US20100172699A1 - Hybrid Riser Tower and Methods of Installing Same - Google Patents

Hybrid Riser Tower and Methods of Installing Same Download PDF

Info

Publication number
US20100172699A1
US20100172699A1 US12/513,840 US51384007A US2010172699A1 US 20100172699 A1 US20100172699 A1 US 20100172699A1 US 51384007 A US51384007 A US 51384007A US 2010172699 A1 US2010172699 A1 US 2010172699A1
Authority
US
United States
Prior art keywords
riser
line
buoyancy module
installing
buoyancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US12/513,840
Other versions
US8186912B2 (en
Inventor
Jean-Francois Saint-Marcoux
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acergy France SAS
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/513,840 priority Critical patent/US8186912B2/en
Publication of US20100172699A1 publication Critical patent/US20100172699A1/en
Assigned to ACERGY FRANCE, S.A. reassignment ACERGY FRANCE, S.A. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DE-ROUX, GREGOIRE, MR., BRANCHUT, JEAN- PIERRE, MR., SAINT-MARCOUX, JEAN- FRANCOIS, MR.
Application granted granted Critical
Publication of US8186912B2 publication Critical patent/US8186912B2/en
Assigned to Acergy France SAS reassignment Acergy France SAS CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: ACERGY FRANCE, S.A.
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1035Wear protectors; Centralising devices, e.g. stabilisers for plural rods, pipes or lines, e.g. for control lines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/012Risers with buoyancy elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices

Definitions

  • the present invention relates to hybrid riser towers and in particular hybrid riser towers for a drill centre.
  • Hybrid Riser Towers are known and form part of the so-called hybrid riser, having an upper and/or lower portions (“jumpers”) made of flexible conduit and suitable for deep and ultra-deep water field development.
  • U.S. Pat. No. 6,082,391 proposes a particular Hybrid Riser Tower (HRT) consisting of an empty central core, supporting a bundle of riser pipes, some used for oil production some used for water and gas injection. This type of tower has been developed and deployed for example in the Girassol field off Angola. Insulating material in the form of syntactic foam blocks surrounds the core and the pipes and separates the hot and cold fluid conduits.
  • SLORs Single Line Offset Risers
  • a problem with these structures is that for a drill centre (a cluster of wells), a large number of these structures are required, one for each production line, each injection line and each gas line. This means that each structure needs to be placed too close to adjacent structures resulting in the increased risk of each structure getting in the way of or interfering with others, due to wake shielding and wake instability.
  • the invention aims to address the above problems.
  • a riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface, wherein a first of said conduits acts as a central structural core, said other conduits being arranged around said first conduit.
  • Said other conduits are preferably arranged substantially symmetrically around said first conduit.
  • said first conduit is a fluid injection line and said other conduits consist of production lines, Said riser preferably comprising two such production lines.
  • At least one of said production lines may be thermally insulated. In one embodiment both production lines are thermally insulated. Alternatively, only one of said production lines is thermally insulated, the uninsulated line being used as a service line.
  • Said thermal insulation may be in the form of a pipe in pipe structure with the annular space used as a gas lift line.
  • Said fluid injection line may be a water or gas injection line.
  • Said riser may further comprise buoyancy.
  • Said buoyancy may be in the form of blocks located at intervals along the length of the riser.
  • Said blocks may be arranged symmetrically around said first conduit to form a substantially circular cross-section.
  • Said foam blocks are preferably arranged non-contiguously around said first conduit.
  • Said production lines may provide a pigging loop.
  • a riser comprising three conduits arranged substantially symmetrically around a central core, said conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface, wherein a first of said conduits is a fluid injection line, said other conduits being production lines.
  • Said production lines may provide a pigging loop.
  • said first conduit is a water injection line and said other conduits consist of production lines.
  • Two such production lines may be provided.
  • At least one of said production lines may be thermally insulated.
  • both production lines are thermally insulated.
  • only one of said production lines is thermally insulated, the uninsulated line being used as a service line.
  • Said thermal insulation may be in the form of a pipe in pipe structure with the annular space used as a gas lift line.
  • Said riser may further comprise buoyancy.
  • Said buoyancy may be in the form of blocks located at intervals along the length of the riser.
  • Said blocks may be arranged symmetrically around said first conduit to form a substantially circular cross-section.
  • Said foam blocks are preferably arranged non-contiguously around said first conduit.
  • Said riser may further comprise a plurality of guide frame elements arranged at intervals along the length of said riser, said frame elements guiding said conduits in place.
  • Sliding devices between the risers and the guide frames may be included to allow sliding and dampen Vortex Induced Motion.
  • Said structural core may also be used as a conduit, either as a production line, injection line or gas lift line.
  • a riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface wherein said riser is provided with buoyancy along at least a part of its length, said buoyancy resulting in said riser having a generally circular cross-section, the circumference of which being non-contiguous.
  • Generally circular in this case means that the general outline of the riser in cross section is circular (or slightly oval/ovoid) even though the outline is non-contiguous and may have considerable gaps in the circular shape.
  • Said buoyancy may be in the form of blocks located at intervals along the length of the riser.
  • Said blocks may be arranged symmetrically around said first conduit to form said largely circular cross-section.
  • Said foam blocks are preferably arranged such that there are gaps between adjacent blocks to obtain said non-contiguous profile.
  • a first of said conduits may act as a central structural core, said other conduits being arranged around said first conduit.
  • Said other conduits are preferably arranged substantially symmetrically around said first conduit.
  • said first conduit is a fluid injection line and said other conduits consist of production lines.
  • Said fluid injection line may be a water or gas injection line.
  • said riser may comprise three conduits arranged substantially symmetrically around a central core, wherein a first of said conduits is a fluid injection line, said other conduits being production lines.
  • Two such production lines may be provided. At least one of said production lines may be thermally insulated. In one embodiment both production lines are thermally insulated. Alternatively, only one of said production lines is thermally insulated, the uninsulated line being used as a service line. Said thermal insulation may be in the form of a pipe in pipe structure with the annular space used as a gas lift line.
  • a riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface by a buoyancy module, said riser being assembled at a place other than the installation site and transported thereto in a substantially horizontal configuration wherein said buoyancy module is attached to said riser by a non-rigid connection prior to said riser being upended to a substantially vertical working orientation.
  • Said connection between the buoyancy module and the riser may be made at the installation site.
  • Said non-rigid connection may be made using a chain.
  • Said chain may be provided in two parts during transportation, with a first part connected to the riser (either directly or indirectly) and a second part connected to the buoyancy module (either directly or indirectly) while being transported.
  • Said parts may be of approximately equal length.
  • Said parts may each be in the region of 10 m to 30 m long.
  • the two parts may be connected together on a service vessel.
  • the buoyancy tank may first be rotated. Said rotation may be through approximately 90 degrees.
  • Said buoyancy module may be towed to the installation site with the riser. Said buoyancy module may be towed behind said riser by connecting a towing line between the riser and the buoyancy module, independent of any other towing lines.
  • the method may comprise the following steps:
  • top and bottom above is to be understood to mean the top and bottom of the item referred to when it is installed.
  • a method of accessing a coil tubing unit located substantially at the top of a riser structure said riser structure comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface by a buoyancy module, wherein said method comprises attaching a line to a point substantially near the top of said riser, and exerting a force on said line to pull said riser, or a top portion thereof, from its normal substantially vertical configuration to a configuration off vertical.
  • the riser's normal substantially vertical configuration should be understood to cover orientations off true vertical, yet vertical in comparison to other riser systems.
  • Said buoyancy module may be attached to said riser (directly or indirectly) by means of a non-rigid connection such as a chain.
  • Said line is preferably attached to a lower portion of said buoyancy module. The tension on said line may therefore also cause said buoyancy module to be moved a distance laterally away from the vertical axis of said riser, thereby allowing access to the coil tubing unit from directly above.
  • Said tension may be exerted on said line by means of a winch or similar device.
  • Said winch may be located on a Floating Production, Storage and Offloading (FPSO) Vessel.
  • FPSO Floating Production, Storage and Offloading
  • FIG. 1 shows a known type of riser structure in an offshore oil production system
  • FIG. 2 shows a riser structure according to an embodiment of the invention
  • FIGS. 3 a and 3 b show, respectively, the riser structure of FIG. 2 in cross section and a section of the riser tower in perspective;
  • FIGS. 4 a and 4 b show, respectively, an alternative riser structure in cross section and a section of the alternative riser tower in perspective;
  • FIG. 5 shows an alternative riser structure in cross-section
  • FIG. 6 shows a riser structure with buoyancy tank being towed to an installation site
  • FIG. 7 shows in detail the towing connection assembly used in FIG. 6
  • FIGS. 8 a and 8 b depict two steps in the installation method according to an embodiment of the invention.
  • FIGS. 9 a and 9 b depict a method for accessing the coil tubing according to a second embodiment of the invention.
  • FIG. 1 illustrates a floating offshore structure 100 fed by riser bundles 110 , which are supported by subsea buoys 115 .
  • Spurs 120 extend from the bottom of the riser bundle to the various well heads 130 .
  • the floating structure is kept in place by mooring lines (not shown), attached to anchors (not shown) on the seabed.
  • the example shown is of a type known generally from the Girassol development, mentioned in the introduction above.
  • Each riser bundle is supported by the upward force provided by its associated buoy 115 .
  • Flexible jumpers 135 are then used between the buoys and the floating structure 100 .
  • the tension in the riser bundles is a result of the net effect of the buoyancy combined with the ultimate weight of the structure and risers in the seawater.
  • the skilled person will appreciate that the bundle may be a few metres in diameter, but is a very slender structure in view of its length (height) of for example 500 m, or even 1 km or more. The structure must be protected from excessive bending and the tension in the bundle is of assistance in this regard.
  • Hybrid Riser Towers such as those described above, have been developed as monobore structures or as structures comprising a number, in the region of six to twelve, of risers arranged around a central structural core.
  • a drill centre is usually of two piggable production lines (at least one being thermally insulated) and an injection line.
  • FIG. 2 shows a simplified multibore hybrid riser tower designed for a drill centre. It comprises two (in this example) production lines 200 , a water injection line 210 , buoyancy blocks 220 , an Upper Riser Termination Assembly (URTA) 230 with its own self buoyancy 240 , a buoyancy tank 250 connected to the URTA by a chain 260 , jumpers 270 connecting the URTA 230 to a Floating Production Unit (FPU) 280 .
  • FPU Floating Production Unit
  • LRTA Lower Riser Termination Assembly
  • This spool connection 310 can be made with a connector or an automatic tie-in system (such as the system known as MATIS (RTM) and described in WO03/040602 incorporated herein by reference). It should be noted that instead of the water injection line 210 , the riser tower may comprise a gas injection line.
  • MATIS MATIS
  • conventional HRTs usually comprise a central structural core with a number of production and injection lines arranged therearound.
  • the water injection line 210 doubles as a central core for the HRT structure, with the two production lines arranged either side, on the same plane, to give a flat cross-section.
  • the inventors have identified that for a small isolated reservoir the minimum number of lines required are three, two production lines to allow pigging and one injection line to maintain pressure.
  • the risers themselves may be fabricated onshore as horizontally sliding pipe-in-pipe incorporating annular gaslift lines, although separate gaslift lines can also be envisaged.
  • the top connection of an annulus pipe-in-pipe can be performed by welding a bulkhead or by a mechanical connection.
  • FIGS. 3 a and 3 b show, respectively, the riser tower in cross section and a section of the riser tower in perspective.
  • This shows the two production lines 200 , the water injection line/ central core 210 , guide frame 320 and buoyancy foam blocks 220 a , 220 b.
  • the guide frame 320 holds the three lines 200 , 210 in place, in a line.
  • a plurality of these guide frames 320 are comprised in the HRT, arranged at regular intervals along its length.
  • buoyancy blocks 220 a. 220 b are arranged non-contiguously around the water injection line/ riser core.
  • the riser assembly must be buoyant so that, in the event of loss of the HRT by the tugs towing it, it will not sink. Buoyancy of the HRT once installed is provided by the addition of the buoyancy 230 along the riser assemble and the buoyancy provided by the buoyancy element 250 at the top. Attaching buoyancy foam blocks to the risers themselves would reduce the compression in the core pipe but the hydrodynamic section would become very asymmetrical. Therefore, it is preferred for the foam blocks to be attached to the core pipe/ guide frame as shown.
  • VIV Vortex Induced Vibration
  • a conventional completely circular cross-section causes a wake, while the breaking up of this circular outline breaks the wake, resulting in a number of smaller eddy currents instead of one large one, and consequently reduced drag.
  • the riser cross-section should still maintain a largely circular (or slight ovoid) profile, as there is no way of knowing the water current direction, so it is preferable that the structure should be as insensitive to direction as possible
  • the distance between guide frames is governed by the amount of compression in the core pipe. Guiding devices are required between the guide frame and the riser.
  • FIGS. 4 a and 4 b show an alternative embodiment to that described above wherein the two production lines 200 and the single water injection line/gas injection line 210 is arranged symmetrically around a structural core 410 .
  • guide frames 400 and buoyancy foam blocks 220 a, 220 b, 220 c arranged non-contiguously around the core 410 .
  • the structural core it is possible in this embodiment for the structural core to be used as a line, should a further line be desired.
  • FIG. 5 shows a variation of the embodiment depicted in FIGS. 3 a and 3 b .
  • this variation instead of two identical insulated production lines there is provided only one insulated production line 200 and one non-insulated service line 500 .
  • the water/gas injection line 210 acts as the structural core for the riser tower, and there are provided guide frames 510 at intervals along the length with buoyancy blocks 220 a, 220 b attached thereto.
  • the service line is always filled with dead oil (not likely to form hydrates). Upon shutdown dead oil from the service line is pushed back into the production line.
  • the hybrid riser is constructed onshore and then towed to its installation site were it is upended and installed. In order to be towed the riser is made neutrally buoyant (or within certain tolerances). Towing is done by at least two tugs, one leading and one at the rear.
  • FIG. 6 shows (in part) a hybrid riser being towed to an installation site prior to being upended and installed. It shows the riser 600 , and at what will be its top when installed, an upper riser installation assembly (URTA) 610 . Attached to this via buoyancy tank tow line 620 is the main top buoyancy tank 630 floating on the sea surface. The URTA 610 is also attached to a trail tug 650 (the lead tug is not shown) about 650 metres behind the URTA via riser tow line 640 . A section of the main permanent chain link 660 a, attached to the buoyancy tank 630 and for making the permanent connection between this and the URTA 610 , can also be seen, as yet unconnected. It should be noted that the buoyancy tank tow line 620 is actually attached to the top of the buoyancy tank 630 , that is the buoyancy tank 630 is inverted compared to the riser 600 itself.
  • URTA upper riser installation assembly
  • FIG. 7 shows in detail the rigging of the URTA 610 .
  • This shows a triplate with swivel 700 which connects the URTA 610 (and therefore the riser 600 ) to the buoyancy tank 630 and trail tug 650 by buoyancy tank tow line 620 and riser tow line 640 respectively.
  • the other section of the permanent chain link 660 b attached to the top of the URTA 610 .
  • FIGS. 8 a and 8 b show the trail tug and apparatus of FIG. 6 during two steps of the installation method.
  • This installation method is as follows: The buoyancy tank is moved back (possibly by a service vessel) and the trail tug 650 pays in the Riser tow line 640 and moves back 150 m towards the riser 600 . The paying in of the tow rope causes the URTA 610 to rise towards the water surface. The buoyancy tank 630 is then rotated 90 degrees (again the service vessel will probably do this) to allow room for the permanent chain connection to be made.
  • FIG. 4 a This shows the buoyancy tank 630 at 90 degrees with the permanent chain connection 660 in place.
  • the trail tug 650 (now about 100 m from the URTA 610 ) is still connected to the URTA 610 by riser tow line 640 .
  • the buoyancy tank tow line 620 is still connected between the buoyancy tank 630 and the URTA 610 and is now slack.
  • the slack buoyancy tank tow line 620 is now disconnected from the triplate swivel 700 and is then passed on to the trail tug 650 . Therefore this line 620 is now connected between the trail tug 650 and the top of the buoyancy tank 630 . This line 620 is then winched taut. The riser towing line 640 is then released. This situation is shown in FIG. 4 b . It can be seen that the tension now goes through the buoyancy tank towing line 620 , buoyancy tank 620 and permanent chain 660 . The triplate swivel 700 is then removed to give room to the permanent buoyancy tank shackle, and the permanent buoyancy tank shackle is secured. The upending process can now begin with the lead tug paying out the dead man anchor. The upending process is described in U.S. Pat. No. 6,082,391 and is incorporated herein by reference.
  • FIGS. 9 a and 9 b depicts a method for accessing the coil tubing unit for a Hybrid Riser Tower which has its buoyancy tank attached non-rigidly, for instance with a chain, as in this example.
  • This shows the top part of the installed riser tower (which may have been installed by the method described above), and in particular the riser 600 , URTA 610 , buoyancy tank 630 , permanent chain link 660 , the coil tubing access 700 , and a temporary line 710 from a winch 730 on the Floating Production, Storage and Offloading (FPSO) Vessel 720 to the bottom of the buoyancy tank 630 .
  • FPSO Floating Production, Storage and Offloading
  • the method comprises attaching the temporary line 710 from the winch 730 on the FPSO 720 to the bottom of the buoyancy tank 630 and using the winch 730 to pull this line 710 causing the riser assembly to move off vertical. This provides the necessary clearance 740 for the coil tubing access.
  • the inventors have recognised that, with the buoyancy tank 630 connected by a chain 660 , the temporary line 710 should be attached to the bottom of the buoyancy tank 630 . Should it be connected to the top of the buoyancy tank 630 , the tank tends only to rotate, while connection to the URTA 610 means that the buoyancy tank 630 tends to remain directly above and still preventing the coil tubing access.
  • buoyancy tank be towed with the riser to the installation site (although this is likely to be the lower cost option), the buoyancy tank may be transported separately and attached prior to upending.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Types And Forms Of Lifts (AREA)
  • Catalysts (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Water Treatment By Electricity Or Magnetism (AREA)
  • Wind Motors (AREA)
  • Road Signs Or Road Markings (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Stringed Musical Instruments (AREA)
  • Harvester Elements (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

Disclosed is a riser comprising a plurality of pipelines. In one example there are three such pipelines, extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface, wherein, in one embodiment a first of said pipelines acts as a central structural core, the other pipelines being arranged around said first pipeline. In another embodiment three pipelines are arranged around a structural core. In each case, the first of said pipelines may be a fluid injection line, said other pipelines being production lines. Also disclosed is a riser having buoyancy along at least a part of its length, said buoyancy resulting in said riser having a generally circular cross-section, the circumference of which being non-contiguous. Methods of installing such risers are also are also described.

Description

  • The present invention relates to hybrid riser towers and in particular hybrid riser towers for a drill centre.
  • Hybrid Riser Towers are known and form part of the so-called hybrid riser, having an upper and/or lower portions (“jumpers”) made of flexible conduit and suitable for deep and ultra-deep water field development. U.S. Pat. No. 6,082,391 (Stolt/Doris) proposes a particular Hybrid Riser Tower (HRT) consisting of an empty central core, supporting a bundle of riser pipes, some used for oil production some used for water and gas injection. This type of tower has been developed and deployed for example in the Girassol field off Angola. Insulating material in the form of syntactic foam blocks surrounds the core and the pipes and separates the hot and cold fluid conduits. Further background has been published in paper “Hybrid Riser Tower: from Functional Specification to Cost per Unit Length” by J-F Saint-Marcoux and M Rochereau, DOT XIII Rio de Janeiro, 18 Oct. 2001. Updated versions of such risers have been proposed in WO 02/053869 A1. The contents of all these documents are incorporated herein by reference, as background to the present disclosure. These multibore HRTs are very large and unwieldy, cannot be fabricated everywhere, and reach the limit of the component capabilities.
  • One known solution is to use a number of Single Line Offset Risers (SLORs) which are essentially monobore HRTs. A problem with these structures is that for a drill centre (a cluster of wells), a large number of these structures are required, one for each production line, each injection line and each gas line. This means that each structure needs to be placed too close to adjacent structures resulting in the increased risk of each structure getting in the way of or interfering with others, due to wake shielding and wake instability.
  • Another problem with all HRTs is vortex induced vibration (alternating shedding of trailing vortexes), which can lead to fatigue damage to drilling and production risers.
  • The invention aims to address the above problems.
  • In a first aspect of the invention there is provided a riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface, wherein a first of said conduits acts as a central structural core, said other conduits being arranged around said first conduit.
  • Said other conduits are preferably arranged substantially symmetrically around said first conduit.
  • In a main embodiment said first conduit is a fluid injection line and said other conduits consist of production lines, Said riser preferably comprising two such production lines. At least one of said production lines may be thermally insulated. In one embodiment both production lines are thermally insulated. Alternatively, only one of said production lines is thermally insulated, the uninsulated line being used as a service line. Said thermal insulation may be in the form of a pipe in pipe structure with the annular space used as a gas lift line. Said fluid injection line may be a water or gas injection line.
  • Said riser may further comprise buoyancy. Said buoyancy may be in the form of blocks located at intervals along the length of the riser. Said blocks may be arranged symmetrically around said first conduit to form a substantially circular cross-section. Said foam blocks are preferably arranged non-contiguously around said first conduit.
  • Said production lines may provide a pigging loop.
  • In a further aspect of the invention there is provided a riser comprising three conduits arranged substantially symmetrically around a central core, said conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface, wherein a first of said conduits is a fluid injection line, said other conduits being production lines.
  • Said production lines may provide a pigging loop.
  • In a main embodiment said first conduit is a water injection line and said other conduits consist of production lines. Two such production lines may be provided. At least one of said production lines may be thermally insulated. In one embodiment both production lines are thermally insulated. Alternatively, only one of said production lines is thermally insulated, the uninsulated line being used as a service line. Said thermal insulation may be in the form of a pipe in pipe structure with the annular space used as a gas lift line.
  • Said riser may further comprise buoyancy. Said buoyancy may be in the form of blocks located at intervals along the length of the riser. Said blocks may be arranged symmetrically around said first conduit to form a substantially circular cross-section. Said foam blocks are preferably arranged non-contiguously around said first conduit.
  • Said riser may further comprise a plurality of guide frame elements arranged at intervals along the length of said riser, said frame elements guiding said conduits in place. Sliding devices between the risers and the guide frames may be included to allow sliding and dampen Vortex Induced Motion.
  • Said structural core may also be used as a conduit, either as a production line, injection line or gas lift line.
  • In a further aspect of the invention there is provided a riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface wherein said riser is provided with buoyancy along at least a part of its length, said buoyancy resulting in said riser having a generally circular cross-section, the circumference of which being non-contiguous.
  • Generally circular in this case means that the general outline of the riser in cross section is circular (or slightly oval/ovoid) even though the outline is non-contiguous and may have considerable gaps in the circular shape.
  • Said buoyancy may be in the form of blocks located at intervals along the length of the riser. Said blocks may be arranged symmetrically around said first conduit to form said largely circular cross-section. Said foam blocks are preferably arranged such that there are gaps between adjacent blocks to obtain said non-contiguous profile.
  • A first of said conduits may act as a central structural core, said other conduits being arranged around said first conduit. Said other conduits are preferably arranged substantially symmetrically around said first conduit. In a main embodiment said first conduit is a fluid injection line and said other conduits consist of production lines. Said fluid injection line may be a water or gas injection line. Alternatively said riser may comprise three conduits arranged substantially symmetrically around a central core, wherein a first of said conduits is a fluid injection line, said other conduits being production lines.
  • Two such production lines may be provided. At least one of said production lines may be thermally insulated. In one embodiment both production lines are thermally insulated. Alternatively, only one of said production lines is thermally insulated, the uninsulated line being used as a service line. Said thermal insulation may be in the form of a pipe in pipe structure with the annular space used as a gas lift line.
  • In a further aspect of the invention there is provided a method of installing a riser, said riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface by a buoyancy module, said riser being assembled at a place other than the installation site and transported thereto in a substantially horizontal configuration wherein said buoyancy module is attached to said riser by a non-rigid connection prior to said riser being upended to a substantially vertical working orientation.
  • Said connection between the buoyancy module and the riser may be made at the installation site. Said non-rigid connection may be made using a chain. Said chain may be provided in two parts during transportation, with a first part connected to the riser (either directly or indirectly) and a second part connected to the buoyancy module (either directly or indirectly) while being transported. Said parts may be of approximately equal length. Said parts may each be in the region of 10 m to 30 m long. The two parts may be connected together on a service vessel. In order to provide room to make the connection, the buoyancy tank may first be rotated. Said rotation may be through approximately 90 degrees.
  • Said buoyancy module may be towed to the installation site with the riser. Said buoyancy module may be towed behind said riser by connecting a towing line between the riser and the buoyancy module, independent of any other towing lines.
  • In one embodiment, in which the riser and buoyancy module are transported together by a first, leading, vessel and second, trailing, vessel the method may comprise the following steps:
      • the second vessel, connected by a first line to the top end of the riser during transportation, pays in said line and moves toward the riser,
      • the Buoyancy module is rotated approximately 90 degrees,
      • the permanent connection between riser and buoyancy module is made on a service vessel;
      • a second line, which connected the top of the buoyancy module to the top of the riser during transportation, is disconnected from said riser and passed to said second vessel;
      • Said first line is disconnected,
      • The riser upending process begins.
  • Reference to “top” and “bottom” above is to be understood to mean the top and bottom of the item referred to when it is installed.
  • In a further aspect of the invention there is provided a method of accessing a coil tubing unit located substantially at the top of a riser structure, said riser structure comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface by a buoyancy module, wherein said method comprises attaching a line to a point substantially near the top of said riser, and exerting a force on said line to pull said riser, or a top portion thereof, from its normal substantially vertical configuration to a configuration off vertical.
  • The riser's normal substantially vertical configuration should be understood to cover orientations off true vertical, yet vertical in comparison to other riser systems.
  • Said buoyancy module may be attached to said riser (directly or indirectly) by means of a non-rigid connection such as a chain. Said line is preferably attached to a lower portion of said buoyancy module. The tension on said line may therefore also cause said buoyancy module to be moved a distance laterally away from the vertical axis of said riser, thereby allowing access to the coil tubing unit from directly above.
  • Said tension may be exerted on said line by means of a winch or similar device. Said winch may be located on a Floating Production, Storage and Offloading (FPSO) Vessel.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Embodiments of the invention will now be described, by way of example only, by reference to the accompanying drawings, in which:
  • FIG. 1 shows a known type of riser structure in an offshore oil production system;
  • FIG. 2 shows a riser structure according to an embodiment of the invention;
  • FIGS. 3 a and 3 b show, respectively, the riser structure of FIG. 2 in cross section and a section of the riser tower in perspective;
  • FIGS. 4 a and 4 b show, respectively, an alternative riser structure in cross section and a section of the alternative riser tower in perspective;
  • FIG. 5 shows an alternative riser structure in cross-section;
  • FIG. 6 shows a riser structure with buoyancy tank being towed to an installation site,
  • FIG. 7 shows in detail the towing connection assembly used in FIG. 6
  • FIGS. 8 a and 8 b depict two steps in the installation method according to an embodiment of the invention; and
  • FIGS. 9 a and 9 b depict a method for accessing the coil tubing according to a second embodiment of the invention.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS
  • FIG. 1 illustrates a floating offshore structure 100 fed by riser bundles 110, which are supported by subsea buoys 115. Spurs 120 extend from the bottom of the riser bundle to the various well heads 130. The floating structure is kept in place by mooring lines (not shown), attached to anchors (not shown) on the seabed. The example shown is of a type known generally from the Girassol development, mentioned in the introduction above.
  • Each riser bundle is supported by the upward force provided by its associated buoy 115. Flexible jumpers 135 are then used between the buoys and the floating structure 100. The tension in the riser bundles is a result of the net effect of the buoyancy combined with the ultimate weight of the structure and risers in the seawater. The skilled person will appreciate that the bundle may be a few metres in diameter, but is a very slender structure in view of its length (height) of for example 500 m, or even 1 km or more. The structure must be protected from excessive bending and the tension in the bundle is of assistance in this regard.
  • Hybrid Riser Towers (HRTs), such as those described above, have been developed as monobore structures or as structures comprising a number, in the region of six to twelve, of risers arranged around a central structural core.
  • It is normal for deepwater developments to be phased and are often built around a drill centre. A drill centre is usually of two piggable production lines (at least one being thermally insulated) and an injection line.
  • FIG. 2 shows a simplified multibore hybrid riser tower designed for a drill centre. It comprises two (in this example) production lines 200, a water injection line 210, buoyancy blocks 220, an Upper Riser Termination Assembly (URTA) 230 with its own self buoyancy 240, a buoyancy tank 250 connected to the URTA by a chain 260, jumpers 270 connecting the URTA 230 to a Floating Production Unit (FPU) 280. At the lower end there is a Lower Riser Termination Assembly (LRTA) 290, a suction or gravity or other type of anchor 300, and a rigid spool connection 310. This spool connection 310 can be made with a connector or an automatic tie-in system (such as the system known as MATIS (RTM) and described in WO03/040602 incorporated herein by reference). It should be noted that instead of the water injection line 210, the riser tower may comprise a gas injection line.
  • As mentioned previously, conventional HRTs usually comprise a central structural core with a number of production and injection lines arranged therearound. In this structure. however, the water injection line 210 doubles as a central core for the HRT structure, with the two production lines arranged either side, on the same plane, to give a flat cross-section.
  • The inventors have identified that for a small isolated reservoir the minimum number of lines required are three, two production lines to allow pigging and one injection line to maintain pressure.
  • The risers themselves may be fabricated onshore as horizontally sliding pipe-in-pipe incorporating annular gaslift lines, although separate gaslift lines can also be envisaged. The top connection of an annulus pipe-in-pipe can be performed by welding a bulkhead or by a mechanical connection.
  • FIGS. 3 a and 3 b show, respectively, the riser tower in cross section and a section of the riser tower in perspective. This shows the two production lines 200, the water injection line/ central core 210, guide frame 320 and buoyancy foam blocks 220 a, 220 b. The guide frame 320 holds the three lines 200, 210 in place, in a line. A plurality of these guide frames 320 are comprised in the HRT, arranged at regular intervals along its length.
  • It can also be seen that the buoyancy blocks 220 a. 220 b are arranged non-contiguously around the water injection line/ riser core. For an onshore-assembled HRT, the riser assembly must be buoyant so that, in the event of loss of the HRT by the tugs towing it, it will not sink. Buoyancy of the HRT once installed is provided by the addition of the buoyancy 230 along the riser assemble and the buoyancy provided by the buoyancy element 250 at the top. Attaching buoyancy foam blocks to the risers themselves would reduce the compression in the core pipe but the hydrodynamic section would become very asymmetrical. Therefore, it is preferred for the foam blocks to be attached to the core pipe/ guide frame as shown.
  • The fact that the foam blocks are arranged non-contiguously around the HRT (as well as being applied non-contiguously along its length) minimises the occurrence of Vortex Induced Vibration (VIV) in the riser tower. A conventional completely circular cross-section causes a wake, while the breaking up of this circular outline breaks the wake, resulting in a number of smaller eddy currents instead of one large one, and consequently reduced drag. The riser cross-section should still maintain a largely circular (or slight ovoid) profile, as there is no way of knowing the water current direction, so it is preferable that the structure should be as insensitive to direction as possible
  • The distance between guide frames is governed by the amount of compression in the core pipe. Guiding devices are required between the guide frame and the riser.
  • FIGS. 4 a and 4 b show an alternative embodiment to that described above wherein the two production lines 200 and the single water injection line/gas injection line 210 is arranged symmetrically around a structural core 410. As before there are guide frames 400 and buoyancy foam blocks 220 a, 220 b, 220 c arranged non-contiguously around the core 410. It is possible in this embodiment for the structural core to be used as a line, should a further line be desired.
  • FIG. 5 shows a variation of the embodiment depicted in FIGS. 3 a and 3 b. In this variation instead of two identical insulated production lines there is provided only one insulated production line 200 and one non-insulated service line 500. As before, the water/gas injection line 210 acts as the structural core for the riser tower, and there are provided guide frames 510 at intervals along the length with buoyancy blocks 220 a, 220 b attached thereto. Under normal conditions the production comes through the insulated line. The service line is always filled with dead oil (not likely to form hydrates). Upon shutdown dead oil from the service line is pushed back into the production line.
  • It should be noted that the hybrid riser is constructed onshore and then towed to its installation site were it is upended and installed. In order to be towed the riser is made neutrally buoyant (or within certain tolerances). Towing is done by at least two tugs, one leading and one at the rear.
  • FIG. 6 shows (in part) a hybrid riser being towed to an installation site prior to being upended and installed. It shows the riser 600, and at what will be its top when installed, an upper riser installation assembly (URTA) 610. Attached to this via buoyancy tank tow line 620 is the main top buoyancy tank 630 floating on the sea surface. The URTA 610 is also attached to a trail tug 650 (the lead tug is not shown) about 650 metres behind the URTA via riser tow line 640. A section of the main permanent chain link 660 a, attached to the buoyancy tank 630 and for making the permanent connection between this and the URTA 610, can also be seen, as yet unconnected. It should be noted that the buoyancy tank tow line 620 is actually attached to the top of the buoyancy tank 630, that is the buoyancy tank 630 is inverted compared to the riser 600 itself.
  • FIG. 7 shows in detail the rigging of the URTA 610. This shows a triplate with swivel 700 which connects the URTA 610 (and therefore the riser 600) to the buoyancy tank 630 and trail tug 650 by buoyancy tank tow line 620 and riser tow line 640 respectively. Also shown is the other section of the permanent chain link 660 b attached to the top of the URTA 610.
  • By using a chain to connect the buoyancy tank to the riser (instead of, for example a flexjoint) and by making the chain link long enough (say each section 630 a, 630 b being about 20 metres in length) it becomes possible to attach the buoyancy tank 230 to the riser 600 by joining these two sections 630 a, 630 b together at the installation site prior to upending. This dispenses with the need to have a heavy installation vessel with crane to hold and install the buoyancy tank when upended. Only service vessels are required. It also allows the possibility of towing the buoyancy tank with the riser to the installation site thus reducing cost. Furthermore, the use of a chain instead of a rigid connection dispenses with the need for a taper joint.
  • FIGS. 8 a and 8 b show the trail tug and apparatus of FIG. 6 during two steps of the installation method. This installation method is as follows: The buoyancy tank is moved back (possibly by a service vessel) and the trail tug 650 pays in the Riser tow line 640 and moves back 150 m towards the riser 600. The paying in of the tow rope causes the URTA 610 to rise towards the water surface. The buoyancy tank 630 is then rotated 90 degrees (again the service vessel will probably do this) to allow room for the permanent chain connection to be made.
  • With the buoyancy tank 630 rotated, the service vessels pays in the 60 m permanent chain section 660 a from the buoyancy tank 630, and the 60 m permanent chain section 660 b on the URTA 610. The permanent chain link between the buoyancy tank 630 and the URTA 610 (and therefore the riser 600) is made on the shark jaws of the service vessel. The resulting situation is shown in FIG. 4 a. This shows the buoyancy tank 630 at 90 degrees with the permanent chain connection 660 in place. The trail tug 650 (now about 100 m from the URTA 610) is still connected to the URTA 610 by riser tow line 640. The buoyancy tank tow line 620 is still connected between the buoyancy tank 630 and the URTA 610 and is now slack.
  • The slack buoyancy tank tow line 620 is now disconnected from the triplate swivel 700 and is then passed on to the trail tug 650. Therefore this line 620 is now connected between the trail tug 650 and the top of the buoyancy tank 630. This line 620 is then winched taut. The riser towing line 640 is then released. This situation is shown in FIG. 4 b. It can be seen that the tension now goes through the buoyancy tank towing line 620, buoyancy tank 620 and permanent chain 660. The triplate swivel 700 is then removed to give room to the permanent buoyancy tank shackle, and the permanent buoyancy tank shackle is secured. The upending process can now begin with the lead tug paying out the dead man anchor. The upending process is described in U.S. Pat. No. 6,082,391 and is incorporated herein by reference.
  • One issue with the Hybrid Riser Tower as described (with chain connection to the buoyancy tank) is the coil tubing access. This was previously done by having access to the coil tubing unit to be from directly vertically above the URTA. In this case the buoyancy tank was rigidly connected with a taper joint. However access from vertically above is not possible with the buoyancy tank attached to a chain also directly vertically above the URTA.
  • FIGS. 9 a and 9 b depicts a method for accessing the coil tubing unit for a Hybrid Riser Tower which has its buoyancy tank attached non-rigidly, for instance with a chain, as in this example. This shows the top part of the installed riser tower (which may have been installed by the method described above), and in particular the riser 600, URTA 610, buoyancy tank 630, permanent chain link 660, the coil tubing access 700, and a temporary line 710 from a winch 730 on the Floating Production, Storage and Offloading (FPSO) Vessel 720 to the bottom of the buoyancy tank 630.
  • The method comprises attaching the temporary line 710 from the winch 730 on the FPSO 720 to the bottom of the buoyancy tank 630 and using the winch 730 to pull this line 710 causing the riser assembly to move off vertical. This provides the necessary clearance 740 for the coil tubing access.
  • The inventors have recognised that, with the buoyancy tank 630 connected by a chain 660, the temporary line 710 should be attached to the bottom of the buoyancy tank 630. Should it be connected to the top of the buoyancy tank 630, the tank tends only to rotate, while connection to the URTA 610 means that the buoyancy tank 630 tends to remain directly above and still preventing the coil tubing access.
  • The above embodiments are for illustration only and other embodiments and variations are possible and envisaged without departing from the spirit and scope of the invention. For example it is not essential that the buoyancy tank be towed with the riser to the installation site (although this is likely to be the lower cost option), the buoyancy tank may be transported separately and attached prior to upending.

Claims (20)

1-43. (canceled)
44. A method of installing a riser, said riser comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface by a buoyancy module, said riser being assembled at a place other than the installation site and transported thereto in a substantially horizontal configuration wherein said buoyancy module is attached to said riser by a non-rigid connection prior to said riser being upended to a substantially vertical working orientation, said riser and buoyancy module being transported together by a first, leading, vessel and second, trailing, vessel, the method further comprising the steps of:
connecting said second vessel by a first line to the top end of the riser during transportation and paying in said first line to move toward the riser,
rotating the buoyancy module approximately 90 degrees,
making a permanent connection between said riser and buoyancy module on a service vessel;
disconnecting a second line, which connected the to of the buoyancy module to the top of the riser during transportation, and passing said second line to said second vessel;
disconnecting said first line,
initiating the upending of the riser.
45. A method of installing a riser as claimed in claim 44 wherein said connection between the buoyancy module and the riser is made at the installation site.
46. A method of installing a riser as claimed in claim 44 wherein said non-rigid connection is made using a chain.
47. A method of installing a riser as claimed in claim 46 wherein said chain is provided in two parts during transportation, with a first part connected, directly or indirectly, to the riser and a second part connected, directly or indirectly, to the buoyancy module while being transported.
48. A method of installing a riser as claimed in claim 47 wherein said parts are of approximately equal length.
49. A method of installing a riser as claimed in claim 47 wherein said parts are each in the region of 10 m to 30 m long.
50. A method of installing a riser as claimed in claim 47 wherein the two parts are connected together on a service vessel.
51. A method of installing a riser as claimed in claim 47 wherein, in order to provide room to make the connection, the buoyancy module tank is rotated prior to connection.
52. A method of installing a riser as claimed in claim 51 wherein said rotation is through approximately 90 degrees.
53. A method of installing a riser as claimed in claim 44 wherein said buoyancy module is towed to the installation site with the riser.
54. A method of installing a riser as claimed in claim 53 wherein said buoyancy module is towed behind said riser by connecting a towing line between the riser and the buoyancy module, independent of any other towing lines.
55. (canceled)
56. A method of accessing a coil tubing unit located substantially at the top of a riser structure, said riser structure comprising a plurality of conduits extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface by a buoyancy module, wherein said method comprises attaching a line to a point substantially near the top of said riser, and exerting a force on said line to pull said riser, or a top portion thereof, from its normal substantially vertical configuration to a configuration off vertical.
57. A method as claimed in claim 56 wherein said buoyancy module is attached, directly or indirectly, to said riser by means of a non-rigid connection.
58. A method as claimed in claim 57 wherein said non-rigid connection comprises a chain.
59. A method as claimed in claim 56, wherein said line is attached to a lower portion of said buoyancy module.
60. A method as claimed in claim 56 wherein the tension on said line also causes said buoyancy module to be moved a distance laterally away from the vertical axis of said riser, thereby allowing access to the coil tubing unit from directly above.
61. A method as claimed in claim 56 wherein said force is exerted on said line by means of a winch or similar device.
62. A method as claimed in claim 61 wherein said winch is located on a Floating Production, Storage and Offloading (FPSO) Vessel.
US12/513,840 2006-11-08 2007-11-06 Hybrid riser tower and methods of installing same Active US8186912B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/513,840 US8186912B2 (en) 2006-11-08 2007-11-06 Hybrid riser tower and methods of installing same

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US85757206P 2006-11-08 2006-11-08
GB0704670.9 2007-03-10
GBGB0704670.9A GB0704670D0 (en) 2006-11-08 2007-03-10 Hybrid tower and methods of installing same
PCT/GB2007/050675 WO2008056185A2 (en) 2006-11-08 2007-11-06 Hybrid riser tower and methods of installing same
US12/513,840 US8186912B2 (en) 2006-11-08 2007-11-06 Hybrid riser tower and methods of installing same

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2007/050675 A-371-Of-International WO2008056185A2 (en) 2006-11-08 2007-11-06 Hybrid riser tower and methods of installing same

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/460,777 Continuation-In-Part US8998539B2 (en) 2006-11-08 2012-04-30 Hybrid riser tower and methods of installing same

Publications (2)

Publication Number Publication Date
US20100172699A1 true US20100172699A1 (en) 2010-07-08
US8186912B2 US8186912B2 (en) 2012-05-29

Family

ID=39144588

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/513,840 Active US8186912B2 (en) 2006-11-08 2007-11-06 Hybrid riser tower and methods of installing same

Country Status (9)

Country Link
US (1) US8186912B2 (en)
EP (4) EP2474468B1 (en)
AT (1) ATE499282T1 (en)
AU (1) AU2007319011B2 (en)
BR (3) BR122018073569B1 (en)
DE (1) DE602007012744D1 (en)
GB (1) GB0704670D0 (en)
NO (2) NO344207B1 (en)
WO (1) WO2008056185A2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110168399A1 (en) * 2008-05-02 2011-07-14 Jean Francois Saint-Marcoux Mid water gas lift
US20110271508A1 (en) * 2008-11-13 2011-11-10 Jean-Pierre Branchut Methods and associated apparatus of constructing and installing rigid riser structures
US20120043052A1 (en) * 2010-07-23 2012-02-23 Heat-Line Corporation Geothermal Energy Transfer System
US20140041878A1 (en) * 2011-04-18 2014-02-13 Magma Global Limited Hybrid Riser System
US20150000925A1 (en) * 2010-02-10 2015-01-01 Heerema Marine Contractors Nederland Se Riser assembly from a vessel and on a seabed
US9121228B2 (en) 2009-10-21 2015-09-01 Fluor Technologies Corporation Hybrid buoyed and stayed towers and risers for deepwater
US20150315853A1 (en) * 2014-04-30 2015-11-05 Seahorse Equipment Corp Bundled, articulated riser system for fpso vessel
US20180266194A1 (en) * 2015-12-21 2018-09-20 Halliburton Energy Services, Inc. Method and system for deployment of tubing strings for riser-less applications
US10378331B2 (en) * 2012-05-30 2019-08-13 Onesubsea Ip Uk Limited Monitoring integrity of a riser pipe network
US11125030B2 (en) * 2018-12-21 2021-09-21 Odebrecht Óleo E Gás S.A. Guiding system on a hybrid lifting tower, and hybrid lifting tower

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2932839B1 (en) * 2008-06-23 2010-08-20 Technip France UNDERWATER TRANSPORTATION FACILITY FOR HYDROCARBONS.
US20100059230A1 (en) * 2008-09-05 2010-03-11 Harold Brian Skeels Coil tubing guide
GB0900097D0 (en) 2009-01-07 2009-02-11 Acergy Us Inc Improvements in hybrid riser towers and fabrication thereof
FR2942497B1 (en) * 2009-02-26 2013-04-26 Saipem Sa MULTI-RISER HYBRID TILT-TYPE FLAT-SURFACE LINK INSTALLATION COMPRISING SLIDING FLOATING MODULES
GB2475108A (en) * 2009-11-05 2011-05-11 Acergy Us Inc Methods of constructing and installing rigid riser structures and associated apparatus
FR2960208B1 (en) 2010-05-20 2012-08-10 Saipem Sa SURFACE BONDING SYSTEM COMPRISING A FLEXIBLE DRIVING GUIDE STRUCTURE
WO2011150363A1 (en) * 2010-05-28 2011-12-01 Weatherford/Lamb, Inc. Deepwater completion installation and intervention system
GB2500102B (en) * 2012-03-05 2014-01-29 Acergy France Sa Buoyancy arrangements for hybrid riser towers
KR101696156B1 (en) * 2016-07-27 2017-01-12 김정현 Flexible riser system
GB2559810B (en) 2017-02-21 2021-01-06 Acergy France SAS Fabrication of pipe bundles offshore
GB2602115B (en) 2020-12-18 2023-07-12 Subsea 7 Norway As Storage of fluids underwater
NO347964B1 (en) * 2020-12-18 2024-06-03 Subsea 7 Norway As Storage of fluids underwater

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4271550A (en) * 1977-05-26 1981-06-09 Institut Francais Du Petrole Method for submerging an equipment of negative buoyancy
US4645467A (en) * 1984-04-24 1987-02-24 Amtel, Inc. Detachable mooring and cargo transfer system
US6321844B1 (en) * 1997-09-12 2001-11-27 Stolt Comex Seaway Hybrid riser and method for sub-sea transportation of petroleum products with the device
US20050063788A1 (en) * 2001-10-10 2005-03-24 Terje Clausen Riser and method of installing same
US6893190B2 (en) * 2000-08-01 2005-05-17 Single Buoy Moorings Inc. Method and structure for connecting a floating structure with rope anchor lines to the seabed
US20070044972A1 (en) * 2005-09-01 2007-03-01 Roveri Francisco E Self-supported riser system and method of installing same

Family Cites Families (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3517110A (en) 1968-04-01 1970-06-23 North American Rockwell Flexible underwater riser containing electrical conductors and material conduits
FR2029884A5 (en) 1969-01-30 1970-10-23 Liautaud Jean Production storage and bunkering assembly - for an underwater petroleum field
NL152649B (en) 1970-01-28 1977-03-15 Shell Int Research PIPELINE OR PIPELINE SECTION FOR THE TRANSPORT OF A FLUIDUM IN CRYOGENIC TEMPERATURES, FOR EXAMPLE LIQUID NATURAL GAS.
AR192712A1 (en) 1970-07-08 1973-03-14 Snam Progetti ANCHORING DEVICE FOR MOORING BUOYS
DE2543293C3 (en) * 1975-09-27 1978-03-16 Thyssen Industrie Ag, 4300 Essen Underwater drilling device
US4098333A (en) * 1977-02-24 1978-07-04 Compagnie Francaise Des Petroles Marine production riser system
FR2510713A1 (en) 1981-07-31 1983-02-04 Vallourec PREFABRICATED TUBE ELEMENT FOR FLUID TRANSPORT PIPES AT TEMPERATURE DIFFERENT FROM THE AMBIENT
SE8300252L (en) 1983-01-19 1984-07-20 Dansk Rorind SET TO SHARP TWO FORISOLATED PIPES AND A SHARP SHELET TO BE USED IN APPLICATION OF THESE SETS
US4673313A (en) 1985-04-11 1987-06-16 Mobil Oil Corporation Marine production riser and method for installing same
DE3934253A1 (en) 1988-10-14 1990-04-19 Architektur Bauwesen Hochschul Ceramic and glass or glass pipe section - has casing and inner and outer tie pieces, with tubular sleeve and pipe straps
NO953217L (en) * 1995-08-16 1997-02-17 Aker Eng As Method and arrangement of pipe bundles
FR2751721B1 (en) 1996-07-26 1998-09-11 Itp METHOD FOR ASSEMBLING PIPES BY ASSEMBLY AT SEA OF SUCCESSIVE PIPES, AND PIPES FOR IMPLEMENTING THIS PROCESS
NO981701D0 (en) 1998-04-16 1998-04-16 Kvaerner Oilfield Prod As Compound hybrid rises year
US6004074A (en) * 1998-08-11 1999-12-21 Mobil Oil Corporation Marine riser having variable buoyancy
GB2346188A (en) * 1999-01-29 2000-08-02 2H Offshore Engineering Limite Concentric offset riser
US6155748A (en) * 1999-03-11 2000-12-05 Riser Systems Technologies Deep water riser flotation apparatus
NO994094D0 (en) * 1999-08-24 1999-08-24 Aker Riser Systems As riser
FR2809136B1 (en) 2000-05-19 2002-11-08 Saibos Construcoes Maritimas L BASE-SURFACE CONNECTION INSTALLATION FOR SUBSEA PIPE, CONNECTION DEVICE BETWEEN A FLOAT AND A RISER, AND INTERVENTION METHOD IN SAID RISER
WO2002012776A1 (en) * 2000-08-03 2002-02-14 Stolt Offshore Sa Thermally insulated pipeline bundle
OA12417A (en) * 2001-01-08 2006-04-18 Stolt Offshore Sa Marine riser tower.
WO2002063128A1 (en) * 2001-01-08 2002-08-15 Stolt Offshore Sa Marine riser tower
US6948884B2 (en) * 2001-03-14 2005-09-27 Technip France Vortex-induced vibration reduction device for fluid immersed cylinders
FR2825116B1 (en) * 2001-05-25 2003-12-05 Inst Francais Du Petrole METHOD FOR DIMENSIONING A DRILLING RISER
GB2376728A (en) 2001-06-20 2002-12-24 Corus Uk Ltd A method of manufacturing a double-walled pipe structure
US7445404B2 (en) 2001-11-06 2008-11-04 Acergy Uk Limited Remote bolted flange connection apparatus and methods of operation thereof
GB0227851D0 (en) 2002-11-29 2003-01-08 Stolt Offshore Sa Subsea structure and methods of construction and installation thereof
US7070361B2 (en) * 2003-03-06 2006-07-04 Shell Oil Company Apparatus and methods for providing VIV suppression to a riser system comprising umbilical elements
FR2852677B1 (en) * 2003-03-18 2006-01-06 Saipem Sa DEVICE FOR HEATING AND THERMALLY INSULATING AT LEAST ONE UNDERWATER DRIVING
GB0409361D0 (en) 2004-04-27 2004-06-02 Stolt Offshore Sa Marine riser tower
US7191836B2 (en) * 2004-08-02 2007-03-20 Kellogg Brown & Root Llc Dry tree subsea well communications apparatus and method using variable tension large offset risers
GB2419171A (en) 2004-10-14 2006-04-19 Crp Group Ltd Insulated pipe assembly
GB0512471D0 (en) 2005-06-18 2005-07-27 Stolt Offshore Sa Hybrid riser tower and methods of installation thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4271550A (en) * 1977-05-26 1981-06-09 Institut Francais Du Petrole Method for submerging an equipment of negative buoyancy
US4645467A (en) * 1984-04-24 1987-02-24 Amtel, Inc. Detachable mooring and cargo transfer system
US6321844B1 (en) * 1997-09-12 2001-11-27 Stolt Comex Seaway Hybrid riser and method for sub-sea transportation of petroleum products with the device
US6893190B2 (en) * 2000-08-01 2005-05-17 Single Buoy Moorings Inc. Method and structure for connecting a floating structure with rope anchor lines to the seabed
US20050063788A1 (en) * 2001-10-10 2005-03-24 Terje Clausen Riser and method of installing same
US20070044972A1 (en) * 2005-09-01 2007-03-01 Roveri Francisco E Self-supported riser system and method of installing same

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110168399A1 (en) * 2008-05-02 2011-07-14 Jean Francois Saint-Marcoux Mid water gas lift
US8439248B2 (en) * 2008-11-13 2013-05-14 Subsea 7 (Us) Llc Methods and associated apparatus of constructing and installing rigid riser structures
US20110271508A1 (en) * 2008-11-13 2011-11-10 Jean-Pierre Branchut Methods and associated apparatus of constructing and installing rigid riser structures
US9121228B2 (en) 2009-10-21 2015-09-01 Fluor Technologies Corporation Hybrid buoyed and stayed towers and risers for deepwater
US20150000925A1 (en) * 2010-02-10 2015-01-01 Heerema Marine Contractors Nederland Se Riser assembly from a vessel and on a seabed
US20120043052A1 (en) * 2010-07-23 2012-02-23 Heat-Line Corporation Geothermal Energy Transfer System
US9816732B2 (en) 2010-07-23 2017-11-14 Heat-Line Corporation Geothermal energy transfer system
US20140041878A1 (en) * 2011-04-18 2014-02-13 Magma Global Limited Hybrid Riser System
US9334695B2 (en) * 2011-04-18 2016-05-10 Magma Global Limited Hybrid riser system
US10378331B2 (en) * 2012-05-30 2019-08-13 Onesubsea Ip Uk Limited Monitoring integrity of a riser pipe network
US20150315853A1 (en) * 2014-04-30 2015-11-05 Seahorse Equipment Corp Bundled, articulated riser system for fpso vessel
US9562399B2 (en) * 2014-04-30 2017-02-07 Seahourse Equipment Corp. Bundled, articulated riser system for FPSO vessel
US20180266194A1 (en) * 2015-12-21 2018-09-20 Halliburton Energy Services, Inc. Method and system for deployment of tubing strings for riser-less applications
US11125030B2 (en) * 2018-12-21 2021-09-21 Odebrecht Óleo E Gás S.A. Guiding system on a hybrid lifting tower, and hybrid lifting tower

Also Published As

Publication number Publication date
EP2474468A1 (en) 2012-07-11
EP2130758B1 (en) 2013-01-23
NO344207B1 (en) 2019-10-14
EP2130758A2 (en) 2009-12-09
US8186912B2 (en) 2012-05-29
BRPI0718827A2 (en) 2014-02-04
NO20190762A1 (en) 2009-06-08
BRPI0718827B1 (en) 2019-06-18
DE602007012744D1 (en) 2011-04-07
EP2130758A3 (en) 2010-07-07
EP2474468B1 (en) 2013-06-19
EP2818399A1 (en) 2014-12-31
GB0704670D0 (en) 2007-04-18
AU2007319011A1 (en) 2008-05-15
EP2818399B1 (en) 2016-03-16
ATE499282T1 (en) 2011-03-15
BR122018073554B1 (en) 2019-11-26
WO2008056185A2 (en) 2008-05-15
AU2007319011B2 (en) 2013-06-13
EP2079633B1 (en) 2011-02-23
NO20092183L (en) 2009-06-08
NO345042B1 (en) 2020-09-07
WO2008056185A3 (en) 2009-02-19
BR122018073569B1 (en) 2019-11-26
EP2079633A2 (en) 2009-07-22

Similar Documents

Publication Publication Date Title
US8186912B2 (en) Hybrid riser tower and methods of installing same
US6415828B1 (en) Dual buoy single point mooring and fluid transfer system
US8998539B2 (en) Hybrid riser tower and methods of installing same
US8905143B2 (en) Riser configuration
US20110286802A1 (en) Improved Subsea Riser System
US20100129161A1 (en) Hybrid riser systems and methods
GB2148842A (en) J-configured offshore oil production riser
US10597952B2 (en) Steel catenary riser top interface
US9562399B2 (en) Bundled, articulated riser system for FPSO vessel
AU2006202167A1 (en) Transporting an elongate member through water
US6763862B2 (en) Submerged flowline termination at a single point mooring buoy
US20060002767A1 (en) Subsea structure and methods of construction and installation thereof
AU2013216661B2 (en) Hybrid riser tower
US20070003374A1 (en) Subsea structure and methods of construction and installation thereof
US20120043090A1 (en) Improved subsea riser system
WO2011018713A2 (en) Marine riser apparatus and method of installation thereof
Hatton Low Cost Deepwater Hybrid Riser System.

Legal Events

Date Code Title Description
AS Assignment

Owner name: ACERGY FRANCE, S.A., FRANCE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SAINT-MARCOUX, JEAN- FRANCOIS, MR.;BRANCHUT, JEAN- PIERRE, MR.;DE-ROUX, GREGOIRE, MR.;SIGNING DATES FROM 20101104 TO 20101116;REEL/FRAME:025554/0358

STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: ACERGY FRANCE SAS, FRANCE

Free format text: CHANGE OF NAME;ASSIGNOR:ACERGY FRANCE, S.A.;REEL/FRAME:036389/0362

Effective date: 20140602

FPAY Fee payment

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 12