US20090031739A1 - Air conditioner - Google Patents
Air conditioner Download PDFInfo
- Publication number
- US20090031739A1 US20090031739A1 US12/281,064 US28106407A US2009031739A1 US 20090031739 A1 US20090031739 A1 US 20090031739A1 US 28106407 A US28106407 A US 28106407A US 2009031739 A1 US2009031739 A1 US 2009031739A1
- Authority
- US
- United States
- Prior art keywords
- refrigerant
- pressure gas
- air conditioner
- indoor
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B15/00—Sorption machines, plants or systems, operating continuously, e.g. absorption type
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B13/00—Compression machines, plants or systems, with reversible cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B49/00—Arrangement or mounting of control or safety devices
- F25B49/005—Arrangement or mounting of control or safety devices of safety devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/027—Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
- F25B2313/02741—Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2400/00—General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
- F25B2400/04—Refrigeration circuit bypassing means
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2400/00—General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
- F25B2400/13—Economisers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2500/00—Problems to be solved
- F25B2500/19—Calculation of parameters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2600/00—Control issues
- F25B2600/21—Refrigerant outlet evaporator temperature
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/04—Refrigerant level
Definitions
- the present invention relates to a refrigerant circuit of an air conditioner and an air conditioner provided therewith.
- An object of the present invention is to control the high pressure gas pipe so as to reduce the pressure to a low level in order to prevent accumulation of liquid refrigerant in the high pressure gas pipe resulting from condensation during the refrigerant quantity judging operation of the multi-air conditioner capable of performing the simultaneous cooling and heating operation.
- An air conditioner is an air conditioner that performs a refrigerant quantity judging operation to judge the refrigerant quantity in a refrigerant circuit, the air conditioner including a heat source unit, a utilization unit, an expansion mechanism, a first gas refrigerant pipe, a second gas refrigerant pipe, a liquid refrigerant pipe, a switching mechanism, a bypass circuit, a bypass circuit opening/closing means, and a controller.
- the heat source unit includes a compression means that compresses refrigerant gas and a heat source side heat exchanger.
- the utilization unit includes a utilization side heat exchanger.
- the first gas refrigerant pipe extends from the discharge side of the compression means to the utilization unit.
- the second gas refrigerant pipe extends from the suction side of the compression means to the utilization unit.
- the liquid refrigerant pipe extends from the heat source side heat exchanger to the utilization unit.
- the switching mechanism can switch between a first state and a second state.
- the first state is a state in which the refrigerant flowing through the liquid refrigerant pipe evaporates in the utilization side heat exchanger and then flows into the second gas refrigerant pipe.
- the second state is a state in which the refrigerant flowing through the first gas refrigerant pipe condenses in the utilization side heat exchanger and then flows into the liquid refrigerant pipe.
- the bypass circuit bypasses the first gas refrigerant pipe to the second gas refrigerant pipe.
- the bypass circuit opening/closing means is provided in the bypass circuit and opens and closes the bypass circuit.
- the controller opens the bypass circuit opening/closing means before performing the refrigerant quantity judging operation.
- the refrigerant pipe comprises two gas pipe systems, and the switching mechanism switches between the first state (cooling state) and the second state (heating state).
- the air conditioner can be freely set to the cooling operation and the heating operation.
- the refrigerant quantity judging operation is performed by, for example, setting all the rooms (all the utilization units) to the first state (cooling state) by the switching mechanism (cooing/heating selection unit).
- the switching mechanism cooing/heating selection unit
- the bypass circuit opening/closing means that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided, and the bypass circuit opening/closing means (bypass valve) is set to an opened state during the refrigerant quantity judging operation, thereby reducing the pressure difference between the first gas refrigerant pipe and the second gas refrigerant pipe and preventing accumulation of liquid refrigerant in the first gas refrigerant pipe resulting from condensation.
- the refrigerant quantity judging operation with high accuracy can be achieved.
- An air conditioner according to a second aspect of the present invention is the air conditioner according to the first aspect of the present invention, wherein the bypass circuit opening/closing means is provided in the heat source unit.
- the bypass circuit opening/closing means is provided in the heat source unit. Accordingly, the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- An air conditioner according to a third aspect of the present invention is the air conditioner according to the first or second aspect of the present invention, further including a switching unit.
- the switching unit is a unit different from the heat source unit and the utilization unit.
- the switching unit includes the switching mechanism.
- the bypass circuit opening/closing means is provided in the switching unit.
- the bypass circuit opening/closing means is provided in the switching unit.
- the refrigerant hardly flows through the first gas refrigerant pipe when the bypass circuit opening/closing means is provided only in the heat source unit. Therefore, there is a possibility that the temperate of the gas refrigerant in the pipe may change because of the incoming heat from the outside air and thereby the density of the refrigerant may change, which may increase the detection error.
- the bypass circuit opening/closing means that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided in the switching unit.
- the bypass circuit opening/closing means together with the bypass circuit opening/closing means provided in the heat source unit, the low pressure gas refrigerant is caused to easily flow through the first gas refrigerant pipe. Therefore, it is possible to prevent the temperature of the gas refrigerant in the pipe from being changed by the incoming heat from the outside air and to reduce the detection error.
- the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Accordingly, it is possible to reduce the labors for construction and the cost.
- An air conditioner according to a fourth aspect of the present invention is the air conditioner according to any one of the first through third aspects of the present invention, further including a temperature detecting means.
- the temperature detecting means detects the refrigerant temperature in the first gas refrigerant pipe and outputs a refrigerant temperature detection value.
- the controller corrects the refrigerant quantity judged by the refrigerant quantity judging operation based on the refrigerant temperature detection value.
- the refrigerant does not easily flow through the first gas refrigerant pipe even after the first gas refrigerant pipe is bypassed to the second gas refrigerant pipe by the provision of the bypass circuit and the distribution of the refrigerant gas pressure in the pipe is equalized. Therefore, there is a possibility that the temperate of the gas refrigerant in the pipe may change because of the incoming heat from the outside air and thereby the density of the refrigerant may change, which may increase the detection error.
- the temperature detecting means is provided in the first gas refrigerant pipe, and the density of the refrigerant in the pipe is corrected by utilizing the refrigerant temperature detection value.
- the density of the refrigerant in the pipe is corrected by utilizing the refrigerant temperature detection value.
- An air conditioner according to a fifth aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the temperature detecting means is provided in the switching unit.
- the temperature detecting means is mounted on the first gas refrigerant pipe in the switching unit. Therefore, the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- An air conditioner according to a sixth aspect of the present invention is the air conditioner according to the fourth or fifth aspect of the present invention, wherein the temperature detection device is provided in the heat source unit.
- the temperature detecting means is mounted on the first gas refrigerant pipe in the heat source unit. Therefore, the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost. In addition, by using this temperature detecting means together with the temperature detecting means provided in the switching unit in the fifth aspect of the present invention, it is possible to more accurately correct the density of the refrigerant in the pipe.
- the bypass circuit opening/closing means (bypass valve) that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided, and the bypass circuit opening/closing means is set to an opened state during the refrigerant quantity judging operation, thereby reducing the pressure difference between the first gas refrigerant pipe and the second gas refrigerant pipe and preventing accumulation of liquid refrigerant in the first gas refrigerant pipe resulting from condensation.
- the refrigerant quantity judging operation with high accuracy can be achieved.
- the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- the bypass circuit opening/closing means that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided in the switching unit, and the low pressure gas refrigerant is caused to easily flow through the first gas refrigerant pipe by using this bypass circuit opening/closing means together with the bypass circuit opening/closing means provided in the heat source unit. Accordingly, it is possible to prevent the temperature of the gas refrigerant in the pipe from being changed by the incoming heat from the outside air and to reduce the detection error.
- the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- the temperature detecting means is provided in the first gas refrigerant pipe, and the density of the refrigerant in the pipe is corrected by utilizing the refrigerant temperature detection value. Thereby it is possible to reduce the detection error. Thus, the refrigerant quantity judging operation with higher accuracy can be achieved.
- the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- this temperature detecting means together with the temperature detecting means provided in the switching unit in the fifth aspect of the present invention, it is possible to more accurately correct the density of the refrigerant in the pipe.
- FIG. 1 is a schematic configuration view of an air conditioner according to an embodiment of the present invention.
- FIG. 2 is a control block diagram of the air conditioner.
- FIG. 3 is a flowchart of a test operation mode.
- FIG. 4 is a flowchart of an automatic refrigerant charging operation.
- FIG. 5 is a schematic diagram to show a state of the refrigerant flowing in a refrigerant circuit in a refrigerant quantity judging operation (illustrations of a four-way switching valve and the like are omitted).
- FIG. 6 is a flowchart of a pipe volume judging operation.
- FIG. 7 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a liquid refrigerant communication pipe.
- FIG. 8 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a gas refrigerant communication pipe.
- FIG. 9 is a flowchart of an initial refrigerant quantity detection operation.
- FIG. 10 is a flowchart of a refrigerant leak detection operation mode.
- FIG. 1 is a schematic configuration view of an air conditioner 1 according to an embodiment of the present invention.
- the air conditioner 1 is a device that is used to cool and heat a room in a building and the like by performing a vapor compression-type refrigeration cycle operation.
- the air conditioner 1 mainly includes one outdoor unit 2 as a heat source unit, a plurality (three in the present embodiment) of indoor units 3 a to 3 c as utilization units connected in parallel to the outdoor unit 2 , connection units 4 a to 4 c provided respectively correspondingly to the indoor units 3 a to 3 c , a first refrigerant communication pipe group 5 that interconnects the outdoor unit 2 and the connection units 4 a to 4 c , and a second refrigerant communication pipe group 7 that interconnects the connection units 4 a to 4 c and the indoor units 3 a to 3 c .
- the first refrigerant communication pipe group 5 is configured by a first liquid refrigerant communication pipe 51 , a high pressure gas refrigerant communication pipe 52 , and a low pressure gas refrigerant communication pipe 53
- the second refrigerant communication pipe group 7 is configured by second liquid refrigerant communication pipes 71 a to 71 c and second gas refrigerant communication pipes 72 a to 72 c .
- This air conditioner 1 is configured to be able to perform a simultaneous cooling and heating operation according to the demand of the air-conditioned space in a room, where the indoor units 3 a to 3 c are installed, for example, as in the case where a cooling operation is performed in one air-conditioned space and a heating operation is performed in another air conditioned-space or the like.
- the vapor compression-type refrigerant circuit 10 of the air conditioner 1 in the present embodiment is configured by the interconnection of the outdoor unit 2 , the indoor units 3 a to 3 c , the connection units 4 a to 4 c , the first refrigerant communication pipe group 5 , and the second refrigerant communication pipe group 7 .
- the indoor units 3 a to 3 c are installed by being embedded in or hung from a ceiling of a room in a building and the like or by being mounted or the like on a wall surface of a room.
- the indoor units 3 a to 3 c are connected to the connection units 4 a to 4 c via the second refrigerant communication pipe group 7 , and configure a part of the refrigerant circuit 10 .
- an indoor fan 32 a of the indoor unit 3 a corresponds to indoor fans 32 b and 32 c of the indoor units 3 b and 3 c.
- the indoor unit 3 a mainly includes an indoor side refrigerant circuit 30 a that configures a part of the refrigerant circuit 10 .
- the indoor side refrigerant circuit 30 a mainly includes an indoor expansion valve V 9 a as an expansion mechanism and an indoor heat exchanger 31 a as a utilization side heat exchanger.
- the indoor expansion valve V 9 a is an electrically powered expansion valve connected to the liquid side of the indoor heat exchanger 31 a in order to adjust the flow rate or the like of the refrigerant flowing in the indoor side refrigerant circuit 30 a.
- the indoor heat exchanger 31 a is a fin-and-tube type heat exchanger of a cross fin system configured by a heat transfer tube and numerous fins, and is a heat exchanger that functions as an evaporator for the refrigerant during the cooling operation to cool the indoor air and functions as a condenser for the refrigerant during the heating operation to heat the indoor air.
- the indoor unit 3 a includes the indoor fan 32 a as a ventilation fan for sucking indoor air into the unit, causing the air to heat exchange with the refrigerant in the indoor heat exchanger 31 a , and then supplying the air to the room as supply air.
- the indoor fan 32 a is a fan capable of varying an air flow rate Wr of the air which is supplied to the indoor heat exchanger 31 a , and in the present embodiment, is a centrifugal fan, multi-blade fan, or the like, which is driven by a motor 33 a comprising a DC fan motor.
- a liquid side temperature sensor T 9 a that detects the temperature of the refrigerant (i.e., the refrigerant temperature corresponding to a condensation temperature Tc during the heating operation or an evaporation temperature Te during the cooling operation) is disposed at the liquid side of the indoor heat exchanger 31 a .
- a gas side temperature sensor T 10 a that detects a temperature Teo of the refrigerant is disposed at the gas side of the indoor heat exchanger 31 a .
- a room temperature sensor T 11 a that detects the temperature of the indoor air that flows into the unit (i.e., a room temperature Tr) is disposed at the indoor air suction side of the indoor unit 3 a .
- the liquid side temperature sensor T 9 a , the gas side temperature sensor T 10 a , and the room temperature sensor T 11 a comprise thermistors.
- the indoor unit 3 a includes an indoor side controller 34 a that controls the operation of each portion constituting the indoor unit 3 a .
- the indoor side controller 34 a includes a microcomputer, a memory and the like disposed in order to control the indoor unit 3 a , and is configured such that it can exchange control signals and the like with a remote controller (not shown) for individually operating the indoor unit 3 a , exchange control signals and the like with the outdoor unit 2 and the connection units 4 a to 4 c via a transmission line 8 a , and the like.
- the outdoor unit 2 is installed outside of a building and the like, is connected to the connection units 4 a to 4 c via the first refrigerant communication pipe group 5 , configuring the refrigerant circuit 10 .
- the outdoor unit 2 mainly includes an outdoor side refrigerant circuit 20 that configures a part of the refrigerant circuit 10 .
- This outdoor side refrigerant circuit 20 mainly includes a compressor 21 , a four-way switching valve V 1 , an outdoor heat exchanger 22 as a heat source side heat exchanger, an outdoor expansion valve V 2 as an expansion mechanism, an accumulator 23 , a subcooler 24 as a temperature adjustment mechanism, a first bypass refrigerant circuit 27 , a pressure reducing circuit 28 , a liquid side stop valve V 4 , and a high pressure gas side stop valve V 5 , a low pressure gas side stop valve V 6 , and a first high pressure gas on/off valve V 8 .
- the compressor 21 is a compressor whose operation capacity can be varied, and in the present embodiment, is a positive displacement-type compressor driven by a motor 21 a whose rotation frequency Rm is controlled by an inverter. In the present embodiment, only one compressor 21 is provided, but it is not limited thereto, and two or more compressors may be connected in parallel according to the number of connected units of indoor units and the like.
- the four-way switching valve V 1 is a valve provided for causing the outdoor heat exchanger 22 to function as an evaporator and a condenser.
- the four-way switching valve V 1 is connected to the refrigerant gas side of the outdoor heat exchanger 22 , the accumulator 23 on the suction side of the compressor 21 , the discharge side of the compressor 21 , and the pressure reducing circuit 28 .
- the discharge side of the compressor 21 is connected to the refrigerant gas side of the outdoor heat exchanger 22
- the accumulator 23 on the suction side of the compressor 21 is connected to the pressure reducing circuit 28 .
- the refrigerant gas side of the outdoor heat exchanger 22 is connected to the accumulator 23 on the suction side of the compressor 21 , and the discharge side of the compressor 21 is connected to the pressure reducing circuit 28 .
- the outdoor heat exchanger 22 is a heat exchanger capable of functioning as an evaporator for the refrigerant and also as a condenser for the refrigerant. In this embodiment, it is a fin-and-tube type heat exchanger of a cross fin system that exchanges heat with the refrigerant using air as a heat source.
- the gas side of the outdoor heat exchanger 22 is connected to the four-way switching valve V 1 , and the liquid side thereof is connected to the first liquid refrigerant communication pipe 51 .
- the outdoor expansion valve V 2 is an electrically powered expansion valve connected to the liquid side of the outdoor heat exchanger 22 in order to adjust the pressure, flow rate, or the like of the refrigerant flowing in the outdoor side refrigerant circuit 20 .
- the outdoor unit 2 includes an outdoor fan 25 as a ventilation fan for sucking outdoor air into the unit, causing the air to exchange heat with the refrigerant in the outdoor heat exchanger 22 , and then exhausting the air to the outside.
- the outdoor fan 25 is a fan capable of varying an air flow rate Wo of the air which is supplied to the outdoor heat exchanger 22 , and in the present embodiment, is a propeller fan or the like driven by a motor 25 a comprising a DC fan motor.
- the accumulator 23 is connected between the four-way switching valve V 1 and the compressor 21 , and is a container capable of accumulating excess refrigerant generated in the refrigerant circuit 10 in accordance with the change in the operation load of the indoor units 3 a to 3 c and the like.
- the accumulator 23 is connected to the connection units 4 a to 4 c via the low pressure gas side stop valve V 6 and the low pressure gas refrigerant communication pipe 53 .
- the subcooler 24 is a double tube heat exchanger, and is disposed to cool the refrigerant sent to the indoor expansion valves V 9 a to V 9 c after the refrigerant is condensed in the outdoor heat exchanger 22 .
- the subcooler 24 is connected between the outdoor expansion valve V 2 and the liquid side stop valve V 4 .
- a second bypass refrigerant circuit 6 as a cooling source of the subcooler 24 is disposed. Note that, in the description below, a portion corresponding to the refrigerant circuit 10 excluding the second bypass refrigerant circuit 6 is referred to as a main refrigerant circuit for convenience sake.
- the second bypass refrigerant circuit 6 is connected to the main refrigerant circuit so as to cause a portion of the refrigerant sent from the outdoor heat exchanger 22 to the indoor expansion valves V 9 a to V 9 c via the connection units 4 a to 4 c to branch from the main refrigerant circuit and return to the suction side of the compressor 21 .
- the second bypass refrigerant circuit 6 includes a branch circuit 61 connected so as to branch a portion of the refrigerant sent from the outdoor expansion valve V 2 to the indoor expansion valves V 9 a to V 9 c via the connection units 4 a to 4 c at a position between the outdoor heat exchanger 22 and the subcooler 24 , and a merging circuit 62 connected to the suction side of the compressor 21 so as to return a portion of refrigerant from an outlet on the second bypass refrigerant circuit 6 side of the subcooler 24 to the suction side of the compressor 21 .
- the branch circuit 61 is disposed with a bypass expansion valve V 7 for adjusting the flow rate of the refrigerant flowing in the second bypass refrigerant circuit 6 .
- the bypass expansion valve V 7 comprises an electrically operated expansion valve.
- the refrigerant sent from the outdoor heat exchanger 22 to the indoor expansion valves V 9 a to V 9 c via the connection units 4 a to 4 c is cooled in the subcooler 24 by the refrigerant flowing in the second bypass refrigerant circuit 6 which has been depressurized by the bypass expansion valve V 7 .
- performance of the subcooler 24 is controlled by adjusting the opening degree of the bypass expansion valve V 7 .
- the first bypass refrigerant circuit 27 is a circuit that bypasses the pipe between the high pressure gas side stop valve V 5 and the discharge side of the compressor 21 to the pipe between the low pressure gas side stop valve V 6 and the accumulator 23 .
- a first bypass on/off valve V 3 is provided in the first bypass refrigerant circuit 27 .
- the first bypass on/off valve V 3 is a solenoid valve capable of distributing and blocking the refrigerant.
- the pressure reducing circuit 28 includes a capillary tube C 1 and is connected to the four-way switching valve V 1 and the accumulator 23 .
- the liquid side stop valve V 4 , the high pressure gas side stop valve V 5 , and the low pressure gas side stop valve V 6 are valves disposed at ports connected to external equipment and pipes (specifically, the first liquid refrigerant communication pipe 51 , the high pressure gas refrigerant communication pipe 52 , and the low pressure gas refrigerant communication pipe 53 ).
- the liquid side stop valve V 4 is connected to the outdoor heat exchanger 22 via the subcooler 24 and the outdoor expansion valve V 2 .
- the high pressure gas side stop valve V 5 is connected to the discharge side of the compressor 21 .
- the low pressure gas side stop valve V 6 is connected to the suction side of the compressor 21 via the accumulator 23 .
- the first high pressure gas on/off valve V 8 is provided on the pipe on the high pressure gas side which is branched from the discharge side of the compressor 21 , and is a solenoid valve capable of distributing and blocking the high pressure gas refrigerant through the high pressure gas refrigerant communication pipe 52 .
- various sensors are disposed in the outdoor unit 2 .
- disposed in the outdoor unit 2 are a suction pressure sensor P 1 that detects a suction pressure Ps of the compressor 21 , a discharge pressure sensor P 2 that detects a discharge pressure Pd of the compressor 21 , a suction temperature sensor T 1 that detects a suction temperature Ts of the compressor 21 , and a discharge temperature sensor T 2 that detects a discharge temperature Td of the compressor 21 .
- the suction temperature sensor T 1 is disposed at a position between the accumulator 23 and the compressor 21 .
- the outdoor heat exchanger 22 is provided with a heat exchanger temperature sensor T 3 that detects the temperature of the refrigerant flowing through the outdoor heat exchanger 22 (i.e., the refrigerant temperature corresponding to the condensation temperature Tc during the cooling operation or the evaporation temperature Te during the heating operation).
- a liquid side temperature sensor T 4 that detects a refrigerant temperature Tco is disposed at the liquid side of the outdoor heat exchanger 22 .
- a liquid pipe temperature sensor T 5 that detects the temperature of the refrigerant (i.e., a liquid pipe temperature Tlp) is disposed at the outlet on the main refrigerant circuit side of the subcooler 24 .
- An outdoor temperature sensor T 6 that detects the temperature of the outdoor air that flows into the unit (i.e., an outdoor temperature Ta) is disposed at the outdoor air suction side of the outdoor unit 2 .
- the merging circuit 62 of the second bypass refrigerant circuit 6 is disposed with a bypass temperature sensor T 7 for detecting the refrigerant temperature flowing at the outlet on the second bypass refrigerant circuit 6 side of the subcooler 24 .
- a first high pressure gas pipe temperature sensor T 8 that detects the temperature of the refrigerant (i.e., a first high pressure gas pipe temperature Th 1 ) is provided to the high pressure gas pipe extending from the high pressure gas side stop valve V 5 to the first high pressure gas on/off valve V 8 .
- the suction temperature sensor T 1 , the discharge temperature sensor T 2 , the heat exchanger temperature sensor T 3 , the liquid side temperature sensor T 4 , the liquid pipe temperature sensor T 5 , the outdoor temperature sensor T 6 , the bypass temperature sensor T 7 , and the first high pressure gas pipe temperature sensor T 8 comprise thermistors.
- the outdoor unit 2 includes an outdoor side controller 26 that controls the operation of each portion constituting the outdoor unit 2 .
- the outdoor side controller 26 includes a microcomputer and a memory disposed in order to control the outdoor unit 2 , an inverter circuit that controls the motor 21 a , and the like, and is configured such that it can exchange control signals and the like with the indoor side controllers 34 a to 34 c of the indoor units 3 a to 3 c and connection side controllers 44 a to 44 c of the connection units 4 a to 4 c (described later) via the transmission line 8 a .
- a controller 8 that performs the operation control of the entire air conditioner 1 is configured by the indoor side controllers 34 a to 34 c , the connection side controllers 44 a to 44 c , the outdoor side controller 26 , and the transmission line 8 a that interconnects each of these controllers.
- the controller 8 is connected so as to be able to receive detection signals of various sensors P 1 , P 2 , T 1 to T 8 , T 9 a to T 9 c , T 10 a to T 10 c , T 11 a to T 11 c , T 12 a to T 12 c and also to be able to control various equipment and valves 21 , 25 , 32 a to 32 c , V 1 to V 3 , V 7 , V 8 , V 9 a to V 9 c , V 10 a to V 10 c , V 11 a to V 11 c , V 12 a to V 12 c , V 13 a to V 13 c based on these detection signals and the like.
- FIG. 2 is a control block diagram of the air conditioner 1 .
- connection units 4 a to 4 c are installed with the indoor units 3 a to 3 c in the room of a building or the like.
- the connection units 4 a to 4 c are interposed, together with the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 , between the indoor units 3 a to 3 c and the outdoor unit 2 , and configure a part of the refrigerant circuit 10 .
- connection units 4 a to 4 c are described. Note that, because the connection units 4 a , 4 b , and 4 c all have the same configuration, only the configuration of the connection unit 4 a is described here, and in regard to the configurations of the connection units 4 b and 4 c , reference symbols Yb and Yc are used instead of reference symbols Ya representing the respective portions of the connection unit 4 a , and descriptions of those respective portions are omitted.
- a subcooler 41 a of the connection unit 4 a corresponds to subcoolers 41 b and 41 c of the connection units 4 b and 4 c.
- connection unit 4 a configures a part of the refrigerant circuit 10 and is provided with a connection side refrigerant circuit 40 a .
- the connection side refrigerant circuit 40 a mainly includes the subcooler 41 a , a pressure reducing circuit 42 a , a third bypass refrigerant circuit 43 a , the low pressure gas on/off valve V 10 a , and the second high pressure gas on/off valve V 11 a.
- the subcooler 41 a is a device in which a portion of the liquid refrigerant to be returned to the first liquid refrigerant communication pipe 51 is sent to the subcooler 41 a via the pressure reducing circuit 42 a (described later) so as to subcool the liquid refrigerant to be returned to the first liquid refrigerant communication pipe 51 when the indoor units 3 a to 3 c perform the simultaneous cooling and heating operation.
- a portion of the liquid refrigerant introduced into the subcooler 41 a evaporates as a result of heat exchange, and is returned to the outdoor side refrigerant circuit 20 through the low pressure gas refrigerant communication pipe 53 .
- the pressure reducing circuit 42 a has a pressure reducing circuit on/off valve V 12 a and a capillary tube C 2 a which are connected in series.
- the third bypass refrigerant circuit 43 a is a circuit that bypasses the high pressure gas refrigerant communication pipe 52 to the low pressure gas refrigerant communication pipe 53 .
- a second bypass on/off valve V 13 a is provided in the third bypass refrigerant circuit 43 a .
- the second bypass on/off valve V 13 a is a solenoid valve capable of distributing and blocking the refrigerant.
- the low pressure gas on/off valve V 10 a is connected to the low pressure gas refrigerant communication pipe 53 , and is a solenoid valve capable of distributing and blocking the refrigerant.
- the second high pressure gas on/off valve V 11 a is connected to the high pressure gas refrigerant communication pipe 52 , and is a solenoid valve capable of distributing and blocking the refrigerant.
- connection unit 4 a sets the low pressure gas on/off valve V 10 a to an opened state and closes the second high pressure gas on/off valve V 11 a when the indoor unit 3 a performs the cooling operation. Accordingly, the connection unit 4 a can function to send the liquid refrigerant that flows in from the first liquid refrigerant communication pipe 51 to the indoor expansion valve V 9 a of the indoor side refrigerant circuit 30 a and to return the gas refrigerant that is depressurized in the indoor expansion valve V 9 a and evaporated in the indoor heat exchanger 31 a to the low pressure gas refrigerant communication pipe 53 .
- connection unit 4 a closes the low pressure gas on/off valve V 10 a and sets the second high pressure gas on/off valve V 11 a to an opened state when the indoor unit 3 a performs the heating operation. Accordingly, the connection unit 4 a can function to send the high pressure gas refrigerant that flows in from the high pressure gas refrigerant communication pipe 52 to the gas side of the indoor heat exchanger 31 a in the indoor side refrigerant circuit 30 a and to return the liquid refrigerant condensed in the indoor heat exchanger 31 a to the first liquid refrigerant communication pipe 51 .
- connection unit 4 a is provided with a second high pressure gas pipe temperature sensor T 12 a that detects the temperature of the refrigerant (i.e., a second high pressure gas pipe temperature Th 2 ) in the high pressure gas refrigerant flow path.
- the second high pressure gas pipe temperature sensor T 12 a comprises a thermistor.
- connection unit 4 a includes a connection side controller 44 a that controls the operation of each portion constituting the connection unit 4 a .
- connection side controller 44 a includes a microcomputer and a memory disposed in order to control the indoor unit 4 a , and is configured such that it can exchange control signals and the like with the indoor side controller 34 a of the indoor unit 3 a.
- the outdoor side refrigerant circuit 20 is connected to the indoor side refrigerant circuits 30 a to 30 c via the connection side refrigerant circuits 40 a to 40 c , and thereby the refrigerant circuit 10 of the air conditioner 1 is configured.
- the air conditioner 1 in the present embodiment can performs the so-called simultaneous cooling and heating operation where, for example, the indoor unit 3 c performs the heating operation while the indoor units 3 a and 3 b perform the cooling operation, and the like.
- the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 are refrigerant pipes that are arranged on site when installing the air conditioner 1 at an installation location such as a building and the like. Pipes having various lengths and pipe diameters are used according to the installation conditions such as an installation location, combination of an outdoor unit, an indoor unit, and a connection unit, and the like. Accordingly, for example, when installing a new air conditioner 1 , in order to calculate the charging quantity of the refrigerant, it is necessary to obtain accurate information regarding the lengths and pipe diameters and the like of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 . However, management of such information and the calculation itself of the refrigerant quantity are difficult.
- the refrigerant circuit 10 of the air conditioner 1 is configured by the interconnection of the indoor side refrigerant circuits 30 a to 30 c , the outdoor side refrigerant circuit 20 , the connection side refrigerant circuits 40 a to 40 c , the first refrigerant communication pipe group 5 , and the second refrigerant communication pipe group 7 .
- this refrigerant circuit 10 is configured by the second bypass refrigerant circuit 6 and the main refrigerant circuit excluding the second bypass refrigerant circuit 6 .
- the controller 8 constituted by the indoor side controllers 34 a to 34 c , the connection side controllers 44 a to 44 c , and the outdoor side controller 26 allows the air conditioner 1 in the present embodiment to operate the cooling operation, the heating operation, and the simultaneous cooling and heating operation by switching thereamong by the four-way switching valve V 1 and the first high pressure on/off valve V 8 in the outdoor unit 2 and the low pressure gas on/off valve V 10 a and the second high pressure gas on/off valve V 11 a in the connection units 4 a to 4 c , and also to control each equipment of the outdoor unit 2 , the indoor units 3 a to 3 c , and the connection units 4 a to 4 c according to the operation load of each of the indoor units 3 a to 3 c.
- the operation modes of the air conditioner 1 in the present embodiment include: a normal operation mode where control of constituent equipment of the outdoor unit 2 , the indoor units 3 a to 3 c , and the connection units 4 a to 4 c is performed according to the operation load of each of the indoor units 3 a to 3 c ; a test operation mode where a test operation to be performed after installation of constituent equipment of the air conditioner 1 is performed (specifically, it is not limited to after the first-time installation of equipment: it also includes, for example, after modification by adding or removing constituent equipment such as an indoor unit, after repair of damaged equipment, and the like); and a refrigerant leak detection operation mode where, after the test operation is finished and the normal operation has started, whether or not the refrigerant is leaking from the refrigerant circuit 10 is judged.
- the normal operation mode mainly includes the following operations according to the cooling and heating load of the indoor units 3 a to 3 c : the cooling operation where all the indoor units 3 a to 3 c perform cooling; the heating operation where all the indoor units 3 a to 3 c perform heating; and the simultaneous cooling and heating operation where one or some of the indoor units 3 a to 3 c perform cooling and the other indoor unit(s) performs heating.
- the simultaneous cooling and heating operation can be divided into a case where the operation is performed by causing the outdoor heat exchanger 22 of the outdoor unit 2 to function as an evaporator (evaporation operation state), and a case where the operation is performed by causing the outdoor heat exchanger 22 of the outdoor unit 2 to function as a condenser (condensation operation state).
- the simultaneous cooling and heating operation described here specifically refers to, for example, an operation where the indoor unit 3 a performs the cooling operation and the other indoor units 3 b and 3 c perform the heating operation.
- the test operation mode mainly includes an automatic refrigerant charging operation to charge refrigerant into the refrigerant circuit 10 ; a pipe volume judging operation to detect the volumes of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 ; and an initial refrigerant quantity detection operation to detect the initial refrigerant quantity after installing constituent equipment or after charging refrigerant into the refrigerant circuit 10 .
- the four-way switching valve V 1 is switched to a state indicated by solid lines in FIG. 1 , and thereby the outdoor heat exchanger 22 is caused to function as a condenser.
- the outdoor expansion valve V 2 is in a fully opened state.
- the liquid side stop valve V 4 , the high pressure gas side stop valve V 5 , and the low pressure gas side stop valve V 6 are set to an opened state, and the first high pressure gas on/off valve V 8 is set to a closed state.
- the opening degree of each of the indoor expansion valves V 9 a to V 9 c is adjusted such that a superheating degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c (i.e., the gas sides of the indoor heat exchangers 31 a to 31 c ) becomes constant at a target superheating degree SHrs.
- the superheating degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c is detected by subtracting the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors T 9 a to T 9 c from the refrigerant temperature detected by the gas side temperature sensors T 10 a to T 10 c , or is detected by converting the suction pressure Ps of the compressor 21 detected by the suction pressure sensor P 1 to saturation temperature corresponding to the evaporation temperature Te, and subtracting this saturation temperature of the refrigerant from the refrigerant temperature detected by the gas side temperature sensors T 10 a to T 10 c .
- a temperature sensor that detects the temperature of the refrigerant flowing through each of the indoor heat exchangers 31 a to 31 c may be disposed such that the superheating degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c is detected by subtracting the refrigerant temperature corresponding to the evaporation temperature Te which is detected by this temperature sensor from the refrigerant temperature detected by the gas side temperature sensors T 10 a to T 10 c.
- the opening degree of the bypass expansion valve V 7 is adjusted such that a superheating degree SHb of the refrigerant at the outlet on the second bypass refrigerant circuit 6 side of the subcooler 24 becomes a target superheating degree SHbs.
- the superheating degree SHb of the refrigerant at the outlet on the second bypass refrigerant circuit 6 side of the subcooler 24 is detected by converting the suction pressure Ps of the compressor 21 detected by the suction pressure sensor P 1 to saturation temperature corresponding to the evaporation temperature Te, and subtracting this saturation temperature of the refrigerant from the refrigerant temperature detected by the bypass temperature sensor T 7 .
- a temperature sensor may be disposed at an inlet on the second bypass refrigerant circuit 6 side of the subcooler 24 such that the superheating degree SHb of the refrigerant at the outlet on the second bypass refrigerant circuit 6 side of the subcooler 24 is detected by subtracting the refrigerant temperature detected by this temperature sensor from the refrigerant temperature detected by the bypass temperature sensor T 7 .
- connection units 4 a to 4 c the second high pressure gas on/off valves V 11 a to V 11 c are closed, and at the same time, the low pressure gas on/off valves V 10 a to V 10 c are opened.
- the indoor heat exchangers 31 a to 31 c of the indoor units 3 a to 3 c function as evaporators, and at the same time, a state is achieved where the indoor heat exchangers 31 a to 31 c of the indoor units 3 a to 3 c are connected to the suction side of the compressor 21 of the outdoor unit 2 via the low presser gas refrigerant communication pipe 53 .
- the pressure reducing circuit on/off valves V 12 a to V 12 c are in a closed state.
- the refrigerant flowing from the outlet of the bypass expansion valve V 7 of the second bypass refrigerant circuit 6 toward the suction side of the compressor 21 passes through the subcooler 24 and exchanges heat with high pressure liquid refrigerant sent from the outdoor heat exchanger 22 on the main refrigerant circuit side to the indoor units 3 a to 3 c.
- the high pressure liquid refrigerant in a subcooled state is sent to the indoor units 3 a to 3 c via the liquid side stop valve V 4 , the first liquid refrigerant communication pipe 51 , and each connection units 4 a to 4 c .
- the high pressure liquid refrigerant sent to the indoor units 3 a to 3 c is depressurized close to the suction pressure Ps of the compressor 21 by the indoor expansion valves V 9 a to V 9 c , becomes refrigerant in a low pressure gas-liquid two-phase state, is sent to the indoor heat exchangers 31 a to 31 c , exchanges heat with the indoor air in the indoor heat exchangers 31 a to 31 c , and is evaporated into low pressure gas refrigerant.
- the low pressure gas refrigerant is sent to the low pressure gas refrigerant communication pipe 53 through the low pressure gas on/off valves V 10 a to V 10 c of the connection units 4 a to 4 c .
- This low pressure gas refrigerant is sent to the outdoor unit 2 via the low pressure gas refrigerant communication pipe 53 , and flows into the accumulator 23 via the low pressure gas side stop valve V 6 . Then, the low pressure gas refrigerant that flowed into the accumulator 23 is again sucked into the compressor 21 .
- the four-way switching valve V 1 is switched to a state indicated by dotted lines in FIG. 1 , and thereby the outdoor heat exchanger 22 functions as an evaporator.
- the high pressure gas refrigerant compressed in and discharged from the compressor 21 is supplied to the indoor units 3 a to 3 c through the high pressure gas refrigerant communication pipe 52 .
- the opening degree of the outdoor expansion valve V 2 is adjusted so as to be able to depressurize the refrigerant that flows into the outdoor heat exchanger 22 to a pressure where the refrigerant can be evaporated (i.e., an evaporation pressure Pe) in the outdoor heat exchanger 22 .
- the liquid side stop valve V 4 , the high pressure gas side stop valve V 5 , and the low pressure gas side stop valve V 6 are in an opened state, and the bypass expansion valve V 7 and the first high pressure gas on/off valve V 8 are in an opened state.
- the opening degree of each of the indoor expansion valves V 9 a to V 9 c is adjusted such that a subcooling degree SCr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c (i.e., the liquid sides of the indoor heat exchangers 31 a to 31 c ) becomes constant at a target subcooling degree SCrs.
- the subcooling degree SCr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c is detected by converting the discharge pressure Pd of the compressor 21 detected by the discharge pressure sensor P 2 to saturation temperature corresponding to the condensation temperature Tc, and by subtracting the refrigerant temperature detected by the liquid side temperature sensors T 9 a to T 9 c from the refrigerant saturation temperature.
- a temperature sensor that detects the temperature of the refrigerant flowing through each of the indoor heat exchangers 31 a to 31 c may be disposed such that the subcooling degree SCr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c is detected by subtracting the refrigerant temperature corresponding to the condensation temperature Tc which is detected by this temperature sensor from the refrigerant temperature detected by the liquid side temperature sensors T 9 a to T 9 c.
- connection units 4 a to 4 c as the low pressure gas on/off valve V 10 a to V 10 c are closed and the second high pressure gas on/off valves V 11 a to V 11 c are opened at the same time, the indoor heat exchangers 31 a to 31 c of the indoor units 3 a to 3 c are brought into a state where they function as condensers. In addition, the pressure reducing circuit on/off valves V 12 a to V 12 c are in an opened state.
- the high pressure gas refrigerant sent to the high pressure gas refrigerant communication pipe 52 is sent to each of the connection units 4 a to 4 c .
- the high pressure gas refrigerant sent to the connection units 4 a to 4 c is sent to the indoor units 3 a to 3 a through the second high pressure gas on/off valves V 11 a to V 11 c .
- the high pressure gas refrigerant sent to the indoor units 3 a to 3 c exchanges heat with the indoor air in the indoor heat exchangers 31 a to 31 c and is condensed into high pressure liquid refrigerant. Subsequently, it is depressurized according to the opening degree of the indoor expansion valves V 9 a to V 9 c when passing through the indoor expansion valves V 9 a to V 9 c.
- the refrigerant that passed through the indoor expansion valves V 9 a to V 9 c is sent to the subcoolers 41 a to 41 c of the connection units 4 a to 4 c .
- This subcooled liquid refrigerant is sent to the outdoor unit 2 via the first liquid refrigerant communication pipe 51 , is further depressurized via the liquid side stop valve V 4 and the outdoor expansion valve V 2 , and then flows into the outdoor heat exchanger 22 .
- the refrigerant in a low pressure gas-liquid two-phase state that flowed into the outdoor heat exchanger 22 exchanges heat with the outdoor air supplied by the outdoor fan 25 is evaporated into low pressure gas refrigerant, and flows into the accumulator 23 via the four-way switching valve V 1 .
- the low pressure gas refrigerant that flowed into the accumulator 23 is again sucked into the compressor 21 .
- An operation which is the simultaneous cooling and heating operation where, for example, among the indoor units 3 a to 3 c , the indoor unit 3 a performs the cooling operation and at the same time the indoor units 3 b and 3 c perform the heating operation, and in which the outdoor heat exchanger 22 of the outdoor unit 2 is caused to function as an evaporator according to the air conditioning load of the entire indoor units 3 a to 3 c .
- the four-way switching valve V 1 is switched to a state indicated by dotted lines in FIG. 1 .
- the outdoor heat exchanger 22 functions as an evaporator and also the high pressure gas refrigerant compressed in and discharged from the compressor 21 is supplied to the two indoor units 3 b and 3 c performing the heating operation through the high pressure gas refrigerant communication pipe 52 .
- the bypass expansion valve V 7 is closed, and the first high pressure gas on/off valve V 8 is set to an opened state.
- the opening degree of the indoor expansion valve V 9 a is adjusted according to the cooling load of the indoor unit 3 a .
- adjustment of the opening degree is performed based on the superheating degree of the indoor heat exchanger 31 a (specifically, the temperature difference between the refrigerant temperature detected by the liquid side temperature sensor T 9 a and the refrigerant temperature detected by the gas side temperature sensor T 10 a ).
- connection unit 4 a the second high pressure gas on/off valve V 11 a is closed and at the same time the low pressure gas on/off valve V 10 a is opened. Accordingly, the indoor heat exchanger 31 a of the indoor unit 3 a is caused to function as an evaporator and at the same time a state is achieved where the indoor heat exchanger 31 a of the indoor unit 3 a is connected to the suction side of the compressor 21 of the outdoor unit 2 via the low pressure gas refrigerant communication pipe 53 . In addition, the pressure reducing circuit on/off valve V 12 a is in a closed state.
- the opening degree of each of the indoor expansion valves V 9 b and V 9 c is adjusted such that the subcooling degree SCr of the refrigerant at the outlet of each of the indoor heat exchangers 31 b and 31 c (i.e., the liquid sides of the indoor heat exchangers 31 b and 31 c ) becomes constant at the target subcooling degree SCrs.
- connection units 4 b and 4 c the low pressure gas on/off valves V 10 b and V 10 c are closed and at the same time the second high pressure gas on/off valves V 11 b and V 11 c are opened.
- the indoor heat exchangers 31 b and 31 c of the indoor units 3 b and 3 c are brought into a state where they function as condensers.
- the pressure reducing circuit on/off valves V 12 b and V 12 c are in an opened state.
- the high pressure gas refrigerant compressed in and discharged from the compressor 21 is sent to the high pressure gas refrigerant communication pipe 52 through the high pressure gas side stop valve V 5 .
- the high pressure gas refrigerant sent to the high pressure gas refrigerant communication pipe 52 is sent to each of the indoor units 3 b and 3 c through each of the connection units 4 b and 4 c and the second high pressure gas on/off valves V 11 b and V 11 c .
- the high pressure gas refrigerant sent to the indoor units 3 b and 3 c exchanges heat with the indoor air in the indoor heat exchangers 31 b and 31 c and is condensed into high pressure liquid refrigerant. Subsequently, it is depressurized according to the opening degree of the indoor expansion valves V 9 b and V 9 c when passing through the indoor expansion valves V 9 b and V 9 c .
- the indoor air is heated and supplied to the room.
- the refrigerant that passed through the indoor expansion valves V 9 b and V 9 c is sent to the subcoolers 41 b and 41 c of the connection units 4 b and 4 c and is subcooled.
- This subcooled liquid refrigerant is sent to the first liquid refrigerant communication pipe 51 , and a portion of the liquid refrigerant sent to the first liquid refrigerant communication pipe 51 is sent to the connection unit 4 a .
- the refrigerant sent to the connection unit 4 a is sent to the indoor expansion valve V 9 a of the indoor unit 3 a.
- the refrigerant sent to the indoor expansion valve V 9 a is depressurized by the indoor expansion valve V 9 a . Thereafter, the refrigerant exchanges heat with the indoor air in the indoor heat exchangers 31 a and is thereby evaporated into low pressure gas refrigerant. On the other hand, the indoor air is cooled and supplied to the room. Then, the low pressure gas refrigerant is sent to the connection unit 4 a.
- the low pressure gas refrigerant sent to the connection unit 4 a is sent to the outdoor unit 2 through the low pressure gas on/off valve V 10 a and the low pressure gas refrigerant communication pipe 53 , and flows into the accumulator 23 via the low pressure gas side stop valve V 6 . Then, the low pressure gas refrigerant that flowed into the accumulator 23 is again sucked into the compressor 21 .
- the remaining portion of the refrigerant from which the refrigerant sent from the first liquid refrigerant communication pipe 51 to the connection unit 4 a and the indoor unit 3 a is excluded is sent to the outdoor heat exchanger 22 via the liquid side stop valve V 4 of the outdoor unit 2 , is evaporated in the outdoor heat exchanger 22 , and becomes low pressure gas refrigerant.
- This gas refrigerant is sucked into the compressor 21 via the four-way switching valve V 1 and the accumulator 23 .
- An operation which is the simultaneous cooling and heating operation mode where, for example, among the indoor units 3 a to 3 c , the indoor unit 3 a and 3 b perform the cooling operation and at the same time the indoor unit 3 c performs the heating operation, and in which the outdoor heat exchanger 22 of the outdoor unit 2 is caused to function as a condenser according to the air conditioning load of the entire indoor units 3 a to 3 c .
- the four-way switching valve V 1 is switched to a state indicated by solid lines in FIG. 1 .
- the outdoor heat exchanger 22 functions as a condenser and also the high pressure gas refrigerant compressed in and discharged from the compressor 21 is supplied to the indoor unit 3 c through the high pressure gas refrigerant communication pipe 52 .
- the first high pressure gas on/off valve V 8 is set to an opened state.
- the opening degree of each of the indoor expansion valves V 9 a and V 9 b is adjusted according to the cooling load of each of the indoor units 3 a and 3 b .
- adjustment of the opening degree is performed based on the superheating degree of each of the indoor heat exchangers 31 a and 31 b (specifically, the temperature difference between the refrigerant temperature detected by the liquid side temperature sensors T 9 a and T 9 b and the refrigerant temperature detected by the gas side temperature sensors T 10 a and T 10 b , respectively).
- connection units 4 a and 4 b the second high pressure gas on/off valves V 11 a and V 11 b are closed and at the same time the low pressure gas on/off valves V 10 a and V 10 b are opened.
- the indoor heat exchangers 31 a and 31 b of the indoor units 3 a and 3 b will function as evaporators and at the same time a state is achieved where the indoor heat exchangers 31 a and 31 b of the indoor units 3 a and 3 b are connected to the suction side of the compressor 21 of the outdoor unit 2 via the low pressure gas refrigerant communication pipe 53 .
- the pressure reducing circuit on/off valves V 12 a and V 12 b are in a closed state.
- the opening degree of the indoor expansion valve V 9 c is adjusted according to the heating load of the indoor unit 3 c .
- adjustment of the opening degree is performed based on the subcooling degree of the indoor heat exchanger 31 c (specifically, the temperature difference between the refrigerant temperature detected by the liquid side temperature sensor T 9 c and the refrigerant temperature detected by the gas side temperature sensor T 10 c ).
- connection unit 4 c the low pressure gas on/off valve V 10 c is closed and at the same time the second high pressure gas on/off valve V 11 c is opened. Accordingly, a state is achieved where the indoor heat exchanger 31 c of the indoor unit 3 c functions as a condenser. In addition, the pressure reducing circuit on/off valve V 12 c is in an opened state.
- the high pressure gas refrigerant compressed in and discharged from the compressor 21 is sent to the outdoor heat exchanger 22 through the four-way switching valve V 1 and is also sent to the high pressure gas refrigerant communication pipe 52 through the high pressure gas side stop valve V 5 .
- the high pressure gas refrigerant sent to the outdoor heat exchanger 22 is condensed in the outdoor heat exchanger 22 and becomes liquid refrigerant. Then, the liquid refrigerant is sent to the first liquid refrigerant communication pipe 51 through the liquid side stop valve V 4 .
- the high pressure gas refrigerant sent to the high pressure gas refrigerant communication pipe 52 is sent to the connection unit 4 c .
- the high pressure gas refrigerant sent to the connection unit 4 c is sent to the indoor heat exchanger 31 c of the indoor unit 3 c through the second high pressure gas on/off valve V 11 c.
- the high pressure gas refrigerant sent to the indoor heat exchanger 31 c exchanges heat with the indoor air in the indoor heat exchanger 31 c of the indoor unit 3 c and thereby is condensed.
- the indoor air is heated and supplied to the room.
- the refrigerant condensed in the indoor heat exchanger 31 c passes through the indoor expansion valve V 9 c and then is sent to the connection unit 4 c.
- the refrigerant sent to the connection unit 4 c is sent to the first liquid refrigerant communication pipe 51 , and mergers with the refrigerant that is sent to the first liquid refrigerant communication pipe 51 through the liquid side stop valve V 4 .
- the refrigerant that flows through the first liquid refrigerant communication pipe 51 is sent to the indoor expansion valves V 9 a and V 9 b of the indoor units 3 a and 3 b via the connection units 4 a and 4 b.
- the refrigerant sent to the indoor expansion valves V 9 a and V 9 b is depressurized by the indoor expansion valves V 9 a and V 9 b . Then, the refrigerant evaporates as a result of heat exchange with the indoor air in the indoor heat exchangers 31 a and 31 b and becomes low pressure gas refrigerant. On the other hand, the indoor air is cooled and supplied to the room. Then, the low pressure gas refrigerant is sent to the connection units 4 a and 4 b.
- the low pressure gas refrigerant sent to the connection units 4 a and 4 b is sent to the low pressure gas refrigerant communication pipe 53 through the low pressure gas on/off valves V 10 a and V 10 b .
- the low pressure gas refrigerant sent to the low pressure gas refrigerant communication pipe 53 is sucked into the compressor 21 via the low pressure gas side stop valve V 6 and the accumulator 23 .
- Such operation control as described above in the normal operation mode is performed by the controller 8 (more specifically, the indoor side controllers 34 a to 34 c , the connection side controllers 44 a to 44 c , the outdoor side controller 26 , and the transmission line 8 a that interconnects each of the controllers 34 a to 34 c , 44 a to 44 c , and 26 ) that functions as a normal operation controlling means to perform the normal operation that includes the cooling operation and the heating operation.
- FIG. 3 is a flowchart of the test operation mode.
- the test operation mode first, the automatic refrigerant charging operation in Step S 1 is performed. Subsequently, the pipe volume judging operation in Step S 2 is performed, and then the initial refrigerant quantity detection operation in Step S 3 is performed.
- the outdoor unit 2 into which the refrigerant is charged in advance, the indoor units 3 a to 3 c , and the connection units 4 a to 4 c are installed at an installation location such as a building and the like and interconnected via the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 to configure the refrigerant circuit 10 ; and subsequently additional refrigerant is charged into the refrigerant circuit 10 whose refrigerant quantity is insufficient according to the volumes of the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 .
- Step S 1 Automatic Refrigerant Charging Operation
- the liquid side stop valve V 4 , the high pressure gas side stop valve V 5 , and the low pressure gas side stop valve V 6 of the outdoor unit 2 are opened and the refrigerant circuit 10 is filled with the refrigerant that is charged in the outdoor unit 2 in advance.
- FIG. 4 is a flowchart of the automatic refrigerant charging operation.
- Step S 11 Refrigerant Quantity Judging Operation
- the refrigerant circuit 10 becomes a state where the indoor expansion valves V 9 a to V 9 c of the indoor units 3 a to 3 c , the low pressure gas on/off valves V 10 a to V 10 c of the connection units 4 a to 4 c , and the outdoor expansion valve V 2 are opened, and the first high pressure gas on/off valve V 8 of the outdoor unit 2 and the second high pressure gas on/off valves V 11 a to V 11 c of the connection units 4 a to 4 c are closed.
- all indoor unit operation the compressor 21 , the outdoor fan 25 , and the indoor fans 32 a to 32 c are started, and all of the indoor units 3 a to 3 c are forcibly caused to perform the cooling operation (hereinafter referred to as “all indoor unit operation”).
- all indoor unit operation the first bypass on/off valve V 3 in the first bypass refrigerant circuit 27 in the outdoor unit 2 and the second bypass on/off valves V 13 a to V 13 c in the third bypass refrigerant circuits 43 a to 43 c in the connection units 4 a to 4 c are in an opened state, and the pressure of the refrigerant in the high pressure gas refrigerant communication pipe 52 and in the low pressure gas refrigerant communication pipe 53 becomes equalized.
- the high pressure gas refrigerant compressed and discharged in the compressor 21 flows along a flow path from the compressor 21 to the outdoor heat exchanger 22 that functions as a condenser (see the portion from the compressor 21 to the outdoor heat exchanger 22 in the area indicated by diagonal hatching in FIG. 5 ); the high pressure refrigerant that undergoes phase-change from a gas state to a liquid state by heat exchange with the outdoor air flows in the outdoor heat exchanger 22 that functions as a condenser (see the portion corresponding to the outdoor heat exchanger 22 in the area indicated by diagonal hatching and black hatching in FIG.
- the high pressure liquid refrigerant flows along a flow path from the outdoor heat exchanger 22 to the indoor expansion valves V 9 a to V 9 c (including the outdoor expansion valve V 2 , the portion corresponding to the main refrigerant circuit side of the subcooler 24 , and the first liquid refrigerant communication pipe 51 ) and a flow path from the outdoor heat exchanger 22 to the bypass expansion valve V 7 (see the portions from the outdoor heat exchanger 22 to the indoor expansion valves V 9 a to V 9 c and to the bypass expansion valve V 7 in the area indicated by black hatching in FIG.
- the low pressure refrigerant that undergoes a phase change from a gas-liquid two-phase state to a gas state by heat exchange with the indoor air and the like flows in the portions corresponding to the indoor heat exchangers 31 a to 31 c that function as evaporators and the portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 (see the portions corresponding to the indoor heat exchangers 31 a to 31 c and the portion corresponding to the subcooler 24 in the area indicated by lattice hatching and diagonal hatching in FIG.
- the low pressure gas refrigerant flows along flow paths on the high pressure gas side and the low pressure gas side of the connection units 4 a to 4 c (including the third bypass refrigerant circuits 43 a to 43 c ), a flow path including the high pressure gas refrigerant communication pipe 52 , the low pressure gas refrigerant communication pipe 53 , the first bypass refrigerant circuit 27 , and the accumulator 23 , and a flow path from the portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 to the compressor 21 (see the portion from the indoor heat exchangers 31 a to 31 c to the compressor 21 ((including the high pressure gas refrigerant connection pipe 52 and the low pressure gas refrigerant communication pipe 53 and the connection units 4 a to 4 c )) and the portion from the portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 to the compressor 21 (see the portion from the indoor heat exchangers 31 a to 31 c to the compressor 21 ((including the high
- FIG. 5 is a schematic diagram to show a state of the refrigerant flowing in the refrigerant circuit 10 in a refrigerant quantity judging operation (illustrations of the four-way switching valve V 1 and the like are omitted).
- the indoor expansion valves V 9 a to V 9 c are controlled such that the superheating degree SHr of each of the indoor heat exchangers 31 a to 31 c that function as evaporators becomes constant (hereinafter referred to as “superheating degree control”); the operation capacity of the compressor 21 is controlled such that the evaporation pressure Pe becomes constant (hereinafter referred to as “evaporation pressure control”); the air flow rate Wo of outdoor air supplied to the outdoor heat exchanger 22 by the outdoor fan 25 is controlled such that a condensation pressure Pc of the refrigerant in the outdoor heat exchanger 22 becomes constant (hereinafter referred to as “condensation pressure control”); the operation capacity of the subcooler 24 is controlled such that the temperature of the refrigerant sent from the subcooler 24 to the indoor expansion valves V 9 a to V 9 c becomes constant (hereinafter referred to
- the reason to perform the evaporation pressure control is because the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 31 a to 31 c that function as evaporators is greatly affected by the refrigerant quantity in the indoor heat exchangers 31 a to 31 c where the low pressure refrigerant flows while undergoing a phase change from a gas-liquid two-phase state to a gas state as a result of heat exchange with the indoor air (see the portions corresponding to the indoor heat exchangers 31 a to 31 c in the area indicated by lattice hatching and diagonal hatching in FIG. 5 , which is hereinafter referred to as “evaporator portion C”).
- the state of the refrigerant flowing in the evaporator portion C is stabilized by causing the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 31 a to 31 c to become constant as a result of controlling the operation capacity of the compressor 21 by the motor 21 a whose rotation frequency Rm is controlled by an inverter.
- a state is created in which the refrigerant quantity in the evaporator portion C changes mainly by the evaporation pressure Pe.
- the control of the evaporation pressure Pe by the compressor 21 in the present embodiment is achieved in the following manner: the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors T 9 a to T 9 c of the indoor heat exchangers 31 a to 31 c is converted to saturation pressure; the operation capacity of the compressor 21 is controlled such that the saturation pressure becomes constant at a target low pressure Pes (in other words, the control to change the rotation frequency Rm of the motor 21 a is performed); and then a refrigerant circulation flow rate Wc flowing in the refrigerant circuit 10 is increased or decreased.
- the refrigerant temperature which corresponds to the evaporation temperature Te
- the operation capacity of the compressor 21 may be controlled such that the suction pressure Ps of the compressor 21 detected by the suction pressure sensor P 1 , which is the operation state quantity equivalent to the pressure of the refrigerant at the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 31 a to 31 c , becomes constant at the target low pressure Pes, or the saturation temperature (which corresponds to the evaporation temperature Te) corresponding to the suction pressure Ps becomes constant at a target low pressure Tes.
- the operation capacity of the compressor 21 may be controlled such that the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors T 9 a to T 9 c of the indoor heat exchangers 31 a to 31 c becomes constant at the target low pressure Tes.
- gas refrigerant distribution portion D which is hereinafter referred to as “gas refrigerant distribution portion D”) becomes stabilized, creating a state where the refrigerant quantity in the gas refrigerant distribution portion D changes mainly by the evaporation pressure Pe (i.e., the suction pressure Ps), which is the operation state quantity equivalent to the pressure of the refrigerant in the gas refrigerant distribution portion D.
- the evaporation pressure Pe i.e., the suction pressure Ps
- the reason to perform the condensation pressure control is because the condensation pressure Pc of the refrigerant is greatly affected by the refrigerant quantity in the outdoor heat exchanger 22 where the high pressure refrigerant flows while undergoing a phase change from a gas state to a liquid state as a result of heat exchange with the outdoor air (see the portion corresponding to the outdoor heat exchanger 22 in the area indicated by diagonal hatching and black hatching in FIG. 5 , which is hereinafter referred to as “condenser portion A”).
- the condensation pressure Pc of the refrigerant in the condenser portion A greatly changes due to the effect of the outdoor temperature Ta.
- the air flow rate Wo of the indoor air supplied from the outdoor fan 25 to the outdoor heat exchanger 22 is controlled by the motor 25 a , and thereby the condensation pressure Pc of the refrigerant in the outdoor heat exchanger 22 is maintained constant and the state of the refrigerant flowing in the condenser portion A is stabilized.
- a state is created where the refrigerant quantity in the condenser portion A changes mainly by a subcooling degree SCo at the liquid side of the outdoor heat exchanger 22 (hereinafter referred to as the outlet of the outdoor heat exchanger 22 in the description regarding the refrigerant quantity judging operation).
- the discharge pressure Pd of the compressor 21 detected by the discharge pressure sensor P 2 which is the operation state quantity equivalent to the condensation pressure Pc of the refrigerant in the outdoor heat exchanger 22 , or the temperature of the refrigerant flowing through the outdoor heat exchanger 22 (i.e., the condensation temperature Tc) detected by the heat exchanger temperature sensor T 3 is used.
- the high pressure liquid refrigerant flows along the flow path from the outdoor heat exchanger 22 to the indoor expansion valves V 9 a to V 9 c (including the outdoor expansion valve V 2 , the portion on the main refrigerant circuit side of the subcooler 24 , and the first liquid refrigerant communication pipe 51 ) and the flow path from the outdoor heat exchanger 22 to the bypass expansion valve V 7 of the second bypass refrigerant circuit 6 , the pressure of the refrigerant in the portions from the outdoor heat exchanger 22 to the indoor expansion valves V 9 a to V 9 c and to the bypass expansion valve V 7 (see the area indicated by black hatching in FIG. 5 , which is hereinafter referred to as “liquid refrigerant distribution portion B”) becomes stabilized, and the liquid refrigerant distribution portion B is sealed by the liquid refrigerant, thereby becoming a stable state.
- the reason to perform the liquid pipe temperature control is to prevent a change in the density of the refrigerant in the refrigerant pipes from the subcooler 24 to the indoor expansion valves V 9 a to V 9 c including the first liquid refrigerant communication pipe 51 (see the portion from the subcooler 24 to the indoor expansion valves V 9 a to V 9 c in the liquid refrigerant distribution portion B shown in FIG. 5 ).
- Performance of the subcooler 24 is controlled by increasing or decreasing the flow rate of the refrigerant flowing in the second bypass refrigerant circuit 6 such that the refrigerant temperature Tlp detected by the liquid pipe temperature sensor T 5 disposed at the outlet on the main refrigerant circuit side of the subcooler 24 becomes constant at a target liquid pipe temperature Tlps, and by adjusting the quantity of heat exchange between the refrigerant flowing in the main refrigerant circuit side and the refrigerant flowing in the second bypass refrigerant circuit 6 side of the subcooler 24 .
- the flow rate of the refrigerant in the second bypass refrigerant circuit 6 is increased or decreased by adjustment of the opening degree of the bypass expansion valve V 7 . In this way, the liquid pipe temperature control is achieved in which the refrigerant temperature in the refrigerant pipes from the subcooler 24 to the indoor expansion valves V 9 a to V 9 c including the first liquid refrigerant communication pipe 51 becomes constant.
- the superheating degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c is controlled such that the superheating degree SHr of the refrigerant at the gas sides of the indoor heat exchangers 31 a to 31 c (hereinafter referred to as the outlets of the indoor heat exchangers 31 a to 31 c in the description regarding the refrigerant quantity judging operation) becomes constant at the target superheating degree SHrs (in other words, such that the gas refrigerant at the outlet of each of the indoor heat exchangers 31 a to 31 c is in a superheat state) by controlling the opening degree of the indoor expansion valves V 9 a to V 9 c , and thereby the state of the refrigerant flowing
- the state of the refrigerant circulating in the refrigerant circuit 10 becomes stabilized, and the distribution of the refrigerant quantity in the refrigerant circuit 10 becomes constant. Therefore, when refrigerant starts to be charged into the refrigerant circuit 10 by additional refrigerant charging, which is subsequently performed, it is possible to create a state where a change in the refrigerant quantity in the refrigerant circuit 10 mainly appears as a change of the refrigerant quantity in the outdoor heat exchanger 22 (hereinafter this operation is referred to as “refrigerant quantity judging operation”).
- Such control as described above is performed as the process in Step S 11 by the controller 8 (more specifically, by the indoor side controllers 34 a to 34 c , the connection side controllers 44 a to 44 c , the outdoor side controller 26 , and the transmission line 8 a that interconnects each of the controllers 34 a to 34 c , 44 a to 44 c , 26 ) that functions as a refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation.
- Step S 11 when refrigerant is not charged in advance in the outdoor unit 2 , it is necessary prior to Step S 11 to charge refrigerant until the refrigerant quantity reaches a level where constituent equipment will not abnormally stop during the above described refrigerant quantity judging operation.
- Step S 12 Refrigerant Quantity Calculation
- the controller 8 that functions as a refrigerant quantity calculating means calculates the refrigerant quantity in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 during additional refrigerant charging in Step S 12 .
- the refrigerant quantity calculating means divides the refrigerant circuit 10 into a plurality of portions, calculates the refrigerant quantity for each divided portion, and thereby calculates the refrigerant quantity in the refrigerant circuit 10 . More specifically, a relational expression between the refrigerant quantity in each portion and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is set for each divided portion, and the refrigerant quantity in each portion can be calculated by using these relational expressions. In the present embodiment, when the four-way switching valve V 1 is in a state indicated by solid lines in FIG.
- the refrigerant circuit 10 is divided into the following portions and a relational expression is set for each portion: a portion corresponding to the compressor 21 and a portion from the compressor 21 to the outdoor heat exchanger 22 including the four-way switching valve V 1 (not shown in FIG.
- high pressure gas pipe portion E a portion corresponding to the outdoor heat exchanger 22 (i.e., the condenser portion A); a portion from the outdoor heat exchanger 22 to the subcooler 24 and an inlet side half of a portion corresponding to the main refrigerant circuit side of the subcooler 24 in the liquid refrigerant distribution portion B (hereinafter referred to as “high temperature side liquid pipe portion B 1 ”); an outlet side half of a portion corresponding to the main refrigerant circuit side of the subcooler 24 and a portion from the subcooler 24 to the liquid side stop valve V 4 (not shown in FIG.
- liquid refrigerant communication pipe portion B 3 a portion from the first liquid refrigerant communication pipe 51 in the liquid refrigerant distribution portion B up to the second gas refrigerant communication pipes 72 a to 72 c in the gas refrigerant distribution portion D including portions corresponding to the indoor expansion valves V 9 a to V 9 c and the indoor heat exchangers 31 a to 31 c (i.e., the evaporator portion C) (hereinafter referred to as “indoor unit portion F”); a portion combining the high pressure gas refrigerant communication pipe 52 and
- first low pressure low pressure gas pipe portion H the first high pressure gas on/off valve V 8 (hereinafter referred to as “first low pressure low pressure gas pipe portion H”) in the gas refrigerant distribution portion D; a portion combining a portion from the low pressure gas side stop valve V 6 (not shown in FIG.
- second bypass circuit portion J a portion from the high temperature side liquid pipe portion B 1 to the second low pressure gas pipe portion I including the bypass expansion valve V 7 and a portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 in the liquid refrigerant distribution portion B
- gas refrigerant communication pipe portion G the portion combining the high pressure gas refrigerant communication pipe portion G 1 and the low pressure gas refrigerant communication pipe portion G 2 is referred to as a gas refrigerant communication pipe portion G.
- a relational expression between a refrigerant quantity Mog 1 in the high pressure gas pipe portion E and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- Mog 1 Vog 1 ⁇ d
- the volume Vog 1 of the high pressure gas pipe portion E is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
- the density ⁇ d of the refrigerant in the high pressure gas pipe portion E is obtained by converting the discharge temperature Td and the discharge pressure Pd.
- a relational expression between a refrigerant quantity Mc in the condenser portion A and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- Mc kc 1 ⁇ Ta+kc 2 ⁇ Tc+kc 3 ⁇ SHm+kc 4 ⁇ Wc+kc 5 ⁇ c+kc 6 ⁇ co+kc 7,
- the parameters kc 1 to kc 7 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of the controller 8 .
- the compressor discharge superheating degree SHm is a superheating degree of the refrigerant at the discharge side of the compressor, and is obtained by converting the discharge pressure Pd to refrigerant saturation temperature and subtracting this refrigerant saturation temperature from the discharge temperature Td.
- a saturated liquid density ⁇ c of the refrigerant is obtained by converting the condensation temperature Tc.
- the density ⁇ co of the refrigerant at the outlet of the outdoor heat exchanger 22 is obtained by converting the condensation pressure Pc, which is obtained by converting the condensation temperature Tc, and the refrigerant temperature Tco.
- a relational expression between a refrigerant quantity Mol 1 in the high temperature side liquid pipe portion B 1 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- the volume Vol 1 of the high temperature side liquid pipe portion B 1 in the outdoor unit 2 is multiplied by the density ⁇ co of the refrigerant in the high temperature side liquid pipe portion B 1 (i.e., the above described density of the refrigerant at the outlet of the outdoor heat exchanger 22 ).
- the volume Vol 1 of the high pressure side liquid pipe portion B 1 is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
- a relational expression between a refrigerant quantity Mol 2 in the low temperature side liquid pipe portion B 2 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- the volume Vol 2 of the low temperature side liquid pipe portion B 2 is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
- the density ⁇ lp of the refrigerant in the low temperature side liquid pipe portion B 2 is the density of the refrigerant at the outlet of the subcooler 24 , and is obtained by converting the condensation pressure Pc and the refrigerant temperature Tlp at the outlet of the subcooler 24 .
- a relational expression between a refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- the volume Vlp is divided into a volume Vlp 1 of the portion combining the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71 a to 71 c and a volume Vlp 2 of the liquid side refrigerant flow path in the connection units 4 a to 4 c .
- the volume Vlp 1 of the portion combining the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71 a to 71 c because the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71 a to 71 c are refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site, and the controller 8 calculates the volume Vlp 1 from the input information of the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71 a to 71 c .
- the volume Vlp 1 is calculated by using the operation results of the pipe volume judging operation.
- the volume Vlp 2 of the liquid side refrigerant flow path in the connection units 4 a to 4 c is a value that is known prior to installation of the connection units 4 a to 4 c at the installation location and is stored in advance in the memory of the controller 8 .
- a relational expression between a refrigerant quantity Mr in the indoor unit portion F and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- Mr kr 1 ⁇ Tlp+kr 2 ⁇ T+kr 3 ⁇ SHr+kr 4 ⁇ Wr+kr 5,
- the parameters kr 1 to kr 5 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of the controller 8 .
- the relational expression for the refrigerant quantity Mr is set for each of the three indoor units 3 a to 3 c , and the entire refrigerant quantity in the indoor unit portion F is calculated by adding the refrigerant quantity Mr in the indoor unit 3 a , the refrigerant quantity Mr in the indoor unit 3 b , and the refrigerant quantity Mr in the indoor unit 3 c .
- relational expressions having parameters kr 1 to kr 5 with different values will be used when the model and/or capacity is different among the indoor unit 3 a , the indoor unit 3 b , and the indoor unit 3 c.
- the gas refrigerant communication pipe portion G is divided into a high pressure gas refrigerant communication pipe portion G 1 and a low pressure gas refrigerant communication pipe portion G 2 , and a refrigerant quantity Mgp in the gas refrigerant communication pipe portion G is a value obtained by adding a refrigerant quantity Mgph in the high pressure gas refrigerant communication pipe portion G 1 and a refrigerant quantity Mgp 1 in the low pressure gas refrigerant communication pipe portion G 2 .
- a volume Vgp of the gas refrigerant communication pipe portion G is a value obtained by adding a volume Vgph of the high pressure gas refrigerant communication pipe portion G 1 and a volume Vgp 1 of the low pressure gas refrigerant communication pipe portion G 2 .
- theses relational expressions are expressed as follows.
- Vgp Vgph+Vgp 1
- a relational expression between the refrigerant quantity Mgph in the high pressure gas refrigerant communication pipe portion G 1 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- the volume Vgph is divided into a volume Vgph 1 of the high pressure gas refrigerant communication pipe 52 and a volume Vgph 2 of the high pressure gas side refrigerant flow path in the connection units 4 a to 4 c (including up to the second bypass on/off valves V 13 a to V 13 c on the high pressure gas side in the third bypass refrigerant circuits 43 a to 43 c ).
- the volume Vgp 1 of the high pressure gas refrigerant communication pipe 52 As is the case with the portion combining the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71 a to 71 c , because the high pressure gas refrigerant communication pipe 52 is a refrigerant pipe arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site, and the controller 8 calculates the volume Vgp 1 from the input information of the high pressure gas refrigerant communication pipe 52 .
- the volume Vgp 1 is calculated by using the operation results of the pipe volume judging operation.
- the density ⁇ gph of the refrigerant in the high pressure gas refrigerant communication pipe portion G 1 is an average value among: a density ⁇ s of the refrigerant at the suction side of the compressor 21 , a density ⁇ oh of the refrigerant in the pipe on the high pressure gas side between the high pressure gas side stop valve V 5 and the first high pressure gas on/off valve V 8 in the outdoor unit 2 , a density ⁇ bsh of the refrigerant in the high pressure gas side refrigerant flow path in the connection units 4 a to 4 c , and a density ⁇ eo of the refrigerant at the outlets of the indoor heat exchangers 31 a to 31 c (i.e., the inlets of the second gas refrigerant communication pipes 72 a to 72 c ).
- the density ⁇ s of the refrigerant is obtained by converting the suction pressure Ps and the suction temperature Ts.
- the density ⁇ oh of the refrigerant is obtained by converting the first high pressure gas pipe temperature Th 1 .
- the density ⁇ bsh of the refrigerant is obtained by converting the second high pressure gas pipe temperature Th 2 .
- the density ⁇ eo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a converted value of the evaporation temperature Te, and an outlet temperature Teo of each of the indoor heat exchangers 31 a to 31 c .
- the volume Vgp 2 of the high pressure gas side refrigerant flow path in the connection units 4 a to 4 c is a value that is known prior to installation of the connection units 4 a to 4 c at the installing location and is stored in advance in the memory of the controller 8 .
- a relational expression between the refrigerant quantity Mgp 1 in the low pressure gas refrigerant communication pipe portion G 2 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- Mgp 1 Vgp 1 ⁇ gp 1
- the volume Vgp 1 is divided into a volume Vgpl 1 of a portion combining the low pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c , and a volume Vgpl 2 of the low pressure gas side refrigerant flow path in the connection units 4 a to 4 c (including up to the second bypass on/off valves V 13 a to V 13 c on the low pressure gas side in the third bypass refrigerant circuits 43 a to 43 c ).
- the volume Vgpl 1 of the portion combining the low pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c As is the case with the portion combining the first liquid refrigerant communication pipe 51 and the second liquid refrigerant communication pipes 71 a to 71 c and also as is the case with the high pressure gas refrigerant communication pipe 52 , because the low pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c are refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site, and the controller 8 calculates the volume Vgpl 1 from the input information of the low pressure gas refrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c .
- the volume Vgpl 1 is calculated by using the operation results of the pipe volume judging operation.
- the density ⁇ gp 1 of the refrigerant in the low pressure gas refrigerant communication pipe portion G 2 is an average value between the density ⁇ s of the refrigerant at the suction side of the compressor 21 and the density ⁇ eo of the refrigerant at the outlets of the indoor heat exchangers 31 a to 31 c (i.e., the inlet of the second gas refrigerant communication pipes 72 a to 72 c ).
- the density ⁇ s of the refrigerant is obtained by converting the suction pressure Ps and the suction temperature Ts, and the density ⁇ eo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a converted value of the evaporation temperature Te, and the outlet temperature Teo of each of the indoor heat exchangers 31 a to 31 c .
- the volume Vgpl 2 of the low pressure gas side refrigerant flow path in the connection units 4 a to 4 c is a value that is known prior to installation of the connection units 4 a to 4 c at the installation location and is stored in advance in the memory of the controller 8 .
- a relational expression between a refrigerant quantity Mog 2 in the first low pressure gas pipe portion H and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- Mog 2 Vog 2 ⁇ oh
- the volume Vog 2 of the first low pressure gas pipe portion H is a value that is known prior to shipment to the installation location and is stored in advance in the memory of the controller 8 .
- a relational expression between a refrigerant quantity Mog 3 in the second low pressure gas pipe portion I and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- Mog 3 Vog 3 ⁇ s
- volume Vog 3 of the second low pressure gas pipe portion I in the outdoor unit 2 is multiplied by the density ⁇ s of the refrigerant in the second low pressure gas pipe portion I.
- the volume Vog 3 of the second low pressure gas pipe portion I is a value that is known prior to shipment to the installation location and is stored in advance in the memory of the controller 8 .
- a relational expression between a refrigerant quantity Mob in the second bypass circuit portion J and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is expressed, for example, by
- the refrigerant quantity Mob of the second bypass circuit portion J may be calculated using a simpler relational expression because the refrigerant quantity in that portion is smaller compared to other portions. For example, it is expressed as follows:
- the volume Vob of the second bypass circuit portion J is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
- the saturated liquid density ⁇ e at the portion on the second bypass circuit side of the subcooler 24 is obtained by converting the suction pressure Ps or the evaporation temperature Te.
- one outdoor unit 2 is provided.
- the relational expression for the refrigerant quantity in each portion is set for each of the plurality of outdoor units, and the entire refrigerant quantity in the outdoor units is calculated by adding the refrigerant quantity in each portion of the plurality of the outdoor units. Note that, relational expressions for the refrigerant quantity in each portion having parameters with different values will be used when a plurality of outdoor units with different models and capacities are connected.
- the refrigerant quantity in each portion is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant quantity judging operation, and thereby the refrigerant quantity in the refrigerant circuit 10 can be calculated.
- Step S 12 is repeated until the condition for judging the adequacy of the refrigerant quantity in the below described Step S 13 is satisfied. Therefore, in the period from the start to the completion of additional refrigerant charging, the refrigerant quantity in each portion is calculated from the operation state quantity during refrigerant charging by using the relational expressions for each portion in the refrigerant circuit 10 .
- the refrigerant quantity Mo in the outdoor unit 2 is calculated by adding the refrigerant quantity Mog 1 , Mc, Mol 1 , Mol 2 , Mog 2 , Mog 3 , and Mob in the above described each portion in the outdoor unit 2 .
- Step S 12 the process in Step S 12 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation.
- Step S 13 Judging the Adequacy of the Refrigerant Quantity
- the refrigerant quantity in the refrigerant circuit 10 gradually increases.
- the refrigerant quantity that should be charged into the refrigerant circuit 10 after additional refrigerant charging cannot be prescribed as the refrigerant quantity in the entire refrigerant circuit 10 .
- the indoor units 3 a to 3 c , and the connection units 4 a to 4 c i.e., the refrigerant circuit 10 excluding the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7 )
- the connection units 4 a to 4 c i.e., the refrigerant circuit 10 excluding the first refrigerant communication pipe group 5 and the second refrigerant communication pipe group 7
- additional refrigerant can be charged by the following manner: a value of this refrigerant quantity is stored as a target charging value Ms, in advance, in the memory of the controller 8 ; the refrigerant quantity Mo in the outdoor unit 2 , the refrigerant quantity Mr in each of the indoor units 3 a to 3 c , and the refrigerant quantity Mbs in each of the connection units 4 a to 4 c are calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation by using the above described relational expressions; and additional refrigerant is charged until a value of the sum of the above calculated refrigerant quantities reaches the target charging value Ms.
- Step S 13 is a process to judge the adequacy of the refrigerant quantity charged into the refrigerant circuit 10 by additional refrigerant charging by judging whether or not the refrigerant quantity, which is obtained by adding the refrigerant quantity Mo in the outdoor unit 2 , the refrigerant quantity Mr in the indoor units 3 a to 3 c , and the refrigerant quantity Mbs in the connection units 4 a to 4 c in the automatic refrigerant charging operation, has reached the target charging value Ms.
- Step S 13 when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in the outdoor unit 2 , the refrigerant quantity Mr in each of the indoor units 3 a to 3 c , and the refrigerant quantity Mbs in each of the connection units 4 a to 4 c is smaller than the target charging value Ms and additional refrigerant charging has not been completed, the process in Step S 13 is repeated until the target charging value Ms is reached.
- the target charging value Ms may be set as a value corresponding to only the refrigerant quantity Mo in the outdoor unit 2 instead of corresponding to all of the outdoor unit 2 , the indoor units 3 a to 3 c , and the connection units 4 a to 4 c ; or may be set as a value corresponding to the refrigerant quantity Mc in the outdoor heat exchanger 22 , and additional refrigerant may be charged until the target charging value Ms is reached under such setting.
- Step S 13 the process in Step S 13 is performed by the controller 8 that functions as the refrigerant quantity judging means for judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 in the refrigerant quantity judging operation of the automatic refrigerant charging operation (i.e., for judging whether or not the refrigerant quantity has reached the target charging value Ms).
- Step S 2 Pipe Volume Judging Operation
- Step S 2 the process proceeds to the pipe volume judging operation in Step S 2 .
- the process from Step S 21 to Step S 25 as shown in FIG. 6 is performed by the controller 8 .
- FIG. 6 is a flowchart of the pipe volume judging operation.
- Steps S 21 , S 22 Pipe Volume Judging Operation for the Liquid Refrigerant Communication Pipe and Volume Calculation
- Step S 21 as is the case with the above described refrigerant quantity judging operation in Step S 11 of the automatic refrigerant charging operation as described above, the pipe volume judging operation for the liquid refrigerant communication pipe portion B 3 , including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control, is performed.
- the target liquid pipe temperature Tlps of the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the subcooler 24 in the liquid pipe temperature control is regarded as a first target value Tlps 1
- the state where the refrigerant quantity judging operation is stable at this first target value Tlps 1 is regarded as a first state (see the refrigerating cycle indicated by lines including dotted lines in FIG. 7 ).
- FIG. 7 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the liquid refrigerant communication pipe.
- the first state where the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the subcooler 24 in liquid pipe temperature control is stable at the first target value Tlps 1 is switched to a second state (see the refrigerating cycle indicated by solid lines in FIG. 7 ) where the target liquid pipe temperature Tlps is changed to a second target value Tlps 2 different from the first target value Tlps 1 and stabilized without changing the conditions for other equipment controls, i.e., the conditions for the condensation pressure control, superheating degree control, and evaporation pressure control (i.e., without changing the target superheating degree SHrs and the target low pressure Tes).
- the second target value Tlps 2 is a temperature higher than the first target value Tlps 1 .
- the density of the refrigerant in the liquid refrigerant communication pipe portion B 3 decreases, and therefore the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B 3 moves to other portions in the refrigerant circuit 10 .
- the conditions for other equipment controls other than the liquid pipe temperature control are not changed, and therefore the refrigerant quantity Mog 1 in the high pressure gas pipe portion E, the refrigerant quantity Mog 2 in the first low pressure gas pipe portion H, the refrigerant quantity Mog 3 in the second low pressure gas pipe portion I, and the refrigerant quantity Mgph in the high pressure gas refrigerant communication pipe portion G 1 and the refrigerant quantity Mgp 1 in the low pressure gas refrigerant communication pipe portion G 2 are maintained substantially constant, and the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B 3 will move to the condenser portion A, the high temperature side liquid pipe portion B 1 , the low temperature side liquid pipe portion B 2 , the indoor unit portion F, and the second bypass circuit portion J.
- the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mol 1 in the high temperature side liquid pipe portion B 1 , the refrigerant quantity Mol 2 in the low temperature side liquid pipe portion B 2 , the refrigerant quantity Mr in the indoor unit portion F, and the refrigerant quantity Mob in the second bypass circuit portion J will increase by the quantity of the refrigerant that has decreased in the liquid refrigerant communication pipe portion B 3 .
- Such control as described above is performed as the process in Step S 21 by the controller 8 (more specifically, by the indoor side controllers 34 a to 34 c , the connection side controllers 44 a to 44 c , the outdoor side controller 26 , and the transmission line 8 a that interconnects each of the controllers 34 a to 34 c , 44 a to 44 c , and 26 ) that functions as a pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the refrigerant quantity Mlp of the liquid refrigerant communication pipe portion B 3 .
- Step S 22 the volume Vlp of the liquid refrigerant communication pipe portion B 3 is calculated by utilizing a phenomenon that the refrigerant quantity in the liquid refrigerant communication pipe portion B 3 decreases and the refrigerant whose quantity has decreased moves to other portions in the refrigerant circuit 10 because of the change from the first state to the second state.
- the refrigerant increase/decrease quantity ⁇ Mlp can be, for example, calculated by the following function expression:
- ⁇ Mlp ⁇ ( ⁇ Mc+ ⁇ Mol 1+ ⁇ Mol 2+ ⁇ Mr+ ⁇ Mob ).
- the value of ⁇ Mlp is divided by a density change quantity ⁇ lp of the refrigerant between the first state and the second state in the liquid refrigerant communication pipe portion B 3 , and thereby the volume Vlp of the liquid refrigerant communication pipe portion B 3 can be calculated.
- the refrigerant quantity Mog 1 and the refrigerant quantity Mog 2 may be included in the above described function expression.
- Vlp ⁇ Mlp/ ⁇ lp
- the volume Vlp 2 of the liquid side refrigerant flow path in the connection units 4 a to 4 c is a value that is known prior to installation of the connection units 4 a to 4 c at the installation location.
- ⁇ Mc, ⁇ Mol 1 , ⁇ Mol 2 , ⁇ Mr, and ⁇ Mob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state.
- the density change quantity ⁇ lp can be obtained by calculating the density of the refrigerant at the outlet of the subcooler 24 in the first state and the density of the refrigerant at the outlet of the subcooler 24 in the second state and further by subtracting the density of the refrigerant in the first state from the density of the refrigerant in the second state.
- the volume Vlp of the liquid refrigerant communication pipe portion B 3 can be calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the first and second states.
- the state is changed such that the second target value Tlps 2 in the second state becomes a temperature higher than the first target value Tlps 1 in the first state and therefore the refrigerant in the low temperature side liquid pipe portion B 2 is moved to other portions to increase the refrigerant quantity in other portions; thereby the volume Vlp of the liquid refrigerant communication pipe portion B 3 is calculated from the increased quantity.
- the state may be changed such that the second target value Tlps 2 in the second state becomes a temperature lower than the first target value Tlps 1 in the first state and therefore the refrigerant is moved from other portions to the liquid refrigerant communication pipe portion B 3 to decrease the refrigerant quantity in other portions; thereby the volume Vlp of the liquid refrigerant communication pipe portion B 3 is calculated from the decreased quantity.
- Step S 22 is performed by the controller 8 that functions as the pipe volume calculating means for the liquid refrigerant communication pipe, which calculates the volume Vlp of the liquid refrigerant communication pipe portion B 3 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the pipe volume judging operation for the liquid refrigerant communication pipe portion B 3 .
- Steps S 23 , S 24 Pipe Volume Judging Operation and Volume Calculation for the Gas Refrigerant Communication Pipe
- Step S 23 the pipe volume judging operation for the gas refrigerant communication pipe portion G, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control, is performed in Step S 23 .
- the target low pressure Pes of the suction pressure Ps of the compressor 21 in the evaporation pressure control is regarded as a first target value Pes 1
- the state where the refrigerant quantity judging operation is stable at this first target value Pes 1 is regarded as a first state (see the refrigerating cycle indicated by lines including dotted lines in FIG. 8 ).
- FIG. 8 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the gas refrigerant communication pipe.
- the first state where the target low pressure Pes of the suction pressure Ps in the compressor 21 in evaporation pressure control is stable at the first target value Pes 1 is switched to a second state (see the refrigerating cycle indicated only by solid lines in FIG. 8 ) where the target low pressure Pes is changed to a second target value Pes 2 different from the first target value Pes 1 and stabilized without changing the conditions for other equipment controls, i.e., without changing the conditions for the liquid pipe temperature control, the condensation pressure control, and the superheating degree control (i.e., without changing the target liquid pipe temperature Tlps and the target superheating degree SHrs).
- the second target value Pes 2 is a pressure lower than the first target value Pes 1 .
- the density of the refrigerant in the gas refrigerant communication pipe portion G decreases, and therefore the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to other portions in the refrigerant circuit 10 .
- the conditions for other equipment controls other than the evaporation pressure control are not changed, and therefore the refrigerant quantity Mog 1 in the high pressure gas pipe portion E, the refrigerant quantity Mol 1 in the high temperature side liquid pipe portion B 1 , the refrigerant quantity Mol 2 in the low temperature side liquid pipe portion B 2 , and the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 are maintained substantially constant, and the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to the first low pressure gas pipe portion H, the second low pressure gas pipe portion I, the condenser portion A, the indoor unit portion F, and the second bypass circuit portion J.
- the refrigerant quantity Mog 2 in the first low pressure gas pipe portion H, the refrigerant quantity Mog 3 in the second low pressure gas pipe portion I, the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mr in the indoor unit portion F, and the refrigerant quantity Mob in the second bypass circuit portion J will increase by the quantity of the refrigerant that has decreased in the gas refrigerant communication pipe portion G.
- Such control as described above is performed as the process in Step S 23 by the controller 8 (more specifically, by the indoor side controllers 34 a to 34 c , the connection side controllers 44 a to 44 c , the outdoor side controller 26 , and the transmission line 8 a that interconnects each of the controllers 34 a to 34 c , 44 a to 44 c , and 26 ) that functions as the pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the volume Vgp of the gas refrigerant communication pipe portion G.
- Step S 24 the volume Vgp of the gas refrigerant communication pipe portion G is calculated by utilizing a phenomenon that the refrigerant quantity in the gas refrigerant communication pipe portion G decreases and the refrigerant whose quantity has decreased moves to other portions in the refrigerant circuit 10 because of the change from the first state to the second state.
- the refrigerant increase/decrease quantity ⁇ Mgp can be, for example, calculated by the following function expression:
- ⁇ Mgp ⁇ ( ⁇ Mc+ ⁇ Mog 2 + ⁇ Mog 3 + ⁇ Mr+ ⁇ Mob ).
- the value of ⁇ Mgp is divided by a density change quantity ⁇ gp of the refrigerant between the first state and the second state in the gas refrigerant communication pipe portion G, and thereby the volume Vgp of the gas refrigerant communication pipe portion G can be calculated.
- the refrigerant quantity Mog 1 , the refrigerant quantity Mol 1 , and the refrigerant quantity Mol 2 may be included in the above described function expression.
- Vgp ⁇ Mgp/ ⁇ gp
- ⁇ Mc, ⁇ Mog 2 , ⁇ Mog 3 , ⁇ Mr and ⁇ Mob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state.
- the density change quantity ⁇ gp can be obtained by calculating an average density among the density ⁇ s of the refrigerant at the suction side of the compressor 21 , the density ⁇ oh of the refrigerant in the pipe on the high pressure gas side between the high pressure gas side stop valve V 5 and the first high pressure gas on/off valve V 8 in the outdoor unit 2 , the density ⁇ bsh of the refrigerant in the high pressure gas side refrigerant flow path in the connection units 4 a to 4 c , and the density ⁇ eo of the refrigerant at the outlets of the indoor heat exchangers 31 a to 31 c in the first state and by subtracting the average density in the first state from the average density in the second state.
- the volume Vgp of the gas refrigerant communication pipe portion G can be calculated from the operation state quantity of constituent equipment or the refrigerant flowing in the refrigerant circuit 10 in the first and second states.
- the volume Vgp 2 of the high pressure gas side refrigerant flow path and the low pressure gas side refrigerant flow path (including a portion corresponding to the third bypass refrigerant circuits 43 a to 43 c ) in the connection units 4 a to 4 c is a value that is known prior to installation of the connection units 4 a to 4 c at the installation location.
- the volume Vgp 1 of the portion combining the high pressure gas refrigerant communication pipe 52 , the low pressure gas refrigerant communication pipe 53 , and the second gas refrigerant communication pipes 72 a to 72 c which are the refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, by subtracting the volume Vgp 2 from the volume Vgp of the gas refrigerant communication pipe portion Q which is determined by the calculation.
- the state is changed such that the second target value Pes 2 in the second state becomes a pressure lower than the first target value Pes 1 in the first state and therefore the refrigerant in the gas refrigerant communication pipe portion G is moved to other portions to increase the refrigerant quantity in other portions; thereby the volume Vlp in the gas refrigerant communication pipe portion G is calculated from the increased quantity.
- the state may be changed such that the second target value Pes 2 in the second state becomes a pressure higher than the first target value Pes 1 in the first state and therefore the refrigerant is moved from other portions to the gas refrigerant communication pipe portion G to decrease the refrigerant quantity in other portions; thereby the volume Vlp of the gas refrigerant communication pipe portion G may be calculated from the decreased quantity.
- Step S 24 is performed by the controller 8 that functions as the pipe volume calculating means for a gas refrigerant communication pipe, which calculates the volume Vgp of the gas refrigerant communication pipe portion G from the operation state quantity of constituent equipment or the refrigerant flowing in the refrigerant circuit 10 during the pipe volume judging operation for the gas refrigerant communication pipe portion G.
- Step S 25 Judging the Validity of a Result of Pipe Volume Judging Operation
- Step S 25 whether or not a result of the pipe volume judging operation is valid, in other words, whether or not the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G calculated by the pipe volume calculating means are valid is judged.
- ⁇ 1 and ⁇ 2 are values that are changed based on the minimum value and the maximum value of the pipe volume ratio in feasible combinations of the heat source unit and the utilization unit.
- Step S 2 for the pipe volume judging operation is completed.
- the process for the pipe volume judging operation and the volume calculation in Step S 21 to Step S 24 is performed again.
- Step S 25 is performed by the controller 8 that functions as a validity judging means for judging whether or not a result of the above described pipe volume judging operation is valid, in other words, whether or not the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G calculated by the pipe volume calculating means are valid.
- the pipe volume judging operation (Steps S 21 , S 22 ) for the liquid refrigerant communication pipe portion B 3 is first performed and then the pipe volume judging operation for the gas refrigerant communication pipe portion G (Steps S 23 , S 24 ) is performed.
- the pipe volume judging operation for the gas refrigerant communication pipe portion G may be performed first.
- Step S 25 when a result of the pipe volume judging operation in Steps S 21 to S 24 is judged to be invalid a plurality of times, or when it is desired to more simply judge the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion Q although it is not shown in FIG.
- Step S 25 after a result of the pipe volume judging operation in Steps S 21 to S 24 is judged to be invalid, it is possible to proceed to the process for estimating, from the pressure loss in a portion combining the liquid refrigerant communication pipe portion B 3 and the gas refrigerant communication pipe portion G (hereinafter referred to as “refrigerant communication pipe portion K”), the length of the refrigerant communication pipe portion K and calculating the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G from the estimated pipe length and an average volume ratio, thereby obtaining the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G.
- refrigerant communication pipe portion K the length of the refrigerant communication pipe portion K and calculating the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G from the estimated
- the case where the pipe volume judging operation is performed to calculate the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G is described on the premise that there is no information regarding the length, pipe diameter and the like of the refrigerant communication pipe portion K, and the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G are unknown.
- the pipe volume calculating means has a function to calculate the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G by inputting information regarding the length, pipe diameters and the like of the refrigerant communication pipe portion K, such function may be used together.
- the above described validity judging means may be used to judge whether or not the input information regarding the lengths, pipe diameters and the like of the refrigerant communication pipe portion K is valid.
- Step S 3 Initial Refrigerant Quantity Detection Operation
- Step S 3 the process in Step S 31 and Step S 32 shown in FIG. 9 is performed by the controller 8 .
- FIG. 9 is a flowchart of the initial refrigerant quantity detection operation.
- Step S 31 Refrigerant Quantity Judging Operation
- Step S 31 as is the case with the above described refrigerant quantity judging operation of Step S 11 in the automatic refrigerant charging operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed.
- the target liquid pipe temperature value Tlps in the liquid pipe temperature control, the target superheat degree value SHrs in the superheat degree control, and the target low pressure value Pes in the evaporation pressure control are same as the target values during the refrigerant quantity judging operation of Step S 1 in the automatic refrigerant charging operation.
- Step S 31 the process in Step S 31 is performed by the controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control.
- Step S 32 Refrigerant Quantity Calculation
- the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity detection operation in Step S 32 by the controller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation.
- Calculation of the refrigerant quantity in the refrigerant circuit 10 is performed by using the above described relational expression between the refrigerant quantity in each portion in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 .
- the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 and the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G can be calculated, and further by adding the refrigerant quantity in each of other portions, the initial refrigerant quantity in the entire refrigerant circuit 10 can be detected.
- This initial refrigerant quantity is used as a reference refrigerant quantity Mi of the entire refrigerant circuit 10 , which serves as a reference for judging whether or not there is a refrigerant leak from the refrigerant circuit 10 during the below described refrigerant leak detection operation. Therefore, it is stored as a value of the operation state quantity in the memory of the controller 8 serving as the state quantity storing means.
- Step S 32 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity detection operation.
- FIG. 10 is a flowchart of the refrigerant leak detection operation mode.
- Step S 41 Refrigerant Quantity Judging Operation
- the normal operation mode when operation in the normal operation mode such as the above described cooling operation and heating operation has gone on for a certain period of time (for example, half a year to a year), the normal operation mode is automatically or manually switched to the refrigerant leak detection operation mode, and as is the case with the refrigerant quantity judging operation of the initial refrigerant quantity detection operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control, is performed.
- values that are the same as the target values in Step S 31 of the refrigerant quantity judging operation of the initial refrigerant quantity detection operation are used for the target liquid pipe temperature Tlps in the liquid pipe temperature control, the target superheating degree SHrs in the superheating degree control, and the target low pressure Pes in the evaporation pressure control.
- this refrigerant quantity judging operation is performed for each time the refrigerant leak detection operation is performed. Even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 22 changes due to the different operating conditions, for example, such as when the condensation pressure Pc is different or when the refrigerant is leaking, the refrigerant temperature Tlp in the liquid refrigerant communication pipe portion B 3 is maintained constant at the same target liquid pipe temperature Tlps by the liquid pipe temperature control.
- Step S 41 the process in Step S 41 is performed by the controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control.
- Step S 42 Refrigerant Quantity Calculation
- the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation in Step S 42 by the controller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation.
- Calculation of the refrigerant quantity in the refrigerant circuit 10 is performed by using the above described relational expression between the refrigerant quantity in each portion in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 .
- the volume Vlp of the liquid refrigerant communication pipe portion B 3 and the volume Vgp of the gas refrigerant communication pipe portion G which were unknown at the time of after installation of constituent equipment of the air conditioner 1 , have been calculated and the values thereof are known by the above described pipe volume judging operation.
- the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 and the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G can be calculated, and further by adding the refrigerant quantity in each of other portions, the refrigerant quantity M in the entire refrigerant circuit 10 can be calculated.
- the refrigerant temperature Tlp in the liquid refrigerant communication pipe portion B 3 is maintained constant at the target liquid pipe temperature Tlps by the liquid pipe temperature control. Therefore, regardless of the difference in the operating conditions for the refrigerant leak detection operation, the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 will be maintained constant even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 22 changes.
- Step S 42 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity at each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation.
- Steps S 43 , S 44 Judging the Adequacy of the Refrigerant Quantity, Warning Display
- the refrigerant quantity in the refrigerant circuit 10 decreases. Then, when the refrigerant quantity in the refrigerant circuit 10 decreases, mainly, a tendency of a decrease in the subcooling degree SCo at the outlet of the outdoor heat exchanger 22 appears. Along with this, the refrigerant quantity Mc in the outdoor heat exchanger 22 decreases, and the refrigerant quantities in other portions tend to be maintained substantially constant.
- the refrigerant quantity M of the entire refrigerant circuit 10 calculated in the above described Step S 42 is smaller than the reference refrigerant quantity Mi detected in the initial refrigerant quantity detection operation when the refrigerant is leaking from the refrigerant circuit 10 ; whereas when the refrigerant is not leaking from the refrigerant circuit 10 , the refrigerant quantity M is substantially the same as the reference refrigerant quantity Mi.
- Step S 43 whether or not the refrigerant is leaking is judged in Step S 43 .
- Step S 43 whether or not the refrigerant is leaking from the refrigerant circuit 10 .
- Step S 43 when it is judged in Step S 43 that the refrigerant is leaking from the refrigerant circuit 10 , the process proceeds to Step S 44 , and a warning indicating that a refrigerant leak is detected is displayed on the warning display 9 . Subsequently, the refrigerant leak detection operation mode is finished.
- Steps S 42 to S 44 the process from Steps S 42 to S 44 is performed by the controller 8 that functions as a refrigerant leak detecting means, which is one of the refrigerant quantity judging means, and which detects whether or not the refrigerant is leaking by judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 while performing the refrigerant quantity judging operation in the refrigerant leak detection operation mode.
- a refrigerant leak detecting means which is one of the refrigerant quantity judging means, and which detects whether or not the refrigerant is leaking by judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 while performing the refrigerant quantity judging operation in the refrigerant leak detection operation mode.
- the controller 8 functions as the refrigerant quantity judging operation means, the refrigerant quantity calculating means, the refrigerant quantity judging means, the pipe volume judging operation means, the pipe volume calculating means, the validity judging means, and the state quantity storing means, and thereby configures the refrigerant quantity judging system for judging the adequacy of the refrigerant quantity charged into the refrigerant circuit 10 .
- the high pressure gas refrigerant communication pipe portion G 1 extending from the outdoor unit 2 to the connection units 4 a to 4 c will be in a shut-off state. Thereby the refrigerant condenses and accumulates in the pipe, and thus the detection error may be increased.
- the first bypass refrigerant circuit 27 and the third bypass refrigerant circuits 43 a to 43 c which bypass the high pressure gas refrigerant communication pipe portion G 1 to the low pressure gas refrigerant communication pipe portion G 2 are provided, and the first bypass on/off valve V 3 and the second bypass on/off valves V 13 a to V 13 c are set to an opened state during the refrigerant quantity judging operation, thereby reducing the pressure difference between the high pressure gas refrigerant communication pipe portion G 1 and the low pressure gas refrigerant communication pipe portion G 2 and preventing accumulation of liquid refrigerant in the high pressure gas refrigerant communication pipe portion G 1 resulting from condensation.
- the refrigerant quantity judging operation with high accuracy can be achieved.
- first bypass on/off valve V 3 and the third bypass on/off valves are provided in the outdoor unit 2 and in the connection units 4 a to 4 c , respectively.
- the first bypass on/off valve V 3 is provided in the outdoor unit 2
- the third bypass on/off valves are provided in the connection units 4 a to 4 c .
- the bypass circuit can be provided in the refrigerant circuit 10 even without laying pipes for the bypass circuit at the time of construction. Accordingly, it is possible to reduce the labors for construction and the cost.
- This air conditioner 1 is further provided with the temperature sensor in the high pressure gas refrigerant communication pipe portion G 1 . Accordingly, even when the temperate of the gas refrigerant in the high pressure gas refrigerant communication pipe portion G 1 changes because of the incoming heat from the outside air and the like and thereby the density of the refrigerant changes, it is possible to correct the density of the refrigerant based on the temperature detection value by the temperature sensor. Thereby it is possible to reduce the detection error. Thus, the refrigerant quantity judging operation with higher accuracy can be achieved.
- the first high pressure gas pipe temperature sensor T 8 is provided in the heat source unit, and the second high pressure gas pipe temperature sensors T 12 a to T 12 c are provided in the connection units 4 a to 4 c . Accordingly, by using the first high pressure gas pipe temperature sensor T 8 and the second high pressure gas pipe temperature sensors T 12 a to T 12 c in combination, it is possible to more accurately correct the density of the refrigerant in the pipe.
- the temperature detecting means can be provided in the refrigerant circuit 10 even without providing the temperature sensor in the high pressure gas refrigerant pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- the present invention is applied to an air conditioner including a single outdoor unit.
- the present invention may be applied to an air conditioner including a plurality of outdoor units.
- an air-cooled outdoor unit that uses the outdoor air as the heat source is used as the outdoor unit 2 of the air conditioner 1
- a water-cooled type or ice thermal storage type outdoor unit may be used instead.
- the first bypass refrigerant circuit 27 is provided on the outdoor unit 2 side and the third bypass refrigerant circuits 43 a to 43 c are provided on the connection units 4 a to 4 c side.
- the bypass circuits may be provided only on the outdoor unit 2 side or only on the connection units 4 a to 4 c side.
- the first high pressure gas pipe temperature sensor T 8 is mounted on the outdoor unit 2 side and the second high pressure gas pipe temperature sensors T 12 a to T 12 c are mounted on the connection units 4 a to 4 c side.
- the temperature sensors may be mounted only on the outdoor unit 2 side or only on the connection units 4 a to 4 c side. In addition, the temperature sensors may not necessarily be provided.
- the controller 8 that performs the operation control of the entire air conditioner 1 is configured by the outdoor side controller 26 , the indoor side controllers 34 a to 34 c , and the connection side controllers 44 a to 44 c as they exchange control signals via the transmission line 8 a .
- a controller that performs the operation control of the entire air conditioner 1 may be provided in the outdoor unit 2 , in the indoor units 3 a to 3 c , or in the connection units 4 a to 4 c ; or, a single unit may be provided as a control unit.
- the air conditioner according to the present invention reduces the pressure difference between the first gas refrigerant communication pipe and the second gas refrigerant communication pipe, prevents accumulation of liquid refrigerant in the first gas refrigerant communication pipe resulting from condensation, and can perform the refrigerant quantity judging operation with high accuracy.
- the present invention is useful as a refrigerant circuit of an air conditioner, an air conditioner provided therewith, and the like.
Abstract
An air conditioner performs a refrigerant quantity judging operation to judge the refrigerant quantity in a refrigerant circuit, and includes a heat source unit, utilization units, expansion mechanisms, a first refrigerant gas pipe, a second refrigerant gas pipe, a refrigerant liquid pipe, switching mechanisms, bypass circuits, bypass circuit opening/closing element, and a controller. The switching mechanism can switch between a first state and a second state. The bypass circuit opening/closing element are provided in the bypass circuits that bypass the first refrigerant gas pipe to the second refrigerant gas pipe, and open and close the bypass circuits. The controller opens the bypass circuit opening/closing element before performing the refrigerant quantity judging operation.
Description
- The present invention relates to a refrigerant circuit of an air conditioner and an air conditioner provided therewith.
- Conventionally, an approach has been proposed in which a simulation of refrigeration cycle characteristics is performed and the excess or deficiency of the refrigerant quantity is judged by using a result of the calculation, in order to judge the excess or deficiency of the refrigerant quantity in a refrigerant circuit of an air conditioner (for example, see Patent Document 1).
- <Patent Document 1>
- JP-A Publication No. 3-186170
- However, according to the technology disclosed in Patent Document 1, with the multi-air conditioner capable of performing a simultaneous cooling and heating operation, when performing the refrigerant quantity judging operation while the cooling operation is performed in all rooms, the high pressure gas pipe extending from the outdoor unit to the cooling/heating selection unit will be in a shut-off state on the cooling/heating selection unit side. Thereby the refrigerant condenses and accumulates in the pipe and thus the detection error may be increased.
- An object of the present invention is to control the high pressure gas pipe so as to reduce the pressure to a low level in order to prevent accumulation of liquid refrigerant in the high pressure gas pipe resulting from condensation during the refrigerant quantity judging operation of the multi-air conditioner capable of performing the simultaneous cooling and heating operation.
- An air conditioner according to a first aspect of the present invention is an air conditioner that performs a refrigerant quantity judging operation to judge the refrigerant quantity in a refrigerant circuit, the air conditioner including a heat source unit, a utilization unit, an expansion mechanism, a first gas refrigerant pipe, a second gas refrigerant pipe, a liquid refrigerant pipe, a switching mechanism, a bypass circuit, a bypass circuit opening/closing means, and a controller. The heat source unit includes a compression means that compresses refrigerant gas and a heat source side heat exchanger. The utilization unit includes a utilization side heat exchanger. The first gas refrigerant pipe extends from the discharge side of the compression means to the utilization unit. The second gas refrigerant pipe extends from the suction side of the compression means to the utilization unit. The liquid refrigerant pipe extends from the heat source side heat exchanger to the utilization unit. The switching mechanism can switch between a first state and a second state. The first state is a state in which the refrigerant flowing through the liquid refrigerant pipe evaporates in the utilization side heat exchanger and then flows into the second gas refrigerant pipe. The second state is a state in which the refrigerant flowing through the first gas refrigerant pipe condenses in the utilization side heat exchanger and then flows into the liquid refrigerant pipe. The bypass circuit bypasses the first gas refrigerant pipe to the second gas refrigerant pipe. The bypass circuit opening/closing means is provided in the bypass circuit and opens and closes the bypass circuit. The controller opens the bypass circuit opening/closing means before performing the refrigerant quantity judging operation.
- In this air conditioner, the refrigerant pipe comprises two gas pipe systems, and the switching mechanism switches between the first state (cooling state) and the second state (heating state). Thereby the air conditioner can be freely set to the cooling operation and the heating operation. With this air conditioner capable of performing a simultaneous cooling and heating operation, the refrigerant quantity judging operation is performed by, for example, setting all the rooms (all the utilization units) to the first state (cooling state) by the switching mechanism (cooing/heating selection unit). However, because the first gas refrigerant pipe (high pressure gas pipe) extending from the heat source unit to the switching mechanism will be in a shut-off state, the refrigerant condenses and accumulates in the pipe, which may increase the detection error.
- Therefore, in this present invention, the bypass circuit opening/closing means (bypass valve) that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided, and the bypass circuit opening/closing means (bypass valve) is set to an opened state during the refrigerant quantity judging operation, thereby reducing the pressure difference between the first gas refrigerant pipe and the second gas refrigerant pipe and preventing accumulation of liquid refrigerant in the first gas refrigerant pipe resulting from condensation. Thus, the refrigerant quantity judging operation with high accuracy can be achieved.
- An air conditioner according to a second aspect of the present invention is the air conditioner according to the first aspect of the present invention, wherein the bypass circuit opening/closing means is provided in the heat source unit.
- In this air conditioner, the bypass circuit opening/closing means is provided in the heat source unit. Accordingly, the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- An air conditioner according to a third aspect of the present invention is the air conditioner according to the first or second aspect of the present invention, further including a switching unit. The switching unit is a unit different from the heat source unit and the utilization unit. The switching unit includes the switching mechanism. The bypass circuit opening/closing means is provided in the switching unit.
- With this air conditioner, the bypass circuit opening/closing means is provided in the switching unit. The refrigerant hardly flows through the first gas refrigerant pipe when the bypass circuit opening/closing means is provided only in the heat source unit. Therefore, there is a possibility that the temperate of the gas refrigerant in the pipe may change because of the incoming heat from the outside air and thereby the density of the refrigerant may change, which may increase the detection error.
- Thus, in the present invention, the bypass circuit opening/closing means that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided in the switching unit. By using this bypass circuit opening/closing means together with the bypass circuit opening/closing means provided in the heat source unit, the low pressure gas refrigerant is caused to easily flow through the first gas refrigerant pipe. Therefore, it is possible to prevent the temperature of the gas refrigerant in the pipe from being changed by the incoming heat from the outside air and to reduce the detection error. In addition, the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Accordingly, it is possible to reduce the labors for construction and the cost.
- An air conditioner according to a fourth aspect of the present invention is the air conditioner according to any one of the first through third aspects of the present invention, further including a temperature detecting means. The temperature detecting means detects the refrigerant temperature in the first gas refrigerant pipe and outputs a refrigerant temperature detection value. The controller corrects the refrigerant quantity judged by the refrigerant quantity judging operation based on the refrigerant temperature detection value.
- In this air conditioner, the refrigerant does not easily flow through the first gas refrigerant pipe even after the first gas refrigerant pipe is bypassed to the second gas refrigerant pipe by the provision of the bypass circuit and the distribution of the refrigerant gas pressure in the pipe is equalized. Therefore, there is a possibility that the temperate of the gas refrigerant in the pipe may change because of the incoming heat from the outside air and thereby the density of the refrigerant may change, which may increase the detection error.
- Thus, in the present invention, the temperature detecting means is provided in the first gas refrigerant pipe, and the density of the refrigerant in the pipe is corrected by utilizing the refrigerant temperature detection value. Thereby it is possible to reduce the detection error. Thus, the refrigerant quantity judging operation with higher accuracy can be achieved.
- An air conditioner according to a fifth aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the temperature detecting means is provided in the switching unit.
- In this air conditioner, the temperature detecting means is mounted on the first gas refrigerant pipe in the switching unit. Therefore, the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- An air conditioner according to a sixth aspect of the present invention is the air conditioner according to the fourth or fifth aspect of the present invention, wherein the temperature detection device is provided in the heat source unit.
- In this air conditioner, the temperature detecting means is mounted on the first gas refrigerant pipe in the heat source unit. Therefore, the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost. In addition, by using this temperature detecting means together with the temperature detecting means provided in the switching unit in the fifth aspect of the present invention, it is possible to more accurately correct the density of the refrigerant in the pipe.
- In the air conditioner according to the first aspect of the present invention, the bypass circuit opening/closing means (bypass valve) that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided, and the bypass circuit opening/closing means is set to an opened state during the refrigerant quantity judging operation, thereby reducing the pressure difference between the first gas refrigerant pipe and the second gas refrigerant pipe and preventing accumulation of liquid refrigerant in the first gas refrigerant pipe resulting from condensation. Thus, the refrigerant quantity judging operation with high accuracy can be achieved.
- In the air conditioner according to the second aspect of the present invention, the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- In the air conditioner according to the third aspect of the present invention, the bypass circuit opening/closing means that bypasses the first gas refrigerant pipe to the second gas refrigerant pipe is provided in the switching unit, and the low pressure gas refrigerant is caused to easily flow through the first gas refrigerant pipe by using this bypass circuit opening/closing means together with the bypass circuit opening/closing means provided in the heat source unit. Accordingly, it is possible to prevent the temperature of the gas refrigerant in the pipe from being changed by the incoming heat from the outside air and to reduce the detection error. In addition, the bypass circuit can be provided in the refrigerant circuit even without laying pipes for the bypass circuit at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- With the air conditioner according to the fourth aspect of the present invention, the temperature detecting means is provided in the first gas refrigerant pipe, and the density of the refrigerant in the pipe is corrected by utilizing the refrigerant temperature detection value. Thereby it is possible to reduce the detection error. Thus, the refrigerant quantity judging operation with higher accuracy can be achieved.
- In the air conditioner according to the fifth aspect of the present invention, the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost.
- In the air conditioner according to the sixth aspect of the present invention, the temperature detecting means can be mounted on the first gas refrigerant pipe even without providing the temperature detecting means to the refrigerant communication pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost. In addition, by using this temperature detecting means together with the temperature detecting means provided in the switching unit in the fifth aspect of the present invention, it is possible to more accurately correct the density of the refrigerant in the pipe.
-
FIG. 1 is a schematic configuration view of an air conditioner according to an embodiment of the present invention. -
FIG. 2 is a control block diagram of the air conditioner. -
FIG. 3 is a flowchart of a test operation mode. -
FIG. 4 is a flowchart of an automatic refrigerant charging operation. -
FIG. 5 is a schematic diagram to show a state of the refrigerant flowing in a refrigerant circuit in a refrigerant quantity judging operation (illustrations of a four-way switching valve and the like are omitted). -
FIG. 6 is a flowchart of a pipe volume judging operation. -
FIG. 7 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a liquid refrigerant communication pipe. -
FIG. 8 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a gas refrigerant communication pipe. -
FIG. 9 is a flowchart of an initial refrigerant quantity detection operation. -
FIG. 10 is a flowchart of a refrigerant leak detection operation mode. -
- 1 Air conditioner
- 2 Outdoor unit (heat source unit)
- 21 Compressor (compression means)
- 22 Outdoor heat exchanger (heat source side heat exchanger)
- 27 First bypass refrigerant circuit (bypass circuit)
- 3 a to 3 c Indoor units (utilization units)
- 31 a to 31 c Indoor heat exchangers (utilization side heat exchangers)
- 4 a to 4 c Connection units (switching mechanism/switching units)
- 43 a to 43 c Third bypass refrigerant circuits (bypass circuits)
- 8 Controller
- V3 First bypass on/off valve (bypass circuit opening/closing means)
- V13 a to V13 c Second bypass on/off valves (bypass circuit opening/closing means)
- T8 First high pressure gas pipe temperature sensor (temperature detecting means)
- T12 a to T12 c Second high pressure gas pipe temperature sensors (temperature detecting means)
- In the following, an embodiment of an air conditioner according to the present invention is described based on the drawings.
-
FIG. 1 is a schematic configuration view of an air conditioner 1 according to an embodiment of the present invention. The air conditioner 1 is a device that is used to cool and heat a room in a building and the like by performing a vapor compression-type refrigeration cycle operation. The air conditioner 1 mainly includes oneoutdoor unit 2 as a heat source unit, a plurality (three in the present embodiment) ofindoor units 3 a to 3 c as utilization units connected in parallel to theoutdoor unit 2,connection units 4 a to 4 c provided respectively correspondingly to theindoor units 3 a to 3 c, a first refrigerantcommunication pipe group 5 that interconnects theoutdoor unit 2 and theconnection units 4 a to 4 c, and a second refrigerant communication pipe group 7 that interconnects theconnection units 4 a to 4 c and theindoor units 3 a to 3 c. The first refrigerantcommunication pipe group 5 is configured by a first liquidrefrigerant communication pipe 51, a high pressure gasrefrigerant communication pipe 52, and a low pressure gasrefrigerant communication pipe 53, and the second refrigerant communication pipe group 7 is configured by second liquidrefrigerant communication pipes 71 a to 71 c and second gas refrigerant communication pipes 72 a to 72 c. This air conditioner 1 is configured to be able to perform a simultaneous cooling and heating operation according to the demand of the air-conditioned space in a room, where theindoor units 3 a to 3 c are installed, for example, as in the case where a cooling operation is performed in one air-conditioned space and a heating operation is performed in another air conditioned-space or the like. In other words, the vapor compression-type refrigerant circuit 10 of the air conditioner 1 in the present embodiment is configured by the interconnection of theoutdoor unit 2, theindoor units 3 a to 3 c, theconnection units 4 a to 4 c, the first refrigerantcommunication pipe group 5, and the second refrigerant communication pipe group 7. - <Indoor Unit>
- The
indoor units 3 a to 3 c are installed by being embedded in or hung from a ceiling of a room in a building and the like or by being mounted or the like on a wall surface of a room. Theindoor units 3 a to 3 c are connected to theconnection units 4 a to 4 c via the second refrigerant communication pipe group 7, and configure a part of therefrigerant circuit 10. - Next, the configurations of the
indoor units 3 a to 3 c are described. Note that, because theindoor units indoor unit 3 a is described here, and in regard to the configurations of theindoor units indoor unit 3 a, and descriptions of those respective portions are omitted. For example, anindoor fan 32 a of theindoor unit 3 a corresponds toindoor fans indoor units - The
indoor unit 3 a mainly includes an indoor side refrigerant circuit 30 a that configures a part of therefrigerant circuit 10. The indoor side refrigerant circuit 30 a mainly includes an indoor expansion valve V9 a as an expansion mechanism and anindoor heat exchanger 31 a as a utilization side heat exchanger. - The indoor expansion valve V9 a is an electrically powered expansion valve connected to the liquid side of the
indoor heat exchanger 31 a in order to adjust the flow rate or the like of the refrigerant flowing in the indoor side refrigerant circuit 30 a. - The
indoor heat exchanger 31 a is a fin-and-tube type heat exchanger of a cross fin system configured by a heat transfer tube and numerous fins, and is a heat exchanger that functions as an evaporator for the refrigerant during the cooling operation to cool the indoor air and functions as a condenser for the refrigerant during the heating operation to heat the indoor air. - In addition, the
indoor unit 3 a includes theindoor fan 32 a as a ventilation fan for sucking indoor air into the unit, causing the air to heat exchange with the refrigerant in theindoor heat exchanger 31 a, and then supplying the air to the room as supply air. Theindoor fan 32 a is a fan capable of varying an air flow rate Wr of the air which is supplied to theindoor heat exchanger 31 a, and in the present embodiment, is a centrifugal fan, multi-blade fan, or the like, which is driven by amotor 33 a comprising a DC fan motor. - In addition, various sensors are disposed in the
indoor unit 3 a. A liquid side temperature sensor T9 a that detects the temperature of the refrigerant (i.e., the refrigerant temperature corresponding to a condensation temperature Tc during the heating operation or an evaporation temperature Te during the cooling operation) is disposed at the liquid side of theindoor heat exchanger 31 a. A gas side temperature sensor T10 a that detects a temperature Teo of the refrigerant is disposed at the gas side of theindoor heat exchanger 31 a. A room temperature sensor T11 a that detects the temperature of the indoor air that flows into the unit (i.e., a room temperature Tr) is disposed at the indoor air suction side of theindoor unit 3 a. In the present embodiment, the liquid side temperature sensor T9 a, the gas side temperature sensor T10 a, and the room temperature sensor T11 a comprise thermistors. In addition, theindoor unit 3 a includes anindoor side controller 34 a that controls the operation of each portion constituting theindoor unit 3 a. Additionally, theindoor side controller 34 a includes a microcomputer, a memory and the like disposed in order to control theindoor unit 3 a, and is configured such that it can exchange control signals and the like with a remote controller (not shown) for individually operating theindoor unit 3 a, exchange control signals and the like with theoutdoor unit 2 and theconnection units 4 a to 4 c via atransmission line 8 a, and the like. - <Outdoor Unit>
- The
outdoor unit 2 is installed outside of a building and the like, is connected to theconnection units 4 a to 4 c via the first refrigerantcommunication pipe group 5, configuring therefrigerant circuit 10. - Next, the configuration of the
outdoor unit 2 is described. Theoutdoor unit 2 mainly includes an outdoor siderefrigerant circuit 20 that configures a part of therefrigerant circuit 10. This outdoor siderefrigerant circuit 20 mainly includes acompressor 21, a four-way switching valve V1, anoutdoor heat exchanger 22 as a heat source side heat exchanger, an outdoor expansion valve V2 as an expansion mechanism, anaccumulator 23, asubcooler 24 as a temperature adjustment mechanism, a firstbypass refrigerant circuit 27, apressure reducing circuit 28, a liquid side stop valve V4, and a high pressure gas side stop valve V5, a low pressure gas side stop valve V6, and a first high pressure gas on/off valve V8. - The
compressor 21 is a compressor whose operation capacity can be varied, and in the present embodiment, is a positive displacement-type compressor driven by amotor 21 a whose rotation frequency Rm is controlled by an inverter. In the present embodiment, only onecompressor 21 is provided, but it is not limited thereto, and two or more compressors may be connected in parallel according to the number of connected units of indoor units and the like. - The four-way switching valve V1 is a valve provided for causing the
outdoor heat exchanger 22 to function as an evaporator and a condenser. The four-way switching valve V1 is connected to the refrigerant gas side of theoutdoor heat exchanger 22, theaccumulator 23 on the suction side of thecompressor 21, the discharge side of thecompressor 21, and thepressure reducing circuit 28. Additionally, when causing theoutdoor heat exchanger 22 to function as a condenser, the discharge side of thecompressor 21 is connected to the refrigerant gas side of theoutdoor heat exchanger 22, and theaccumulator 23 on the suction side of thecompressor 21 is connected to thepressure reducing circuit 28. On the other hand, when causing theoutdoor heat exchanger 22 to function as an evaporator, the refrigerant gas side of theoutdoor heat exchanger 22 is connected to theaccumulator 23 on the suction side of thecompressor 21, and the discharge side of thecompressor 21 is connected to thepressure reducing circuit 28. - The
outdoor heat exchanger 22 is a heat exchanger capable of functioning as an evaporator for the refrigerant and also as a condenser for the refrigerant. In this embodiment, it is a fin-and-tube type heat exchanger of a cross fin system that exchanges heat with the refrigerant using air as a heat source. The gas side of theoutdoor heat exchanger 22 is connected to the four-way switching valve V1, and the liquid side thereof is connected to the first liquidrefrigerant communication pipe 51. - The outdoor expansion valve V2 is an electrically powered expansion valve connected to the liquid side of the
outdoor heat exchanger 22 in order to adjust the pressure, flow rate, or the like of the refrigerant flowing in the outdoor siderefrigerant circuit 20. - In addition, the
outdoor unit 2 includes anoutdoor fan 25 as a ventilation fan for sucking outdoor air into the unit, causing the air to exchange heat with the refrigerant in theoutdoor heat exchanger 22, and then exhausting the air to the outside. Theoutdoor fan 25 is a fan capable of varying an air flow rate Wo of the air which is supplied to theoutdoor heat exchanger 22, and in the present embodiment, is a propeller fan or the like driven by amotor 25 a comprising a DC fan motor. - The
accumulator 23 is connected between the four-way switching valve V1 and thecompressor 21, and is a container capable of accumulating excess refrigerant generated in therefrigerant circuit 10 in accordance with the change in the operation load of theindoor units 3 a to 3 c and the like. In addition, theaccumulator 23 is connected to theconnection units 4 a to 4 c via the low pressure gas side stop valve V6 and the low pressure gasrefrigerant communication pipe 53. - In the present embodiment, the
subcooler 24 is a double tube heat exchanger, and is disposed to cool the refrigerant sent to the indoor expansion valves V9 a to V9 c after the refrigerant is condensed in theoutdoor heat exchanger 22. Thesubcooler 24 is connected between the outdoor expansion valve V2 and the liquid side stop valve V4. - In addition, a second
bypass refrigerant circuit 6 as a cooling source of thesubcooler 24 is disposed. Note that, in the description below, a portion corresponding to therefrigerant circuit 10 excluding the secondbypass refrigerant circuit 6 is referred to as a main refrigerant circuit for convenience sake. - The second
bypass refrigerant circuit 6 is connected to the main refrigerant circuit so as to cause a portion of the refrigerant sent from theoutdoor heat exchanger 22 to the indoor expansion valves V9 a to V9 c via theconnection units 4 a to 4 c to branch from the main refrigerant circuit and return to the suction side of thecompressor 21. Specifically, the secondbypass refrigerant circuit 6 includes abranch circuit 61 connected so as to branch a portion of the refrigerant sent from the outdoor expansion valve V2 to the indoor expansion valves V9 a to V9 c via theconnection units 4 a to 4 c at a position between theoutdoor heat exchanger 22 and thesubcooler 24, and a mergingcircuit 62 connected to the suction side of thecompressor 21 so as to return a portion of refrigerant from an outlet on the secondbypass refrigerant circuit 6 side of thesubcooler 24 to the suction side of thecompressor 21. Further, thebranch circuit 61 is disposed with a bypass expansion valve V7 for adjusting the flow rate of the refrigerant flowing in the secondbypass refrigerant circuit 6. Here, the bypass expansion valve V7 comprises an electrically operated expansion valve. In this way, the refrigerant sent from theoutdoor heat exchanger 22 to the indoor expansion valves V9 a to V9 c via theconnection units 4 a to 4 c is cooled in thesubcooler 24 by the refrigerant flowing in the secondbypass refrigerant circuit 6 which has been depressurized by the bypass expansion valve V7. In other words, performance of thesubcooler 24 is controlled by adjusting the opening degree of the bypass expansion valve V7. - The first
bypass refrigerant circuit 27 is a circuit that bypasses the pipe between the high pressure gas side stop valve V5 and the discharge side of thecompressor 21 to the pipe between the low pressure gas side stop valve V6 and theaccumulator 23. A first bypass on/off valve V3 is provided in the firstbypass refrigerant circuit 27. Here, the first bypass on/off valve V3 is a solenoid valve capable of distributing and blocking the refrigerant. - The
pressure reducing circuit 28 includes a capillary tube C1 and is connected to the four-way switching valve V1 and theaccumulator 23. - The liquid side stop valve V4, the high pressure gas side stop valve V5, and the low pressure gas side stop valve V6 are valves disposed at ports connected to external equipment and pipes (specifically, the first liquid
refrigerant communication pipe 51, the high pressure gasrefrigerant communication pipe 52, and the low pressure gas refrigerant communication pipe 53). The liquid side stop valve V4 is connected to theoutdoor heat exchanger 22 via thesubcooler 24 and the outdoor expansion valve V2. The high pressure gas side stop valve V5 is connected to the discharge side of thecompressor 21. The low pressure gas side stop valve V6 is connected to the suction side of thecompressor 21 via theaccumulator 23. - The first high pressure gas on/off valve V8 is provided on the pipe on the high pressure gas side which is branched from the discharge side of the
compressor 21, and is a solenoid valve capable of distributing and blocking the high pressure gas refrigerant through the high pressure gasrefrigerant communication pipe 52. - In addition, various sensors are disposed in the
outdoor unit 2. Specifically, disposed in theoutdoor unit 2 are a suction pressure sensor P1 that detects a suction pressure Ps of thecompressor 21, a discharge pressure sensor P2 that detects a discharge pressure Pd of thecompressor 21, a suction temperature sensor T1 that detects a suction temperature Ts of thecompressor 21, and a discharge temperature sensor T2 that detects a discharge temperature Td of thecompressor 21. The suction temperature sensor T1 is disposed at a position between theaccumulator 23 and thecompressor 21. Theoutdoor heat exchanger 22 is provided with a heat exchanger temperature sensor T3 that detects the temperature of the refrigerant flowing through the outdoor heat exchanger 22 (i.e., the refrigerant temperature corresponding to the condensation temperature Tc during the cooling operation or the evaporation temperature Te during the heating operation). A liquid side temperature sensor T4 that detects a refrigerant temperature Tco is disposed at the liquid side of theoutdoor heat exchanger 22. A liquid pipe temperature sensor T5 that detects the temperature of the refrigerant (i.e., a liquid pipe temperature Tlp) is disposed at the outlet on the main refrigerant circuit side of thesubcooler 24. An outdoor temperature sensor T6 that detects the temperature of the outdoor air that flows into the unit (i.e., an outdoor temperature Ta) is disposed at the outdoor air suction side of theoutdoor unit 2. The mergingcircuit 62 of the secondbypass refrigerant circuit 6 is disposed with a bypass temperature sensor T7 for detecting the refrigerant temperature flowing at the outlet on the secondbypass refrigerant circuit 6 side of thesubcooler 24. A first high pressure gas pipe temperature sensor T8 that detects the temperature of the refrigerant (i.e., a first high pressure gas pipe temperature Th1) is provided to the high pressure gas pipe extending from the high pressure gas side stop valve V5 to the first high pressure gas on/off valve V8. In the present embodiment, the suction temperature sensor T1, the discharge temperature sensor T2, the heat exchanger temperature sensor T3, the liquid side temperature sensor T4, the liquid pipe temperature sensor T5, the outdoor temperature sensor T6, the bypass temperature sensor T7, and the first high pressure gas pipe temperature sensor T8 comprise thermistors. - In addition, the
outdoor unit 2 includes anoutdoor side controller 26 that controls the operation of each portion constituting theoutdoor unit 2. Additionally, theoutdoor side controller 26 includes a microcomputer and a memory disposed in order to control theoutdoor unit 2, an inverter circuit that controls themotor 21 a, and the like, and is configured such that it can exchange control signals and the like with theindoor side controllers 34 a to 34 c of theindoor units 3 a to 3 c andconnection side controllers 44 a to 44 c of theconnection units 4 a to 4 c (described later) via thetransmission line 8 a. In other words, acontroller 8 that performs the operation control of the entire air conditioner 1 is configured by theindoor side controllers 34 a to 34 c, theconnection side controllers 44 a to 44 c, theoutdoor side controller 26, and thetransmission line 8 a that interconnects each of these controllers. - As shown in
FIG. 2 , thecontroller 8 is connected so as to be able to receive detection signals of various sensors P1, P2, T1 to T8, T9 a to T9 c, T10 a to T10 c, T11 a to T11 c, T12 a to T12 c and also to be able to control various equipment andvalves warning display 9 comprising LEDs and the like, which is configured to indicate that a refrigerant leak is detected in the below described refrigerant leak detection operation, is connected to thecontroller 8. Here,FIG. 2 is a control block diagram of the air conditioner 1. - <Connection Unit>
- The
connection units 4 a to 4 c are installed with theindoor units 3 a to 3 c in the room of a building or the like. Theconnection units 4 a to 4 c are interposed, together with the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7, between theindoor units 3 a to 3 c and theoutdoor unit 2, and configure a part of therefrigerant circuit 10. - Next, the configurations of the
connection units 4 a to 4 c are described. Note that, because theconnection units connection unit 4 a is described here, and in regard to the configurations of theconnection units connection unit 4 a, and descriptions of those respective portions are omitted. For example, a subcooler 41 a of theconnection unit 4 a corresponds to subcoolers 41 b and 41 c of theconnection units - The
connection unit 4 a configures a part of therefrigerant circuit 10 and is provided with a connection siderefrigerant circuit 40 a. The connection siderefrigerant circuit 40 a mainly includes the subcooler 41 a, apressure reducing circuit 42 a, a thirdbypass refrigerant circuit 43 a, the low pressure gas on/off valve V10 a, and the second high pressure gas on/off valve V11 a. - The
subcooler 41 a is a device in which a portion of the liquid refrigerant to be returned to the first liquidrefrigerant communication pipe 51 is sent to the subcooler 41 a via thepressure reducing circuit 42 a (described later) so as to subcool the liquid refrigerant to be returned to the first liquidrefrigerant communication pipe 51 when theindoor units 3 a to 3 c perform the simultaneous cooling and heating operation. A portion of the liquid refrigerant introduced into the subcooler 41 a evaporates as a result of heat exchange, and is returned to the outdoor siderefrigerant circuit 20 through the low pressure gasrefrigerant communication pipe 53. Thepressure reducing circuit 42 a has a pressure reducing circuit on/off valve V12 a and a capillary tube C2 a which are connected in series. - The third
bypass refrigerant circuit 43 a is a circuit that bypasses the high pressure gasrefrigerant communication pipe 52 to the low pressure gasrefrigerant communication pipe 53. A second bypass on/off valve V13 a is provided in the thirdbypass refrigerant circuit 43 a. Here, the second bypass on/off valve V13 a is a solenoid valve capable of distributing and blocking the refrigerant. - The low pressure gas on/off valve V10 a is connected to the low pressure gas
refrigerant communication pipe 53, and is a solenoid valve capable of distributing and blocking the refrigerant. - The second high pressure gas on/off valve V11 a is connected to the high pressure gas
refrigerant communication pipe 52, and is a solenoid valve capable of distributing and blocking the refrigerant. - The
connection unit 4 a sets the low pressure gas on/off valve V10 a to an opened state and closes the second high pressure gas on/off valve V11 a when theindoor unit 3 a performs the cooling operation. Accordingly, theconnection unit 4 a can function to send the liquid refrigerant that flows in from the first liquidrefrigerant communication pipe 51 to the indoor expansion valve V9 a of the indoor side refrigerant circuit 30 a and to return the gas refrigerant that is depressurized in the indoor expansion valve V9 a and evaporated in theindoor heat exchanger 31 a to the low pressure gasrefrigerant communication pipe 53. - In addition, the
connection unit 4 a closes the low pressure gas on/off valve V10 a and sets the second high pressure gas on/off valve V11 a to an opened state when theindoor unit 3 a performs the heating operation. Accordingly, theconnection unit 4 a can function to send the high pressure gas refrigerant that flows in from the high pressure gasrefrigerant communication pipe 52 to the gas side of theindoor heat exchanger 31 a in the indoor side refrigerant circuit 30 a and to return the liquid refrigerant condensed in theindoor heat exchanger 31 a to the first liquidrefrigerant communication pipe 51. - In addition, the
connection unit 4 a is provided with a second high pressure gas pipe temperature sensor T12 a that detects the temperature of the refrigerant (i.e., a second high pressure gas pipe temperature Th2) in the high pressure gas refrigerant flow path. In the present embodiment, the second high pressure gas pipe temperature sensor T12 a comprises a thermistor. - Further, the
connection unit 4 a includes aconnection side controller 44 a that controls the operation of each portion constituting theconnection unit 4 a. Additionally, theconnection side controller 44 a includes a microcomputer and a memory disposed in order to control theindoor unit 4 a, and is configured such that it can exchange control signals and the like with theindoor side controller 34 a of theindoor unit 3 a. - As described above, the outdoor side
refrigerant circuit 20 is connected to the indoor side refrigerant circuits 30 a to 30 c via the connection siderefrigerant circuits 40 a to 40 c, and thereby therefrigerant circuit 10 of the air conditioner 1 is configured. Additionally, the air conditioner 1 in the present embodiment can performs the so-called simultaneous cooling and heating operation where, for example, theindoor unit 3 c performs the heating operation while theindoor units - <First Refrigerant Communication Pipe Group and Second Refrigerant Communication Pipe Group>
- The first refrigerant
communication pipe group 5 and the second refrigerant communication pipe group 7 are refrigerant pipes that are arranged on site when installing the air conditioner 1 at an installation location such as a building and the like. Pipes having various lengths and pipe diameters are used according to the installation conditions such as an installation location, combination of an outdoor unit, an indoor unit, and a connection unit, and the like. Accordingly, for example, when installing a new air conditioner 1, in order to calculate the charging quantity of the refrigerant, it is necessary to obtain accurate information regarding the lengths and pipe diameters and the like of the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7. However, management of such information and the calculation itself of the refrigerant quantity are difficult. In addition, when utilizing an existing pipe to renew an indoor unit, an outdoor unit, or a connection unit, there is a case where information regarding the lengths and pipe diameters and the like of the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7 has been lost. - As described above, the
refrigerant circuit 10 of the air conditioner 1 is configured by the interconnection of the indoor side refrigerant circuits 30 a to 30 c, the outdoor siderefrigerant circuit 20, the connection siderefrigerant circuits 40 a to 40 c, the first refrigerantcommunication pipe group 5, and the second refrigerant communication pipe group 7. In addition, it can also be said that thisrefrigerant circuit 10 is configured by the secondbypass refrigerant circuit 6 and the main refrigerant circuit excluding the secondbypass refrigerant circuit 6. Additionally, thecontroller 8 constituted by theindoor side controllers 34 a to 34 c, theconnection side controllers 44 a to 44 c, and theoutdoor side controller 26 allows the air conditioner 1 in the present embodiment to operate the cooling operation, the heating operation, and the simultaneous cooling and heating operation by switching thereamong by the four-way switching valve V1 and the first high pressure on/off valve V8 in theoutdoor unit 2 and the low pressure gas on/off valve V10 a and the second high pressure gas on/off valve V11 a in theconnection units 4 a to 4 c, and also to control each equipment of theoutdoor unit 2, theindoor units 3 a to 3 c, and theconnection units 4 a to 4 c according to the operation load of each of theindoor units 3 a to 3 c. - Next, the operation of the air conditioner 1 in the present embodiment is described.
- The operation modes of the air conditioner 1 in the present embodiment include: a normal operation mode where control of constituent equipment of the
outdoor unit 2, theindoor units 3 a to 3 c, and theconnection units 4 a to 4 c is performed according to the operation load of each of theindoor units 3 a to 3 c; a test operation mode where a test operation to be performed after installation of constituent equipment of the air conditioner 1 is performed (specifically, it is not limited to after the first-time installation of equipment: it also includes, for example, after modification by adding or removing constituent equipment such as an indoor unit, after repair of damaged equipment, and the like); and a refrigerant leak detection operation mode where, after the test operation is finished and the normal operation has started, whether or not the refrigerant is leaking from therefrigerant circuit 10 is judged. - The normal operation mode mainly includes the following operations according to the cooling and heating load of the
indoor units 3 a to 3 c: the cooling operation where all theindoor units 3 a to 3 c perform cooling; the heating operation where all theindoor units 3 a to 3 c perform heating; and the simultaneous cooling and heating operation where one or some of theindoor units 3 a to 3 c perform cooling and the other indoor unit(s) performs heating. In addition, according to the air-conditioning load of the entireindoor units 3 a to 3 c, the simultaneous cooling and heating operation can be divided into a case where the operation is performed by causing theoutdoor heat exchanger 22 of theoutdoor unit 2 to function as an evaporator (evaporation operation state), and a case where the operation is performed by causing theoutdoor heat exchanger 22 of theoutdoor unit 2 to function as a condenser (condensation operation state). Note that, the simultaneous cooling and heating operation described here specifically refers to, for example, an operation where theindoor unit 3 a performs the cooling operation and the otherindoor units - In addition, the test operation mode mainly includes an automatic refrigerant charging operation to charge refrigerant into the
refrigerant circuit 10; a pipe volume judging operation to detect the volumes of the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7; and an initial refrigerant quantity detection operation to detect the initial refrigerant quantity after installing constituent equipment or after charging refrigerant into therefrigerant circuit 10. - Operation in each operation mode of the air conditioner 1 is described below.
- <Normal Operation Mode>
- (Cooling Operation)
- First, the cooling operation in the normal operation mode is described with reference to
FIGS. 1 and 2 . - During the cooling operation, in the outdoor side
refrigerant circuit 20 of theoutdoor unit 2, the four-way switching valve V1 is switched to a state indicated by solid lines inFIG. 1 , and thereby theoutdoor heat exchanger 22 is caused to function as a condenser. The outdoor expansion valve V2 is in a fully opened state. The liquid side stop valve V4, the high pressure gas side stop valve V5, and the low pressure gas side stop valve V6 are set to an opened state, and the first high pressure gas on/off valve V8 is set to a closed state. - In the
indoor units 3 a to 3 c, the opening degree of each of the indoor expansion valves V9 a to V9 c is adjusted such that a superheating degree SHr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c (i.e., the gas sides of theindoor heat exchangers 31 a to 31 c) becomes constant at a target superheating degree SHrs. In the present embodiment, the superheating degree SHr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c is detected by subtracting the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors T9 a to T9 c from the refrigerant temperature detected by the gas side temperature sensors T10 a to T10 c, or is detected by converting the suction pressure Ps of thecompressor 21 detected by the suction pressure sensor P1 to saturation temperature corresponding to the evaporation temperature Te, and subtracting this saturation temperature of the refrigerant from the refrigerant temperature detected by the gas side temperature sensors T10 a to T10 c. Note that, although it is not employed in the present embodiment, a temperature sensor that detects the temperature of the refrigerant flowing through each of theindoor heat exchangers 31 a to 31 c may be disposed such that the superheating degree SHr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c is detected by subtracting the refrigerant temperature corresponding to the evaporation temperature Te which is detected by this temperature sensor from the refrigerant temperature detected by the gas side temperature sensors T10 a to T10 c. - In addition, the opening degree of the bypass expansion valve V7 is adjusted such that a superheating degree SHb of the refrigerant at the outlet on the second
bypass refrigerant circuit 6 side of thesubcooler 24 becomes a target superheating degree SHbs. In the present embodiment, the superheating degree SHb of the refrigerant at the outlet on the secondbypass refrigerant circuit 6 side of thesubcooler 24 is detected by converting the suction pressure Ps of thecompressor 21 detected by the suction pressure sensor P1 to saturation temperature corresponding to the evaporation temperature Te, and subtracting this saturation temperature of the refrigerant from the refrigerant temperature detected by the bypass temperature sensor T7. Note that, although it is not employed in the present embodiment, a temperature sensor may be disposed at an inlet on the secondbypass refrigerant circuit 6 side of thesubcooler 24 such that the superheating degree SHb of the refrigerant at the outlet on the secondbypass refrigerant circuit 6 side of thesubcooler 24 is detected by subtracting the refrigerant temperature detected by this temperature sensor from the refrigerant temperature detected by the bypass temperature sensor T7. - In the
connection units 4 a to 4 c, the second high pressure gas on/off valves V11 a to V11 c are closed, and at the same time, the low pressure gas on/off valves V10 a to V10 c are opened. Thereby, theindoor heat exchangers 31 a to 31 c of theindoor units 3 a to 3 c function as evaporators, and at the same time, a state is achieved where theindoor heat exchangers 31 a to 31 c of theindoor units 3 a to 3 c are connected to the suction side of thecompressor 21 of theoutdoor unit 2 via the low presser gasrefrigerant communication pipe 53. In addition, the pressure reducing circuit on/off valves V12 a to V12 c are in a closed state. - When the
compressor 21, theoutdoor fan 25, and theindoor fans 32 a to 32 c are started in this state of therefrigerant circuit 10, the low pressure gas refrigerant is sucked into thecompressor 21 and compressed into high pressure gas refrigerant. Subsequently, the high pressure gas refrigerant is sent to theoutdoor heat exchanger 22 via the four-way switching valve V1, exchanges heat with the outdoor air supplied by theoutdoor fan 25, and becomes condensed into high pressure liquid refrigerant. Then, this high pressure liquid refrigerant passes through the outdoor expansion valve V2, flows into thesubcooler 24, exchanges heat with the refrigerant flowing in the secondbypass refrigerant circuit 6, is further cooled, and becomes subcooled. At this time, a portion of the high pressure liquid refrigerant condensed in theoutdoor heat exchanger 22 is branched into the secondbypass refrigerant circuit 6 and is depressurized by the bypass expansion valve V7. Subsequently, it is returned to the suction side of thecompressor 21. Here, the refrigerant that passes through the bypass expansion valve V7 is depressurized close to the suction pressure Ps of thecompressor 21 and thereby a portion of the refrigerant evaporates. Then, the refrigerant flowing from the outlet of the bypass expansion valve V7 of the secondbypass refrigerant circuit 6 toward the suction side of thecompressor 21 passes through thesubcooler 24 and exchanges heat with high pressure liquid refrigerant sent from theoutdoor heat exchanger 22 on the main refrigerant circuit side to theindoor units 3 a to 3 c. - Then, the high pressure liquid refrigerant in a subcooled state is sent to the
indoor units 3 a to 3 c via the liquid side stop valve V4, the first liquidrefrigerant communication pipe 51, and eachconnection units 4 a to 4 c. The high pressure liquid refrigerant sent to theindoor units 3 a to 3 c is depressurized close to the suction pressure Ps of thecompressor 21 by the indoor expansion valves V9 a to V9 c, becomes refrigerant in a low pressure gas-liquid two-phase state, is sent to theindoor heat exchangers 31 a to 31 c, exchanges heat with the indoor air in theindoor heat exchangers 31 a to 31 c, and is evaporated into low pressure gas refrigerant. - Then, the low pressure gas refrigerant is sent to the low pressure gas
refrigerant communication pipe 53 through the low pressure gas on/off valves V10 a to V10 c of theconnection units 4 a to 4 c. This low pressure gas refrigerant is sent to theoutdoor unit 2 via the low pressure gasrefrigerant communication pipe 53, and flows into theaccumulator 23 via the low pressure gas side stop valve V6. Then, the low pressure gas refrigerant that flowed into theaccumulator 23 is again sucked into thecompressor 21. - (Heating Operation)
- During the heating operation, in the outdoor side
refrigerant circuit 20 of theoutdoor unit 2, the four-way switching valve V1 is switched to a state indicated by dotted lines inFIG. 1 , and thereby theoutdoor heat exchanger 22 functions as an evaporator. At the same time, the high pressure gas refrigerant compressed in and discharged from thecompressor 21 is supplied to theindoor units 3 a to 3 c through the high pressure gasrefrigerant communication pipe 52. The opening degree of the outdoor expansion valve V2 is adjusted so as to be able to depressurize the refrigerant that flows into theoutdoor heat exchanger 22 to a pressure where the refrigerant can be evaporated (i.e., an evaporation pressure Pe) in theoutdoor heat exchanger 22. The liquid side stop valve V4, the high pressure gas side stop valve V5, and the low pressure gas side stop valve V6 are in an opened state, and the bypass expansion valve V7 and the first high pressure gas on/off valve V8 are in an opened state. - In the
indoor units 3 a to 3 c, the opening degree of each of the indoor expansion valves V9 a to V9 c is adjusted such that a subcooling degree SCr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c (i.e., the liquid sides of theindoor heat exchangers 31 a to 31 c) becomes constant at a target subcooling degree SCrs. In the present embodiment, the subcooling degree SCr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c is detected by converting the discharge pressure Pd of thecompressor 21 detected by the discharge pressure sensor P2 to saturation temperature corresponding to the condensation temperature Tc, and by subtracting the refrigerant temperature detected by the liquid side temperature sensors T9 a to T9 c from the refrigerant saturation temperature. Note that, although it is not employed in the present embodiment, a temperature sensor that detects the temperature of the refrigerant flowing through each of theindoor heat exchangers 31 a to 31 c may be disposed such that the subcooling degree SCr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c is detected by subtracting the refrigerant temperature corresponding to the condensation temperature Tc which is detected by this temperature sensor from the refrigerant temperature detected by the liquid side temperature sensors T9 a to T9 c. - In the
connection units 4 a to 4 c, as the low pressure gas on/off valve V10 a to V10 c are closed and the second high pressure gas on/off valves V11 a to V11 c are opened at the same time, theindoor heat exchangers 31 a to 31 c of theindoor units 3 a to 3 c are brought into a state where they function as condensers. In addition, the pressure reducing circuit on/off valves V12 a to V12 c are in an opened state. - When the
compressor 21, theoutdoor fan 25, and theindoor fans 32 a to 32 c are started in this state of therefrigerant circuit 10, the low pressure gas refrigerant is sucked into thecompressor 21 and compressed into high pressure gas refrigerant. Then, this high pressure gas refrigerant is sent to the high pressure gasrefrigerant communication pipe 52 via the four-way switching valve V1 and the high pressure gas side stop valve V5. - Then, the high pressure gas refrigerant sent to the high pressure gas
refrigerant communication pipe 52 is sent to each of theconnection units 4 a to 4 c. The high pressure gas refrigerant sent to theconnection units 4 a to 4 c is sent to theindoor units 3 a to 3 a through the second high pressure gas on/off valves V11 a to V11 c. The high pressure gas refrigerant sent to theindoor units 3 a to 3 c exchanges heat with the indoor air in theindoor heat exchangers 31 a to 31 c and is condensed into high pressure liquid refrigerant. Subsequently, it is depressurized according to the opening degree of the indoor expansion valves V9 a to V9 c when passing through the indoor expansion valves V9 a to V9 c. - Then, the refrigerant that passed through the indoor expansion valves V9 a to V9 c is sent to the subcoolers 41 a to 41 c of the
connection units 4 a to 4 c. This subcooled liquid refrigerant is sent to theoutdoor unit 2 via the first liquidrefrigerant communication pipe 51, is further depressurized via the liquid side stop valve V4 and the outdoor expansion valve V2, and then flows into theoutdoor heat exchanger 22. Then, the refrigerant in a low pressure gas-liquid two-phase state that flowed into theoutdoor heat exchanger 22 exchanges heat with the outdoor air supplied by theoutdoor fan 25, is evaporated into low pressure gas refrigerant, and flows into theaccumulator 23 via the four-way switching valve V1. Then, the low pressure gas refrigerant that flowed into theaccumulator 23 is again sucked into thecompressor 21. - (Simultaneous Cooling and Heating Operation/Evaporation Load)
- An operation (evaporation operation) is described which is the simultaneous cooling and heating operation where, for example, among the
indoor units 3 a to 3 c, theindoor unit 3 a performs the cooling operation and at the same time theindoor units outdoor heat exchanger 22 of theoutdoor unit 2 is caused to function as an evaporator according to the air conditioning load of the entireindoor units 3 a to 3 c. At this time, as is the case with the above described heating operation mode, the four-way switching valve V1 is switched to a state indicated by dotted lines inFIG. 1 . Thereby theoutdoor heat exchanger 22 functions as an evaporator and also the high pressure gas refrigerant compressed in and discharged from thecompressor 21 is supplied to the twoindoor units refrigerant communication pipe 52. At this time, the bypass expansion valve V7 is closed, and the first high pressure gas on/off valve V8 is set to an opened state. - In the
indoor unit 3 a, the opening degree of the indoor expansion valve V9 a is adjusted according to the cooling load of theindoor unit 3 a. For example, adjustment of the opening degree is performed based on the superheating degree of theindoor heat exchanger 31 a (specifically, the temperature difference between the refrigerant temperature detected by the liquid side temperature sensor T9 a and the refrigerant temperature detected by the gas side temperature sensor T10 a). - In the
connection unit 4 a, the second high pressure gas on/off valve V 11 a is closed and at the same time the low pressure gas on/off valve V10 a is opened. Accordingly, theindoor heat exchanger 31 a of theindoor unit 3 a is caused to function as an evaporator and at the same time a state is achieved where theindoor heat exchanger 31 a of theindoor unit 3 a is connected to the suction side of thecompressor 21 of theoutdoor unit 2 via the low pressure gasrefrigerant communication pipe 53. In addition, the pressure reducing circuit on/off valve V12 a is in a closed state. - In addition, in the
indoor units indoor heat exchangers indoor heat exchangers - In the
connection units indoor heat exchangers indoor units - In this state of the
refrigerant circuit 10, the high pressure gas refrigerant compressed in and discharged from thecompressor 21 is sent to the high pressure gasrefrigerant communication pipe 52 through the high pressure gas side stop valve V5. - Then, the high pressure gas refrigerant sent to the high pressure gas
refrigerant communication pipe 52 is sent to each of theindoor units connection units indoor units indoor heat exchangers - The refrigerant that passed through the indoor expansion valves V9 b and V9 c is sent to the
subcoolers connection units refrigerant communication pipe 51, and a portion of the liquid refrigerant sent to the first liquidrefrigerant communication pipe 51 is sent to theconnection unit 4 a. Then, the refrigerant sent to theconnection unit 4 a is sent to the indoor expansion valve V9 a of theindoor unit 3 a. - The refrigerant sent to the indoor expansion valve V9 a is depressurized by the indoor expansion valve V9 a. Thereafter, the refrigerant exchanges heat with the indoor air in the
indoor heat exchangers 31 a and is thereby evaporated into low pressure gas refrigerant. On the other hand, the indoor air is cooled and supplied to the room. Then, the low pressure gas refrigerant is sent to theconnection unit 4 a. - The low pressure gas refrigerant sent to the
connection unit 4 a is sent to theoutdoor unit 2 through the low pressure gas on/off valve V10 a and the low pressure gasrefrigerant communication pipe 53, and flows into theaccumulator 23 via the low pressure gas side stop valve V6. Then, the low pressure gas refrigerant that flowed into theaccumulator 23 is again sucked into thecompressor 21. - On the other hand, the remaining portion of the refrigerant from which the refrigerant sent from the first liquid
refrigerant communication pipe 51 to theconnection unit 4 a and theindoor unit 3 a is excluded is sent to theoutdoor heat exchanger 22 via the liquid side stop valve V4 of theoutdoor unit 2, is evaporated in theoutdoor heat exchanger 22, and becomes low pressure gas refrigerant. This gas refrigerant is sucked into thecompressor 21 via the four-way switching valve V1 and theaccumulator 23. - (Simultaneous Cooling and Heating Operation/Condensation Load)
- An operation (condensation operation) is described which is the simultaneous cooling and heating operation mode where, for example, among the
indoor units 3 a to 3 c, theindoor unit indoor unit 3 c performs the heating operation, and in which theoutdoor heat exchanger 22 of theoutdoor unit 2 is caused to function as a condenser according to the air conditioning load of the entireindoor units 3 a to 3 c. At this time, the four-way switching valve V1 is switched to a state indicated by solid lines inFIG. 1 . Thereby theoutdoor heat exchanger 22 functions as a condenser and also the high pressure gas refrigerant compressed in and discharged from thecompressor 21 is supplied to theindoor unit 3 c through the high pressure gasrefrigerant communication pipe 52. At this time, the first high pressure gas on/off valve V8 is set to an opened state. - In the
indoor units indoor units indoor heat exchangers - In the
connection units indoor heat exchangers indoor units indoor heat exchangers indoor units compressor 21 of theoutdoor unit 2 via the low pressure gasrefrigerant communication pipe 53. In addition, the pressure reducing circuit on/off valves V12 a and V12 b are in a closed state. - In the
indoor unit 3 c, the opening degree of the indoor expansion valve V9 c is adjusted according to the heating load of theindoor unit 3 c. For example, adjustment of the opening degree is performed based on the subcooling degree of theindoor heat exchanger 31 c (specifically, the temperature difference between the refrigerant temperature detected by the liquid side temperature sensor T9 c and the refrigerant temperature detected by the gas side temperature sensor T10 c). - In the
connection unit 4 c, the low pressure gas on/off valve V10 c is closed and at the same time the second high pressure gas on/off valve V11 c is opened. Accordingly, a state is achieved where theindoor heat exchanger 31 c of theindoor unit 3 c functions as a condenser. In addition, the pressure reducing circuit on/off valve V12 c is in an opened state. - In such a state of the
refrigerant circuit 10, the high pressure gas refrigerant compressed in and discharged from thecompressor 21 is sent to theoutdoor heat exchanger 22 through the four-way switching valve V1 and is also sent to the high pressure gasrefrigerant communication pipe 52 through the high pressure gas side stop valve V5. - The high pressure gas refrigerant sent to the
outdoor heat exchanger 22 is condensed in theoutdoor heat exchanger 22 and becomes liquid refrigerant. Then, the liquid refrigerant is sent to the first liquidrefrigerant communication pipe 51 through the liquid side stop valve V4. - In addition, the high pressure gas refrigerant sent to the high pressure gas
refrigerant communication pipe 52 is sent to theconnection unit 4 c. The high pressure gas refrigerant sent to theconnection unit 4 c is sent to theindoor heat exchanger 31 c of theindoor unit 3 c through the second high pressure gas on/off valve V11 c. - The high pressure gas refrigerant sent to the
indoor heat exchanger 31 c exchanges heat with the indoor air in theindoor heat exchanger 31 c of theindoor unit 3 c and thereby is condensed. On the other hand, the indoor air is heated and supplied to the room. The refrigerant condensed in theindoor heat exchanger 31 c passes through the indoor expansion valve V9 c and then is sent to theconnection unit 4 c. - The refrigerant sent to the
connection unit 4 c is sent to the first liquidrefrigerant communication pipe 51, and mergers with the refrigerant that is sent to the first liquidrefrigerant communication pipe 51 through the liquid side stop valve V4. The refrigerant that flows through the first liquidrefrigerant communication pipe 51 is sent to the indoor expansion valves V9 a and V9 b of theindoor units connection units - The refrigerant sent to the indoor expansion valves V9 a and V9 b is depressurized by the indoor expansion valves V9 a and V9 b. Then, the refrigerant evaporates as a result of heat exchange with the indoor air in the
indoor heat exchangers connection units - The low pressure gas refrigerant sent to the
connection units refrigerant communication pipe 53 through the low pressure gas on/off valves V10 a and V10 b. The low pressure gas refrigerant sent to the low pressure gasrefrigerant communication pipe 53 is sucked into thecompressor 21 via the low pressure gas side stop valve V6 and theaccumulator 23. - Such operation control as described above in the normal operation mode is performed by the controller 8 (more specifically, the
indoor side controllers 34 a to 34 c, theconnection side controllers 44 a to 44 c, theoutdoor side controller 26, and thetransmission line 8 a that interconnects each of thecontrollers 34 a to 34 c, 44 a to 44 c, and 26) that functions as a normal operation controlling means to perform the normal operation that includes the cooling operation and the heating operation. - <Test Operation Mode>
- Next, the test operation mode is described with reference to
FIGS. 1 to 3 . Here,FIG. 3 is a flowchart of the test operation mode. In the present embodiment, in the test operation mode, first, the automatic refrigerant charging operation in Step S1 is performed. Subsequently, the pipe volume judging operation in Step S2 is performed, and then the initial refrigerant quantity detection operation in Step S3 is performed. - In the present embodiment, an example of a case is described where the
outdoor unit 2 into which the refrigerant is charged in advance, theindoor units 3 a to 3 c, and theconnection units 4 a to 4 c are installed at an installation location such as a building and the like and interconnected via the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7 to configure therefrigerant circuit 10; and subsequently additional refrigerant is charged into therefrigerant circuit 10 whose refrigerant quantity is insufficient according to the volumes of the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7. - (Step S1: Automatic Refrigerant Charging Operation)
- First, the liquid side stop valve V4, the high pressure gas side stop valve V5, and the low pressure gas side stop valve V6 of the
outdoor unit 2 are opened and therefrigerant circuit 10 is filled with the refrigerant that is charged in theoutdoor unit 2 in advance. - Next, when a worker performing the test operation connects a refrigerant cylinder for additional charging to a service port (not shown) of the
refrigerant circuit 10 and issues a command to start the test operation directly to thecontroller 8 or remotely by a remote controller (not shown) and the like, thecontroller 8 starts the process from Step S11 to Step S13 shown inFIG. 4 . Here,FIG. 4 is a flowchart of the automatic refrigerant charging operation. - (Step S11: Refrigerant Quantity Judging Operation)
- When a command to start the automatic refrigerant charging operation is issued, with the four-way switching valve V1 of the
outdoor unit 2 in a state indicated by solid lines inFIG. 1 , therefrigerant circuit 10 becomes a state where the indoor expansion valves V9 a to V9 c of theindoor units 3 a to 3 c, the low pressure gas on/off valves V10 a to V10 c of theconnection units 4 a to 4 c, and the outdoor expansion valve V2 are opened, and the first high pressure gas on/off valve V8 of theoutdoor unit 2 and the second high pressure gas on/off valves V11 a to V11 c of theconnection units 4 a to 4 c are closed. Then, thecompressor 21, theoutdoor fan 25, and theindoor fans 32 a to 32 c are started, and all of theindoor units 3 a to 3 c are forcibly caused to perform the cooling operation (hereinafter referred to as “all indoor unit operation”). At this time, the first bypass on/off valve V3 in the firstbypass refrigerant circuit 27 in theoutdoor unit 2 and the second bypass on/off valves V13 a to V13 c in the thirdbypass refrigerant circuits 43 a to 43 c in theconnection units 4 a to 4 c are in an opened state, and the pressure of the refrigerant in the high pressure gasrefrigerant communication pipe 52 and in the low pressure gasrefrigerant communication pipe 53 becomes equalized. - Consequently, as shown in
FIG. 5 , in the refrigerant circuit 10, the high pressure gas refrigerant compressed and discharged in the compressor 21 flows along a flow path from the compressor 21 to the outdoor heat exchanger 22 that functions as a condenser (see the portion from the compressor 21 to the outdoor heat exchanger 22 in the area indicated by diagonal hatching inFIG. 5 ); the high pressure refrigerant that undergoes phase-change from a gas state to a liquid state by heat exchange with the outdoor air flows in the outdoor heat exchanger 22 that functions as a condenser (see the portion corresponding to the outdoor heat exchanger 22 in the area indicated by diagonal hatching and black hatching inFIG. 5 ); the high pressure liquid refrigerant flows along a flow path from the outdoor heat exchanger 22 to the indoor expansion valves V9 a to V9 c (including the outdoor expansion valve V2, the portion corresponding to the main refrigerant circuit side of the subcooler 24, and the first liquid refrigerant communication pipe 51) and a flow path from the outdoor heat exchanger 22 to the bypass expansion valve V7 (see the portions from the outdoor heat exchanger 22 to the indoor expansion valves V9 a to V9 c and to the bypass expansion valve V7 in the area indicated by black hatching inFIG. 5 ); the low pressure refrigerant that undergoes a phase change from a gas-liquid two-phase state to a gas state by heat exchange with the indoor air and the like flows in the portions corresponding to the indoor heat exchangers 31 a to 31 c that function as evaporators and the portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 (see the portions corresponding to the indoor heat exchangers 31 a to 31 c and the portion corresponding to the subcooler 24 in the area indicated by lattice hatching and diagonal hatching inFIG. 5 ); and, within a flow path from the indoor heat exchangers 31 a to 31 c to the compressor 21, the low pressure gas refrigerant flows along flow paths on the high pressure gas side and the low pressure gas side of the connection units 4 a to 4 c (including the third bypass refrigerant circuits 43 a to 43 c), a flow path including the high pressure gas refrigerant communication pipe 52, the low pressure gas refrigerant communication pipe 53, the first bypass refrigerant circuit 27, and the accumulator 23, and a flow path from the portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 to the compressor 21 (see the portion from the indoor heat exchangers 31 a to 31 c to the compressor 21 ((including the high pressure gas refrigerant connection pipe 52 and the low pressure gas refrigerant communication pipe 53 and the connection units 4 a to 4 c)) and the portion from the portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 to the compressor 21 in the area indicated by diagonal hatching inFIG. 5 ).FIG. 5 is a schematic diagram to show a state of the refrigerant flowing in therefrigerant circuit 10 in a refrigerant quantity judging operation (illustrations of the four-way switching valve V1 and the like are omitted). - Next, equipment control as described below is performed to proceed to operation to stabilize the state of the refrigerant circulating in the
refrigerant circuit 10. Specifically, the indoor expansion valves V9 a to V9 c are controlled such that the superheating degree SHr of each of theindoor heat exchangers 31 a to 31 c that function as evaporators becomes constant (hereinafter referred to as “superheating degree control”); the operation capacity of thecompressor 21 is controlled such that the evaporation pressure Pe becomes constant (hereinafter referred to as “evaporation pressure control”); the air flow rate Wo of outdoor air supplied to theoutdoor heat exchanger 22 by theoutdoor fan 25 is controlled such that a condensation pressure Pc of the refrigerant in theoutdoor heat exchanger 22 becomes constant (hereinafter referred to as “condensation pressure control”); the operation capacity of thesubcooler 24 is controlled such that the temperature of the refrigerant sent from thesubcooler 24 to the indoor expansion valves V9 a to V9 c becomes constant (hereinafter referred to as “liquid pipe temperature control”); and the air flow rate Wr of indoor air supplied to theindoor heat exchangers 31 a to 31 c by theindoor fans 32 a to 32 c is maintained constant such that the evaporation pressure Pe of the refrigerant is stably controlled by the above described evaporation pressure control. - Here, the reason to perform the evaporation pressure control is because the evaporation pressure Pe of the refrigerant in the
indoor heat exchangers 31 a to 31 c that function as evaporators is greatly affected by the refrigerant quantity in theindoor heat exchangers 31 a to 31 c where the low pressure refrigerant flows while undergoing a phase change from a gas-liquid two-phase state to a gas state as a result of heat exchange with the indoor air (see the portions corresponding to theindoor heat exchangers 31 a to 31 c in the area indicated by lattice hatching and diagonal hatching inFIG. 5 , which is hereinafter referred to as “evaporator portion C”). Then, here, the state of the refrigerant flowing in the evaporator portion C is stabilized by causing the evaporation pressure Pe of the refrigerant in theindoor heat exchangers 31 a to 31 c to become constant as a result of controlling the operation capacity of thecompressor 21 by themotor 21 a whose rotation frequency Rm is controlled by an inverter. In other words, a state is created in which the refrigerant quantity in the evaporator portion C changes mainly by the evaporation pressure Pe. Note that, the control of the evaporation pressure Pe by thecompressor 21 in the present embodiment is achieved in the following manner: the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors T9 a to T9 c of theindoor heat exchangers 31 a to 31 c is converted to saturation pressure; the operation capacity of thecompressor 21 is controlled such that the saturation pressure becomes constant at a target low pressure Pes (in other words, the control to change the rotation frequency Rm of themotor 21 a is performed); and then a refrigerant circulation flow rate Wc flowing in therefrigerant circuit 10 is increased or decreased. Note that, although it is not employed in the present embodiment, the operation capacity of thecompressor 21 may be controlled such that the suction pressure Ps of thecompressor 21 detected by the suction pressure sensor P1, which is the operation state quantity equivalent to the pressure of the refrigerant at the evaporation pressure Pe of the refrigerant in theindoor heat exchangers 31 a to 31 c, becomes constant at the target low pressure Pes, or the saturation temperature (which corresponds to the evaporation temperature Te) corresponding to the suction pressure Ps becomes constant at a target low pressure Tes. Also, the operation capacity of thecompressor 21 may be controlled such that the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors T9 a to T9 c of theindoor heat exchangers 31 a to 31 c becomes constant at the target low pressure Tes. - Then, by performing such evaporation pressure control, the state of the refrigerant flowing through the refrigerant pipes from the
indoor heat exchangers 31 a to 31 c to thecompressor 21 including the low pressure gasrefrigerant communication pipe 53 and the accumulator 23 (see the portion from theindoor heat exchangers 31 a to 31 c to thecompressor 21 in the area indicated by diagonal hatching inFIG. 5 , which is hereinafter referred to as “gas refrigerant distribution portion D”) becomes stabilized, creating a state where the refrigerant quantity in the gas refrigerant distribution portion D changes mainly by the evaporation pressure Pe (i.e., the suction pressure Ps), which is the operation state quantity equivalent to the pressure of the refrigerant in the gas refrigerant distribution portion D. - In addition, the reason to perform the condensation pressure control is because the condensation pressure Pc of the refrigerant is greatly affected by the refrigerant quantity in the
outdoor heat exchanger 22 where the high pressure refrigerant flows while undergoing a phase change from a gas state to a liquid state as a result of heat exchange with the outdoor air (see the portion corresponding to theoutdoor heat exchanger 22 in the area indicated by diagonal hatching and black hatching inFIG. 5 , which is hereinafter referred to as “condenser portion A”). The condensation pressure Pc of the refrigerant in the condenser portion A greatly changes due to the effect of the outdoor temperature Ta. Therefore, the air flow rate Wo of the indoor air supplied from theoutdoor fan 25 to theoutdoor heat exchanger 22 is controlled by themotor 25 a, and thereby the condensation pressure Pc of the refrigerant in theoutdoor heat exchanger 22 is maintained constant and the state of the refrigerant flowing in the condenser portion A is stabilized. In other words, a state is created where the refrigerant quantity in the condenser portion A changes mainly by a subcooling degree SCo at the liquid side of the outdoor heat exchanger 22 (hereinafter referred to as the outlet of theoutdoor heat exchanger 22 in the description regarding the refrigerant quantity judging operation). Note that, for the control of the condensation pressure Pc by theoutdoor fan 25 in the present embodiment, the discharge pressure Pd of thecompressor 21 detected by the discharge pressure sensor P2, which is the operation state quantity equivalent to the condensation pressure Pc of the refrigerant in theoutdoor heat exchanger 22, or the temperature of the refrigerant flowing through the outdoor heat exchanger 22 (i.e., the condensation temperature Tc) detected by the heat exchanger temperature sensor T3 is used. - Then, by performing such condensation pressure control, the high pressure liquid refrigerant flows along the flow path from the
outdoor heat exchanger 22 to the indoor expansion valves V9 a to V9 c (including the outdoor expansion valve V2, the portion on the main refrigerant circuit side of thesubcooler 24, and the first liquid refrigerant communication pipe 51) and the flow path from theoutdoor heat exchanger 22 to the bypass expansion valve V7 of the secondbypass refrigerant circuit 6, the pressure of the refrigerant in the portions from theoutdoor heat exchanger 22 to the indoor expansion valves V9 a to V9 c and to the bypass expansion valve V7 (see the area indicated by black hatching inFIG. 5 , which is hereinafter referred to as “liquid refrigerant distribution portion B”) becomes stabilized, and the liquid refrigerant distribution portion B is sealed by the liquid refrigerant, thereby becoming a stable state. - In addition, the reason to perform the liquid pipe temperature control is to prevent a change in the density of the refrigerant in the refrigerant pipes from the
subcooler 24 to the indoor expansion valves V9 a to V9 c including the first liquid refrigerant communication pipe 51 (see the portion from thesubcooler 24 to the indoor expansion valves V9 a to V9 c in the liquid refrigerant distribution portion B shown inFIG. 5 ). Performance of thesubcooler 24 is controlled by increasing or decreasing the flow rate of the refrigerant flowing in the secondbypass refrigerant circuit 6 such that the refrigerant temperature Tlp detected by the liquid pipe temperature sensor T5 disposed at the outlet on the main refrigerant circuit side of thesubcooler 24 becomes constant at a target liquid pipe temperature Tlps, and by adjusting the quantity of heat exchange between the refrigerant flowing in the main refrigerant circuit side and the refrigerant flowing in the secondbypass refrigerant circuit 6 side of thesubcooler 24. Note that, the flow rate of the refrigerant in the secondbypass refrigerant circuit 6 is increased or decreased by adjustment of the opening degree of the bypass expansion valve V7. In this way, the liquid pipe temperature control is achieved in which the refrigerant temperature in the refrigerant pipes from thesubcooler 24 to the indoor expansion valves V9 a to V9 c including the first liquidrefrigerant communication pipe 51 becomes constant. - Then, even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 22 (i.e., the subcooling degree SCo of the refrigerant at the outlet of the outdoor heat exchanger 22) changes along with an increase in the refrigerant quantity by charging refrigerant into the
refrigerant circuit 10, the effect of a change in the refrigerant temperature Tco at the outlet of theoutdoor heat exchanger 22 will remain only within the refrigerant pipes from the outlet of theoutdoor heat exchanger 22 to thesubcooler 24 as a result of performing such liquid pipe temperature constant control. Accordingly, the effect of a change in the refrigerant temperature Tco at the outlet of theoutdoor heat exchanger 22 will not extend to the refrigerant pipes from thesubcooler 24 to the indoor expansion valves V9 a to V9 c including the first liquidrefrigerant communication pipe 51 in the liquid refrigerant distribution portion B. - Further, the reason to perform the superheating degree control is because the refrigerant quantity in the evaporator portion C greatly affects the quality of wet vapor of the refrigerant at the outlets of the
indoor heat exchangers 31 a to 31 c. The superheating degree SHr of the refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c is controlled such that the superheating degree SHr of the refrigerant at the gas sides of theindoor heat exchangers 31 a to 31 c (hereinafter referred to as the outlets of theindoor heat exchangers 31 a to 31 c in the description regarding the refrigerant quantity judging operation) becomes constant at the target superheating degree SHrs (in other words, such that the gas refrigerant at the outlet of each of theindoor heat exchangers 31 a to 31 c is in a superheat state) by controlling the opening degree of the indoor expansion valves V9 a to V9 c, and thereby the state of the refrigerant flowing in the evaporator portion C is stabilized. - Consequently, by performing such superheating degree control, a state is created in which the gas refrigerant reliably flows in the gas refrigerant distribution portion D.
- By various control described above, the state of the refrigerant circulating in the
refrigerant circuit 10 becomes stabilized, and the distribution of the refrigerant quantity in therefrigerant circuit 10 becomes constant. Therefore, when refrigerant starts to be charged into therefrigerant circuit 10 by additional refrigerant charging, which is subsequently performed, it is possible to create a state where a change in the refrigerant quantity in therefrigerant circuit 10 mainly appears as a change of the refrigerant quantity in the outdoor heat exchanger 22 (hereinafter this operation is referred to as “refrigerant quantity judging operation”). - Such control as described above is performed as the process in Step S11 by the controller 8 (more specifically, by the
indoor side controllers 34 a to 34 c, theconnection side controllers 44 a to 44 c, theoutdoor side controller 26, and thetransmission line 8 a that interconnects each of thecontrollers 34 a to 34 c, 44 a to 44 c, 26) that functions as a refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation. - Note that, unlike the present embodiment, when refrigerant is not charged in advance in the
outdoor unit 2, it is necessary prior to Step S11 to charge refrigerant until the refrigerant quantity reaches a level where constituent equipment will not abnormally stop during the above described refrigerant quantity judging operation. - (Step S12: Refrigerant Quantity Calculation)
- Next, additional refrigerant is charged into the
refrigerant circuit 10 while performing the above described refrigerant quantity judging operation. At this time, thecontroller 8 that functions as a refrigerant quantity calculating means calculates the refrigerant quantity in therefrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 during additional refrigerant charging in Step S12. - First, the refrigerant quantity calculating means in the present embodiment is described. The refrigerant quantity calculating means divides the
refrigerant circuit 10 into a plurality of portions, calculates the refrigerant quantity for each divided portion, and thereby calculates the refrigerant quantity in therefrigerant circuit 10. More specifically, a relational expression between the refrigerant quantity in each portion and the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 is set for each divided portion, and the refrigerant quantity in each portion can be calculated by using these relational expressions. In the present embodiment, when the four-way switching valve V1 is in a state indicated by solid lines inFIG. 1 , i.e., a state where the discharge side of the compressor 21 is connected to the gas side of the outdoor heat exchanger 22 and where the suction side of the compressor 21 is connected to the outlets of the indoor heat exchangers 31 a to 31 c via the low pressure gas side stop valve V6 and the low pressure gas refrigerant communication pipe 53, the refrigerant circuit 10 is divided into the following portions and a relational expression is set for each portion: a portion corresponding to the compressor 21 and a portion from the compressor 21 to the outdoor heat exchanger 22 including the four-way switching valve V1 (not shown inFIG. 5 ) (hereinafter referred to as “high pressure gas pipe portion E”); a portion corresponding to the outdoor heat exchanger 22 (i.e., the condenser portion A); a portion from the outdoor heat exchanger 22 to the subcooler 24 and an inlet side half of a portion corresponding to the main refrigerant circuit side of the subcooler 24 in the liquid refrigerant distribution portion B (hereinafter referred to as “high temperature side liquid pipe portion B1”); an outlet side half of a portion corresponding to the main refrigerant circuit side of the subcooler 24 and a portion from the subcooler 24 to the liquid side stop valve V4 (not shown inFIG. 5 ) in the liquid refrigerant distribution portion B (hereinafter referred to as “low temperature side liquid pipe portion B2”); a portion combining the first liquid refrigerant communication pipe 51, the liquid side refrigerant flow path of the connection units 4 a to 4 c, and the second liquid refrigerant communication pipe 71 a to 71 c in the liquid refrigerant distribution portion B (hereinafter referred to as “liquid refrigerant communication pipe portion B3”); a portion from the first liquid refrigerant communication pipe 51 in the liquid refrigerant distribution portion B up to the second gas refrigerant communication pipes 72 a to 72 c in the gas refrigerant distribution portion D including portions corresponding to the indoor expansion valves V9 a to V9 c and the indoor heat exchangers 31 a to 31 c (i.e., the evaporator portion C) (hereinafter referred to as “indoor unit portion F”); a portion combining the high pressure gas refrigerant communication pipe 52 and the high pressure gas side refrigerant flow path (including up to the second bypass on/off valves V13 a to V13 c on the high pressure gas side of the third bypass refrigerant circuits 43 a to 43 c) in the connection units 4 a to 4 c (hereinafter referred to as “high pressure gas refrigerant communication pipe portion G1”) in the gas refrigerant distribution portion D; a portion combining the low pressure gas refrigerant communication pipe 53, the second gas refrigerant communication pipes 72 a to 72 c, and the low pressure gas side refrigerant flow path in the connection units 4 a to 4 c (including up to the second bypass on/off valves V13 a to V13 c on the low pressure gas side of the third bypass refrigerant circuits 43 a to 43 c) (hereinafter referred to as “low pressure gas refrigerant communication pipe portion G2”) in the gas refrigerant distribution portion D; a portion from the high pressure gas side stop valve V5 (not shown inFIG. 5 ) to the first high pressure gas on/off valve V8 (hereinafter referred to as “first low pressure low pressure gas pipe portion H”) in the gas refrigerant distribution portion D; a portion combining a portion from the low pressure gas side stop valve V6 (not shown inFIG. 5 ) to the first bypass refrigerant circuit 27 and the first bypass refrigerant circuit 27 and a portion from the first bypass refrigerant circuit 27 to the four-way switching valve V1 and a portion from the first bypass refrigerant circuit 27 to the compressor 21 including the accumulator 23 (hereinafter referred to as “second low pressure gas pipe portion I”); and a portion from the high temperature side liquid pipe portion B1 to the second low pressure gas pipe portion I including the bypass expansion valve V7 and a portion corresponding to the second bypass refrigerant circuit 6 side of the subcooler 24 in the liquid refrigerant distribution portion B (hereinafter referred to as “second bypass circuit portion J”). Note that the portion combining the high pressure gas refrigerant communication pipe portion G1 and the low pressure gas refrigerant communication pipe portion G2 is referred to as a gas refrigerant communication pipe portion G. Next, the relational expressions set for each portion described above are described. - In the present embodiment, a relational expression between a refrigerant quantity Mog1 in the high pressure gas pipe portion E and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mog1=Vog1×ρd, - which is a function expression in which a volume Vog1 of the high pressure gas pipe portion E in the
outdoor unit 2 is multiplied by a density ρd of the refrigerant in high pressure gas pipe portion E. Note that, the volume Vog1 of the high pressure gas pipe portion E is a value that is known prior to installation of theoutdoor unit 2 at the installation location and is stored in advance in the memory of thecontroller 8. In addition, the density ρd of the refrigerant in the high pressure gas pipe portion E is obtained by converting the discharge temperature Td and the discharge pressure Pd. - A relational expression between a refrigerant quantity Mc in the condenser portion A and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mc=kc1×Ta+kc2×Tc+kc3×SHm+kc4×Wc+kc5×ρc+kc6×ρco+kc7, - which is a function expression of the outdoor temperature Ta, the condensation temperature Tc, a compressor discharge superheating degree SHm, the refrigerant circulation flow rate Wc, the saturated liquid density ρc of the refrigerant in the
outdoor heat exchanger 22, and a density ρco of the refrigerant at the outlet of theoutdoor heat exchanger 22. Note that, the parameters kc1 to kc7 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of thecontroller 8. In addition, the compressor discharge superheating degree SHm is a superheating degree of the refrigerant at the discharge side of the compressor, and is obtained by converting the discharge pressure Pd to refrigerant saturation temperature and subtracting this refrigerant saturation temperature from the discharge temperature Td. The refrigerant circulation flow rate Wc is expressed as a function of the evaporation temperature Te and the condensation temperature Tc (i.e., Wc=f(Te, Tc)). A saturated liquid density ρc of the refrigerant is obtained by converting the condensation temperature Tc. The density ρco of the refrigerant at the outlet of theoutdoor heat exchanger 22 is obtained by converting the condensation pressure Pc, which is obtained by converting the condensation temperature Tc, and the refrigerant temperature Tco. - A relational expression between a refrigerant quantity Mol1 in the high temperature side liquid pipe portion B1 and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mol1=Vol1×ρco, - which is a function expression in which a volume Vol1 of the high temperature side liquid pipe portion B1 in the
outdoor unit 2 is multiplied by the density ρco of the refrigerant in the high temperature side liquid pipe portion B1 (i.e., the above described density of the refrigerant at the outlet of the outdoor heat exchanger 22). Note that, the volume Vol1 of the high pressure side liquid pipe portion B1 is a value that is known prior to installation of theoutdoor unit 2 at the installation location and is stored in advance in the memory of thecontroller 8. - A relational expression between a refrigerant quantity Mol2 in the low temperature side liquid pipe portion B2 and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mol2=Vol2×ρlp, - which is a function expression in which a volume Vol2 of the low temperature side liquid pipe portion B2 in the
outdoor unit 2 is multiplied by a density pip of the refrigerant in the low temperature side liquid pipe portion B2. Note that, the volume Vol2 of the low temperature side liquid pipe portion B2 is a value that is known prior to installation of theoutdoor unit 2 at the installation location and is stored in advance in the memory of thecontroller 8. In addition, the density ρlp of the refrigerant in the low temperature side liquid pipe portion B2 is the density of the refrigerant at the outlet of thesubcooler 24, and is obtained by converting the condensation pressure Pc and the refrigerant temperature Tlp at the outlet of thesubcooler 24. - A relational expression between a refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mlp=Vlp×ρlp, - which is a function expression in which a volume Vlp of the portion combining the first liquid
refrigerant communication pipe 51, the liquid side refrigerant flow path in theconnection units 4 a to 4 c, and the second liquidrefrigerant communication pipes 71 a to 71 c is multiplied by the density pip of the refrigerant in the liquid refrigerant communication pipe portion B3 (i.e., the density of the refrigerant at the outlet of the subcooler 24). Here, the volume Vlp is divided into a volume Vlp1 of the portion combining the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c and a volume Vlp2 of the liquid side refrigerant flow path in theconnection units 4 a to 4 c. As for the volume Vlp1 of the portion combining the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c, because the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c are refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site, and thecontroller 8 calculates the volume Vlp1 from the input information of the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c. Or, as described below, the volume Vlp1 is calculated by using the operation results of the pipe volume judging operation. In addition, the volume Vlp2 of the liquid side refrigerant flow path in theconnection units 4 a to 4 c is a value that is known prior to installation of theconnection units 4 a to 4 c at the installation location and is stored in advance in the memory of thecontroller 8. - A relational expression between a refrigerant quantity Mr in the indoor unit portion F and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mr=kr1×Tlp+kr2×ΔT+kr3×SHr+kr4×Wr+kr5, - which is a function expression of the refrigerant temperature Tlp at the outlet of the
subcooler 24, a temperature difference ΔT in which the evaporation temperature Te is subtracted from the room temperature Tr, the superheating degree SHr of the refrigerant at the outlets of theindoor heat exchangers 31 a to 31 c, and the air flow rate Wr of theindoor fans 32 a to 32 c. Note that, the parameters kr1 to kr5 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of thecontroller 8. Note that, here, the relational expression for the refrigerant quantity Mr is set for each of the threeindoor units 3 a to 3 c, and the entire refrigerant quantity in the indoor unit portion F is calculated by adding the refrigerant quantity Mr in theindoor unit 3 a, the refrigerant quantity Mr in theindoor unit 3 b, and the refrigerant quantity Mr in theindoor unit 3 c. Note that, relational expressions having parameters kr1 to kr5 with different values will be used when the model and/or capacity is different among theindoor unit 3 a, theindoor unit 3 b, and theindoor unit 3 c. - The gas refrigerant communication pipe portion G is divided into a high pressure gas refrigerant communication pipe portion G1 and a low pressure gas refrigerant communication pipe portion G2, and a refrigerant quantity Mgp in the gas refrigerant communication pipe portion G is a value obtained by adding a refrigerant quantity Mgph in the high pressure gas refrigerant communication pipe portion G1 and a refrigerant quantity Mgp1 in the low pressure gas refrigerant communication pipe portion G2. In addition, a volume Vgp of the gas refrigerant communication pipe portion G is a value obtained by adding a volume Vgph of the high pressure gas refrigerant communication pipe portion G1 and a volume Vgp1 of the low pressure gas refrigerant communication pipe portion G2. In other words, theses relational expressions are expressed as follows.
-
Mgp=Mgph+Mgp1 -
Vgp=Vgph+Vgp1 - A relational expression between the refrigerant quantity Mgph in the high pressure gas refrigerant communication pipe portion G1 and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mgph=Vgph×ρgph, - which is a function expression in which the volume Vgph of the portion combining the high pressure gas
refrigerant communication pipe 52 and the high pressure gas side refrigerant flow path (including up to the second bypass on/off valves V13 a to V13 c on the high pressure gas side of the thirdbypass refrigerant circuits 43 a to 43 c) is multiplied by a density ρgph of the refrigerant in the high pressure gas refrigerant communication pipe portion G1. Here, the volume Vgph is divided into a volume Vgph1 of the high pressure gasrefrigerant communication pipe 52 and a volume Vgph2 of the high pressure gas side refrigerant flow path in theconnection units 4 a to 4 c (including up to the second bypass on/off valves V13 a to V13 c on the high pressure gas side in the thirdbypass refrigerant circuits 43 a to 43 c). As for the volume Vgp1 of the high pressure gasrefrigerant communication pipe 52, as is the case with the portion combining the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c, because the high pressure gasrefrigerant communication pipe 52 is a refrigerant pipe arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site, and thecontroller 8 calculates the volume Vgp1 from the input information of the high pressure gasrefrigerant communication pipe 52. Or, as described below, the volume Vgp1 is calculated by using the operation results of the pipe volume judging operation. In addition, the density ρgph of the refrigerant in the high pressure gas refrigerant communication pipe portion G1 is an average value among: a density ρs of the refrigerant at the suction side of thecompressor 21, a density ρoh of the refrigerant in the pipe on the high pressure gas side between the high pressure gas side stop valve V5 and the first high pressure gas on/off valve V8 in theoutdoor unit 2, a density ρbsh of the refrigerant in the high pressure gas side refrigerant flow path in theconnection units 4 a to 4 c, and a density ρeo of the refrigerant at the outlets of theindoor heat exchangers 31 a to 31 c (i.e., the inlets of the second gas refrigerant communication pipes 72 a to 72 c). The density ρs of the refrigerant is obtained by converting the suction pressure Ps and the suction temperature Ts. The density ρoh of the refrigerant is obtained by converting the first high pressure gas pipe temperature Th1. The density ρbsh of the refrigerant is obtained by converting the second high pressure gas pipe temperature Th2. The density ρeo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a converted value of the evaporation temperature Te, and an outlet temperature Teo of each of theindoor heat exchangers 31 a to 31 c. In addition, the volume Vgp2 of the high pressure gas side refrigerant flow path in theconnection units 4 a to 4 c (including up to the second bypass on/off valves V13 a to V13 c on the high pressure gas side in the thirdbypass refrigerant circuits 43 a to 43 c) is a value that is known prior to installation of theconnection units 4 a to 4 c at the installing location and is stored in advance in the memory of thecontroller 8. - A relational expression between the refrigerant quantity Mgp1 in the low pressure gas refrigerant communication pipe portion G2 and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mgp1=Vgp1×ρgp1, - which is a function expression in which the volume Vgp1 of a portion combining the low pressure gas
refrigerant communication pipe 53, the second gas refrigerant communication pipes 72 a to 72 c, and the low pressure gas refrigerant flow path in theconnection units 4 a to 4 c (including up to the second bypass on/off valves V13 a to V13 c on the low pressure gas side of the thirdbypass refrigerant circuit 43 a to 43 c) is multiplied by a density ρgp1 of the refrigerant in the low pressure gas refrigerant communication pipe portion G2. Here, the volume Vgp1 is divided into a volume Vgpl1 of a portion combining the low pressure gasrefrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c, and a volume Vgpl2 of the low pressure gas side refrigerant flow path in theconnection units 4 a to 4 c (including up to the second bypass on/off valves V13 a to V13 c on the low pressure gas side in the thirdbypass refrigerant circuits 43 a to 43 c). As for the volume Vgpl1 of the portion combining the low pressure gasrefrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c, as is the case with the portion combining the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c and also as is the case with the high pressure gasrefrigerant communication pipe 52, because the low pressure gasrefrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c are refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site, and thecontroller 8 calculates the volume Vgpl1 from the input information of the low pressure gasrefrigerant communication pipe 53 and the second gas refrigerant communication pipes 72 a to 72 c. Or, as described below, the volume Vgpl1 is calculated by using the operation results of the pipe volume judging operation. In addition, the density ρgp1 of the refrigerant in the low pressure gas refrigerant communication pipe portion G2 is an average value between the density ρs of the refrigerant at the suction side of thecompressor 21 and the density ρeo of the refrigerant at the outlets of theindoor heat exchangers 31 a to 31 c (i.e., the inlet of the second gas refrigerant communication pipes 72 a to 72 c). The density ρs of the refrigerant is obtained by converting the suction pressure Ps and the suction temperature Ts, and the density ρeo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a converted value of the evaporation temperature Te, and the outlet temperature Teo of each of theindoor heat exchangers 31 a to 31 c. In addition, the volume Vgpl2 of the low pressure gas side refrigerant flow path in theconnection units 4 a to 4 c (including up to the second bypass on/off valves V13 a to V13 c on the low pressure gas side in the thirdbypass refrigerant circuits 43 a to 43 c) is a value that is known prior to installation of theconnection units 4 a to 4 c at the installation location and is stored in advance in the memory of thecontroller 8. - A relational expression between a refrigerant quantity Mog2 in the first low pressure gas pipe portion H and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mog2=Vog2×ρoh, - which is a function expression in which a volume Vog2 of the first low pressure gas pipe portion H in the
outdoor unit 2 is multiplied by the density ρoh of the refrigerant in the first low pressure gas pipe portion H. Note that, the volume Vog2 of the first low pressure gas pipe portion H is a value that is known prior to shipment to the installation location and is stored in advance in the memory of thecontroller 8. - A relational expression between a refrigerant quantity Mog3 in the second low pressure gas pipe portion I and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mog3=Vog3×ρs, - which is a function expression in which a volume Vog3 of the second low pressure gas pipe portion I in the
outdoor unit 2 is multiplied by the density ρs of the refrigerant in the second low pressure gas pipe portion I. Note that, the volume Vog3 of the second low pressure gas pipe portion I is a value that is known prior to shipment to the installation location and is stored in advance in the memory of thecontroller 8. - A relational expression between a refrigerant quantity Mob in the second bypass circuit portion J and the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 is expressed, for example, by -
Mob−kob1×ρco+kob2×ρs+kob3×Pc+kob4, - which is a function expression of the density ρco of the refrigerant at the outlet of the
outdoor heat exchanger 22, and the density ρs of the refrigerant at the outlet on the bypass circuit side of thesubcooler 24 and the evaporation pressure Pe. Note that, the parameters kob1 to kob3 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of thecontroller 8. In addition, the refrigerant quantity Mob of the second bypass circuit portion J may be calculated using a simpler relational expression because the refrigerant quantity in that portion is smaller compared to other portions. For example, it is expressed as follows: -
Mob=Vob×ρe×kob5, - which is a function expression in which a volume Vob of the second bypass circuit portion J is multiplied by the saturated liquid density ρe at the portion corresponding to the second bypass circuit side of the
subcooler 24 and a correct coefficient kob. Note that, the volume Vob of the second bypass circuit portion J is a value that is known prior to installation of theoutdoor unit 2 at the installation location and is stored in advance in the memory of thecontroller 8. In addition, the saturated liquid density ρe at the portion on the second bypass circuit side of thesubcooler 24 is obtained by converting the suction pressure Ps or the evaporation temperature Te. - Note that, in the present embodiment, one
outdoor unit 2 is provided. However, when a plurality of outdoor units are connected, as for the refrigerant quantities in the outdoor unit such as Mog1, Mc, Mol1, Mol2, Mog2, Mog3, and Mob, the relational expression for the refrigerant quantity in each portion is set for each of the plurality of outdoor units, and the entire refrigerant quantity in the outdoor units is calculated by adding the refrigerant quantity in each portion of the plurality of the outdoor units. Note that, relational expressions for the refrigerant quantity in each portion having parameters with different values will be used when a plurality of outdoor units with different models and capacities are connected. - As described above, in the present embodiment, by using the relational expressions for each portion in the
refrigerant circuit 10, the refrigerant quantity in each portion is calculated from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the refrigerant quantity judging operation, and thereby the refrigerant quantity in therefrigerant circuit 10 can be calculated. - Further, this Step S12 is repeated until the condition for judging the adequacy of the refrigerant quantity in the below described Step S13 is satisfied. Therefore, in the period from the start to the completion of additional refrigerant charging, the refrigerant quantity in each portion is calculated from the operation state quantity during refrigerant charging by using the relational expressions for each portion in the
refrigerant circuit 10. More specifically, a refrigerant quantity Mo in theoutdoor unit 2, the refrigerant quantity Mr in each of theindoor units 3 a to 3 c, and a refrigerant quantity Mbs in each of theconnection units 4 a to 4 c (=Vlp2×ρlp+Vgp2×ρgp) (i.e., the refrigerant quantity in each portion in therefrigerant circuit 10 excluding the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7) necessary for judgment of the adequacy of the refrigerant quantity in the below described Step S13 are calculated. Here, the refrigerant quantity Mo in theoutdoor unit 2 is calculated by adding the refrigerant quantity Mog1, Mc, Mol1, Mol2, Mog2, Mog3, and Mob in the above described each portion in theoutdoor unit 2. - In this way, the process in Step S12 is performed by the
controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in therefrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the automatic refrigerant charging operation. - (Step S13: Judging the Adequacy of the Refrigerant Quantity)
- As described above, when additional refrigerant charging into the
refrigerant circuit 10 starts, the refrigerant quantity in therefrigerant circuit 10 gradually increases. Here, when the volume of the first refrigerantcommunication pipe group 5 is unknown, the refrigerant quantity that should be charged into therefrigerant circuit 10 after additional refrigerant charging cannot be prescribed as the refrigerant quantity in the entirerefrigerant circuit 10. However, when the focus is placed only on theoutdoor unit 2, theindoor units 3 a to 3 c, and theconnection units 4 a to 4 c (i.e., therefrigerant circuit 10 excluding the first refrigerantcommunication pipe group 5 and the second refrigerant communication pipe group 7), it is possible to know in advance the optimal refrigerant quantity in theoutdoor unit 2 in the normal operation mode by tests and detailed simulations. Therefore, additional refrigerant can be charged by the following manner: a value of this refrigerant quantity is stored as a target charging value Ms, in advance, in the memory of thecontroller 8; the refrigerant quantity Mo in theoutdoor unit 2, the refrigerant quantity Mr in each of theindoor units 3 a to 3 c, and the refrigerant quantity Mbs in each of theconnection units 4 a to 4 c are calculated from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the automatic refrigerant charging operation by using the above described relational expressions; and additional refrigerant is charged until a value of the sum of the above calculated refrigerant quantities reaches the target charging value Ms. In other words, Step S13 is a process to judge the adequacy of the refrigerant quantity charged into therefrigerant circuit 10 by additional refrigerant charging by judging whether or not the refrigerant quantity, which is obtained by adding the refrigerant quantity Mo in theoutdoor unit 2, the refrigerant quantity Mr in theindoor units 3 a to 3 c, and the refrigerant quantity Mbs in theconnection units 4 a to 4 c in the automatic refrigerant charging operation, has reached the target charging value Ms. - Then, in Step S13, when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in the
outdoor unit 2, the refrigerant quantity Mr in each of theindoor units 3 a to 3 c, and the refrigerant quantity Mbs in each of theconnection units 4 a to 4 c is smaller than the target charging value Ms and additional refrigerant charging has not been completed, the process in Step S13 is repeated until the target charging value Ms is reached. In addition, when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in theoutdoor unit 2, the refrigerant quantity Mr in each of theindoor units 3 a to 3 c, and the refrigerant quantity Mbs in each of theconnection units 4 a to 4 c reaches the target charging value Ms, additional refrigerant charging is completed, and Step S1 as the automatic refrigerant charging operation process is completed. - Note that, in the above described refrigerant quantity judging operation, as the amount of additional refrigerant charged into the
refrigerant circuit 10 increases, a tendency of an increase in the subcooling degree SCo at the outlet of theoutdoor heat exchanger 22 appears, causing the refrigerant quantity Mc in theoutdoor heat exchanger 22 to increase, and the refrigerant quantity in other portions tends to be maintained substantially constant. Therefore, the target charging value Ms may be set as a value corresponding to only the refrigerant quantity Mo in theoutdoor unit 2 instead of corresponding to all of theoutdoor unit 2, theindoor units 3 a to 3 c, and theconnection units 4 a to 4 c; or may be set as a value corresponding to the refrigerant quantity Mc in theoutdoor heat exchanger 22, and additional refrigerant may be charged until the target charging value Ms is reached under such setting. - In this way, the process in Step S13 is performed by the
controller 8 that functions as the refrigerant quantity judging means for judging the adequacy of the refrigerant quantity in therefrigerant circuit 10 in the refrigerant quantity judging operation of the automatic refrigerant charging operation (i.e., for judging whether or not the refrigerant quantity has reached the target charging value Ms). - (Step S2: Pipe Volume Judging Operation)
- When the above described automatic refrigerant charging operation in Step S1 is completed, the process proceeds to the pipe volume judging operation in Step S2. In the pipe volume judging operation, the process from Step S21 to Step S25 as shown in
FIG. 6 is performed by thecontroller 8. Here,FIG. 6 is a flowchart of the pipe volume judging operation. - (Steps S21, S22: Pipe Volume Judging Operation for the Liquid Refrigerant Communication Pipe and Volume Calculation)
- In Step S21, as is the case with the above described refrigerant quantity judging operation in Step S11 of the automatic refrigerant charging operation as described above, the pipe volume judging operation for the liquid refrigerant communication pipe portion B3, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control, is performed. Here, the target liquid pipe temperature Tlps of the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the
subcooler 24 in the liquid pipe temperature control is regarded as a first target value Tlps1, and the state where the refrigerant quantity judging operation is stable at this first target value Tlps1 is regarded as a first state (see the refrigerating cycle indicated by lines including dotted lines inFIG. 7 ). Note that,FIG. 7 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the liquid refrigerant communication pipe. - Next, the first state where the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the
subcooler 24 in liquid pipe temperature control is stable at the first target value Tlps1 is switched to a second state (see the refrigerating cycle indicated by solid lines inFIG. 7 ) where the target liquid pipe temperature Tlps is changed to a second target value Tlps2 different from the first target value Tlps1 and stabilized without changing the conditions for other equipment controls, i.e., the conditions for the condensation pressure control, superheating degree control, and evaporation pressure control (i.e., without changing the target superheating degree SHrs and the target low pressure Tes). In the present embodiment, the second target value Tlps2 is a temperature higher than the first target value Tlps1. - In this way, by changing from the stable state at the first state to the second state, the density of the refrigerant in the liquid refrigerant communication pipe portion B3 decreases, and therefore the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B3 moves to other portions in the
refrigerant circuit 10. More specifically, as described above, the conditions for other equipment controls other than the liquid pipe temperature control are not changed, and therefore the refrigerant quantity Mog1 in the high pressure gas pipe portion E, the refrigerant quantity Mog2 in the first low pressure gas pipe portion H, the refrigerant quantity Mog3 in the second low pressure gas pipe portion I, and the refrigerant quantity Mgph in the high pressure gas refrigerant communication pipe portion G1 and the refrigerant quantity Mgp1 in the low pressure gas refrigerant communication pipe portion G2 are maintained substantially constant, and the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B3 will move to the condenser portion A, the high temperature side liquid pipe portion B1, the low temperature side liquid pipe portion B2, the indoor unit portion F, and the second bypass circuit portion J. In other words, the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mol1 in the high temperature side liquid pipe portion B1, the refrigerant quantity Mol2 in the low temperature side liquid pipe portion B2, the refrigerant quantity Mr in the indoor unit portion F, and the refrigerant quantity Mob in the second bypass circuit portion J will increase by the quantity of the refrigerant that has decreased in the liquid refrigerant communication pipe portion B3. - Such control as described above is performed as the process in Step S21 by the controller 8 (more specifically, by the
indoor side controllers 34 a to 34 c, theconnection side controllers 44 a to 44 c, theoutdoor side controller 26, and thetransmission line 8 a that interconnects each of thecontrollers 34 a to 34 c, 44 a to 44 c, and 26) that functions as a pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the refrigerant quantity Mlp of the liquid refrigerant communication pipe portion B3. - Next, in Step S22, the volume Vlp of the liquid refrigerant communication pipe portion B3 is calculated by utilizing a phenomenon that the refrigerant quantity in the liquid refrigerant communication pipe portion B3 decreases and the refrigerant whose quantity has decreased moves to other portions in the
refrigerant circuit 10 because of the change from the first state to the second state. - First, a calculation formula used in order to calculate the volume Vlp of the liquid refrigerant communication pipe portion B3 is described. Provided that the quantity of the refrigerant that has decreased in the liquid refrigerant communication pipe portion B3 and moved to other portions in the
refrigerant circuit 10 by the above described pipe volume judging operation is a refrigerant increase/decrease quantity ΔMlp, and that the increase/decrease quantities of the refrigerant in each portion between the first state and the second state are ΔMc, ΔMol1, ΔMol2, ΔMr, and ΔMob (here, the refrigerant quantity Mog1, the refrigerant quantity Mog2, the refrigerant quantity Mog3, the refrigerant quantity Mgph, and the refrigerant quantity Mgp1 are omitted because they are maintained substantially constant), the refrigerant increase/decrease quantity ΔMlp can be, for example, calculated by the following function expression: -
ΔMlp=−(ΔMc+ΔMol1+ΔMol2+ΔMr+ΔMob). - Then, the value of ΔMlp is divided by a density change quantity Δρlp of the refrigerant between the first state and the second state in the liquid refrigerant communication pipe portion B3, and thereby the volume Vlp of the liquid refrigerant communication pipe portion B3 can be calculated. Note that, although there is little effect on a calculation result of the refrigerant increase/decrease quantity ΔMlp, the refrigerant quantity Mog1 and the refrigerant quantity Mog2 may be included in the above described function expression.
-
Vlp=ΔMlp/Δρlp - In addition, the volume Vlp2 of the liquid side refrigerant flow path in the
connection units 4 a to 4 c is a value that is known prior to installation of theconnection units 4 a to 4 c at the installation location. Thus, it is possible to determine the volume Vlp1 of the portion combining the first liquidrefrigerant communication pipe 51 and the second liquidrefrigerant communication pipes 71 a to 71 c, which are the refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, by subtracting the volume Vlp2 from the volume Vlp of the liquid refrigerant communication pipe portion B3, which is determined by the calculation. - Note that, ΔMc, ΔMol1, ΔMol2, ΔMr, and ΔMob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the
refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state. In addition, the density change quantity Δρlp can be obtained by calculating the density of the refrigerant at the outlet of thesubcooler 24 in the first state and the density of the refrigerant at the outlet of thesubcooler 24 in the second state and further by subtracting the density of the refrigerant in the first state from the density of the refrigerant in the second state. - By using the calculation formula as described above, the volume Vlp of the liquid refrigerant communication pipe portion B3 can be calculated from the operation state quantity of constituent equipment or refrigerant flowing in the
refrigerant circuit 10 in the first and second states. - Note that, in the present embodiment, the state is changed such that the second target value Tlps2 in the second state becomes a temperature higher than the first target value Tlps1 in the first state and therefore the refrigerant in the low temperature side liquid pipe portion B2 is moved to other portions to increase the refrigerant quantity in other portions; thereby the volume Vlp of the liquid refrigerant communication pipe portion B3 is calculated from the increased quantity. However, the state may be changed such that the second target value Tlps2 in the second state becomes a temperature lower than the first target value Tlps1 in the first state and therefore the refrigerant is moved from other portions to the liquid refrigerant communication pipe portion B3 to decrease the refrigerant quantity in other portions; thereby the volume Vlp of the liquid refrigerant communication pipe portion B3 is calculated from the decreased quantity.
- In this way, the process in Step S22 is performed by the
controller 8 that functions as the pipe volume calculating means for the liquid refrigerant communication pipe, which calculates the volume Vlp of the liquid refrigerant communication pipe portion B3 from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the pipe volume judging operation for the liquid refrigerant communication pipe portion B3. - (Steps S23, S24: Pipe Volume Judging Operation and Volume Calculation for the Gas Refrigerant Communication Pipe)
- After the above described Step S21 and Step S22 are completed, the pipe volume judging operation for the gas refrigerant communication pipe portion G, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control, is performed in Step S23. Here, the target low pressure Pes of the suction pressure Ps of the
compressor 21 in the evaporation pressure control is regarded as a first target value Pes1, and the state where the refrigerant quantity judging operation is stable at this first target value Pes1 is regarded as a first state (see the refrigerating cycle indicated by lines including dotted lines inFIG. 8 ). Note thatFIG. 8 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the gas refrigerant communication pipe. - Next, the first state where the target low pressure Pes of the suction pressure Ps in the
compressor 21 in evaporation pressure control is stable at the first target value Pes1 is switched to a second state (see the refrigerating cycle indicated only by solid lines inFIG. 8 ) where the target low pressure Pes is changed to a second target value Pes2 different from the first target value Pes1 and stabilized without changing the conditions for other equipment controls, i.e., without changing the conditions for the liquid pipe temperature control, the condensation pressure control, and the superheating degree control (i.e., without changing the target liquid pipe temperature Tlps and the target superheating degree SHrs). In the present embodiment, the second target value Pes2 is a pressure lower than the first target value Pes1. - In this way, by changing from the stable state at the first state to the second state, the density of the refrigerant in the gas refrigerant communication pipe portion G decreases, and therefore the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to other portions in the
refrigerant circuit 10. More specifically, as described above, the conditions for other equipment controls other than the evaporation pressure control are not changed, and therefore the refrigerant quantity Mog1 in the high pressure gas pipe portion E, the refrigerant quantity Mol1 in the high temperature side liquid pipe portion B1, the refrigerant quantity Mol2 in the low temperature side liquid pipe portion B2, and the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 are maintained substantially constant, and the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to the first low pressure gas pipe portion H, the second low pressure gas pipe portion I, the condenser portion A, the indoor unit portion F, and the second bypass circuit portion J. In other words, the refrigerant quantity Mog2 in the first low pressure gas pipe portion H, the refrigerant quantity Mog3 in the second low pressure gas pipe portion I, the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mr in the indoor unit portion F, and the refrigerant quantity Mob in the second bypass circuit portion J will increase by the quantity of the refrigerant that has decreased in the gas refrigerant communication pipe portion G. - Such control as described above is performed as the process in Step S23 by the controller 8 (more specifically, by the
indoor side controllers 34 a to 34 c, theconnection side controllers 44 a to 44 c, theoutdoor side controller 26, and thetransmission line 8 a that interconnects each of thecontrollers 34 a to 34 c, 44 a to 44 c, and 26) that functions as the pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the volume Vgp of the gas refrigerant communication pipe portion G. - Next in Step S24, the volume Vgp of the gas refrigerant communication pipe portion G is calculated by utilizing a phenomenon that the refrigerant quantity in the gas refrigerant communication pipe portion G decreases and the refrigerant whose quantity has decreased moves to other portions in the
refrigerant circuit 10 because of the change from the first state to the second state. - First, a calculation formula used in order to calculate the volume Vgp of the gas refrigerant communication pipe portion G is described. Provided that the quantity of the refrigerant that has decreased in the gas refrigerant communication pipe portion G and moved to other portions in the
refrigerant circuit 10 by the above described pipe volume judging operation is a refrigerant increase/decrease quantity ΔMgp, and that the increase/decrease quantities of the refrigerant in each portion between the first state and the second state are ΔMc, ΔMog2, ΔMog3, ΔMr, and ΔMob (here, the refrigerant quantity Mog1, the refrigerant quantity Mol1, the refrigerant quantity Mol2, and the refrigerant quantity Mlp are omitted because they are maintained substantially constant), the refrigerant increase/decrease quantity ΔMgp can be, for example, calculated by the following function expression: -
ΔMgp=−(ΔMc+ΔMog2+ΔMog3+ΔMr+ΔMob). - Then, the value of ΔMgp is divided by a density change quantity Δρgp of the refrigerant between the first state and the second state in the gas refrigerant communication pipe portion G, and thereby the volume Vgp of the gas refrigerant communication pipe portion G can be calculated. Note that, although there is little effect on a calculation result of the refrigerant increase/decrease quantity ΔMgp, the refrigerant quantity Mog1, the refrigerant quantity Mol1, and the refrigerant quantity Mol2 may be included in the above described function expression.
-
Vgp=ΔMgp/Δρgp - Note that, ΔMc,
ΔMog 2, ΔMog 3, ΔMr and ΔMob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in therefrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state. In addition, the density change quantity Δρgp can be obtained by calculating an average density among the density ρs of the refrigerant at the suction side of thecompressor 21, the density ρoh of the refrigerant in the pipe on the high pressure gas side between the high pressure gas side stop valve V5 and the first high pressure gas on/off valve V8 in theoutdoor unit 2, the density ρbsh of the refrigerant in the high pressure gas side refrigerant flow path in theconnection units 4 a to 4 c, and the density ρeo of the refrigerant at the outlets of theindoor heat exchangers 31 a to 31 c in the first state and by subtracting the average density in the first state from the average density in the second state. - By using such calculation formula as described above, the volume Vgp of the gas refrigerant communication pipe portion G can be calculated from the operation state quantity of constituent equipment or the refrigerant flowing in the
refrigerant circuit 10 in the first and second states. - In addition, the volume Vgp2 of the high pressure gas side refrigerant flow path and the low pressure gas side refrigerant flow path (including a portion corresponding to the third
bypass refrigerant circuits 43 a to 43 c) in theconnection units 4 a to 4 c is a value that is known prior to installation of theconnection units 4 a to 4 c at the installation location. Thus, it is possible to determine the volume Vgp1 of the portion combining the high pressure gasrefrigerant communication pipe 52, the low pressure gasrefrigerant communication pipe 53, and the second gas refrigerant communication pipes 72 a to 72 c, which are the refrigerant pipes arranged on site when installing the air conditioner 1 at an installation location such as a building and the like, by subtracting the volume Vgp2 from the volume Vgp of the gas refrigerant communication pipe portion Q which is determined by the calculation. - Note that, in the present embodiment, the state is changed such that the second target value Pes2 in the second state becomes a pressure lower than the first target value Pes1 in the first state and therefore the refrigerant in the gas refrigerant communication pipe portion G is moved to other portions to increase the refrigerant quantity in other portions; thereby the volume Vlp in the gas refrigerant communication pipe portion G is calculated from the increased quantity. However, the state may be changed such that the second target value Pes2 in the second state becomes a pressure higher than the first target value Pes1 in the first state and therefore the refrigerant is moved from other portions to the gas refrigerant communication pipe portion G to decrease the refrigerant quantity in other portions; thereby the volume Vlp of the gas refrigerant communication pipe portion G may be calculated from the decreased quantity.
- In this way, the process in Step S24 is performed by the
controller 8 that functions as the pipe volume calculating means for a gas refrigerant communication pipe, which calculates the volume Vgp of the gas refrigerant communication pipe portion G from the operation state quantity of constituent equipment or the refrigerant flowing in therefrigerant circuit 10 during the pipe volume judging operation for the gas refrigerant communication pipe portion G. - (Step S25: Judging the Validity of a Result of Pipe Volume Judging Operation)
- After the above described Step S21 to Step S24 are completed, in Step S25, whether or not a result of the pipe volume judging operation is valid, in other words, whether or not the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G calculated by the pipe volume calculating means are valid is judged.
- Specifically, as shown in an inequality expression below, it is judged by whether or not the ratio of the volume Vlp of the liquid refrigerant communication pipe portion B3 to the volume Vgp of the gas refrigerant communication pipe portion G obtained by the calculations is in a predetermined numerical value range.
-
ε1<Vlp/Vgp<ε2 - Here, ε1 and ε2 are values that are changed based on the minimum value and the maximum value of the pipe volume ratio in feasible combinations of the heat source unit and the utilization unit.
- Then, when the volume ratio Vlp/Vgp satisfies the above described numerical value range, the process in Step S2 for the pipe volume judging operation is completed. When the volume ratio Vlp/Vgp does not satisfy the above numerical value range, the process for the pipe volume judging operation and the volume calculation in Step S21 to Step S24 is performed again.
- In this way, the process in Step S25 is performed by the
controller 8 that functions as a validity judging means for judging whether or not a result of the above described pipe volume judging operation is valid, in other words, whether or not the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G calculated by the pipe volume calculating means are valid. - Note that, in the present embodiment, the pipe volume judging operation (Steps S21, S22) for the liquid refrigerant communication pipe portion B3 is first performed and then the pipe volume judging operation for the gas refrigerant communication pipe portion G (Steps S23, S24) is performed. However, the pipe volume judging operation for the gas refrigerant communication pipe portion G may be performed first.
- In addition, in the above described Step S25, when a result of the pipe volume judging operation in Steps S21 to S24 is judged to be invalid a plurality of times, or when it is desired to more simply judge the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion Q although it is not shown in
FIG. 6 , for example, in Step S25, after a result of the pipe volume judging operation in Steps S21 to S24 is judged to be invalid, it is possible to proceed to the process for estimating, from the pressure loss in a portion combining the liquid refrigerant communication pipe portion B3 and the gas refrigerant communication pipe portion G (hereinafter referred to as “refrigerant communication pipe portion K”), the length of the refrigerant communication pipe portion K and calculating the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G from the estimated pipe length and an average volume ratio, thereby obtaining the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G. - In addition, in the present embodiment, the case where the pipe volume judging operation is performed to calculate the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G is described on the premise that there is no information regarding the length, pipe diameter and the like of the refrigerant communication pipe portion K, and the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G are unknown. However, when the pipe volume calculating means has a function to calculate the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G by inputting information regarding the length, pipe diameters and the like of the refrigerant communication pipe portion K, such function may be used together.
- Further, when the above described function to calculate the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G by the pipe volume judging operation and by using the operation results is not used but only the function to calculate the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G by inputting information regarding the length, pipe diameter and the like of the refrigerant communication pipe portion K is used, the above described validity judging means (Step S25) may be used to judge whether or not the input information regarding the lengths, pipe diameters and the like of the refrigerant communication pipe portion K is valid.
- (Step S3: Initial Refrigerant Quantity Detection Operation)
- When the above described pipe volume judging operation of Step S2 is completed, the process proceeds to the initial refrigerant quantity detection operation of Step S3. In the initial refrigerant quantity detection operation, the process in Step S31 and Step S32 shown in
FIG. 9 is performed by thecontroller 8. Here,FIG. 9 is a flowchart of the initial refrigerant quantity detection operation. - (Step S31: Refrigerant Quantity Judging Operation)
- In Step S31, as is the case with the above described refrigerant quantity judging operation of Step S11 in the automatic refrigerant charging operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed. Here, as a rule, values to be used for the target liquid pipe temperature value Tlps in the liquid pipe temperature control, the target superheat degree value SHrs in the superheat degree control, and the target low pressure value Pes in the evaporation pressure control are same as the target values during the refrigerant quantity judging operation of Step S1 in the automatic refrigerant charging operation.
- In this way, the process in Step S31 is performed by the
controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control. - (Step S32: Refrigerant Quantity Calculation)
- Next, the refrigerant quantity in the
refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the initial refrigerant quantity detection operation in Step S32 by thecontroller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation. Calculation of the refrigerant quantity in therefrigerant circuit 10 is performed by using the above described relational expression between the refrigerant quantity in each portion in therefrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10. However, at this time, the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion Q which were unknown at the time of after installation of constituent equipment of the air conditioner 1, have been calculated and the values thereof are known by the above described pipe volume judging operation. Thus, by multiplying the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G by the density of the refrigerant, the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 and the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G can be calculated, and further by adding the refrigerant quantity in each of other portions, the initial refrigerant quantity in the entirerefrigerant circuit 10 can be detected. This initial refrigerant quantity is used as a reference refrigerant quantity Mi of the entirerefrigerant circuit 10, which serves as a reference for judging whether or not there is a refrigerant leak from therefrigerant circuit 10 during the below described refrigerant leak detection operation. Therefore, it is stored as a value of the operation state quantity in the memory of thecontroller 8 serving as the state quantity storing means. - In this way, the process in Step S32 is performed by the
controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in therefrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the initial refrigerant quantity detection operation. - <Refrigerant Leak Detection Operation Mode>
- Next, the refrigerant leak detection operation mode is described with reference to
FIGS. 1 , 2, 5, and 10. Here,FIG. 10 is a flowchart of the refrigerant leak detection operation mode. - In the present embodiment, an example of a case is described where, whether or not the refrigerant in the
refrigerant circuit 10 is leaking to the outside due to an unforeseen factor is detected periodically (for example, during a period of time such as on a holiday or in the middle of the night when air conditioning is not needed). - (Step S41: Refrigerant Quantity Judging Operation)
- First, when operation in the normal operation mode such as the above described cooling operation and heating operation has gone on for a certain period of time (for example, half a year to a year), the normal operation mode is automatically or manually switched to the refrigerant leak detection operation mode, and as is the case with the refrigerant quantity judging operation of the initial refrigerant quantity detection operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control, is performed. Here, as a rule, values that are the same as the target values in Step S31 of the refrigerant quantity judging operation of the initial refrigerant quantity detection operation are used for the target liquid pipe temperature Tlps in the liquid pipe temperature control, the target superheating degree SHrs in the superheating degree control, and the target low pressure Pes in the evaporation pressure control.
- Note that, this refrigerant quantity judging operation is performed for each time the refrigerant leak detection operation is performed. Even when the refrigerant temperature Tco at the outlet of the
outdoor heat exchanger 22 changes due to the different operating conditions, for example, such as when the condensation pressure Pc is different or when the refrigerant is leaking, the refrigerant temperature Tlp in the liquid refrigerant communication pipe portion B3 is maintained constant at the same target liquid pipe temperature Tlps by the liquid pipe temperature control. - In this way, the process in Step S41 is performed by the
controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheating degree control, and evaporation pressure control. - (Step S42: Refrigerant Quantity Calculation)
- Next, the refrigerant quantity in the
refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the refrigerant leak detection operation in Step S42 by thecontroller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation. Calculation of the refrigerant quantity in therefrigerant circuit 10 is performed by using the above described relational expression between the refrigerant quantity in each portion in therefrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10. However, at this time, as is the case with the initial refrigerant quantity detection operation, the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G, which were unknown at the time of after installation of constituent equipment of the air conditioner 1, have been calculated and the values thereof are known by the above described pipe volume judging operation. Thus, by multiplying the volume Vlp of the liquid refrigerant communication pipe portion B3 and the volume Vgp of the gas refrigerant communication pipe portion G by the density of the refrigerant, the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 and the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G can be calculated, and further by adding the refrigerant quantity in each of other portions, the refrigerant quantity M in the entirerefrigerant circuit 10 can be calculated. - Here, as described above, the refrigerant temperature Tlp in the liquid refrigerant communication pipe portion B3 is maintained constant at the target liquid pipe temperature Tlps by the liquid pipe temperature control. Therefore, regardless of the difference in the operating conditions for the refrigerant leak detection operation, the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 will be maintained constant even when the refrigerant temperature Tco at the outlet of the
outdoor heat exchanger 22 changes. - In this way, the process in Step S42 is performed by the
controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity at each portion in therefrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in therefrigerant circuit 10 in the refrigerant leak detection operation. - (Steps S43, S44: Judging the Adequacy of the Refrigerant Quantity, Warning Display)
- When refrigerant leaks from the
refrigerant circuit 10, the refrigerant quantity in therefrigerant circuit 10 decreases. Then, when the refrigerant quantity in therefrigerant circuit 10 decreases, mainly, a tendency of a decrease in the subcooling degree SCo at the outlet of theoutdoor heat exchanger 22 appears. Along with this, the refrigerant quantity Mc in theoutdoor heat exchanger 22 decreases, and the refrigerant quantities in other portions tend to be maintained substantially constant. Consequently, the refrigerant quantity M of the entirerefrigerant circuit 10 calculated in the above described Step S42 is smaller than the reference refrigerant quantity Mi detected in the initial refrigerant quantity detection operation when the refrigerant is leaking from therefrigerant circuit 10; whereas when the refrigerant is not leaking from therefrigerant circuit 10, the refrigerant quantity M is substantially the same as the reference refrigerant quantity Mi. - By utilizing the above-described characteristics, whether or not the refrigerant is leaking is judged in Step S43. When it is judged in Step S43 that the refrigerant is not leaking from the
refrigerant circuit 10, the refrigerant leak detection operation mode is finished. - On the other hand, when it is judged in Step S43 that the refrigerant is leaking from the
refrigerant circuit 10, the process proceeds to Step S44, and a warning indicating that a refrigerant leak is detected is displayed on thewarning display 9. Subsequently, the refrigerant leak detection operation mode is finished. - In this way, the process from Steps S42 to S44 is performed by the
controller 8 that functions as a refrigerant leak detecting means, which is one of the refrigerant quantity judging means, and which detects whether or not the refrigerant is leaking by judging the adequacy of the refrigerant quantity in therefrigerant circuit 10 while performing the refrigerant quantity judging operation in the refrigerant leak detection operation mode. - As described above, in the air conditioner 1 in the present embodiment, the
controller 8 functions as the refrigerant quantity judging operation means, the refrigerant quantity calculating means, the refrigerant quantity judging means, the pipe volume judging operation means, the pipe volume calculating means, the validity judging means, and the state quantity storing means, and thereby configures the refrigerant quantity judging system for judging the adequacy of the refrigerant quantity charged into therefrigerant circuit 10. - (A)
- With this air conditioner 1, when performing the refrigerant quantity judging operation while the
indoor units 3 a to 3 c in all the rooms are set to the cooling operation state, the high pressure gas refrigerant communication pipe portion G1 extending from theoutdoor unit 2 to theconnection units 4 a to 4 c will be in a shut-off state. Thereby the refrigerant condenses and accumulates in the pipe, and thus the detection error may be increased. Therefore, the firstbypass refrigerant circuit 27 and the thirdbypass refrigerant circuits 43 a to 43 c which bypass the high pressure gas refrigerant communication pipe portion G1 to the low pressure gas refrigerant communication pipe portion G2 are provided, and the first bypass on/off valve V3 and the second bypass on/off valves V13 a to V13 c are set to an opened state during the refrigerant quantity judging operation, thereby reducing the pressure difference between the high pressure gas refrigerant communication pipe portion G1 and the low pressure gas refrigerant communication pipe portion G2 and preventing accumulation of liquid refrigerant in the high pressure gas refrigerant communication pipe portion G1 resulting from condensation. Thus, the refrigerant quantity judging operation with high accuracy can be achieved. In addition, the first bypass on/off valve V3 and the third bypass on/off valves are provided in theoutdoor unit 2 and in theconnection units 4 a to 4 c, respectively. The first bypass on/off valve V3 is provided in theoutdoor unit 2, and the third bypass on/off valves are provided in theconnection units 4 a to 4 c. By using these valves in combination, the low pressure gas refrigerant can easily flow through the high pressure gas refrigerant communication pipe portion G1, and the temperature change of the gas refrigerant can be minimized. Thus, the detection error can be reduced. In addition, the bypass circuit can be provided in therefrigerant circuit 10 even without laying pipes for the bypass circuit at the time of construction. Accordingly, it is possible to reduce the labors for construction and the cost. - (B)
- This air conditioner 1 is further provided with the temperature sensor in the high pressure gas refrigerant communication pipe portion G1. Accordingly, even when the temperate of the gas refrigerant in the high pressure gas refrigerant communication pipe portion G1 changes because of the incoming heat from the outside air and the like and thereby the density of the refrigerant changes, it is possible to correct the density of the refrigerant based on the temperature detection value by the temperature sensor. Thereby it is possible to reduce the detection error. Thus, the refrigerant quantity judging operation with higher accuracy can be achieved. In addition, with this air conditioner 1, in the high pressure gas refrigerant communication pipe portion G1, the first high pressure gas pipe temperature sensor T8 is provided in the heat source unit, and the second high pressure gas pipe temperature sensors T12 a to T12 c are provided in the
connection units 4 a to 4 c. Accordingly, by using the first high pressure gas pipe temperature sensor T8 and the second high pressure gas pipe temperature sensors T12 a to T12 c in combination, it is possible to more accurately correct the density of the refrigerant in the pipe. In addition, the temperature detecting means can be provided in therefrigerant circuit 10 even without providing the temperature sensor in the high pressure gas refrigerant pipe at the time of construction. Therefore, it is possible to reduce the labors for construction and the cost. - While a preferred embodiment of the present invention has been described with reference to the figures, the scope of the present invention is not limited to the above embodiment, and the various changes and modifications may be made without departing from the scope of the present invention.
- (A)
- In the above described embodiment, an example in which the present invention is applied to an air conditioner including a single outdoor unit is described. However, it is not limited thereto, and the present invention may be applied to an air conditioner including a plurality of outdoor units. In addition, although an air-cooled outdoor unit that uses the outdoor air as the heat source is used as the
outdoor unit 2 of the air conditioner 1, a water-cooled type or ice thermal storage type outdoor unit may be used instead. - (B)
- In the above described embodiment, as the bypass circuits, the first
bypass refrigerant circuit 27 is provided on theoutdoor unit 2 side and the thirdbypass refrigerant circuits 43 a to 43 c are provided on theconnection units 4 a to 4 c side. However, the bypass circuits may be provided only on theoutdoor unit 2 side or only on theconnection units 4 a to 4 c side. - (C)
- In the above described embodiment, as the temperature sensors, the first high pressure gas pipe temperature sensor T8 is mounted on the
outdoor unit 2 side and the second high pressure gas pipe temperature sensors T12 a to T12 c are mounted on theconnection units 4 a to 4 c side. However, the temperature sensors may be mounted only on theoutdoor unit 2 side or only on theconnection units 4 a to 4 c side. In addition, the temperature sensors may not necessarily be provided. - (D)
- The
controller 8 that performs the operation control of the entire air conditioner 1 is configured by theoutdoor side controller 26, theindoor side controllers 34 a to 34 c, and theconnection side controllers 44 a to 44 c as they exchange control signals via thetransmission line 8 a. However, it is not limited thereto. A controller that performs the operation control of the entire air conditioner 1 may be provided in theoutdoor unit 2, in theindoor units 3 a to 3 c, or in theconnection units 4 a to 4 c; or, a single unit may be provided as a control unit. - The air conditioner according to the present invention reduces the pressure difference between the first gas refrigerant communication pipe and the second gas refrigerant communication pipe, prevents accumulation of liquid refrigerant in the first gas refrigerant communication pipe resulting from condensation, and can perform the refrigerant quantity judging operation with high accuracy. Thus, the present invention is useful as a refrigerant circuit of an air conditioner, an air conditioner provided therewith, and the like.
Claims (17)
1. An air conditioner that performs a refrigerant quantity judging operation to judge the refrigerant quantity in a refrigerant circuit, the air conditioner comprising:
a heat source unit including a heat source side heat exchanger and a compression element configured to compress refrigerant gas;
a utilization unit including a utilization side heat exchanger;
an expansion mechanism;
a first gas refrigerant pipe extending from a discharge side of the compression element to the utilization unit;
a second gas refrigerant pipe extending from a suction side of the compression element to the utilization unit;
a liquid refrigerant pipe extending from the heat source side heat exchanger to the utilization unit;
a switching mechanism configured to switch between a first state and a second state, the refrigerant flowing through the liquid refrigerant pipe evaporating in the utilization side heat exchanger and thereafter flowing into the second gas refrigerant pipe in the first state, and the refrigerant flowing through the first gas refrigerant pipe condensing in the utilization side heat exchanger and thereafter flowing into the liquid refrigerant pipe in the second state;
a bypass circuit configured to bypass the first gas refrigerant pipe to the second gas refrigerant pipe;
a bypass circuit opening/closing element provided in the bypass circuit and configured to open and close the bypass circuit; and
a controller configured to open the bypass circuit opening/closing element before performing the refrigerant quantity judging operation.
2. The air conditioner according to claim 1 , wherein
the bypass circuit opening/closing element is provided in the heat source unit.
3. The air conditioner according to claim 1 , further comprising
a switching unit separate from the utilization unit and the heat source unit, the switching unit including the switching mechanism, and
the bypass circuit opening/closing element being provided in the switching unit.
4. The air conditioner according to claim 1 , further comprising
a temperature detecting element configured to detect the refrigerant temperature in the first gas refrigerant pipe and output a refrigerant temperature detection value, and
the controller corrects the refrigerant quantity judged by the refrigerant quantity judging operation based on the refrigerant temperature detection value.
5. The air conditioner according to claim 4 , wherein
the temperature detecting element is provided in the switching unit.
6. The air conditioner according to claim 4 , wherein
the temperature detecting element is provided in the heat source unit.
7. The air conditioner according to claim 5 , wherein
the temperature detecting element is provided in the heat source unit.
8. The air conditioner according to claim 2 , further comprising
a switching unit separate from the utilization unit and the heat source unit, the switching unit including the switching mechanism, and
the bypass circuit opening/closing element being provided in the switching unit.
9. The air conditioner according to claim 8 , further comprising
a temperature detecting element configured to detect the refrigerant temperature in the first gas refrigerant pipe and output a refrigerant temperature detection value, and
the controller corrects the refrigerant quantity judged by the refrigerant quantity judging operation based on the refrigerant temperature detection value.
10. The air conditioner according to claim 9 , wherein
the temperature detecting element is provided in the switching unit.
11. The air conditioner according to claim 9 , wherein
the temperature detecting element is provided in the heat source unit.
12. The air conditioner according to claim 2 , further comprising
a temperature detecting element configured to detect the refrigerant temperature in the first gas refrigerant pipe and output a refrigerant temperature detection value, and
the controller corrects the refrigerant quantity judged by the refrigerant quantity judging operation based on the refrigerant temperature detection value.
13. The air conditioner according to claim 12 , wherein
the temperature detecting element is provided in the switching unit.
14. The air conditioner according to claim 12 , wherein
the temperature detecting element is provided in the heat source unit.
15. The air conditioner according to claim 3 , further comprising
a temperature detecting element configured to detect the refrigerant temperature in the first gas refrigerant pipe and output a refrigerant temperature detection value, and
the controller corrects the refrigerant quantity judged by the refrigerant quantity judging operation based on the refrigerant temperature detection value.
16. The air conditioner according to claim 15 , wherein
the temperature detecting element is provided in the switching unit.
17. The air conditioner according to claim 15 , wherein
the temperature detecting element is provided in the heat source unit.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006-065932 | 2006-03-10 | ||
JP2006065932A JP3963192B1 (en) | 2006-03-10 | 2006-03-10 | Air conditioner |
PCT/JP2007/054587 WO2007105604A1 (en) | 2006-03-10 | 2007-03-08 | Air conditioner |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090031739A1 true US20090031739A1 (en) | 2009-02-05 |
Family
ID=38498631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/281,064 Abandoned US20090031739A1 (en) | 2006-03-10 | 2007-03-08 | Air conditioner |
Country Status (8)
Country | Link |
---|---|
US (1) | US20090031739A1 (en) |
EP (1) | EP1998124B1 (en) |
JP (1) | JP3963192B1 (en) |
KR (1) | KR100960539B1 (en) |
CN (1) | CN101395436B (en) |
AU (1) | AU2007225803B2 (en) |
ES (1) | ES2646190T3 (en) |
WO (1) | WO2007105604A1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110296861A1 (en) * | 2009-02-24 | 2011-12-08 | Daikin Industries, Ltd. | Heat pump system |
US20190293417A1 (en) * | 2016-11-30 | 2019-09-26 | Daikin Industries, Ltd. | Pipe diameter determination method, pipe diameter determination apparatus, and refrigerating apparatus |
US10527322B2 (en) * | 2015-09-11 | 2020-01-07 | Hitachi-Johnson Controls Air Conditioning, Inc. | Air conditioner |
US10533783B2 (en) | 2018-04-26 | 2020-01-14 | Hitachi-Johnson Controls Air Conditioning, Inc. | Air conditioner having compressor bypass and evaluation of volume of connecting pipe |
US20210231317A1 (en) * | 2020-01-28 | 2021-07-29 | Lg Electronics Inc. | Air conditioning apparatus |
US20220128253A1 (en) * | 2019-07-12 | 2022-04-28 | Daikin Industries, Ltd. | Refrigerant leakage notifying device and refrigeration cycle system including refrigerant leakage notifying device |
EP4148346A4 (en) * | 2020-05-08 | 2024-01-24 | Daikin Ind Ltd | Refrigeration cycle system, heat source unit, and refrigeration cycle device |
US11927377B2 (en) | 2014-09-26 | 2024-03-12 | Waterfurnace International, Inc. | Air conditioning system with vapor injection compressor |
US11953239B2 (en) | 2018-08-29 | 2024-04-09 | Waterfurnace International, Inc. | Integrated demand water heating using a capacity modulated heat pump with desuperheater |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009079842A (en) * | 2007-09-26 | 2009-04-16 | Mitsubishi Electric Corp | Refrigerating cycle device and its control method |
JP5186951B2 (en) * | 2008-02-29 | 2013-04-24 | ダイキン工業株式会社 | Air conditioner |
JP5764736B2 (en) * | 2010-11-30 | 2015-08-19 | パナソニックIpマネジメント株式会社 | Refrigeration equipment |
WO2014061132A1 (en) * | 2012-10-18 | 2014-04-24 | ダイキン工業株式会社 | Air conditioner |
US9696078B2 (en) | 2013-11-20 | 2017-07-04 | Mitsubishi Electric Corporation | Refrigeration cycle apparatus |
CN113272598B (en) * | 2019-01-16 | 2022-08-19 | 三菱电机株式会社 | Air conditioner |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5214918A (en) * | 1989-12-13 | 1993-06-01 | Hitachi, Ltd. | Refrigerator and method for indicating refrigerant amount |
US5388422A (en) * | 1991-01-10 | 1995-02-14 | Mitsubishi Denki Kabushiki Kaisha | Air-conditioning system |
US20030230096A1 (en) * | 2002-06-12 | 2003-12-18 | Lg Electronics Inc. | Multi-unit air conditioner and method for controlling the same |
US20040035133A1 (en) * | 2002-08-24 | 2004-02-26 | Lg Electronics Inc. | Simultaneous heating and cooling operation type multi-air conditioner |
US20050252221A1 (en) * | 2003-01-10 | 2005-11-17 | Daikin Industries, Ltd. | Refrigeration system and method for detecting quantity of refrigerant of refrigeration system |
US6973796B2 (en) * | 2002-08-22 | 2005-12-13 | Lg Electronics Inc. | Multi-air conditioner and operation method thereof |
US20060162353A1 (en) * | 2004-12-29 | 2006-07-27 | Lg Electronics Inc. | Multi-type air conditioner for simultaneous heating and cooling use and method for withdrawing refrigerant therefrom |
US8069682B2 (en) * | 2006-03-20 | 2011-12-06 | Daikin Industries, Ltd. | Air conditioner that corrects refrigerant quantity determination based on refrigerant temperature |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2611440B2 (en) * | 1989-07-31 | 1997-05-21 | ダイキン工業株式会社 | Operation control device for air conditioner |
JP3186170B2 (en) * | 1992-02-13 | 2001-07-11 | 井関農機株式会社 | Threshing cylinder deployment device |
JP3291753B2 (en) * | 1992-04-08 | 2002-06-10 | ダイキン工業株式会社 | Refrigerant charging amount detection device for refrigeration equipment |
JP3063468B2 (en) * | 1993-07-02 | 2000-07-12 | 神鋼電機株式会社 | Positioning method of the cutting part of the undercut machine |
JP4747439B2 (en) * | 2001-05-18 | 2011-08-17 | 株式会社富士通ゼネラル | Multi-room air conditioner |
JP3953976B2 (en) * | 2003-04-30 | 2007-08-08 | 三星電子株式会社 | Air conditioner |
JP4270197B2 (en) | 2004-06-11 | 2009-05-27 | ダイキン工業株式会社 | Air conditioner |
-
2006
- 2006-03-10 JP JP2006065932A patent/JP3963192B1/en active Active
-
2007
- 2007-03-08 KR KR1020087023156A patent/KR100960539B1/en not_active IP Right Cessation
- 2007-03-08 US US12/281,064 patent/US20090031739A1/en not_active Abandoned
- 2007-03-08 EP EP07738077.2A patent/EP1998124B1/en active Active
- 2007-03-08 CN CN2007800080112A patent/CN101395436B/en active Active
- 2007-03-08 AU AU2007225803A patent/AU2007225803B2/en active Active
- 2007-03-08 ES ES07738077.2T patent/ES2646190T3/en active Active
- 2007-03-08 WO PCT/JP2007/054587 patent/WO2007105604A1/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5214918A (en) * | 1989-12-13 | 1993-06-01 | Hitachi, Ltd. | Refrigerator and method for indicating refrigerant amount |
US5388422A (en) * | 1991-01-10 | 1995-02-14 | Mitsubishi Denki Kabushiki Kaisha | Air-conditioning system |
US20030230096A1 (en) * | 2002-06-12 | 2003-12-18 | Lg Electronics Inc. | Multi-unit air conditioner and method for controlling the same |
US6973796B2 (en) * | 2002-08-22 | 2005-12-13 | Lg Electronics Inc. | Multi-air conditioner and operation method thereof |
US20040035133A1 (en) * | 2002-08-24 | 2004-02-26 | Lg Electronics Inc. | Simultaneous heating and cooling operation type multi-air conditioner |
US20050252221A1 (en) * | 2003-01-10 | 2005-11-17 | Daikin Industries, Ltd. | Refrigeration system and method for detecting quantity of refrigerant of refrigeration system |
US20060162353A1 (en) * | 2004-12-29 | 2006-07-27 | Lg Electronics Inc. | Multi-type air conditioner for simultaneous heating and cooling use and method for withdrawing refrigerant therefrom |
US8069682B2 (en) * | 2006-03-20 | 2011-12-06 | Daikin Industries, Ltd. | Air conditioner that corrects refrigerant quantity determination based on refrigerant temperature |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110296861A1 (en) * | 2009-02-24 | 2011-12-08 | Daikin Industries, Ltd. | Heat pump system |
US9581361B2 (en) * | 2009-02-24 | 2017-02-28 | Daikin Industries, Ltd. | Heat pump system |
US11927377B2 (en) | 2014-09-26 | 2024-03-12 | Waterfurnace International, Inc. | Air conditioning system with vapor injection compressor |
US10527322B2 (en) * | 2015-09-11 | 2020-01-07 | Hitachi-Johnson Controls Air Conditioning, Inc. | Air conditioner |
US20190293417A1 (en) * | 2016-11-30 | 2019-09-26 | Daikin Industries, Ltd. | Pipe diameter determination method, pipe diameter determination apparatus, and refrigerating apparatus |
US11105620B2 (en) * | 2016-11-30 | 2021-08-31 | Daikin Industries, Ltd. | Pipe diameter determination method, pipe diameter determination apparatus, and refrigerating apparatus |
US10533783B2 (en) | 2018-04-26 | 2020-01-14 | Hitachi-Johnson Controls Air Conditioning, Inc. | Air conditioner having compressor bypass and evaluation of volume of connecting pipe |
US11953239B2 (en) | 2018-08-29 | 2024-04-09 | Waterfurnace International, Inc. | Integrated demand water heating using a capacity modulated heat pump with desuperheater |
US20220128253A1 (en) * | 2019-07-12 | 2022-04-28 | Daikin Industries, Ltd. | Refrigerant leakage notifying device and refrigeration cycle system including refrigerant leakage notifying device |
US20210231317A1 (en) * | 2020-01-28 | 2021-07-29 | Lg Electronics Inc. | Air conditioning apparatus |
EP4148346A4 (en) * | 2020-05-08 | 2024-01-24 | Daikin Ind Ltd | Refrigeration cycle system, heat source unit, and refrigeration cycle device |
Also Published As
Publication number | Publication date |
---|---|
WO2007105604A1 (en) | 2007-09-20 |
CN101395436A (en) | 2009-03-25 |
CN101395436B (en) | 2012-08-29 |
EP1998124A1 (en) | 2008-12-03 |
JP3963192B1 (en) | 2007-08-22 |
EP1998124A4 (en) | 2016-11-02 |
ES2646190T3 (en) | 2017-12-12 |
KR100960539B1 (en) | 2010-06-03 |
JP2007240108A (en) | 2007-09-20 |
EP1998124B1 (en) | 2017-10-04 |
KR20080097475A (en) | 2008-11-05 |
AU2007225803B2 (en) | 2009-12-24 |
AU2007225803A1 (en) | 2007-09-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7954333B2 (en) | Air conditioner | |
US8069682B2 (en) | Air conditioner that corrects refrigerant quantity determination based on refrigerant temperature | |
US9303908B2 (en) | Air conditioner | |
US7946121B2 (en) | Air conditioner | |
US20090031739A1 (en) | Air conditioner | |
AU2006324596B2 (en) | Air conditioner | |
US7980086B2 (en) | Air conditioner | |
US20090095000A1 (en) | Air conditioner | |
US20090100849A1 (en) | Air conditioner | |
US7997093B2 (en) | Air conditioner | |
US7878010B2 (en) | Air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: DAIKIN INDUSTRIES, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KASAHARA, SHINICHI;YOSHIMI, MANABU;NISHIMURA, TADAFUMI;REEL/FRAME:021456/0732;SIGNING DATES FROM 20070530 TO 20070531 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |