CN107060776A - The unit development machine combination of underground interface channel draws in construction method - Google Patents

The unit development machine combination of underground interface channel draws in construction method Download PDF

Info

Publication number
CN107060776A
CN107060776A CN201710333607.5A CN201710333607A CN107060776A CN 107060776 A CN107060776 A CN 107060776A CN 201710333607 A CN201710333607 A CN 201710333607A CN 107060776 A CN107060776 A CN 107060776A
Authority
CN
China
Prior art keywords
space
head assembly
driving head
tube coupling
passage tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710333607.5A
Other languages
Chinese (zh)
Inventor
乔华山
王中兵
姜传斌
黄骥征
凡后奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd filed Critical Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd
Priority to CN201710333607.5A priority Critical patent/CN107060776A/en
Publication of CN107060776A publication Critical patent/CN107060776A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of unit development machine combination of underground interface channel draws in construction method, is related to civil engineering technical field, what is solved is the existing method technical problem high to working space requirement.This method sets space of setting out, reception space respectively at destination channel two ends, multiple horizontal orientation holes are drilled with the soil body between space and reception space that sets out, and by it is multiple it is small-bore driving heads be put into space of setting out be combined into one it is bigbore driving head assembly, and each drag-line on the horizontal pull device being arranged in reception space is each passed through each horizontal orientation hole rear dragging guides to space of setting out, draw in construction using what head assembly implementation goal passage was tunneled in each drag-line traction.The method that the present invention is provided, is particularly suitable for use in the narrow and small occasion of working space.

Description

The unit development machine combination of underground interface channel draws in construction method
Technical field
The present invention relates to civil engineering technology, the unit development machine combination of more particularly to a kind of underground interface channel is drawn in The technology of construction method.
Background technology
Current underpass is usually to use cut and cover tunneling or non-excavating construction.Although construction that Ming digs method is simple, quick, Economy, but it is larger to surrounding environment influence, and the connection for being not suitable for the underground space of the close quarters applied to modern city is applied In work.Using push bench process to be the most commonly used in no-dig technique method, although and this method can be to keep away some shortcomings exempted from during Ming is dug, either Traditional push bench process or the pipe-pulling construction method as described in patent ZL200810044160.0, are required for by setting out or receiving work Make space and counter-force is provided.And underground interface channel is diversified in specifications and cross dimensions is larger, therefore required to set out or receive work empty Between size it is relatively also larger, particularly interface channel between existing building, because the basement headroom of existing building is low, Narrow and small and without the wall of larger counter-force, its working space is narrow and small, it is impossible to meet the construction of pipe-pulling construction method and traditional push bench process It is required that.
The content of the invention
For defect present in above-mentioned prior art, the technical problems to be solved by the invention are to provide a kind of to work Bulk requires that the unit development machine combination of low underground interface channel draws in construction method.
In order to solve the above-mentioned technical problem, a kind of unit development machine combination of underground interface channel provided by the present invention is drawn Enter construction method, it is characterised in that comprise the following steps that:
1)One space of setting out is set at destination channel top, and one reception space is set in destination channel tail end, and is being connect Setting horizontal pull device in space is received, and fixes on horizontal pull device many drag-lines;
2)Multiple horizontal orientation holes parallel to destination channel axis are drilled with the soil body between space and reception space that sets out, And each drag-line on the horizontal pull device in reception space is each passed through each horizontal orientation hole rear dragging guides to the sky that sets out Between;
3)Multiple small-bore driving heads are put into and set out in space, and each driving head is combined into a bigbore pick Enter head assembly, and the anchoring part for tunneling head assembly is fixed with each drag-line;
4)Driving head assembly is advanced to the driving initial position of destination channel, and all drag-lines of pretension;
5)The first segment passage tube coupling of destination channel is hung in and set out in space, and by passage tube coupling splicing in driving head group Fit tail end;
6)Synchronously and pulling force continuously is applied to each drag-line using horizontal pull device, makes driving head assembly in each drag-line Pulling force effect under, along the direction driving parallel to destination channel axis in the soil body, and drive the passage tube coupling of tail end to enter Enter in the culvert excavated by driving head assembly;
7)Later section passage tube coupling is hung in and set out in space, and the passage tube coupling is spliced into the tail in previous section passage tube coupling End;
8)Repeat step 6)To step 7), until the top of first segment passage tube coupling reaches reception space, destination channel is drawn in Construction is that announcement is finished;
9)Hung out after driving head assembly is disintegrated from reception space, or driving head assembly disintegration is retreated to the sky that sets out Between hang out.
Further, the driving head assembly is made up of multiple small-bore driving heads of cutting bore identical, or It is made up of the different small-bore driving head of multiple cutting bores.
Further, in the tunneling process of driving head assembly, the culvert that head assembly is excavated is tunneled to having been enter into The outer wall pressure injection mud of passage tube coupling in hole, makes the mud of institute's pressure injection in the outer wall formation mud sleeve of passage tube coupling, to reduce The running resistance of side wall.
The unit development machine combination for the underground interface channel that the present invention is provided draws in construction method, changes prior art and exists The automatic reaction mode of big cross section passage is tackled in construction using big active well, but is broken the whole up into parts, unit is tunneled using unit The construction method that draws in is closed, in the way of light section unit development machine combines and to be formed and tunneled after big cross section, big cross section passage is completed Construction, low is required to working space size, effectively solves in existing building that headroom is low, working space is narrow and small, it is impossible to is set The difficulty of big active well, especially to setting out, reception space it is narrow and small, and space of setting out can not provide counter-force occasion it is especially suitable.
Brief description of the drawings
Fig. 1 is that the unit development machine combination of the underground interface channel of the embodiment of the present invention draws in construction method and is drilled with water The schematic diagram of flat directional hole;
Fig. 2 is that the unit development machine combination of the underground interface channel of the embodiment of the present invention is drawn in construction method using tunneling head Assembly implements the schematic diagram of driving;
Fig. 3 is that the unit development machine of the underground interface channel of the embodiment of the present invention combines the driving head group drawn in construction method Fit structural representation;
Fig. 4 is that the unit development machine combination of the underground interface channel of the embodiment of the present invention draws in after construction method construction is finished and will dug Enter the schematic diagram of head assembly disintegration.
Embodiment
Embodiments of the invention are described in further detail below in conjunction with brief description of the drawings, but the present embodiment is not used to limit The system present invention, every similar structure using the present invention and its similar change, all should be included in protection scope of the present invention, the present invention In pause mark represent the relation of sum.
As Figure 1-Figure 4, a kind of unit development machine combination for underground interface channel that the embodiment of the present invention is provided is drawn Enter construction method, it is characterised in that comprise the following steps that:
1)One space 2 of setting out is set at destination channel top, and in destination channel tail end one reception space 1 of setting, and Drag-line counter force wall 4 is set in reception space 1, and the level being made up of multiple hollow jacks is installed on drag-line counter force wall 4 and is drawn Power apparatus 6, and each on each hollow jack of horizontal pull device 6 fix a drag-line 7;
Wherein, space of setting out is used as tunneling the working space of head and passage tube coupling, and reception space is used to receive development machine Head;
2)In the soil body between space and reception space that sets out, it is drilled with using horizontal directional drilling machine 3 multiple logical parallel to target The horizontal orientation hole 5 of road axis, and each drag-line 7 on the horizontal pull device 6 in reception space is each passed through each water The flat rear dragging of directional hole 5 guides to space 2 of setting out;
3)Multiple small-bore driving heads 8 are put into and set out in space 2, and each driving head 8 is combined into a heavy caliber Driving head assembly, and by tunnel head assembly anchoring part fixed with each drag-line 7;
The driving head assembly can be made up of multiple small-bore driving heads of cutting bore identical, can also be by multiple The different small-bore driving head composition of bore is cut, small-bore, heavy caliber herein are relativeness;
The driving head quantity and the cutting bore of each driving head tunneled in head assembly, can be by manually according to destination channel Cross-sectional area and destination channel two ends working space size setting, such as design size(It is long × high)For 4.8m × 3.6m's Underground interface channel, it is that to cut bores be 1.2m × 1.2m by 2.4m × 2.4m driving head and 8 that can use 1 cutting bore Driving head be combined into driving head assembly, can also use 12 cutting bores for 1.2m × 1.2m driving head combination Into driving head assembly;
4)Driving head assembly is advanced to the driving initial position of destination channel, and all drag-lines 7 of pretension;
5)The first segment passage tube coupling 11 of destination channel is hung in and set out in space, and by passage tube coupling splicing in driving head The tail end of assembly;
The passage tube coupling can be steel box culvert tube coupling or reinforced concrete box culvert tube coupling;
6)Using the synchronization of 6 pairs of each drag-lines of horizontal pull device 7 and continuously apply pulling force, driving head assembly is drawn each Under the pulling force effect of rope 7, along the direction driving parallel to destination channel axis in the soil body, and the passage tube coupling of tail end is driven 11 enter in the culvert excavated by driving head assembly;
In the tunneling process of driving head assembly, by driving side of the pulling force to driving head assembly for adjusting each drag-line To being corrected, to ensure the axial traveling precision for tunneling head assembly;
In the tunneling process of driving head assembly, to the passage tube coupling having been enter into the culvert that driving head assembly is excavated Outer wall pressure injection mud, make the mud of institute's pressure injection in the outer wall formation mud sleeve of passage tube coupling, to reduce the running resistance of side wall;
7)Later section passage tube coupling 11 is hung in and set out in space, and the passage tube coupling is spliced in previous section passage tube coupling 11 Tail end;
8)Repeat step 6)To step 7), until the top of first segment passage tube coupling reaches reception space, destination channel is drawn in Construction is that announcement is finished;
9)Hung out after driving head assembly is disintegrated from reception space, or driving head assembly disintegration is retreated to the sky that sets out Between hang out.

Claims (3)

1. a kind of unit development machine combination of underground interface channel draws in construction method, it is characterised in that comprise the following steps that:
1)One space of setting out is set at destination channel top, and one reception space is set in destination channel tail end, and is being connect Setting horizontal pull device in space is received, and fixes on horizontal pull device many drag-lines;
2)Multiple horizontal orientation holes parallel to destination channel axis are drilled with the soil body between space and reception space that sets out, And each drag-line on the horizontal pull device in reception space is each passed through each horizontal orientation hole rear dragging guides to the sky that sets out Between;
3)Multiple small-bore driving heads are put into and set out in space, and each driving head is combined into a bigbore pick Enter head assembly, and the anchoring part for tunneling head assembly is fixed with each drag-line;
4)Driving head assembly is advanced to the driving initial position of destination channel, and all drag-lines of pretension;
5)The first segment passage tube coupling of destination channel is hung in and set out in space, and by passage tube coupling splicing in driving head group Fit tail end;
6)Synchronously and pulling force continuously is applied to each drag-line using horizontal pull device, makes driving head assembly in each drag-line Pulling force effect under, along the direction driving parallel to destination channel axis in the soil body, and drive the passage tube coupling of tail end to enter Enter in the culvert excavated by driving head assembly;
7)Later section passage tube coupling is hung in and set out in space, and the passage tube coupling is spliced into the tail in previous section passage tube coupling End;
8)Repeat step 6)To step 7), until the top of first segment passage tube coupling reaches reception space, destination channel is drawn in Construction is that announcement is finished;
9)Hung out after driving head assembly is disintegrated from reception space, or driving head assembly disintegration is retreated to the sky that sets out Between hang out.
2. the unit development machine combination of underground interface channel according to claim 1 draws in construction method, it is characterised in that: The driving head assembly is made up of multiple small-bore driving heads of cutting bore identical, or different by multiple cutting bores Small-bore driving head composition.
3. the unit development machine combination of underground interface channel according to claim 1 draws in construction method, it is characterised in that: In the tunneling process of driving head assembly, to the outer of the passage tube coupling having been enter into the culvert that driving head assembly is excavated Wall pressure notes mud, makes the mud of institute's pressure injection in the outer wall formation mud sleeve of passage tube coupling, to reduce the running resistance of side wall.
CN201710333607.5A 2017-05-12 2017-05-12 The unit development machine combination of underground interface channel draws in construction method Pending CN107060776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710333607.5A CN107060776A (en) 2017-05-12 2017-05-12 The unit development machine combination of underground interface channel draws in construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710333607.5A CN107060776A (en) 2017-05-12 2017-05-12 The unit development machine combination of underground interface channel draws in construction method

Publications (1)

Publication Number Publication Date
CN107060776A true CN107060776A (en) 2017-08-18

Family

ID=59596858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710333607.5A Pending CN107060776A (en) 2017-05-12 2017-05-12 The unit development machine combination of underground interface channel draws in construction method

Country Status (1)

Country Link
CN (1) CN107060776A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173521A (en) * 2020-04-06 2020-05-19 中铁工程装备集团有限公司 Modular combined type underground engineering tunneling device and construction method thereof
CN111594208A (en) * 2020-05-29 2020-08-28 中铁工程装备集团有限公司 Heading machine and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0890708A1 (en) * 1997-07-11 1999-01-13 Heerema Ondergrondse Infrastructuren B.V. Method, system and device for building a wall in the ground
CN1408982A (en) * 2001-09-17 2003-04-09 石油勘探开发科学研究院钻井工艺研究所 Method and equipment for drilling large bore well (hole) using small size screw drill tool combination
CN101571045A (en) * 2009-05-22 2009-11-04 上海广联建设发展有限公司 Top-pulling type construction method for burying box culvert and pipeline underground
CN101787891A (en) * 2010-04-22 2010-07-28 中建市政建设有限公司 Station-crossing construction method and station-crossing construction device of wheel type mobile foundation
CN105041327A (en) * 2015-08-27 2015-11-11 北京建工土木工程有限公司 Subsurface tunnel reverse shield receiving method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0890708A1 (en) * 1997-07-11 1999-01-13 Heerema Ondergrondse Infrastructuren B.V. Method, system and device for building a wall in the ground
CN1408982A (en) * 2001-09-17 2003-04-09 石油勘探开发科学研究院钻井工艺研究所 Method and equipment for drilling large bore well (hole) using small size screw drill tool combination
CN101571045A (en) * 2009-05-22 2009-11-04 上海广联建设发展有限公司 Top-pulling type construction method for burying box culvert and pipeline underground
CN101787891A (en) * 2010-04-22 2010-07-28 中建市政建设有限公司 Station-crossing construction method and station-crossing construction device of wheel type mobile foundation
CN105041327A (en) * 2015-08-27 2015-11-11 北京建工土木工程有限公司 Subsurface tunnel reverse shield receiving method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173521A (en) * 2020-04-06 2020-05-19 中铁工程装备集团有限公司 Modular combined type underground engineering tunneling device and construction method thereof
CN111594208A (en) * 2020-05-29 2020-08-28 中铁工程装备集团有限公司 Heading machine and construction method thereof

Similar Documents

Publication Publication Date Title
CN101571045B (en) Top-pulling type construction method for burying box culvert and pipeline underground
CN101701646B (en) Method for slurry-water balance type pipe-pulling construction of underground pipeline
CN102889427B (en) Device, system and method for repairing underground pipeline of trenchless pneumatic cracking pipe
RU2392390C2 (en) Trenchless pipe driving method
CN111306360A (en) Trenchless pipeline jacking and laying construction method
CN101749024B (en) Pipe-pulling construction method of underground buried box culvert
CN202852194U (en) Device and system of under ground pipeline repair without excavation of pneumatic burst pipe
CN204200254U (en) A kind of coal column is reinforced and is used two-way two-ended cables
CN212175815U (en) Deep foundation pit supporting structure
CN107060776A (en) The unit development machine combination of underground interface channel draws in construction method
CN101922297A (en) Synchronous towing, pushing and tunneling device of underground box culvert or pipeline construction
CN201763350U (en) Pulling jack device for underground concealed box culvert or pipe construction
KR20030045695A (en) Method for Digging a Tunnel
CN205387708U (en) Clear stake device of disposable rotary -cut formula of a complete set of pipe
CN101749028B (en) Cross-pulling construction method for soft soil zone with high ground water level
CN109505633B (en) Lining back guide pipe grouting water plugging device for muddy stratum and construction method
CN107023305B (en) The blocking construction method of underground interface channel
CN102434168B (en) Pipe connecting device
CN112610255B (en) Tunnel construction method for penetrating through weak and broken surrounding rock
CN107269283B (en) A kind of big cross section tunneling subway station and running tunnel penetrate through construction method
JP2005120622A (en) Construction method of underground structure
CN107130980A (en) A kind of construction method of tunnel bad geological section consolidation by grouting
CN108798718A (en) Subsequent grouting method is held before tunnel
CN204942755U (en) Combined structure for optical cable and oil pipeline back-dragging in same hole
CN211113744U (en) A non-excavation construction structures for changing old pipeline between two inspection shafts

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication