US11434617B2 - Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like - Google Patents
Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like Download PDFInfo
- Publication number
- US11434617B2 US11434617B2 US16/775,369 US202016775369A US11434617B2 US 11434617 B2 US11434617 B2 US 11434617B2 US 202016775369 A US202016775369 A US 202016775369A US 11434617 B2 US11434617 B2 US 11434617B2
- Authority
- US
- United States
- Prior art keywords
- foundation
- collar
- spread
- pedestal
- bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active, expires
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/08—Reinforcements for flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/12—Geometrical or physical properties corrugated
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/80—Repairing, retrofitting or upgrading methods
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
Definitions
- the present invention is related to the field of foundations for the support of tall, heavy and/or large towers and, more particularly, to a retrofit structure addition and method for reinforcing existing concrete gravity spread foundations currently used to support wind turbines and similar structures, especially those foundations which have failed or are failing due to long term dynamic fatigue.
- the present invention is directed to a retrofit spread foundation reinforcing structure and method for restoring the integrity of existing gravity spread foundations and extending the useful life thereof.
- the retrofit spread foundation reinforcing structure includes a generally cylindrical shape sustaining member forming an annular cementitious reinforcing collar addition positioned around the central pedestal and above the expanded base or horizontal spread section of an original gravity spread foundation.
- the shape sustaining member forming the annular collar addition may be embodied as a corrugated metal pipe (CMP) having a diameter greater than the diameter of the pedestal.
- CMP corrugated metal pipe
- the collar addition thus fully encircles and confines the central pedestal with the base of the collar pressing against the upper surface of the horizontal spread section of the already existing spread foundation adjacent to the engaging interface between the bottom of the pedestal and the top of the spread foundation below the pedestal.
- a plurality of radially extending bolts extend horizontally through the CMP and cementitious ring of the collar and into the pedestal of the original foundation.
- Soil and/or rock anchor bolts are placed to extend vertically from the top of the cementitious ring of the collar addition down through the horizontal spread section and into the underlying soil and/or rock substrate beneath the spread section.
- anchor bolts are used herein for ease of description and are understood by those skilled in the art to include tensioning and/or connecting anchors embodied as bolts as well as anchors having tensioning and/or connecting components other than bolts.
- the radial bolts and soil and/or rock anchor bolts are post-tensioned in the manner described in my earlier patents, U.S. Pat. Nos. 7,533,505, 5,826,387, 6,672,023, and 7,155,875, all of which are hereby incorporated by reference in their entirety as if fully set forth herein and sometimes are referred to herein as “my prior patents”, to place the entire foundation under high unit compression loading in both the horizontal and vertical directions which strengthens the cold joint interface between the pedestal and the spread section.
- the soil and/or rock anchor bolts are tightened so as to exceed the maximum uplift expected from overturning forces of the wind turbine structure on the foundation.
- the entire foundation with the reinforcing collar addition is able to withstand the various loads with the concrete thereof always remaining in compression and the bolts always in static tension.
- Another object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding object that includes a reinforcing collar positioned around the central pedestal and above the expanded base or horizontal spread section of a gravity spread foundation.
- a further object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects in which the collar includes a CMP having a diameter greater than an outer diameter of the pedestal to encircle the pedestal, an area between the CMP and the pedestal being filled with cementitious material to define an annular ring bounded on an outer perimeter by the CMP, the base of the collar resting on, or pressing against, the upper surface of the horizontal spread section of the foundation.
- Yet a further object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that includes post-tensioned soil and/or rock anchor bolts extending vertically from the top of the cementitious annular ring of the collar down through the horizontal spread section of the foundation and into the underlying soil and/or rock substrate.
- Still a further object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that includes post-tensioned radially extending bolts that extend horizontally through the CMP and annular cementitious collar and into the pedestal of the foundation.
- Another object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that, when installed on an existing gravity spread foundation, places the retrofit portion of the foundation under high unit compression loading through tightening of the anchor bolts so as to exceed the maximum internal tension expected from overturning forces of the wind turbine structure on the foundation.
- Yet another object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that may be efficiently installed in support of gravity spread foundations of various configurations.
- Still another object of the present invention is to provide a method of installing a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that includes placement of a CMP around the base of the pedestal of a spread foundation structure and filling the annular area between the CMP and the pedestal with cementitious material to form a collar that encircles and supports the spread foundation pedestal.
- Yet a further object of the present invention is to provide a method of installing a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects in which soil and/or rock anchor bolts are installed vertically through the collar and horizontal spread section of the original foundation and into the underlying soil and/or rock substrate either before or after the cementitious material is poured into the annular ring between the CMP and the pedestal to reinforce the cold joint engaging interface between the bottom of the pedestal and the upper surface of the central part of the spread section below the pedestal.
- Another object of the present invention is to provide a method of installing a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects in which the anchor bolts are post-tensioned in a specified sequence to place uniform tension on the foundation.
- FIG. 1 is a front view of a wind turbine supported on a conventional gravity spread foundation with the retrofit spread foundation reinforcing structure addition installed thereon in accordance with the present invention.
- FIG. 2 is a sectional side view of one type of conventional concrete gravity spread foundation.
- FIG. 3 is a top view of the conventional spread foundation shown in FIG. 2 .
- FIG. 4 is a sectional side view of the conventional spread foundation shown in FIG. 2 with the retrofit spread foundation reinforcing structure addition installed thereon in accordance with the present invention.
- FIG. 5 is a top view of the conventional spread foundation reinforced with the retrofit spread foundation reinforcing structure addition shown in FIG. 4 .
- FIG. 5A is a side cutaway view of the collar showing the radial bolts and strand hoops.
- FIGS. 6A-6C are top cutaway views of each of three respective layers of radial bolts as installed according to the retrofit structure and method of the present invention.
- FIG. 6D is an isolated top view of the existing spread foundation tower base flange as shown in relationship to the radial bolts in FIGS. 6A-6C .
- FIGS. 7A and 7B are side views of the three radial bolt layers shown in FIGS. 6A-6C showing the vertical spacing in their layered configuration as when installed.
- FIG. 7C is an enlarged view of a radial bolt like those shown in FIGS. 7A and 7B .
- FIG. 7D is an enlarged view of the coupler for the radial bolts shown in FIGS. 7A-7C .
- FIG. 8 shows a soil and/or rock anchor bolt in a partial cutaway view of one side of the original foundation as retrofitted with the reinforcing structure addition of the present invention.
- FIG. 8A is an enlarged view of the drill hole sleeve and foam fill used when the reinforcing collar is constructed before the anchor bolts are in place.
- FIG. 9 is an enlarged view of Detail 9 shown in FIG. 5 , without the radial bolts inserted in the radial bolt holes, depicting the manner in which the drill holes for the anchor bolts are spaced from the three radial bolt layers shown in FIGS. 6A-6C, 7A and 7B and staggered radially with respect to each other.
- FIG. 10 is a top view of the circumference of the retrofit collar showing the soil and/or rock anchor bolt locations and a preferred sequence order for tensioning the soil and/or rock anchor bolts when installing the collar.
- the present invention is directed to a foundation collar reinforcing structure addition, generally designated by reference numeral 10 , for a conventional existing gravity spread foundation generally designated by reference numeral 12 .
- the gravity spread foundation 12 includes an expanded base or horizontal spread section 14 and a central pedestal 16 upon which a tall and/or heavy tower such as a wind turbine, generally designated by reference numeral 18 , is supported.
- the reinforcing structure addition 10 according to the present invention includes an annular collar 20 , positioned around the central pedestal 16 and above the expanded base or horizontal spread section 14 of the gravity spread foundation 12 to confine the pedestal.
- the reinforcing structure addition 10 also exerts compressive force to strengthen the engaging interface 17 which is a cold joint between the bottom of the pedestal and the top of the central part of the spread section under the pedestal 16 .
- the horizontal spread section 14 of the existing gravity spread foundation 12 extends outwardly on all sides of the pedestal 16 and may be octagonal as shown in FIG. 3 , or other shapes such as circular, square and the like.
- the tower 18 is secured to the pedestal 16 with a plurality of tower anchor bolts 19 that are secured at their lower ends to an embedment ring 21 as is known in the art and described in my prior patents.
- the collar 20 as positioned around the central pedestal 16 and above the expanded base or horizontal spread section 14 of the gravity spread foundation 12 , includes a shape sustaining member, generally designated by reference numeral 15 , around its outer perimeter and a ring of cementitious material 24 .
- the shape sustaining outer member 15 is preferably embodied as a corrugated metal pipe (CMP) 22 and will be referred to as such hereinafter.
- CMP corrugated metal pipe
- other perimeter forming structures could be used as long as such alternate structures properly define the periphery of the ring of cementitious material and provide for post tensioning of the radial bolts and the soil and/or anchor bolts as discussed herein.
- the CMP 22 is generally constructed of a plurality of sections that are bolted together to form a circle or a generally circular ring.
- the diameter of the CMP 22 is greater than the diameter of the foundation pedestal 16 and defines the outer perimeter of the ring of cementitious material 24 which is poured into and fills the annular area, generally designated by reference numeral 26 , between the outer side of the pedestal 16 and the CMP 22 .
- the collar 20 thus fully encircles the central pedestal 16 with the base 28 of the collar 20 resting on the upper surface 30 of the horizontal spread section 14 of the foundation 12 (see FIG. 4 ).
- the width or thickness of the cementitious annular collar when completed is preferably about 3.5′.
- the collar 20 does not have to rest directly on the upper surface 30 of the spread section 14 of the foundation since a layer of material could be interposed between the collar and the top of the spread section. However, the collar must press against the spread section 14 in accordance with the present invention.
- the upper surface 81 of the collar bounded by the CMP 22 is preferably about level with the upper surface 83 of the foundation pedestal 16 .
- the top and bottom of the CMP are preferably cut to form a plane that varies no more than about +/ ⁇ 2′′ from level.
- the diameter of the CMP is generally between about 19′ and about 25′, with a CMP pipe tolerance for out of roundness of about 3′′.
- a plurality of radially extending bolts generally designated by reference numeral 40 with strand hoops 44 extend horizontally through the CMP 22 and the cementitious material 24 of the annular ring 26 of the collar 20 and into the pedestal 16 of the foundation 12 as can be seen in FIGS. 4, 5 and 5A .
- the upper and lower bolt layers are circumferentially reinforced by the wire tied strand hoops 44 at about 6′′ intervals.
- the innermost ends generally designated by reference numeral 42 of the radial bolts 40 are received into holes 58 drilled into the side of the pedestal 16 while the length of the radial bolts that extends through the cementitious ring 26 is preferably enclosed within a sleeve 68 (see FIGS.
- the radial bolts 40 which anchor the collar 20 to the pedestal 16 of the foundation 12 , are post-tensioned once the cementitious material has hardened, preferably to about 40% of their ultimate strength.
- washers fitting into the corrugation of the CMP and having a flat outer surface to contact the tensioning nuts are placed against the outer side of the CMP for proper tensioning of the radial bolts, as is known in the art.
- tension plates may be placed on the inside or the outside of the CMP for the same purpose.
- FIGS. 6A, 6B and 6C there are preferably three layers of radial bolts 40 including a top layer 50 , a middle layer 52 and a bottom layer 54 .
- the radially extending bolts 40 in each layer are on substantially the same plane and equidistantly spaced from one another like the spokes of a wheel.
- the bolts in each layer are offset with respect to the bolts in the other layers so that, if the three layers were placed directly on top of one another, none of the bolts of one layer would be in vertical alignment with the bolts in the adjacent layers.
- the radial bolts are positioned so as not to interfere with the tower anchor bolts 19 in the existing tower base flange 56 shown in isolation in FIG. 6D .
- the radial bolt layers 50 , 52 , 54 are vertically spaced from one another with the area between and around the layers being filled with the cementitious material 24 of the annular collar 20 .
- the vertical spacing between the layers is preferably about between about 12′′ and about 18′′, and more preferably about 18′′.
- the diameter of the radial bolts 40 is preferably between about 1′′ and about 2′′.
- the radial bolts 40 are preferably inserted into core holes 58 that are drilled into the side of the central pedestal of the existing gravity spread foundation to a depth of between about 36′′ to about 60′′, and preferably about 54′′.
- the diameter of the radial bolt core holes 58 descends in increments as the drilling approaches the center of the pedestal.
- the core hole at the CMP and inward for about 3′′ has a diameter of about 2.5′′.
- the core hole has a diameter of about 2′′.
- the final 30′′ or so of the hole has a diameter of about 1.75′′.
- the innermost ends 42 of the radial bolts 40 are preferably secured within the drilled foundation core holes 58 with an adhesive such as epoxy 41 that is inserted into the holes during installation of the radial bolts.
- an adhesive such as epoxy 41 that is inserted into the holes during installation of the radial bolts.
- the part 62 of the radial bolts that extends through the collar is covered with a sleeve 68 having a length of between about 15′′ and about 26′′, and preferably about 21′′.
- the radial bolts include two parts.
- the collar embedded part 62 of the radial bolts 40 is preferably joined with the foundation embedded sleeved part 60 of the radial bolts 40 by a coupler 64 .
- the coupler 64 is preferably enclosed within a sleeve 66 having a diameter of about 2.5′′ and a length of about 4′′.
- the collar portion 62 of the radial bolts is preferably between about 4′ and about 5′ in length, and more preferably about 4.5′, and preferably is also encased within a sleeve 68 to prevent engagement of the radial bolt with the cementitious material.
- the outer ends 70 of the radial bolts extend approximately 12′′ beyond the outer perimeter of the collar CMP 22 , although the length of the projecting ends 70 may be greater or lesser as needed for the particular foundation being reinforced.
- a plurality of soil and/or rock anchor bolts 80 are placed to extend vertically from the upper surface 81 of the cementitious annular ring 26 of the collar 20 down through the horizontal spread section 14 of the gravity spread foundation and into the underlying soil and/or rock substrate 90 .
- the soil and/or rock anchor bolts 80 , or anchors are between about 25′ and about 40′ in length, and preferably are about 30′ in length.
- the upper end of the anchor bolts is preferably enclosed within a sleeve 82 to prevent engagement of the bolt with the cementitious material in a “no bond” area 97 (see FIG. 8 ).
- the extent of the “no bond” area 97 is defined by the sleeve 82 that is preferably at least 10′ in length.
- the sleeve 82 extends substantially through the height of the collar 20 , through the spread section 14 of the foundation and about two to three feet into the underlying soil and/or rock substrate 90 .
- the distance from the upper surface 81 of the collar to the bottom 101 of the spread section is approximately 7.5′, with the 10′ sleeve extending about an additional 2.5′ into the underlying substrate.
- the lower bonded area 85 of the anchor bolts, below the horizontal spread section 14 and extending into the underlying soil and/or rock substrate 90 is generally between about 14′ and about 30′ in length, and is preferably about 19′ in length.
- the total embedment length of the soil and/or rock anchor bolts 80 is generally on the order of between about 24′ and about 39′, and preferably is about 29′. Following construction of the collar, the soil and/or rock anchor bolts are post-tensioned in the “no bond” area to about 60% of their ultimate strength.
- tubular PVC sleeves 88 about 6′′ in diameter are placed vertically in the excavated region for the anchor bolts (see FIGS. 8 and 8A ) and secured for the concrete pour. Once the cementitious material is set, the soil and/or rock anchor bolts are drilled down through the hollow center of the PVC sleeves 88 and, to prevent water entry, the upper 3′′ of the drill hole sleeve 88 is filled with foam 91 as shown in FIG. 8A .
- the anchor bolts are drilled in holes 100 in between adjoining radial bolt holes 58 in each radial bolt layer as shown in FIG. 9 such that the anchor bolts 80 and the radial bolts 40 inserted in the holes 58 do not interfere with one another.
- the diameter of the drill hole 100 for the rock anchor bolts is between about 4′′ and about 6′′, and is preferably about 5.5′′.
- grout is poured into the annular space 71 around the lower end of the anchor bolts in the bonded area 85 and in the annular space 73 between the outer surface of the sleeves 82 and the inner surface of the PVC tubes 88 in the “no-bond” area 97 .
- the anchor bolts 80 are post-tensioned in the manner described in my prior patents to place the entire collar 20 and spread foundation 12 under high unit compression loading.
- FIG. 10 A preferred sequence for tensioning of the anchor bolts is shown in FIG. 10 .
- the first and second bolts to be tensioned are on opposite sides of the collar, and the third and fourth bolts to be tensioned are on opposite sides that are 90° out from the first and second bolts.
- the soil and/or rock anchor bolts 80 are tensioned in opposing pairs as set forth in FIG. 10 to ensure even and uniform tension on the collar.
- the soil and/or rock anchor bolts may be part of rock anchors, soil anchors, helical anchors and the like, depending upon the makeup of the underlying support substrate.
- the soil and/or rock anchor bolts in conjunction with the collar that supports and contains the pedestal, serve to reinforce and strengthen the cold joint engaging interface 17 between the bottom of the pedestal and the top of the spread section under the pedestal.
- the reinforcing addition of the present invention effectively provides compressive force on the engaging interface 17 to increase the strength, stiffness and load bearing capacity of the spread foundation.
- a preferred construction sequence for constructing the reinforcing collar according to the present invention is as follows:
- the reinforcing structure addition according to the present invention can extend the life of an original gravity spread foundation that would otherwise have failed or is failing by at least an additional 20-25 years.
- the present invention is also directed to a method of modifying an existing gravity spread reinforced concrete foundation, increasing the foundation stiffness and the rotational stiffness of the entire wind turbine structure. Modifying the existing gravity spread foundation also increases the turbine resistance to overturn and extends the foundation life by at least an additional 25 years, which is the expected turbine life.
- the present invention also includes a method of modifying an existing shallow gravity spread foundation to a deep foundation, alleviating a number of potential failures found in connection with shallow foundations. These failures can include overturn, frost heave, erosion and scour, differential settlement, tilting, foundation/soil gapping, flooding, vertical seismic acceleration, horizontal seismic acceleration, liquefaction, collapsible soils and expansive soils.
- the present invention provides a method of restoring integrity and continued use to a failed or failing concrete gravity spread foundation.
- the retrofit reinforcement structure addition including the collar with radial bolts and soil and/or rock anchor bolts extending horizontally and vertically through the collar, respectively, serves to reinforce, strengthen and provide compressive force upon the engaging interface between the bottom of the pedestal and the top of the spread section under the pedestal.
- the useful life of an otherwise failed or failing gravity foundation is extended for at least an additional 25 years which is the expected turbine life period.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Foundations (AREA)
Abstract
Description
-
- 1) construct temporary turbine supports (temporary guys or brackets);
- 2) excavate soil from atop the spread foundation for construction of retrofit collar; pile soil adjacent to the retrofit excavation;
- 3) expose rebar at radial bolt and rock anchor locations;
- 4) core two 2″ diameter holes 24″ long into foundation pedestal for each bolt;
- 5) expand the 2″ core to 2.5″ for the first 3″ of the core;
- 6) drill 1.75″ hole with percussion drill beyond the 2″ cored hole to within about 30″ of the center of the pedestal for each radial bolt; radial bolt holes extend about 1″ beyond the end of the 0.5″ radial bolt;
- 7) inject approximately 30 cubic inches of epoxy into the back of the holes drilled for the radial bolts;
- 8) insert into each radial bolt hole the 1.5″ grade 75 all thread radial bolt with PVC sleeve sealed at the end of the PVC to the bolt with epoxy;
- 9) turn the couplers onto the bolt;
- 10) turn into the coupler the sleeved outer 4.5′ of 1.5″ grade 75 all thread bolt with wire tied strand hoops on the upper and lower radial bolt circles;
- 11) insert multi-plate CMP sections over radial bolts and bolt CMP sections together;
- 12) place half oval washers over radial bolts into the CMP depressions; turn nuts onto the radial bolts and snug against the washers;
- 13)
place 6″ PVC tubes vertical for rock anchors to be drilled through and secure for concrete pour; - 14) pour concrete retrofit;
- 15) drill and install rock anchors, centralized, and grouted in place in the bond and “no bond” areas, upper ends of said rock anchors being enclosed within a sleeve in the “no bond” area;
- 16) post-tension radial bolts;
- 17) install rock anchor plates grouted in place; and
- 18) post-tension rock anchors.
-
- 1) coordinate retrofit foundation work with electrical work;
- 2) verify turbine de-energized before any work is begun;
- 3) provide backup power generator to allow for control of the wind turbine in an idling condition;
- 4) disconnect cables from transformers;
- 5) temporarily remove and store the transformer for reinstallation;
- 6) demolish the transformer concrete pad, if necessary to remove the pad;
- 7) temporarily remove the existing stairs and store for reinstallation;
- 8) demolish the existing stair landing concrete slab, if necessary;
- 9) locate grounding wires and protect during excavation; if necessary reroute or disconnect and reinstall grounding wires as needed;
- 10) control water that enters the excavation and the turbine pad;
- 11) remove anchor bolt caps and grout from caps and bolt threads;
- 12) relax the tower anchor bolts and thoroughly clean the threads;
- 13) maintain tower anchor bolt nuts in a tight and snug condition; tighten with impact wrench to snug condition;
- 14) repair or reinstall ground wires as required;
- 15) route or reroute conduit as required;
- 16) remove the temporary supports after the retrofit foundation has been constructed complete in place and concrete cured;
- 17) construct new support slab and conduit vault for transformer, if required;
- 18) restore anchor bolt tension;
- 19) reinstall tower access stair; and
- 20) reinstall transformer and connect the electrical cables.
Claims (16)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/775,369 US11434617B2 (en) | 2014-10-07 | 2020-01-29 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US17/874,395 US11814808B2 (en) | 2014-10-07 | 2022-07-27 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201462060743P | 2014-10-07 | 2014-10-07 | |
US201562211158P | 2015-08-28 | 2015-08-28 | |
US14/870,955 US9783950B2 (en) | 2014-10-07 | 2015-09-30 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US15/585,775 US10648150B2 (en) | 2014-10-07 | 2017-05-03 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US16/775,369 US11434617B2 (en) | 2014-10-07 | 2020-01-29 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/585,775 Division US10648150B2 (en) | 2014-10-07 | 2017-05-03 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/874,395 Continuation US11814808B2 (en) | 2014-10-07 | 2022-07-27 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Publications (2)
Publication Number | Publication Date |
---|---|
US20200165792A1 US20200165792A1 (en) | 2020-05-28 |
US11434617B2 true US11434617B2 (en) | 2022-09-06 |
Family
ID=55632428
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/870,955 Active US9783950B2 (en) | 2014-10-07 | 2015-09-30 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US15/585,775 Active US10648150B2 (en) | 2014-10-07 | 2017-05-03 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US16/775,369 Active 2035-11-22 US11434617B2 (en) | 2014-10-07 | 2020-01-29 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US17/874,395 Active US11814808B2 (en) | 2014-10-07 | 2022-07-27 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/870,955 Active US9783950B2 (en) | 2014-10-07 | 2015-09-30 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US15/585,775 Active US10648150B2 (en) | 2014-10-07 | 2017-05-03 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/874,395 Active US11814808B2 (en) | 2014-10-07 | 2022-07-27 | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
Country Status (2)
Country | Link |
---|---|
US (4) | US9783950B2 (en) |
CA (2) | CA3019073C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20240026631A1 (en) * | 2021-04-12 | 2024-01-25 | Rwe Renewables Europe & Australia Gmbh | Retrofit for existing wind turbine foundations, retrofitted wind turbine foundation and method for retrofitting a wind turbine foundation |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011087022A1 (en) * | 2011-11-24 | 2013-05-29 | Wobben Properties Gmbh | Device and method for anchoring a wind energy plant |
US9783950B2 (en) | 2014-10-07 | 2017-10-10 | Allan P. Henderson | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US10544559B2 (en) | 2016-11-02 | 2020-01-28 | Inventus Holdings, Llc | Pier and mat foundation fortification and monitoring system |
CN107091005A (en) * | 2017-05-24 | 2017-08-25 | 常熟风范电力设备股份有限公司 | A kind of reinforcement type electric force pole tower |
CN107100192B (en) * | 2017-06-19 | 2022-06-07 | 湖南科技大学 | Local reinforcing device and method for foundation ring of wind generating set |
CN107237266B (en) * | 2017-06-27 | 2023-02-28 | 中铁第四勘察设计院集团有限公司 | Open cut rock anchor combined foundation and reverse operation construction method thereof |
CN107859050B (en) * | 2017-09-29 | 2019-12-13 | 新疆金风科技股份有限公司 | Wind driven generator foundation and construction method thereof |
CN108360549A (en) * | 2018-01-09 | 2018-08-03 | 上海斯耐迪工程咨询有限公司 | Anchor pole bar planting foundation construction method of the mountainous region photovoltaic gradient more than 25 degree of angles |
US11085165B2 (en) * | 2018-04-19 | 2021-08-10 | RRC Power & Energy, LLC | Post-tension tube foundation and method of assembling same |
US10662605B2 (en) * | 2018-04-19 | 2020-05-26 | RRC Power & Energy, LLC | Post-tension tube foundation and method of assembling same |
CN108797633B (en) * | 2018-06-12 | 2020-04-21 | 国网四川省电力公司技能培训中心 | Island type high-voltage line tower footing protection structure and construction method thereof |
US11661718B2 (en) * | 2018-07-25 | 2023-05-30 | Terracon Consultants, Inc. | Concrete pier foundation with lateral shear reinforcing loops and methods of constructing the same |
US11365523B2 (en) | 2018-11-13 | 2022-06-21 | Terracon Consultants, Inc. | Methods for constructing tensionless concrete pier foundations and foundations constructed thereby |
KR102160628B1 (en) * | 2018-11-19 | 2020-09-29 | 한국건설기술연구원 | Wind turbine structure for retrofitting spread footing in partial repowering , and construction method for the same |
US11274412B2 (en) * | 2019-01-31 | 2022-03-15 | Terracon Consultants, Inc. | Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same |
US11885092B2 (en) | 2019-01-31 | 2024-01-30 | Terracon Consultants, Inc. | Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same |
CN110700334B (en) * | 2019-09-25 | 2021-04-27 | 江苏筑岩建设有限公司 | Rapid repairing method for fan foundation |
CN111155571A (en) * | 2019-12-25 | 2020-05-15 | 湖北瑞宏新能源设备有限公司 | Foundation anchor bolt reinforcing structure of wind driven generator and foundation anchor bolt fracture reinforcing method |
JP7536396B2 (en) | 2020-06-24 | 2024-08-20 | 鹿島建設株式会社 | Methods for reinforcing the foundation footing of existing bridge piers |
CN112112201A (en) * | 2020-09-03 | 2020-12-22 | 中天钢铁集团有限公司 | Rapid treatment method for rolling mill foundation |
CN112064664A (en) * | 2020-09-17 | 2020-12-11 | 武大巨成结构股份有限公司 | Improved structure and improved method for fan foundation |
CN113338365B (en) * | 2021-06-25 | 2022-11-15 | 中国华能集团清洁能源技术研究院有限公司 | Reinforced structure of onshore fan expanded foundation pipe pile and construction method |
CN113700614A (en) * | 2021-09-16 | 2021-11-26 | 华能(浙江)能源开发有限公司清洁能源分公司 | Gravity type foundation for offshore wind power |
CN114592536A (en) * | 2022-03-23 | 2022-06-07 | 山东建筑大学 | Fan foundation transformation structure and construction method |
EP4431679A1 (en) * | 2023-03-17 | 2024-09-18 | Nordex Energy Spain, S.A.U. | Reinforcement system for a tower of a wind turbine, tower of a wind turbine and method of reinforcing a tower of a wind turbine |
Citations (79)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US732485A (en) | 1903-01-30 | 1903-06-30 | William N Wight | Composite column and beam. |
US969039A (en) | 1909-03-20 | 1910-08-30 | John Wunder | Reinforced concrete structure. |
US1139384A (en) | 1913-05-22 | 1915-05-11 | Harrison S Taft | Apparatus for constructing concrete columns. |
US1189459A (en) | 1915-04-10 | 1916-07-04 | Emil O Lundin | Electrical pole and pole-base. |
US1529895A (en) | 1924-07-21 | 1925-03-17 | Chance John H La | Sectional foundation for mounting signal poles and the like |
US1647925A (en) | 1925-04-25 | 1927-11-01 | May John Walter | Anchor footing for steel towers |
US2377055A (en) | 1944-05-31 | 1945-05-29 | Joseph H Thornley | Pile cap |
US2625815A (en) | 1943-10-23 | 1953-01-20 | Eric A Black | Adjustable anchorage |
US2971295A (en) | 1955-03-21 | 1961-02-14 | Phillips Petroleum Co | Prestressed concrete units and structures |
US3646748A (en) | 1970-03-24 | 1972-03-07 | Frederic A Lang | Tendons for prestressed concrete and process for making such tendons |
USRE27732E (en) | 1971-02-22 | 1973-08-14 | Reinforcement of concrete structures | |
US3798868A (en) | 1972-04-07 | 1974-03-26 | D Loranger | Method of building construction |
US3927497A (en) | 1972-11-15 | 1975-12-23 | Hitachi Ltd | Supporting structure of pressure vessel |
US4043133A (en) | 1976-07-21 | 1977-08-23 | Yegge Lawrence R | Structure and method of constructing and test-loading pile anchored foundations |
US4051661A (en) | 1976-09-15 | 1977-10-04 | Bethlehem Steel Corporation | Wire strand and rope |
US4068445A (en) | 1975-02-18 | 1978-01-17 | A. B. Chance Company | Lightweight, screw anchor supported foundation and method of installing same |
US4092811A (en) | 1977-02-14 | 1978-06-06 | T. Y. Lin International | Cooling tower, construction method therefor and precast prestressed concrete building units |
US4094222A (en) * | 1975-06-09 | 1978-06-13 | Hilti Aktiengesellschaft | Adhesively secured anchor bolt |
DE2754577A1 (en) | 1977-12-08 | 1979-06-13 | Bateman Ltd E | Conveyor installation method - by excavating for foundations, then casting in whilst support members are held up in position |
US4197695A (en) | 1977-11-08 | 1980-04-15 | Bethlehem Steel Corporation | Method of making sealed wire rope |
US4247225A (en) | 1979-09-06 | 1981-01-27 | Kamak Corporation | Alignment device |
WO1984003531A1 (en) | 1983-03-03 | 1984-09-13 | Bakvis Beheer Bv | Device for securing an upstanding elongated element at its lower end to the upper surface of a pedestal |
JPS6092518A (en) | 1983-10-26 | 1985-05-24 | Taisei Corp | Connection of pile heads under water |
EP0160135A1 (en) | 1982-11-29 | 1985-11-06 | Raymond E. Hutchinson | Tendon for post-tensioning prestressed concrete and process for making the tendon |
JPS61109826A (en) | 1984-11-02 | 1986-05-28 | Nikken Sekkei:Kk | Reinforcing metal fitting for pile-foundation connection |
JPS6471987A (en) | 1987-09-04 | 1989-03-16 | Gen Motors Corp | Cable drive type window regulator |
US4866903A (en) | 1987-01-06 | 1989-09-19 | Ferstay William G | Positioning device |
US4887691A (en) | 1988-11-04 | 1989-12-19 | Rotondo/Penn-Cast | Modular wall construction using posts and panels |
JPH04353117A (en) | 1991-05-29 | 1992-12-08 | Zenitakagumi:Kk | Wire anchor body and anchoring method |
US5218805A (en) | 1991-08-19 | 1993-06-15 | Superior Precast, Inc. | Post assembly and noise barrier wall |
JPH05311678A (en) | 1992-05-12 | 1993-11-22 | Chiyoda Corp | Foundation combined with pile |
US5505033A (en) | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
JPH08338034A (en) | 1995-06-14 | 1996-12-24 | Hitachi Ltd | Fixed construction of crane, fixing method thereof and withdrawal method of fixed construction |
US5586417A (en) | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
US5623792A (en) | 1996-05-24 | 1997-04-29 | Crumpacker; William H. | Grave marker leveling |
JPH09256390A (en) | 1996-03-18 | 1997-09-30 | Geotop Corp | Vibration-isolation pile foundation |
JPH1113150A (en) * | 1997-06-23 | 1999-01-19 | Nakamura:Kk | Bond anchor method |
JPH11181797A (en) | 1997-12-18 | 1999-07-06 | Modern Material:Kk | Method for fixing support for retaining-wall block and foundation member for use therein |
US5966882A (en) | 1994-12-19 | 1999-10-19 | Naito; Kingo | Structure of base of column and construction method for base of column |
US6102118A (en) | 1998-12-30 | 2000-08-15 | Moore; Curt A. | Multi-purpose adjustable centralizer system with tool |
KR20010057453A (en) | 1999-12-23 | 2001-07-04 | 이구택 | Steel pier anchorage system using large deformed bar |
JP2001200582A (en) | 2000-01-17 | 2001-07-27 | Ps Corp | Prestress introduction method for concrete disk structure |
JP2002061201A (en) | 2000-08-16 | 2002-02-28 | Kinya Miura | Foundation structure and its construction method |
WO2002027105A1 (en) | 2000-09-27 | 2002-04-04 | Allan P Henderson | Perimeter weighted foundation for wind turbines and the like |
US20020050110A1 (en) | 2001-10-26 | 2002-05-02 | Ytterberg Carl N. | Reinforced shrinkage compensating concrete slab structure |
US20020095878A1 (en) | 2000-12-05 | 2002-07-25 | Henderson Allan P. | Tilt-up and telescopic support tower for large structures |
DE10105472A1 (en) | 2001-02-05 | 2002-08-22 | Straeb Gmbh & Co Geb | Height-adjustable foundation for posts for traffic signs etc. has tubular holder with hollow crumple zone filled and enclosed by soft mortar encasing material |
WO2002099204A1 (en) | 2001-06-06 | 2002-12-12 | Corus Uk Ltd | Ground anchorage apparatus |
JP2003013442A (en) | 2001-07-03 | 2003-01-15 | Ashimori Ind Co Ltd | Cast-in-place pile construction method and its structure |
FR2833029A1 (en) | 2001-11-30 | 2003-06-06 | Pierre Louis Glacon | Box for making cavity for upright beam in concrete foundation is made from expanded metal with two opposite holes for transverse bar |
JP2003232046A (en) | 2002-02-07 | 2003-08-19 | Ohbayashi Corp | Steel pipe damper and locking foundation structure using the same |
US6659691B1 (en) | 2002-07-08 | 2003-12-09 | Richard M. Berry | Pile array assembly system for reduced soil liquefaction |
US6665990B1 (en) | 2000-03-06 | 2003-12-23 | Barr Engineering Co. | High-tension high-compression foundation for tower structures |
US6705058B1 (en) | 1999-02-12 | 2004-03-16 | Newmark International Inc. | Multiple-part pole |
US20040261340A1 (en) | 2003-06-27 | 2004-12-30 | Thomas Behlinger | Fastening arrangement of a machine base and method of fastening the same |
EP1526278A1 (en) | 2003-10-21 | 2005-04-27 | GMB Beton- en industriebouw noord west B.V. | Wind turbine foundation |
JP2005220554A (en) | 2004-02-04 | 2005-08-18 | Railway Technical Res Inst | Construction method of concrete structure of axial prestressed construction making use of spiral hoop and its concrete structure |
CA2551712A1 (en) | 2006-07-05 | 2008-01-05 | Con-Tech Systems Ltd. | Void form for constructing post-tensioned foundation piles |
US7533505B2 (en) | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US7618217B2 (en) | 2003-12-15 | 2009-11-17 | Henderson Allan P | Post-tension pile anchor foundation and method therefor |
JP2010065454A (en) | 2008-09-11 | 2010-03-25 | Mitsui Eng & Shipbuild Co Ltd | Foundation structure of tower-like structure |
US7905069B1 (en) | 2005-12-30 | 2011-03-15 | Aero Solutions, Llc | Reinforcing systems to strengthen monopole towers |
WO2011029994A1 (en) | 2009-09-11 | 2011-03-17 | Peikko Group Oy | Connecting element and radial reinforcement structure |
US20110173897A1 (en) | 2010-01-20 | 2011-07-21 | Stacey Schneider | Apparatus and method for protecting a downspout of a gutter |
US20120047830A1 (en) | 2006-09-21 | 2012-03-01 | Ahmed Phuly | Fatigue resistant foundation |
WO2012037450A1 (en) | 2010-09-17 | 2012-03-22 | Ensoft, Inc. | Foundation for wind turbine generator |
WO2012062425A2 (en) | 2010-11-09 | 2012-05-18 | Rehau Ag + Co | System for reinforcing and setting up a supporting post for the passage of a heat transfer medium, and method for producing the supporting post |
US20120151860A1 (en) | 2010-12-15 | 2012-06-21 | Yeou-Fong Li | Ductile shear reinforced bar layout applied to reinforced concrete shear wall structures |
US20120266447A1 (en) | 2011-04-21 | 2012-10-25 | Francisco Diaz-Vallellanes | Anti-theft devices for electrical wires |
DE202012006606U1 (en) | 2012-07-07 | 2012-11-12 | Alexander Nikulin | module |
US20120314540A1 (en) | 2011-06-07 | 2012-12-13 | Alter Josef K | Hollow rebar for crosshole sonic logging access tubes and longitudinal concrete reinforcing in drilled shafts |
US20130129474A1 (en) | 2010-04-21 | 2013-05-23 | Wobben Properties Gmbh | Wind power plant foundation and wind power plant |
US20130255169A1 (en) * | 2012-03-30 | 2013-10-03 | Allan P. Henderson | Cementitious foundation cap with post-tensioned helical anchors |
US20140260223A1 (en) | 2013-03-14 | 2014-09-18 | Allison Transmission Inc. | System And Method For Controlling Pump Performance In A Transmission |
US20150075099A1 (en) * | 2013-08-08 | 2015-03-19 | University Of Utah Research Foundation | Elongate member reinforcement |
US20150376859A1 (en) | 2006-09-21 | 2015-12-31 | Ahmed Phuly | Fatigue Resistant Foundation |
US9783950B2 (en) | 2014-10-07 | 2017-10-10 | Allan P. Henderson | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US20180264680A1 (en) | 2006-09-21 | 2018-09-20 | Ahmed Phuly | Foundation with pedestal and ribs for towers |
US20200032478A1 (en) | 2016-06-06 | 2020-01-30 | Robert Carl Rajewski | Hydrovac |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2948995A (en) * | 1953-02-24 | 1960-08-16 | Shell Oil Co | Connections between reinforced, precast concrete structures and method of making same |
US5761875A (en) * | 1996-08-27 | 1998-06-09 | Newmark International, Inc. | Reinforced concrete pole with attachment mechanism |
US6513291B2 (en) * | 2001-04-23 | 2003-02-04 | David R. Gilsdorf | Concrete slab construction for building columns |
US7166876B2 (en) | 2004-04-28 | 2007-01-23 | Taiwan Semiconductor Manufacturing Company, Ltd. | MOSFET with electrostatic discharge protection structure and method of fabrication |
JP4046741B2 (en) * | 2004-09-06 | 2008-02-13 | リサーチ インスティチュート オブ インダストリアル サイエンス アンド テクノロジー | Grout reinforcement |
EP1866484A1 (en) * | 2005-03-16 | 2007-12-19 | Densit A/S | Tower foundation system and method for providing such system |
US20110061321A1 (en) * | 2006-09-21 | 2011-03-17 | Ahmed Phuly | Fatigue reistant foundation system |
US8555518B2 (en) * | 2011-05-18 | 2013-10-15 | Norman Tooman | Grout template for wind turbine foundations |
DE102011087022A1 (en) * | 2011-11-24 | 2013-05-29 | Wobben Properties Gmbh | Device and method for anchoring a wind energy plant |
US9340947B2 (en) | 2013-03-07 | 2016-05-17 | Allan P. Henderson | Perimeter pile anchor foundation |
US20140260023A1 (en) * | 2013-03-15 | 2014-09-18 | Allan Henderson | Continuous strand hoop reinforcement for concrete foundations |
-
2015
- 2015-09-30 US US14/870,955 patent/US9783950B2/en active Active
- 2015-10-02 CA CA3019073A patent/CA3019073C/en active Active
- 2015-10-02 CA CA2908093A patent/CA2908093C/en active Active
-
2017
- 2017-05-03 US US15/585,775 patent/US10648150B2/en active Active
-
2020
- 2020-01-29 US US16/775,369 patent/US11434617B2/en active Active
-
2022
- 2022-07-27 US US17/874,395 patent/US11814808B2/en active Active
Patent Citations (88)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US732485A (en) | 1903-01-30 | 1903-06-30 | William N Wight | Composite column and beam. |
US969039A (en) | 1909-03-20 | 1910-08-30 | John Wunder | Reinforced concrete structure. |
US1139384A (en) | 1913-05-22 | 1915-05-11 | Harrison S Taft | Apparatus for constructing concrete columns. |
US1189459A (en) | 1915-04-10 | 1916-07-04 | Emil O Lundin | Electrical pole and pole-base. |
US1529895A (en) | 1924-07-21 | 1925-03-17 | Chance John H La | Sectional foundation for mounting signal poles and the like |
US1647925A (en) | 1925-04-25 | 1927-11-01 | May John Walter | Anchor footing for steel towers |
US2625815A (en) | 1943-10-23 | 1953-01-20 | Eric A Black | Adjustable anchorage |
US2377055A (en) | 1944-05-31 | 1945-05-29 | Joseph H Thornley | Pile cap |
US2971295A (en) | 1955-03-21 | 1961-02-14 | Phillips Petroleum Co | Prestressed concrete units and structures |
US3646748A (en) | 1970-03-24 | 1972-03-07 | Frederic A Lang | Tendons for prestressed concrete and process for making such tendons |
USRE27732E (en) | 1971-02-22 | 1973-08-14 | Reinforcement of concrete structures | |
US3798868A (en) | 1972-04-07 | 1974-03-26 | D Loranger | Method of building construction |
US3927497A (en) | 1972-11-15 | 1975-12-23 | Hitachi Ltd | Supporting structure of pressure vessel |
US4068445A (en) | 1975-02-18 | 1978-01-17 | A. B. Chance Company | Lightweight, screw anchor supported foundation and method of installing same |
US4094222A (en) * | 1975-06-09 | 1978-06-13 | Hilti Aktiengesellschaft | Adhesively secured anchor bolt |
US4043133A (en) | 1976-07-21 | 1977-08-23 | Yegge Lawrence R | Structure and method of constructing and test-loading pile anchored foundations |
US4051661A (en) | 1976-09-15 | 1977-10-04 | Bethlehem Steel Corporation | Wire strand and rope |
US4092811A (en) | 1977-02-14 | 1978-06-06 | T. Y. Lin International | Cooling tower, construction method therefor and precast prestressed concrete building units |
US4197695A (en) | 1977-11-08 | 1980-04-15 | Bethlehem Steel Corporation | Method of making sealed wire rope |
DE2754577A1 (en) | 1977-12-08 | 1979-06-13 | Bateman Ltd E | Conveyor installation method - by excavating for foundations, then casting in whilst support members are held up in position |
US4247225A (en) | 1979-09-06 | 1981-01-27 | Kamak Corporation | Alignment device |
EP0160135A1 (en) | 1982-11-29 | 1985-11-06 | Raymond E. Hutchinson | Tendon for post-tensioning prestressed concrete and process for making the tendon |
WO1984003531A1 (en) | 1983-03-03 | 1984-09-13 | Bakvis Beheer Bv | Device for securing an upstanding elongated element at its lower end to the upper surface of a pedestal |
JPS6092518A (en) | 1983-10-26 | 1985-05-24 | Taisei Corp | Connection of pile heads under water |
JPS61109826A (en) | 1984-11-02 | 1986-05-28 | Nikken Sekkei:Kk | Reinforcing metal fitting for pile-foundation connection |
US4866903A (en) | 1987-01-06 | 1989-09-19 | Ferstay William G | Positioning device |
JPS6471987A (en) | 1987-09-04 | 1989-03-16 | Gen Motors Corp | Cable drive type window regulator |
US4887691A (en) | 1988-11-04 | 1989-12-19 | Rotondo/Penn-Cast | Modular wall construction using posts and panels |
US5505033A (en) | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
JPH04353117A (en) | 1991-05-29 | 1992-12-08 | Zenitakagumi:Kk | Wire anchor body and anchoring method |
US5218805A (en) | 1991-08-19 | 1993-06-15 | Superior Precast, Inc. | Post assembly and noise barrier wall |
JPH05311678A (en) | 1992-05-12 | 1993-11-22 | Chiyoda Corp | Foundation combined with pile |
US5826387A (en) | 1994-11-23 | 1998-10-27 | Henderson; Allan P. | Pier foundation under high unit compression |
US5586417A (en) | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
US5966882A (en) | 1994-12-19 | 1999-10-19 | Naito; Kingo | Structure of base of column and construction method for base of column |
JPH08338034A (en) | 1995-06-14 | 1996-12-24 | Hitachi Ltd | Fixed construction of crane, fixing method thereof and withdrawal method of fixed construction |
JPH09256390A (en) | 1996-03-18 | 1997-09-30 | Geotop Corp | Vibration-isolation pile foundation |
US5623792A (en) | 1996-05-24 | 1997-04-29 | Crumpacker; William H. | Grave marker leveling |
JPH1113150A (en) * | 1997-06-23 | 1999-01-19 | Nakamura:Kk | Bond anchor method |
JPH11181797A (en) | 1997-12-18 | 1999-07-06 | Modern Material:Kk | Method for fixing support for retaining-wall block and foundation member for use therein |
US6102118A (en) | 1998-12-30 | 2000-08-15 | Moore; Curt A. | Multi-purpose adjustable centralizer system with tool |
US6705058B1 (en) | 1999-02-12 | 2004-03-16 | Newmark International Inc. | Multiple-part pole |
KR20010057453A (en) | 1999-12-23 | 2001-07-04 | 이구택 | Steel pier anchorage system using large deformed bar |
JP2001200582A (en) | 2000-01-17 | 2001-07-27 | Ps Corp | Prestress introduction method for concrete disk structure |
US6665990B1 (en) | 2000-03-06 | 2003-12-23 | Barr Engineering Co. | High-tension high-compression foundation for tower structures |
JP2002061201A (en) | 2000-08-16 | 2002-02-28 | Kinya Miura | Foundation structure and its construction method |
WO2002027105A1 (en) | 2000-09-27 | 2002-04-04 | Allan P Henderson | Perimeter weighted foundation for wind turbines and the like |
US6672023B2 (en) | 2000-09-27 | 2004-01-06 | Allan P. Henderson | Perimeter weighted foundation for wind turbines and the like |
US20020124502A1 (en) | 2000-09-27 | 2002-09-12 | Henderson Allan P. | Perimeter weighted foundation for wind turbines and the like |
US7155875B2 (en) | 2000-09-27 | 2007-01-02 | Henderson Allan P | Method of forming a perimeter weighted foundation for wind turbines and the like |
US20050005562A1 (en) | 2000-12-05 | 2005-01-13 | Henderson Allan P. | Telescopic support tower |
US20020095878A1 (en) | 2000-12-05 | 2002-07-25 | Henderson Allan P. | Tilt-up and telescopic support tower for large structures |
US6782667B2 (en) | 2000-12-05 | 2004-08-31 | Z-Tek, Llc | Tilt-up and telescopic support tower for large structures |
DE10105472A1 (en) | 2001-02-05 | 2002-08-22 | Straeb Gmbh & Co Geb | Height-adjustable foundation for posts for traffic signs etc. has tubular holder with hollow crumple zone filled and enclosed by soft mortar encasing material |
WO2002099204A1 (en) | 2001-06-06 | 2002-12-12 | Corus Uk Ltd | Ground anchorage apparatus |
JP2003013442A (en) | 2001-07-03 | 2003-01-15 | Ashimori Ind Co Ltd | Cast-in-place pile construction method and its structure |
US20020050110A1 (en) | 2001-10-26 | 2002-05-02 | Ytterberg Carl N. | Reinforced shrinkage compensating concrete slab structure |
FR2833029A1 (en) | 2001-11-30 | 2003-06-06 | Pierre Louis Glacon | Box for making cavity for upright beam in concrete foundation is made from expanded metal with two opposite holes for transverse bar |
JP2003232046A (en) | 2002-02-07 | 2003-08-19 | Ohbayashi Corp | Steel pipe damper and locking foundation structure using the same |
US6659691B1 (en) | 2002-07-08 | 2003-12-09 | Richard M. Berry | Pile array assembly system for reduced soil liquefaction |
US7533505B2 (en) | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US20040261340A1 (en) | 2003-06-27 | 2004-12-30 | Thomas Behlinger | Fastening arrangement of a machine base and method of fastening the same |
EP1526278A1 (en) | 2003-10-21 | 2005-04-27 | GMB Beton- en industriebouw noord west B.V. | Wind turbine foundation |
US7707797B2 (en) | 2003-12-15 | 2010-05-04 | Henderson Allan P | Pile anchor foundation |
US7618217B2 (en) | 2003-12-15 | 2009-11-17 | Henderson Allan P | Post-tension pile anchor foundation and method therefor |
JP2005220554A (en) | 2004-02-04 | 2005-08-18 | Railway Technical Res Inst | Construction method of concrete structure of axial prestressed construction making use of spiral hoop and its concrete structure |
US7905069B1 (en) | 2005-12-30 | 2011-03-15 | Aero Solutions, Llc | Reinforcing systems to strengthen monopole towers |
CA2551712A1 (en) | 2006-07-05 | 2008-01-05 | Con-Tech Systems Ltd. | Void form for constructing post-tensioned foundation piles |
US20120047830A1 (en) | 2006-09-21 | 2012-03-01 | Ahmed Phuly | Fatigue resistant foundation |
US20150376859A1 (en) | 2006-09-21 | 2015-12-31 | Ahmed Phuly | Fatigue Resistant Foundation |
US10640995B2 (en) | 2006-09-21 | 2020-05-05 | Ahmed M. Phuly | Method of constructing a wind tower foundation with pedestal and ribs |
US20180264680A1 (en) | 2006-09-21 | 2018-09-20 | Ahmed Phuly | Foundation with pedestal and ribs for towers |
JP2010065454A (en) | 2008-09-11 | 2010-03-25 | Mitsui Eng & Shipbuild Co Ltd | Foundation structure of tower-like structure |
WO2011029994A1 (en) | 2009-09-11 | 2011-03-17 | Peikko Group Oy | Connecting element and radial reinforcement structure |
US20110173897A1 (en) | 2010-01-20 | 2011-07-21 | Stacey Schneider | Apparatus and method for protecting a downspout of a gutter |
US20130129474A1 (en) | 2010-04-21 | 2013-05-23 | Wobben Properties Gmbh | Wind power plant foundation and wind power plant |
WO2012037450A1 (en) | 2010-09-17 | 2012-03-22 | Ensoft, Inc. | Foundation for wind turbine generator |
US20120070233A1 (en) | 2010-09-17 | 2012-03-22 | Ensoft, Inc. | Foundation for wind turbine generator |
WO2012062425A2 (en) | 2010-11-09 | 2012-05-18 | Rehau Ag + Co | System for reinforcing and setting up a supporting post for the passage of a heat transfer medium, and method for producing the supporting post |
US20120151860A1 (en) | 2010-12-15 | 2012-06-21 | Yeou-Fong Li | Ductile shear reinforced bar layout applied to reinforced concrete shear wall structures |
US20120266447A1 (en) | 2011-04-21 | 2012-10-25 | Francisco Diaz-Vallellanes | Anti-theft devices for electrical wires |
US20120314540A1 (en) | 2011-06-07 | 2012-12-13 | Alter Josef K | Hollow rebar for crosshole sonic logging access tubes and longitudinal concrete reinforcing in drilled shafts |
US20130255169A1 (en) * | 2012-03-30 | 2013-10-03 | Allan P. Henderson | Cementitious foundation cap with post-tensioned helical anchors |
DE202012006606U1 (en) | 2012-07-07 | 2012-11-12 | Alexander Nikulin | module |
US20140260223A1 (en) | 2013-03-14 | 2014-09-18 | Allison Transmission Inc. | System And Method For Controlling Pump Performance In A Transmission |
US20150075099A1 (en) * | 2013-08-08 | 2015-03-19 | University Of Utah Research Foundation | Elongate member reinforcement |
US9783950B2 (en) | 2014-10-07 | 2017-10-10 | Allan P. Henderson | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like |
US20200032478A1 (en) | 2016-06-06 | 2020-01-30 | Robert Carl Rajewski | Hydrovac |
Non-Patent Citations (47)
Title |
---|
A unique turnkey solution for wind turbine tower foundations. https://web.archive.org/...b/20120403071116/http://www.peikko.com/solutions-category/solutions/s=A+unique+turnkey+solution+for+wind+turbine+tower+foundations/sid=24072976. |
Affidavit of Josef Alter in U.S. Appl. No. 11/428,778, executed on Jun. 2, 2009. |
Allam et al. Crack width evaluation for flexural RC members. Alexandria Engineering Journal, (2012) 51, 211-220. |
Aschenbroich, Horst Dipl.Ing. Reinforcement of dams in Canada and the USA. Www.contechsystems.com. |
Aschenbroich, Horst, Dipl. Ing. Micro Pile Reinforcement Systems and Corrosion Protection, 2001. |
Aschenbroich, Horst. Dipl. Ing. A Post Tensioned Micropile Foundation System with Groutable Void Forms (GVF). |
Benefits for wind energy specialist. https://web.archive/org/web/20121030175316/http://www.peikko.com/group/t=Wind+Energy+Specialist. |
Bruce et al. Foundation Rehabilitation of the Pocomoke River Bridge, Maryland, Using High Capacity Preloaded Pinpiles, The Conference on Bridges official proceedings. Jun. 4-6, 1984. |
Clemence, Samuel P., Uplift Behavior of Anchor Foundations in Soil. Proceedings of a session sponsored by the Geotechnical Engineering Division of the American Society of Civil Engineers in conjunction with the ASCE Convention in Detroit, Michigan. Oct. 24, 1985. |
Crabtree et al. The Strengthening of Transmission Tower Foundations Using Grouted Anchor Bars. |
Dams—Innovations for Sustainable Water Resources, 22nd Annual USSD Conference San Diego, California, Jun. 24-28, 2002. |
Declaration of Dr. John T. Bryant in Support of Petition for Inter Partes U.S. Pat. No. 7,533,505 (filed Sep. 9, 2021). |
Declaration of Dr. John T. Bryant in Support of Petition for Inter Partes U.S. Pat. No. 7,618,217 (filed Sep. 9, 2021). |
Declaration of Dr. John T. Bryant in Support of Petition for Inter Partes U.S. Pat. No. 7,707,797 (filed Sep. 9, 2021). |
Deformation of Reinforced Concrete Anchor Foundations in the Far Norht, Plenum Publishing Corporation, 1991. |
Design Examples: Attachment 8. |
Eurooppalainetekninen hyväksyntä. ETA-10/02; European Technical Approval. VTT Expert Services Oy. Issued Apr. 21, 2011. |
Federal Highway Administration Transportation. Geotechnical Engineering Circular N. 4, Ground Anchors and Anchored Systems, Jun. 1999. |
Hevosselkä Wind Park, Tervola, Finland, https://www.peikko.com/reference/hevosselka-wind-park. |
https://web.archive.org/web/20121003065612/http://www.peikko.com:80/news/year=2012. |
https://web.arcive.org/web/20121003064830/http://www.peikko.com/news/year=2012/month=05. |
Kelley. A. Short History of Unbounded Post—Tensioning Specifications, Concrete Repair Bullentine, Jul./Aug. 2001. |
Kim, Nak-Kyung. Performance of Tension and Compression Anchors in Weathered Soil. Journal of Geotechnical and Geoenvironmental Engineering, Dec. 2003. |
Loflin, Bryan J. Bond and Material Properties of Grade 270 and Grade 300 Prestressing Strands. Jun. 10, 2008. |
Mäkelänkangas Wind Park, Hamina, Finland, https://www.peikko.com/reference/makelankangas-wind-park/. |
Muukko Wind Park, Lappeenranta, Finland. https://www.peikko.com/reference/muukko-wind-park/. |
Newman, Morton. Structural Details for Concrete Construction. McGraw Hill Book Company, 1998. |
Nigels, McLeod C. Prestressed Conrete Tension Piles and Their Connections, PCI Journal, Jul.-Aug. 1988. |
Peck et al. Foundation Engineering, Sec ond Edition, John Wiley & Sons, 1953. |
Peikko and Enercon to Expand Their Cooperation. Press Release Apr. 5, 2011. https://web.archive/org/web/20110814012119/http://www.peikko.com/news/n=Peikko+and+Enecon+to+expand+their+cooperation. |
Peikko Group: Product Catalogue. Jul. 2, 2012. |
Peikko to supply the wind turbine tower foundation solution to Finnish Muukko wind park. https://www.peikko.cz/novinky/peikko-to-supply-the-wind-turbine-tower-foundation-solution-to-finnish-muukko-wind-park-2/. |
Peikko to supply the wind turbine tower foundation solution to Finnish Muukko wing park. https://web.archive/org/web/20121001214327/http://www.peikko.com/news/n=Peikko+to+supply+the+wing+turbine+tower+foundation+solution+to+Finnish+Muukko+wing+park. |
Peikko's Foundation Solution Chosen for Wing for Wing Park to be Built in Hamina, Finland. https://web.archive.org/web/20111228043258/http://www.peikko.com/news/n=Peikko%27s+Foundation+Solution+choses+for+Wind+Park+to+be+builtin+in+Hamina%2c+Finland. |
Petition for Inter Partes Review of U.S. Pat. No. 7,533,505 filed Sep. 10, 2021. |
Petition for Inter Partes Review of U.S. Pat. No. 7,618,217 filed Sep. 10, 2021. |
Petition for Inter Partes Review of U.S. Pat. No. 7,707,797 filed Sep. 10, 2021. |
Post-Tensioning Manueal, Fifth Edition, Post-Tensioning Institute, 1990. |
Prestressed Concrete Bridges. |
Prestressed Concrete, PCA America's Cement Manufacturers, 1916. |
Reflections on the Beginnings of Prestressed Concrete in America, The Prestressed Concrete Institute, 1981. |
Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete, ASTM International. |
Svensson, Henrick. Design of Foundations for Wind Turbines, 2010. |
U.S. Department of Transportation Federal Highway Administration. Post-Tensioning Tendon Installation and Grouting Manuarl, Version 2.0, May 2013. |
Video by Peiiko Group uploaded to YouTube on Apr. 13, 2012. https://urldefense.com/v3/_https://youtu.be/j7k-ayGWfh4_;lUrcuqBw_IQl3puXZHuFb4eyZpuDPdTKr3XTjcljoqtpuEEdpwCGStoa9L6X9-0D1V2Ngk3NmsUcbQ51S. |
Wind Turbine Anchoring Solutions, Peikko Group, Concrete Connections. |
Wind Turbines Uljabuouda, Sweden, Project Story in PeikkoNews Feb. 2009. https://web.archive.org/web/20120320121335/http:www.peikko.com/reference-main/references/rg=Power+Plants+and+LInes/r=Wind+Turbines+Ulkabuouda+%2C+Sweden. |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20240026631A1 (en) * | 2021-04-12 | 2024-01-25 | Rwe Renewables Europe & Australia Gmbh | Retrofit for existing wind turbine foundations, retrofitted wind turbine foundation and method for retrofitting a wind turbine foundation |
US12018449B2 (en) * | 2021-04-12 | 2024-06-25 | Rwe Renewables Europe & Australia Gmbh | Retrofit for existing wind turbine foundations, retrofitted wind turbine foundation and method for retrofitting a wind turbine foundation |
Also Published As
Publication number | Publication date |
---|---|
CA3019073C (en) | 2020-09-08 |
US11814808B2 (en) | 2023-11-14 |
CA2908093A1 (en) | 2016-04-07 |
US20200165792A1 (en) | 2020-05-28 |
US9783950B2 (en) | 2017-10-10 |
US20220356669A1 (en) | 2022-11-10 |
CA2908093C (en) | 2018-11-13 |
CA3019073A1 (en) | 2016-04-07 |
US20160097179A1 (en) | 2016-04-07 |
US10648150B2 (en) | 2020-05-12 |
US20170233975A1 (en) | 2017-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11434617B2 (en) | Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like | |
US9739027B2 (en) | Perimeter pile anchor foundation | |
US9745712B2 (en) | Cementitious foundation cap with post-tensioned helical anchors and method of making the same | |
US7416367B2 (en) | Lateral force resistance device | |
US20160201350A1 (en) | Tower and method for assembling tower | |
US10851763B2 (en) | Wind turbine foundation and method of constructing a wind turbine foundation | |
JP6638141B2 (en) | Basic structure of tower structure | |
US10738436B1 (en) | Tubular foundation for onshore wind turbine generators | |
WO2006030893A1 (en) | Foundation structure of tower | |
ES2652466T3 (en) | Foundation placement method | |
US20210348597A1 (en) | Pile foundation and construction method of pile foundation | |
JP2008223303A (en) | Foundation structure of tower-like structure | |
JP5860662B2 (en) | Structural members for steel tower foundation, steel tower foundation, and construction method of steel tower foundation | |
JP6703466B2 (en) | Jig for preventing leakage of filler and method for manufacturing composite pile using the jig | |
KR101613844B1 (en) | Transition pieces of offshore wind turbines and whole structure of wind turbines having it | |
US20200208612A1 (en) | Bionic Root Foundation for Onshore Wind Turbine Generators | |
JP5301721B1 (en) | PC artificial ground in the active fault area and buildings on the PC artificial ground | |
EP3247848A1 (en) | Tower and method for constructing a tower | |
CN104278691A (en) | Pile foundation for high-voltage transmission line iron tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: TERRACON CONSULTANTS, INC., KANSAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HENDERSON, ALLAN P.;REEL/FRAME:051653/0004 Effective date: 20190311 |
|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |