * 1971-06-17 1974-09-24 Offshore Technology Corp Stably buoyed floating offshore device
US3931778A (en) * 1974-08-08 1976-01-13 Raymond International, Inc. Support barge method and apparatus
JPS582874B2 (en) * 1975-05-12 1983-01-19 三井造船株式会社 Kozaiyu Sosenyousen
SE419325B (en) * 1976-06-11 1981-07-27 Resmastservice Ab SET TO LOAD AND LOAD HEAVY COLLIN ON SHIPS AND DEVICE IMPLEMENTATION
FR2405182A1 (en) * 1977-10-04 1979-05-04 Metalliques Entrepr Cie Fse PROCESS AND EQUIPMENT FOR PLACING ON COLUMNS ANCHORED TO THE BOTTOM, FROM A TRANSPORTER VESSEL, LOADS, PLATFORMS OR SIMILAR, FOR INSTALLATIONS OFF THE COAST
JPS5536147A (en) * 1978-09-04 1980-03-13 Hitachi Zosen Corp Method of constructing structure on sea-surface
FR2446794A1 (en) * 1979-01-22 1980-08-14 Iceberg Transport Int Deep water lifting hoist - has vertical piles on cross piece foundation carrying bridge and ballasting to give lift

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2308743A (en) * 1939-09-16 1943-01-19 William P Bulkley Barge
JPS5647035B2 (en) * 1972-03-02 1981-11-06
JPS52110193U (en) * 1976-02-16 1977-08-22

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP0094433A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11142290B2 (en) 2016-10-18 2021-10-12 Ulstein Design & Solutions B.V. Self-propelled jack-up vessel

Also Published As

Publication number Publication date
NL8220438A (en) 1983-09-01
JPS5878296U (en) 1983-05-26
EP0094433A4 (en) 1984-04-27
MY8600638A (en) 1986-12-31
GB8316184D0 (en) 1983-07-20
GB2119322A (en) 1983-11-16
EP0094433A1 (en) 1983-11-23
GB2119322B (en) 1985-07-31
BR8207984A (en) 1983-10-04

Similar Documents

Publication Publication Date Title
US20210269129A1 (en) Sea vessel docking station
KR101047978B1 (en) Deep sea
US7255180B2 (en) Modular drill system requiring limited field assembly and limited equipment support
KR101201959B1 (en) Extensible semi-submersible platform
KR101905211B1 (en) Sea contaiver that can be closed on all sides
WO1983001932A1 (en) Work ship for installing large offshore structure
JPS6088713A (en) Ocean drilling rig having sealed working region
US6565286B2 (en) Method for fabricating and assembling a floating offshore structure
GB1382693A (en) Method of connecting underwater installations
WO1983001931A1 (en) Work ship for installing large offshore structure
US4658903A (en) Method for handling wellhead assembly
US7882792B2 (en) Auxiliary floating structure and procedure for descent of equipment into the sea
KR20160000111U (en) Fittings moving system for work underwater using a cable winch robot
US5036782A (en) Method for converting a semi-submersible vessel
KR20150143374A (en) multi function dock
JPH0115448B2 (en)
KR101964835B1 (en) Facility for launching offshore structure, and method of launching offshore structure
CN117166938A (en) Geological investigation rig suitable for small-size boats and ships
KR20150000890U (en) Carrier equipment for cargo-working of pier mooring ship
JPS5942136B2 (en) How to assemble a landing lift type offshore work platform
CN203544298U (en) Acoustic positioning compartment
JP2020023286A (en) Transport system and transport method
KR20160052883A (en) Dry dock available special ship building
JPS61135891A (en) Ship for transporting structure on sea
JPS6357596B2 (en)

Legal Events

Date Code Title Description
AK Designated states

Designated state(s): BR GB NL US

AL Designated countries for regional patents

Designated state(s): FR

WWE Wipo information: entry into national phase

Ref document number: 1982903468

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1982903468

Country of ref document: EP

WWW Wipo information: withdrawn in national office

Ref document number: 1982903468

Country of ref document: EP