US20130180274A1 - Refrigeration cycle apparatus and refrigeration cycle control method - Google Patents

Refrigeration cycle apparatus and refrigeration cycle control method Download PDF

Info

Publication number
US20130180274A1
US20130180274A1 US13/876,540 US201113876540A US2013180274A1 US 20130180274 A1 US20130180274 A1 US 20130180274A1 US 201113876540 A US201113876540 A US 201113876540A US 2013180274 A1 US2013180274 A1 US 2013180274A1
Authority
US
United States
Prior art keywords
water
temperature
pressure
hot
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/876,540
Inventor
Shogo Tamaki
Makoto Saito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Assigned to MITSUBISHI ELECTRIC CORPORATION reassignment MITSUBISHI ELECTRIC CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SAITO, MAKOTO, TAMAKI, SHOGO
Publication of US20130180274A1 publication Critical patent/US20130180274A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/027Condenser control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/003Indoor unit with water as a heat sink or heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0233Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02731Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one three-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2341/00Details of ejectors not being used as compression device; Details of flow restrictors or expansion valves
    • F25B2341/06Details of flow restrictors or expansion valves
    • F25B2341/063Feed forward expansion valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/07Exceeding a certain pressure value in a refrigeration component or cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/19Refrigerant outlet condenser temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1931Discharge pressures

Definitions

  • the present invention relates to integrated air-conditioning and hot-water-supply systems that can perform an air-conditioning operation (i.e., cooling operation or heating operation) and a hot-water-supply operation at the same time, and more specifically, to an integrated air-conditioning and hot-water-supply system that determines a high-temperature-water supply state when the condensing temperature becomes higher than or equal to a predetermined value during a hot-water supply and that suppresses an excessive increase in high pressure by controlling the condensing temperature of a compressor and the opening degree of a pressure-reducing mechanism so as to achieve a predetermined hot-water-supply capacity within a usage range of the compressor.
  • an air-conditioning operation i.e., cooling operation or heating operation
  • a hot-water-supply operation at the same time
  • an integrated air-conditioning and hot-water-supply system that determines a high-temperature-water supply state when the condensing temperature becomes higher than or equal to a predetermined value during a
  • a hot-water-suppliable heat pump system that is equipped with a refrigerant circuit formed by connecting a hot-water-supply unit (i.e., a water heater) to a heat source unit (i.e., an outdoor unit) by pipes and that can perform the hot-water-supply operation is known.
  • a hot-water-supply unit i.e., a water heater
  • a heat source unit i.e., an outdoor unit
  • the valve opening degree of a pressure-reducing device is controlled in accordance with a discharge temperature or a discharge pressure as a target.
  • the operation efficiency is set in accordance with a discharge temperature or a discharge pressure that has a maximum value relative to the valve opening degree of the pressure-reducing device and that corresponds to the maximum operation efficiency as a target control value.
  • the pressure-reducing device is controlled in accordance with the discharge temperature or the discharge pressure corresponding to the maximum operation efficiency.
  • the control is performed based on the operation efficiency regardless of an increase in the discharge pressure of the pressure-reducing device. This causes the discharge pressure to increase, possibly resulting in an excessive increase in the condensing temperature.
  • an integrated air-conditioning and hot-water-supply system that is equipped with a refrigerant circuit formed by connecting a use-side unit (i.e., an indoor unit) by pipes in addition to a hot-water-supply unit and that can perform the air-conditioning operation and the hot-water-supply operation at the same time, if there are an air conditioning load and a high-temperature-water-supply request at the same time during the high-temperature-water supply, an operation method that satisfies both of them needs to be established.
  • a use-side unit i.e., an indoor unit
  • an integrated air-conditioning and hot-water-supply system that can suppress an excessive increase in condensing temperature and can ensure a hot-water-supply capacity within a usage range of a compressor during the high-temperature-water supply.
  • a refrigeration cycle apparatus includes a refrigeration cycle mechanism having a compressor whose operating frequency is controllable, a first radiator, a first pressure-reducing mechanism whose opening degree is controllable, and a first evaporator, and in which a refrigerant sequentially circulates through the compressor, the first radiator, the first pressure-reducing mechanism, and the first evaporator; a high-pressure sensor that detects a high pressure between a discharge side of the compressor and a liquid side of the first pressure-reducing mechanism; and a controller that calculates a condensing temperature of the first radiator based on the high pressure detected by the high-pressure sensor.
  • the controller When the calculated condensing temperature of the first radiator is higher than or equal to a preset target condensing-temperature value, the controller performs condensing-temperature control for controlling the operating frequency of the compressor based on a difference between the calculated condensing temperature and the target condensing-temperature value, and performs opening-degree control for controlling the opening degree of the first pressure-reducing mechanism concurrently with the condensing-temperature control based on a difference between a current opening degree of the first pressure-reducing mechanism and a preset target opening-degree value.
  • the present invention can provide a refrigeration cycle apparatus that can suppress an excessive increase in condensing temperature and can ensure a hot-water-supply capacity within a usage range of a compressor during the high-temperature-water supply.
  • FIG. 1 illustrates the configuration of an integrated air-conditioning and hot-water-supply system 100 according to Embodiment 1.
  • FIG. 2 schematically illustrates the flow of water from a hot-water-supply unit 304 to a hot-water-supply tank 305 in Embodiment 1.
  • FIG. 3 schematically illustrates a controller 110 in Embodiment 1.
  • FIG. 4 illustrates an operation of four-way valves relative to operation modes in Embodiment 1.
  • FIG. 5 illustrates a method for determining a target evaporating-temperature value from a maximum cooled-room temperature difference in compressor control in Embodiment 1.
  • FIG. 6 illustrates a method for determining a target condensing-temperature value from a maximum heated-room temperature difference in compressor control in Embodiment 1.
  • FIG. 7 illustrates the relationships among a target opening degree, a hot-water-supply capacity, and operation efficiency in Embodiment 1.
  • FIG. 8 illustrates tests performed when performing control for changing a target opening-degree value of a hot-water-supply pressure-reducing mechanism in accordance with a compressor frequency in Embodiment 1.
  • FIG. 9 illustrates the relationship between an outdoor-air temperature and the target opening-degree value in Embodiment 1.
  • FIG. 10 illustrates the relationships among the hot-water-supply capacity, an evaporating capacity, and a compressor input in Embodiment 1.
  • FIG. 11 illustrates the contents of tests performed at a development stage when performing control for changing the target opening-degree value in accordance with the hot-water-supply capacity in Embodiment 1.
  • FIG. 12 is a flowchart illustrating the flow for determining whether a high-temperature-water supply is to be performed or a normal hot-water supply is to be performed in Embodiment 1.
  • FIG. 13 is a flowchart illustrating an operation method during a high-temperature-water supply in a simultaneous heating and hot-water-supply operation in Embodiment 1.
  • FIG. 14 is a flowchart illustrating an operation method during a high-temperature-water supply in a simultaneous cooling and hot-water-supply operation in Embodiment 1.
  • Embodiment 1 will be described below with reference to FIGS. 1 to 14 .
  • FIG. 1 is a refrigerant circuit configuration diagram of an integrated air-conditioning and hot-water-supply system 100 (refrigeration cycle apparatus) according to Embodiment 1.
  • the dimensional relationships among components may sometimes differ from actual dimensional relationships.
  • the unit of the symbol will be written in parenthesis [ ]. If a symbol is dimensionless (i.e., has no units), the unit will be expressed as [-].
  • FIG. 2 schematically illustrates the flow of water from a hot-water-supply unit 304 to a hot-water-supply tank 305 in the integrated air-conditioning and hot-water-supply system 100 .
  • FIG. 3 schematically illustrates various kinds of sensors in the integrated air-conditioning and hot-water-supply system 100 , and a measuring unit 101 , a calculating unit 102 , a control unit 103 , and a storage unit 104 in a controller 110 .
  • the configuration of the integrated air-conditioning and hot-water-supply system 100 will be described below with reference to FIGS. 1 to 3 .
  • the integrated air-conditioning and hot-water-supply system 100 is a triple-pipe multisystem integrated air-conditioning and hot-water-supply system that performs a vapor-compression refrigeration cycle operation so as to simultaneously perform a cooling operation or heating operation selected in a use-side unit and a hot-water-supply operation in a hot-water-supply unit.
  • the integrated air-conditioning and hot-water-supply system 100 is an integrated air-conditioning and hot-water-supply system that can ensure a hot-water-supply capacity by suppressing an excessive increase in high pressure during a supply of high-temperature water when the hot-water-supply operation is performed in the hot-water-supply unit.
  • FIG. 1 illustrates the refrigerant circuit configuration
  • FIG. 2 illustrates a water circuit configuration from the hot-water-supply unit 304 to the hot-water-supply tank 305 .
  • the integrated air-conditioning and hot-water-supply system 100 has a heat source unit 301 , a branch unit 302 , use-side units 303 a and 303 b , the hot-water-supply unit 304 , and the hot-water-supply tank 305 .
  • the heat source unit 301 and the branch unit 302 are connected by a liquid extension pipe 6 serving as a refrigerant pipe and a gas extension pipe 12 serving as a refrigerant pipe.
  • the hot-water-supply unit 304 has one end connected to the heat source unit 301 via a hot-water-supply gas extension pipe 15 serving as a refrigerant pipe and another end connected to the branch unit 302 via a hot-water-supply liquid pipe 18 serving as a refrigerant pipe.
  • the use-side units 303 a and 303 b and the branch unit 302 are connected by indoor gas pipes 11 a and 11 b serving as refrigerant pipes and indoor liquid pipes 8 a and 8 b serving as refrigerant pipes.
  • the hot-water-supply tank 305 and the hot-water-supply unit 304 are connected by an upstream water pipe 20 serving as a water pipe and a downstream water pipe 21 serving as a water pipe.
  • thermoelectric cooler 100 Although one heat source unit, two use-side units, one hot-water-supply unit, and one hot-water-supply tank 305 are connected as an example in Embodiment 1, the configuration is not limited to this and the numbers thereof may be more than or fewer than those shown. Furthermore, although a refrigerant used in the integrated air-conditioning and hot-water-supply system 100 is R410A, the refrigerant used in the integrated air-conditioning and hot-water-supply system 100 is not limited to this kind of refrigerant.
  • HFC hydrogen fluorocarbon
  • R407C or R404A an HFC (hydrofluorocarbon) refrigerant
  • HCFC hydroochlorofluorocarbon
  • R22 or R134a a refrigerant that operates at a critical pressure or higher, such as CO 2 .
  • the integrated air-conditioning and hot-water-supply system 100 includes the controller 110 .
  • the controller 110 includes the measuring unit 101 , the calculating unit 102 , the control unit 103 , and the storage unit 104 .
  • Control to be described below is entirely performed by the controller 110 .
  • the controller 110 is disposed in the heat source unit 301 in FIG. 1 , this is only an example.
  • the position where the controller 110 is disposed is not limited.
  • an operation mode of the heat source unit 301 is determined based on whether there are a hot-water-supply load in the connected hot-water-supply unit 304 and cooling loads or heating loads in the use-side units 303 a and 303 b .
  • the integrated air-conditioning and hot-water-supply system 100 is capable of performing the following five operation modes, which includes
  • the cooling operation mode A is an operation mode of the heat source unit 301 when there is no hot-water-supply request signal (also referred to as “hot-water-supply request”) and the cooling operation is performed by the use-side units 303 a and 303 b .
  • the heating operation mode B is an operation mode of the heat source unit 301 when there is no hot-water-supply request and the heating operation is performed by the use-side units 303 a and 303 b.
  • the hot-water-supply operation mode C is an operation mode of the heat source unit 301 when there is no air conditioning load and the hot-water-supply operation is performed by the hot-water-supply unit 304 .
  • the simultaneous heating and hot-water-supply operation mode D is an operation mode of the heat source unit 301 when the heating operation by the use-side units 303 a and 303 b and the hot-water-supply operation by the hot-water-supply unit 304 are simultaneously performed.
  • the simultaneous cooling and hot-water-supply operation mode E is an operation mode of the heat source unit 301 when the cooling operation by the use-side units 303 a and 303 b and the hot-water-supply operation by the hot-water-supply unit 304 are simultaneously performed.
  • the use-side units 303 a and 303 b are connected to the heat source unit 301 via the branch unit 302 .
  • the use-side units 303 a and 303 b are installed in areas (e.g., by being concealed in or suspended from a ceiling indoors or being hung on a wall) where the units can blow conditioned air to an air conditioning target region.
  • the use-side units 303 a and 303 b are connected to the heat source unit 301 via the branch unit 302 , the liquid extension pipe 6 , and the gas extension pipe 12 , and constitute a part of the refrigerant circuit.
  • the use-side units 303 a and 303 b each include an indoor-side refrigerant circuit that constitutes a part of the refrigerant circuit. These indoor-side refrigerant circuits are constituted by respective indoor heat exchangers 9 a and 9 b serving as use-side heat exchangers. Furthermore, the use-side units 303 a and 303 b are respectively provided with indoor air-sending devices 10 a and 10 b for supplying conditioned air, after having exchanged heat with the refrigerant in the indoor heat exchangers 9 a and 9 b , to the air conditioning target region, such as an indoor space.
  • the indoor heat exchangers 9 a and 9 b may each be formed of, for example, a cross-fin-type fin-and-tube heat exchanger constituted of a heat transfer pipe and multiple fins.
  • the indoor heat exchangers 9 a and 9 b may each be formed of a micro-channel heat exchanger, a shell-and-tube heat exchanger, a heat-pipe heat exchanger, or a double-pipe heat exchanger.
  • the indoor heat exchangers 9 a and 9 b function as refrigerant evaporators and cool the air in the air conditioning target region.
  • the indoor heat exchangers 9 a and 9 b function as refrigerant condensers (or radiators) and heat the air in the air conditioning target region.
  • the indoor air-sending devices 10 a and 10 b have a function of suctioning indoor air into the use-side units 303 a and 303 b , making the indoor air exchange heat with the refrigerant at the indoor heat exchangers 9 a and 9 b , and then supplying the indoor air as conditioned air to the air conditioning target region.
  • the indoor air taken in by the indoor air-sending devices 10 a and 10 b and the refrigerant flowing through the indoor heat exchangers 9 a and 9 b can exchange heat with each other.
  • the indoor air-sending devices 10 a and 10 b are capable of adjusting the flow rate of conditioned air to be supplied to the indoor heat exchangers 9 a and 9 b and each include a fan, such as a centrifugal fan or a multi-blade fan, and a motor, such as a DC fan motor, for driving this fan.
  • a fan such as a centrifugal fan or a multi-blade fan
  • a motor such as a DC fan motor
  • the use-side units 303 a and 303 b are provided with the following various kinds of sensors, which include:
  • indoor liquid temperature sensors 206 a and 206 b that are provided at the liquid side of the indoor heat exchangers 9 a and 9 b and detect the temperature of a liquid refrigerant
  • indoor gas temperature sensors 207 a and 207 b that are provided at the gas side of the indoor heat exchangers 9 a and 9 b and detect the temperature of a gas refrigerant
  • indoor suction temperature sensors 208 a and 208 b that are provided at the indoor-air suction side of the use-side units 303 a and 303 b and detect the temperature of indoor air flowing into the units.
  • the operation of the indoor air-sending devices 10 a and 10 b is controlled by the control unit 103 that functions as normal-operation control means that performs a normal operation including the cooling operation mode A and the heating operation mode B of the use-side units 303 a and 303 b.
  • the hot-water-supply unit 304 is connected to the heat source unit 301 via the branch unit 302 . As shown in FIG. 2 , the hot-water-supply unit 304 has a function of supplying hot water to the hot-water-supply tank 305 installed, for example, outdoors and boiling the water in the hot-water-supply tank 305 by heating the water.
  • a plate-type water heat exchanger 16 of the hot-water-supply unit 304 includes a connection section 25 (i.e., an inflowing-water-pipe connection section) connected to the downstream water pipe 21 (i.e., an inflowing water pipe), a connection section 26 (i.e., an outflowing water pipe connection section) connected to the upstream water pipe 20 (i.e., an outflowing water pipe), and a water pipe 27 through which water flowing therein from the downstream water pipe 21 flows out toward the upstream water pipe 20 .
  • a connection section 25 i.e., an inflowing-water-pipe connection section
  • connection section 26 i.e., an outflowing water pipe connection section
  • upstream water pipe 20 i.e., an outflowing water pipe
  • the hot-water-supply unit 304 has one end connected to the heat source unit 301 via the hot-water-supply gas extension pipe 15 and another end connected to the branch unit 302 via the hot-water-supply liquid pipe 18 , and constitutes a part of the refrigerant circuit in the integrated air-conditioning and hot-water-supply system 100 .
  • the hot-water-supply unit 304 includes a hot-water-supply-side refrigerant circuit that constitutes a part of the refrigerant circuit.
  • the hot-water-supply-side refrigerant circuit has the plate-type water heat exchanger 16 serving as a hot-water-supply-side heat exchanger as an elemental function.
  • the hot-water-supply unit 304 is provided with a feed pump 17 for supplying hot water, after having exchanged heat with the refrigerant in the plate-type water heat exchanger 16 , to the hot-water-supply tank 305 , etc.
  • the plate-type water heat exchanger 16 functions as a refrigerant condenser and heats the water to be supplied by the feed pump 17 .
  • the feed pump 17 has a function of supplying the water into the hot-water-supply unit 304 , making the water exchange heat at the plate-type water heat exchanger 16 so as to turn the water into hot water, and then supplying the hot water into the hot-water-supply tank 305 so as to make the hot water exchange heat with the water in the hot-water-supply tank 305 .
  • the water supplied by the feed pump 17 and the refrigerant flowing through the plate-type water heat exchanger 16 can exchange heat with each other, and the water supplied by the feed pump 17 and the water in the hot-water-supply tank 305 can exchange heat with each other.
  • the flow rate of water to be supplied to the plate-type water heat exchanger 16 can be adjusted.
  • the hot-water-supply unit 304 is provided with the following various kinds of sensors, which include:
  • a hot-water-supply liquid temperature sensor 209 that is provided at the liquid side of the plate-type water heat exchanger 16 and detects the temperature of a liquid refrigerant.
  • the operation of the feed pump 17 is controlled by the control unit 103 that functions as normal-operation control means that performs the normal operation including the hot-water-supply operation mode C of the hot-water-supply unit 304 (see FIG. 3 ).
  • the hot-water-supply tank 305 is installed, for example, outdoors and has a function of storing the hot water boiled by the hot-water-supply unit 304 . Furthermore, the hot-water-supply tank 305 has one end connected to the hot-water-supply unit 304 via the upstream water pipe 20 and another end connected to the hot-water-supply unit 304 via the downstream water pipe 21 , and constitutes a part of a water circuit in the integrated air-conditioning and hot-water-supply system 100 .
  • the hot-water-supply tank 305 is of a full-water type that makes the hot water flow out of the upper portion of the tank when the hot water is consumed by the user and that is supplied with water from the lower portion of the tank in accordance with the consumed amount.
  • the water fed by the feed pump 17 in the hot-water-supply unit 304 becomes hot water by being heated by the refrigerant at the plate-type water heat exchanger 16 and then travels through the upstream water pipe 20 so as to flow into the hot-water-supply tank 305 .
  • the hot water exchanges heat with the water in the hot-water-supply tank 305 as intermediate water without being mixed with the water in the tank, thereby turning into cold water.
  • the water flows out of the hot-water-supply tank 305 and travels through the downstream water pipe 21 so as to flow into the hot-water-supply unit 304 again.
  • the water turns into hot water at the plate-type water heat exchanger 16 .
  • the water is boiled in the hot-water-supply tank 305 .
  • the method for heating the water in the hot-water-supply tank 305 is not limited to the intermediate-water-based heat exchange method as in Embodiment 1.
  • the water in the hot-water-supply tank 305 may flow directly into a pipe, turn into hot water by exchanging heat at the plate-type water heat exchanger 16 , and then return to the hot-water-supply tank 305 .
  • the hot-water-supply tank 305 is provided with the following various kinds of sensors, which include:
  • a hot-water-supply-tank water temperature sensor 210 that is provided on a side surface at the lower portion of the hot-water-supply tank 305 and detects the temperature of the hot water in the tank.
  • the heat source unit 301 is installed, for example, outdoors and is connected to the use-side units 303 a and 303 b via the liquid extension pipe 6 , the gas extension pipe 12 , and the branch unit 302 . Moreover, the heat source unit 301 is connected to the hot-water-supply unit 304 via the hot-water-supply gas extension pipe 15 , the liquid extension pipe 6 , and the branch unit 302 , and constitutes a part of the refrigerant circuit in the integrated air-conditioning and hot-water-supply system 100 .
  • the heat source unit 301 includes an outdoor-side refrigerant circuit that constitutes a part of the refrigerant circuit.
  • the outdoor-side refrigerant circuit has a compressor 1 that compresses the refrigerant, two four-way valves (i.e., a first four-way valve 2 and a second four-way valve 13 ) for switching the flowing direction of the refrigerant in accordance with the outdoor operation mode, an outdoor heat exchanger 3 as a heat-source-side heat exchanger, and an accumulator 14 for retaining an excess refrigerant.
  • the heat source unit 301 is constituted of an outdoor air-sending device 4 for supplying air to the outdoor heat exchanger 3 and an outdoor pressure-reducing mechanism 5 as a heat-source-side pressure-reducing mechanism for controlling the distributive flow rate of the refrigerant.
  • the compressor 1 suctions the refrigerant and compresses this refrigerant to a high-temperature high-pressure state.
  • the compressor 1 equipped in Embodiment 1 is capable of adjusting the operation capacity and is, for example, a positive-displacement compressor that is driven by a motor (not shown) controlled by an inverter.
  • a single compressor 1 is shown as an example in Embodiment 1, the configuration is not limited to this, and two or more compressors 1 may be connected in parallel to each other in accordance with, for example, the connected number of use-side units 303 a and 303 b and hot-water-supply units 304 .
  • a discharge-side pipe connected to the compressor 1 is bifurcated at an intermediate section of the pipe and has one end connected to the gas extension pipe 12 via the second four-way valve 13 and another end connected to the hot-water-supply gas extension pipe 15 via the first four-way valve 2 .
  • the first four-way valve 2 and the second four-way valve 13 each function as a flow switching device that switches the flowing direction of the refrigerant in accordance with the operation mode of the heat source unit 301 .
  • FIG. 4 illustrates the operational contents of the four-way valves relative to the operation modes.
  • the terms “solid line” and “dash line” shown in FIG. 4 correspond to solid lines and dashed lines shown in FIG. 1 that denote the switched statuses of the first four-way valve 2 and the second four-way valve 13 .
  • the first four-way valve 2 is switched to the “solid line” state. Specifically, in the cooling operation mode A, in order to make the outdoor heat exchanger 3 function as a condenser for the refrigerant compressed by the compressor 1 , the first four-way valve 2 is switched so as to connect the discharge side of the compressor 1 to the gas side of the outdoor heat exchanger 3 . In the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, or the simultaneous cooling and hot-water-supply operation mode E, the first four-way valve 2 is switched to the “dash line” state.
  • the first four-way valve 2 is switched so as to connect the discharge side of the compressor 1 to the gas side of the plate-type water heat exchanger 16 and also to connect the suction side of the compressor 1 to the gas side of the outdoor heat exchanger 3 .
  • the second four-way valve 13 switched to the “solid line” state. Specifically, the second four-way valve 13 is switched so as to connect the suction side of the compressor 1 to the gas side of the indoor heat exchangers 9 a and 9 b , such that the indoor heat exchangers 9 a and 9 b are made to function as evaporators for the refrigerant compressed by the compressor 1 in the cooling operation mode A or the simultaneous cooling and hot-water-supply operation mode E or such that the refrigerant is prevented from flowing to the use-side units 303 a and 303 b in the hot-water-supply operation mode C.
  • the second four-way valve 13 is switched to the “dash line” state. Specifically, in the heating operation mode B, the hot-water-supply operation mode C, and the simultaneous heating and hot-water-supply operation mode D, in order to make the indoor heat exchangers 9 a and 9 b function as refrigerant condensers, the second four-way valve 13 is switched so as to connect the discharge side of the compressor 1 to the gas side of the indoor heat exchangers 9 a and 9 b.
  • the outdoor heat exchanger 3 has its gas side connected to the first four-way valve 2 and its liquid side connected to the outdoor pressure-reducing mechanism 5 .
  • the outdoor heat exchanger 3 may be formed of, for example, a cross-fin-type fin-and-tube heat exchanger constituted of a heat transfer pipe and multiple fins.
  • the outdoor heat exchanger 3 may be formed of a micro-channel heat exchanger, a shell-and-tube heat exchanger, a heat-pipe heat exchanger, or a double-pipe heat exchanger.
  • the outdoor heat exchanger 3 functions as a refrigerant condenser and cools the refrigerant.
  • the outdoor heat exchanger 3 functions as a refrigerant evaporator and heats the refrigerant.
  • the outdoor air-sending device 4 has a function of suctioning outdoor air into the heat source unit 301 , making the outdoor air exchange heat at the outdoor heat exchanger 3 , and then discharging the air to the outside. Specifically, in the heat source unit 301 , the outdoor air taken in by the outdoor air-sending device 4 and the refrigerant flowing through the outdoor heat exchanger 3 can exchange heat with each other.
  • the outdoor air-sending device 4 is capable of adjusting the flow rate of air to be supplied to the outdoor heat exchanger 3 and includes a fan, such as a propeller fan, and a motor, such as a DC fan motor, for driving this fan.
  • the accumulator 14 is provided at the suction side of the compressor 1 and has a function of retaining the liquid refrigerant to prevent it from flowing back to the compressor 1 when there is a malfunction in the integrated air-conditioning and hot-water-supply system 100 or during a transient response of an operational state caused by a change in operation control.
  • the heat source unit 301 is provided with the following various kinds of sensors, which include:
  • a high-pressure sensor 201 that is provided at the discharge side of the compressor 1 and detects a high-pressure side high pressure
  • a discharge temperature sensor 202 that is provided at the discharge side of the compressor 1 and detects a discharge temperature
  • an outdoor gas temperature sensor 203 that is provided at the gas side of the outdoor heat exchanger 3 and detects a gas refrigerant temperature
  • an outdoor liquid temperature sensor 204 that is provided at the liquid side of the outdoor heat exchanger 3 and detects a liquid refrigerant temperature
  • an outdoor-air temperature sensor 205 that is provided at the outdoor-air suction side of the heat source unit 301 and detects the temperature of outdoor air flowing into the unit.
  • each of the compressor 1 , the first four-way valve 2 , the outdoor air-sending device 4 , the outdoor pressure-reducing mechanism 5 , and the second four-way valve 13 is controlled by the control unit 103 that functions as normal-operation control means that performs the normal operation including the cooling operation mode A, the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, and the simultaneous cooling and hot-water-supply operation mode C.
  • the branch unit 302 is installed, for example, indoors, is connected to the heat source unit 301 via the liquid extension pipe 6 and the gas extension pipe 12 , is connected to the use-side units 303 a and 303 b via the indoor liquid pipes 8 a and 8 b and the indoor gas pipes 11 a and 11 b , is connected to the hot-water-supply unit 304 via the hot-water-supply liquid pipe 18 , and constitutes a part of the refrigerant circuit in the integrated air-conditioning and hot-water-supply system 100 .
  • the branch unit 302 has a function of controlling the flow of the refrigerant in accordance with a requested operation in the use-side units 303 a and 303 b and the hot-water-supply unit 304 .
  • the branch unit 302 includes a branch refrigerant circuit that constitutes a part of the refrigerant circuit.
  • the branch refrigerant circuit has indoor pressure-reducing mechanisms 7 a and 7 b as use-side pressure-reducing mechanisms for controlling the distributive flow rate of the refrigerant, and a hot-water-supply pressure-reducing mechanism 19 for controlling the distributive flow rate of the refrigerant.
  • the indoor pressure-reducing mechanisms 7 a and 7 b are respectively provided in the indoor liquid pipes 8 a and 8 b .
  • the hot-water-supply pressure-reducing mechanism 19 is provided in the hot-water-supply liquid pipe 18 in the branch unit 302 .
  • Each of the indoor pressure-reducing mechanisms 7 a and 7 b functions as a pressure-reducing valve and an expansion valve, and reduces the pressure of and expands the refrigerant flowing through the liquid extension pipe 6 in the cooling operation mode A and reduces the pressure of and expands the refrigerant flowing through the hot-water-supply pressure-reducing mechanism 19 in the simultaneous cooling and hot-water-supply operation mode E.
  • the indoor pressure-reducing mechanisms 7 a and 7 b reduce the pressure of and expand the refrigerant flowing through the indoor liquid pipes 8 a and 8 b .
  • the hot-water-supply pressure-reducing mechanism 19 functions as a pressure-reducing valve and an expansion valve and reduces the pressure of and expands the refrigerant flowing through the hot-water-supply liquid pipe 18 in the hot-water-supply operation mode C and the simultaneous heating and hot-water-supply operation mode D.
  • the indoor pressure-reducing mechanisms 7 a and 7 b and the hot-water-supply pressure-reducing mechanism 19 may each be of a type whose opening degree is variably controllable, such as precise flow control means using an electronic expansion valve or inexpensive refrigerant flow control means such as a capillary tube.
  • the operation of the hot-water-supply pressure-reducing mechanism 19 is controlled by the control unit 103 of the controller 110 , which functions as normal-operation control means that performs the normal operation including the hot-water-supply operation mode C of the hot-water-supply unit 304 .
  • the operation of each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled by the control unit 103 functioning as normal-operation control means that performs the normal operation including the cooling operation mode A and the heating operation mode B of the use-side units 303 a and 303 b.
  • the values detected by the various kinds of temperature and pressure sensors are input to the measuring unit 101 and are processed by the calculating unit 102 . Then, based on the processed result of the calculating unit 102 , the control unit 103 controls the compressor 1 , the first four-way valve 2 , the outdoor air-sending device 4 , the outdoor pressure-reducing mechanism 5 , the indoor pressure-reducing mechanisms 7 a and 7 b , the indoor air-sending devices 10 and 10 b , the second four-way valve 13 , the feed pump 17 , and the hot-water-supply pressure-reducing mechanism 19 .
  • the overall operation of the integrated air-conditioning and hot-water-supply system 100 is controlled by the controller 110 equipped with the measuring unit 101 , the calculating unit 102 , and the control unit 103 .
  • the controller 110 may be constituted of a microcomputer. Calculation expressions to be described in Embodiment 1 below are calculated by the calculating unit 102 , and the control unit 103 controls each of the devices, such as the compressor 1 , in accordance with the calculation results.
  • the storage unit 104 stores data to be used in the calculating unit 102 and the calculation results.
  • the control unit 103 performs each operation mode by controlling the following:
  • the measuring unit 101 , the calculating unit 102 , and the control unit 103 may be integrally provided or may be provided independently of each other. Furthermore, the measuring unit 101 , the calculating unit 102 , and the control unit 103 may be provided in any one of the units. Moreover, the measuring unit 101 , the calculating unit 102 , and the control unit 103 may be provided in each of the units.
  • the integrated air-conditioning and hot-water-supply system 100 controls each of the devices equipped in the heat source unit 301 , the branch unit 302 , the use-side units 303 a and 303 b , and the hot-water-supply unit 304 in accordance with requested air conditioning loads of the use-side units 303 a and 303 b and a requested hot-water-supply load of the hot-water-supply unit 304 .
  • the integrated air-conditioning and hot-water-supply system 100 performs the cooling operation mode A, the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, or the simultaneous cooling and hot-water-supply operation mode E.
  • the simultaneous cooling and hot-water-supply operation mode E further includes a “hot-water-supply priority mode” in which the operating frequency of the compressor 1 is controlled in accordance with a hot-water-supply request signal from the hot-water-supply unit 304 and a “cooling priority mode” in which the operating frequency of the compressor 1 is controlled in accordance with cooling loads of the use-side units 303 a and 303 b .
  • the hot-water-supply request signal is output from the hot-water-supply unit 304 when the temperature of the water stored in the hot-water-supply tank 305 is lower than a preset hot-water-supply temperature.
  • the control unit 103 estimates a cooling load and a heating load from a temperature difference (i.e., an indoor temperature difference) between an indoor suction temperature and a preset indoor temperature and performs control based on an assumption that the larger the indoor temperature difference, the larger the cooling load and the heating load.
  • a temperature difference i.e., an indoor temperature difference
  • each four-way valve in each of the operation modes is as shown in FIG. 4 .
  • a control method for high-temperature-water supply will be described in addition to a normal control method.
  • the hot-water-supply pressure-reducing mechanism 19 is completely closed.
  • the first four-way valve 2 is in the solid-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3 .
  • the second four-way valve 13 is in the solid-line state, meaning that the suction side of the compressor 1 is connected to the indoor heat exchangers 9 a and 9 b via the gas extension pipe 12 .
  • the compressor 1 While the refrigerant circuit is in this state, the compressor 1 , the outdoor air-sending device 4 , and the indoor pressure-reducing mechanisms 7 a and 7 b are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1 , thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant travels through the first four-way valve 2 and flows into the outdoor heat exchanger 3 where the gas refrigerant condenses by exchanging heat with outdoor air supplied by the outdoor air-sending device 4 , thereby becoming a high-pressure liquid refrigerant.
  • the high-pressure liquid refrigerant flows to the outdoor pressure-reducing mechanism 5 where the high-pressure liquid refrigerant is reduced in pressure. Subsequently, the liquid refrigerant travels through the liquid extension pipe 6 and flows into the branch unit 302 . At this time, the outdoor pressure-reducing mechanism 5 is controlled to a maximum opening degree. The refrigerant flowing into the branch unit 302 is reduced in pressure by the indoor pressure-reducing mechanisms 7 a and 7 b so as to become a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant flows out of the branch unit 302 and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the use-side units 303 a and 303 b.
  • the refrigerant flowing into the use-side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant evaporates by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b , thereby becoming a low-pressure gas refrigerant.
  • each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a cooled-room temperature difference) obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b in corresponding use-side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the cooling load requested in the air-conditioned space where the use-side units 303 a and 303 b are installed.
  • the refrigerant flowing out of the indoor heat exchangers 9 a and 9 b flows out of the use-side units 303 a and 303 b and then travels through the indoor gas pipes 11 a and 11 b and the branch unit 302 so as to flow into the gas extension pipe 12 .
  • the refrigerant then travels through the second four-way valve 13 and passes through the accumulator 14 so as to be suctioned into the compressor 1 again.
  • the operating frequency of the compressor 1 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value.
  • the predetermined evaporating-temperature value is the temperature detected by the indoor liquid temperature sensor 206 a or 206 b .
  • the predetermined evaporating-temperature value is determined from a temperature difference (i.e., a cooled-room temperature difference), which is obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b , in the use-side unit 303 a or 303 b that has the maximum temperature difference in the use-side units 303 a and 303 b.
  • FIG. 5 illustrates a method for determining a target-evaporating-temperature value from a maximum cooled-room temperature difference in compressor control.
  • a target-evaporating-temperature value in a corresponding range is set on the basis of a maximum cooled-Room Temperature difference ⁇ Tje [-].
  • Target-evaporating-temperature values A1 to A4 in respective maximum cooled-room temperature difference ranges are determined from tests, etc.
  • the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the condensing temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205 .
  • the condensing temperature in this case is a saturation temperature calculated based on the pressure detected by the high-pressure sensor 201 .
  • the hot-water-supply pressure-reducing mechanism 19 i.e., a first pressure-reducing mechanism
  • the first four-way valve 2 is in the dash-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the plate-type water heat exchanger 16 (i.e., a first radiator) and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3 (i.e., a first evaporator).
  • the second four-way valve 13 is in the dash-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the indoor heat exchangers 9 a and 9 b.
  • the compressor 1 While the refrigerant circuit is in this state, the compressor 1 , the outdoor air-sending device 4 , the indoor air-sending devices 10 a and 10 b , and the feed pump 17 are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1 , thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant flows through the second four-way valve 13 .
  • the refrigerant flowing into the second four-way valve 13 flows out of the heat source unit 301 and travels through the gas extension pipe 12 so as to flow into the branch unit 302 . Subsequently, the refrigerant travels through the indoor gas pipes 11 a and 11 b so as to flow into the use-side units 303 a and 303 b .
  • the refrigerant flowing into the use-side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant condenses by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b so as to become a high-pressure liquid refrigerant, which then flows out of the indoor heat exchangers 9 a and 9 b .
  • the refrigerant having heated the indoor air at the indoor heat exchangers 9 a and 9 b flows out of the use-side units 303 a and 303 b and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the branch unit 302 .
  • the refrigerant is then reduced in pressure by the indoor pressure-reducing mechanisms 7 a and 7 b , thereby becoming a low-pressure, two-phase gas-liquid or liquid-phase refrigerant. Subsequently, the refrigerant flows out of the branch unit 302 .
  • Each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a heated-room temperature difference) obtained by subtracting a preset indoor temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b in corresponding use-side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the heating load requested in the air-conditioned space where the use-side units 303 a and 303 b are installed.
  • a temperature difference i.e., a heated-room temperature difference
  • the refrigerant flowing out of the branch unit 302 travels through the liquid extension pipe 6 , flows into the heat source unit 301 , passes through the outdoor pressure-reducing mechanism 5 , and then flows into the outdoor heat exchanger 3 .
  • the opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state.
  • the refrigerant flowing into the outdoor heat exchanger 3 evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4 , thereby becoming a low-pressure gas refrigerant.
  • This refrigerant flows out of the outdoor heat exchanger 3 travels through the first four-way valve 2 , passes through the accumulator 14 , and is then suctioned into the compressor 1 again.
  • the operating frequency of the compressor 1 is controlled by the control unit 103 such that the condensing temperature is made equal to a target value.
  • the method for determining the condensing temperature is the same as that in the cooling operation.
  • the target condensing-temperature value is determined from a temperature difference (i.e., a heated-room temperature difference), which is obtained by subtracting a preset indoor temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b , in the use-side unit 303 a or 303 b that has the maximum heated-room temperature difference in the use-side units 303 a and 303 b.
  • FIG. 6 illustrates a method for determining a target-condensing-temperature value from a maximum heated-room temperature difference in compressor control.
  • a target-condensing-temperature value in a corresponding range is set on the basis of a maximum heated-room temperature difference ⁇ Tjc [-].
  • Target-condensing-temperature values B1 to B4 in respective maximum heated-room temperature difference ranges are determined from tests, etc.
  • the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205 .
  • the evaporating temperature in this case is determined based on the temperature detected by the outdoor liquid temperature sensor 204 .
  • the first four-way valve 2 is in the dash-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the plate-type water heat exchanger 16 and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3 .
  • the second four-way valve 13 is in the solid-line state, meaning that the suction side of the compressor 1 is connected to the indoor heat exchangers 9 a and 9 b via the gas extension pipe 12 .
  • the compressor 1 While the refrigerant circuit is in this state, the compressor 1 , the outdoor air-sending device 4 , the indoor air-sending devices 10 a and 10 b , and the feed pump 17 are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1 , thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant flows through the first four-way valve 2 .
  • the refrigerant flowing into the first four-way valve 2 flows out of the heat source unit 301 and travels through the hot-water-supply gas extension pipe 15 so as to flow into the hot-water-supply unit 304 .
  • the refrigerant flowing into the hot-water-supply unit 304 flows into the plate-type water heat exchanger 16 where the refrigerant condenses by exchanging heat with water supplied by the feed pump 17 so as to become a high-pressure liquid refrigerant, which then flows out of the plate-type water heat exchanger 16 .
  • the refrigerant having heated the water at the plate-type water heat exchanger 16 flows out of the hot-water-supply unit 304 , travels through the hot-water-supply liquid pipe 18 , flows into the branch unit 302 , and is then reduced in pressure by the hot-water-supply pressure-reducing mechanism 19 , thereby becoming a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant flows out of the branch unit 302 and flows into the heat source unit 301 via the liquid extension pipe 6 .
  • the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled by the control unit 103 such that the degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is made equal to a predetermined value.
  • the degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is determined by calculating a saturation temperature (i.e., a calculated condensing temperature) from a pressure (i.e., a high pressure) detected by the high-pressure sensor 201 (i.e., a high-pressure sensor) and then subtracting a temperature detected by the hot-water-supply liquid temperature sensor 209 therefrom.
  • the hot-water-supply pressure-reducing mechanism 19 controls the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 so that the degree of subcooling of the refrigerant at the liquid side of the plate-type water heat exchanger 16 is made equal to the predetermined value. Therefore, the high-pressure liquid refrigerant condensed by the plate-type water heat exchanger 16 turns into a state with a predetermined degree of subcooling. Accordingly, the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 corresponds to a hot-water-supply request according to the usage condition of hot water in a facility where the hot-water-supply unit 304 is installed.
  • the refrigerant flowing out of the branch unit 302 travels through the liquid extension pipe 6 , flows into the heat source unit 301 , passes through the outdoor pressure-reducing mechanism 5 , and then flows into the outdoor heat exchanger 3 .
  • the opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state.
  • the refrigerant flowing into the outdoor heat exchanger 3 evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4 , thereby becoming a low-pressure gas refrigerant.
  • This refrigerant flows out of the outdoor heat exchanger 3 travels through the first four-way valve 2 , passes through the accumulator 14 , and is then suctioned into the compressor 1 again.
  • the operating frequency of the compressor 1 is controlled to a high value by the control unit 103 .
  • the controller 110 ensures a high hot-water-supply capacity so as to increase the water temperature in the hot-water-supply tank 305 to a preset hot-water-supply temperature as quickly as possible in response to a hot-water-supply request signal detected by the hot-water-supply-tank water temperature sensor 210 .
  • the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205 .
  • the evaporating temperature in this case is the temperature detected by the outdoor liquid temperature sensor 204 .
  • the inlet water temperature (i.e., the temperature of water flowing into the connection section 25 ) of the plate-type water heat exchanger 16 also becomes high, causing the condensing temperature to increase.
  • the operating frequency of the compressor 1 is controlled to a high value, the high pressure increases to a value outside an appropriate operating range of the compressor 1 . Therefore, if a condensing temperature calculated from a detected value of the high-pressure sensor 201 reaches an upper limit value (e.g., 60 degrees C.), condensing-temperature control shown in expressions (1) and (2) is performed on the compressor 1 so as to prevent the condensing temperature from increasing.
  • ⁇ F ( CTm ⁇ CT ) ⁇ k CT-comp (2)
  • Fm denotes a target operating frequency [Hz] of the compressor 1
  • F denotes a current operating frequency [Hz] of the compressor 1
  • ⁇ F denotes a change [Hz] in the operating frequency of the compressor 1
  • CTm denotes a target condensing-temperature value [degrees C]
  • CT denotes a calculated condensing temperature [degrees C]
  • k CT,comp denotes gain compensation [-] for a change in the operating frequency of the compressor.
  • the target condensing-temperature value CTm is, for example, a maximum condensing-temperature value (e.g., 60 degrees C.) allowable in an appropriate usage range of the compressor 1 .
  • the condensing temperature CT is a saturation temperature calculated from the pressure detected by the high-pressure sensor 201 .
  • the gain compensation k CT,comp for a change in the operating frequency of the compressor is set to a value based on tests or simulation such that the condensing temperature CT does not increase from the target condensing-temperature value CTm and that the frequency does not decrease rapidly.
  • the high-pressure sensor 201 is provided between the compressor 1 and the first four-way valve 2 in Embodiment 1, the configuration is not limited to this.
  • the high-pressure sensor 201 may be provided at any position between the liquid side of the hot-water-supply pressure-reducing mechanism 19 and the discharge side of the compressor 1 , which is located at the high-pressure side of the refrigeration cycle. If the high-pressure sensor 201 is disposed between the first four-way valve 2 and the liquid side of the hot-water-supply pressure-reducing mechanism 19 , an additional pressure sensor for determining the condensing temperature in the heating operation mode B is disposed between the compressor 1 and the second four-way valve 13 .
  • the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled. Specifically, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled in accordance with expressions (3) and (4) so that the predetermined hot-water-supply capacity can be ensured.
  • S j denotes an opening degree [pulse] of the pressure-reducing mechanism after changing the opening degree thereof
  • S j-1 denotes a current opening degree [pulse] of the pressure-reducing mechanism
  • ⁇ S j denotes a change [pulse] in the opening degree of the pressure-reducing mechanism
  • S j m denotes a target opening degree [pulse] of the pressure-reducing mechanism (sometimes referred to as “target pressure-reducing-mechanism opening-degree value”).
  • the target opening degree S j m [pulse] of the pressure-reducing mechanism can be determined at the development stage in the following manner.
  • FIG. 7 illustrates the relationship between the hot-water-supply capacity and the operation efficiency.
  • FIG. 7( a ) illustrates the hot-water-supply capacity of the plate-type water heat exchanger 16 relative to the opening degree of the hot-water-supply pressure-reducing mechanism 19 .
  • the abscissa axis denotes the opening degree of the hot-water-supply pressure-reducing mechanism 19
  • the ordinate axis denotes a target hot-water-supply capacity value of the plate-type water heat exchanger 16 .
  • FIG. 7( b ) illustrates the operation efficiency (COP) relative to the opening degree of the hot-water-supply pressure-reducing mechanism 19 .
  • COP operation efficiency
  • the abscissa axis denotes the opening degree of the hot-water-supply pressure-reducing mechanism 19
  • the ordinate axis denotes the operation efficiency.
  • the target opening degree S j m of the pressure-reducing mechanism can be set based on FIG. 7 as an opening degree that achieves a minimum-required hot-water-supply capacity to be ensured. Specifically, the target opening-degree value is set in correspondence with a target value for the hot-water-supply capacity (i.e., heat-radiation capacity) of the plate-type water heat exchanger 16 (i.e., first radiator).
  • the target opening degree S j m of the pressure-reducing mechanism is determined based on tests or simulation at the development stage.
  • the operating frequency of the compressor 1 is decreased by performing the condensing-temperature control (i.e., expressions (1) and (2)) on the compressor 1 , causing the hot-water-supply capacity to decrease. Therefore, the target opening degree is determined when the inlet water temperature is at the maximum.
  • the inlet water temperature is estimated such that, for example, when the maximum value of the hot-water-supply temperature is 60 degrees C.
  • the hot-water-supply capacity is a rated hot-water-supply capacity
  • the amount of flowing water causes the temperature difference between the inlet water temperature and the outlet water temperature of the plate-type water heat exchanger 16 to be 5 degrees C.
  • the hot-water-supply temperature is 60 degrees C.
  • the outlet water temperature is 60 degrees C.
  • the inlet water temperature is 55 degrees C.
  • the maximum inlet water temperature is 55 degrees C.
  • the minimum-required hot-water-supply capacity i.e., the heat-radiation capacity of the plate-type water heat exchanger 16
  • the operation efficiency can be increased.
  • the target hot-water-supply capacity value of the plate-type water heat exchanger 16 may be set in correspondence with an upper limit value in design for the inlet water temperature of the water flowing into the water pipe of the plate-type water heat exchanger 16 from the downstream water pipe 21 .
  • the condensing-temperature control is performed on the compressor 1 , and the operation is performed with the target opening degree S j m of the pressure-reducing mechanism as a fixed value regardless of the operating frequency of the compressor 1 . Therefore, the minimum-required hot-water-supply capacity can be ensured when the inlet water temperature is 55 degrees C., and the operating frequency of the compressor is increased when the inlet water temperature is low at 54 degrees C. or 53 degrees C.
  • the hot-water-supply capacity increases in proportion to the operating frequency of the compressor, the hot-water-supply capacity is excessive when the inlet water temperature is low, leading to reduced operating efficiency even though the time required for completing the hot-water-supply operation can be shortened. If the minimum-required hot-water-supply capacity can be ensured, it is desirable that the hot-water-supply operation be performed at the highest possible operation efficiency. Therefore, when the inlet water temperature is low at 54 degrees C. or 53 degrees C., the opening degree of the hot-water-supply pressure-reducing mechanism 19 may be reduced to suppress an excessive hot-water-supply capacity, so that the minimum-required hot-water-supply capacity can be ensured. Reducing the opening degree of the hot-water-supply pressure-reducing mechanism 19 causes a pressure difference in the hot-water-supply pressure-reducing mechanism 19 to increase and the condensing temperature to increase, resulting in a lower operating frequency of the compressor 1 .
  • FIG. 8 illustrates tests performed when performing control for changing the target opening-degree value of the hot-water-supply pressure-reducing mechanism in accordance with the frequency of the compressor.
  • the contents of the tests are shown in FIG. 8 for explaining how the control is performed in detail.
  • the tests are performed when the inlet water temperature is at the maximum at 55 degrees C. and also when the inlet water temperature is 54 degrees C. and 53 degrees C., and target opening degrees S j m of the pressure-reducing mechanism that achieve the minimum-required hot-water-supply capacity to be ensured when the condensing-temperature control is performed on the compressor 1 (the target condensing temperature is set to, for example, 60 degrees C.) are determined.
  • a compressor frequency F is also recorded, and a function f(F) of the target opening degree S j m of the pressure-reducing mechanism relative to the compressor frequency F is created from a point obtained from each test.
  • the function of the target opening degree S j m of the pressure-reducing mechanism can be obtained with higher accuracy by increasing the number of tested inlet-water-temperature points. Furthermore, because the operating frequency of the compressor 1 becomes higher and the refrigerant flow rate increases as the inlet water temperature decreases, the target opening degree S j m of the pressure-reducing mechanism also increases.
  • the target opening degree S j m of the pressure-reducing mechanism is determined from the function f(F) shown in expression (5), which is created at the development stage.
  • the controller 110 stores the following expression (5) in the storage unit 104 as frequency/opening-degree correspondence information.
  • FIG. 9 illustrates the relationship between the outdoor-air temperature and the target opening-degree value.
  • the operating frequency of the compressor 1 decreases, causing the target opening-degree value S j m for ensuring the hot-water-supply capacity to increase.
  • a constant hot-water-supply capacity can also be ensured relative to a change in the outdoor-air temperature, such as an increase in the outdoor-air temperature.
  • the controller 110 stores the relationship between the outdoor-air temperature and the target opening-degree value shown in FIG. 9 in the storage unit 104 as outdoor-air-temperature/opening-degree correspondence information.
  • the control unit 103 of the controller 110 refers to the outdoor-air-temperature/opening-degree correspondence information so as to identify a target opening-degree value corresponding to an outdoor-air temperature detected by the outdoor-air temperature sensor 205 from the outdoor-air-temperature/opening-degree correspondence information, and uses the identified target opening-degree value as a target opening-degree value in the opening-degree control.
  • a target opening degree S j m of the pressure-reducing mechanism For determining the target opening degree S j m of the pressure-reducing mechanism, a target opening degree is determined from tests performed at the development stage so as to achieve a constant hot-water-supply capacity. However, because there are individual differences among pressure-reducing mechanisms in actuality, a constant hot-water-supply capacity is sometimes not achieved even if the same pressure-reducing mechanism is used. The following configuration can be used to solve this problem.
  • FIG. 10 illustrates the relationships among a hot-water-supply capacity Qc, an evaporating capacity Qe, and a compressor input W.
  • a sum of the evaporating capacity of the outdoor heat exchanger 3 and the input of the compressor 1 is equal to the hot-water-supply capacity of the plate-type water heat exchanger 16 . Therefore, the hot-water-supply capacity is determined by determining the evaporating capacity of the outdoor heat exchanger 3 and the input of the compressor 1 (i.e., compressing work done on the refrigerant by the compressor 1 ).
  • a table showing the evaporating capacity relative to a temperature difference between the outdoor-air temperature and the evaporating temperature is created based on tests, and the evaporating capacity of the outdoor heat exchanger 3 is determined by using the table.
  • FIG. 11 illustrates the contents of tests performed at the development stage when performing control for changing the target opening-degree value in accordance with the hot-water-supply capacity.
  • the contents of the tests are shown in FIG. 11 .
  • the condensing-temperature control is performed on the compressor 1 , and the opening degree of the hot-water-supply pressure-reducing mechanism 19 that can ensure the hot-water-supply capacity at a maximum inlet water temperature of 55 degrees C. is determined.
  • the “difference between the outdoor-air temperature and the evaporating temperature” and the “evaporating capacity” of the outdoor heat exchanger 3 at that point are recorded.
  • the evaporating temperature is based on a detected value of the outdoor liquid temperature sensor 204 .
  • the opening degree is slightly changed (to, for example, about 50 pulses) from the previously-determined opening degree of the hot-water-supply pressure-reducing mechanism 19 .
  • the “difference between the outdoor-air temperature and the evaporating temperature” and the evaporating capacity of the outdoor heat exchanger 3 at that point are recorded.
  • the blanks in FIG. 11 are filled in this manner.
  • the values on the table are linearly-interpolated so as to determine the evaporating capacity.
  • the relationship between the “difference between the outdoor-air temperature and the evaporating temperature” and the evaporating capacity obtained in FIG. 11 is input to the controller 110 .
  • the controller 110 interpolates the results of the relationship (three sets thereof in FIG. 11 ) between the “difference between the outdoor-air temperature and the evaporating temperature” and the evaporating capacity and calculates a function of the evaporating capacity and the “difference between the outdoor-air temperature and the evaporating temperature”.
  • the input W [kW] of the compressor 1 can be calculated from the operating frequency F [Hz] of the compressor 1 , the condensing temperature CT [degrees C], and an evaporating temperature ET [degrees C] by using the following expression (6).
  • the degree of superheat at the inlet of the compressor is simply set to zero.
  • the operating frequency F of the compressor 1 is obtained as operation information.
  • the condensing temperature CT is obtained as a saturation pressure detected by the high-pressure sensor 201 .
  • the evaporating temperature ET is determined in a manner similar to how the evaporating capacity is calculated. Accordingly, since the evaporating capacity Qe [kW] and the input W [kW] of the compressor 1 can be determined, the hot-water-supply capacity Qc [kW] can be determined from expression (7).
  • the target opening degree S j m of the pressure-reducing mechanism can be determined from the determined hot-water-supply capacity Qc and a target minimum-required hot-water-supply capacity value Qcm [kW].
  • k Q c ,S jm denotes gain compensation [-] for a change in the target opening degree of the pressure-reducing mechanism and is determined from tests or simulation.
  • the target opening degree S j m of the pressure-reducing mechanism is determined. Accordingly, variations in hot-water-supply capacity caused by individual differences among pressure-reducing mechanisms can be suppressed, so that the minimum-required hot-water-supply capacity can be ensured during the high-temperature-water supply in any actual system. Because the target opening degree S j m of the pressure-reducing mechanism is calculated by determining the hot-water-supply capacity by using the outdoor-air temperature in this method, the outdoor-air temperature compensation shown in FIG. 9 is not necessary.
  • the controller 110 receives data of two or more sets of a temperature difference between the outdoor-air temperature around the outdoor heat exchanger 3 and the evaporating temperature of the outdoor heat exchanger 3 and the evaporating capacity of the outdoor heat exchanger 3 corresponding to this temperature difference. Based on the input data, the controller 110 determines a functional relationship between the temperature difference and the evaporating capacity by interpolation and refers to the determined functional relationship so as to identify, from the functional relationship, the evaporating capacity that corresponds to the temperature difference between the outdoor-air temperature detected by the outdoor-air temperature sensor 205 and the evaporating temperature detected by the outdoor liquid temperature sensor 204 .
  • the controller 110 calculates a compressor input W, which indicates the compressing work done on the refrigerant by the compressor, from the operating frequency of the compressor 1 , the calculated condensing temperature, and the evaporating temperature detected by the outdoor liquid temperature sensor 204 (expression (6)). Furthermore, the controller 110 calculates the hot-water-supply capacity Qc of the plate-type water heat exchanger 16 from the identified evaporating capacity Qe and the calculated compressor input W (expression (7)).
  • the controller 110 determines a target opening-degree value in accordance with a difference between the calculated hot-water-supply capacity Qc and a preliminarily-stored target hot-water-supply-capacity value Qcm, and uses the determined target opening-degree value as a target opening-degree value in the opening-degree control (expression (8)).
  • FIG. 12 is a flowchart illustrating the flow for determining whether the high-temperature-water supply is to be performed or the hot-water-supply (i.e., normal hot-water supply) other than the high-temperature-water-supply is to be performed.
  • the controller 110 determines whether the condensing temperature has increased to a value higher than a predetermined value CTm.
  • the predetermined value CTm for the condensing temperature is, for example, a maximum value (e.g., 60 degrees C.) of an appropriate usage range of the compressor 1 .
  • step S 12 the high-temperature-water-supply operation is performed by performing the condensing-temperature control shown in expressions (1) and (2) on the compressor 1 and performing the opening-degree control shown in expressions (3) and (4) on the hot-water-supply pressure-reducing mechanism 19 .
  • step S 13 the normal hot-water-supply operation is performed by performing normal control on the compressor 1 and the hot-water-supply pressure-reducing mechanism 19 .
  • the hot-water-supply operation is performed in response to a hot-water-supply request, and condensing-temperature control is performed on the compressor and opening-degree control is performed on the pressure-reducing mechanism during the high-temperature-water supply in which the condensing temperature becomes higher than the predetermined value CTm, thereby suppressing an excessive increase in high pressure and achieving a predetermined hot-water-supply capacity.
  • the hot-water-supply pressure-reducing mechanism 19 is used as a pressure-reducing mechanism whose opening degree is controlled during the high-temperature-water supply in which the condensing temperature CT becomes higher than or equal to the predetermined value CTm in Embodiment 1, this is merely an example.
  • the controlled subject is not limited to the hot-water-supply pressure-reducing mechanism 19 , and the opening-degree control may alternatively be performed on the outdoor pressure-reducing mechanism 5 .
  • the opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state when the hot-water-supply pressure-reducing mechanism 19 is used as a pressure-reducing mechanism whose opening degree is controlled, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled so that it is in a completely open state.
  • the integrated air-conditioning and hot-water-supply system 100 is described as an example in Embodiment 1, the high-temperature-water-supply control according to the technology developed in the present invention can also be applied to the hot-water-supply operation in a hot-water-supply system in which the heat source unit 301 and the hot-water-supply unit 304 are connected by a refrigerant communication pipe, specifically, a hot-water-supply system that does not have an air-conditioning function but is only capable of performing the hot-water-supply operation.
  • the refrigerant is not limited to an R410A refrigerant and may alternatively be, for example, a refrigerant, such as a CO 2 refrigerant, whose operating pressure becomes higher than or equal to the critical pressure (i.e., a refrigerant whose pressure at the high-pressure side, such as the pressure at the discharge side of the compressor, becomes higher than or equal to the critical pressure).
  • a refrigerant such as a CO 2 refrigerant
  • Fm denotes a target operating frequency [Hz] of the compressor 1
  • F denotes a current operating frequency [Hz] of the compressor 1
  • AF denotes a change [Hz] in the operating frequency of the compressor 1
  • Pm high denotes a target high-pressure value [MPaG]
  • P high denotes a calculated condensing temperature [MPaG]
  • k P,comp denotes gain compensation [-] for a change in the operating frequency of the compressor.
  • the target high-pressure value Pm high is, for example, a maximum high-pressure value (e.g., 14.5 MPaG when a CO 2 refrigerant is used) allowable in the appropriate usage range of the compressor 1 .
  • a maximum high-pressure value e.g., 14.5 MPaG when a CO 2 refrigerant is used
  • the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled based on expressions (3) and (4) so that a predetermined hot-water-supply capacity can be ensured.
  • the technology according to the present invention can be applied to a refrigerant that operates at the critical pressure or higher, similar to a refrigerant that operates at the critical pressure or lower, such as an R410A refrigerant, thereby suppressing an excessive increase in high pressure during the high-temperature-water supply so as to achieve the predetermined hot-water-supply capacity.
  • the first four-way valve 2 is in the “dash-line” state in FIG. 4 .
  • the second four-way valve 13 is in the “dash-line” state. This means that the discharge side of the compressor 1 is connected to the gas side of the indoor heat exchangers 9 a and 9 b .
  • both the first four-way valve 2 and the second four-way valve 13 are in the “dash-line” state, as in the “heating operation mode”, the hot-water-supply pressure-reducing mechanism 19 is open in the simultaneous heating and hot-water-supply operation mode D, unlike in the “heating operation mode” in which the hot-water-supply pressure-reducing mechanism 19 is closed.
  • the compressor 1 While the refrigerant circuit is in this state, the compressor 1 , the outdoor air-sending device 4 , the indoor air-sending devices 10 a and 10 b , and the feed pump 17 are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1 , thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant is distributed so as to flow through the first four-way valve 2 and the second four-way valve 13 .
  • the refrigerant flowing into the first four-way valve 2 flows out of the heat source unit 301 and travels through the hot-water-supply gas extension pipe 15 so as to flow into the hot-water-supply unit 304 .
  • the refrigerant flowing into the hot-water-supply unit 304 flows into the plate-type water heat exchanger 16 where the refrigerant condenses by exchanging heat with water supplied by the feed pump 17 so as to become a high-pressure liquid refrigerant, which then flows out of the plate-type water heat exchanger 16 .
  • the refrigerant having heated the water at the plate-type water heat exchanger 16 flows out of the hot-water-supply unit 304 , travels through the hot-water-supply liquid pipe 18 , flows into the branch unit 302 , and is then reduced in pressure by the hot-water-supply pressure-reducing mechanism 19 , thereby becoming a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant merges with the refrigerant flowing from the indoor pressure-reducing mechanisms 7 a and 7 b and flows out of the branch unit 302 .
  • a flow path branching from the discharge side of the compressor 1 and extending through the second four-way valve 13 , the indoor heat exchangers 9 a and 9 b , and the indoor pressure-reducing mechanisms 7 a and 7 b serves as a branch flow path relative to a flow path for the hot-water-supply operation.
  • the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled by the control unit 103 such that the degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is made equal to a predetermined value.
  • the degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is similar to that in the hot-water-supply operation.
  • the hot-water-supply pressure-reducing mechanism 19 controls the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 so that the degree of subcooling of the refrigerant at the liquid side of the plate-type water heat exchanger 16 is made equal to the predetermined value.
  • the high-pressure liquid refrigerant condensed by the plate-type water heat exchanger 16 turns into a state with a predetermined degree of subcooling. Accordingly, the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 corresponds to a hot-water-supply request according to the usage condition of hot water in the facility where the hot-water-supply unit 304 is installed.
  • the refrigerant flowing into the second four-way valve 13 flows out of the heat source unit 301 and travels through the gas extension pipe 12 so as to flow to the branch unit 302 . Subsequently, the refrigerant travels through the indoor gas pipes 11 a and 11 b so as to flow into the use-side units 303 a and 303 b .
  • the refrigerant flowing into the use-side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant condenses by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b so as to become a high-pressure liquid refrigerant, which then flows out of the indoor heat exchangers 9 a and 9 b .
  • the refrigerant having heated the indoor air at the indoor heat exchangers 9 a and 9 b flows out of the use-side units 303 a and 303 b and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the branch unit 302 .
  • the refrigerant is then reduced in pressure by the indoor pressure-reducing mechanisms 7 a and 7 b , thereby becoming a low-pressure, two-phase gas-liquid or liquid-phase refrigerant. Subsequently, the refrigerant flowing out of the indoor pressure-reducing mechanisms 7 a and 7 b merges with the refrigerant flowing from the hot-water-supply pressure-reducing mechanism 19 and flows out of the branch unit 302 .
  • Each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a heated-room temperature difference) obtained by subtracting a preset indoor temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b (i.e., an indoor temperature sensor) in corresponding use-side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the heating load requested in the air-conditioned space where the use-side units 303 a and 303 b are installed.
  • a temperature difference i.e., a heated-room temperature difference
  • the refrigerant flowing out of the branch unit 302 travels through the liquid extension pipe 6 , flows into the heat source unit 301 , passes through the outdoor pressure-reducing mechanism 5 , and then flows into the outdoor heat exchanger 3 .
  • the opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state.
  • the refrigerant flowing into the outdoor heat exchanger 3 evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4 , thereby becoming a low-pressure gas refrigerant.
  • This refrigerant flows out of the outdoor heat exchanger 3 travels through the first four-way valve 2 , passes through the accumulator 14 , and is then suctioned into the compressor 1 again.
  • the operating frequency of the compressor 1 is controlled to a high value by the control unit 103 so that a high hot-water-supply capacity can be ensured.
  • the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205 .
  • the evaporating temperature in this case is the temperature detected by the outdoor liquid temperature sensor 204 .
  • the hot-water-supply temperature is a high temperature (e.g., 60 degrees C.)
  • the inlet water temperature of the plate-type water heat exchanger 16 also becomes high, causing the condensing temperature to increase.
  • the heating operation is performed in the use-side units 303 a and 303 b in the simultaneous heating and hot-water-supply operation mode D.
  • the simultaneous heating and hot-water-supply operation is stopped if the condensing temperature CT increases to a value higher than a predetermined value. Then, the controller 110 performs a switching process for alternately switching between the heating operation and the hot-water-supply operation so that the heating operation and the hot-water-supply operation are performed.
  • FIG. 13 is a flowchart illustrating the flow of an operation method during the high-temperature-water supply in the simultaneous heating and hot-water-supply operation. Specifically, the operation is performed in accordance with the flowchart shown in FIG. 13 .
  • step S 21 it is determined whether or not the condensing temperature has increased to a value higher than a predetermined value. Similar to the case of the hot-water-supply temperature, the predetermined value for the condensing temperature CT is, for example, a maximum condensing-temperature value (e.g., 60 degrees C.) allowable in the appropriate usage range of the compressor 1 .
  • a maximum condensing-temperature value e.g. 60 degrees C.
  • the condensing temperature CT is lower than or equal to the predetermined value, normal control is continuously performed in the simultaneous heating and hot-water-supply operation in step S 22 . If the condensing temperature is above the predetermined value, the mode is changed to a heating operation mode in step S 23 .
  • the use-side units 303 a and 303 b are set in a heating thermostat OFF state, and the following control is performed for the purpose of changing to a hot-water-supply operation mode.
  • the indoor pressure-reducing mechanisms 7 a and 7 b are normally controlled so that a “heated-room temperature difference”, which is equal to “indoor suction temperature (detected by indoor suction temperature sensor) ⁇ preset indoor temperature”, is eliminated.
  • the indoor pressure-reducing mechanisms 7 a and 7 b are controlled so that the “heated-room temperature difference” is a positive value, such as +1 degree C. (i.e., a predetermined positive value) (S 23 ). Moreover, the operating frequency of the compressor 1 is controlled so that the condensing temperature CT is made equal to the target value CTm. Normally, the target value CTm for the condensing temperature is determined from a “heated-room temperature difference” in the use-side unit 303 a or 303 b that has the maximum heated-room temperature difference.
  • the target value CTm for the condensing temperature is determined from a “heated-room temperature difference of ⁇ 1 degree C.” in the use-side unit 303 a or 303 b that has the maximum heated-room temperature difference of ⁇ 1 degree C.
  • the “heated-room temperature difference” i.e., indoor suction temperature ⁇ preset indoor temperature
  • the “heated-room temperature difference” can be made equal to +1 degree C.
  • step S 24 it is determined whether the heated-room temperature difference is greater than or equal to +1 degree C. If the heated-room temperature difference is smaller than +1 degree C., the process returns to step S 23 . If the heated-room temperature difference is greater than or equal to +1 degree C., the process proceeds to step S 25 where the use-side units 303 a and 303 b are set in a thermostat OFF state and the hot-water-supply unit 304 is set in a thermostat ON state, thereby commencing the hot-water-supply operation mode C. Specifically, the simultaneous heating and hot-water-supply operation mode D is changed to the hot-water-supply operation mode C.
  • the first four-way valve 2 and the second four-way valve 13 are set to the hot-water-supply operation mode C in FIG. 4 .
  • This state is a high-temperature-water-supply state since the condensing temperature CT is higher than or equal to the predetermined value, and the controller 110 performs the condensing-temperature control on the compressor 1 and the opening-degree control on the hot-water-supply pressure-reducing mechanism 19 .
  • the controller 110 determines whether the heated-room temperature difference (i.e., indoor suction temperature ⁇ preset indoor temperature) is greater than or equal to 0 degrees C. If the heated-room temperature difference is smaller than 0 degrees C., the process returns to step S 23 where the controller 110 performs the heating operation mode B.
  • step S 27 the controller 110 determines whether or not there is a hot-water-supply request (i.e., whether the hot-water supply is completed). If there is a hot-water-supply request, the process returns to step S 25 where the controller 110 continues to perform the hot-water-supply operation mode C. If there is no hot-water-supply request, the process proceeds to step S 28 where the controller 110 stops the hot-water-supply unit 304 and sets the use-side units 303 a and 303 b to a heating thermostat ON state so as to commence the normal heating operation.
  • the use-side units 303 a and 303 b perform the cooling operation
  • the hot-water-supply unit 304 performs the hot-water-supply operation.
  • the first four-way valve 2 is in the dash-line state
  • the second four-way valve 13 is in the solid-line state. This means that the discharge side of the compressor 1 is connected to the plate-type water heat exchanger 16 via the hot-water-supply gas extension pipe 15 , and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3 .
  • the refrigerant flowing out of the plate-type water heat exchanger 16 travels through the hot-water-supply pressure-reducing mechanism 19 and subsequently diverges therefrom so as to flow into the indoor pressure-reducing mechanisms 7 a and 7 b and into the liquid extension pipe 6 .
  • the compressor 1 While the refrigerant circuit is in this state, the compressor 1 , the outdoor air-sending device 4 , the indoor air-sending devices 10 a and 10 b , and the feed pump 17 are activated, so that a low-pressure gas refrigerant is suctioned into and compressed by the compressor 1 , thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant flows into the first four-way valve 2 .
  • the refrigerant flowing into the first four-way valve 2 flows out of the heat source unit 301 and travels through the hot-water-supply gas extension pipe 15 so as to flow into the hot-water-supply unit 304 .
  • the refrigerant flowing into the hot-water-supply unit 304 flows into the plate-type water heat exchanger 16 where the refrigerant condenses by exchanging heat with water supplied by the feed pump 17 so as to become a high-pressure liquid refrigerant, which then flows out of the plate-type water heat exchanger 16 .
  • the refrigerant having heated the water at the plate-type water heat exchanger 16 flows out of the hot-water-supply unit 304 and travels through the hot-water-supply liquid pipe 18 , so as to flow into the branch unit 302 .
  • the refrigerant flowing into the branch unit 302 is reduced in pressure by the hot-water-supply pressure-reducing mechanism 19 , thereby becoming an intermediate-pressure, two-phase gas-liquid or liquid-phase refrigerant.
  • the hot-water-supply pressure-reducing mechanism 19 is controlled to a maximum opening degree.
  • the refrigerant is distributed so as to flow into the liquid extension pipe 6 and into the indoor pressure-reducing mechanisms 7 a and 7 b .
  • the refrigeration traveling toward the indoor units diverges at a branch section 28 . Furthermore, in FIG.
  • flow paths constituted by the indoor pressure-reducing mechanisms 7 a and 7 b (i.e., second pressure-reducing mechanisms), the indoor heat exchangers 9 a and 9 b (i.e., second evaporators), and the second four-way valve 13 constitute heat-absorption branch flow paths.
  • the refrigerant flowing into the indoor pressure-reducing mechanisms 7 a and 7 b is reduced in pressure into a low-pressure two-phase gas-liquid state and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the use-side units 303 a and 303 b .
  • the refrigerant flowing into the use-side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant evaporates by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b , thereby becoming a low-pressure gas refrigerant.
  • each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a cooled-room temperature difference) obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b in corresponding use-side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the cooling load requested in the air-conditioned space where the use-side units 303 a and 303 b are installed.
  • a temperature difference i.e., a cooled-room temperature difference
  • the refrigerant flowing out of the indoor heat exchangers 9 a and 9 b flows out of the use-side units 303 a and 303 b and then travels through the indoor gas pipes 11 a and 11 b , the branch unit 302 , and the gas extension pipe 12 so as to flow into the heat source unit 301 .
  • the refrigerant flowing into the heat source unit 301 passes through the second four-way valve 13 and then merges with the refrigerant having passed through the outdoor heat exchanger 3 .
  • the refrigerant flowing into the liquid extension pipe 6 flows into the heat source unit 301 and is reduced in pressure by the outdoor pressure-reducing mechanism 5 , thereby becoming a low-pressure two-phase gas-liquid refrigerant.
  • the refrigerant flows into the outdoor heat exchanger 3 where the refrigerant evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4 .
  • the refrigerant travels through the first four-way valve 2 and merges with the refrigerant having passed through the indoor heat exchangers 9 a and 9 b .
  • the refrigerant passes through the accumulator 14 and is suctioned into the compressor 1 again.
  • the simultaneous cooling and hot-water-supply operation mode E is in the hot-water-supply priority mode
  • the water temperature in the hot-water-supply tank 305 is increased to a preset hot-water-supply temperature as quickly as possible in response to a hot-water-supply request of the hot-water-supply unit 304 .
  • the control unit 103 controls the compressor 1 so as to increase the operating frequency thereof. Therefore, heat absorption is necessary in the outdoor heat exchanger 3 for achieving an equal cooling capacity for the cooling loads of the use-side units 303 a and 303 b .
  • the opening degree of the outdoor pressure-reducing mechanism 5 is controlled by the control unit 103 such that the degree of superheat at the gas side of the outdoor heat exchanger 3 is made equal to a predetermined value.
  • the degree of superheat at the gas side of the outdoor heat exchanger 3 is determined by subtracting the temperature detected by the outdoor liquid temperature sensor 204 from the temperature detected by the outdoor gas temperature sensor 203 .
  • the quantity of air from the outdoor air-sending device 4 is controlled such that the evaporating temperature is made equal to a predetermined value.
  • the evaporating temperature is the temperature detected by the indoor liquid temperature sensor 206 a or 206 b .
  • the predetermined evaporating-temperature value is determined from a temperature difference (i.e., a cooled-room temperature difference), which is obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b , in the use-side unit 303 a or 303 b that has the maximum heated-room temperature difference in the use-side units 303 a and 303 b.
  • the operating frequency of the compressor 1 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the cooling loads of the use-side units 303 a and 303 b .
  • the predetermined evaporating-temperature value is determined from a temperature difference (i.e., a cooled-room temperature difference), which is obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b , in the use-side unit 303 a or 303 b that has the maximum heated-room temperature difference in the use-side units 303 a and 303 b .
  • the outdoor pressure-reducing mechanism 5 is controlled to a small opening degree by the control unit 103 , and the outdoor air-sending device 4 is stopped by the control unit 103 .
  • the operation is normally performed in the cooling priority mode and is performed in accordance with the cooling load so as to achieve a favorable level of comfort inside.
  • the cooling load is small, the operating frequency of the compressor 1 becomes low. If this causes the hot-water-supply capacity to be low for a long time, the time that it takes to complete the hot-water-supply operation increases, causing a shortage of hot water.
  • the simultaneous cooling and hot-water-supply operation mode E is performed in the hot-water-supply priority mode so as to prevent the shortage of hot water.
  • the hot-water-supply temperature is a high temperature (e.g., 60 degrees C.)
  • the inlet water temperature of the plate-type water heat exchanger 16 also becomes high, causing the condensing temperature CT to increase.
  • the cooling operation is performed in the use-side units 303 a and 303 b in the simultaneous cooling and the hot-water-supply operation. Therefore, when the condensing-temperature control shown in expressions (1) and (2) is performed on the compressor 1 and the opening-degree control shown in expressions (3) and (4) is performed on the hot-water-supply pressure-reducing mechanism 19 , the operating frequency of the compressor 1 becomes low in the condensing-temperature control.
  • a cooling capacity cannot be ensured in the use-side units 303 a and 303 b , sometimes resulting in a “non-cooled” state. Therefore, if the condensing temperature increases to a value higher than a predetermined value during the simultaneous cooling and hot-water-supply operation, the simultaneous operation is stopped, and the cooling operation and the hot-water-supply operation are performed by alternately switching between the cooling operation and the hot-water-supply operation, as in the simultaneous heating and hot-water-supply operation.
  • FIG. 14 is a flowchart illustrating the flow of an operation method during the high-temperature-water supply in the simultaneous cooling and hot-water-supply operation mode. Specifically, the operation is performed in accordance with the flowchart shown in FIG. 14 .
  • step S 31 it is determined whether or not the condensing temperature has increased to a value higher than a predetermined value. Similar to the case of the hot-water-supply temperature, the predetermined value for the condensing temperature is, for example, a maximum condensing-temperature value (e.g., 60 degrees C.) allowable in the appropriate usage range of the compressor 1 .
  • a maximum condensing-temperature value e.g. 60 degrees C.
  • the process proceeds to the cooling operation mode A in step S 33 .
  • the use-side units 303 a and 303 b are set in a cooling thermostat OFF state, and the following control is performed for the purpose of changing to the hot-water-supply operation mode C.
  • the indoor pressure-reducing mechanisms 7 a and 7 b are normally controlled so that a “cooled-room temperature difference”, which is equal to “indoor suction temperature (detected by indoor suction temperature sensor) ⁇ preset indoor temperature”, is eliminated.
  • the indoor pressure-reducing mechanisms 7 a and 7 b are controlled so that the cooled-room temperature difference is a negative value, such as ⁇ 1 degree C. (i.e., a predetermined negative value).
  • the operating frequency of the compressor 1 is controlled so that the evaporating temperature is made equal to a target value.
  • the target value for the evaporating temperature is determined from a cooled-room temperature difference in the use-side unit 303 a or 303 b that has the maximum cooled-room temperature difference in the use-side units 303 a and 303 b .
  • the target evaporating-temperature value for the operating frequency of the compressor 1 is determined from a cooled-room temperature difference of +1 degree C. in the use-side unit 303 a or 303 b that has the maximum heated-room temperature difference of +1 degree C.
  • step S 34 it is determined whether the cooled-room temperature difference is smaller than or equal to ⁇ 1 degree C. If the cooled-room temperature difference is not smaller than or equal to ⁇ 1 degree C., the process returns to step S 33 . If the cooled-room temperature difference is smaller than or equal to ⁇ 1 degree C., the process proceeds to step S 35 where the use-side units 303 a and 303 b are set in a cooling thermostat OFF state and the mode is changed to the hot-water-supply operation mode C.
  • this state is a high-temperature-water-supply state since the condensing temperature is higher than or equal to the predetermined value, and the condensing-temperature control is performed on the compressor 1 , and the opening-degree control is performed on the hot-water-supply pressure-reducing mechanism 19 .
  • step S 36 it is determined whether the cooled-room temperature difference is smaller than or equal to 0 degrees C. If the cooled-room temperature difference is greater than or equal to 0 degrees C., the process returns to step S 33 where the mode is set to the cooling operation mode A.
  • step S 37 it is determined whether or not there is a hot-water-supply request (i.e., whether the hot-water supply is completed). If there is a hot-water-supply request, the process returns to step S 35 where the hot-water-supply operation mode C is continuously performed. If there is no hot-water-supply request, the process proceeds to step S 38 where the hot-water-supply unit 304 is stopped and the use-side units 303 a and 303 b are set to a cooling thermostat ON state, thereby commencing the normal cooling operation.
  • an excessive increase in condensing temperature during the high-temperature-water supply can be suppressed, and a hot-water-supply capacity can be ensured within a usage range of the compressor.
  • Embodiment 1 Although the integrated air-conditioning and hot-water-supply system 100 (refrigeration cycle apparatus) is described in Embodiment 1, the operation of the integrated air-conditioning and hot-water-supply system 100 can be construed as a refrigeration cycle control method.
  • 1 compressor, 2 : first four-way valve, 3 : outdoor heat exchanger, 4 : outdoor air-sending device, 5 : outdoor pressure-reducing mechanism, 6 : liquid extension pipe, 7 a , 7 b : indoor pressure-reducing mechanism, 8 a , 8 b : indoor liquid pipe, 9 a , 9 b : indoor heat exchanger, 10 a , 10 b : indoor air-sending device, 11 a , 11 b : indoor gas pipe, 12 : gas extension pipe, 13: second four-way valve, 14: accumulator, 15 : hot-water-supply gas extension pipe, 16 : plate-type water heat exchanger, 17 : feed pump, 18 : hot-water-supply liquid pipe, 19 : hot-water-supply pressure-reducing mechanism, 20 : upstream water pipe, 21 : downstream water pipe, 100 : integrated air-conditioning and hot-water-supply system, 110 : controller, 101 : measuring unit, 102 : calculating unit, 103

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

An integrated air-conditioning and hot-water-supply system includes a compressor, a plate-type water heat exchanger, a hot-water-supply pressure-reducing mechanism, and an outdoor heat exchanger. Moreover, the integrated air-conditioning and hot-water-supply system includes a high-pressure sensor that detects a high pressure in the compressor, and a controller that calculates a condensing temperature of the plate-type water heat exchanger based on the high pressure detected by the high-pressure sensor. When the calculated condensing temperature is higher than or equal to a preset target condensing-temperature value, the controller performs condensing-temperature control for controlling the operating frequency of the compressor based on a difference between the calculated condensing temperature and the target condensing-temperature value, and performs opening-degree control for controlling the opening degree of the hot-water-supply pressure-reducing mechanism concurrently with the condensing-temperature control based on a difference between a current opening degree of the hot-water-supply pressure-reducing mechanism and a preset target opening-degree value.

Description

    TECHNICAL FIELD
  • The present invention relates to integrated air-conditioning and hot-water-supply systems that can perform an air-conditioning operation (i.e., cooling operation or heating operation) and a hot-water-supply operation at the same time, and more specifically, to an integrated air-conditioning and hot-water-supply system that determines a high-temperature-water supply state when the condensing temperature becomes higher than or equal to a predetermined value during a hot-water supply and that suppresses an excessive increase in high pressure by controlling the condensing temperature of a compressor and the opening degree of a pressure-reducing mechanism so as to achieve a predetermined hot-water-supply capacity within a usage range of the compressor.
  • BACKGROUND ART
  • In the related art, a hot-water-suppliable heat pump system that is equipped with a refrigerant circuit formed by connecting a hot-water-supply unit (i.e., a water heater) to a heat source unit (i.e., an outdoor unit) by pipes and that can perform the hot-water-supply operation is known. When the hot-water-supply temperature becomes high (e.g., 60 degrees C.) in such a hot-water-supply system, the condensing temperature increases, causing an excessive increase in high pressure. This is a problem in that it is difficult to ensure a hot-water-supply capacity. For this reason, there have been efforts to solve this problem (e.g., see Patent Literature 1 and Patent Literature 2).
  • In a heat-pump bath hot-water-supply device discussed in Patent Literature 1, the valve opening degree of a pressure-reducing device is controlled in accordance with a discharge temperature or a discharge pressure as a target. The operation efficiency is set in accordance with a discharge temperature or a discharge pressure that has a maximum value relative to the valve opening degree of the pressure-reducing device and that corresponds to the maximum operation efficiency as a target control value. By changing the target control value in accordance with a bathtub temperature, a boiling temperature, a water-side inlet temperature, and a compressor frequency, high operation efficiency can be achieved even when the bathtub temperature, the boiling temperature, the water-side inlet temperature, and the compressor frequency change.
  • In a heat-pump hot-water-supply device discussed in Patent Literature 2, the discharge pressure is monitored during the hot-water-supply operation, and discharge-pressure control is performed on an expansion valve when the discharge pressure increases, so that the operation can be continuously performed without the discharge pressure exceeding the usage range of the compressor.
  • CITATION LIST Patent Literature
    • Patent Literature 1: Japanese Unexamined Patent Application Publication No. 2004-53118
    • Patent Literature 2: Japanese Unexamined Patent Application Publication No. 2005-98530
    SUMMARY OF INVENTION Technical Problem
  • In the heat-pump bath hot-water-supply device discussed in Patent Literature 1, the pressure-reducing device is controlled in accordance with the discharge temperature or the discharge pressure corresponding to the maximum operation efficiency. However, in the case where a high-temperature-water supply is performed and the requested hot-water-supply capacity and the compressor frequency are high, the control is performed based on the operation efficiency regardless of an increase in the discharge pressure of the pressure-reducing device. This causes the discharge pressure to increase, possibly resulting in an excessive increase in the condensing temperature.
  • In the heat-pump hot-water-supply device discussed in Patent Literature 2, in the case where the high-temperature-water supply is performed and the requested hot-water-supply capacity and the compressor frequency are high, an increase in high pressure sometimes cannot be suppressed by simply controlling the pressure-reducing device, resulting in an excessive increase in the condensing temperature.
  • Furthermore, in an integrated air-conditioning and hot-water-supply system that is equipped with a refrigerant circuit formed by connecting a use-side unit (i.e., an indoor unit) by pipes in addition to a hot-water-supply unit and that can perform the air-conditioning operation and the hot-water-supply operation at the same time, if there are an air conditioning load and a high-temperature-water-supply request at the same time during the high-temperature-water supply, an operation method that satisfies both of them needs to be established.
  • In the present invention, when the condensing temperature becomes higher than or equal to a predetermined value during the hot-water supply, a high-temperature-water supply state is determined, condensing-temperature control is performed on a compressor, and opening-degree control is performed on a pressure-reducing mechanism. Accordingly, an integrated air-conditioning and hot-water-supply system that can suppress an excessive increase in condensing temperature and can ensure a hot-water-supply capacity within a usage range of a compressor during the high-temperature-water supply.
  • Solution to Problem
  • A refrigeration cycle apparatus according to the present invention includes a refrigeration cycle mechanism having a compressor whose operating frequency is controllable, a first radiator, a first pressure-reducing mechanism whose opening degree is controllable, and a first evaporator, and in which a refrigerant sequentially circulates through the compressor, the first radiator, the first pressure-reducing mechanism, and the first evaporator; a high-pressure sensor that detects a high pressure between a discharge side of the compressor and a liquid side of the first pressure-reducing mechanism; and a controller that calculates a condensing temperature of the first radiator based on the high pressure detected by the high-pressure sensor. When the calculated condensing temperature of the first radiator is higher than or equal to a preset target condensing-temperature value, the controller performs condensing-temperature control for controlling the operating frequency of the compressor based on a difference between the calculated condensing temperature and the target condensing-temperature value, and performs opening-degree control for controlling the opening degree of the first pressure-reducing mechanism concurrently with the condensing-temperature control based on a difference between a current opening degree of the first pressure-reducing mechanism and a preset target opening-degree value.
  • Advantageous Effects of Invention
  • The present invention can provide a refrigeration cycle apparatus that can suppress an excessive increase in condensing temperature and can ensure a hot-water-supply capacity within a usage range of a compressor during the high-temperature-water supply.
  • BRIEF DESCRIPTION OF DRAWINGS
  • FIG. 1 illustrates the configuration of an integrated air-conditioning and hot-water-supply system 100 according to Embodiment 1.
  • FIG. 2 schematically illustrates the flow of water from a hot-water-supply unit 304 to a hot-water-supply tank 305 in Embodiment 1.
  • FIG. 3 schematically illustrates a controller 110 in Embodiment 1.
  • FIG. 4 illustrates an operation of four-way valves relative to operation modes in Embodiment 1.
  • FIG. 5 illustrates a method for determining a target evaporating-temperature value from a maximum cooled-room temperature difference in compressor control in Embodiment 1.
  • FIG. 6 illustrates a method for determining a target condensing-temperature value from a maximum heated-room temperature difference in compressor control in Embodiment 1.
  • FIG. 7 illustrates the relationships among a target opening degree, a hot-water-supply capacity, and operation efficiency in Embodiment 1.
  • FIG. 8 illustrates tests performed when performing control for changing a target opening-degree value of a hot-water-supply pressure-reducing mechanism in accordance with a compressor frequency in Embodiment 1.
  • FIG. 9 illustrates the relationship between an outdoor-air temperature and the target opening-degree value in Embodiment 1.
  • FIG. 10 illustrates the relationships among the hot-water-supply capacity, an evaporating capacity, and a compressor input in Embodiment 1.
  • FIG. 11 illustrates the contents of tests performed at a development stage when performing control for changing the target opening-degree value in accordance with the hot-water-supply capacity in Embodiment 1.
  • FIG. 12 is a flowchart illustrating the flow for determining whether a high-temperature-water supply is to be performed or a normal hot-water supply is to be performed in Embodiment 1.
  • FIG. 13 is a flowchart illustrating an operation method during a high-temperature-water supply in a simultaneous heating and hot-water-supply operation in Embodiment 1.
  • FIG. 14 is a flowchart illustrating an operation method during a high-temperature-water supply in a simultaneous cooling and hot-water-supply operation in Embodiment 1.
  • DESCRIPTION OF EMBODIMENTS Embodiment 1
  • Embodiment 1 will be described below with reference to FIGS. 1 to 14.
  • FIG. 1 is a refrigerant circuit configuration diagram of an integrated air-conditioning and hot-water-supply system 100 (refrigeration cycle apparatus) according to Embodiment 1. In the following figures including FIG. 1, the dimensional relationships among components may sometimes differ from actual dimensional relationships. Furthermore, when a symbol used in a numerical expression first appears in this specification, the unit of the symbol will be written in parenthesis [ ]. If a symbol is dimensionless (i.e., has no units), the unit will be expressed as [-].
  • FIG. 2 schematically illustrates the flow of water from a hot-water-supply unit 304 to a hot-water-supply tank 305 in the integrated air-conditioning and hot-water-supply system 100.
  • FIG. 3 schematically illustrates various kinds of sensors in the integrated air-conditioning and hot-water-supply system 100, and a measuring unit 101, a calculating unit 102, a control unit 103, and a storage unit 104 in a controller 110. The configuration of the integrated air-conditioning and hot-water-supply system 100 will be described below with reference to FIGS. 1 to 3. The integrated air-conditioning and hot-water-supply system 100 is a triple-pipe multisystem integrated air-conditioning and hot-water-supply system that performs a vapor-compression refrigeration cycle operation so as to simultaneously perform a cooling operation or heating operation selected in a use-side unit and a hot-water-supply operation in a hot-water-supply unit. The integrated air-conditioning and hot-water-supply system 100 is an integrated air-conditioning and hot-water-supply system that can ensure a hot-water-supply capacity by suppressing an excessive increase in high pressure during a supply of high-temperature water when the hot-water-supply operation is performed in the hot-water-supply unit. FIG. 1 illustrates the refrigerant circuit configuration, and FIG. 2 illustrates a water circuit configuration from the hot-water-supply unit 304 to the hot-water-supply tank 305.
  • System Configuration
  • The integrated air-conditioning and hot-water-supply system 100 has a heat source unit 301, a branch unit 302, use- side units 303 a and 303 b, the hot-water-supply unit 304, and the hot-water-supply tank 305. The heat source unit 301 and the branch unit 302 are connected by a liquid extension pipe 6 serving as a refrigerant pipe and a gas extension pipe 12 serving as a refrigerant pipe. The hot-water-supply unit 304 has one end connected to the heat source unit 301 via a hot-water-supply gas extension pipe 15 serving as a refrigerant pipe and another end connected to the branch unit 302 via a hot-water-supply liquid pipe 18 serving as a refrigerant pipe. The use- side units 303 a and 303 b and the branch unit 302 are connected by indoor gas pipes 11 a and 11 b serving as refrigerant pipes and indoor liquid pipes 8 a and 8 b serving as refrigerant pipes. The hot-water-supply tank 305 and the hot-water-supply unit 304 are connected by an upstream water pipe 20 serving as a water pipe and a downstream water pipe 21 serving as a water pipe.
  • Although one heat source unit, two use-side units, one hot-water-supply unit, and one hot-water-supply tank 305 are connected as an example in Embodiment 1, the configuration is not limited to this and the numbers thereof may be more than or fewer than those shown. Furthermore, although a refrigerant used in the integrated air-conditioning and hot-water-supply system 100 is R410A, the refrigerant used in the integrated air-conditioning and hot-water-supply system 100 is not limited to this kind of refrigerant. Other alternatives include, for example, an HFC (hydrofluorocarbon) refrigerant, such as R407C or R404A, an HCFC (hydrochlorofluorocarbon) refrigerant, such as R22 or R134a, and a refrigerant that operates at a critical pressure or higher, such as CO2.
  • As shown in FIG. 1, the integrated air-conditioning and hot-water-supply system 100 includes the controller 110. The controller 110 includes the measuring unit 101, the calculating unit 102, the control unit 103, and the storage unit 104.
  • Control to be described below is entirely performed by the controller 110. Although the controller 110 is disposed in the heat source unit 301 in FIG. 1, this is only an example. The position where the controller 110 is disposed is not limited.
  • Operation Modes of Heat Source Unit 301
  • Operation modes that can be performed by the integrated air-conditioning and hot-water-supply system 100 will be briefly described. In the integrated air-conditioning and hot-water-supply system 100, an operation mode of the heat source unit 301 is determined based on whether there are a hot-water-supply load in the connected hot-water-supply unit 304 and cooling loads or heating loads in the use- side units 303 a and 303 b. The integrated air-conditioning and hot-water-supply system 100 is capable of performing the following five operation modes, which includes
  • a cooling operation mode A,
  • a heating operation mode B,
  • a hot-water-supply operation mode C,
  • a simultaneous heating and hot-water-supply operation mode D, and
  • a simultaneous cooling and hot-water-supply operation mode E.
  • (1) The cooling operation mode A is an operation mode of the heat source unit 301 when there is no hot-water-supply request signal (also referred to as “hot-water-supply request”) and the cooling operation is performed by the use- side units 303 a and 303 b. (2) The heating operation mode B is an operation mode of the heat source unit 301 when there is no hot-water-supply request and the heating operation is performed by the use- side units 303 a and 303 b.
  • (3) The hot-water-supply operation mode C is an operation mode of the heat source unit 301 when there is no air conditioning load and the hot-water-supply operation is performed by the hot-water-supply unit 304.
  • (4) The simultaneous heating and hot-water-supply operation mode D is an operation mode of the heat source unit 301 when the heating operation by the use- side units 303 a and 303 b and the hot-water-supply operation by the hot-water-supply unit 304 are simultaneously performed.
  • (5) The simultaneous cooling and hot-water-supply operation mode E is an operation mode of the heat source unit 301 when the cooling operation by the use- side units 303 a and 303 b and the hot-water-supply operation by the hot-water-supply unit 304 are simultaneously performed.
  • Use- Side Units 303 a and 303 b
  • The use- side units 303 a and 303 b are connected to the heat source unit 301 via the branch unit 302. The use- side units 303 a and 303 b are installed in areas (e.g., by being concealed in or suspended from a ceiling indoors or being hung on a wall) where the units can blow conditioned air to an air conditioning target region. The use- side units 303 a and 303 b are connected to the heat source unit 301 via the branch unit 302, the liquid extension pipe 6, and the gas extension pipe 12, and constitute a part of the refrigerant circuit.
  • The use- side units 303 a and 303 b each include an indoor-side refrigerant circuit that constitutes a part of the refrigerant circuit. These indoor-side refrigerant circuits are constituted by respective indoor heat exchangers 9 a and 9 b serving as use-side heat exchangers. Furthermore, the use- side units 303 a and 303 b are respectively provided with indoor air-sending devices 10 a and 10 b for supplying conditioned air, after having exchanged heat with the refrigerant in the indoor heat exchangers 9 a and 9 b, to the air conditioning target region, such as an indoor space.
  • The indoor heat exchangers 9 a and 9 b may each be formed of, for example, a cross-fin-type fin-and-tube heat exchanger constituted of a heat transfer pipe and multiple fins. Alternatively, the indoor heat exchangers 9 a and 9 b may each be formed of a micro-channel heat exchanger, a shell-and-tube heat exchanger, a heat-pipe heat exchanger, or a double-pipe heat exchanger. When the operation mode performed by the use- side units 303 a and 303 b is the cooling operation mode A, the indoor heat exchangers 9 a and 9 b function as refrigerant evaporators and cool the air in the air conditioning target region. When the operation mode is the heating operation mode B, the indoor heat exchangers 9 a and 9 b function as refrigerant condensers (or radiators) and heat the air in the air conditioning target region.
  • The indoor air-sending devices 10 a and 10 b have a function of suctioning indoor air into the use- side units 303 a and 303 b, making the indoor air exchange heat with the refrigerant at the indoor heat exchangers 9 a and 9 b, and then supplying the indoor air as conditioned air to the air conditioning target region. Specifically, in the use- side units 303 a and 303 b, the indoor air taken in by the indoor air-sending devices 10 a and 10 b and the refrigerant flowing through the indoor heat exchangers 9 a and 9 b can exchange heat with each other. The indoor air-sending devices 10 a and 10 b are capable of adjusting the flow rate of conditioned air to be supplied to the indoor heat exchangers 9 a and 9 b and each include a fan, such as a centrifugal fan or a multi-blade fan, and a motor, such as a DC fan motor, for driving this fan.
  • The use- side units 303 a and 303 b are provided with the following various kinds of sensors, which include:
  • (1) indoor liquid temperature sensors 206 a and 206 b that are provided at the liquid side of the indoor heat exchangers 9 a and 9 b and detect the temperature of a liquid refrigerant;
    (2) indoor gas temperature sensors 207 a and 207 b that are provided at the gas side of the indoor heat exchangers 9 a and 9 b and detect the temperature of a gas refrigerant; and
    (3) indoor suction temperature sensors 208 a and 208 b that are provided at the indoor-air suction side of the use- side units 303 a and 303 b and detect the temperature of indoor air flowing into the units.
  • As shown in FIG. 3, the operation of the indoor air-sending devices 10 a and 10 b is controlled by the control unit 103 that functions as normal-operation control means that performs a normal operation including the cooling operation mode A and the heating operation mode B of the use- side units 303 a and 303 b.
  • Hot-Water-Supply Unit 304
  • The hot-water-supply unit 304 is connected to the heat source unit 301 via the branch unit 302. As shown in FIG. 2, the hot-water-supply unit 304 has a function of supplying hot water to the hot-water-supply tank 305 installed, for example, outdoors and boiling the water in the hot-water-supply tank 305 by heating the water. A plate-type water heat exchanger 16 of the hot-water-supply unit 304 includes a connection section 25 (i.e., an inflowing-water-pipe connection section) connected to the downstream water pipe 21 (i.e., an inflowing water pipe), a connection section 26 (i.e., an outflowing water pipe connection section) connected to the upstream water pipe 20 (i.e., an outflowing water pipe), and a water pipe 27 through which water flowing therein from the downstream water pipe 21 flows out toward the upstream water pipe 20. Furthermore, the hot-water-supply unit 304 has one end connected to the heat source unit 301 via the hot-water-supply gas extension pipe 15 and another end connected to the branch unit 302 via the hot-water-supply liquid pipe 18, and constitutes a part of the refrigerant circuit in the integrated air-conditioning and hot-water-supply system 100.
  • The hot-water-supply unit 304 includes a hot-water-supply-side refrigerant circuit that constitutes a part of the refrigerant circuit. The hot-water-supply-side refrigerant circuit has the plate-type water heat exchanger 16 serving as a hot-water-supply-side heat exchanger as an elemental function. Furthermore, the hot-water-supply unit 304 is provided with a feed pump 17 for supplying hot water, after having exchanged heat with the refrigerant in the plate-type water heat exchanger 16, to the hot-water-supply tank 305, etc.
  • When the hot-water-supply operation mode C is performed by the hot-water-supply unit 304, the plate-type water heat exchanger 16 functions as a refrigerant condenser and heats the water to be supplied by the feed pump 17. The feed pump 17 has a function of supplying the water into the hot-water-supply unit 304, making the water exchange heat at the plate-type water heat exchanger 16 so as to turn the water into hot water, and then supplying the hot water into the hot-water-supply tank 305 so as to make the hot water exchange heat with the water in the hot-water-supply tank 305. Specifically, in the hot-water-supply unit 304, the water supplied by the feed pump 17 and the refrigerant flowing through the plate-type water heat exchanger 16 can exchange heat with each other, and the water supplied by the feed pump 17 and the water in the hot-water-supply tank 305 can exchange heat with each other. Moreover, the flow rate of water to be supplied to the plate-type water heat exchanger 16 can be adjusted.
  • The hot-water-supply unit 304 is provided with the following various kinds of sensors, which include:
  • (1) a hot-water-supply liquid temperature sensor 209 that is provided at the liquid side of the plate-type water heat exchanger 16 and detects the temperature of a liquid refrigerant.
  • The operation of the feed pump 17 is controlled by the control unit 103 that functions as normal-operation control means that performs the normal operation including the hot-water-supply operation mode C of the hot-water-supply unit 304 (see FIG. 3).
  • Hot-Water-Supply Tank 305
  • The hot-water-supply tank 305 is installed, for example, outdoors and has a function of storing the hot water boiled by the hot-water-supply unit 304. Furthermore, the hot-water-supply tank 305 has one end connected to the hot-water-supply unit 304 via the upstream water pipe 20 and another end connected to the hot-water-supply unit 304 via the downstream water pipe 21, and constitutes a part of a water circuit in the integrated air-conditioning and hot-water-supply system 100. The hot-water-supply tank 305 is of a full-water type that makes the hot water flow out of the upper portion of the tank when the hot water is consumed by the user and that is supplied with water from the lower portion of the tank in accordance with the consumed amount.
  • The water fed by the feed pump 17 in the hot-water-supply unit 304 becomes hot water by being heated by the refrigerant at the plate-type water heat exchanger 16 and then travels through the upstream water pipe 20 so as to flow into the hot-water-supply tank 305. The hot water exchanges heat with the water in the hot-water-supply tank 305 as intermediate water without being mixed with the water in the tank, thereby turning into cold water. Subsequently, the water flows out of the hot-water-supply tank 305 and travels through the downstream water pipe 21 so as to flow into the hot-water-supply unit 304 again. After being fed by the feed pump 17 again, the water turns into hot water at the plate-type water heat exchanger 16. As a result of this process, the water is boiled in the hot-water-supply tank 305.
  • The method for heating the water in the hot-water-supply tank 305 is not limited to the intermediate-water-based heat exchange method as in Embodiment 1. As an alternative heating method, the water in the hot-water-supply tank 305 may flow directly into a pipe, turn into hot water by exchanging heat at the plate-type water heat exchanger 16, and then return to the hot-water-supply tank 305.
  • The hot-water-supply tank 305 is provided with the following various kinds of sensors, which include:
  • (1) a hot-water-supply-tank water temperature sensor 210 that is provided on a side surface at the lower portion of the hot-water-supply tank 305 and detects the temperature of the hot water in the tank.
  • Heat Source Unit 301
  • The heat source unit 301 is installed, for example, outdoors and is connected to the use- side units 303 a and 303 b via the liquid extension pipe 6, the gas extension pipe 12, and the branch unit 302. Moreover, the heat source unit 301 is connected to the hot-water-supply unit 304 via the hot-water-supply gas extension pipe 15, the liquid extension pipe 6, and the branch unit 302, and constitutes a part of the refrigerant circuit in the integrated air-conditioning and hot-water-supply system 100.
  • The heat source unit 301 includes an outdoor-side refrigerant circuit that constitutes a part of the refrigerant circuit. As elemental devices, the outdoor-side refrigerant circuit has a compressor 1 that compresses the refrigerant, two four-way valves (i.e., a first four-way valve 2 and a second four-way valve 13) for switching the flowing direction of the refrigerant in accordance with the outdoor operation mode, an outdoor heat exchanger 3 as a heat-source-side heat exchanger, and an accumulator 14 for retaining an excess refrigerant. Furthermore, the heat source unit 301 is constituted of an outdoor air-sending device 4 for supplying air to the outdoor heat exchanger 3 and an outdoor pressure-reducing mechanism 5 as a heat-source-side pressure-reducing mechanism for controlling the distributive flow rate of the refrigerant.
  • The compressor 1 suctions the refrigerant and compresses this refrigerant to a high-temperature high-pressure state. The compressor 1 equipped in Embodiment 1 is capable of adjusting the operation capacity and is, for example, a positive-displacement compressor that is driven by a motor (not shown) controlled by an inverter. Although only a single compressor 1 is shown as an example in Embodiment 1, the configuration is not limited to this, and two or more compressors 1 may be connected in parallel to each other in accordance with, for example, the connected number of use- side units 303 a and 303 b and hot-water-supply units 304. Furthermore, a discharge-side pipe connected to the compressor 1 is bifurcated at an intermediate section of the pipe and has one end connected to the gas extension pipe 12 via the second four-way valve 13 and another end connected to the hot-water-supply gas extension pipe 15 via the first four-way valve 2.
  • The first four-way valve 2 and the second four-way valve 13 each function as a flow switching device that switches the flowing direction of the refrigerant in accordance with the operation mode of the heat source unit 301.
  • FIG. 4 illustrates the operational contents of the four-way valves relative to the operation modes. The terms “solid line” and “dash line” shown in FIG. 4 correspond to solid lines and dashed lines shown in FIG. 1 that denote the switched statuses of the first four-way valve 2 and the second four-way valve 13.
  • In the cooling operation mode A, the first four-way valve 2 is switched to the “solid line” state. Specifically, in the cooling operation mode A, in order to make the outdoor heat exchanger 3 function as a condenser for the refrigerant compressed by the compressor 1, the first four-way valve 2 is switched so as to connect the discharge side of the compressor 1 to the gas side of the outdoor heat exchanger 3. In the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, or the simultaneous cooling and hot-water-supply operation mode E, the first four-way valve 2 is switched to the “dash line” state. Specifically, in the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, or the simultaneous cooling and hot-water-supply operation mode E, in order to make the outdoor heat exchanger 3 function as a refrigerant evaporator, the first four-way valve 2 is switched so as to connect the discharge side of the compressor 1 to the gas side of the plate-type water heat exchanger 16 and also to connect the suction side of the compressor 1 to the gas side of the outdoor heat exchanger 3.
  • In the cooling operation mode A, the hot-water-supply operation mode C, or the simultaneous cooling and hot-water-supply operation mode E, the second four-way valve 13 switched to the “solid line” state. Specifically, the second four-way valve 13 is switched so as to connect the suction side of the compressor 1 to the gas side of the indoor heat exchangers 9 a and 9 b, such that the indoor heat exchangers 9 a and 9 b are made to function as evaporators for the refrigerant compressed by the compressor 1 in the cooling operation mode A or the simultaneous cooling and hot-water-supply operation mode E or such that the refrigerant is prevented from flowing to the use- side units 303 a and 303 b in the hot-water-supply operation mode C. In the heating operation mode B, the hot-water-supply operation mode C, and the simultaneous heating and hot-water-supply operation mode D, the second four-way valve 13 is switched to the “dash line” state. Specifically, in the heating operation mode B, the hot-water-supply operation mode C, and the simultaneous heating and hot-water-supply operation mode D, in order to make the indoor heat exchangers 9 a and 9 b function as refrigerant condensers, the second four-way valve 13 is switched so as to connect the discharge side of the compressor 1 to the gas side of the indoor heat exchangers 9 a and 9 b.
  • The outdoor heat exchanger 3 has its gas side connected to the first four-way valve 2 and its liquid side connected to the outdoor pressure-reducing mechanism 5. The outdoor heat exchanger 3 may be formed of, for example, a cross-fin-type fin-and-tube heat exchanger constituted of a heat transfer pipe and multiple fins. Alternatively, the outdoor heat exchanger 3 may be formed of a micro-channel heat exchanger, a shell-and-tube heat exchanger, a heat-pipe heat exchanger, or a double-pipe heat exchanger. In the cooling operation mode A, the outdoor heat exchanger 3 functions as a refrigerant condenser and cools the refrigerant. In the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, and the simultaneous cooling and hot-water-supply operation mode E, the outdoor heat exchanger 3 functions as a refrigerant evaporator and heats the refrigerant.
  • The outdoor air-sending device 4 has a function of suctioning outdoor air into the heat source unit 301, making the outdoor air exchange heat at the outdoor heat exchanger 3, and then discharging the air to the outside. Specifically, in the heat source unit 301, the outdoor air taken in by the outdoor air-sending device 4 and the refrigerant flowing through the outdoor heat exchanger 3 can exchange heat with each other. The outdoor air-sending device 4 is capable of adjusting the flow rate of air to be supplied to the outdoor heat exchanger 3 and includes a fan, such as a propeller fan, and a motor, such as a DC fan motor, for driving this fan.
  • The accumulator 14 is provided at the suction side of the compressor 1 and has a function of retaining the liquid refrigerant to prevent it from flowing back to the compressor 1 when there is a malfunction in the integrated air-conditioning and hot-water-supply system 100 or during a transient response of an operational state caused by a change in operation control.
  • The heat source unit 301 is provided with the following various kinds of sensors, which include:
  • (1) a high-pressure sensor 201 that is provided at the discharge side of the compressor 1 and detects a high-pressure side high pressure;
    (2) a discharge temperature sensor 202 that is provided at the discharge side of the compressor 1 and detects a discharge temperature;
    (3) an outdoor gas temperature sensor 203 that is provided at the gas side of the outdoor heat exchanger 3 and detects a gas refrigerant temperature;
    (4) an outdoor liquid temperature sensor 204 that is provided at the liquid side of the outdoor heat exchanger 3 and detects a liquid refrigerant temperature; and
    (5) an outdoor-air temperature sensor 205 that is provided at the outdoor-air suction side of the heat source unit 301 and detects the temperature of outdoor air flowing into the unit.
  • The operation of each of the compressor 1, the first four-way valve 2, the outdoor air-sending device 4, the outdoor pressure-reducing mechanism 5, and the second four-way valve 13 is controlled by the control unit 103 that functions as normal-operation control means that performs the normal operation including the cooling operation mode A, the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, and the simultaneous cooling and hot-water-supply operation mode C.
  • Branch Unit 302
  • The branch unit 302 is installed, for example, indoors, is connected to the heat source unit 301 via the liquid extension pipe 6 and the gas extension pipe 12, is connected to the use- side units 303 a and 303 b via the indoor liquid pipes 8 a and 8 b and the indoor gas pipes 11 a and 11 b, is connected to the hot-water-supply unit 304 via the hot-water-supply liquid pipe 18, and constitutes a part of the refrigerant circuit in the integrated air-conditioning and hot-water-supply system 100. The branch unit 302 has a function of controlling the flow of the refrigerant in accordance with a requested operation in the use- side units 303 a and 303 b and the hot-water-supply unit 304.
  • The branch unit 302 includes a branch refrigerant circuit that constitutes a part of the refrigerant circuit. As elemental devices, the branch refrigerant circuit has indoor pressure-reducing mechanisms 7 a and 7 b as use-side pressure-reducing mechanisms for controlling the distributive flow rate of the refrigerant, and a hot-water-supply pressure-reducing mechanism 19 for controlling the distributive flow rate of the refrigerant.
  • The indoor pressure-reducing mechanisms 7 a and 7 b are respectively provided in the indoor liquid pipes 8 a and 8 b. The hot-water-supply pressure-reducing mechanism 19 is provided in the hot-water-supply liquid pipe 18 in the branch unit 302. Each of the indoor pressure-reducing mechanisms 7 a and 7 b functions as a pressure-reducing valve and an expansion valve, and reduces the pressure of and expands the refrigerant flowing through the liquid extension pipe 6 in the cooling operation mode A and reduces the pressure of and expands the refrigerant flowing through the hot-water-supply pressure-reducing mechanism 19 in the simultaneous cooling and hot-water-supply operation mode E. In the heating operation mode B and the simultaneous heating and hot-water-supply operation mode D, the indoor pressure-reducing mechanisms 7 a and 7 b reduce the pressure of and expand the refrigerant flowing through the indoor liquid pipes 8 a and 8 b. The hot-water-supply pressure-reducing mechanism 19 functions as a pressure-reducing valve and an expansion valve and reduces the pressure of and expands the refrigerant flowing through the hot-water-supply liquid pipe 18 in the hot-water-supply operation mode C and the simultaneous heating and hot-water-supply operation mode D. The indoor pressure-reducing mechanisms 7 a and 7 b and the hot-water-supply pressure-reducing mechanism 19 may each be of a type whose opening degree is variably controllable, such as precise flow control means using an electronic expansion valve or inexpensive refrigerant flow control means such as a capillary tube.
  • As shown in FIG. 3, the operation of the hot-water-supply pressure-reducing mechanism 19 is controlled by the control unit 103 of the controller 110, which functions as normal-operation control means that performs the normal operation including the hot-water-supply operation mode C of the hot-water-supply unit 304. The operation of each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled by the control unit 103 functioning as normal-operation control means that performs the normal operation including the cooling operation mode A and the heating operation mode B of the use- side units 303 a and 303 b.
  • Controller 110
  • As shown in FIG. 3, the values detected by the various kinds of temperature and pressure sensors are input to the measuring unit 101 and are processed by the calculating unit 102. Then, based on the processed result of the calculating unit 102, the control unit 103 controls the compressor 1, the first four-way valve 2, the outdoor air-sending device 4, the outdoor pressure-reducing mechanism 5, the indoor pressure-reducing mechanisms 7 a and 7 b, the indoor air-sending devices 10 and 10 b, the second four-way valve 13, the feed pump 17, and the hot-water-supply pressure-reducing mechanism 19. Specifically, the overall operation of the integrated air-conditioning and hot-water-supply system 100 is controlled by the controller 110 equipped with the measuring unit 101, the calculating unit 102, and the control unit 103. The controller 110 may be constituted of a microcomputer. Calculation expressions to be described in Embodiment 1 below are calculated by the calculating unit 102, and the control unit 103 controls each of the devices, such as the compressor 1, in accordance with the calculation results. The storage unit 104 stores data to be used in the calculating unit 102 and the calculation results.
  • Specifically, based on commands, such as an operation mode (e.g., a cooling request signal for requesting the cooling operation of the use-side units 303) received via a remote controller, a hot-water-supply request signal, to be described below, and a preset temperature, and information detected by the various sensors, the control unit 103 performs each operation mode by controlling the following:
  • the operating frequency of the compressor 1,
  • the switching of the first four-way valve 2,
  • the rotation speed (including an on/off operation) of the outdoor air-sending device 4,
  • the opening degree of the outdoor pressure-reducing mechanism 5,
  • the opening degrees of the indoor pressure-reducing mechanisms 7 a and 7 b,
  • the rotation speeds (including an on/off operation) of the indoor air-sending devices 10 a and 10 b,
  • the switching of the second four-way valve 13,
  • the rotation speed (including an on/off operation) of the feed pump 17, and
  • the opening degree of the hot-water-supply pressure-reducing mechanism 19.
  • The measuring unit 101, the calculating unit 102, and the control unit 103 may be integrally provided or may be provided independently of each other. Furthermore, the measuring unit 101, the calculating unit 102, and the control unit 103 may be provided in any one of the units. Moreover, the measuring unit 101, the calculating unit 102, and the control unit 103 may be provided in each of the units.
  • Operation Modes
  • The integrated air-conditioning and hot-water-supply system 100 controls each of the devices equipped in the heat source unit 301, the branch unit 302, the use- side units 303 a and 303 b, and the hot-water-supply unit 304 in accordance with requested air conditioning loads of the use- side units 303 a and 303 b and a requested hot-water-supply load of the hot-water-supply unit 304. With this control, the integrated air-conditioning and hot-water-supply system 100 performs the cooling operation mode A, the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, or the simultaneous cooling and hot-water-supply operation mode E.
  • The simultaneous cooling and hot-water-supply operation mode E further includes a “hot-water-supply priority mode” in which the operating frequency of the compressor 1 is controlled in accordance with a hot-water-supply request signal from the hot-water-supply unit 304 and a “cooling priority mode” in which the operating frequency of the compressor 1 is controlled in accordance with cooling loads of the use- side units 303 a and 303 b. The hot-water-supply request signal is output from the hot-water-supply unit 304 when the temperature of the water stored in the hot-water-supply tank 305 is lower than a preset hot-water-supply temperature. When the hot-water-supply request signal is output, the control unit 103 estimates a cooling load and a heating load from a temperature difference (i.e., an indoor temperature difference) between an indoor suction temperature and a preset indoor temperature and performs control based on an assumption that the larger the indoor temperature difference, the larger the cooling load and the heating load.
  • Operation
  • Specific refrigerant flowing methods and normal control methods in the cooling operation mode A, the heating operation mode B, the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, and the simultaneous cooling and hot-water-supply operation mode E performed by the integrated air-conditioning and hot-water-supply system 100 will now be described. The operation of each four-way valve in each of the operation modes is as shown in FIG. 4. For each of the hot-water-supply operation mode C, the simultaneous heating and hot-water-supply operation mode D, and the simultaneous cooling and hot-water-supply operation mode E, a control method for high-temperature-water supply will be described in addition to a normal control method.
  • Cooling Operation Mode A
  • In the cooling operation mode, the hot-water-supply pressure-reducing mechanism 19 is completely closed. In the cooling operation mode A, the first four-way valve 2 is in the solid-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3. Furthermore, the second four-way valve 13 is in the solid-line state, meaning that the suction side of the compressor 1 is connected to the indoor heat exchangers 9 a and 9 b via the gas extension pipe 12.
  • While the refrigerant circuit is in this state, the compressor 1, the outdoor air-sending device 4, and the indoor pressure-reducing mechanisms 7 a and 7 b are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1, thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant travels through the first four-way valve 2 and flows into the outdoor heat exchanger 3 where the gas refrigerant condenses by exchanging heat with outdoor air supplied by the outdoor air-sending device 4, thereby becoming a high-pressure liquid refrigerant. After flowing out of the outdoor heat exchanger 3, the high-pressure liquid refrigerant flows to the outdoor pressure-reducing mechanism 5 where the high-pressure liquid refrigerant is reduced in pressure. Subsequently, the liquid refrigerant travels through the liquid extension pipe 6 and flows into the branch unit 302. At this time, the outdoor pressure-reducing mechanism 5 is controlled to a maximum opening degree. The refrigerant flowing into the branch unit 302 is reduced in pressure by the indoor pressure-reducing mechanisms 7 a and 7 b so as to become a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant flows out of the branch unit 302 and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the use- side units 303 a and 303 b.
  • The refrigerant flowing into the use- side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant evaporates by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b, thereby becoming a low-pressure gas refrigerant. In this case, each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a cooled-room temperature difference) obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b in corresponding use- side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the cooling load requested in the air-conditioned space where the use- side units 303 a and 303 b are installed.
  • The refrigerant flowing out of the indoor heat exchangers 9 a and 9 b flows out of the use- side units 303 a and 303 b and then travels through the indoor gas pipes 11 a and 11 b and the branch unit 302 so as to flow into the gas extension pipe 12. The refrigerant then travels through the second four-way valve 13 and passes through the accumulator 14 so as to be suctioned into the compressor 1 again.
  • The operating frequency of the compressor 1 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value. The predetermined evaporating-temperature value is the temperature detected by the indoor liquid temperature sensor 206 a or 206 b. The predetermined evaporating-temperature value is determined from a temperature difference (i.e., a cooled-room temperature difference), which is obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b, in the use- side unit 303 a or 303 b that has the maximum temperature difference in the use- side units 303 a and 303 b.
  • FIG. 5 illustrates a method for determining a target-evaporating-temperature value from a maximum cooled-room temperature difference in compressor control. Specifically, as shown in FIG. 5, a target-evaporating-temperature value in a corresponding range is set on the basis of a maximum cooled-Room Temperature difference ΔTje [-]. Target-evaporating-temperature values A1 to A4 in respective maximum cooled-room temperature difference ranges are determined from tests, etc. Furthermore, the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the condensing temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205. The condensing temperature in this case is a saturation temperature calculated based on the pressure detected by the high-pressure sensor 201.
  • Heating Operation Mode B
  • In the heating operation mode, the hot-water-supply pressure-reducing mechanism 19 (i.e., a first pressure-reducing mechanism) is completely closed. Therefore, the refrigerant does not flow to the first four-way valve 2 and the hot-water-supply unit 304. In the heating operation mode B, the first four-way valve 2 is in the dash-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the plate-type water heat exchanger 16 (i.e., a first radiator) and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3 (i.e., a first evaporator). The second four-way valve 13 is in the dash-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the indoor heat exchangers 9 a and 9 b.
  • While the refrigerant circuit is in this state, the compressor 1, the outdoor air-sending device 4, the indoor air-sending devices 10 a and 10 b, and the feed pump 17 are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1, thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant flows through the second four-way valve 13.
  • The refrigerant flowing into the second four-way valve 13 flows out of the heat source unit 301 and travels through the gas extension pipe 12 so as to flow into the branch unit 302. Subsequently, the refrigerant travels through the indoor gas pipes 11 a and 11 b so as to flow into the use- side units 303 a and 303 b. The refrigerant flowing into the use- side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant condenses by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b so as to become a high-pressure liquid refrigerant, which then flows out of the indoor heat exchangers 9 a and 9 b. The refrigerant having heated the indoor air at the indoor heat exchangers 9 a and 9 b flows out of the use- side units 303 a and 303 b and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the branch unit 302. The refrigerant is then reduced in pressure by the indoor pressure-reducing mechanisms 7 a and 7 b, thereby becoming a low-pressure, two-phase gas-liquid or liquid-phase refrigerant. Subsequently, the refrigerant flows out of the branch unit 302.
  • Each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a heated-room temperature difference) obtained by subtracting a preset indoor temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b in corresponding use- side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the heating load requested in the air-conditioned space where the use- side units 303 a and 303 b are installed.
  • The refrigerant flowing out of the branch unit 302 travels through the liquid extension pipe 6, flows into the heat source unit 301, passes through the outdoor pressure-reducing mechanism 5, and then flows into the outdoor heat exchanger 3. The opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state. The refrigerant flowing into the outdoor heat exchanger 3 evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4, thereby becoming a low-pressure gas refrigerant. This refrigerant flows out of the outdoor heat exchanger 3, travels through the first four-way valve 2, passes through the accumulator 14, and is then suctioned into the compressor 1 again.
  • The operating frequency of the compressor 1 is controlled by the control unit 103 such that the condensing temperature is made equal to a target value. The method for determining the condensing temperature is the same as that in the cooling operation. The target condensing-temperature value is determined from a temperature difference (i.e., a heated-room temperature difference), which is obtained by subtracting a preset indoor temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b, in the use- side unit 303 a or 303 b that has the maximum heated-room temperature difference in the use- side units 303 a and 303 b.
  • FIG. 6 illustrates a method for determining a target-condensing-temperature value from a maximum heated-room temperature difference in compressor control. Specifically, as shown in FIG. 6, a target-condensing-temperature value in a corresponding range is set on the basis of a maximum heated-room temperature difference ΔTjc [-]. Target-condensing-temperature values B1 to B4 in respective maximum heated-room temperature difference ranges are determined from tests, etc. Furthermore, the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205. The evaporating temperature in this case is determined based on the temperature detected by the outdoor liquid temperature sensor 204.
  • Hot-Water-Supply Operation Mode C
  • In the hot-water-supply operation mode C, the first four-way valve 2 is in the dash-line state, meaning that the discharge side of the compressor 1 is connected to the gas side of the plate-type water heat exchanger 16 and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3. The second four-way valve 13 is in the solid-line state, meaning that the suction side of the compressor 1 is connected to the indoor heat exchangers 9 a and 9 b via the gas extension pipe 12.
  • While the refrigerant circuit is in this state, the compressor 1, the outdoor air-sending device 4, the indoor air-sending devices 10 a and 10 b, and the feed pump 17 are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1, thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant flows through the first four-way valve 2.
  • The refrigerant flowing into the first four-way valve 2 flows out of the heat source unit 301 and travels through the hot-water-supply gas extension pipe 15 so as to flow into the hot-water-supply unit 304. The refrigerant flowing into the hot-water-supply unit 304 flows into the plate-type water heat exchanger 16 where the refrigerant condenses by exchanging heat with water supplied by the feed pump 17 so as to become a high-pressure liquid refrigerant, which then flows out of the plate-type water heat exchanger 16. The refrigerant having heated the water at the plate-type water heat exchanger 16 flows out of the hot-water-supply unit 304, travels through the hot-water-supply liquid pipe 18, flows into the branch unit 302, and is then reduced in pressure by the hot-water-supply pressure-reducing mechanism 19, thereby becoming a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant flows out of the branch unit 302 and flows into the heat source unit 301 via the liquid extension pipe 6.
  • In the hot-water-supply operation mode, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled by the control unit 103 such that the degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is made equal to a predetermined value. The degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is determined by calculating a saturation temperature (i.e., a calculated condensing temperature) from a pressure (i.e., a high pressure) detected by the high-pressure sensor 201 (i.e., a high-pressure sensor) and then subtracting a temperature detected by the hot-water-supply liquid temperature sensor 209 therefrom. The hot-water-supply pressure-reducing mechanism 19 controls the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 so that the degree of subcooling of the refrigerant at the liquid side of the plate-type water heat exchanger 16 is made equal to the predetermined value. Therefore, the high-pressure liquid refrigerant condensed by the plate-type water heat exchanger 16 turns into a state with a predetermined degree of subcooling. Accordingly, the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 corresponds to a hot-water-supply request according to the usage condition of hot water in a facility where the hot-water-supply unit 304 is installed.
  • The refrigerant flowing out of the branch unit 302 travels through the liquid extension pipe 6, flows into the heat source unit 301, passes through the outdoor pressure-reducing mechanism 5, and then flows into the outdoor heat exchanger 3. The opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state. The refrigerant flowing into the outdoor heat exchanger 3 evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4, thereby becoming a low-pressure gas refrigerant. This refrigerant flows out of the outdoor heat exchanger 3, travels through the first four-way valve 2, passes through the accumulator 14, and is then suctioned into the compressor 1 again.
  • The operating frequency of the compressor 1 is controlled to a high value by the control unit 103. Specifically, in the case of the hot-water-supply operation, the controller 110 ensures a high hot-water-supply capacity so as to increase the water temperature in the hot-water-supply tank 305 to a preset hot-water-supply temperature as quickly as possible in response to a hot-water-supply request signal detected by the hot-water-supply-tank water temperature sensor 210. Furthermore, the quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205. The evaporating temperature in this case is the temperature detected by the outdoor liquid temperature sensor 204.
  • If the hot-water-supply temperature is high (e.g., 60 degrees C.), the inlet water temperature (i.e., the temperature of water flowing into the connection section 25) of the plate-type water heat exchanger 16 also becomes high, causing the condensing temperature to increase. In this case, if the operating frequency of the compressor 1 is controlled to a high value, the high pressure increases to a value outside an appropriate operating range of the compressor 1. Therefore, if a condensing temperature calculated from a detected value of the high-pressure sensor 201 reaches an upper limit value (e.g., 60 degrees C.), condensing-temperature control shown in expressions (1) and (2) is performed on the compressor 1 so as to prevent the condensing temperature from increasing.

  • [Math. 1]

  • Fm=F+ΔF  (1)

  • [Math. 2]

  • ΔF=(CTm−CTk CT-comp  (2)
  • In this case, Fm denotes a target operating frequency [Hz] of the compressor 1, F denotes a current operating frequency [Hz] of the compressor 1, ΔF denotes a change [Hz] in the operating frequency of the compressor 1, CTm denotes a target condensing-temperature value [degrees C], CT denotes a calculated condensing temperature [degrees C], and kCT,comp denotes gain compensation [-] for a change in the operating frequency of the compressor.
  • The target condensing-temperature value CTm is, for example, a maximum condensing-temperature value (e.g., 60 degrees C.) allowable in an appropriate usage range of the compressor 1. The condensing temperature CT is a saturation temperature calculated from the pressure detected by the high-pressure sensor 201. The gain compensation kCT,comp for a change in the operating frequency of the compressor is set to a value based on tests or simulation such that the condensing temperature CT does not increase from the target condensing-temperature value CTm and that the frequency does not decrease rapidly. Although the high-pressure sensor 201 is provided between the compressor 1 and the first four-way valve 2 in Embodiment 1, the configuration is not limited to this. The high-pressure sensor 201 may be provided at any position between the liquid side of the hot-water-supply pressure-reducing mechanism 19 and the discharge side of the compressor 1, which is located at the high-pressure side of the refrigeration cycle. If the high-pressure sensor 201 is disposed between the first four-way valve 2 and the liquid side of the hot-water-supply pressure-reducing mechanism 19, an additional pressure sensor for determining the condensing temperature in the heating operation mode B is disposed between the compressor 1 and the second four-way valve 13.
  • If the calculated condensing temperature CT reaches the target condensing-temperature value CTm during the high-temperature-water supply, CT becomes higher than CTm. In that case, the operating frequency of the compressor 1 is decreased in accordance with expressions (1) and (2), whereby the condensing temperature CT can be prevented from being higher than the target condensing-temperature value CTm. When the operating frequency of the compressor 1 decreases, the hot-water-supply capacity decreases. In order to adjust the amount of decrease in the hot-water-supply capacity, pressure-reducing-mechanism opening-degree control is performed so that a predetermined hot-water-supply capacity can be ensured. In Embodiment 1, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled. Specifically, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled in accordance with expressions (3) and (4) so that the predetermined hot-water-supply capacity can be ensured.

  • [Math. 3]

  • S j =S j-1 +ΔS j  (3)

  • [Math. 4]

  • ΔS j=(S j m−S j-1)  (4)
  • In this case, Sj denotes an opening degree [pulse] of the pressure-reducing mechanism after changing the opening degree thereof, Sj-1 denotes a current opening degree [pulse] of the pressure-reducing mechanism, ΔSj denotes a change [pulse] in the opening degree of the pressure-reducing mechanism, and Sjm denotes a target opening degree [pulse] of the pressure-reducing mechanism (sometimes referred to as “target pressure-reducing-mechanism opening-degree value”).
  • The target opening degree Sjm [pulse] of the pressure-reducing mechanism can be determined at the development stage in the following manner.
  • FIG. 7 illustrates the relationship between the hot-water-supply capacity and the operation efficiency. FIG. 7( a) illustrates the hot-water-supply capacity of the plate-type water heat exchanger 16 relative to the opening degree of the hot-water-supply pressure-reducing mechanism 19. The abscissa axis denotes the opening degree of the hot-water-supply pressure-reducing mechanism 19, whereas the ordinate axis denotes a target hot-water-supply capacity value of the plate-type water heat exchanger 16. FIG. 7( b) illustrates the operation efficiency (COP) relative to the opening degree of the hot-water-supply pressure-reducing mechanism 19. The abscissa axis denotes the opening degree of the hot-water-supply pressure-reducing mechanism 19, whereas the ordinate axis denotes the operation efficiency. When the inlet water temperature during high-temperature-water supply increases and condensing-temperature control is to be performed on the compressor 1, the hot-water-supply capacity of the plate-type water heat exchanger 16 and the operation efficiency (COP) change as shown in FIGS. 7( a) and 7(b) relative to the opening degree of the hot-water-supply pressure-reducing mechanism 19. Because the operating frequency of the compressor 1 becomes higher as the opening degree of the hot-water-supply pressure-reducing mechanism 19 increases, the hot-water-supply capacity increases. In contrast, the operation efficiency decreases. The target opening degree Sjm of the pressure-reducing mechanism can be set based on FIG. 7 as an opening degree that achieves a minimum-required hot-water-supply capacity to be ensured. Specifically, the target opening-degree value is set in correspondence with a target value for the hot-water-supply capacity (i.e., heat-radiation capacity) of the plate-type water heat exchanger 16 (i.e., first radiator). The target opening degree Sjm of the pressure-reducing mechanism is determined based on tests or simulation at the development stage. Furthermore, as the hot-water-supply temperature becomes higher and the inlet water temperature increases (i.e., as CT increases when CT>CTm), the operating frequency of the compressor 1 is decreased by performing the condensing-temperature control (i.e., expressions (1) and (2)) on the compressor 1, causing the hot-water-supply capacity to decrease. Therefore, the target opening degree is determined when the inlet water temperature is at the maximum. The inlet water temperature is estimated such that, for example, when the maximum value of the hot-water-supply temperature is 60 degrees C. and the hot-water-supply capacity is a rated hot-water-supply capacity, the amount of flowing water causes the temperature difference between the inlet water temperature and the outlet water temperature of the plate-type water heat exchanger 16 to be 5 degrees C. In this case, since the hot-water-supply temperature is 60 degrees C., the outlet water temperature is 60 degrees C. and the inlet water temperature is 55 degrees C. In other words, the maximum inlet water temperature is 55 degrees C. Because the hot-water-supply capacity increases as the inlet water temperature decreases, the minimum-required hot-water-supply capacity (i.e., the heat-radiation capacity of the plate-type water heat exchanger 16) can be ensured by determining the target opening degree when the inlet water temperature is at the maximum. Furthermore, it is obvious from FIG. 7 that, by lowering the target hot-water-supply capacity and lowering the target opening degree Sjm, the operation efficiency can be increased.
  • The target hot-water-supply capacity value of the plate-type water heat exchanger 16 may be set in correspondence with an upper limit value in design for the inlet water temperature of the water flowing into the water pipe of the plate-type water heat exchanger 16 from the downstream water pipe 21.
  • When an operation is actually performed with the target opening degree Sjm of the pressure-reducing mechanism described above, the condensing-temperature control is performed on the compressor 1, and the operation is performed with the target opening degree Sjm of the pressure-reducing mechanism as a fixed value regardless of the operating frequency of the compressor 1. Therefore, the minimum-required hot-water-supply capacity can be ensured when the inlet water temperature is 55 degrees C., and the operating frequency of the compressor is increased when the inlet water temperature is low at 54 degrees C. or 53 degrees C. Because the hot-water-supply capacity increases in proportion to the operating frequency of the compressor, the hot-water-supply capacity is excessive when the inlet water temperature is low, leading to reduced operating efficiency even though the time required for completing the hot-water-supply operation can be shortened. If the minimum-required hot-water-supply capacity can be ensured, it is desirable that the hot-water-supply operation be performed at the highest possible operation efficiency. Therefore, when the inlet water temperature is low at 54 degrees C. or 53 degrees C., the opening degree of the hot-water-supply pressure-reducing mechanism 19 may be reduced to suppress an excessive hot-water-supply capacity, so that the minimum-required hot-water-supply capacity can be ensured. Reducing the opening degree of the hot-water-supply pressure-reducing mechanism 19 causes a pressure difference in the hot-water-supply pressure-reducing mechanism 19 to increase and the condensing temperature to increase, resulting in a lower operating frequency of the compressor 1.
  • FIG. 8 illustrates tests performed when performing control for changing the target opening-degree value of the hot-water-supply pressure-reducing mechanism in accordance with the frequency of the compressor. The contents of the tests are shown in FIG. 8 for explaining how the control is performed in detail. For determining the target opening degree of the pressure-reducing mechanism at the development stage mentioned above, the tests are performed when the inlet water temperature is at the maximum at 55 degrees C. and also when the inlet water temperature is 54 degrees C. and 53 degrees C., and target opening degrees Sjm of the pressure-reducing mechanism that achieve the minimum-required hot-water-supply capacity to be ensured when the condensing-temperature control is performed on the compressor 1 (the target condensing temperature is set to, for example, 60 degrees C.) are determined. In this case, a compressor frequency F is also recorded, and a function f(F) of the target opening degree Sjm of the pressure-reducing mechanism relative to the compressor frequency F is created from a point obtained from each test. The function of the target opening degree Sjm of the pressure-reducing mechanism can be obtained with higher accuracy by increasing the number of tested inlet-water-temperature points. Furthermore, because the operating frequency of the compressor 1 becomes higher and the refrigerant flow rate increases as the inlet water temperature decreases, the target opening degree Sjm of the pressure-reducing mechanism also increases. In the actual operation, when the condensing-temperature control is performed on the compressor 1, the target opening degree Sjm of the pressure-reducing mechanism is determined from the function f(F) shown in expression (5), which is created at the development stage. The controller 110 stores the following expression (5) in the storage unit 104 as frequency/opening-degree correspondence information.

  • [Math. 5]

  • S j m=f(F)  (5)
  • By performing the operation in this manner, high operating efficiency can be achieved while the minimum-required hot-water-supply capacity is ensured.
  • FIG. 9 illustrates the relationship between the outdoor-air temperature and the target opening-degree value. As shown in FIG. 9, since the pressure at the low-pressure side increases and the pressure at the high-pressure side increases as the outdoor-air temperature increases, the operating frequency of the compressor 1 decreases, causing the target opening-degree value Sjm for ensuring the hot-water-supply capacity to increase. By changing the target opening-degree value Sjm in accordance with the outdoor-air temperature, a constant hot-water-supply capacity can also be ensured relative to a change in the outdoor-air temperature, such as an increase in the outdoor-air temperature.
  • The controller 110 stores the relationship between the outdoor-air temperature and the target opening-degree value shown in FIG. 9 in the storage unit 104 as outdoor-air-temperature/opening-degree correspondence information. When the condensing-temperature control and the opening-degree control are concurrently performed, the control unit 103 of the controller 110 refers to the outdoor-air-temperature/opening-degree correspondence information so as to identify a target opening-degree value corresponding to an outdoor-air temperature detected by the outdoor-air temperature sensor 205 from the outdoor-air-temperature/opening-degree correspondence information, and uses the identified target opening-degree value as a target opening-degree value in the opening-degree control.
  • For determining the target opening degree Sjm of the pressure-reducing mechanism, a target opening degree is determined from tests performed at the development stage so as to achieve a constant hot-water-supply capacity. However, because there are individual differences among pressure-reducing mechanisms in actuality, a constant hot-water-supply capacity is sometimes not achieved even if the same pressure-reducing mechanism is used. The following configuration can be used to solve this problem. By determining the hot-water-supply capacity directly from the operational state of the actual system in operation and setting a target opening degree of the pressure-reducing mechanism that can at least ensure a “target constant hot-water-supply capacity” by using the determined hot-water-supply capacity, variations in hot-water-supply capacity caused by individual differences among pressure-reducing mechanisms or degradation over time can be prevented, thereby preventing an unexpected decrease in hot-water-supply capacity.
  • FIG. 10 illustrates the relationships among a hot-water-supply capacity Qc, an evaporating capacity Qe, and a compressor input W. The following description relates to a specific method. A sum of the evaporating capacity of the outdoor heat exchanger 3 and the input of the compressor 1 is equal to the hot-water-supply capacity of the plate-type water heat exchanger 16. Therefore, the hot-water-supply capacity is determined by determining the evaporating capacity of the outdoor heat exchanger 3 and the input of the compressor 1 (i.e., compressing work done on the refrigerant by the compressor 1). A table showing the evaporating capacity relative to a temperature difference between the outdoor-air temperature and the evaporating temperature is created based on tests, and the evaporating capacity of the outdoor heat exchanger 3 is determined by using the table.
  • FIG. 11 illustrates the contents of tests performed at the development stage when performing control for changing the target opening-degree value in accordance with the hot-water-supply capacity. The contents of the tests are shown in FIG. 11. The condensing-temperature control is performed on the compressor 1, and the opening degree of the hot-water-supply pressure-reducing mechanism 19 that can ensure the hot-water-supply capacity at a maximum inlet water temperature of 55 degrees C. is determined. The “difference between the outdoor-air temperature and the evaporating temperature” and the “evaporating capacity” of the outdoor heat exchanger 3 at that point are recorded. In Embodiment 1, the evaporating temperature is based on a detected value of the outdoor liquid temperature sensor 204. Subsequently, in a state where the opening degree is slightly changed (to, for example, about 50 pulses) from the previously-determined opening degree of the hot-water-supply pressure-reducing mechanism 19, the “difference between the outdoor-air temperature and the evaporating temperature” and the evaporating capacity of the outdoor heat exchanger 3 at that point are recorded. The blanks in FIG. 11 are filled in this manner. By completing the table in FIG. 11 and applying it to the actual operation, the evaporating capacity can be calculated from the outdoor-air temperature and the evaporating temperature. If a difference between the outdoor-air temperature and the evaporating temperature that is not determined in the tests is detected in the actual operation, the values on the table are linearly-interpolated so as to determine the evaporating capacity. Specifically, the relationship between the “difference between the outdoor-air temperature and the evaporating temperature” and the evaporating capacity obtained in FIG. 11 is input to the controller 110. The controller 110 interpolates the results of the relationship (three sets thereof in FIG. 11) between the “difference between the outdoor-air temperature and the evaporating temperature” and the evaporating capacity and calculates a function of the evaporating capacity and the “difference between the outdoor-air temperature and the evaporating temperature”.
  • The input W [kW] of the compressor 1 can be calculated from the operating frequency F [Hz] of the compressor 1, the condensing temperature CT [degrees C], and an evaporating temperature ET [degrees C] by using the following expression (6). The degree of superheat at the inlet of the compressor is simply set to zero.

  • [Math. 6]

  • W=f(F,CT,ET)  (6)
  • The operating frequency F of the compressor 1 is obtained as operation information. The condensing temperature CT is obtained as a saturation pressure detected by the high-pressure sensor 201. The evaporating temperature ET is determined in a manner similar to how the evaporating capacity is calculated. Accordingly, since the evaporating capacity Qe [kW] and the input W [kW] of the compressor 1 can be determined, the hot-water-supply capacity Qc [kW] can be determined from expression (7).

  • [Math. 7]

  • Qc=Qe+W  (7)
  • The target opening degree Sjm of the pressure-reducing mechanism can be determined from the determined hot-water-supply capacity Qc and a target minimum-required hot-water-supply capacity value Qcm [kW].

  • [Math. 8]

  • Sj,m=(Qcm−Qck Q c ,S jm   (8)
  • In this case, kQ c ,S jm denotes gain compensation [-] for a change in the target opening degree of the pressure-reducing mechanism and is determined from tests or simulation. By determining the hot-water-supply capacity from the evaporating capacity and the input of the compressor 1 in this manner, the target opening degree Sjm of the pressure-reducing mechanism is determined. Accordingly, variations in hot-water-supply capacity caused by individual differences among pressure-reducing mechanisms can be suppressed, so that the minimum-required hot-water-supply capacity can be ensured during the high-temperature-water supply in any actual system. Because the target opening degree Sjm of the pressure-reducing mechanism is calculated by determining the hot-water-supply capacity by using the outdoor-air temperature in this method, the outdoor-air temperature compensation shown in FIG. 9 is not necessary.
  • This will be described in detail below. The controller 110 receives data of two or more sets of a temperature difference between the outdoor-air temperature around the outdoor heat exchanger 3 and the evaporating temperature of the outdoor heat exchanger 3 and the evaporating capacity of the outdoor heat exchanger 3 corresponding to this temperature difference. Based on the input data, the controller 110 determines a functional relationship between the temperature difference and the evaporating capacity by interpolation and refers to the determined functional relationship so as to identify, from the functional relationship, the evaporating capacity that corresponds to the temperature difference between the outdoor-air temperature detected by the outdoor-air temperature sensor 205 and the evaporating temperature detected by the outdoor liquid temperature sensor 204. Then, the controller 110 calculates a compressor input W, which indicates the compressing work done on the refrigerant by the compressor, from the operating frequency of the compressor 1, the calculated condensing temperature, and the evaporating temperature detected by the outdoor liquid temperature sensor 204 (expression (6)). Furthermore, the controller 110 calculates the hot-water-supply capacity Qc of the plate-type water heat exchanger 16 from the identified evaporating capacity Qe and the calculated compressor input W (expression (7)). The controller 110 determines a target opening-degree value in accordance with a difference between the calculated hot-water-supply capacity Qc and a preliminarily-stored target hot-water-supply-capacity value Qcm, and uses the determined target opening-degree value as a target opening-degree value in the opening-degree control (expression (8)).
  • FIG. 12 is a flowchart illustrating the flow for determining whether the high-temperature-water supply is to be performed or the hot-water-supply (i.e., normal hot-water supply) other than the high-temperature-water-supply is to be performed. First, in step S11, the controller 110 determines whether the condensing temperature has increased to a value higher than a predetermined value CTm. The predetermined value CTm for the condensing temperature is, for example, a maximum value (e.g., 60 degrees C.) of an appropriate usage range of the compressor 1. If the condensing temperature CT has increased to a value higher than the predetermined value, the process proceeds to step S12 where the high-temperature-water-supply operation is performed by performing the condensing-temperature control shown in expressions (1) and (2) on the compressor 1 and performing the opening-degree control shown in expressions (3) and (4) on the hot-water-supply pressure-reducing mechanism 19. If the condensing temperature CT is lower than the predetermined value, the process proceeds to step S13 where the normal hot-water-supply operation is performed by performing normal control on the compressor 1 and the hot-water-supply pressure-reducing mechanism 19. This reliably allows for switching to high-temperature-water supply control in response to an increase in the condensing temperature CT, thereby suppressing an increase in the condensing temperature.
  • With the above process, the hot-water-supply operation is performed in response to a hot-water-supply request, and condensing-temperature control is performed on the compressor and opening-degree control is performed on the pressure-reducing mechanism during the high-temperature-water supply in which the condensing temperature becomes higher than the predetermined value CTm, thereby suppressing an excessive increase in high pressure and achieving a predetermined hot-water-supply capacity.
  • Although the hot-water-supply pressure-reducing mechanism 19 is used as a pressure-reducing mechanism whose opening degree is controlled during the high-temperature-water supply in which the condensing temperature CT becomes higher than or equal to the predetermined value CTm in Embodiment 1, this is merely an example. The controlled subject is not limited to the hot-water-supply pressure-reducing mechanism 19, and the opening-degree control may alternatively be performed on the outdoor pressure-reducing mechanism 5. In this case, similar to how the opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state when the hot-water-supply pressure-reducing mechanism 19 is used as a pressure-reducing mechanism whose opening degree is controlled, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled so that it is in a completely open state.
  • Furthermore, although the integrated air-conditioning and hot-water-supply system 100 is described as an example in Embodiment 1, the high-temperature-water-supply control according to the technology developed in the present invention can also be applied to the hot-water-supply operation in a hot-water-supply system in which the heat source unit 301 and the hot-water-supply unit 304 are connected by a refrigerant communication pipe, specifically, a hot-water-supply system that does not have an air-conditioning function but is only capable of performing the hot-water-supply operation.
  • Furthermore, although an R410A refrigerant whose operating pressure becomes lower than or equal to the critical pressure is used as the refrigerant in Embodiment 1, the refrigerant is not limited to an R410A refrigerant and may alternatively be, for example, a refrigerant, such as a CO2 refrigerant, whose operating pressure becomes higher than or equal to the critical pressure (i.e., a refrigerant whose pressure at the high-pressure side, such as the pressure at the discharge side of the compressor, becomes higher than or equal to the critical pressure). In this case, when the pressure (high pressure) detected by the high-pressure sensor 201 of the controller becomes higher than or equal to a predetermined high pressure (e.g., 14.5 MPaG when a CO2 refrigerant is used), high-pressure control shown in expressions (9) and (10) is performed on the compressor 1 so as to prevent the high pressure from increasing.

  • [Math. 9]

  • Fm=F+ΔF  (9)

  • [Math. 10]

  • ΔF=(Pm high −P highk P,comp  (10)
  • In this case, Fm denotes a target operating frequency [Hz] of the compressor 1, F denotes a current operating frequency [Hz] of the compressor 1, AF denotes a change [Hz] in the operating frequency of the compressor 1, Pmhigh denotes a target high-pressure value [MPaG], Phigh denotes a calculated condensing temperature [MPaG], and kP,comp denotes gain compensation [-] for a change in the operating frequency of the compressor.
  • The target high-pressure value Pmhigh is, for example, a maximum high-pressure value (e.g., 14.5 MPaG when a CO2 refrigerant is used) allowable in the appropriate usage range of the compressor 1. Furthermore, in order to adjust the amount of decrease in hot-water-supply capacity, the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled based on expressions (3) and (4) so that a predetermined hot-water-supply capacity can be ensured. By performing the control in this manner, the technology according to the present invention can be applied to a refrigerant that operates at the critical pressure or higher, similar to a refrigerant that operates at the critical pressure or lower, such as an R410A refrigerant, thereby suppressing an excessive increase in high pressure during the high-temperature-water supply so as to achieve the predetermined hot-water-supply capacity.
  • Simultaneous Heating and Hot-Water-Supply Operation Mode D
  • In the simultaneous heating and hot-water-supply operation mode D (i.e., concurrent heat-radiation operation), the first four-way valve 2 is in the “dash-line” state in FIG. 4. This means that the discharge side of the compressor 1 is connected to the gas side of the plate-type water heat exchanger 16, and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3. The second four-way valve 13 is in the “dash-line” state. This means that the discharge side of the compressor 1 is connected to the gas side of the indoor heat exchangers 9 a and 9 b. Although both the first four-way valve 2 and the second four-way valve 13 are in the “dash-line” state, as in the “heating operation mode”, the hot-water-supply pressure-reducing mechanism 19 is open in the simultaneous heating and hot-water-supply operation mode D, unlike in the “heating operation mode” in which the hot-water-supply pressure-reducing mechanism 19 is closed.
  • While the refrigerant circuit is in this state, the compressor 1, the outdoor air-sending device 4, the indoor air-sending devices 10 a and 10 b, and the feed pump 17 are activated. This causes a low-pressure gas refrigerant to be suctioned into and compressed by the compressor 1, thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant is distributed so as to flow through the first four-way valve 2 and the second four-way valve 13.
  • The refrigerant flowing into the first four-way valve 2 flows out of the heat source unit 301 and travels through the hot-water-supply gas extension pipe 15 so as to flow into the hot-water-supply unit 304. The refrigerant flowing into the hot-water-supply unit 304 flows into the plate-type water heat exchanger 16 where the refrigerant condenses by exchanging heat with water supplied by the feed pump 17 so as to become a high-pressure liquid refrigerant, which then flows out of the plate-type water heat exchanger 16. The refrigerant having heated the water at the plate-type water heat exchanger 16 flows out of the hot-water-supply unit 304, travels through the hot-water-supply liquid pipe 18, flows into the branch unit 302, and is then reduced in pressure by the hot-water-supply pressure-reducing mechanism 19, thereby becoming a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant merges with the refrigerant flowing from the indoor pressure-reducing mechanisms 7 a and 7 b and flows out of the branch unit 302. A flow path branching from the discharge side of the compressor 1 and extending through the second four-way valve 13, the indoor heat exchangers 9 a and 9 b, and the indoor pressure-reducing mechanisms 7 a and 7 b serves as a branch flow path relative to a flow path for the hot-water-supply operation.
  • The opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled by the control unit 103 such that the degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is made equal to a predetermined value. The degree of subcooling at the liquid side of the plate-type water heat exchanger 16 is similar to that in the hot-water-supply operation. The hot-water-supply pressure-reducing mechanism 19 controls the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 so that the degree of subcooling of the refrigerant at the liquid side of the plate-type water heat exchanger 16 is made equal to the predetermined value. Therefore, the high-pressure liquid refrigerant condensed by the plate-type water heat exchanger 16 turns into a state with a predetermined degree of subcooling. Accordingly, the flow rate of refrigerant flowing through the plate-type water heat exchanger 16 corresponds to a hot-water-supply request according to the usage condition of hot water in the facility where the hot-water-supply unit 304 is installed.
  • On the other hand, the refrigerant flowing into the second four-way valve 13 flows out of the heat source unit 301 and travels through the gas extension pipe 12 so as to flow to the branch unit 302. Subsequently, the refrigerant travels through the indoor gas pipes 11 a and 11 b so as to flow into the use- side units 303 a and 303 b. The refrigerant flowing into the use- side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant condenses by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b so as to become a high-pressure liquid refrigerant, which then flows out of the indoor heat exchangers 9 a and 9 b. The refrigerant having heated the indoor air at the indoor heat exchangers 9 a and 9 b flows out of the use- side units 303 a and 303 b and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the branch unit 302. The refrigerant is then reduced in pressure by the indoor pressure-reducing mechanisms 7 a and 7 b, thereby becoming a low-pressure, two-phase gas-liquid or liquid-phase refrigerant. Subsequently, the refrigerant flowing out of the indoor pressure-reducing mechanisms 7 a and 7 b merges with the refrigerant flowing from the hot-water-supply pressure-reducing mechanism 19 and flows out of the branch unit 302.
  • Each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a heated-room temperature difference) obtained by subtracting a preset indoor temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b (i.e., an indoor temperature sensor) in corresponding use- side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the heating load requested in the air-conditioned space where the use- side units 303 a and 303 b are installed.
  • The refrigerant flowing out of the branch unit 302 travels through the liquid extension pipe 6, flows into the heat source unit 301, passes through the outdoor pressure-reducing mechanism 5, and then flows into the outdoor heat exchanger 3. The opening degree of the outdoor pressure-reducing mechanism 5 is controlled so that it is in a completely open state. The refrigerant flowing into the outdoor heat exchanger 3 evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4, thereby becoming a low-pressure gas refrigerant. This refrigerant flows out of the outdoor heat exchanger 3, travels through the first four-way valve 2, passes through the accumulator 14, and is then suctioned into the compressor 1 again.
  • Since there is a hot-water-supply request signal detected by the hot-water-supply-tank water temperature sensor 210, the operating frequency of the compressor 1 is controlled to a high value by the control unit 103 so that a high hot-water-supply capacity can be ensured. The quantity of air from the outdoor air-sending device 4 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the outdoor-air temperature detected by the outdoor-air temperature sensor 205. The evaporating temperature in this case is the temperature detected by the outdoor liquid temperature sensor 204.
  • If the hot-water-supply temperature is a high temperature (e.g., 60 degrees C.), the inlet water temperature of the plate-type water heat exchanger 16 also becomes high, causing the condensing temperature to increase. Unlike the case of the hot-water-supply operation, the heating operation is performed in the use- side units 303 a and 303 b in the simultaneous heating and hot-water-supply operation mode D. Therefore, even if the condensing-temperature control shown in expressions (1) and (2) is performed on the compressor 1 and the opening-degree control shown in expressions (3) and (4) is performed on the hot-water-supply pressure-reducing mechanism 19, the hot-water-supply capacity sometimes cannot be ensured, and the opening degree of the hot-water-supply pressure-reducing mechanism 19 is controlled regardless of the state in the heated room. Consequently, a heating capacity cannot be ensured in the use- side units 303 a and 303 b, possibly resulting in a non-heated state. Therefore, in the case of the simultaneous heating and hot-water-supply operation, the simultaneous heating and hot-water-supply operation is stopped if the condensing temperature CT increases to a value higher than a predetermined value. Then, the controller 110 performs a switching process for alternately switching between the heating operation and the hot-water-supply operation so that the heating operation and the hot-water-supply operation are performed.
  • FIG. 13 is a flowchart illustrating the flow of an operation method during the high-temperature-water supply in the simultaneous heating and hot-water-supply operation. Specifically, the operation is performed in accordance with the flowchart shown in FIG. 13. First, in step S21, it is determined whether or not the condensing temperature has increased to a value higher than a predetermined value. Similar to the case of the hot-water-supply temperature, the predetermined value for the condensing temperature CT is, for example, a maximum condensing-temperature value (e.g., 60 degrees C.) allowable in the appropriate usage range of the compressor 1. If the condensing temperature CT is lower than or equal to the predetermined value, normal control is continuously performed in the simultaneous heating and hot-water-supply operation in step S22. If the condensing temperature is above the predetermined value, the mode is changed to a heating operation mode in step S23. In this case, the use- side units 303 a and 303 b are set in a heating thermostat OFF state, and the following control is performed for the purpose of changing to a hot-water-supply operation mode. In the heating operation, the indoor pressure-reducing mechanisms 7 a and 7 b are normally controlled so that a “heated-room temperature difference”, which is equal to “indoor suction temperature (detected by indoor suction temperature sensor)−preset indoor temperature”, is eliminated. The indoor pressure-reducing mechanisms 7 a and 7 b are controlled so that the “heated-room temperature difference” is a positive value, such as +1 degree C. (i.e., a predetermined positive value) (S23). Moreover, the operating frequency of the compressor 1 is controlled so that the condensing temperature CT is made equal to the target value CTm. Normally, the target value CTm for the condensing temperature is determined from a “heated-room temperature difference” in the use- side unit 303 a or 303 b that has the maximum heated-room temperature difference. However, the target value CTm for the condensing temperature is determined from a “heated-room temperature difference of −1 degree C.” in the use- side unit 303 a or 303 b that has the maximum heated-room temperature difference of −1 degree C. By performing the control in this manner, the “heated-room temperature difference” (i.e., indoor suction temperature−preset indoor temperature) can be made equal to +1 degree C.
  • Subsequently, in step S24, it is determined whether the heated-room temperature difference is greater than or equal to +1 degree C. If the heated-room temperature difference is smaller than +1 degree C., the process returns to step S23. If the heated-room temperature difference is greater than or equal to +1 degree C., the process proceeds to step S25 where the use- side units 303 a and 303 b are set in a thermostat OFF state and the hot-water-supply unit 304 is set in a thermostat ON state, thereby commencing the hot-water-supply operation mode C. Specifically, the simultaneous heating and hot-water-supply operation mode D is changed to the hot-water-supply operation mode C. In other words, the first four-way valve 2 and the second four-way valve 13 are set to the hot-water-supply operation mode C in FIG. 4. This state is a high-temperature-water-supply state since the condensing temperature CT is higher than or equal to the predetermined value, and the controller 110 performs the condensing-temperature control on the compressor 1 and the opening-degree control on the hot-water-supply pressure-reducing mechanism 19. In step S26, the controller 110 determines whether the heated-room temperature difference (i.e., indoor suction temperature−preset indoor temperature) is greater than or equal to 0 degrees C. If the heated-room temperature difference is smaller than 0 degrees C., the process returns to step S23 where the controller 110 performs the heating operation mode B. If the heated-room temperature difference is greater than or equal to 0 degrees C., the process proceeds to step S27 where the controller 110 determines whether or not there is a hot-water-supply request (i.e., whether the hot-water supply is completed). If there is a hot-water-supply request, the process returns to step S25 where the controller 110 continues to perform the hot-water-supply operation mode C. If there is no hot-water-supply request, the process proceeds to step S28 where the controller 110 stops the hot-water-supply unit 304 and sets the use- side units 303 a and 303 b to a heating thermostat ON state so as to commence the normal heating operation.
  • By performing the above procedure, a constant heating capacity and a constant hot-water-supply capacity can be ensured when there is a heating load and a hot-water-supply request at the same time and when the inlet water temperature is high in the high-temperature-water supply.
  • Simultaneous Cooling and Hot-Water-Supply Operation Mode E
  • In the simultaneous cooling and hot-water-supply operation mode E (i.e., concurrent heat-absorption and heat-radiation operation), the use- side units 303 a and 303 b perform the cooling operation, and the hot-water-supply unit 304 performs the hot-water-supply operation. As shown in FIG. 4, in the simultaneous cooling and hot-water-supply operation mode E, the first four-way valve 2 is in the dash-line state, and the second four-way valve 13 is in the solid-line state. This means that the discharge side of the compressor 1 is connected to the plate-type water heat exchanger 16 via the hot-water-supply gas extension pipe 15, and the suction side of the compressor 1 is connected to the gas side of the outdoor heat exchanger 3. The refrigerant flowing out of the plate-type water heat exchanger 16 travels through the hot-water-supply pressure-reducing mechanism 19 and subsequently diverges therefrom so as to flow into the indoor pressure-reducing mechanisms 7 a and 7 b and into the liquid extension pipe 6.
  • While the refrigerant circuit is in this state, the compressor 1, the outdoor air-sending device 4, the indoor air-sending devices 10 a and 10 b, and the feed pump 17 are activated, so that a low-pressure gas refrigerant is suctioned into and compressed by the compressor 1, thereby becoming a high-temperature high-pressure gas refrigerant. Subsequently, the high-temperature high-pressure gas refrigerant flows into the first four-way valve 2.
  • The refrigerant flowing into the first four-way valve 2 flows out of the heat source unit 301 and travels through the hot-water-supply gas extension pipe 15 so as to flow into the hot-water-supply unit 304. The refrigerant flowing into the hot-water-supply unit 304 flows into the plate-type water heat exchanger 16 where the refrigerant condenses by exchanging heat with water supplied by the feed pump 17 so as to become a high-pressure liquid refrigerant, which then flows out of the plate-type water heat exchanger 16. The refrigerant having heated the water at the plate-type water heat exchanger 16 flows out of the hot-water-supply unit 304 and travels through the hot-water-supply liquid pipe 18, so as to flow into the branch unit 302.
  • The refrigerant flowing into the branch unit 302 is reduced in pressure by the hot-water-supply pressure-reducing mechanism 19, thereby becoming an intermediate-pressure, two-phase gas-liquid or liquid-phase refrigerant. In this case, the hot-water-supply pressure-reducing mechanism 19 is controlled to a maximum opening degree. Subsequently, the refrigerant is distributed so as to flow into the liquid extension pipe 6 and into the indoor pressure-reducing mechanisms 7 a and 7 b. As shown in FIG. 1, the refrigeration traveling toward the indoor units diverges at a branch section 28. Furthermore, in FIG. 1, flow paths constituted by the indoor pressure-reducing mechanisms 7 a and 7 b (i.e., second pressure-reducing mechanisms), the indoor heat exchangers 9 a and 9 b (i.e., second evaporators), and the second four-way valve 13 constitute heat-absorption branch flow paths.
  • The refrigerant flowing into the indoor pressure-reducing mechanisms 7 a and 7 b is reduced in pressure into a low-pressure two-phase gas-liquid state and travels through the indoor liquid pipes 8 a and 8 b so as to flow into the use- side units 303 a and 303 b. The refrigerant flowing into the use- side units 303 a and 303 b flows into the indoor heat exchangers 9 a and 9 b where the refrigerant evaporates by exchanging heat with indoor air supplied by the indoor air-sending devices 10 a and 10 b, thereby becoming a low-pressure gas refrigerant.
  • In this case, each of the indoor pressure-reducing mechanisms 7 a and 7 b is controlled such that a temperature difference (i.e., a cooled-room temperature difference) obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b in corresponding use- side unit 303 a or 303 b is eliminated. Therefore, the flow rate of refrigerant flowing through the indoor heat exchangers 9 a and 9 b corresponds to the cooling load requested in the air-conditioned space where the use- side units 303 a and 303 b are installed.
  • The refrigerant flowing out of the indoor heat exchangers 9 a and 9 b flows out of the use- side units 303 a and 303 b and then travels through the indoor gas pipes 11 a and 11 b, the branch unit 302, and the gas extension pipe 12 so as to flow into the heat source unit 301. The refrigerant flowing into the heat source unit 301 passes through the second four-way valve 13 and then merges with the refrigerant having passed through the outdoor heat exchanger 3.
  • On the other hand, the refrigerant flowing into the liquid extension pipe 6 flows into the heat source unit 301 and is reduced in pressure by the outdoor pressure-reducing mechanism 5, thereby becoming a low-pressure two-phase gas-liquid refrigerant. Subsequently, the refrigerant flows into the outdoor heat exchanger 3 where the refrigerant evaporates by exchanging heat with outdoor air supplied by the outdoor air-sending device 4. Then, the refrigerant travels through the first four-way valve 2 and merges with the refrigerant having passed through the indoor heat exchangers 9 a and 9 b. Subsequently, the refrigerant passes through the accumulator 14 and is suctioned into the compressor 1 again.
  • In the case where the simultaneous cooling and hot-water-supply operation mode E is in the hot-water-supply priority mode, the water temperature in the hot-water-supply tank 305 is increased to a preset hot-water-supply temperature as quickly as possible in response to a hot-water-supply request of the hot-water-supply unit 304. Thus, in order to ensure a high hot-water-supply capacity, the control unit 103 controls the compressor 1 so as to increase the operating frequency thereof. Therefore, heat absorption is necessary in the outdoor heat exchanger 3 for achieving an equal cooling capacity for the cooling loads of the use- side units 303 a and 303 b. The opening degree of the outdoor pressure-reducing mechanism 5 is controlled by the control unit 103 such that the degree of superheat at the gas side of the outdoor heat exchanger 3 is made equal to a predetermined value. The degree of superheat at the gas side of the outdoor heat exchanger 3 is determined by subtracting the temperature detected by the outdoor liquid temperature sensor 204 from the temperature detected by the outdoor gas temperature sensor 203. The quantity of air from the outdoor air-sending device 4 is controlled such that the evaporating temperature is made equal to a predetermined value.
  • The evaporating temperature is the temperature detected by the indoor liquid temperature sensor 206 a or 206 b. The predetermined evaporating-temperature value is determined from a temperature difference (i.e., a cooled-room temperature difference), which is obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b, in the use- side unit 303 a or 303 b that has the maximum heated-room temperature difference in the use- side units 303 a and 303 b.
  • In the case where the simultaneous cooling and hot-water-supply operation mode E is the cooling priority mode, the operating frequency of the compressor 1 is controlled by the control unit 103 such that the evaporating temperature is made equal to a predetermined value in accordance with the cooling loads of the use- side units 303 a and 303 b. The predetermined evaporating-temperature value is determined from a temperature difference (i.e., a cooled-room temperature difference), which is obtained by subtracting a preset temperature from an indoor suction temperature detected by the indoor suction temperature sensor 208 a or 208 b, in the use- side unit 303 a or 303 b that has the maximum heated-room temperature difference in the use- side units 303 a and 303 b. Because the operating frequency of the compressor 1 is set in accordance with the cooling loads of the use- side units 303 a and 303 b, there is no need to perform heat absorption in the outdoor heat exchanger 3. Therefore, the outdoor pressure-reducing mechanism 5 is controlled to a small opening degree by the control unit 103, and the outdoor air-sending device 4 is stopped by the control unit 103.
  • In the simultaneous cooling and hot-water-supply operation mode E, the operation is normally performed in the cooling priority mode and is performed in accordance with the cooling load so as to achieve a favorable level of comfort inside. However, if the cooling load is small, the operating frequency of the compressor 1 becomes low. If this causes the hot-water-supply capacity to be low for a long time, the time that it takes to complete the hot-water-supply operation increases, causing a shortage of hot water. In order to prevent such a shortage of hot water, if a hot-water-supply request is detected continuously for a certain period of time (e.g., two consecutive hours), the simultaneous cooling and hot-water-supply operation mode E is performed in the hot-water-supply priority mode so as to prevent the shortage of hot water.
  • If the hot-water-supply temperature is a high temperature (e.g., 60 degrees C.), the inlet water temperature of the plate-type water heat exchanger 16 also becomes high, causing the condensing temperature CT to increase. Unlike the case of the hot-water-supply operation, the cooling operation is performed in the use- side units 303 a and 303 b in the simultaneous cooling and the hot-water-supply operation. Therefore, when the condensing-temperature control shown in expressions (1) and (2) is performed on the compressor 1 and the opening-degree control shown in expressions (3) and (4) is performed on the hot-water-supply pressure-reducing mechanism 19, the operating frequency of the compressor 1 becomes low in the condensing-temperature control. Thus, a cooling capacity cannot be ensured in the use- side units 303 a and 303 b, sometimes resulting in a “non-cooled” state. Therefore, if the condensing temperature increases to a value higher than a predetermined value during the simultaneous cooling and hot-water-supply operation, the simultaneous operation is stopped, and the cooling operation and the hot-water-supply operation are performed by alternately switching between the cooling operation and the hot-water-supply operation, as in the simultaneous heating and hot-water-supply operation.
  • FIG. 14 is a flowchart illustrating the flow of an operation method during the high-temperature-water supply in the simultaneous cooling and hot-water-supply operation mode. Specifically, the operation is performed in accordance with the flowchart shown in FIG. 14. First, in step S31, it is determined whether or not the condensing temperature has increased to a value higher than a predetermined value. Similar to the case of the hot-water-supply temperature, the predetermined value for the condensing temperature is, for example, a maximum condensing-temperature value (e.g., 60 degrees C.) allowable in the appropriate usage range of the compressor 1. If the condensing temperature is lower than or equal to the predetermined value, normal control is continuously performed in the simultaneous cooling and hot-water-supply operation in step S32. If the condensing temperature is higher than or equal to the predetermined value, the process proceeds to the cooling operation mode A in step S33. In this case, the use- side units 303 a and 303 b are set in a cooling thermostat OFF state, and the following control is performed for the purpose of changing to the hot-water-supply operation mode C. In the cooling operation, the indoor pressure-reducing mechanisms 7 a and 7 b are normally controlled so that a “cooled-room temperature difference”, which is equal to “indoor suction temperature (detected by indoor suction temperature sensor)−preset indoor temperature”, is eliminated. The indoor pressure-reducing mechanisms 7 a and 7 b are controlled so that the cooled-room temperature difference is a negative value, such as −1 degree C. (i.e., a predetermined negative value). Moreover, the operating frequency of the compressor 1 is controlled so that the evaporating temperature is made equal to a target value. Normally, the target value for the evaporating temperature is determined from a cooled-room temperature difference in the use- side unit 303 a or 303 b that has the maximum cooled-room temperature difference in the use- side units 303 a and 303 b. However, the target evaporating-temperature value for the operating frequency of the compressor 1 is determined from a cooled-room temperature difference of +1 degree C. in the use- side unit 303 a or 303 b that has the maximum heated-room temperature difference of +1 degree C. By performing the control in this manner, the cooled-room temperature difference can be made equal to −1 degree C.
  • Subsequently, in step S34, it is determined whether the cooled-room temperature difference is smaller than or equal to −1 degree C. If the cooled-room temperature difference is not smaller than or equal to −1 degree C., the process returns to step S33. If the cooled-room temperature difference is smaller than or equal to −1 degree C., the process proceeds to step S35 where the use- side units 303 a and 303 b are set in a cooling thermostat OFF state and the mode is changed to the hot-water-supply operation mode C. In the hot-water-supply operation mode C, this state is a high-temperature-water-supply state since the condensing temperature is higher than or equal to the predetermined value, and the condensing-temperature control is performed on the compressor 1, and the opening-degree control is performed on the hot-water-supply pressure-reducing mechanism 19. In step S36, it is determined whether the cooled-room temperature difference is smaller than or equal to 0 degrees C. If the cooled-room temperature difference is greater than or equal to 0 degrees C., the process returns to step S33 where the mode is set to the cooling operation mode A. If the cooled-room temperature difference is smaller than or equal to 0 degrees C., the process proceeds to step S37 where it is determined whether or not there is a hot-water-supply request (i.e., whether the hot-water supply is completed). If there is a hot-water-supply request, the process returns to step S35 where the hot-water-supply operation mode C is continuously performed. If there is no hot-water-supply request, the process proceeds to step S38 where the hot-water-supply unit 304 is stopped and the use- side units 303 a and 303 b are set to a cooling thermostat ON state, thereby commencing the normal cooling operation.
  • By performing the above procedure, a constant hot-water-supply capacity can be ensured and the cooling operation can be performed when there is a cooling load and a hot-water-supply request at the same time and when the inlet water temperature is high in the high-temperature-water supply.
  • With the integrated air-conditioning and hot-water-supply system 100 according to Embodiment 1, an excessive increase in condensing temperature during the high-temperature-water supply can be suppressed, and a hot-water-supply capacity can be ensured within a usage range of the compressor.
  • Although the integrated air-conditioning and hot-water-supply system 100 (refrigeration cycle apparatus) is described in Embodiment 1, the operation of the integrated air-conditioning and hot-water-supply system 100 can be construed as a refrigeration cycle control method.
  • REFERENCE SIGNS LIST
  • 1: compressor, 2: first four-way valve, 3: outdoor heat exchanger, 4: outdoor air-sending device, 5: outdoor pressure-reducing mechanism, 6: liquid extension pipe, 7 a, 7 b: indoor pressure-reducing mechanism, 8 a, 8 b: indoor liquid pipe, 9 a, 9 b: indoor heat exchanger, 10 a, 10 b: indoor air-sending device, 11 a, 11 b: indoor gas pipe, 12: gas extension pipe, 13: second four-way valve, 14: accumulator, 15: hot-water-supply gas extension pipe, 16: plate-type water heat exchanger, 17: feed pump, 18: hot-water-supply liquid pipe, 19: hot-water-supply pressure-reducing mechanism, 20: upstream water pipe, 21: downstream water pipe, 100: integrated air-conditioning and hot-water-supply system, 110: controller, 101: measuring unit, 102: calculating unit, 103: control unit, 104: storage unit, 201: high-pressure sensor, 202: discharge temperature sensor, 203: outdoor gas temperature sensor, 204: outdoor liquid temperature sensor, 205: outdoor-air temperature sensor, 206 a, 206 b: indoor liquid temperature sensor, 207 a, 207 b: indoor gas temperature sensor, 208 a, 208 b: indoor suction temperature sensor, 209: hot-water-supply liquid temperature sensor, 210: hot-water-supply-tank water temperature sensor, 301: heat source unit, 302: branch unit, 303 a, 303 b: use-side unit, 304: hot-water-supply unit, 305: hot-water-supply tank

Claims (14)

1. A refrigeration cycle apparatus comprising:
a refrigeration cycle mechanism having a compressor whose operating frequency is controllable, a first radiator, a first pressure-reducing mechanism whose opening degree is controllable, and a first evaporator, wherein a refrigerant sequentially circulates through the compressor, the first radiator, the first pressure-reducing mechanism, and the first evaporator;
a high-pressure sensor that detects a high pressure between a discharge side of the compressor and a liquid side of the first pressure-reducing mechanism; and
a controller that controls the operating frequency of the compressor and controlling the opening degree of the first pressure-reducing mechanism based on a degree of subcooling of the first radiator, wherein,
when a condensing temperature of the first radiator that is obtained based on the high pressure detected by the high-pressure sensor is higher than or equal to a preset target condensing-temperature value,
the controller
(a) performs condensing-temperature control for reducing the operating frequency of the compressor based on a difference between the condensing temperature and the target condensing-temperature value, and
(b) performs opening-degree control for increasing the opening degree of the first pressure-reducing mechanism more than opening-degree control under the control based on the degree of the subcooling.
2. The refrigeration cycle apparatus of claim 1, wherein
the first pressure-reducing mechanism performs the opening-degree control based on a preset target opening degree value so as to ensure a predetermined level of a heat-radiation capacity of the first radiator.
3. The refrigeration cycle apparatus of claim 2,
wherein the first radiator includes
an inflowing-water-pipe connection section connected to an inflowing water pipe into which water flows,
an outflowing-water-pipe connection section connected to an outflowing water pipe from which the water flows, and
a water pipe through which the water flowing in from the inflowing water pipe passes and flows out to the outflowing water pipe,
wherein the first radiator heats the water passing through the water pipe by radiating heat to the water, and
wherein the target heat-radiation-capacity value of the first radiator is set in correspondence with an upper limit value in design for an inlet water temperature of the water flowing into the water pipe from the inflowing water pipe.
4. The refrigeration cycle apparatus of claim 1, wherein the controller includes a storage unit that stores frequency/opening-degree correspondence information in which the operating frequency of the compressor and a preset the target opening-degree value of the first pressure-reducing mechanism are stored in correspondence with each other, and wherein when the controller concurrently performs the condensing-temperature control and the opening-degree control, the controller refers to the frequency/opening-degree correspondence information so as to identify the target opening-degree value corresponding to a current operating frequency of the compressor from the frequency/opening-degree correspondence information, and uses the identified target opening-degree value as the target opening-degree value in the opening-degree control.
5. The refrigeration cycle apparatus of claim 1,
wherein the first evaporator is disposed outdoors,
wherein the refrigeration cycle apparatus comprises an outdoor-air temperature sensor that detects an outdoor-air temperature around the first evaporator, and
wherein the controller includes a storage unit that stores outdoor-air-temperature/opening-degree correspondence information in which the outdoor-air temperature and the preset target opening-degree value of the first pressure-reducing mechanism are stored in correspondence with each other, and wherein when the controller concurrently performs the condensing-temperature control and the opening-degree control, the controller refers to the outdoor-air-temperature/opening-degree correspondence information so as to identify the target opening-degree value corresponding to the outdoor-air temperature detected by the outdoor-air temperature sensor from the outdoor-air-temperature/opening-degree correspondence information, and uses the identified target opening-degree value as the target opening-degree value in the opening-degree control.
6. The refrigeration cycle apparatus of claim 1,
wherein the first evaporator is disposed outdoors,
wherein the refrigeration cycle apparatus comprises:
an outdoor-air temperature sensor that detects an outdoor-air temperature around the first evaporator; and
an evaporating temperature sensor that detects an evaporating temperature of the refrigerant in the first evaporator, and
wherein the controller receives data of two or more sets of a temperature difference between the outdoor-air temperature around the first evaporator and the evaporating temperature of the first evaporator and an evaporating capacity of the first evaporator corresponding to the temperature difference, determines a functional relationship between the temperature difference and the evaporating capacity based on the received data, refers to the determined functional relationship so as to identify the evaporating capacity corresponding to the temperature difference between the outdoor-air temperature detected by the outdoor-air temperature sensor and the evaporating temperature detected by the evaporating temperature sensor from the functional relationship, calculates a compressor input, which indicates compressing work done on the refrigerant by the compressor, from the operating frequency of the compressor, the condensing temperature, and the evaporating temperature detected by the evaporating temperature sensor, calculates a heat-radiation capacity of the first radiator from the identified evaporating capacity and the calculated compressor input, determines the target opening-degree value of the first pressure-reducing mechanism in accordance with a difference between the calculated heat-radiation capacity and a preliminarily-stored target heat-radiation-capacity value, and uses the determined target opening-degree value as the target opening-degree value in the opening-degree control.
7. The refrigeration cycle apparatus of claim 1, comprising:
a branch flow path branching from the discharge side of the compressor and having a second radiator and a second pressure-reducing mechanism, the branch flow path being connected to the second radiator and the second pressure-reducing mechanism sequentially from the discharge side of the compressor and merging with an intermediate section between the first pressure-reducing mechanism and the first evaporator,
wherein the controller performs a concurrent heat-radiation operation in which the refrigerant discharged from the compressor is circulated by being made to flow into the first radiator and the second radiator, and wherein when the condensing temperature becomes higher than or equal to the target condensing-temperature value during the concurrent heat-radiation operation, the controller performs a switching process for alternately switching between a process for making the discharged refrigerant flow into the first radiator and a process for making the discharged refrigerant flow into the second radiator.
8. The refrigeration cycle apparatus of claim 7,
wherein the second radiator exchanges heat with indoor air,
wherein the refrigeration cycle apparatus comprises an indoor temperature sensor that detects an indoor temperature, and
wherein the controller performs the switching process based on a temperature difference obtained by subtracting a preliminarily-stored preset indoor temperate from the indoor temperature detected by the indoor temperature sensor.
9. The refrigeration cycle apparatus of claim 8, wherein
when the discharged refrigerant is made to flow only into the second radiator due to the switching process, the controller controls the operating frequency of the compressor and the opening degree of the first pressure-reducing mechanism so that the temperature difference is greater than a predetermined positive value, and wherein when the temperature difference becomes greater than the predetermined positive value, the controller performs the switching process so as to make the discharged refrigerant flow only into the first radiator.
10. The refrigeration cycle apparatus of claim 1, comprising:
a heat-absorption branch flow path that branches from a branch section between the first pressure-reducing mechanism and the first evaporator and merges with a suction side of the compressor, the heat-absorption branch flow path having a second evaporator and a pressure-reducing mechanism for the second evaporator, the heat-absorption branch flow path being connected to the pressure-reducing mechanism for the second evaporator and to the second evaporator sequentially from the branch section and merging with the suction side of the compressor,
wherein the controller performs a concurrent heat-absorption and heat-radiation operation in which a heat-radiation operation of the first radiator and a heat-absorption operation of the second evaporator are concurrently performed, the heat-radiation operation being operation in which the refrigerant discharged from the compressor is suctioned into the compressor from the suction side thereof via the first radiator, the first pressure-reducing mechanism, the branch section, and the first evaporator, the heat-absorption operation being operation in which the discharged refrigerant is suctioned into the compressor from the suction side thereof via the first radiator, the first pressure-reducing mechanism, the branch section, the pressure-reducing mechanism for the second evaporator, and the second evaporator, and wherein when the condensing temperature becomes higher than or equal to the target condensing-temperature value during the concurrent heat-reception and heat-radiation operation, the controller performs a switching process for alternately switching between the heat-radiation operation and the heat-absorption operation.
11. The refrigeration cycle apparatus of claim 10,
wherein the second evaporator exchanges heat with indoor air,
wherein the refrigeration cycle apparatus comprises an indoor temperature sensor that detects an indoor temperature, and
wherein the controller performs the switching process based on a temperature difference obtained by subtracting a preliminarily-stored preset indoor temperature from the indoor temperature detected by the indoor temperature sensor.
12. The refrigeration cycle apparatus of claim 11, wherein when only the heat-absorption operation is performed due to the switching process, the controller controls the operating frequency of the compressor and the opening degree of the first pressure-reducing mechanism so that the temperature difference is smaller than a predetermined negative value, and wherein when the temperature difference becomes smaller than the predetermined negative value, the controller performs the switching process so that only the heat-radiation operation is performed.
13. The refrigeration cycle apparatus of claim 1,
wherein the refrigeration cycle apparatus uses a refrigerant that operates at a critical pressure or higher, and
wherein when the high pressure detected by the high-pressure sensor is higher than or equal to a preset target high-pressure value, the controller performs high-pressure control for controlling the operating frequency of the compressor based on a difference between the high pressure and the target high-pressure value, and performs opening-degree control for controlling the opening degree of the first pressure-reducing mechanism concurrently with the high-pressure control based on the difference between the current opening degree of the first pressure-reducing mechanism and the preset target opening-degree value.
14. A refrigeration cycle control method for performing an operation on a refrigeration cycle apparatus, the refrigeration cycle apparatus including a refrigeration cycle mechanism having a compressor whose operating frequency is controllable, a first radiator, a first pressure-reducing mechanism whose opening degree is controllable, and a first evaporator, wherein a refrigerant sequentially circulates through the compressor, the first radiator, the first pressure-reducing mechanism, and the first evaporator; and a high-pressure sensor that detects a high pressure between a discharge side of the compressor and a liquid side of the first pressure-reducing mechanism, the refrigeration cycle apparatus controlling the operating frequency of the compressor and controlling the opening degree of the first pressure-reducing mechanism based on a degree of subcooling of the first radiator, the method comprising:
when a condensing temperature of the first radiator corresponding to the high pressure detected by the high-pressure sensor is higher than or equal to a preset target condensing-temperature value,
performing condensing-temperature control for reducing the operating frequency of the compressor based on a difference between the condensing temperature and the preset target condensing-temperature value, and
performing opening-degree control for increasing the opening degree of the first pressure-reducing mechanism more than opening-degree control under the control based the degree of on the subcooling.
US13/876,540 2010-10-29 2011-03-08 Refrigeration cycle apparatus and refrigeration cycle control method Abandoned US20130180274A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2010-243200 2010-10-29
JP2010243200A JP5228023B2 (en) 2010-10-29 2010-10-29 Refrigeration cycle equipment
PCT/JP2011/055374 WO2012056739A1 (en) 2010-10-29 2011-03-08 Refrigeration cycle device and refrigeration cycle control method

Publications (1)

Publication Number Publication Date
US20130180274A1 true US20130180274A1 (en) 2013-07-18

Family

ID=45993481

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/876,540 Abandoned US20130180274A1 (en) 2010-10-29 2011-03-08 Refrigeration cycle apparatus and refrigeration cycle control method

Country Status (5)

Country Link
US (1) US20130180274A1 (en)
EP (1) EP2634508B1 (en)
JP (1) JP5228023B2 (en)
CN (1) CN103180676B (en)
WO (1) WO2012056739A1 (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160084535A1 (en) * 2014-09-18 2016-03-24 Fujitsu General Limited Outdoor unit of air conditioner and air conditioner
US20170082334A1 (en) * 2014-05-30 2017-03-23 Mitsubishi Electric Corporation Air-conditioning apparatus
EP2733441A3 (en) * 2012-11-16 2018-04-04 Mitsubishi Heavy Industries Thermal Systems, Ltd. Multi-type air conditioner
US20190011148A1 (en) * 2016-02-10 2019-01-10 Mitsubishi Electric Corporation Refrigeration cycle apparatus
US20190072284A1 (en) * 2016-05-26 2019-03-07 Mitsubishi Electric Corporation Heat-pump air-conditioning hot-water supply device
US10253992B2 (en) * 2014-10-21 2019-04-09 Gd Midea Heating & Ventilating Equipment Co., Ltd. Multi-split air-conditioner and outdoor unit system thereof
US10288328B2 (en) * 2015-07-22 2019-05-14 Gd Midea Heating & Ventilating Equipment Co., Ltd. Outdoor unit for VRF air conditioning system and VRF air conditioning system having same
US10921023B2 (en) 2016-09-23 2021-02-16 Daikin Industries, Ltd. System for air-conditioning and hot-water supply
WO2021034182A1 (en) * 2019-08-21 2021-02-25 Daikin Research & Development Malaysia Sdn. Bhd. An integrated air conditioning and liquid heating system
US20210169740A1 (en) * 2019-12-09 2021-06-10 Thaddeus Medical Systems, Inc. Medical transport container monitoring using machine learning
US11209182B2 (en) * 2016-09-23 2021-12-28 Daikin Industries, Ltd. System for air-conditioning and hot-water supply
CN114353152A (en) * 2021-12-23 2022-04-15 广东万和热能科技有限公司 Wall-mounted furnace for synchronously heating and bathing and control method thereof
US20220136712A1 (en) * 2020-11-02 2022-05-05 Rheem Manufacturing Company Combined space and water heating systems
CN115427744A (en) * 2020-01-21 2022-12-02 Lg电子株式会社 Air conditioner
EP4290160A1 (en) * 2022-06-10 2023-12-13 Guangdong Carrier HVAC Co., Ltd. Heat recovery multi-split air conditioning system and control method

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5955673B2 (en) * 2012-07-13 2016-07-20 愛三工業株式会社 Air conditioner for vehicles
JP2014081119A (en) * 2012-10-16 2014-05-08 Panasonic Corp Refrigerator
CN102880164A (en) * 2012-11-06 2013-01-16 安徽日源环保能源科技有限公司 Centralized control system and control method for air conditioners and hot water in building
JP6053826B2 (en) * 2012-12-28 2016-12-27 三菱電機株式会社 Air conditioner
JP5870915B2 (en) * 2012-12-28 2016-03-01 ダイキン工業株式会社 Refrigeration equipment
US9797605B2 (en) 2013-01-07 2017-10-24 Mitsubishi Electric Corporation Heat pump system
JP6143585B2 (en) * 2013-07-08 2017-06-07 サンデンホールディングス株式会社 Showcase cooling system
CN104896793A (en) * 2014-03-06 2015-09-09 珠海格力电器股份有限公司 Air conditioner water heater system
JP6327558B2 (en) * 2014-06-04 2018-05-23 パナソニックIpマネジメント株式会社 Air conditioner
JP6458456B2 (en) * 2014-11-07 2019-01-30 ダイキン工業株式会社 Air conditioning system
CN104329777B (en) * 2014-11-19 2017-02-22 珠海格力电器股份有限公司 Frequency control method and system
WO2017195294A1 (en) * 2016-05-11 2017-11-16 三菱電機株式会社 Refrigeration cycle device
JP6679461B2 (en) * 2016-10-14 2020-04-15 株式会社コロナ Heat pump water heater with heating function
JP6728535B2 (en) * 2016-10-20 2020-07-22 株式会社コロナ Heat pump water heater with cooling function
CN109253495A (en) * 2018-09-12 2019-01-22 宁波市海智普智能科技有限公司 Modular point of family air-conditioner set of one kind and control method
CN112013474A (en) * 2019-05-30 2020-12-01 广东美的制冷设备有限公司 Air conditioner and control method thereof
JP7283285B2 (en) * 2019-07-22 2023-05-30 株式会社デンソー refrigeration cycle equipment
KR20210108247A (en) 2020-02-25 2021-09-02 엘지전자 주식회사 Heat pump and method thereof
CN111609513B (en) * 2020-05-13 2023-05-26 青岛海尔空调器有限总公司 Air conditioner, control method thereof and computer readable storage medium
CN111649417A (en) * 2020-05-25 2020-09-11 宁波奥克斯电气股份有限公司 Air conditioner with water heater function and control method
CN112344453B (en) * 2020-11-09 2023-11-24 青岛海信日立空调系统有限公司 Air conditioner and air conditioner flow valve control method
JP7014988B1 (en) * 2020-12-02 2022-02-02 ダイキン工業株式会社 Refrigeration equipment
JPWO2023203745A1 (en) * 2022-04-22 2023-10-26
CN115523591B (en) * 2022-08-17 2023-07-21 宁波奥克斯电气股份有限公司 Control method and device for electronic expansion valve of indoor unit and central air conditioner

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4353409A (en) * 1979-12-26 1982-10-12 The Trane Company Apparatus and method for controlling a variable air volume temperature conditioning system
US4481788A (en) * 1981-12-09 1984-11-13 System Homes Company, Ltd. Water heating system
JPH07190395A (en) * 1993-12-28 1995-07-28 Noritz Corp Hot water supply heater
JPH10148427A (en) * 1996-11-19 1998-06-02 Daikin Ind Ltd Heat pump system
JPH10288420A (en) * 1997-04-15 1998-10-27 Daikin Ind Ltd Heat pump water heater
US6192696B1 (en) * 1997-12-25 2001-02-27 Mitsubishi Denki Kabushiki Kaisha Refrigerating apparatus
JP2001065949A (en) * 1999-08-26 2001-03-16 Matsushita Electric Ind Co Ltd Controller for multi-chamber type air conditioner
JP2002318016A (en) * 2001-04-18 2002-10-31 Denso Corp Heat pump type eater heater
JP2006200890A (en) * 2006-04-27 2006-08-03 Hitachi Ltd Air conditioner
US20070193287A1 (en) * 2004-03-31 2007-08-23 Daikin Industries, Ltd. Air Conditioner And Method Of Controlling Air Conditioner
EP1972871A2 (en) * 2007-03-19 2008-09-24 Mitsubishi Electric Corporation Hot water system
US20090199581A1 (en) * 2008-02-07 2009-08-13 Miitsubishi Electric Corporation Heat pump water heater outdoor unit and heat pump water heater

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01114668A (en) * 1987-10-28 1989-05-08 Toshiba Corp Two-stage compression refrigeration cycle device
JPH11108468A (en) * 1997-10-03 1999-04-23 Hitachi Ltd Air conditioner
JP4277373B2 (en) * 1998-08-24 2009-06-10 株式会社日本自動車部品総合研究所 Heat pump cycle
JP4258944B2 (en) * 1999-10-28 2009-04-30 株式会社デンソー Supercritical vapor compressor refrigeration cycle
JP2003054249A (en) * 2001-08-10 2003-02-26 Japan Climate Systems Corp Vehicular air conditioner
JP4693308B2 (en) * 2001-09-13 2011-06-01 三洋電機株式会社 Heat pump type water heater
JP2004053118A (en) 2002-07-19 2004-02-19 Matsushita Electric Ind Co Ltd Heat pump bath hot water supply device
JP2005098530A (en) 2003-09-22 2005-04-14 Matsushita Electric Ind Co Ltd Heat pump type water heater
DE102004005175A1 (en) * 2004-02-02 2005-08-18 Behr Gmbh & Co. Kg Method and device for pressure regulation in a refrigerant circuit
JP2009236392A (en) * 2008-03-27 2009-10-15 Sanyo Electric Co Ltd Air conditioner
US20110100042A1 (en) * 2008-06-24 2011-05-05 Mitsubishi Electric Corporation Refrigerating cycle device and air conditioner
JP5570739B2 (en) * 2009-02-25 2014-08-13 三菱重工業株式会社 Multi-type air conditioner, outdoor unit thereof, and control method thereof
CN101603751B (en) * 2009-07-15 2013-07-10 北京科技大学 Variable frequency energy-saving control method for refrigeration system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4353409A (en) * 1979-12-26 1982-10-12 The Trane Company Apparatus and method for controlling a variable air volume temperature conditioning system
US4481788A (en) * 1981-12-09 1984-11-13 System Homes Company, Ltd. Water heating system
JPH07190395A (en) * 1993-12-28 1995-07-28 Noritz Corp Hot water supply heater
JPH10148427A (en) * 1996-11-19 1998-06-02 Daikin Ind Ltd Heat pump system
JPH10288420A (en) * 1997-04-15 1998-10-27 Daikin Ind Ltd Heat pump water heater
US6192696B1 (en) * 1997-12-25 2001-02-27 Mitsubishi Denki Kabushiki Kaisha Refrigerating apparatus
JP2001065949A (en) * 1999-08-26 2001-03-16 Matsushita Electric Ind Co Ltd Controller for multi-chamber type air conditioner
JP2002318016A (en) * 2001-04-18 2002-10-31 Denso Corp Heat pump type eater heater
US20070193287A1 (en) * 2004-03-31 2007-08-23 Daikin Industries, Ltd. Air Conditioner And Method Of Controlling Air Conditioner
JP2006200890A (en) * 2006-04-27 2006-08-03 Hitachi Ltd Air conditioner
EP1972871A2 (en) * 2007-03-19 2008-09-24 Mitsubishi Electric Corporation Hot water system
US20090199581A1 (en) * 2008-02-07 2009-08-13 Miitsubishi Electric Corporation Heat pump water heater outdoor unit and heat pump water heater

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
Akifumi et al., Controller For Multi-Chamber Type Air Conditioner, 3/16/2001, JP2001065949A, Whole Document *
Funakoshi et al., Air Conditioner, 8/3/2006, JP2006200890A, Whole Document *
Hidehiko, Heat Pump Water Heater, 10/27/1998, JPH10288420A, Whole Document *
Joji et al., Heat Pump Type Eater Heater, 10/31/2002, JP2002318016A, Whole Document *
Okada et al., Hot Water System, 9/24/2008, EP1972871A2, Whole Document *
Takayuki et al., Heap Pump System, 6/2/1998, JPH10148427A, Whole Document *
Tomio, Hot Water Supply Heater, 7/28/1995, JPH07190395A, Whole Document *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2733441A3 (en) * 2012-11-16 2018-04-04 Mitsubishi Heavy Industries Thermal Systems, Ltd. Multi-type air conditioner
US20170082334A1 (en) * 2014-05-30 2017-03-23 Mitsubishi Electric Corporation Air-conditioning apparatus
US10451324B2 (en) * 2014-05-30 2019-10-22 Mitsubishi Electric Corporation Air-conditioning apparatus
US9909784B2 (en) * 2014-09-18 2018-03-06 Fujitsu General Limited Outdoor unit of air conditioner and air conditioner
US20160084535A1 (en) * 2014-09-18 2016-03-24 Fujitsu General Limited Outdoor unit of air conditioner and air conditioner
US10253992B2 (en) * 2014-10-21 2019-04-09 Gd Midea Heating & Ventilating Equipment Co., Ltd. Multi-split air-conditioner and outdoor unit system thereof
US10288328B2 (en) * 2015-07-22 2019-05-14 Gd Midea Heating & Ventilating Equipment Co., Ltd. Outdoor unit for VRF air conditioning system and VRF air conditioning system having same
US20190011148A1 (en) * 2016-02-10 2019-01-10 Mitsubishi Electric Corporation Refrigeration cycle apparatus
US10753645B2 (en) * 2016-02-10 2020-08-25 Mitsubishi Electric Corporation Refrigeration cycle apparatus
US20190072284A1 (en) * 2016-05-26 2019-03-07 Mitsubishi Electric Corporation Heat-pump air-conditioning hot-water supply device
US10816224B2 (en) 2016-05-26 2020-10-27 Mitsubishi Electric Corporation Heat-pump air-conditioning hot-water supply device
US10921023B2 (en) 2016-09-23 2021-02-16 Daikin Industries, Ltd. System for air-conditioning and hot-water supply
US11209182B2 (en) * 2016-09-23 2021-12-28 Daikin Industries, Ltd. System for air-conditioning and hot-water supply
WO2021034182A1 (en) * 2019-08-21 2021-02-25 Daikin Research & Development Malaysia Sdn. Bhd. An integrated air conditioning and liquid heating system
US20210169740A1 (en) * 2019-12-09 2021-06-10 Thaddeus Medical Systems, Inc. Medical transport container monitoring using machine learning
CN115427744A (en) * 2020-01-21 2022-12-02 Lg电子株式会社 Air conditioner
US20220136712A1 (en) * 2020-11-02 2022-05-05 Rheem Manufacturing Company Combined space and water heating systems
CN114353152A (en) * 2021-12-23 2022-04-15 广东万和热能科技有限公司 Wall-mounted furnace for synchronously heating and bathing and control method thereof
EP4290160A1 (en) * 2022-06-10 2023-12-13 Guangdong Carrier HVAC Co., Ltd. Heat recovery multi-split air conditioning system and control method

Also Published As

Publication number Publication date
JP5228023B2 (en) 2013-07-03
EP2634508A4 (en) 2016-11-16
JP2012097910A (en) 2012-05-24
EP2634508A1 (en) 2013-09-04
WO2012056739A1 (en) 2012-05-03
EP2634508B1 (en) 2018-10-03
CN103180676A (en) 2013-06-26
CN103180676B (en) 2016-03-16

Similar Documents

Publication Publication Date Title
EP2634508B1 (en) Refrigeration cycle device and refrigeration cycle control method
JP5121908B2 (en) Air conditioner
US9683768B2 (en) Air-conditioning apparatus
JP5634502B2 (en) Air conditioning and hot water supply complex system
EP2792968B1 (en) Air conditioning device
US9557083B2 (en) Air-conditioning apparatus with multiple operational modes
EP2090849A1 (en) Refrigeration device
JP5511983B2 (en) Air conditioning and hot water supply complex system
US9080778B2 (en) Air-conditioning hot-water supply combined system
EP2765371A1 (en) Refrigeration cycle device
EP2927612B1 (en) Air conditioning device
EP2650620A1 (en) Heat pump device
EP3839365B1 (en) Air-conditioning system
US20220057100A1 (en) Air-conditioning apparatus
JP5881339B2 (en) Air conditioner
JP5889347B2 (en) Refrigeration cycle apparatus and refrigeration cycle control method
JP6589946B2 (en) Refrigeration equipment
WO2014103013A1 (en) Heat pump system
JP5005011B2 (en) Air conditioner
JP5479625B2 (en) Refrigeration cycle apparatus and refrigeration cycle control method
WO2022259396A1 (en) Air-conditioning apparatus
JP2023091255A (en) Refrigeration device with plurality of sensors for detecting state of refrigerant
EP2716997B1 (en) Air conditioning device
JP2008145038A (en) Air conditioner

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI ELECTRIC CORPORATION, JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TAMAKI, SHOGO;SAITO, MAKOTO;REEL/FRAME:030104/0270

Effective date: 20130311

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION