US20230332801A1 - Hot water supply system - Google Patents

Hot water supply system Download PDF

Info

Publication number
US20230332801A1
US20230332801A1 US18/214,849 US202318214849A US2023332801A1 US 20230332801 A1 US20230332801 A1 US 20230332801A1 US 202318214849 A US202318214849 A US 202318214849A US 2023332801 A1 US2023332801 A1 US 2023332801A1
Authority
US
United States
Prior art keywords
hot water
water supply
total amount
learning
heating apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
US18/214,849
Other languages
English (en)
Inventor
Hideho SAKAGUCHI
Tetsuya Okamoto
Masanori Ukibune
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Assigned to DAIKIN INDUSTRIES, LTD. reassignment DAIKIN INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: OKAMOTO, TETSUYA, SAKAGUCHI, Hideho, UKIBUNE, MASANORI
Publication of US20230332801A1 publication Critical patent/US20230332801A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/02Domestic hot-water supply systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1051Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
    • F24D19/1054Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/172Scheduling based on user demand, e.g. determining starting point of heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/212Temperature of the water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/238Flow rate
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/30Control of fluid heaters characterised by control outputs; characterised by the components to be controlled
    • F24H15/375Control of heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H4/00Fluid heaters characterised by the use of heat pumps
    • F24H4/02Water heaters
    • F24H4/04Storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/08Storage tanks

Definitions

  • Japanese Unexamined Patent Application Publication No. 2006-183947 discloses a hot water supply system including a hot water generation means such as a fuel cell or a gas engine, and a hot water storage tank that utilizes discharged heat of the hot water generation means.
  • This hot water supply system provides an optimum operation plan of the fuel cell by learning a pattern of hot water supply demand.
  • a first aspect is a hot water supply system that includes a hot water supply apparatus, a plurality of supply paths, and an estimation unit.
  • the hot water supply apparatus includes a heating apparatus configured to heat water, a tank configured to store the water heated by the heating apparatus, and a water circuit configured to circulate the water in the tank.
  • Each supply path is coupled to a corresponding one of a plurality of hot water supply targets and is configured to supply the water from the tank.
  • the estimation unit is configured to predict a total amount of hot water supply demand, based on time-series data of a first index that indicates an amount of heat of water used in each of the plurality of hot water supply targets.
  • FIG. 1 is an overall configuration diagram of a hot water supply system according to an embodiment.
  • FIG. 3 is a diagram illustrating a flow of refrigerant when the heating apparatus is in an operating state.
  • FIG. 4 is a flowchart illustrating an operation of the hot water supply system.
  • FIG. 5 is a graph illustrating a relationship between a total amount of hot water supply demand and control of an operation of the heating apparatus.
  • FIG. 6 is a block diagram of a hot water supply system according to a first modification of the embodiment.
  • FIG. 7 is a block diagram of a hot water supply system according to a second modification of the embodiment.
  • FIG. 8 is a flowchart illustrating an operation of the hot water supply system.
  • FIG. 9 is a block diagram of a hot water supply system according to a third modification of the embodiment.
  • FIG. 10 is a block diagram of a hot water supply system according to a fourth modification of the embodiment.
  • FIG. 11 is a flowchart illustrating an operation of the hot water supply system.
  • the present disclosure presents a hot water supply system ( 1 ).
  • the hot water supply system ( 1 ) heats water supplied from a water source and stores the heated water in a tank ( 40 ). Hot water stored in the tank ( 40 ) is supplied to a plurality of hot water supply targets ( 4 ).
  • the water source includes a water supply.
  • the hot water supply targets ( 4 ) include a bathtub, a shower, a faucet, and so on.
  • the hot water supply system ( 1 ) includes a heating apparatus ( 20 ), the tank ( 40 ), a water circuit ( 50 ), supply paths ( 5 ), a first pipe ( 6 ), pressure sensors ( 60 ), temperature sensors ( 61 , 63 ), and a control unit ( 30 ).
  • the heating apparatus ( 20 ) is of a heat pump type.
  • the heating apparatus ( 20 ) generates heat for heating water.
  • the heating apparatus ( 20 ) is of a vapor compression type.
  • the heating apparatus ( 20 ) includes a refrigerant circuit ( 21 ).
  • the refrigerant circuit ( 21 ) is filled with refrigerant.
  • the refrigerant circuit ( 21 ) includes a compressor ( 22 ), a heat-source-side heat exchanger ( 23 ), an expansion valve ( 24 ), and a utilization-side heat exchanger ( 25 ).
  • the compressor ( 22 ) compresses refrigerant suctioned thereto and discharges the compressed refrigerant.
  • the heat-source-side heat exchanger ( 23 ) is an air-cooled heat exchanger.
  • the heat-source-side heat exchanger ( 23 ) is disposed outdoors.
  • the heating apparatus ( 20 ) includes an outdoor fan ( 27 ).
  • the outdoor fan ( 27 ) is disposed in the vicinity of the heat-source-side heat exchanger ( 23 ).
  • the heat-source-side heat exchanger ( 23 ) allows air transported by the outdoor fan ( 27 ) and the refrigerant to exchange heat.
  • the expansion valve ( 24 ) is a decompression mechanism that decompresses the refrigerant.
  • the expansion valve ( 24 ) is provided between a liquid-side end of the utilization-side heat exchanger ( 25 ) and a liquid-side end of the heat-source-side heat exchanger ( 23 ).
  • the decompression mechanism is not limited to the expansion valve, and may be a capillary tube, an expander, or the like. The expander recovers energy of the refrigerant as power.
  • the utilization-side heat exchanger ( 25 ) is a liquid-cooled heat exchanger.
  • the utilization-side heat exchanger ( 25 ) includes a first flow path ( 25 a ) and a second flow path ( 25 b ).
  • the second flow path ( 25 b ) is coupled to the refrigerant circuit ( 21 ).
  • the first flow path ( 25 a ) is coupled to the water circuit ( 50 ).
  • the utilization-side heat exchanger ( 25 ) allows water flowing through the first flow path ( 25 a ) and the refrigerant flowing through the second flow path ( 25 b ) to exchange heat.
  • the first flow path ( 25 a ) is formed along the second flow path ( 25 b ).
  • a direction of the refrigerant flowing through the second flow path ( 25 b ) is substantially opposite to a direction of the water flowing through the first flow path ( 25 a ). That is, during the heating operation, the utilization-side heat exchanger ( 25 ) functions as a counter-current heat exchanger.
  • the tank ( 40 ) is a container that stores water.
  • the tank ( 40 ) has a vertically long cylindrical shape.
  • the tank ( 40 ) includes a body portion ( 41 ) that has a cylindrical shape, a bottom portion ( 42 ) that closes a lower end of the body portion ( 41 ), and a top portion ( 43 ) that closes an upper end of the body portion ( 41 ).
  • Water in the tank ( 40 ) circulates through the water circuit ( 50 ).
  • the first flow path ( 25 a ) of the utilization-side heat exchanger ( 25 ) is coupled to the water circuit ( 50 ).
  • the water circuit ( 50 ) includes an upstream flow path ( 51 ) and a downstream flow path ( 52 ).
  • An inflow end of the upstream flow path ( 51 ) is coupled to the bottom portion ( 42 ) of the tank ( 40 ).
  • An outflow end of the upstream flow path ( 51 ) is coupled to an inflow end of the first flow path ( 25 a ).
  • An inflow end of the downstream flow path ( 52 ) is coupled to an outflow end of the first flow path ( 25 a ).
  • An outflow end of the downstream flow path ( 52 ) is coupled to the top portion ( 43 ) of the tank ( 40 ).
  • the water circuit ( 50 ) includes a water pump ( 53 ).
  • the water pump ( 53 ) causes water to circulate through the water circuit ( 50 ).
  • the water pump ( 53 ) transports water in the tank ( 40 ) to send the water to the first flow path ( 25 a ) of the utilization-side heat exchanger ( 25 ).
  • the water pump ( 53 ) further transports the water to the first flow path ( 25 a ) to send the water to the tank ( 40 ).
  • An inflow end of the first pipe ( 6 ) is coupled to the tank ( 40 ).
  • An outflow end of the first pipe ( 6 ) is coupled to an inflow end of each of the plurality of supply paths ( 5 ).
  • An outflow end of each of the supply paths ( 5 ) is coupled to a corresponding one of the hot water supply targets ( 4 ).
  • the hot water supply system ( 1 ) includes the first temperature sensors ( 61 ) and the second temperature sensor ( 63 ).
  • the first temperature sensors ( 61 ) are provided at the respective hot water supply targets ( 4 ).
  • the first temperature sensors ( 61 ) each detect a temperature of water used in a corresponding one of the hot water supply targets ( 4 ).
  • the second temperature sensor ( 63 ) is provided at the inflow end of the first pipe ( 6 ).
  • the second temperature sensor ( 63 ) detects a temperature of water flowing into the first pipe ( 6 ) from the tank ( 40 ).
  • the control unit ( 30 ) illustrated in FIG. 2 includes a microcomputer and a memory device (specifically, a semiconductor memory) that stores software that causes the microcomputer to operate.
  • the control unit ( 30 ) is connected to various devices and sensors of a hot water supply apparatus ( 10 ) with cables or wirelessly.
  • the control unit ( 30 ) controls devices of the heating apparatus ( 20 ) and the water circuit ( 50 ).
  • the devices of the water circuit ( 50 ) include the water pump ( 53 ).
  • the control unit ( 30 ) includes a storage unit ( 31 ), a first learning unit ( 32 ), an estimation unit ( 33 ), and a second learning unit ( 35 ).
  • the storage unit ( 31 ) stores time-series data of a first index.
  • the first index indicates an amount of heat of water used in each of the hot water supply targets ( 4 ).
  • the first index includes a temperature of water used in each of the hot water supply targets ( 4 ) and a pressure of water in each of the supply paths ( 5 ).
  • the time-series data of the first index is referred to as first time-series data.
  • the first time-series data is time-series data in the present disclosure.
  • a total amount of hot water supply demand means an amount of heat of water used by the entire hot water supply apparatus ( 10 ) in a predetermined time.
  • the total amount of hot water supply demand corresponds to a sum of amounts of heat of water used in the respective hot water supply targets ( 4 ).
  • the storage unit ( 31 ) stores an actual total amount of hot water supply demand as time-series data.
  • the actual total amount of hot water supply demand is determined by measuring, with a detection means, an amount of heat of water flowing out from the tank ( 40 ) to the first pipe ( 6 ). Specifically, the total amount of hot water supply demand is determined based on values obtained by the flow rate sensor ( 62 ) and the second temperature sensor ( 63 ).
  • the time-series data of the total amount of hot water supply demand stored in the storage unit ( 31 ) is referred to as second time-series data.
  • the first learning unit ( 32 ) learns the first time-series data of a predetermined period stored in the storage unit ( 31 ) and the second time-series data of the same time period as that of the first time-series data in association with each other.
  • the first learning unit ( 32 ) performs learning through machine learning.
  • the estimation unit ( 33 ) predicts an amount of hot water supply demand, based on the first time-series data. Specifically, the estimation unit ( 33 ) predicts the total amount of hot water supply demand, based on a result of learning performed by the first learning unit ( 32 ). More specifically, the estimation unit ( 33 ) predicts the total amount of hot water supply demand by using a trained estimation model (M 1 ) that has learned, through machine learning, the first time-series data and the second time-series data stored in the storage unit ( 31 ) in association with each other. The estimation unit ( 33 ) predicts, for example, the total amount of hot water supply demand for the next day which is a predetermined time. As illustrated in FIG. 5 , the total amount of hot water supply demand predicted by the estimation unit ( 33 ) may be time-series data that changes on a certain time (for example, hourly) basis.
  • the estimation model (M 1 ) is included in the estimation unit ( 33 ).
  • the estimation model (M 1 ) is generated to predict, based on the first time-series data, the total amount of hot water supply demand.
  • the estimation model (M 1 ) is constructed as a multilayer neural network that has acquired a prediction capability through machine learning.
  • the estimation model (M 1 ) in the present embodiment is generated through “supervised learning”.
  • the neural network for generating the estimation model (M 1 ) performs learning using learning data and a discriminant function.
  • the learning data is a set of pairs of input data and training data corresponding to the input data.
  • the input data is the first time-series data of a predetermined period stored in the storage unit ( 31 ). Specifically, the input data is time-series data of the pressure of water in each of the supply paths ( 5 ) in a predetermined period and time-series data of the temperature of water used in the hot water supply target ( 4 ) connected to the supply path ( 5 ).
  • the training data is the second time-series data in the same period as that of the input data.
  • the neural network is caused to perform “supervised learning” using the learning data described above, so that the trained estimation model (M 1 ) is generated as a result of learning.
  • the estimation unit ( 33 ) predicts the total amount of hot water supply demand by using the trained estimation model (M 1 ).
  • the estimation unit ( 33 ) inputs, to the trained estimation model (M 1 ), the first time-series data of a predetermined period (for example, one week up to the previous day) stored in the storage unit ( 31 ), to output the total amount of hot water supply demand. In this way, the estimation unit ( 33 ) predicts the total amount of hot water supply demand.
  • the second learning unit ( 35 ) learns the total amount of hot water supply demand and the operation state of the heating apparatus ( 20 ) in association with each other.
  • the second learning unit ( 35 ) performs learning through machine learning.
  • the control unit ( 30 ) controls the operation of the heating apparatus ( 20 ), based on a result of learning performed by the second learning unit ( 35 ). Specifically, the control unit ( 30 ) controls the operation of the heating apparatus ( 20 ) by using an operation prediction model (M 2 ).
  • the control unit ( 30 ) includes the operation prediction model (M 2 ).
  • the operation prediction model (M 2 ) is generated through machine learning to predict, based on the total amount of hot water supply demand, control of the operation of the heating apparatus ( 20 ).
  • the control unit ( 30 ) controls the operation of the heating apparatus ( 20 ) by using such a trained operation prediction model (M 2 ).
  • the operation prediction model (M 2 ) is generated through “reinforcement learning”. Specifically, the second learning unit ( 35 ) sets electricity cost per day as a reward and sets the operation state of the heating apparatus ( 20 ) as a state variable.
  • the operation state of the heating apparatus ( 20 ) refers to, for example, an ON state or an OFF state of the heating apparatus ( 20 ).
  • the second learning unit ( 35 ) inputs, as input data, the second time-series data of a predetermined period to the operation prediction model (M 2 ).
  • the second learning unit ( 35 ) performs learning such that the electricity cost for the operation of the heating apparatus ( 20 ) for one day is minimized.
  • the total amount of hot water supply demand predicted by the estimation unit ( 33 ) is input to the trained operation prediction model (M 2 ) thus generated, so that the operation of the heating apparatus ( 20 ) is controlled such that the power is minimized.
  • the control unit ( 30 ) controls the heating apparatus ( 20 ) to perform a heating operation. Specifically, the control unit ( 30 ) causes the compressor ( 22 ) and the outdoor fan ( 27 ) to operate. The control unit ( 30 ) appropriately adjusts an opening degree of the expansion valve ( 24 ). The control unit ( 30 ) causes the water pump ( 53 ) to operate.
  • the refrigerant compressed by the compressor ( 22 ) flows through the second flow path ( 25 b ) of the utilization-side heat exchanger ( 25 ).
  • the refrigerant in the second flow path ( 25 b ) dissipates heat to water in the first flow path ( 25 a ).
  • the pressure of the refrigerant that has dissipated heat or has condensed in the second flow path ( 25 b ) is reduced by the expansion valve ( 24 ).
  • the refrigerant then flows through the heat-source-side heat exchanger ( 23 ).
  • the refrigerant absorbs heat from outdoor air to evaporate.
  • the refrigerant that has evaporated in the heat-source-side heat exchanger ( 23 ) is suctioned by the compressor ( 22 ).
  • the water in the tank ( 40 ) flows out to the upstream flow path ( 51 ).
  • the water in the upstream flow path ( 51 ) flows through the first flow path ( 25 a ) of the utilization-side heat exchanger ( 25 ).
  • the water in the first flow path ( 25 a ) is heated by the refrigerant in the heating apparatus ( 20 ).
  • the heated water in the tank ( 40 ) flows through the predetermined supply path ( 5 ) through the first pipe ( 6 ).
  • the water flowing through the supply path ( 5 ) flows out to outside from the hot water supply target ( 4 ) coupled to the supply path ( 5 ).
  • step ST 1 the control unit ( 30 ) inputs the first time-series data of one week up to the previous day to the trained estimation model (M 1 ).
  • step ST 2 the control unit ( 30 ) outputs the total amount of hot water supply demand for the next day (future) from the trained estimation model (M 1 ).
  • the total amount of hot water supply demand output at this time is time-series data that changes on an hourly basis for the next day.
  • step ST 3 the control unit ( 30 ) inputs the total amount of hot water supply demand for the next day output in step ST 2 to the trained operation prediction model (M 2 ).
  • step ST 4 the control unit ( 30 ) outputs control of the operation of the heating apparatus ( 20 ) for the next day from the trained operation prediction model (M 2 ).
  • the control of the operation output at this time is, for example, an operation plan for setting the heating apparatus ( 20 ) in an ON state or an OFF state on an hourly basis for the next day as illustrated in FIG. 5 .
  • the control unit ( 30 ) controls the heating operation of the heating apparatus ( 20 ).
  • the heating apparatus ( 20 ) boils the water in the tank ( 40 ) so that an amount of hot water needed in each time period can be supplied to the hot water supply targets ( 4 ) based on the predicted total amount of hot water supply demand.
  • control unit ( 30 ) controls the heating operation of the heating apparatus ( 20 ) to boil the water in the tank ( 40 ) in accordance with the necessary amount of hot water in each time period after 15:00.
  • the prediction accuracy of the total amount of hot water supply demand of the house can be improved.
  • the amount of hot water supply of each of the hot water supply targets ( 4 ) to be used varies from household to household.
  • the predicted value of the amount of hot water supply for the household A affects the predicted value of the entire apartment housing.
  • the prediction accuracy of the amount of hot water supply for the other households may decrease.
  • the hot water supply system ( 1 ) of the present embodiment estimates the total amount of hot water supply demand of the entire apartment housing, based on the time-series data of the first index of each of the hot water supply targets ( 4 ) of each household in the apartment housing.
  • the prediction accuracy of the total amount of hot water supply demand of the entire apartment housing can be improved, and consequently the prediction accuracy of the total amount of hot water supply demand of each household can be improved.
  • the first learning unit ( 32 ) performs the learning through machine learning.
  • the total amount of hot water supply demand can be predicted based on a result of the learning obtained through machine learning.
  • the estimation unit ( 33 ) includes the estimation model (M 1 ) generated through machine learning to predict, based on the first time-series data, the total amount of hot water supply demand, and predicts the total amount of hot water supply demand by using the estimation model (M 1 ).
  • the trained estimation model (M 1 ) based on the first time-series data of a predetermined period is generated through supervised learning. By using such a trained estimation model (M 1 ), the prediction accuracy of the total amount of hot water supply demand can be improved for sure.
  • the trained estimation model (M 1 ) is updated through sequential learning.
  • the number of times of the use of the hot water supply system ( 1 ) increases, the number of times of the update of the trained estimation model (M 1 ) also increases.
  • the prediction accuracy of the total amount of hot water supply demand output from the trained estimation model (M 1 ) can be improved.
  • the first index includes the temperature of the water used in each of the plurality of hot water supply targets ( 4 ) and the pressure of the water in each of the supply paths ( 5 ).
  • the trained estimation model (M 1 ) can be generated through supervised learning by using, as input data, the time-series data of the temperature of the water used in each of the hot water supply targets ( 4 ) and the time-series data of the pressure of the water in the supply path ( 5 ) connected to the hot water supply target ( 4 ) and by using, as training data, the second time-series data.
  • the hot water supply system ( 1 ) of the embodiment includes the control unit ( 30 ) that controls the operation of the heating apparatus ( 20 ), based on the total amount of hot water supply demand.
  • the heating apparatus ( 20 ) can perform the operation according to the amount of heat of water needed by the hot water supply targets ( 4 ) in each time period of the next day.
  • the hot water supply system ( 1 ) of the embodiment includes the second learning unit ( 35 ) that learns the total amount of hot water supply demand and the operation state of the heating apparatus ( 20 ) in association with each other.
  • the control unit ( 30 ) controls the operation of the heating apparatus ( 20 ), based on a result of the learning performed by the second learning unit ( 35 ).
  • the operation of the heating apparatus ( 20 ) can be controlled based on the result of the learning performed by the second learning unit ( 35 ).
  • the second learning unit ( 35 ) performs the learning through machine learning.
  • the control of the operation of the heating apparatus ( 20 ) can be predicted based on a result of the learning obtained through machine learning.
  • the control unit ( 30 ) includes the operation prediction model (M 2 ) generated through machine learning to predict, based on the total amount of hot water supply demand, control of the operation of the heating apparatus ( 20 ), and controls the operation of the heating apparatus ( 20 ) by using the operation prediction model (M 2 ).
  • the heating apparatus ( 20 ) can be operated with high efficiency and the operation of the heating apparatus ( 20 ) can be controlled so that the electricity cost per day is minimized as compared with past electricity cost. Since the operation of the heating apparatus ( 20 ) can be controlled in accordance with the total amount of hot water supply demand, running out of hot water in the tank ( 40 ) can be suppressed while hot water is being supplied.
  • the trained operation prediction model (M 2 ) is updated through sequential learning.
  • the number of times of the use of the hot water supply system ( 1 ) increases, the number of times of the update of the trained operation prediction model (M 2 ) also increases.
  • control of the operation that achieves reduced electricity cost can be predicted.
  • the electricity cost per day can be made low.
  • the heating apparatus ( 20 ) is of a heat pump type.
  • the risk of running out of hot water can be reduced and a highly efficient operation can be performed.
  • the estimation unit ( 33 ) includes the trained estimation model (M 1 ) that has performed learning in advance.
  • M 1 the trained estimation model
  • the control unit ( 30 ) does not include the first learning unit ( 32 ).
  • the estimation model (M 1 ) of the present modification is generated in advance to predict, based on the first time-series data, the total amount of hot water supply demand before the hot water supply system ( 1 ) is used by a user (before shipment of the hot water supply system ( 1 )).
  • the estimation model (M 1 ) of the present modification is also generated through “supervised learning”.
  • Predetermined learning data stored in a data server is input to the estimation model (M 1 ).
  • the input data includes nationwide user information (the number of family members, the age and gender of each family member, and residential area), information on the hot water supply targets ( 4 ) owned by each user (the number of hot water supply targets, types of the hot water supply targets ( 4 ), and faucet information), the time-series data of the pressure of the water in the supply path ( 5 ) coupled to each of the hot water supply targets ( 4 ) of the hot water supply system ( 1 ) owned by each user, and the time-series data of the temperature of the water used in the hot water supply target.
  • the training data is the second time-series data stored in the data server.
  • the data server stores time-series data of past several years.
  • the neural network is caused to perform “supervised learning” by using such learning data.
  • the trained estimation model (M 1 ) of the present modification is generated as a result of learning.
  • the estimation unit ( 33 ) predicts the total amount of hot water supply demand by using the trained estimation model (M 1 ).
  • the storage unit ( 31 ) stores user data.
  • the user data includes information such as a family structure (such as the number of family members and the age and gender of each family member) and a residential area.
  • the hot water supply system ( 1 ) of the present modification also predicts the total amount of hot water supply demand, based on the first time-series data of each hot water supply target, and thus can improve the prediction accuracy of the total amount of hot water supply demand.
  • the trained estimation model (M 1 ) of the present modification is generated by using the first time-series data of nationwide users stored in the data server.
  • the hot water supply system ( 1 ) already includes the trained estimation model (M 1 ) at the time of shipment, the user can use the hot water supply system ( 1 ) having a high prediction accuracy of the total amount of hot water supply demand from the start of use.
  • the hot water supply system ( 1 ) of the present modification predicts the total amount of hot water supply demand by using a predetermined logical expression.
  • An amount of hot water supply demand means an amount of heat of water for each of the hot water supply targets ( 4 ) used in a predetermined period.
  • the amount of hot water supply demand corresponds to a total amount of heat of water used in each of the hot water supply targets ( 4 ).
  • the hot water supply system ( 1 ) of the present modification predicts the amount of hot water supply demand of each of the hot water supply targets ( 4 ), based on time-series data of an amount of heat of water used in the hot water supply target ( 4 ) in a predetermined period.
  • the hot water supply system ( 1 ) then predicts the total amount of hot water supply demand, based on the predicted amounts of hot water supply demand of the respective hot water supply targets ( 4 ).
  • the control unit ( 30 ) includes a calculation unit ( 34 ).
  • the control unit ( 30 ) of the present modification does not include the estimation model (M 1 ).
  • the first learning unit ( 32 ) does not perform machine learning.
  • the calculation unit ( 34 ) determines time-series data of the amount of hot water supply demand of each of the hot water supply targets ( 4 ) in a predetermined period, based on the first time-series data stored in the storage unit ( 31 ).
  • the estimation unit ( 33 ) predicts the amount of hot water supply demand of each of the hot water supply targets ( 4 ), based on the amount of hot water supply demand of the hot water supply target ( 4 ) in the predetermined period determined by the calculation unit ( 34 ).
  • the amount of hot water supply demand of each of the hot water supply targets ( 4 ) is predicted by using a predetermined logical expression and a first coefficient.
  • the total amount of hot water supply demand predicted by the estimation unit ( 33 ) may be time-series data that changes on a certain time (for example, hourly) basis for the next day.
  • the estimation unit ( 33 ) predicts the total amount of hot water supply demand, based on the predicted amounts of hot water supply demand of the respective hot water supply targets ( 4 ).
  • the total amount of hot water supply demand is predicted by using a predetermined logical expression and a second coefficient.
  • the first learning unit ( 32 ) inputs the first coefficient and the second coefficient to the estimation unit ( 33 ).
  • the first learning unit ( 32 ) adjusts the first coefficient to reduce a residual between the amount of hot water supply demand in a predetermined period predicted by the estimation unit ( 33 ) for each of the hot water supply targets ( 4 ) and the amount of hot water supply demand actually used in the predetermined period.
  • the first learning unit ( 32 ) inputs the adjusted first coefficient to the estimation unit ( 33 ).
  • the first learning unit ( 32 ) adjusts the second coefficient to reduce a residual between the total amount of hot water supply demand in a predetermined period predicted by the estimation unit ( 33 ) and the total amount of hot water supply demand actually used in the predetermined period.
  • the first learning unit ( 32 ) inputs the second coefficient to the estimation unit ( 33 ). Operation of Hot Water Supply System
  • steps ST 24 to ST 26 are the same as steps ST 3 to ST 5 of the above-described embodiment, respectively, description thereof is omitted.
  • step ST 21 the control unit ( 30 ) determines, based on the first time-series data of a predetermined period (for example, one week up to the previous day) stored in the storage unit ( 31 ), time-series data of the amount of hot water supply demand of each of the hot water supply targets ( 4 ) in the period.
  • a predetermined period for example, one week up to the previous day
  • step ST 22 the control unit ( 30 ) predicts, by using the predetermined logical expression and the first coefficient, the amount of hot water supply demand of each of the hot water supply targets ( 4 ) for the next day, from the time-series data of the amount of hot water supply demand determined in step ST 21 .
  • step ST 23 the control unit ( 30 ) predicts the total amount of hot water supply demand for the next day from the amounts of hot water supply demand of the respective hot water supply targets ( 4 ) for the next day predicted in step ST 22 .
  • step ST 27 the control unit ( 30 ) adjusts the first coefficient to reduce a prediction error, based on the residual between the amount of hot water supply demand of each of the hot water supply targets ( 4 ) predicted in step ST 22 and the amount of hot water supply demand of the hot water supply target ( 4 ) actually used.
  • the control unit ( 30 ) inputs the adjusted first coefficient to the estimation unit ( 33 ).
  • step ST 28 the control unit ( 30 ) adjusts the predetermined second coefficient to reduce a prediction error, based on the residual between the total amount of hot water supply demand predicted in step ST 23 and the total amount of hot water supply demand actually used.
  • the control unit ( 30 ) inputs the adjusted second coefficient to the estimation unit ( 33 ).
  • the present modification by repeating the adjustment of input of the first coefficient for prediction of the amount of hot water supply demand of each of the hot water supply targets ( 4 ), the residual between the predicted amount of hot water supply demand of each of the hot water supply targets ( 4 ) and the amount of hot water supply demand of the hot water supply target ( 4 ) actually used can be reduced. Further, by repeating the adjustment of input of the second coefficient, the residual between the predicted amount of hot water supply demand and the hot water supply demand actually used can be reduced, and consequently the prediction accuracy of the total amount of hot water supply demand can be improved.
  • control unit ( 30 ) includes the trained operation prediction model (M 2 ) that has performed learning in advance.
  • M 2 the trained operation prediction model
  • the control unit ( 30 ) of the present modification does not include the second learning unit ( 35 ).
  • the operation prediction model (M 2 ) of the present modification is generated in advance to predict control of the operation based on the total amount of hot water supply demand before the hot water supply system ( 1 ) is used by a user (before shipment of the hot water supply system ( 1 )).
  • the operation prediction model (M 2 ) of the present modification is also generated through “reinforcement learning”.
  • the input data (such as nationwide user information (the number of family members, the age and gender of each family member, and residential area), information on the hot water supply targets ( 4 ) owned by each user (the number of hot water supply targets, type of the hot water supply targets, and faucet information), and the total amount of hot water supply demand of each user) stored in the data server of the above-described embodiment is input to the operation prediction model (M 2 ).
  • the electricity cost per day is set as the reward and the operation state of the heating apparatus ( 20 ) is set as the state variable, so that the trained operation prediction model (M 2 ) that has performed learning to minimize the electricity cost for the operation of the heating apparatus ( 20 ) per day is generated.
  • control of the operation of the heating apparatus ( 20 ) to minimize the electric power is output.
  • the heating apparatus ( 20 ) can be controlled so that the electricity cost per day is minimized as compared with the past electricity cost.
  • the trained operation prediction model (M 2 ) of the present modification is generated by using the total amount of hot water supply demand of nationwide users stored in the data server.
  • control of the operation of the heating apparatus ( 20 ) can be predicted which reduces the electricity cost more according to the user than in the case of inputting the total amount of hot water supply demand alone.
  • the hot water supply system ( 1 ) already includes the trained operation prediction model (M 2 ) at the time of shipment, the user can use the hot water supply system ( 1 ) that can control the operation of the heating apparatus ( 20 ) to reduce the electricity cost per day from the start of use.
  • the hot water supply system ( 1 ) of the present modification predicts control of the operation of the heating apparatus ( 20 ) from the total amount of hot water supply demand based on predetermined control.
  • a configuration different from those of the above-described embodiment and modifications will be described below.
  • the control unit ( 30 ) includes a run-out-of-hot-water determining unit ( 36 ).
  • the control unit ( 30 ) does not include the operation prediction model (M 2 ).
  • the run-out-of-hot-water determining unit ( 36 ) determines that there is no water in the tank ( 40 ) (hot water has run out).
  • the second learning unit ( 35 ) learns control of the operation of the heating apparatus ( 20 ) for reducing a risk of running out of hot water, based on the total amount of hot water supply demand. Specifically, if there is a time when hot water has run out as a result of controlling the operation state of the heating apparatus ( 20 ) based on the total amount of hot water supply demand predicted by the estimation unit ( 33 ), the second learning unit ( 35 ) corrects the control of the operation of the heating apparatus ( 20 ) performed on that day. Based on such a feedback, the second learning unit ( 35 ) corrects the control of the operation of the heating apparatus ( 20 ) and predicts control of the operation of the heating apparatus ( 20 ) for the next day.
  • steps ST 41 and ST 42 are the same as steps ST 1 and ST 2 of the above-described embodiment, respectively, description thereof is omitted.
  • step ST 43 the control unit ( 30 ) predicts control of the operation of the heating apparatus ( 20 ), based on the total amount of hot water supply demand estimated by the estimation unit ( 33 ).
  • step ST 44 the control unit ( 30 ) controls the heating apparatus ( 20 ) to perform control of the operation predicted in step ST 43 .
  • step ST 45 the control unit ( 30 ) determines whether running out of hot water occurs while hot water is being supplied to the hot water supply target(s) ( 4 ). If running out of hot water occurs (YES in step ST 45 ), the control unit ( 30 ) controls the heating apparatus ( 20 ) to boil the water supplied to the tank ( 40 ) (step ST 44 ). If running out of hot water does not occur (NO in step ST 45 ), step ST 46 is performed.
  • step ST 46 the control unit ( 30 ) determines whether the operation of the heating apparatus ( 20 ) for one day has ended. If the operation has ended (YES in step ST 46 ), step ST 47 is performed. If the operation has not ended (NO in step ST 46 ), step ST 44 is performed again.
  • step ST 47 the control unit ( 30 ) determines whether running out of hot water has occurred in the operation of the heating apparatus ( 20 ) for the day. If running out of hot water has occurred (YES in step ST 47 ), step ST 48 is performed.
  • step ST 48 the control unit ( 30 ) corrects the control of the operation, based on the occurrence time of running out of hot water, the amount of water that has been boiled, the boiling temperature, and so on.
  • control unit ( 30 ) corrects the control of the operation of the heating apparatus ( 20 ) at each occurrence of running out of hot water. By predicting control of the operation, based on such a correction, the risk of running out of hot water on the next day can be reduced.
  • the first index may be a temperature of water used in each of the hot water supply targets ( 4 ) and an amount of water in the supply path ( 5 ) connected to the hot water supply target ( 4 ).
  • each of the supply paths ( 5 ) is provided with a flow rate sensor (not illustrated) that measures a flow rate of water.
  • the flow rate sensor is connected to the control unit ( 30 ) with a cable or wirelessly.
  • the first index may be an amount of heat of water used in each of the hot water supply targets ( 4 ).
  • the time-series data of the amount of heat of water used in each of the hot water supply targets ( 4 ) may be determined based on time-series data of the temperature of water used in the hot water supply target ( 4 ) and time-series data of a pressure of water in the supply path ( 5 ) coupled to the hot water supply target ( 4 ).
  • the time-series data of the amount of heat of water used in each of the hot water supply targets ( 4 ) may be determined based on time-series data of the temperature of water used in the hot water supply target ( 4 ) and time-series data of an amount of water in the supply path ( 5 ) coupled to the hot water supply target ( 4 ).
  • the time-series data of the amount of heat of water used in each of the hot water supply targets ( 4 ) is input to the estimation model (M 1 ) as input data.
  • the operation state of the heating apparatus ( 20 ) which is set as the state variable, may be a rotation speed of the compressor ( 22 ), a condensation temperature of the utilization-side heat exchanger ( 25 ), an opening degree of the expansion valve ( 24 ), or the like.
  • the control unit ( 30 ) increases the rotation speed of the compressor ( 22 ) to heat water in the tank ( 40 ), or decreases the opening degree of the expansion valve ( 24 ) to suppress an increase in the condensation temperature of the utilization-side heat exchanger ( 25 ) and thus to suppress heating of the water in the tank ( 40 ).
  • the hot water supply system ( 1 ) may include a predetermined sensor (not illustrated) capable of directly detecting an amount of heat of water used in each of the hot water supply targets ( 4 ).
  • a predetermined sensor capable of directly detecting an amount of heat of water used in each of the hot water supply targets ( 4 ).
  • the time-series data of the amount of heat of water used in each of the hot water supply targets ( 4 ) detected not by the calculation unit ( 34 ) but by the sensor is input to the estimation model (M 1 ).
  • the input data input to the estimation model (M 1 ) may include at least one of the number of hot water supply targets ( 4 ), types of the hot water supply targets ( 4 ), and specifications of faucets of the hot water supply targets ( 4 ).
  • the total amount of hot water supply demand can be predicted based on the hot water supply target ( 4 ) whose type is specified and the first time-series data of the hot water supply target ( 4 ).
  • the hot water supply targets ( 4 ) are a bathtub and a shower
  • the bathtub (filling the bathtub with hot water) and the shower are often used at the same time or in relatively close time periods (before and during bathing).
  • the first learning unit ( 32 ) can learn the total amount of hot water supply demand in consideration of the amount of hot water supply demand of the shower, based on the first time-series data of the bathtub, and can also learn the total amount of hot water supply demand in consideration of the amount of hot water supply demand of the bathtub, based on the first time-series data of the shower.
  • the trained estimation model (M 1 ) that has been trained in this way, the risk of running out of hot water can be reduced.
  • the total amount of hot water supply demand predicted by the estimation unit ( 33 ) may be an amount of heat of water to be used by the hot water supply apparatus ( 10 ) only in a predetermined time period (for example, one hour from a certain time on the next day).
  • the second time-series data may be determined based on a change in the temperature of hot water stored in the tank ( 40 ).
  • a stored hot water temperature sensor (not illustrated) is provided in the tank ( 40 ).
  • the stored hot water temperature sensor is connected to the control unit ( 30 ) with a cable or wirelessly. For example, when a temperature value obtained by the stored hot water temperature sensor decreases, the decrease indicates that hot water is supplied from the tank ( 40 ) and water is supplied to the tank ( 40 ).
  • the amount of heat of water that has flowed out from the tank ( 40 ) can be determined based on how much the temperature detected by the stored hot water temperature sensor has decreased.
  • the estimation unit ( 33 ) may estimate the total amount of hot water supply demand, based on an amount (amounts) of used hot water in a selected one (selected ones) of the hot water supply targets ( 4 ).
  • the prediction accuracy of the total amount of hot water supply demand can be improved by omitting a noise-like hot water supply target that decreases the prediction accuracy.
  • the estimation model (M 1 ) can also be generated through “unsupervised learning”.
  • the neural network repeats a learning operation of grouping a plurality of pieces of input data into a plurality of classifications by clustering so that pieces of input data (total amounts of hot water supply demand) similar to one another are classified into the same classification.
  • the trained estimation model (M 1 ) can be generated without using training data.
  • the estimation model (M 1 ) may be generated through “reinforcement learning”.
  • the storage unit ( 31 ) does not have to be provided in the control unit ( 30 ).
  • the storage unit ( 31 ) may be provided in a predetermined server that can communicate with the control unit ( 30 ).
  • the operation prediction model (M 2 ) may be generated through “supervised learning” or “unsupervised learning”.
  • the first learning unit ( 32 ) may perform learning by using a learning method other than those used in the above-described embodiment and modifications.
  • the second learning unit ( 35 ) may perform learning by using a learning method other than those used in the above-described embodiment and modifications.
  • the present disclosure is useful for a hot water supply system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluid Mechanics (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
US18/214,849 2020-12-28 2023-06-27 Hot water supply system Pending US20230332801A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2020218484A JP7108210B2 (ja) 2020-12-28 2020-12-28 給湯システム
JP2020-218484 2020-12-28
PCT/JP2021/047399 WO2022145297A1 (ja) 2020-12-28 2021-12-21 給湯システム

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/047399 Continuation WO2022145297A1 (ja) 2020-12-28 2021-12-21 給湯システム

Publications (1)

Publication Number Publication Date
US20230332801A1 true US20230332801A1 (en) 2023-10-19

Family

ID=82260443

Family Applications (1)

Application Number Title Priority Date Filing Date
US18/214,849 Pending US20230332801A1 (en) 2020-12-28 2023-06-27 Hot water supply system

Country Status (7)

Country Link
US (1) US20230332801A1 (https=)
EP (1) EP4249826B1 (https=)
JP (2) JP7108210B2 (https=)
CN (1) CN116710713A (https=)
CA (1) CA3203244A1 (https=)
ES (1) ES3032879T3 (https=)
WO (1) WO2022145297A1 (https=)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4675192A3 (en) * 2024-06-14 2026-04-29 Regal Beloit America, Inc. Hybrid water heater system and methods of use

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4148419B2 (ja) 2004-12-28 2008-09-10 東京瓦斯株式会社 コージェネレーションシステム及び制御方法
CN100520190C (zh) * 2007-09-29 2009-07-29 江苏天舒电器有限公司 热泵热水系统动态节能运行的预测与控制方法
WO2011024311A1 (ja) 2009-08-31 2011-03-03 株式会社 東芝 給湯装置
JP5595794B2 (ja) * 2010-06-02 2014-09-24 関西電力株式会社 給湯システム
JP5220082B2 (ja) 2010-11-01 2013-06-26 三菱電機株式会社 給湯機の制御装置、制御システム、制御プログラム、及び制御方法
JP5507615B2 (ja) * 2012-05-25 2014-05-28 大阪瓦斯株式会社 コージェネレーションシステム
JP2014149094A (ja) 2013-01-30 2014-08-21 Noritz Corp 給湯装置
JP6052342B2 (ja) 2015-06-10 2016-12-27 三菱電機株式会社 貯湯式給湯システム
JP6977332B2 (ja) 2017-06-26 2021-12-08 株式会社ノーリツ 貯湯給湯装置
JP7013854B2 (ja) * 2017-12-26 2022-02-01 株式会社ノーリツ 貯湯給湯装置
JP7125001B2 (ja) 2018-03-26 2022-08-24 株式会社ノーリツ 貯湯給湯装置
JP7110730B2 (ja) * 2018-05-29 2022-08-02 株式会社ノーリツ 貯湯給湯装置
JP7292081B2 (ja) 2019-03-28 2023-06-16 大阪瓦斯株式会社 制御システム
CN110822724B (zh) * 2019-12-03 2021-03-16 美的集团股份有限公司 热水器用水量预测方法及装置、热水器及电子设备

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4675192A3 (en) * 2024-06-14 2026-04-29 Regal Beloit America, Inc. Hybrid water heater system and methods of use

Also Published As

Publication number Publication date
JP2022103697A (ja) 2022-07-08
ES3032879T3 (en) 2025-07-28
CA3203244A1 (en) 2022-07-07
EP4249826A4 (en) 2024-05-01
JP2022137204A (ja) 2022-09-21
JP7633534B2 (ja) 2025-02-20
CN116710713A (zh) 2023-09-05
JP7108210B2 (ja) 2022-07-28
WO2022145297A1 (ja) 2022-07-07
EP4249826A1 (en) 2023-09-27
EP4249826B1 (en) 2025-05-14

Similar Documents

Publication Publication Date Title
CN113785162B (zh) 蓄热系统
US9182154B2 (en) Adaptive control of vapor compression system
US9234686B2 (en) User control interface for heat transfer system
KR101222331B1 (ko) 히트 펌프식 급탕기
US20120253543A1 (en) Controlling Operations of Vapor Compression System
CN105518397A (zh) 采用来自空气调节系统的制冷剂加热水的装置和方法
US11226135B2 (en) Control apparatus and method for combination space and water heating
US11644215B2 (en) Systems and methods for flow control in an HVAC system
US20230332801A1 (en) Hot water supply system
JP7093031B2 (ja) 情報処理装置、情報処理方法、及びプログラム
Zhuang et al. Risk-based online robust optimal control of air-conditioning systems for buildings requiring strict humidity control considering measurement uncertainties
WO2022168042A1 (en) Methods and systems for predictive heated water provision
US12222135B2 (en) Methods and systems for predictive heated water provision
Murrieum et al. Building energy performance prediction using machine learning: A data-driven decision-making framework for energy retrofits
JPH0666463A (ja) 熱源機の台数制御装置
WO2019016845A1 (ja) 給湯装置
CN101598378B (zh) 空调控制装置和空调控制方法
CN117146344A (zh) 用于对室内空气进行调节的终端单元
Jung et al. Analysis of the impact of supply air temperature on outdoor unit power consumption in EHP-AHU systems and development of a DNN-Based predictive model
JP6111871B2 (ja) デマンドレスポンスシステム
JP5038641B2 (ja) 熱源装置、その熱媒流量の制御方法及び制御プログラム
US11092354B2 (en) Systems and methods for flow control in an HVAC system
WO2025102158A1 (en) Duty based modulating hydronic circuit technology method and apparatus for optimized configuration of multiple heat pumps
CN120986655A (zh) 加热控制方法、空调系统、空调设备及船舶
CN117948693A (zh) 空气源热泵的控制方法、装置、设备和存储介质

Legal Events

Date Code Title Description
AS Assignment

Owner name: DAIKIN INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SAKAGUCHI, HIDEHO;OKAMOTO, TETSUYA;UKIBUNE, MASANORI;REEL/FRAME:064084/0716

Effective date: 20230519

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION