US20170372438A1 - Power grid system and method of consolidating power injection and consumption in a power grid system - Google Patents
Power grid system and method of consolidating power injection and consumption in a power grid system Download PDFInfo
- Publication number
- US20170372438A1 US20170372438A1 US15/520,914 US201515520914A US2017372438A1 US 20170372438 A1 US20170372438 A1 US 20170372438A1 US 201515520914 A US201515520914 A US 201515520914A US 2017372438 A1 US2017372438 A1 US 2017372438A1
- Authority
- US
- United States
- Prior art keywords
- power
- power grid
- load
- intermittent
- supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computing arrangements based on specific mathematical models
- G06N7/01—Probabilistic graphical models, e.g. probabilistic networks
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/10—Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
- G06Q20/102—Bill distribution or payments
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/14—Payment architectures specially adapted for billing systems
- G06Q20/145—Payments according to the detected use or quantity
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- H02J13/0086—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H02J3/383—
-
- H02J3/386—
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2639—Energy management, use maximum of cheap power, keep peak load low
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/221—General power management systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/20—Information technology specific aspects, e.g. CAD, simulation, modelling, system security
Definitions
- the present invention relates broadly to a power grid system and to a method of consolidating power generation and consumption in a power grid system.
- a generator such as a coal-fired power plant or another combustion engine supply power to the power network pool through a power grid network as adjusted by the load demand on the power grid network.
- Generation of power from auxiliary generators associated with the buildings load may be performed independently of the mains power grid system as an embedded generator to the building solely reducing the total energy drawn by the buildings loads from the power network.
- a solar power system may be connected directly through the buildings distribution board to supply the buildings loads with priority to the power grid.
- intermittent sources for power generation may be used together with dispatchable sources such as coal-fired power plant or another combustion engine to contribute to the power network pool, i.e. in meeting the overall demand experienced in the mains power grid system.
- dispatchable sources such as coal-fired power plant or another combustion engine to contribute to the power network pool, i.e. in meeting the overall demand experienced in the mains power grid system.
- the availability of an environmental resource at a particular time local to the generator eg. the flow of water or sunlight incident on a photovoltaic (PV) plate
- PV photovoltaic
- Embodiments of the present invention provide a power grid system and a method of consolidating power generation and consumption in a power grid system that seek to address at least one of the above problems.
- a power grid system comprising a power grid; at least one load connected to the power grid; a first meter configured for metering power imported from the power grid to the load; at least one intermittent power source connected to the power grid, a second meter configured for metering power generated by the intermittent power source; and a consolidation unit configured for associating readings from the first and second meters such that at least a portion of the power generated by the intermittent power source is offsettable with the power imported from the power grid to the load.
- a method of consolidating power injection and consumption in a power grid system comprising metering power imported from a power grid to a load using a first meter; metering power generated by an intermittent power source connected to the power grid using a second meter; and associating readings from the first and second meters such that at least a portion of the power generated by the intermittent power source is offsettable with the power imported from the power grid to the load.
- FIG. 1 shows a schematic drawing illustrating a power grid system 100 according to an example embodiment.
- FIG. 2 shows a series of voltages on a network associated with electrical conduction through various voltage transformers, each voltage level associated to a particular market settlement pool (e.g. Low Voltage, High Voltage, Extra High Voltage, etc.).
- a particular market settlement pool e.g. Low Voltage, High Voltage, Extra High Voltage, etc.
- FIGS. 3 a ) and b ) show graphs illustrating power consumption by, and power supply to, loads in the power grid system 100 as a function of time over a specified period, according to an example embodiment.
- FIG. 4 shows a histogram illustrating the probabilistic capacity of supply from an intermittent source assuming one time bin interval of supply, according to an example embodiment.
- FIGS. 5 a )- c ) show a set of look-back supply profiles illustrating characteristic fluctuations in power capacity associated with particular time periods, according to an example embodiment.
- FIG. 6 shows a flow chart illustrating a method of consolidating power injection and consumption in a power grid system, according to an example embodiment.
- FIG. 1 shows a schematic drawing illustrating a power grid system 100 according to an example embodiment.
- the system 100 comprises a power grid 102 .
- the power grid 102 is associated through flow of electrons and holes through the network and is associated with various voltages defined through the placement of voltage transformers matching a corresponding specification.
- the mains supply for a load or loads connected to the power grid 102 is from a transformer 119 , as a step down from a higher voltage level.
- the application of transformers for establishing the various voltages on a power grid network is understood in the art and will not be described herein in any detail.
- FIG. 2 shows example voltage levels, e.g. Low Voltage 203 , High Voltage 204 , and Extra High Voltage 205 in a power grid network 200 .
- Each of the transformers 201 , 202 or the Extra High Voltage generator 206 can take the role of the transformer 119 illustrated in FIG. 1 .
- the power grid 102 establishes network used to transfer power among loads from various sources of electricity also establishes an energy market and settlement in a pool associated to the specific voltage range.
- the power grid system 100 further comprises a plurality of building connections e.g. 106 , 107 , each building connection e.g. 106 , 107 comprising power meters e.g. M 1 , M 3 , configured for metering power imported from the power grid 102 to a loads or loads 112 e.g. in the associated building 108 .
- each building connection e.g. 106 , 107 comprising power meters e.g. M 1 , M 3 , configured for metering power imported from the power grid 102 to a loads or loads 112 e.g. in the associated building 108 .
- One or more intermittent sources 114 are also connected to the power grid 102 .
- Meter M 2 is configured for metering power exported by the intermittent source 114 to the power grid 102 .
- the intermittent source 114 may for example be a photovoltaic (PV) power generator.
- the person skilled in the art could additionally adapt the following protocol where the interconnection of the source is through an intermediary or injective power to an intermediate grid connected apparatus.
- the source may inject power to a distribution board of a building attached to the grid, wherein the offset of power drawn by the building is in turn providing additional power at the grid from the supply of power through the intermittent source.
- the interconnection is referred to as “to the grid” but it is understood that for the purposes of establishing energy flow from an intermittent source to a load the consolidation unit may utilize the metering protocol described herein for a variety of kinds of interconnections of the source.
- electricity transactions to a specific load are performed by accounting for at least one of the loads own characteristic profile (in time and in capacity—referred to herein as a “load profile” or a “demand profile”) based on the reading from e.g. meters M 1 , M 3 , and accounting for a market based pricing scenario, such as an energy pool price and/or the relative level of energy demand at a specific point in time.
- Transactions on the market can be based on a particular period of time allocated to a time bin, for example one second, one minute, a half hour, or hour, etc.
- the National Electricity Market of Singapore accounts for energy supply and demand on a half hourly basis—i.e in thirty minute intervals.
- the given time bin during which energy settlements occur is referred to by the inventor below and it is understood that this particular period of time is associated with a given market and may be a variety of time periods.
- a characteristic generation of power from the intermittent source forms the retail basis for supply of power from the intermittent source 114 , such as a PV power generator, to the consumer associated with the building 108 /the loads e.g. 112 .
- the supply characteristic is referred to herein as a supply profile and accounts for fluctuations in the resources and energy supply over time as associated to a given intermittent energy source.
- the histogram 400 of FIG. 4 illustrates the probabilistic capacity of supply from an intermittent source assuming one time bin interval of supply.
- the total supply capacity at the specific time interval is associated with the probability of injection of power from the intermittent source and this distribution can be utilized for providing power to a load or loads connected to the power grid network.
- discrete probability models can be utilized to represent the supply characteristics of the intermittent source(s) and can be factored into a supply contract based on an associated demand profile of the load or loads. It will be appreciated by a person skilled in the art that a histogram illustrating probabilistic demand of the load(s) may be similarly derived.
- the supply from the intermittent source 114 can be delivered to a specific load or loads on the power grid 102 by providing an average amount of power distributed over more than one time bin for supply.
- This allows the supplier of power from the intermittent source 114 to associate the characteristics of their source in time and capacity to the consumer and formulate a contract to supply energy to the consumer on the basis of e.g. a maximum and minimum amount of power that may be delivered in any given time interval to the consumer, or a minimum average amount of power that can be delivered over a specified time period spanning at least more than one time interval.
- the supplier can in addition use an adjusted transaction for the power on a look back basis by receiving or delivering the consumer with energy settlement transactions on the basis of any modification of the actual supply of power over the look back period as compared to the projected supplies of power associated with specific time intervals, or with a combination of those intervals.
- the consumer advantageously avails themselves of an additional or supplemental power supply from the power grid 102 which offsets an alternative means of obtaining power from the power grid 102 , which may for example be based on a separate power retail arrangement.
- the total supply and demand characteristics of a given market may be accounted for using e.g. a consolidation unit 116 as will be described in more detail below.
- a consolidation unit 116 as will be described in more detail below.
- the supply of the intermittent source(s) advantageously reduces the amount of demand to be met from the second supply sources and thus the amount of cost associated with obtaining a supply of power from the second source(s).
- the second source(s) can be a conventional power source that may deliver power to the power network, e.g. a dispatchable power source, however, the second source(s) can also generally be associated with the wholesale pool, i.e. irrespective of the type of power source(s) that provide the power for the wholesale pool.
- Solar PV power is typically generated during peak demand periods, i.e. during the day time and in sunny, thus warm, conditions. This positively correlates to the total energy demand of a consumer, for example from air-conditioning units that cool the building e.g. 108 .
- industrial and commercial activities are typically performed during normal business hours, and thus the energy that is demanded from these activities is positively correlated in time to the supply of Solar PV power (on average). It is noted that by accounting for a clearness index and an irradiance index, the total intermittency of a Solar PV supply source can be determined on average for any given time bin for the supply of power to a load.
- the consumer may negotiate a favorable power supply contract with a secondary retailer in the market at the relevant voltage of the power grid 102 , since a peak demand that forms part of the power supply contract can be anticipated as lower than without the supply from the intermittent source 114 .
- a contestable retailer is obligated to procure wholesale electricity on the spot to fill the retail contract.
- the retailer bears a risk profile at the peak periods, which the retailer will consider in the terms of the supply contract offered to the consumer. If the consumer can anticipate a lower peak demand due to the power supply from the intermittent source 114 , then the risk profile considered by the retailer will be “reduced” in the sense that the retailer can expect having to procure wholesale electricity less often for this consumer, or at a lower capacity of demand on average and as associated with the probabilities of supply determined for the specific intermittent source, putting the contestable retailer in a position to offer more favorable terms based on observing a modified supply profile, and modified risk profile associated with such supply, as determined by observing the alternative supply demand characteristics of the energy pool.
- a consolidation unit 116 in the example embodiment is configured for determining power supplied or injected by the intermittent source into the power grid 102 on the basis of the reading from the meter M 2 .
- the consolidation unit 116 of the system 100 is also configured for determining power imported from the power grid 102 via the building connection e.g. 106 to the load or loads e.g. 112 at the relevant voltage of the power grid 102 , based on readings from the meter M 1 .
- the consolidation unit 116 in the example embodiment is configured to associate the readings from meter M 1 and M 2 such that respective time profiles of the power injected by the intermittent source 114 into the power grid 102 and of the power imported from the power grid 102 to the one or more loads e.g. 112 via the building connection e.g. 106 are associated with each other. At least a portion of the power injected by the intermittent source 114 into the power grid 102 through direct or indirect means, such as an intermediary, is offsetable against the power imported from the power grid 102 to the one or more loads e.g. 112 via the building connection e.g. 106
- the intermittent source 114 may produce and inject 50 kW over a specified consolidation or billing period via the meter M 2 into the power grid 102 .
- the loads e.g. 112 in the associated building 108 may consume 100 kW over the specified period.
- M 1 meters 100 kW were imported from the power grid 102 into the building 108 .
- the consolidation unit 116 i.e. a technical means to associate at least a portion of the power injected from the intermittent source into the power grid 102 with the power imported to the load or loads e.g. 112 in a time resolved manner, power from the intermittent source 114 can in effect be directly provided to a specific load or loads/consumed over the power grid 102 .
- FIG. 3 a shows a graph illustrating power consumption by, and power supply to, the load(s) e.g. 112 ( FIG. 1 ) as a function of time over a specified period.
- Curve 302 schematically shows the consumption by a load, chosen in this example on account of having the peaks e.g. 304 and troughs e.g. 306 coincide with day and night time respectively.
- power consumption is typically increased for e.g. an office building due to working hours and associated operation of appliances such as computers, printers, fans, air conditioning etc.
- Curve 308 schematically shows the PV power generation profile from the PV power generator 114 ( FIG. 1 ) during the specified period.
- the power generation peaks e.g. 310 coincide with the day time, while essentially no power is generated during the night time e.g. 312 . That is, the generation profile 308 and the consumption profile 302 of the chosen source/load pair (or pairs) are preferably matched.
- the matching can also involve controlling the load or a subset of the load so that the controlled consumption profile matches a particular generation profile of the intermittent source(s) and/or vice versa.
- Curve 314 schematically shows the portion of the power consumption that will be met by supply from the power grid 102 ( FIG. 1 ) using secondary energy source(s).
- the amount of power that needs to be met during the peak periods e.g. 304 is reduced accordingly.
- the contestable retailer is obligated to procure wholesale electricity on the spot to fill the retail contract.
- the retailer bears a risk profile at the peak periods e.g. 304 , which the retailer will consider in terms of the supply contract offered to the consumer. If the consumer can anticipate a lower peak demand due to the supplemental power supply from the PV power generator 114 ( FIG.
- an initial time profile of power to be supplied or injected into the power grid 102 may be based on calculations using the technical specifications of intermittent source 114 , and available and/or historical statistical environment conditions such as the total irradiance, day-light hours and intensity, the clearness index, cloud formation, weather conditions etc. at the location of a PV power generator or in proximity to that generator as an example of the intermittent source 114 over a time period.
- the formation of cloud cover within a few hours from the generator, and traveling in the direction of that generator can be used as a forward supply prediction data point.
- Various external data may be incorporated into the consolidation unit 116 to achieve additional refinements to the forward looking supply available from the intermittent source 114 , and can be adapted into the supply arrangement by varying characteristic profiles of associated demand and supply. In turn, this data may also be used to adapt a dispatch strategy actively given that the supply from intermittent sources has been predicted or refined.
- arrangements with consumers on the power grid 102 for supply of power via the power grid 102 can be made taking into account respective load profiles (demand profiles).
- the arrangements can be adjusted periodically, based on historic actual power supply data obtained by the consolidation unit 116 , thus continually improving the cost/actual supply balance of the retail arrangement.
- the supply profile can be changed by adding additional intermittent sources and/or modifying an existing intermittent source.
- a set of look-back supply profiles 500 , 502 , 504 are shown in FIGS. 5 a )- c ) having characteristic fluctuations in power capacity associated with particular time periods, derived from data over one single day each, wherein each of the Figures displays a unique look-back profile of supply from the source on three separate days.
- the demand profile(s) of the load(s) may be similarly found e.g. on a look back basis from which a capacity offset can be determined, on average.
- a consolidation can be technically enabled and can be performed according to example embodiments, to account for changes in the actual supply and the supply profile that was determined to be provided for the specific load.
- the supply profile statistics may be determined by aggregate of various determined fluctuations on the source determined through relevant factors, for example, but not limited to, the generators location, the local irradiance, wind speeds, cloud formation patterns as imaged via satellite, other meteorological information, etc.
- an optimization of the second source price through the use of the pool volatility and price can then be performed.
- the time correlation of the loads along with the sources can be combined to derive the capacity of remaining demand of the load/loads as associated to the pool supply and demand characteristics.
- the load demand from the alternate means can be derived.
- deriving the quantitative risk as associated with a second supply can be technically enabled and be performed according to example embodiments.
- the second supply of power can be modified so as to account for the statistically modified demand associated with the load or loads which are offsetable utilizing the intermittent power supplied.
- the supply and demand as well as pricing of the second supply system can be modified to reflect an optimized scenario wherein the intermittent supply source is utilized.
- a Power Systems Operator may utilize the statistics of the supply source from the PV generator using e.g. the consolidation unit 116 , along with a metrological unit 118 to adjust their dispatch systems to call on a secondary source (for example a conventional or dispatchable source). This can result in an operator of the power grid system 100 to modify their dispatch system against the pool demand.
- a secondary source for example a conventional or dispatchable source.
- a power grid system comprises a power grid; at least one load connected to the power grid; a first meter configured for metering power imported from the power grid to the load; at least one intermittent power source connected to the power grid, a second meter configured for metering power generated by the intermittent power source; and a consolidation unit configured for associating readings from the first and second meters such that at least a portion of the power generated by the intermittent power source is offsettable with the power imported from the power grid to the load.
- the consolidation unit may be configured to associate the readings from the first and second meters such that respective time profiles of the power generated by the intermittent power source and of the power imported from the power grid to the load are associated with each other.
- One or both of the intermittent source and the load may be configured to be controllable for facilitating matching the respective time profiles to each other.
- the consolidation unit may be configured to calculate a power supply cost for the load based on one or both of the associated readings from the first and second meters.
- the power grid system may further comprise at least one dispatchable power source connected to the power grid and may be configured such that a power injection by the dispatchable power source into the power grid is adjustable responsive to one or both of the associated readings from the first and second meters.
- the intermittent source may be directly connected to the power grid or via an intermediate grid-connected apparatus.
- the intermittent source and the load may be located at different locations relative to the power grid or substantially at a same location relative to the power grid.
- the consolidation unit may be configured for deriving a histogram of a probabilistic demand of the load over one or more time bin intervals.
- the consolidation unit may be configured for deriving a histogram of a probabilistic capacity of supply from the intermittent source over one or more time bin intervals.
- a power injection by one or more dispatchable power sources into the power grid may be adjustable as associated with the histogram of the probabilistic capacity of supply from the intermittent source over the one or more time bin intervals.
- a risk profile associated with supply to the load from one or more dispatchable power sources over the power grid may be modifiable as determined by observing a modified demand profile taking into account the histogram of the probabilistic capacity of supply from the intermittent source over the one or more time bin intervals.
- the consolidation unit may be configured to receive external data such as location data, radiation data, wind speed data, cloud formation patterns as imaged via satellite, other meteorological information etc.
- the consolidation unit may be configured to predict or refine a supply from the intermittent source to the load.
- the consolidation unit may be configured to determine a look-back supply profile or profiles of the supply from the intermittent source to the load.
- the consolidation unit may be configured to determine a look-back demand profile or profiles of a demand of the load.
- FIG. 6 shows a flow chart 600 illustrating a method of consolidating power injection and consumption in a power grid system, according to an example embodiment.
- power imported from a power grid to a load is metered using a first meter.
- power generated by an intermittent power source connected to the power grid is metered using a second meter.
- readings from the first and second meters are associated such that at least a portion of the power generated by the intermittent power source is offsettable with the power imported from the power grid to the load.
- the method may comprise associating the readings from the first and second meters such that respective time profiles of the power generated by the intermittent power source and of the power imported from the power grid to the load are associated with each other.
- the method may comprise controlling one or both of the intermittent source and the load for facilitating matching the respective time profiles to each other.
- the method may comprise calculating a power supply cost for the load based on one or both of the associated readings from the first and second meters.
- the method may further comprise adjusting a power injection by at least one dispatchable power source into the power grid responsive to one or both of the associated readings from the first and second meters.
- the intermittent source may be directly connected to the power grid or via an intermediate grid-connected apparatus.
- the intermittent source and the load may be located at different locations relative to the power grid or substantially at a same location relative to the power grid.
- the method may comprise deriving a histogram of a probabilistic demand of the load over one or more time bin intervals.
- the method may comprise deriving a histogram of a probabilistic capacity of supply from the intermittent source over one or more time bin intervals.
- the method may comprise adjusting a power injection by one or more dispatchable power sources into the power grid as associated with the histogram of the probabilistic capacity of supply from the intermittent source over the one or more time bin intervals.
- the method may comprise modifying a risk profile associated with supply to the load from one or more dispatchable power sources over the power grid as determined by observing a modified demand profile taking into account the histogram of the probabilistic capacity of supply from the intermittent source over the one or more time bin intervals.
- the method may comprise considering external data such as location data, radiation data, wind speed data, cloud formation patterns as imaged via satellite, other meteorological information etc.
- the method may comprise predicting or refining a supply from the intermittent source to the load.
- the method may comprise determining a look-back supply profile or profiles of the supply from the intermittent source to the load.
- the method may comprise determining a look-back demand profile or profiles of a demand of the load.
- a method of supplying power using the power grid system of the above embodiments is provided.
- a method of supplying power using the method of the above embodiments is provided.
- Example embodiments can advantageously also enable methods for settlement and transaction of energy supply and demand over a power grid network.
- power generated from an intermittent source or a plurality of such sources is implemented so as to supply a load using the source or sources based on characteristic statistics of the source or sources; or characteristic statistics of the source or sources and other external factors such as local irradiance, wind speed, temperature, other meteorological factors, or the like.
- the supply to the load may account for characteristic statistics of that load. This contrasts with the supply of power from a source to a load is on a basis that supply of power is isolated at a specific time of supply of the power, given the dispatchable nature of a conventional electricity generator.
- the specific time characteristics of the intermittent energy supply source is a solar energy generator supplying power to a load through a power grid network.
- supply of power by a plurality of generators including one or more intermittent or none or more non-intermittent generators, and supplying power through a power grid network to a load or plurality of loads connected to the power grid network.
- Example embodiments can also provide transactional aspects of power settlement of intermittent generation to a load in terms of the transactional settlement of electricity, and in terms of optimization of the transaction of supply from any generator connected to the grid network through use of the characteristic time statistics of one or more generators supplying to a particular load.
- the optimization of the transaction of supply of power to the load or loads may in addition account for the characteristic time statistics of the load or loads.
- Example embodiments can uniquely allow an intermittent source to be transacted as a generator to a particular load on a power grid network.
- the present specification also discloses apparatus for implementing or performing the operations of the methods.
- Such apparatus may be specially constructed for the required purposes, or may comprise a device selectively activated or reconfigured by a computer program stored in the device.
- a computer program may be stored on any computer readable medium.
- the computer readable medium may include storage devices such as magnetic or optical disks, memory chips, or other storage devices suitable for interfacing with a device.
- the computer readable medium may also include a hard-wired medium such as exemplified in the Internet system, or Wireless medium such as exemplified in the GSM mobile telephone system.
- the computer program when loaded and executed on the device effectively results in an apparatus that implements the steps of the method.
- the invention may also be implemented as hardware modules. More particular, in the hardware sense, a module is a functional hardware unit designed for use with other components or modules. For example, a module may be implemented using discrete electronic components, or it can form a portion of an entire electronic circuit such as an Application Specific Integrated Circuit (ASIC). Numerous other possibilities exist. Those skilled in the art will appreciate that the system can also be implemented as a combination of hardware and software modules.
- ASIC Application Specific Integrated Circuit
- PV power generators have been described in example embodiments, in different embodiments different intermittent sources may be used such as wind-based generators or water-based generators, etc., wherein the person skilled in the art would appreciate that each of the generators has a characteristic time based profile that may additionally be determined through various external information, and may in addition be correlated to the risk profile(s) and/or load profile(s) of a given power consumption scenario according to example embodiments.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- Accounting & Taxation (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Finance (AREA)
- General Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Tourism & Hospitality (AREA)
- Primary Health Care (AREA)
- Marketing (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Automation & Control Theory (AREA)
- Probability & Statistics with Applications (AREA)
- Pure & Applied Mathematics (AREA)
- Artificial Intelligence (AREA)
- Evolutionary Computation (AREA)
- Mathematical Optimization (AREA)
- Data Mining & Analysis (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Algebra (AREA)
- Computing Systems (AREA)
- Software Systems (AREA)
- Mathematical Physics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG10201406883U | 2014-10-23 | ||
SG10201406883UA SG10201406883UA (en) | 2014-10-23 | 2014-10-23 | "Power Grid System And Method Of Consolidating Power Injection And Consumption In A Power Grid System" |
PCT/SG2015/050153 WO2016064342A1 (en) | 2014-10-23 | 2015-06-10 | Power grid system and method of consolidating power injection and consumption in a power grid system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20170372438A1 true US20170372438A1 (en) | 2017-12-28 |
Family
ID=55761238
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/520,914 Abandoned US20170372438A1 (en) | 2014-10-23 | 2015-06-10 | Power grid system and method of consolidating power injection and consumption in a power grid system |
US15/520,904 Active 2036-11-21 US10916967B2 (en) | 2014-10-23 | 2015-06-10 | Audit method and system and supply method and system for PV power injection and consumption in a power grid system |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/520,904 Active 2036-11-21 US10916967B2 (en) | 2014-10-23 | 2015-06-10 | Audit method and system and supply method and system for PV power injection and consumption in a power grid system |
Country Status (11)
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11309712B2 (en) * | 2019-10-28 | 2022-04-19 | Enphase Energy, Inc. | Methods and apparatus including an energy management system |
ES2923589R1 (es) * | 2022-07-01 | 2022-10-21 | Crowd Solar S L | Sistema de eficiencia energetica unificador de puntos con capacidad de balancear consumos y excedente de produccion energetica, con preferencia renovable |
US11782186B2 (en) * | 2018-12-21 | 2023-10-10 | Navio International, Inc. | Edge intelligence powered security solutions and other applications for a smart city |
US11790762B2 (en) | 2016-04-19 | 2023-10-17 | Navio International, Inc. | Edge intelligence powered security solutions and other applications for a smart city |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10234885B2 (en) * | 2016-06-13 | 2019-03-19 | Sun Electric Digital Stream Ltd. | Method and system for facilitating auditing of power generation and allocation thereof to consumption loads |
WO2018145201A1 (en) | 2017-02-08 | 2018-08-16 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
US20190123580A1 (en) * | 2017-10-23 | 2019-04-25 | Sigora International Inc. | Management of a power-distribution system |
WO2019139632A1 (en) | 2018-01-11 | 2019-07-18 | Lancium Llc | Method and system for dynamic power delivery to a flexible datacenter using unutilized energy sources |
US11031787B2 (en) | 2018-09-14 | 2021-06-08 | Lancium Llc | System of critical datacenters and behind-the-meter flexible datacenters |
US10873211B2 (en) | 2018-09-14 | 2020-12-22 | Lancium Llc | Systems and methods for dynamic power routing with behind-the-meter energy storage |
US11016553B2 (en) | 2018-09-14 | 2021-05-25 | Lancium Llc | Methods and systems for distributed power control of flexible datacenters |
US11025060B2 (en) | 2018-09-14 | 2021-06-01 | Lancium Llc | Providing computational resource availability based on power-generation signals |
CN109390946B (zh) * | 2018-10-08 | 2020-07-28 | 重庆大学 | 一种基于多参数规划理论的最优概率潮流快速计算方法 |
US11031813B2 (en) | 2018-10-30 | 2021-06-08 | Lancium Llc | Systems and methods for auxiliary power management of behind-the-meter power loads |
US10367353B1 (en) | 2018-10-30 | 2019-07-30 | Lancium Llc | Managing queue distribution between critical datacenter and flexible datacenter |
US10452127B1 (en) | 2019-01-11 | 2019-10-22 | Lancium Llc | Redundant flexible datacenter workload scheduling |
US11128165B2 (en) | 2019-02-25 | 2021-09-21 | Lancium Llc | Behind-the-meter charging station with availability notification |
US11907029B2 (en) | 2019-05-15 | 2024-02-20 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
US11868106B2 (en) | 2019-08-01 | 2024-01-09 | Lancium Llc | Granular power ramping |
US11397999B2 (en) | 2019-08-01 | 2022-07-26 | Lancium Llc | Modifying computing system operations based on cost and power conditions |
US10608433B1 (en) * | 2019-10-28 | 2020-03-31 | Lancium Llc | Methods and systems for adjusting power consumption based on a fixed-duration power option agreement |
US11042948B1 (en) | 2020-02-27 | 2021-06-22 | Lancium Llc | Computing component arrangement based on ramping capabilities |
CA3076653A1 (en) | 2020-03-21 | 2021-09-21 | Upstream Data Inc. | Portable blockchain mining systems and methods of use |
WO2022036239A1 (en) | 2020-08-14 | 2022-02-17 | Lancium Llc | Power aware scheduling |
CN114462983B (zh) * | 2022-04-12 | 2022-07-12 | 国网浙江省电力有限公司 | 适用于配网工程的审计数据处理方法 |
JP7607106B1 (ja) | 2023-12-06 | 2024-12-26 | 株式会社Across Digital | 電力供給システム、および、電力供給方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060027938A1 (en) * | 2003-05-01 | 2006-02-09 | Chapman Teddie C | Water aeration device and method |
US20060276938A1 (en) * | 2005-06-06 | 2006-12-07 | Equinox Energy Solutions, Inc. | Optimized energy management system |
US20090055300A1 (en) * | 2007-07-17 | 2009-02-26 | Mcdowell Grant | Method and system for remote generation of renewable energy |
US20100222934A1 (en) * | 2009-03-02 | 2010-09-02 | Yutaka Iino | System for managing energy at loads |
US20140361745A1 (en) * | 2011-12-27 | 2014-12-11 | Mitsubishi Electric Corporation | Energy management system |
Family Cites Families (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3875149B2 (ja) | 2002-06-10 | 2007-01-31 | 三菱電機株式会社 | 太陽光発電システム |
JP3889679B2 (ja) | 2002-06-28 | 2007-03-07 | 三菱電機株式会社 | 電力関連表示装置およびこれを用いた自家発電システム |
JP2005207629A (ja) | 2004-01-20 | 2005-08-04 | Matsushita Electric Works Ltd | 掘ごたつ用ヒータの収容構造。 |
JP2005219084A (ja) | 2004-02-05 | 2005-08-18 | Sanyo Special Steel Co Ltd | 内面品質が良好な熱間押出継目無鋼管の製造方法 |
US7890436B2 (en) | 2006-10-17 | 2011-02-15 | Clean Power Finance, Inc. | Billing and payment methods and systems enabling consumer premises equipment |
IE20080293A1 (en) | 2007-04-17 | 2008-10-29 | Timothy Patrick Cooper | A load management controller |
US20090160187A1 (en) | 2007-12-19 | 2009-06-25 | Scholte-Wassink Hartmut | Control system and method for operating a wind farm in a balanced state |
JP5659486B2 (ja) | 2009-12-17 | 2015-01-28 | 富士電機株式会社 | 発電計画作成方法および発電計画作成システム |
JP5533343B2 (ja) * | 2010-06-28 | 2014-06-25 | 富士通株式会社 | 電力平準化システム |
JP5925291B2 (ja) | 2011-04-08 | 2016-05-25 | エス・エム・アー・ゾラール・テヒノロギー・アクチエンゲゼルシャフト | 最適化された負荷管理 |
WO2012169879A2 (en) | 2011-06-07 | 2012-12-13 | N.V. Nederlandsche Apparatenfabriek "Nedap" | A power control device for an electrical installation of a building and a method of power controlling an electrical installation of a building |
US8689020B2 (en) * | 2011-08-16 | 2014-04-01 | General Electric Company | Method, system and computer program product for scheduling demand events |
US10387985B2 (en) | 2011-10-07 | 2019-08-20 | Lennox Industries, Inc. | Distributed renewable energy metering |
JP5842994B2 (ja) * | 2012-03-12 | 2016-01-13 | 富士通株式会社 | 運転計画作成方法、運転計画作成プログラムおよび運転計画作成装置 |
JP2013192401A (ja) | 2012-03-14 | 2013-09-26 | Toshiba Corp | 電力需給制御装置 |
AU2013274314A1 (en) * | 2012-06-13 | 2015-01-22 | S&C Electric Company | Power grid photo-voltaic integration using distributed energy storage and management |
US8849715B2 (en) | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
JP6013076B2 (ja) | 2012-08-10 | 2016-10-25 | 京セラ株式会社 | エネルギー管理装置、エネルギー管理システムおよびエネルギー管理方法 |
JP2014068426A (ja) * | 2012-09-25 | 2014-04-17 | Hitachi Ltd | エネルギー需給バランス維持システム |
JP2014143835A (ja) * | 2013-01-24 | 2014-08-07 | Toshiba Corp | 電力系統の制御システム |
US20140214219A1 (en) | 2013-01-31 | 2014-07-31 | Kabushiki Kaisha Toshiba | Energy management system, energy management method, medium, and server |
JP2014192981A (ja) * | 2013-03-26 | 2014-10-06 | Clean Craft:Kk | サーバ装置及びエネルギー流通システム |
CN103530473A (zh) * | 2013-10-25 | 2014-01-22 | 国家电网公司 | 一种含大规模光伏电站的电力系统随机生产模拟方法 |
JP5822363B2 (ja) | 2014-02-28 | 2015-11-24 | サミー株式会社 | ぱちんこ遊技機 |
GB2510735B (en) * | 2014-04-15 | 2015-03-04 | Reactive Technologies Ltd | Frequency response |
-
2014
- 2014-10-23 SG SG10201406883UA patent/SG10201406883UA/en unknown
-
2015
- 2015-06-10 WO PCT/SG2015/050152 patent/WO2016064341A1/en active Application Filing
- 2015-06-10 HK HK18102747.2A patent/HK1243556A1/zh unknown
- 2015-06-10 HK HK18102748.1A patent/HK1243557A1/zh unknown
- 2015-06-10 CN CN201580070777.8A patent/CN107182219A/zh active Pending
- 2015-06-10 JP JP2017522182A patent/JP6563491B2/ja not_active Expired - Fee Related
- 2015-06-10 EP EP15851794.6A patent/EP3210272A4/en not_active Withdrawn
- 2015-06-10 US US15/520,914 patent/US20170372438A1/en not_active Abandoned
- 2015-06-10 HK HK18102746.3A patent/HK1243555A1/zh unknown
- 2015-06-10 US US15/520,904 patent/US10916967B2/en active Active
- 2015-06-10 CA CA2965492A patent/CA2965492A1/en not_active Abandoned
- 2015-06-10 AU AU2015337129A patent/AU2015337129A1/en not_active Abandoned
- 2015-06-10 SG SG11201703224RA patent/SG11201703224RA/en unknown
- 2015-06-10 SG SG11201703223TA patent/SG11201703223TA/en unknown
- 2015-06-10 AU AU2015337130A patent/AU2015337130A1/en not_active Abandoned
- 2015-06-10 HK HK18102749.0A patent/HK1243558A1/zh unknown
- 2015-06-10 WO PCT/SG2015/050153 patent/WO2016064342A1/en active Application Filing
- 2015-06-10 JP JP2017522180A patent/JP2017531998A/ja active Pending
- 2015-06-10 CN CN201580068491.6A patent/CN107112753A/zh active Pending
- 2015-06-10 CA CA2965490A patent/CA2965490A1/en not_active Abandoned
- 2015-06-10 EP EP15851698.9A patent/EP3210271A4/en not_active Withdrawn
- 2015-10-23 TW TW104134858A patent/TW201624866A/zh unknown
-
2016
- 2016-04-15 TW TW105111842A patent/TW201712998A/zh unknown
-
2017
- 2017-04-24 PH PH12017500760A patent/PH12017500760A1/en unknown
-
2020
- 2020-06-25 AU AU2020204246A patent/AU2020204246A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060027938A1 (en) * | 2003-05-01 | 2006-02-09 | Chapman Teddie C | Water aeration device and method |
US20060276938A1 (en) * | 2005-06-06 | 2006-12-07 | Equinox Energy Solutions, Inc. | Optimized energy management system |
US20090055300A1 (en) * | 2007-07-17 | 2009-02-26 | Mcdowell Grant | Method and system for remote generation of renewable energy |
US20100222934A1 (en) * | 2009-03-02 | 2010-09-02 | Yutaka Iino | System for managing energy at loads |
US20140361745A1 (en) * | 2011-12-27 | 2014-12-11 | Mitsubishi Electric Corporation | Energy management system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11790762B2 (en) | 2016-04-19 | 2023-10-17 | Navio International, Inc. | Edge intelligence powered security solutions and other applications for a smart city |
US11782186B2 (en) * | 2018-12-21 | 2023-10-10 | Navio International, Inc. | Edge intelligence powered security solutions and other applications for a smart city |
US11309712B2 (en) * | 2019-10-28 | 2022-04-19 | Enphase Energy, Inc. | Methods and apparatus including an energy management system |
ES2923589R1 (es) * | 2022-07-01 | 2022-10-21 | Crowd Solar S L | Sistema de eficiencia energetica unificador de puntos con capacidad de balancear consumos y excedente de produccion energetica, con preferencia renovable |
Also Published As
Publication number | Publication date |
---|---|
SG10201406883UA (en) | 2016-05-30 |
HK1243558A1 (zh) | 2018-07-13 |
SG11201703223TA (en) | 2017-05-30 |
EP3210272A1 (en) | 2017-08-30 |
AU2020204246A1 (en) | 2020-07-16 |
CA2965492A1 (en) | 2016-04-28 |
CN107182219A (zh) | 2017-09-19 |
HK1243555A1 (zh) | 2018-07-13 |
AU2015337129A1 (en) | 2017-06-01 |
US20180026478A1 (en) | 2018-01-25 |
TW201624866A (zh) | 2016-07-01 |
CN107112753A (zh) | 2017-08-29 |
SG11201703224RA (en) | 2017-05-30 |
US10916967B2 (en) | 2021-02-09 |
TW201712998A (en) | 2017-04-01 |
HK1243556A1 (zh) | 2018-07-13 |
AU2015337130A1 (en) | 2017-06-01 |
WO2016064341A1 (en) | 2016-04-28 |
JP2017531998A (ja) | 2017-10-26 |
EP3210271A4 (en) | 2018-05-30 |
JP6563491B2 (ja) | 2019-08-21 |
HK1243557A1 (zh) | 2018-07-13 |
EP3210271A1 (en) | 2017-08-30 |
JP2017536073A (ja) | 2017-11-30 |
PH12017500760A1 (en) | 2017-11-20 |
CA2965490A1 (en) | 2016-04-28 |
WO2016064342A1 (en) | 2016-04-28 |
EP3210272A4 (en) | 2018-03-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20170372438A1 (en) | Power grid system and method of consolidating power injection and consumption in a power grid system | |
Ghofrani et al. | A framework for optimal placement of energy storage units within a power system with high wind penetration | |
Yao et al. | Residential demand side management under high penetration of rooftop photovoltaic units | |
Malheiro et al. | Integrated sizing and scheduling of wind/PV/diesel/battery isolated systems | |
US9438041B2 (en) | System and method for energy distribution | |
Denholm et al. | Evaluating the limits of solar photovoltaics (PV) in electric power systems utilizing energy storage and other enabling technologies | |
Rahimiyan et al. | Energy management of a cluster of interconnected price-responsive demands | |
JP6592454B2 (ja) | 電力制御システム、電力制御方法及びプログラム | |
McLarty et al. | Micro-grid energy dispatch optimization and predictive control algorithms; A UC Irvine case study | |
US20150324935A1 (en) | Control system for power system | |
EP2973932A1 (en) | System and method for energy distribution | |
Bove et al. | Integrating large shares of wind energy in macro-economical cost-effective way | |
Chen et al. | Technoeconomic Analysis and Optimization of Hybrid Solar‐Wind‐Hydrodiesel Renewable Energy Systems Using Two Dispatch Strategies | |
Hoke et al. | Maximizing the benefits of distributed photovoltaics | |
Jeon et al. | The true economic value of supply-side energy storage in the smart grid environment–The case of Korea | |
JP7319838B2 (ja) | 電力管理装置および電力管理方法 | |
Abul'Wafa | Energy storage sizing for rooftop grid-connected PV system | |
Brinkerink et al. | System dynamics within typical days of a high variable 2030 European power system | |
Awad et al. | Optimized operation of PV/T and micro-CHP hybrid power systems | |
Li et al. | Real-time scheduling of time-shiftable loads in smart grid with dynamic pricing and photovoltaic power generation | |
Wardat et al. | To build or not to build? addressing the expansion strategies of cloud providers | |
Sheppard et al. | Hydro-solar seasonal complementarity for optimal hydropower plant expansion in the transitioning nordic power system | |
Nishanthy et al. | Optimal planning and modelling of the solar roof-top PV system with different incentive policy schemes for residential prosumers: a real-time case study | |
DuVivier et al. | Time of Renewables | |
Craig et al. | Impact of variable renewable energy sources on bulk power system planning and operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SUN ELECTRIC PTE LTD, SINGAPORE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PELOSO, MATTHEW;REEL/FRAME:043126/0914 Effective date: 20170628 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
AS | Assignment |
Owner name: SUN ELECTRIC DIGITAL STREAM LTD., VIRGIN ISLANDS, BRITISH Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SUN ELECTRIC PTE LTD;REEL/FRAME:045651/0253 Effective date: 20180410 Owner name: SUN ELECTRIC DIGITAL STREAM LTD., VIRGIN ISLANDS, Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SUN ELECTRIC PTE LTD;REEL/FRAME:045651/0253 Effective date: 20180410 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
AS | Assignment |
Owner name: VIKRAM KUMAR, INDIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SUN ELECTRIC DIGITAL STREAM LTD.;REEL/FRAME:053773/0823 Effective date: 20200710 |
|
AS | Assignment |
Owner name: SUN ELECTRIC DIGITAL STREAM INC., DELAWARE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:RAMBUTAN PTE LTD;REEL/FRAME:066645/0541 Effective date: 20240126 Owner name: RAMBUTAN PTE LTD, SINGAPORE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KUMAR, VIKRAM;REEL/FRAME:066527/0011 Effective date: 20210921 |