US20010038774A1 - Method, system and device for building a wall in the ground - Google Patents

Method, system and device for building a wall in the ground Download PDF

Info

Publication number
US20010038774A1
US20010038774A1 US09/113,017 US11301798A US2001038774A1 US 20010038774 A1 US20010038774 A1 US 20010038774A1 US 11301798 A US11301798 A US 11301798A US 2001038774 A1 US2001038774 A1 US 2001038774A1
Authority
US
United States
Prior art keywords
wall
building device
ground
wall building
string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/113,017
Other versions
US6357965B2 (en
Inventor
Marinus Chr. Lammertink
Rutger Chr. Van Voorden
Rene Broeder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heerema Holding Construction Inc
Original Assignee
Heerema Holding Construction Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heerema Holding Construction Inc filed Critical Heerema Holding Construction Inc
Assigned to HEEREMA ONDERGRONDSE INFRASTRUCTUREN B.V. reassignment HEEREMA ONDERGRONDSE INFRASTRUCTUREN B.V. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BROEDER, RENE, LAMMERTINK, MARINUS CHRISTIAAN, VAN VOORDE, RUTGER CHRISTIAAN
Assigned to HEEREMA HOLDING CONSTRUCTION, INC. reassignment HEEREMA HOLDING CONSTRUCTION, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HEEREMA ONDERGRONDSE INFRASTRUCTUREN B.V.
Publication of US20010038774A1 publication Critical patent/US20010038774A1/en
Application granted granted Critical
Publication of US6357965B2 publication Critical patent/US6357965B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring
    • E21B7/30Enlarging drilled holes, e.g. by counterboring without earth removal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1053Making by using boring or cutting machines for making a slit along the perimeter of the tunnel profile, the remaining core being removed subsequently, e.g. by blasting

Definitions

  • This invention relates to a method for building a wall or a part thereof in the ground, a system for carrying out the method, and a wall building device for use in the method and system.
  • tunnel wall building devices are e.g. described in the “Handbook of Mining and Tunnel Machinery”, Barbara Stack, 1982, published by John Wiley and Sons, pages 415-417. These known tunnel wall building devices comprise a cutting face at the front of a cylindrical shield. The tunnel wall building device is pushed in the direction of the advance of the shield by hydraulic cylinders acting between the rear side of the shield and the constructed tunnel wall.
  • a first drawback of the use of such tunnel wall building devices is the criticality of the control over the stabilization of the ground in front of the cutting face. Too much excavation will cause local collapse of the ground, while too much push force will cause undesirable settlements of the ground.
  • a second drawback is the required axial support of the tunnel wall building device on the tunnel wall.
  • the axial support force might be a governing load case.
  • the tunnel wall is made of extruded concrete.
  • EP-A-0 354 335 describing axially supporting a boring shield by the extruded concrete tunnel wall through formwork elements used for forming the inner side of the tunnel wall.
  • the tunnel wall building method according to this publication is discontinuous, taking away formwork elements where the concrete has hardened, and adding the formwork elements, after cleaning thereof, directly behind the boring shield. This method is expensive and time-consuming as a result of the use of the formwork elements, which need to be handled behind the boring shield, and can only be removed when the concrete they are supporting has hardened sufficiently, which may take considerable time.
  • EP-A-0 483 445 describes a continuous tunnel wall building method, extruding concrete to form a tunnel wall, and using a sliding formwork arrangement requiring additional means to transfer the axial boring forces to the hardened part of the tunnel wall and to facilitate continuity.
  • the object of the present invention is to provide a method, system, and device for building a wall or a part thereof in general, and a tunnel wall in particular which avoid the risk of collapse or undesirable settlement of the ground in front of the wall building area.
  • Another object of the present invention is to provide a wall building method, system, and device which do not rely on the wall for providing an axial support for the wall building activities.
  • Yet another object of the present invention is to provide a wall building method, system, and device which can be continuous and do not use formwork elements.
  • a further object of the present invention is to provide a wall building method, system, and device which are virtually unaffected by the ground water level.
  • a wall building device having cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the all is pulled through the ground, at least a part of the all being formed by injecting a hardenable material behind he wall building device.
  • the wall is supported on all sides by the ground surrounding the wall (and, in the case of a tunnel wall, by the ground filling the tunnel wall). Consequently, the wall requires no direct strength, and can e.g. be made from fibre concrete with a normal hardening time.
  • the excavation of the ground at one side of the wall can be done after the completion of the tunnel wall, and the stability of the excavation presents no problem at all.
  • the following steps are performed: drilling one or more holes in the ground, on or parallel to the projected path of the wall, each of the one or more holes being drilled by means of a drill string; connecting one end of each drill string at the end of the drilling operation to the wall building device; and pulling the wall building device through the ground by retracting the one or more drill strings.
  • the wall building method may comprise the steps of: drilling one or more holes in the ground, on or parallel to the projected path of the wall, each of the one or more holes being drilled by means of a drill string; connecting one end of each drill string at the end of the drilling operation to one end of a casing string; pulling each casing string through the ground by retracting the drill string connected thereto; disconnecting each casing string from the corresponding drill string; connecting one end of each casing string to the wall building device; and pulling the wall building device through the ground by retracting the one or more casing strings.
  • one or more drill strings and or one or more casing strings are used to pull the wall building device through the ground, using standard directional drilling techniques to bring the drill and casing strings into the ground.
  • the directional drilling techniques are capable of very accurately following the projected path of the wall.
  • the accuracy of the paths of the casing strings can be further improved by using a single drill string and by means of a connecting assembly connecting the ends of several casing strings to one end of the drill string and transversely spaced therefrom, which drill string is then pulled through the ground at the other end thereof.
  • each casing string comprises an inner string and an outer string enclosing the inner string, the inner string being adapted to transfer the pulling force required by the wall building device, and the outer string being adapted to provide low friction forces when moving the inner string relative to the outer string.
  • the outer string serves as a guide for the inner string when pulling the wall building device through the ground by the inner string. The friction forces between the inner string and the outer string can be still further reduced by supplying a fluid to the space between the inner string and the outer string.
  • the inner string of the casing string is made of steel providing the strength needed, while the outer string is made of plastics, e.g. polyethylene providing an excellent low cost and low friction separation wall between the inner string and the ground.
  • plastics e.g. polyethylene providing an excellent low cost and low friction separation wall between the inner string and the ground.
  • a hardenable material is injected behind it to form the wall.
  • the wall material preferably is supplied to the wall building device through at least one of the one or more drill strings/casing strings used for pulling the wall building device through the ground.
  • at least one of the one or more drill strings/casing strings may contain at least one line for supplying energy, at least one line for controlling and/or monitoring the wall building device, at least one duct for supplying a drilling fluid to the wall building device, and/or at least one duct for discharging ground removed by the wall building device.
  • the wall material and the drilling fluid may be supplied to the wall building device through ducts extruded in the wall.
  • Such ducts can also be used for accommodating lines for supplying energy to the wall building device, or for controlling and/or monitoring the wall building device. Further, such ducts can be used for discharging ground removed by the wall building device.
  • the wall building device is adapted to build a wall or wall part provided with wall guide means, the or a further wall building device being provided with means for engaging the wall guide means.
  • the wall guide means preferably comprise a guide slit, which may have an essentially L-shaped cross-section. More generally, in a preferred embodiment at least one guide member is provided in the ground, the wall building device being adapted to be guided along the guide member through the ground.
  • the wall building device When a wall building device is used in a multi-pass mode, i.e. for subsequently passing through the ground along adjacent paths for building a wall from a plurality of separately built wall sections, preferably the wall building device is adapted to be connected to the leading end of a pulling string for pulling the pulling string into the ground simultaneously with pulling the wall building device through the ground.
  • the pulling string is used for pulling the or a further wall building device through the ground in a next passage.
  • the wall building device preferably has an essentially Z-shaped cross-section.
  • An essentially flat wall can be built in the ground by at least two wall building devices which at at least one side thereof are adapted to be coupled to another, which wall building devices further are adapted to be pulled through the ground in a forward direction, and in a direction at an angle to the forward direction.
  • the wall material preferably is injected between one or more membranes defining one or more sides of the wall or wall part formed by the wall building device.
  • the membrane or membranes can be stored in the wall building device in folded or rolled-up form, and unfolded or unrolled when injecting the wall material.
  • the friction between the wall building device and the surrounding ground, and the resistance the ground offers to the wall building device when pulling the wall building device through the ground is preferably reduced by vibrating, lubrication, jetting and/or removing the ground area adjacent to the front part of the wall building device.
  • FIG. 1 shows a vertical cross-section of a ground area in which a tunnel is to be built, illustrating a first operation
  • FIG. 2 shows on an enlarged scale a drill string used in the operation shown in FIG. 1;
  • FIG. 3 illustrates a next operation in the ground
  • FIG. 4 shows on an enlarged scale a part of pulling means used in the operation illustrated in FIG. 3;
  • FIG. 5 illustrates a next operation in the ground in the process of building a tunnel wall
  • FIG. 6 shows on an enlarged scale a side view of a tunnel wall building device shown in FIG. 5;
  • FIG. 7 schematically shows a longitudinal cross-section of the tunnel wall building device shown in FIG. 6;
  • FIGS. 8 and 9 illustrate different methods of excavating a tunnel within the wall
  • FIG. 10 shows a side view, partially in cross-section, of another embodiment of the tunnel wall building device according to the invention.
  • FIG. 11 shows on an enlarged scale a cross-section of a detail X of the tunnel wall building device of FIG. 10;
  • FIG. 12 shows a front view of the tunnel wall building device of FIG. 10
  • FIG. 13 shows a perspective view of a wall building device according to the invention
  • FIG. 14 shows on an enlarged scale a cross-section of the wall building device of FIG. 13 taken along the line XIV-XIV;
  • FIG. 15 shows a perspective view of an assembly used for simultaneously pulling four casing strings through the ground
  • FIG. 16 shows a front view of the assembly of FIG. 15
  • FIG. 17 shows a side view of the assembly of FIG. 15;
  • FIG. 18 shows a cross-section of a structure built in the ground using the method, system and wall building device according to the invention
  • FIG. 19 shows a cross-section of another structure built in the ground using the method, system and wall building device according to the invention.
  • FIG. 20 shows a cross-section of a further structure built in the ground using the method, system and wall building device according to the invention
  • FIGS. 20 a - 20 d illustrate a method for building a structure similar to the one shown in FIG. 20;
  • FIG. 21 shows a cross-section of still another structure built in the ground using the method, system and wall building device according to the invention.
  • FIG. 22 illustrates in perspective view the process of building a composite wall made from uniformly shaped wall sections
  • FIGS. 23 a - 23 g in cross-sectional view show different stages in building composite walls made from uniformly shaped wall parts
  • FIGS. 24 a - 24 c in top view schematically illustrate a further process of building a wall according to the invention.
  • FIGS. 25 a and 25 b in top view schematically illustrate a still further process of building a wall according to the invention.
  • FIGS. 1 and 2 illustrate, in the given example of a tunnel building method it is assumed that a tunnel is to be built in the ground 2 under the ground surface 4 from a first construction pit 6 to a second construction pit 8 .
  • a number of pilot holes 10 are drilled using conventional directional drilling techniques, as described e.g. in “Tunnels & Tunnelling”, published by Morgan-Grampian, November 1996, in particular on page 15.
  • a directional drilling unit 12 pushes a drill string 14 through the ground from the second construction pit 8 to the first construction pit 6 .
  • the pilot holes are drilled on or parallel to the projected path of the tunnel wall.
  • FIGS. 3 and 4 illustrate, after having reached the first construction pit 6 , the front end of the drill string 14 is connected to the front part of a casing string 16 , after which the casing string 16 is pulled through the ground along the path of the pilot hole 10 by the directional drilling unit 12 .
  • casing strings 16 are installed in the ground along the projected path of the tunnel wall.
  • the casing string 16 comprises a steel casing 18 enclosed in a plastic, preferably polyethylene (PE) tube 20 .
  • the casing string 16 is connected to a buoy 22 by a flexible coupling 24 , which buoy 22 in turn is connected to a reaming device 26 by a flexible coupling 28 .
  • the projected tunnel wall has a ring-shaped cross-section, preferably at least four casing strings 16 are installed in the ground 2 spaced along the periphery of the cross-section.
  • FIGS. 5 - 7 illustrate, the back ends of the casing strings 16 are connected to the front end of a tunnel wall building device 30 , which has cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the tunnel wall, and which is pulled through the ground 2 by pulling means 32 (not shown in further detail) pulling simultaneously all casing strings 16 .
  • the wall building device 30 comprises a body 34 with a conical-shaped front part 36 , which is rounded at the front end thereof. Behind the front part 36 , in the body 34 one or more vibration units 38 can be provided to reduce the friction between the wall building device 30 and the ground, and to reduce the forces required to displace the ground with the front part 36 while moving through the ground. Directly behind the front part 36 a fluid 40 , e.g. supplied through one of the casing strings 16 , may be injected to further reduce the friction between the wall building device 30 and the ground 2 .
  • the front part 36 is designed to minimize effects on the surrounding ground area, to avoid plug forming in the wall building device 30 , and to minimize the required force for advancing the wall building device 30 .
  • jetting 42 may be provided to improve the ground displacement, the jetting fluid e.g. being supplied through one of the casing strings 16 .
  • the front part 36 may be made in segments which are movable in the radial direction to allow for small corrections of the path of the wall building device 30 moving through the ground 2 .
  • the tunnel wall 43 is extruded by pumping the wall material 44 into the gap created by the wall building device 30 .
  • the pressure of the wall material 44 which preferably is fibre concrete, ensures the stability of the ground and prevents settlements thereof. The pressure also provides a force in the direction of advance of the wall building device 30 .
  • the wall material 44 does not need to have direct strength, and only has to stabilize the gap created by the wall building device 30 at the rear end thereof.
  • the wall material 44 is extruded between membranes 46 which can be stored in concertina fashion in spaces provided therefore in the body 34 of the wall building device 30 .
  • the membranes 46 are folded up in the body 34 , and unfold when the wall building device advances.
  • the membranes 46 prevent leakage of the wall material into the ground, ensure stabilization of the tunnel wall 43 , provide (extra) water tightness, and provide a quality assurance.
  • membranes in the method, system and wall building device according to the invention are not essential; normally membranes can be omitted, and are used only if special requirements, such as wall quality, water tightness, etc. are to be met.
  • the wall material 44 is supplied to the wall building device 30 through one or more of the casing strings 16 , in particular through the steel casing 18 thereof.
  • the tubes 20 of the casing string 16 are cut in front of the wall building device in a manner not shown in further detail.
  • the cut tube 20 is directed to the inside of the tunnel wall 43 , and can be removed during or after excavating the ground inside the tunnel wall 43 .
  • the longitudinally cut tube can also be reused to protect power supply or signal lines, or can serve other useful purposes when the tunnel is completed.
  • the body 34 of the wall building device 30 comprises channels not shown in further detail guiding the wall material supplied through the casing strings 16 to the rear end of the wall building device 30 between the membranes 46 , and may also comprise other channels not shown in further detail to guide fluid supplied through the casing strings 16 for lubrication and jetting.
  • FIGS. 8 and 9 illustrate, after the tunnel wall has been completed and has sufficient strength, the ground inside the tunnel wall can be excavated using a dragline 50 (FIG. 8) or, when the level of the ground water 52 is high, conventional dredging equipment 54 (FIG. 9) can be used.
  • the wall building device 30 can also, under circumstances, be pulled through the ground by the drill strings 14 , which at the same time may serve to supply the wall material 44 to the wall building device.
  • a tunnel with a rectangular cross-section may be constructed by subsequently building the top wall, the bottom wall and the side walls, after which the ground inside the thus completed tunnel wall is excavated.
  • Yet another possibility is building a first tunnel wall and subsequently building one or more additional tunnel walls enclosing the first tunnel wall, or inside the first tunnel wall.
  • the different tunnel walls may have different properties: one being designed for watertightness, another being designed for strength.
  • FIGS. 10, 11, and 12 show a tunnel wall building device 60 being pulled through the ground by means of four pulling strings 62 not shown in further detail.
  • the wall building device 60 comprises eighty jetting and extruding units 64 arranged along the ring-shaped front side of the wall building device 60 .
  • each jetting and extruding unit 64 comprises a body 66 having four main ducts 68 , 70 , 72 , and 74 formed therein.
  • the ducts 68 , 74 of different jetting and extruding units 64 are in fluid communication with each other and may further be in fluid communication with one or more ducts in a pulling string 62 .
  • the jetting and extruding unit 64 comprises a grid 76 keeping stones and other large objects out of a jetting chamber 78 situated behind the grid 76 .
  • a rotating jetting device is mounted comprising a fluid driven motor 80 driving a tube 82 which is provided with a jet opening 84 .
  • a fluid such as water
  • a fluid motor 80 making the tube 82 rotate.
  • Said fluid further is fed to the jet opening 84 , thus creating a rotating jet 88 .
  • From the duct 70 also fluid is fed through a duct 87 to the jetting chamber 78 , mixing there with the ground jetted by the jet 88 .
  • the ground/fluid mixture is removed from the jetting chamber 78 through a duct 90 to the duct 68 .
  • a lubricating fluid is fed from the duct 72 through the duct 72 a and 72 b out of the body 66 of the jetting and extruding unit 64 .
  • a hardenable material is fed through a duct 92 , after which the hardenable material is extruded at the trailing end 96 of the jetting and extruding unit 64 to form a tunnel wall.
  • a piston unit 98 is provided which is movable in the directions indicated by double arrow 100 .
  • a chamber 102 is filled with a fluid under pressure ensuring a constant pressure on the hardenable material in the extruding chamber 94 despite of variations in the ground travelling speed of the wall building device 60 or variations in the pressure of the hardenable material in the ducts 74 and 92 .
  • the tunnel wall building device comprises only one annular body 66 connected to eighty jetting chambers 78 , each containing a tube 82 driven by a fluid driven motor 80 .
  • the annular body 60 at regular angular intervals ducts 72 a, 72 b and 92 are provided.
  • the piston unit 98 has a generally annular shape, like the body 66 .
  • FIGS. 13 and 14 show a wall building device 110 having an essentially rectangular cross-section, as seen at right angles to the direction of movement in the ground.
  • the wall building device 110 is pulled through the ground by means of two pulling strings 112 not shown in further detail.
  • a number of plates 116 are provided to prevent stones and other large objects from entering into the jetting chambers 78 of a plurality of jetting and extruding units 64 accommodated next to each other in the wall building device 110 .
  • a wall 120 is formed having a substantial rectangular cross-section.
  • the jetting and extruding units 64 of the wall building device 110 are similar to those of the tunnel wall building device 60 and a discussion thereof is omitted here.
  • the wall building device 110 may comprise only one extruding chamber 94 in a substantially unitary body 66 , connected to several jetting chambers 78 .
  • FIGS. 15, 16, and 17 show a connecting assembly 130 , being a frame made of triangular plates 132 and rectangular plates 134 connecting the ends of casing strings 136 with the end of a pull string, such as a drill string 138 .
  • a drilling, reaming and/or jetting head 140 is provided at the point where the assembly 138 is connected to one of the casing strings 136 .
  • the assembly 130 it is possible to bring a number of casing strings 136 in the ground exactly parallel to each other, which would be more difficult if for each of the casing strings a separate drill string would be used.
  • the assembly 130 may take various forms, depending on the number of casing strings 136 to be connected and their position relative to each other.
  • FIG. 18 shows an open channel built in the ground 2 by subsequently or simultaneously building walls 150 , 152 and 154 .
  • FIG. 19 shows another open channel built by subsequently or simultaneously building a wall 156 and 158 in the ground 2 .
  • FIG. 20 shows an open channel in the ground 2 built by forming a wall 160 with a semi-circular cross-section in the ground 2 .
  • FIG. 20 a in a cross-sectional view shows, in a first stage of building a wall with a semi-circular or similar cross-section two elongated wall parts or guide beams 160 a and 160 b defining the path of the complete wall are provided in the ground 2 near the surface, e.g. by digging trenches in the ground and forming the guide beams 160 a, 160 b in situ, or by placing unit lengths of prefabricated guide beam parts in the ground 2 .
  • the guide beams 160 a, 160 b are supported and fixed in the ground 2 by piles 161 driven into the ground 2 in a manner known per se. It should be pointed out here that under the same or other circumstances guide beams or wall parts such as the ones shown in FIG. 20 a for the same use can also be formed or placed on instead of in the ground, in part or as a whole. Further, it is also not essential that the guide beams or wall parts are fixed in or on the ground.
  • the wall building device 160 c may be pulled through the ground only by the lowest pulling string 160 d, while the other two upper strings are replaced by other means for moving the wall building device 160 c by means of a pulling or a pushing force, such as one or more lorries, jacks, etc.
  • the wall building device 160 c is guided along its path in the ground 2 in a manner not shown in further detail by opposite ribs 160 e being part of the guide beams 160 a, 160 b.
  • the wall building device 160 c is fitted with thirty-four jetting and extruding units 64 the structure and operation of which have already been explained in connection with FIG. 11.
  • FIG. 20 c, and FIG. 20 d in a partial cross-section show, with the wall building device 160 c a wall 161 a is formed which is connected to, and fixed by the guide beams 160 a, 160 b, at least in the upward and lateral directions, and possibly also in the longitudinal and downward directions in a manner not shown in further detail.
  • the pulling strings 160 d may be used for supplying wall material, drilling fluid and energy to the wall building device 160 c, for discharging ground removed by the wall building device, and/or for accommodating lines for controlling and monitoring the wall building device.
  • at least part of these functions can also be performed above ground, since the top side of the wall building device 160 c is near or above ground level.
  • a similar, appropriately reshaped wall building device as the one shown in FIGS. 20 b and 20 c can be used for building the channels shown in FIGS. 18 and 19 each with a wall in one piece, using guide beams similar to the ones shown in FIGS. 20 a, 20 b and 20 d.
  • the walls 150 - 160 and 161 a of the channels according to FIGS. 18 - 20 and 20 a are built first, while the ground between the walls 150 - 152 (FIG. 18), between the walls 156 and 158 (FIG. 19), and at the concave side of the walls 160 and 161 a (FIGS. 20 and 20 d, respectively) is excavated afterwards.
  • FIG. 21 shows a wall 162 in the ground 2 , the wall 162 having ducts 164 extruded therein by appropriately designing the trailing portion of the extruding chamber of the wall building device used for building the wall 162 .
  • the ducts 164 may be used for supplying the wall material, drilling fluid and energy to the wall building device, for discharging ground removed by the wall building device, and/or for accommodating lines for controlling and monitoring the wall building device.
  • FIG. 22 shows a composite wall 170 in the ground 2 made from a plurality of interconnecting, uniform, generally Z-shaped wall sections 172 having ducts 174 extruded therein.
  • Each wall section 172 is provided with a guide slit 176 having a generally L-shaped cross-section.
  • a wall building device 178 with a cross-sectional shape similar to the cross-sectional shape of the wall sections 172 is used for building the wall sections 172 by the action of eight jetting and extruding units 64 removing ground material and extruding wall material at the appropriately shaped trailing side of the wall building device 178 .
  • a pulling string 180 (which may be a drill string or a casing string), fixed centrally to the wall building device 178 in a manner not shown in further detail, is used for pulling the latter through the ground 2 in the direction indicated by the arrow.
  • another pulling string 182 of which the leading end is fixed at the side of the wall building device 178 is pulled into the ground.
  • the trailing end of the pulling string 182 is used for pulling the wall building device 178 through the ground 2 in a next passage thereof for forming a next wall section 172 .
  • the trailing end of the pulling string 182 is fixed centrally to the wall building device, like the pulling string 180 .
  • the wall building device 178 is guided in a desired position relative to a wall section 172 formed before by a generally L-shaped foot (not shown) connected to the device 178 and sliding in the guide slit 176 . Also at other points the wall building device 178 is guided by an adjacent wall section 172 , as appears clearly from FIG. 22.
  • the guide slit and the foot may e.g. also be T-shaped or J-shaped.
  • FIG. 23 a shows a composite wall 190 in the ground 2 essentially made from a plurality of interconnecting, uniform, generally Z-shaped wall sections 192 , 192 a.
  • the wall sections 192 have been built essentially in the way illustrated and explained according to FIG. 22.
  • the last wall section that has been built is wall section 192 a.
  • a leading end of a pulling string 194 has been pulled into the ground 2 in a manner not shown in further detail by connecting the pulling string 194 to the wall building device (not shown) used for building the wall section 192 a, similar to the use of the pulling string 182 in FIG. 22.
  • FIGS. 23 a and 23 b illustrate, next the pulling string 194 is used for pulling a wall building device (not shown) connected to a leading end of a new pulling string 196 and the leading end of a further part 194 a of the pulling string 194 through the ground 2 for building wall sections 192 b and 192 c being separated from each other.
  • FIGS. 23 b and 23 c illustrate, next the pulling string 194 a is used for pulling a wall building device (not shown) connected to leading ends of new pulling strings 198 and 200 through the ground 2 for building a wall section 192 d essentially at right angles to the other wall sections 192 , 192 a, 192 b and 192 c.
  • the wall building device used in this step may the same as the wall building device used for building the last-mentioned wall sections.
  • FIGS. 23 c and 23 d illustrate, next the pulling string 198 is used for pulling a wall building device (not shown) connected to a leading end of a new pulling string 202 through the ground 2 for building a wall section 192 e.
  • FIGS. 23 d and 23 e illustrate, next the pulling string 202 is used for pulling a wall building device (not shown) connected to a leading end of a new pulling string 204 in a manner not shown in further detail through the ground 2 for building a wall section 192 f.
  • FIGS. 23 e and 23 f illustrate, next the pulling string 204 is used for pulling a wall building device (not shown) connected to the leading end of a further part 204 a of the pulling string 204 through the ground 2 for building wall sections 192 g and 192 h being separated from each other.
  • FIGS. 23 f and 23 g illustrate, next the pulling string 204 a is used for pulling a wall building device (not shown) connected to leading ends of new pulling strings 206 and 208 through the ground 2 for building a wall section 192 i essentially at right angles to wall sections 192 d - 192 h.
  • the wall building method illustrated in FIGS. 23 a - 23 g provides a grate flexibility in building complex wall structures from basic, essentially uniform wall sections. At any rate, basically only one type of wall building device is needed to build the wall sections 192 , 192 a - 192 i by changing, whenever necessary, the extrusion profile thereof, e.g. by putting into or taking out of operation different jetting and extruding units 64 included in the wall building device.
  • wall sections may take different shapes than the ones shown in FIGS. 23 a - 23 g, possibly for establishing different angles than right angles between walls made up of the wall sections.
  • FIG. 24 a shows four construction pits 210 , 212 , 214 and 216 . Similar to the method described in connection with FIGS. 1 - 4 , two pulling strings 218 , 220 (which may be drill strings or casing strings or similar) have been placed in the ground 2 between the construction pit 210 and the construction pit 212 . The pulling strings 218 and 220 are used for pulling in the direction indicated by the arrows a wall building device 222 along a path from the construction pit 210 to the construction pit 212 . The wall building device 222 at its leading side has five jetting or other excavating devices 224 which are indicated only schematically.
  • two pulling strings 218 , 220 (which may be drill strings or casing strings or similar) have been placed in the ground 2 between the construction pit 210 and the construction pit 212 .
  • the pulling strings 218 and 220 are used for pulling in the direction indicated by the arrows a wall building device 222 along a path from the construction pit 210 to the construction pit 212 .
  • the wall building device 222 is provided with a plurality of jetting and extruding units of which the jetting parts 226 are located at the side of the wall building device 222 facing the construction pits 214 and 216 .
  • the jetting devices 224 are in operation; the jetting and extruding units are inoperative.
  • FIG. 24 b illustrates, the trailing side of the wall building device 222 is connected to a further wall building device 222 a having a plurality of jetting and extruding units of which the jetting parts 228 are located at the side of the wall building device 222 a facing the construction pits 214 and 216 .
  • the jetting and extruding units of the wall building device 222 a are inoperative during the passage of the wall building device 222 a from the construction pit 210 to the construction pit 212 , whereas the jetting devices 224 remain in operation.
  • a further wall building device 222 b (FIG. 24 c ) is connected to the wall building device 222 a, and has essentially the same structure as the wall building device 222 a.
  • a further wall building device 222 c (FIG. 24 c ) is connected, having essentially the same structure as the wall building devices 222 a and 222 b.
  • the four wall building devices 222 and 222 a - 222 c together bridge the distance between the construction pits 210 and 212 .
  • FIG. 24 c illustrates, next the assembly of wall building devices 222 and 222 a - 222 c is pulled by pulling strings 230 and 232 (which may be drill strings or casing strings or similar) in the indicated direction to the construction pits 214 and 216 .
  • the pulling strings 230 and 232 have been pre-installed between the construction pits 212 and 214 , and the construction pits 210 and 216 , respectively, in a similar manner as described with reference to FIGS. 1 - 4 .
  • the jetting devices 224 are out of operation, while the jetting and extruding units of the wall building devices 222 and 222 a - 222 c are in operation, building a wall 234 between the construction pits 212 - 216 .
  • FIGS. 25 a and 25 b show three construction pits 240 , 242 and 244 . Between the construction pits 240 and 242 an assembly of wall building devices 222 and 222 a - 222 d is installed in a manner already explained with reference to FIG. 24 b by means of pulling strings 246 and 248 (which may be drill strings or casing strings or similar).
  • one end of the assembly of wall building devices 222 and 222 a - 222 d is pulled to the construction pit 244 , while the other end of the assembly remains rotatingly connected to the construction pit 240 , thus building a circle segment shaped wall 252 by having the jetting and extruding units of the assembly of wall building devices 222 and 222 a - 222 d in operation, while the jetting devices 224 are inoperative.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A wall is built in the ground by pulling a wall building device having cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the wall through the ground, at least a part of the wall being formed by injecting a hardenable material behind the wall building device. A tunnel is made by first making a tunnel wall, leaving the ground inside the tunnel wall substantially intact, followed by excavating the ground inside the tunnel wall.

Description

    BACKGROUND OF THE INVENTION
  • This invention relates to a method for building a wall or a part thereof in the ground, a system for carrying out the method, and a wall building device for use in the method and system. [0001]
  • DISCUSSION OF THE PRIOR ART
  • Known tunnel wall building devices are e.g. described in the “Handbook of Mining and Tunnel Machinery”, Barbara Stack, 1982, published by John Wiley and Sons, pages 415-417. These known tunnel wall building devices comprise a cutting face at the front of a cylindrical shield. The tunnel wall building device is pushed in the direction of the advance of the shield by hydraulic cylinders acting between the rear side of the shield and the constructed tunnel wall. [0002]
  • A first drawback of the use of such tunnel wall building devices is the criticality of the control over the stabilization of the ground in front of the cutting face. Too much excavation will cause local collapse of the ground, while too much push force will cause undesirable settlements of the ground. [0003]
  • A second drawback is the required axial support of the tunnel wall building device on the tunnel wall. In case of the use of prefabricated elements the axial support force might be a governing load case. [0004]
  • In other methods the tunnel wall is made of extruded concrete. In this respect reference is made here to EP-A-0 354 335 describing axially supporting a boring shield by the extruded concrete tunnel wall through formwork elements used for forming the inner side of the tunnel wall. The tunnel wall building method according to this publication is discontinuous, taking away formwork elements where the concrete has hardened, and adding the formwork elements, after cleaning thereof, directly behind the boring shield. This method is expensive and time-consuming as a result of the use of the formwork elements, which need to be handled behind the boring shield, and can only be removed when the concrete they are supporting has hardened sufficiently, which may take considerable time. [0005]
  • EP-A-0 483 445 describes a continuous tunnel wall building method, extruding concrete to form a tunnel wall, and using a sliding formwork arrangement requiring additional means to transfer the axial boring forces to the hardened part of the tunnel wall and to facilitate continuity. [0006]
  • In all previous methods the management of the ground water level during the fabrication of the tunnel wall may present serious problems. [0007]
  • SUMMARY OF THE INVENTION
  • The object of the present invention is to provide a method, system, and device for building a wall or a part thereof in general, and a tunnel wall in particular which avoid the risk of collapse or undesirable settlement of the ground in front of the wall building area. [0008]
  • Another object of the present invention is to provide a wall building method, system, and device which do not rely on the wall for providing an axial support for the wall building activities. [0009]
  • Yet another object of the present invention is to provide a wall building method, system, and device which can be continuous and do not use formwork elements. [0010]
  • A further object of the present invention is to provide a wall building method, system, and device which are virtually unaffected by the ground water level. [0011]
  • To reach the above objects, in the method according to the invention a wall building device having cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the all is pulled through the ground, at least a part of the all being formed by injecting a hardenable material behind he wall building device. In the process of making the all, the wall is supported on all sides by the ground surrounding the wall (and, in the case of a tunnel wall, by the ground filling the tunnel wall). Consequently, the wall requires no direct strength, and can e.g. be made from fibre concrete with a normal hardening time. The excavation of the ground at one side of the wall can be done after the completion of the tunnel wall, and the stability of the excavation presents no problem at all. Different shapes of wall cross-sections are possible, but not limited to: (semi-)circular, elliptical, rectangular, triangular, flat. Since the wall building device is advanced by pulling, no reaction force is applied on the constructed wall. The advance of the wall building device is therefore independent from the structural strength of the wall at any given moment. [0012]
  • In a preferred embodiment of the wall building method according to the invention, the following steps are performed: drilling one or more holes in the ground, on or parallel to the projected path of the wall, each of the one or more holes being drilled by means of a drill string; connecting one end of each drill string at the end of the drilling operation to the wall building device; and pulling the wall building device through the ground by retracting the one or more drill strings. Alternatively, the wall building method may comprise the steps of: drilling one or more holes in the ground, on or parallel to the projected path of the wall, each of the one or more holes being drilled by means of a drill string; connecting one end of each drill string at the end of the drilling operation to one end of a casing string; pulling each casing string through the ground by retracting the drill string connected thereto; disconnecting each casing string from the corresponding drill string; connecting one end of each casing string to the wall building device; and pulling the wall building device through the ground by retracting the one or more casing strings. Accordingly, depending on the kind of wall to be built, in particular its cross-sectional area and its length, one or more drill strings and or one or more casing strings are used to pull the wall building device through the ground, using standard directional drilling techniques to bring the drill and casing strings into the ground. The directional drilling techniques are capable of very accurately following the projected path of the wall. The accuracy of the paths of the casing strings can be further improved by using a single drill string and by means of a connecting assembly connecting the ends of several casing strings to one end of the drill string and transversely spaced therefrom, which drill string is then pulled through the ground at the other end thereof. [0013]
  • In a preferred embodiment each casing string comprises an inner string and an outer string enclosing the inner string, the inner string being adapted to transfer the pulling force required by the wall building device, and the outer string being adapted to provide low friction forces when moving the inner string relative to the outer string. The outer string serves as a guide for the inner string when pulling the wall building device through the ground by the inner string. The friction forces between the inner string and the outer string can be still further reduced by supplying a fluid to the space between the inner string and the outer string. [0014]
  • Preferably, the inner string of the casing string is made of steel providing the strength needed, while the outer string is made of plastics, e.g. polyethylene providing an excellent low cost and low friction separation wall between the inner string and the ground. [0015]
  • When moving the wall building device through the ground, a hardenable material is injected behind it to form the wall. The wall material preferably is supplied to the wall building device through at least one of the one or more drill strings/casing strings used for pulling the wall building device through the ground. Additionally, at least one of the one or more drill strings/casing strings may contain at least one line for supplying energy, at least one line for controlling and/or monitoring the wall building device, at least one duct for supplying a drilling fluid to the wall building device, and/or at least one duct for discharging ground removed by the wall building device. Alternatively, or in addition thereto, the wall material and the drilling fluid may be supplied to the wall building device through ducts extruded in the wall. Such ducts can also be used for accommodating lines for supplying energy to the wall building device, or for controlling and/or monitoring the wall building device. Further, such ducts can be used for discharging ground removed by the wall building device. [0016]
  • For an improved positioning accuracy of different wall parts relative to each other, preferably the wall building device is adapted to build a wall or wall part provided with wall guide means, the or a further wall building device being provided with means for engaging the wall guide means. In this way the latter wall building device is allowed to exactly follow the path of the wall or wall part already in place in the ground. The wall guide means preferably comprise a guide slit, which may have an essentially L-shaped cross-section. More generally, in a preferred embodiment at least one guide member is provided in the ground, the wall building device being adapted to be guided along the guide member through the ground. [0017]
  • When a wall building device is used in a multi-pass mode, i.e. for subsequently passing through the ground along adjacent paths for building a wall from a plurality of separately built wall sections, preferably the wall building device is adapted to be connected to the leading end of a pulling string for pulling the pulling string into the ground simultaneously with pulling the wall building device through the ground. The pulling string is used for pulling the or a further wall building device through the ground in a next passage. For this purpose, the wall building device preferably has an essentially Z-shaped cross-section. [0018]
  • An essentially flat wall can be built in the ground by at least two wall building devices which at at least one side thereof are adapted to be coupled to another, which wall building devices further are adapted to be pulled through the ground in a forward direction, and in a direction at an angle to the forward direction. [0019]
  • For improving the quality of the wall, the wall material preferably is injected between one or more membranes defining one or more sides of the wall or wall part formed by the wall building device. The membrane or membranes can be stored in the wall building device in folded or rolled-up form, and unfolded or unrolled when injecting the wall material. [0020]
  • The friction between the wall building device and the surrounding ground, and the resistance the ground offers to the wall building device when pulling the wall building device through the ground is preferably reduced by vibrating, lubrication, jetting and/or removing the ground area adjacent to the front part of the wall building device. [0021]
  • The claims and advantages will be more readily appreciated as the same becomes better understood by reference to the following detailed description and considered in connection with the accompanying drawings in which like reference symbols relate to the same parts or parts having the same function. Arrows without reference numerals indicate normal directions of movement.[0022]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows a vertical cross-section of a ground area in which a tunnel is to be built, illustrating a first operation; [0023]
  • FIG. 2 shows on an enlarged scale a drill string used in the operation shown in FIG. 1; [0024]
  • FIG. 3 illustrates a next operation in the ground; [0025]
  • FIG. 4 shows on an enlarged scale a part of pulling means used in the operation illustrated in FIG. 3; [0026]
  • FIG. 5 illustrates a next operation in the ground in the process of building a tunnel wall; [0027]
  • FIG. 6 shows on an enlarged scale a side view of a tunnel wall building device shown in FIG. 5; [0028]
  • FIG. 7 schematically shows a longitudinal cross-section of the tunnel wall building device shown in FIG. 6; [0029]
  • FIGS. 8 and 9 illustrate different methods of excavating a tunnel within the wall; [0030]
  • FIG. 10 shows a side view, partially in cross-section, of another embodiment of the tunnel wall building device according to the invention; [0031]
  • FIG. 11 shows on an enlarged scale a cross-section of a detail X of the tunnel wall building device of FIG. 10; [0032]
  • FIG. 12 shows a front view of the tunnel wall building device of FIG. 10; [0033]
  • FIG. 13 shows a perspective view of a wall building device according to the invention; [0034]
  • FIG. 14 shows on an enlarged scale a cross-section of the wall building device of FIG. 13 taken along the line XIV-XIV; [0035]
  • FIG. 15 shows a perspective view of an assembly used for simultaneously pulling four casing strings through the ground; [0036]
  • FIG. 16 shows a front view of the assembly of FIG. 15; [0037]
  • FIG. 17 shows a side view of the assembly of FIG. 15; [0038]
  • FIG. 18 shows a cross-section of a structure built in the ground using the method, system and wall building device according to the invention; [0039]
  • FIG. 19 shows a cross-section of another structure built in the ground using the method, system and wall building device according to the invention; [0040]
  • FIG. 20 shows a cross-section of a further structure built in the ground using the method, system and wall building device according to the invention; [0041]
  • FIGS. 20[0042] a-20 d illustrate a method for building a structure similar to the one shown in FIG. 20;
  • FIG. 21 shows a cross-section of still another structure built in the ground using the method, system and wall building device according to the invention; [0043]
  • FIG. 22 illustrates in perspective view the process of building a composite wall made from uniformly shaped wall sections; [0044]
  • FIGS. 23[0045] a-23 g in cross-sectional view show different stages in building composite walls made from uniformly shaped wall parts;
  • FIGS. 24[0046] a-24 c in top view schematically illustrate a further process of building a wall according to the invention; and
  • FIGS. 25[0047] a and 25 b in top view schematically illustrate a still further process of building a wall according to the invention.
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • As FIGS. 1 and 2 illustrate, in the given example of a tunnel building method it is assumed that a tunnel is to be built in the [0048] ground 2 under the ground surface 4 from a first construction pit 6 to a second construction pit 8. From the second construction pit 8 a number of pilot holes 10 are drilled using conventional directional drilling techniques, as described e.g. in “Tunnels & Tunnelling”, published by Morgan-Grampian, November 1996, in particular on page 15. A directional drilling unit 12 pushes a drill string 14 through the ground from the second construction pit 8 to the first construction pit 6. The pilot holes are drilled on or parallel to the projected path of the tunnel wall.
  • As FIGS. 3 and 4 illustrate, after having reached the [0049] first construction pit 6, the front end of the drill string 14 is connected to the front part of a casing string 16, after which the casing string 16 is pulled through the ground along the path of the pilot hole 10 by the directional drilling unit 12. As a result of this operation, casing strings 16 are installed in the ground along the projected path of the tunnel wall.
  • As FIG. 4 shows in more detail, the [0050] casing string 16 comprises a steel casing 18 enclosed in a plastic, preferably polyethylene (PE) tube 20. The casing string 16 is connected to a buoy 22 by a flexible coupling 24, which buoy 22 in turn is connected to a reaming device 26 by a flexible coupling 28. When the projected tunnel wall has a ring-shaped cross-section, preferably at least four casing strings 16 are installed in the ground 2 spaced along the periphery of the cross-section.
  • As FIGS. [0051] 5-7 illustrate, the back ends of the casing strings 16 are connected to the front end of a tunnel wall building device 30, which has cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the tunnel wall, and which is pulled through the ground 2 by pulling means 32 (not shown in further detail) pulling simultaneously all casing strings 16.
  • The [0052] wall building device 30 comprises a body 34 with a conical-shaped front part 36, which is rounded at the front end thereof. Behind the front part 36, in the body 34 one or more vibration units 38 can be provided to reduce the friction between the wall building device 30 and the ground, and to reduce the forces required to displace the ground with the front part 36 while moving through the ground. Directly behind the front part 36 a fluid 40, e.g. supplied through one of the casing strings 16, may be injected to further reduce the friction between the wall building device 30 and the ground 2. The front part 36 is designed to minimize effects on the surrounding ground area, to avoid plug forming in the wall building device 30, and to minimize the required force for advancing the wall building device 30. Near the front end of the front part 36 jetting 42 may be provided to improve the ground displacement, the jetting fluid e.g. being supplied through one of the casing strings 16. Furthermore, the front part 36 may be made in segments which are movable in the radial direction to allow for small corrections of the path of the wall building device 30 moving through the ground 2.
  • At the rear end of the [0053] wall building device 30, the tunnel wall 43 is extruded by pumping the wall material 44 into the gap created by the wall building device 30. The pressure of the wall material 44, which preferably is fibre concrete, ensures the stability of the ground and prevents settlements thereof. The pressure also provides a force in the direction of advance of the wall building device 30. The wall material 44 does not need to have direct strength, and only has to stabilize the gap created by the wall building device 30 at the rear end thereof.
  • The [0054] wall material 44 is extruded between membranes 46 which can be stored in concertina fashion in spaces provided therefore in the body 34 of the wall building device 30. The membranes 46 are folded up in the body 34, and unfold when the wall building device advances. The membranes 46 prevent leakage of the wall material into the ground, ensure stabilization of the tunnel wall 43, provide (extra) water tightness, and provide a quality assurance.
  • The use of one or more membranes in the method, system and wall building device according to the invention is not essential; normally membranes can be omitted, and are used only if special requirements, such as wall quality, water tightness, etc. are to be met. [0055]
  • The [0056] wall material 44 is supplied to the wall building device 30 through one or more of the casing strings 16, in particular through the steel casing 18 thereof. As will be clear from FIG. 6, the tubes 20 of the casing string 16 are cut in front of the wall building device in a manner not shown in further detail. The cut tube 20 is directed to the inside of the tunnel wall 43, and can be removed during or after excavating the ground inside the tunnel wall 43. The longitudinally cut tube can also be reused to protect power supply or signal lines, or can serve other useful purposes when the tunnel is completed. The body 34 of the wall building device 30 comprises channels not shown in further detail guiding the wall material supplied through the casing strings 16 to the rear end of the wall building device 30 between the membranes 46, and may also comprise other channels not shown in further detail to guide fluid supplied through the casing strings 16 for lubrication and jetting.
  • As FIGS. 8 and 9 illustrate, after the tunnel wall has been completed and has sufficient strength, the ground inside the tunnel wall can be excavated using a dragline [0057] 50 (FIG. 8) or, when the level of the ground water 52 is high, conventional dredging equipment 54 (FIG. 9) can be used.
  • It will be clear that the [0058] wall building device 30 can also, under circumstances, be pulled through the ground by the drill strings 14, which at the same time may serve to supply the wall material 44 to the wall building device. Further it is possible to construct the tunnel wall in separate elongated parts: a tunnel with a rectangular cross-section may be constructed by subsequently building the top wall, the bottom wall and the side walls, after which the ground inside the thus completed tunnel wall is excavated. Yet another possibility is building a first tunnel wall and subsequently building one or more additional tunnel walls enclosing the first tunnel wall, or inside the first tunnel wall. The different tunnel walls may have different properties: one being designed for watertightness, another being designed for strength.
  • FIGS. 10, 11, and [0059] 12 show a tunnel wall building device 60 being pulled through the ground by means of four pulling strings 62 not shown in further detail. The wall building device 60 comprises eighty jetting and extruding units 64 arranged along the ring-shaped front side of the wall building device 60.
  • As shown in FIG. 11, each jetting and extruding [0060] unit 64 comprises a body 66 having four main ducts 68, 70, 72, and 74 formed therein. The ducts 68, 74 of different jetting and extruding units 64 are in fluid communication with each other and may further be in fluid communication with one or more ducts in a pulling string 62. At its front part the jetting and extruding unit 64 comprises a grid 76 keeping stones and other large objects out of a jetting chamber 78 situated behind the grid 76. In the jetting chamber 78, a rotating jetting device is mounted comprising a fluid driven motor 80 driving a tube 82 which is provided with a jet opening 84. From the duct 70 a fluid, such as water, is fed under pressure through a duct 86 to the fluid motor 80 making the tube 82 rotate. Said fluid further is fed to the jet opening 84, thus creating a rotating jet 88. From the duct 70 also fluid is fed through a duct 87 to the jetting chamber 78, mixing there with the ground jetted by the jet 88. The ground/fluid mixture is removed from the jetting chamber 78 through a duct 90 to the duct 68.
  • For a lubrication of the inner and outer sides of the tunnel [0061] wall building device 60, a lubricating fluid is fed from the duct 72 through the duct 72 a and 72 b out of the body 66 of the jetting and extruding unit 64.
  • From the duct [0062] 74 a hardenable material is fed through a duct 92, after which the hardenable material is extruded at the trailing end 96 of the jetting and extruding unit 64 to form a tunnel wall. In the extruding chamber 94 a piston unit 98 is provided which is movable in the directions indicated by double arrow 100. A chamber 102 is filled with a fluid under pressure ensuring a constant pressure on the hardenable material in the extruding chamber 94 despite of variations in the ground travelling speed of the wall building device 60 or variations in the pressure of the hardenable material in the ducts 74 and 92.
  • In an alternative embodiment, the tunnel wall building device according to FIGS. 10, 11 and [0063] 12 comprises only one annular body 66 connected to eighty jetting chambers 78, each containing a tube 82 driven by a fluid driven motor 80. In the annular body 60, at regular angular intervals ducts 72 a, 72 b and 92 are provided. In this embodiment the piston unit 98 has a generally annular shape, like the body 66.
  • FIGS. 13 and 14 show a [0064] wall building device 110 having an essentially rectangular cross-section, as seen at right angles to the direction of movement in the ground. The wall building device 110 is pulled through the ground by means of two pulling strings 112 not shown in further detail. At the leading side 114 of the wall building device 110 a number of plates 116 are provided to prevent stones and other large objects from entering into the jetting chambers 78 of a plurality of jetting and extruding units 64 accommodated next to each other in the wall building device 110. At the trailing side 118 of the wall building device 110 a wall 120 is formed having a substantial rectangular cross-section. The jetting and extruding units 64 of the wall building device 110 are similar to those of the tunnel wall building device 60 and a discussion thereof is omitted here. Alternatively, the wall building device 110 may comprise only one extruding chamber 94 in a substantially unitary body 66, connected to several jetting chambers 78.
  • FIGS. 15, 16, and [0065] 17 show a connecting assembly 130, being a frame made of triangular plates 132 and rectangular plates 134 connecting the ends of casing strings 136 with the end of a pull string, such as a drill string 138. At the point where the assembly 138 is connected to one of the casing strings 136, a drilling, reaming and/or jetting head 140 is provided. With the assembly 130 it is possible to bring a number of casing strings 136 in the ground exactly parallel to each other, which would be more difficult if for each of the casing strings a separate drill string would be used. The assembly 130 may take various forms, depending on the number of casing strings 136 to be connected and their position relative to each other.
  • FIG. 18 shows an open channel built in the [0066] ground 2 by subsequently or simultaneously building walls 150, 152 and 154.
  • FIG. 19 shows another open channel built by subsequently or simultaneously building a [0067] wall 156 and 158 in the ground 2.
  • FIG. 20 shows an open channel in the [0068] ground 2 built by forming a wall 160 with a semi-circular cross-section in the ground 2.
  • As FIG. 20[0069] a in a cross-sectional view shows, in a first stage of building a wall with a semi-circular or similar cross-section two elongated wall parts or guide beams 160 a and 160 b defining the path of the complete wall are provided in the ground 2 near the surface, e.g. by digging trenches in the ground and forming the guide beams 160 a, 160 b in situ, or by placing unit lengths of prefabricated guide beam parts in the ground 2. The guide beams 160 a, 160 b are supported and fixed in the ground 2 by piles 161 driven into the ground 2 in a manner known per se. It should be pointed out here that under the same or other circumstances guide beams or wall parts such as the ones shown in FIG. 20a for the same use can also be formed or placed on instead of in the ground, in part or as a whole. Further, it is also not essential that the guide beams or wall parts are fixed in or on the ground.
  • Then, as FIG. 20[0070] b in a cross-sectional view and FIG. 20c in a side view according to arrow XXc in FIG. 20b show, a wall building device 160 c having an essentially semicircular cross-section is pulled through the ground 2 by means of three pulling strings 160 d—at least one of which being a drill string or a casing string—in the indicated direction. Alternatively, the wall building device 160 c may be pulled through the ground only by the lowest pulling string 160 d, while the other two upper strings are replaced by other means for moving the wall building device 160 c by means of a pulling or a pushing force, such as one or more lorries, jacks, etc. The wall building device 160 c is guided along its path in the ground 2 in a manner not shown in further detail by opposite ribs 160 e being part of the guide beams 160 a, 160 b. The wall building device 160 c is fitted with thirty-four jetting and extruding units 64 the structure and operation of which have already been explained in connection with FIG. 11. As FIG. 20c, and FIG. 20d in a partial cross-section show, with the wall building device 160 c a wall 161 a is formed which is connected to, and fixed by the guide beams 160 a, 160 b, at least in the upward and lateral directions, and possibly also in the longitudinal and downward directions in a manner not shown in further detail. During the building process, the pulling strings 160 d may be used for supplying wall material, drilling fluid and energy to the wall building device 160 c, for discharging ground removed by the wall building device, and/or for accommodating lines for controlling and monitoring the wall building device. Of course, at least part of these functions can also be performed above ground, since the top side of the wall building device 160 c is near or above ground level. Further, it will be clear that a similar, appropriately reshaped wall building device as the one shown in FIGS. 20b and 20 c can be used for building the channels shown in FIGS. 18 and 19 each with a wall in one piece, using guide beams similar to the ones shown in FIGS. 20a, 20 b and 20 d.
  • In the process of building the walls [0071] 150-160 and 161 a of the channels according to FIGS. 18-20 and 20 a, the walls 150-160 and 161 a are built first, while the ground between the walls 150-152 (FIG. 18), between the walls 156 and 158 (FIG. 19), and at the concave side of the walls 160 and 161 a (FIGS. 20 and 20d, respectively) is excavated afterwards.
  • FIG. 21 shows a [0072] wall 162 in the ground 2, the wall 162 having ducts 164 extruded therein by appropriately designing the trailing portion of the extruding chamber of the wall building device used for building the wall 162. The ducts 164 may be used for supplying the wall material, drilling fluid and energy to the wall building device, for discharging ground removed by the wall building device, and/or for accommodating lines for controlling and monitoring the wall building device.
  • FIG. 22 shows a [0073] composite wall 170 in the ground 2 made from a plurality of interconnecting, uniform, generally Z-shaped wall sections 172 having ducts 174 extruded therein. Each wall section 172 is provided with a guide slit 176 having a generally L-shaped cross-section. A wall building device 178 with a cross-sectional shape similar to the cross-sectional shape of the wall sections 172 is used for building the wall sections 172 by the action of eight jetting and extruding units 64 removing ground material and extruding wall material at the appropriately shaped trailing side of the wall building device 178. A pulling string 180 (which may be a drill string or a casing string), fixed centrally to the wall building device 178 in a manner not shown in further detail, is used for pulling the latter through the ground 2 in the direction indicated by the arrow. At the same time, another pulling string 182 of which the leading end is fixed at the side of the wall building device 178, is pulled into the ground. The trailing end of the pulling string 182 is used for pulling the wall building device 178 through the ground 2 in a next passage thereof for forming a next wall section 172. In said next passage, the trailing end of the pulling string 182 is fixed centrally to the wall building device, like the pulling string 180. It will be clear that by using a pulling string for pulling both a wall building device and the leading end of at least one other pulling string through and into the ground, considerable time and cost savings can be achieved in a multi-pass process using the same wall building device.
  • During a passage through the [0074] ground 2, the wall building device 178 is guided in a desired position relative to a wall section 172 formed before by a generally L-shaped foot (not shown) connected to the device 178 and sliding in the guide slit 176. Also at other points the wall building device 178 is guided by an adjacent wall section 172, as appears clearly from FIG. 22. The guide slit and the foot may e.g. also be T-shaped or J-shaped.
  • FIG. 23[0075] a shows a composite wall 190 in the ground 2 essentially made from a plurality of interconnecting, uniform, generally Z-shaped wall sections 192, 192 a. The wall sections 192 have been built essentially in the way illustrated and explained according to FIG. 22. The last wall section that has been built is wall section 192 a. During the building of wall section 192 a, a leading end of a pulling string 194 has been pulled into the ground 2 in a manner not shown in further detail by connecting the pulling string 194 to the wall building device (not shown) used for building the wall section 192 a, similar to the use of the pulling string 182 in FIG. 22.
  • As FIGS. 23[0076] a and 23 b illustrate, next the pulling string 194 is used for pulling a wall building device (not shown) connected to a leading end of a new pulling string 196 and the leading end of a further part 194 a of the pulling string 194 through the ground 2 for building wall sections 192 b and 192 c being separated from each other.
  • As FIGS. 23[0077] b and 23 c illustrate, next the pulling string 194 a is used for pulling a wall building device (not shown) connected to leading ends of new pulling strings 198 and 200 through the ground 2 for building a wall section 192 d essentially at right angles to the other wall sections 192, 192 a, 192 b and 192 c. The wall building device used in this step may the same as the wall building device used for building the last-mentioned wall sections.
  • As FIGS. 23[0078] c and 23 d illustrate, next the pulling string 198 is used for pulling a wall building device (not shown) connected to a leading end of a new pulling string 202 through the ground 2 for building a wall section 192 e.
  • As FIGS. 23[0079] d and 23 e illustrate, next the pulling string 202 is used for pulling a wall building device (not shown) connected to a leading end of a new pulling string 204 in a manner not shown in further detail through the ground 2 for building a wall section 192 f.
  • As FIGS. 23[0080] e and 23 f illustrate, next the pulling string 204 is used for pulling a wall building device (not shown) connected to the leading end of a further part 204 a of the pulling string 204 through the ground 2 for building wall sections 192 g and 192 h being separated from each other.
  • As FIGS. 23[0081] f and 23 g illustrate, next the pulling string 204 a is used for pulling a wall building device (not shown) connected to leading ends of new pulling strings 206 and 208 through the ground 2 for building a wall section 192 i essentially at right angles to wall sections 192 d-192 h.
  • The wall building method illustrated in FIGS. 23[0082] a-23 g provides a grate flexibility in building complex wall structures from basic, essentially uniform wall sections. At any rate, basically only one type of wall building device is needed to build the wall sections 192, 192 a-192 i by changing, whenever necessary, the extrusion profile thereof, e.g. by putting into or taking out of operation different jetting and extruding units 64 included in the wall building device.
  • Further, wall sections may take different shapes than the ones shown in FIGS. 23[0083] a-23 g, possibly for establishing different angles than right angles between walls made up of the wall sections.
  • FIG. 24[0084] a shows four construction pits 210, 212, 214 and 216. Similar to the method described in connection with FIGS. 1-4, two pulling strings 218, 220 (which may be drill strings or casing strings or similar) have been placed in the ground 2 between the construction pit 210 and the construction pit 212. The pulling strings 218 and 220 are used for pulling in the direction indicated by the arrows a wall building device 222 along a path from the construction pit 210 to the construction pit 212. The wall building device 222 at its leading side has five jetting or other excavating devices 224 which are indicated only schematically. Further, the wall building device 222 is provided with a plurality of jetting and extruding units of which the jetting parts 226 are located at the side of the wall building device 222 facing the construction pits 214 and 216. During the passage of the wall building device 222 from the construction pit 210 to the construction pit 212, only the jetting devices 224 are in operation; the jetting and extruding units are inoperative.
  • As FIG. 24[0085] b illustrates, the trailing side of the wall building device 222 is connected to a further wall building device 222 a having a plurality of jetting and extruding units of which the jetting parts 228 are located at the side of the wall building device 222 a facing the construction pits 214 and 216. The jetting and extruding units of the wall building device 222 a are inoperative during the passage of the wall building device 222 a from the construction pit 210 to the construction pit 212, whereas the jetting devices 224 remain in operation. A further wall building device 222 b (FIG. 24c) is connected to the wall building device 222 a, and has essentially the same structure as the wall building device 222 a. To the wall building device 222 b a further wall building device 222 c (FIG. 24c) is connected, having essentially the same structure as the wall building devices 222 a and 222 b. The four wall building devices 222 and 222 a-222 c together bridge the distance between the construction pits 210 and 212.
  • As FIG. 24[0086] c illustrates, next the assembly of wall building devices 222 and 222 a-222 c is pulled by pulling strings 230 and 232 (which may be drill strings or casing strings or similar) in the indicated direction to the construction pits 214 and 216. The pulling strings 230 and 232 have been pre-installed between the construction pits 212 and 214, and the construction pits 210 and 216, respectively, in a similar manner as described with reference to FIGS. 1-4. During the passage of the assembly of wall building devices 222 and 222 a-222 c through the ground 2, the jetting devices 224 are out of operation, while the jetting and extruding units of the wall building devices 222 and 222 a-222 c are in operation, building a wall 234 between the construction pits 212-216.
  • FIGS. 25[0087] a and 25 b show three construction pits 240, 242 and 244. Between the construction pits 240 and 242 an assembly of wall building devices 222 and 222 a-222 d is installed in a manner already explained with reference to FIG. 24b by means of pulling strings 246 and 248 (which may be drill strings or casing strings or similar). Next, by means of a pulling string 250 one end of the assembly of wall building devices 222 and 222 a-222 d is pulled to the construction pit 244, while the other end of the assembly remains rotatingly connected to the construction pit 240, thus building a circle segment shaped wall 252 by having the jetting and extruding units of the assembly of wall building devices 222 and 222 a-222 d in operation, while the jetting devices 224 are inoperative.
  • While the invention has been described and illustrated in its preferred embodiments, it should be understood that departures may be made therefrom within the scope of the invention, which is not limited to the details disclosed herein. [0088]

Claims (40)

What is claimed is:
1. A method for building a wall or a part thereof in the ground, wherein a wall building device having cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the wall is pulled through the ground, at least a part of the wall being formed by injecting a hardenable material behind the wall building device.
2. The method of
claim 1
, further comprising the steps of:
drilling one or more holes in the ground, on or parallel to the projected path of the wall, each of the one or more holes being drilled by means of a drill string;
connecting one end of each drill string at the end of the drilling operation to the wall building device; and
pulling the wall building device through the ground by retracting the one of more drill strings.
3. The method of
claim 1
, further comprising the steps of:
drilling one or more holes in the ground, on or parallel to the projected path of the wall, each of the one or more holes being drilled by means of a drill string;
connecting one end of each drill string at the end of the drilling operation to one end of a casing string;
pulling each casing string through the ground by retracting the drill string connected thereto;
disconnecting each casing string from the corresponding drill string;
connecting one end of each casing string to the wall building device; and
pulling the wall building device through the ground by retracting the one or more casing strings.
4. The method of
claim 1
, further comprising the steps of:
building at least one first wall or wall part in the ground;
providing said wall or wall part with wall guide means;
providing a wall building device with wall building device guide means adapted to engage the wall guide means; and
pulling the wall building device guided by the at least one wall or wall part through the ground.
5. The method of
claim 1
, comprising the steps of:
providing at least one elongated guide member in the ground; and
pulling the wall building device being adapted to be guided along the guide member through the ground.
6. The method of
claim 1
, comprising the steps of:
connecting a leading end of at least one pulling string to the wall building device;
pulling the pulling string into the ground simultaneously with pulling the wall building device through the ground; and
pulling the wall building device or a further wall building device through the ground by the or each pulling string.
7. The method of
claim 1
, further comprising the steps of:
coupling at least two wall building devices to each other side by side, thereby to form an assembly of wall building devices;
pulling said assembly through the ground sideways; and
thereafter pulling said assembly through the ground in a direction at an angle to said sideways direction.
8. The method of
claim 1
, wherein the hardenable material is injected between one or more membranes defining one or more sides of the wall or wall part formed by the wall building device.
9. The method of
claim 1
, wherein the hardenable material is fibre concrete.
10. The method of
claim 1
, wherein the ground is displaced by the wall building device creating room for the wall.
11. The method of
claim 1
, wherein at least the ground area adjacent to the front part of the wall building device is vibrated, lubricated, jetted and/or removed.
12. The method of
claim 1
, wherein in a first step a wall is made, leaving the ground adjacent the wall substantially intact, and that in a second step the ground at one side of the wall is excavated.
13. The method of
claim 12
, wherein said second step comprises removal of the ground using draglines and trucks and/or using dredging equipment.
14. A system for carrying out the method according to
claim 1
, comprising:
drilling means for drilling one or more holes in the ground on or parallel to the projected path of the wall, the drilling means comprising one or more drill strings;
a wall building device having cross-sectional dimensions which are substantially equal to the dimensions of at least a part of the cross-section of the wall, and having injection means for injecting a hardenable material behind the wall building device;
pulling means for pulling the wall building device through the ground substantially along the path of the one or more holes; and
wall material supplying means for supplying the hardenable material to the wall building device.
15. The system of
claim 14
, wherein the pulling means further comprise means for pulling one or more casing strings through the ground substantially along or parallel to the path of the one or more holes.
16. The system of
claim 14
, further comprising an assembly for connecting one end of a pull string to the ends of more than one casing string, the end of the pull string being transversely spaced from the ends of the casing strings.
17. The system of
claim 16
, wherein said assembly comprises a drilling, reaming and/or jetting head at said end of each casing string.
18. The system of
claim 15
, wherein each casing string comprises an inner string and an outer string enclosing the inner string.
19. The system of
claim 18
, wherein the inner string is adapted to transfer the pulling force required by the wall building device, and the outer string is adapted to provide low friction forces between the inner string and the outer string when moving the inner string relative to the outer string.
20. The system of
claim 18
, wherein the inner string is made of steel, and the outer string is made of plastics.
21. The system of
claim 20
, wherein the outer string is made of polyethylene.
22. The system of
claim 14
, wherein the wall or at least one of the one or more drill strings/casing strings contains at least one duct for supplying the hardenable material to the wall building device.
23. The system of
claim 14
, wherein a duct extruded in the wall or at least one of the one or more drill strings/casing strings contains at least one line for supplying energy to the wall building device.
24. The system of
claim 14
, wherein a duct extruded in the wall or at least one of the one or more drill strings/casing strings contains at least one line for controlling and/or monitoring the wall building device.
25. The system of
claim 14
, wherein the wall or at least one of the one or more drill strings/casing strings contains at least one duct for supplying a drilling fluid to the wall building device.
26. The system of
claim 14
, wherein the wall or at least one of the one or more drill strings/casing strings contains at least one duct for discharging ground removed by the wall building device.
27. The system of
claim 14
, wherein the wall building device is adapted to build a wall or wall part provided with wall guide means, and wherein the or a further wall building device is provided with means for engaging the wall guide means.
28. The system of
claim 27
, wherein the wall guide means comprise a guide slit.
29. The system of
claim 28
, wherein the guide slit essentially has an L-shaped cross-section.
30. The system of
claim 14
, wherein at least one guide member is provided in or on the ground, and wherein the wall building device is adapted to be guided along the guide member through the ground.
31. The system of
claim 14
, wherein the wall building device is adapted to be connected to the leading end of a pulling string for pulling the pulling string into the ground simultaneously with pulling the wall building device through the ground.
32. The system of
claim 14
, wherein the wall building device has an essentially Z-shaped cross-section.
33. The system of
claim 14
, wherein the wall building device at at least one side thereof is adapted to be coupled to another wall building device.
34. The system of
claim 14
, wherein the wall building device is adapted to be pulled through the ground in a forward direction, and is further adapted to be pulled through the ground in a direction at an angle to the forward direction.
35. The system of
claim 14
, wherein the wall building device comprises means for supplying one or more membranes in the ground defining one or more sides of the wall or wall part formed by the wall building device.
36. The system of
claim 14
, wherein the wall building device comprises means for vibrating, lubricating, jetting and/or removing the ground area adjacent to the front part thereof.
37. The system of
claim 14
, further comprising excavating means for excavating the ground at one side of the wall.
38. A wall building device for use in the method of claim 1, and the system of
claim 14
.
39. The wall building device of
claim 38
, comprising at least one extrusion chamber at the trailing side thereof, and a plurality of jetting chambers at the leading side thereof.
40. The wall building device of
claim 39
, wherein each jetting chamber comprises at least one rotatably driven jet tube extending essentially parallel to the direction of movement of the wall building device.
US09/113,017 1997-07-11 1998-07-06 Method, system and device for building a wall in the ground Expired - Fee Related US6357965B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP97202177.8 1997-07-11
EP97202177A EP0890707A1 (en) 1997-07-11 1997-07-11 Method, system and device for building a wall in the ground
EP97202177 1997-07-11

Publications (2)

Publication Number Publication Date
US20010038774A1 true US20010038774A1 (en) 2001-11-08
US6357965B2 US6357965B2 (en) 2002-03-19

Family

ID=8228551

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/113,017 Expired - Fee Related US6357965B2 (en) 1997-07-11 1998-07-06 Method, system and device for building a wall in the ground

Country Status (5)

Country Link
US (1) US6357965B2 (en)
EP (2) EP0890707A1 (en)
JP (1) JPH1181869A (en)
DE (1) DE69805574T2 (en)
DK (1) DK0890708T3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190085689A1 (en) * 2016-02-04 2019-03-21 Heindl Energy Gmbh Bottom-side separation of an object to be cut out of stone
US20240133295A1 (en) * 2019-10-14 2024-04-25 Putzmeister Engineering Gmbh Control fitting, arrangement and method for producing concrete components

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19859821A1 (en) * 1998-12-23 1999-11-18 Tachus Gmbh Shield assembly for boring tunnel
NL1011296C1 (en) * 1999-02-12 2000-08-15 Heerema Ondergrondse Infrastru Method and device for manufacturing an underground tunnel.
NL1016917C2 (en) * 1999-07-02 2002-10-08 Heerema Holding Construction I Excavating device for forming channel in ground has assembly of jet excavating units defining cross section of channel, with sensor connected to at least one unit for measuring force exerted by ground
NL1016952C2 (en) * 1999-07-02 2002-10-15 Heerema Holding Construction I Excavating device for forming channel in ground has assembly of jet excavating units defining cross section of channel, with sensor connected to at least one unit for measuring force exerted by ground
NL1015365C1 (en) 1999-07-02 2001-01-03 Heerema Ondergrondse Infrastru Jet excavator.
NL1012505C2 (en) * 1999-07-02 2001-01-03 Heerema Ondergrondse Infrastru Excavating device for forming channel in ground has assembly of jet excavating units defining cross section of channel, with sensor connected to at least one unit for measuring force exerted by ground
NL1016496C2 (en) * 1999-11-02 2001-06-06 Visser & Smit Bv Method for constructing a drilled tunnel.
EP2598704A4 (en) 2010-07-30 2016-02-24 Fci Holdings Delaware Inc Engineered mine seal
CN102913252B (en) * 2012-11-09 2015-01-07 北京工业大学 Self-feeding continual tunneling device and method for rock tunnel
CN103603681B (en) * 2013-11-06 2016-08-17 神华集团有限责任公司 A kind of support divider wall and construction method thereof
CN105696526A (en) * 2016-01-29 2016-06-22 西北农林科技大学 Phase-change heat-accumulation seepage-prevention hollow plastic plate and construction method thereof
CN106640108B (en) * 2017-01-19 2019-02-19 中铁工程装备集团有限公司 A kind of hypogee modular construction system and its construction method
CN107060776A (en) * 2017-05-12 2017-08-18 上海广联环境岩土工程股份有限公司 The unit development machine combination of underground interface channel draws in construction method
CN110985025B (en) * 2019-12-16 2021-01-26 中铁一局集团有限公司 Method for reconstructing shield tunnel to carry out mine construction
CN112324339B (en) * 2020-11-02 2022-04-01 淮南矿业(集团)有限责任公司 Novel casing running process for large-diameter through drilling
CN112962478B (en) * 2021-02-05 2022-07-15 中铁七局集团武汉工程有限公司 Concrete structure inverted siphon inner and outer mold trolley

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2096850A (en) * 1936-05-18 1937-10-26 Carl T Forsberg Concrete tunnel lining
US3325217A (en) * 1963-12-28 1967-06-13 Karl A Enz Tunneling and excavation through rock by core forming and removal
US3482641A (en) * 1967-02-23 1969-12-09 Stanley G Atkins Apparatus for earth coring
US3656563A (en) * 1970-02-16 1972-04-18 Charles F Blinne Apparatus and method for inserting casing beneath roadbeds
US3874463A (en) * 1972-03-29 1975-04-01 Charles L Hicks Means for boring parallel holes
US3894402A (en) * 1974-07-19 1975-07-15 Martin D Cherrington Apparatus and method for emplacing a conduit along an underground arcuate path
US4043136A (en) * 1975-07-14 1977-08-23 Tidril Corporation System and method for installing production casings
IL51070A (en) * 1976-12-08 1979-07-25 Mottes S Method of producing an underground installation of concrete pipe and devicde useful in such method
CA1046294A (en) * 1977-06-13 1979-01-16 Roger Woods Method and apparatus for lateral excavation
US4456078A (en) * 1980-10-23 1984-06-26 Adam Arthur J L Earth boring method and apparatus
DE3419517C2 (en) * 1984-05-25 1993-09-30 Zueblin Ag Process for underground installation of pipelines and device for carrying out the process
DE3811585A1 (en) 1988-04-07 1989-10-19 Stetter Gmbh METHOD AND DEVICE FOR PROCESSING MORTAR AND CONCRETE IN TUNNEL AND TUBE CONSTRUCTION
DE3827098C1 (en) 1988-08-10 1989-12-21 Wayss & Freytag Ag, 6000 Frankfurt, De
AT397127B (en) 1989-05-11 1994-02-25 Voest Alpine Bergtechnik DRIVING SHIELD
JPH0674713B2 (en) * 1989-08-02 1994-09-21 松坂貿易株式会社 Method and device for replacing existing pipe with new pipe
JP2929027B2 (en) * 1990-03-31 1999-08-03 株式会社間組 Removal method of existing sewer and installation of expanded sewer
FR2679295B1 (en) * 1991-07-17 1997-11-14 Perforex PROCESS AND DEVICE FOR THE IN SITU CONCRETE OF A UNDERGROUND SINGLE AND CORRESPONDING CUTTING BLADE.
IT1256533B (en) * 1992-02-28 1995-12-07 Trevi Spa EQUIPMENT FOR THE EXCAVATION OF GALLERIES.
CA2102760C (en) 1993-11-09 1996-12-03 David M. Brown Underground horizontal pipe installation method and apparatus
US5813482A (en) * 1995-12-26 1998-09-29 Barbera; Leo J. Earth boring system and apparatus
US5928447A (en) * 1997-04-03 1999-07-27 Gianfrancisco; Thomas Conduit repair and interior reconstruction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190085689A1 (en) * 2016-02-04 2019-03-21 Heindl Energy Gmbh Bottom-side separation of an object to be cut out of stone
US20240133295A1 (en) * 2019-10-14 2024-04-25 Putzmeister Engineering Gmbh Control fitting, arrangement and method for producing concrete components

Also Published As

Publication number Publication date
US6357965B2 (en) 2002-03-19
DE69805574D1 (en) 2002-07-04
EP0890708B1 (en) 2002-05-29
DE69805574T2 (en) 2003-01-09
JPH1181869A (en) 1999-03-26
DK0890708T3 (en) 2002-09-23
EP0890707A1 (en) 1999-01-13
EP0890708A1 (en) 1999-01-13

Similar Documents

Publication Publication Date Title
US6357965B2 (en) Method, system and device for building a wall in the ground
CN109026035B (en) Tunnel annular variable cross section expanding excavation method
KR102181396B1 (en) Reinforcing method of pre-drilling before tunnel excavation and tunnel excavation method using the same
CN208885287U (en) Circumferential direction digs shield mechanism
CN109026030A (en) Tunnel circumferential direction digs method
JPH0462292A (en) Diameter widening method and reducing method of tunnel
KR20170102397A (en) The Tunnel construction method to use retangular pipe
JP4296549B2 (en) Underground support structure, its construction method and tunnel construction method
AU2004200274A1 (en) Continuous method of realisation of works underground, tunnels and excavations in general with works of consolidation, impermeabilisation and drainage obtained through guided perforations
KR102609304B1 (en) A grouting method using a direction-controlled borehole and a grouting system for the soft ground and void area
EP1186742A2 (en) Method, system and device for building a wall in the ground
KR101596806B1 (en) Groundwater pressure control means comprises a shield T tunnel structure
JP2933476B2 (en) Underground pipe laying method
JPH11173072A (en) Chemical grouting method and chemical grouting equipment
JP4214082B2 (en) Propulsion method excavation equipment and propulsion method
JP4564895B2 (en) Tunnel widening method
JP4274891B2 (en) Partial widening method of shield tunnel
JPH0517354B2 (en)
JP2637180B2 (en) Enlarged shield method
JP2961685B2 (en) Branch shield excavation method
JP3153887B2 (en) Joining method of shield tunnel
JP4180347B2 (en) Construction method of underground continuous wall and underground continuous wall
JP2018131853A (en) Segment assembly device, tunnel excavator, and segment assembly method
KR101778201B1 (en) Propulsion method to lift boring machine in water
CN112647958A (en) Construction method of box culvert

Legal Events

Date Code Title Description
AS Assignment

Owner name: HEEREMA ONDERGRONDSE INFRASTRUCTUREN B.V., NETHERL

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LAMMERTINK, MARINUS CHRISTIAAN;VAN VOORDE, RUTGER CHRISTIAAN;BROEDER, RENE;REEL/FRAME:009324/0557

Effective date: 19980706

AS Assignment

Owner name: HEEREMA HOLDING CONSTRUCTION, INC., SWITZERLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HEEREMA ONDERGRONDSE INFRASTRUCTUREN B.V.;REEL/FRAME:011564/0979

Effective date: 20001218

CC Certificate of correction
FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20100319