US1529895A - Sectional foundation for mounting signal poles and the like - Google Patents

Sectional foundation for mounting signal poles and the like Download PDF

Info

Publication number
US1529895A
US1529895A US727123A US72712324A US1529895A US 1529895 A US1529895 A US 1529895A US 727123 A US727123 A US 727123A US 72712324 A US72712324 A US 72712324A US 1529895 A US1529895 A US 1529895A
Authority
US
United States
Prior art keywords
foundation
pedestals
slab
sectional
mounting signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US727123A
Inventor
Chance John H La
Wesson Eugene Glenn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US727123A priority Critical patent/US1529895A/en
Application granted granted Critical
Publication of US1529895A publication Critical patent/US1529895A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Definitions

  • the present invention aims to provide an improved sectional foundation for use in mounting signal poles, cable posts and like structures, such as in the installation of railway bloc-k signalling systems, etc.
  • the component parts of the foundation preferably are made up in standardizedsizes which can be assembled in difierent combinations to provide different weights and sizes of foundations according to the requirements of the particular installation and by virtue of this section-alized construction the differentparts of the foundation can be made sufliciently small to permit "of convenient handling by two or three men.
  • Our invention also embodies improved means for rigidly joining the several sections together; also the provision of improved means for anchoring the signal pole or cable post'to the foundation.
  • Flgure 1 1s a side elevational view of a signal pole mounted upon a se'ctio-nalized foundation of our invention
  • Flgure' 2 is a perspective view illustrating the upper and lowerslabs and the intervening pedestals in separated positions ready for assembly
  • Figure 3 is a plan view of the assembled foundation
  • Figure 4 isa side elevational view of the same, partsbeing broken away in. section, and
  • Figure 5 is a side elevational view of a slightly modified construction and assembly.
  • Figure 1 illustrates our improved sectionalized foundation erected ina typical in stallation.
  • the foundation is indicated in itse-ntirety at 7, and is shown as supporting a'si'gnal pole 8]
  • the pole proper is usually mounted on an instrument-case 9, which forms a convenient base 'fo-r'anchoring to the foundation 7.
  • the signal l1ghts,.or other signaling means, are indicated at 11, and a ladder 12 may be secured to' one slde of the pole for affording accessto the upper signalling means 11.
  • the foundation comprises a bottom slab 14- and a top slab 15, both constructed of .reenforced concrete. Interposed between these slabs are a phi-- rality of pedestals 16. There are preferably four of these pedestals, in the form of square columns, these four being spaced apart to locate each pedestal adjacentthe corners of the upper and lower slabs.
  • Each slab 1415 is reenforcedby a'plurality of reenfor'cing rods 17' extending transversely of theslab in opposite directions, as illustrated best in .Figi'ires 3 and 4.
  • Each pedestal 16 is alsoreenforced by longitudinal rods 18 extending down through thecorners of each pedestal.
  • each pedestal 16 Molded rigidly in each pedestal 16 is a section .ofpipe 19 extending centrally.
  • the signal pole, cable post, etc. generally has a base member in the nature of a base flange or base plate which forms a convenient attaching member for receiving the upper ends of these tie boltsl
  • a base member in the nature of a base flange or base plate which forms a convenient attaching member for receiving the upper ends of these tie boltsl
  • the anchoring of different types and styles o-f signal poles, cable posts, etc. merely involves providing appropriate holes "in the base member for receiving the tiebolts.
  • Figure 1 in which it will be noted that the instrument case 9 i'sformed with a base plate 9",which' is provided with apertures in proper spacing for receiving the upper ends of the tie bolts 23.
  • Nuts 28 thread down over the upper ends of these tie bolts and bear against the base plate 9. The drawing up of these-nuts enables considerable eridwise tension to be placed upon thesetiebolts, which rigidly bind the upper and lower slabs and the pedestals together;
  • the upper ends 19 of the tubes 19 preferably'terminate short of the top of the upper slab 15 so that: all of the tension obtainable through the tie bolts 28 and nuts 28 is effective for forcing the top slab 15 down on tlie square upper ends of the pedestals'16. i c y
  • the foundation The projecting can be assembled piece by piece in the hole excavated for receiving the same, such as by first placing the lower slab 14 in position and then slipping the pedestals 16 and upper slab 15 down over the tie bolts extending up from the lower slab; or, if desired, theseveral sectional units can be assembled on the ground level and the completed foundation then lowered into its hole.
  • earth may be tamped in between the-pedestals 16. This gives in effect a single column having a width on each side equal to the combined,
  • the upper slab 15 may project above the ground level to protect the instrument case 9 from water, or this slab may be set below the ground level;
  • the sizes of the several-foundationsections may vary widely in accordance with the height and weight of signal pole, cable post, or the like to be supported, but generally the pedestals will range from 3 -to 5' in height and 6" to 8 in thickness.
  • the slabs 14 and 15 will range from 1 to 3' on a side and from 4 to 5 in thickness. It
  • the pipe lengths 19 may also be located in closer proximity to one side of each pedestal than to the other in order concrete bearlngat their ends against said upper and lower sections; a metal tube anchored centrally of each of said spacing members and extending beyond both ends thereof a distance less than the thickness of said upper and lower sections, the said sections being formed with openings for receiving said tube whereby the tube forms a dowel connection between the spacing memher and upper and lower sections; a rod passing through each of said tubes and extending beyond the upper face of said upper member, the said rod being screwthreaded at its end for the reception of a bolt adapted to draw the upper and lower sectionstightly against said spacing members.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

March 17, 1925. 1,529,895
J. H. LA CHANCE ET AL I SECTIONAL FOUNDATION FOR MOUNTING SIGNAL POLES AND THE LIKE Filed July 21, 1924 2 Sheets-Sheet 1 fzwezzfis. Jfm; ff la Cfiarzce. I gene G'Zzrznksson.
1,529,895 J. H. LA CHANCE ET AL QE'CTIONAL FOUNDATION FOR MOUNTING SIGNAL POLES AND THE LIKE Filed July 21 1924 2 Sheets-Sheet 2 Patented Mar. 17, 1925.
tan-s95 UNITED STATES. PATENT. comes."
JOHN n. LA CHANCE, or HINSDALE, AND EUGENE GLENNWEssoN, or none-R ILLINOIS.
SECTIONAL FOUNDATION ron'ivroourme SIGNAL ronns AND THE LIKE.
Application filed July 21, 1924. Serial 'No. 1721123.
To all whom it may] concern:
Be it known that we, J OHN H. LA CHANCE and EUGENE GLENN NEssoN, citizens of the United States, and residents of Hinsdale, county of Du Page, and'Aurora, county of Kane, and State of Illinois, respectively, have invented a certain new and useful Improvement in Sectional Foundations for Mounting Signal Poles and the like, of which the following is a full, clear, concise, and exact description,reference being had to the accompanying drawings, forming a part of this specification.
The present invention aims to provide an improved sectional foundation for use in mounting signal poles, cable posts and like structures, such as in the installation of railway bloc-k signalling systems, etc.
Because ofthe distance between points of installation, and other factors inherent in this particular field, the erecting of concrete foundations for signal poles, etc., has been subject heretofore to certain major difficulties tending to increase the expense and inconvenience of erection undesirably. For example, if a foundation of units form and of adequate size for supporting a typical signal pole is molded complete at the construction yards the foundation is so heavy and unwieldy that the loading thereof onto a railway car generally necessitates a crane or a large number of laborers, and at the point of use the unloading and the proper placing ofthc foundation again necessitates this crane or a large number of laborers. If, in an efi'ort to avoid this, 'the foundation is molded at its point of use, this necessitates the setting up and knocking down'of the forms at each point of erection; requires the transportation of these forms aswell as the cement and the aggregate, perhaps'miles between signal poles; and consumes considerable time in allowing the cement to set as well as makingthe entire operation dependent to a certain extent upon'th'e weather.
We have avoided these difficulties by devising a practicable design of'sectionalized foundation, the several sections of which can be molded in large quantities at the construction yards and then transported direct to the place of erection with'minilnum expense and inconvenience of handling. The component parts of the foundation preferably are made up in standardizedsizes which can be assembled in difierent combinations to provide different weights and sizes of foundations according to the requirements of the particular installation and by virtue of this section-alized construction the differentparts of the foundation can be made sufliciently small to permit "of convenient handling by two or three men.
Our invention also embodies improved means for rigidly joining the several sections together; also the provision of improved means for anchoring the signal pole or cable post'to the foundation.
Referring now to thewaccompanying drawings in which we have illustrated a preferredembodiment of our invention;
Flgure 1 1s a side elevational view of a signal pole mounted upon a se'ctio-nalized foundation of our invention;
Flgure' 2 is a perspective view illustrating the upper and lowerslabs and the intervening pedestals in separated positions ready for assembly,
Figure 3 is a plan view of the assembled foundation;
Figure 4 isa side elevational view of the same, partsbeing broken away in. section, and
Figure 5 is a side elevational view of a slightly modified construction and assembly.
Figure 1 illustrates our improved sectionalized foundation erected ina typical in stallation. The foundation is indicated in itse-ntirety at 7, and is shown as supporting a'si'gnal pole 8] The pole proper is usually mounted on an instrument-case 9, which forms a convenient base 'fo-r'anchoring to the foundation 7. The signal l1ghts,.or other signaling means, are indicated at 11, and a ladder 12 may be secured to' one slde of the pole for affording accessto the upper signalling means 11. 1
Referring to Figure 2, the foundation comprises a bottom slab 14- and a top slab 15, both constructed of .reenforced concrete. Interposed between these slabs are a phi-- rality of pedestals 16. There are preferably four of these pedestals, in the form of square columns, these four being spaced apart to locate each pedestal adjacentthe corners of the upper and lower slabs.
Each slab 1415 is reenforcedby a'plurality of reenfor'cing rods 17' extending transversely of theslab in opposite directions, as illustrated best in .Figi'ires 3 and 4.
Each pedestal 16is alsoreenforced by longitudinal rods 18 extending down through thecorners of each pedestal.
Molded rigidly in each pedestal 16 is a section .ofpipe 19 extending centrally.
\ 14. These tubes or pipes form effective reenforcing means for the pedestals 16, and
in assembled position, also reenforc'e the lower and upper- slabs 14 and 15 and act as dowel connections between the sections. Their main function, however, is that of tubular guides for long tie bolts 23 which pass through the slabs and through the pedestals. 7 These bolts are preferably of wrought iron and function to rigidly unite allof the sections of-the foundation together, and to anchor the signal pole or cable post to the assembled foundation. In mold ing the base slab 14, the lower ends of the openings 22are enlarged to form counterbores 24. These counterbores receive nuts or'heads 25 upon the lower ends of the tie bolts 23, these heads preferably abutting against wa shers 26 bearing against the bottoms of' the counterbores. ends 19" ofthe tubes or pipes 19 are proportioned to terminate short of the counterbores 24 so that the endwise tension placed on the tie bolts 23 is operative to draw the base slab 14 into firm seating engagement with the lower ends of the pedestals 16.
The signal pole, cable post, etc., generally has a base member in the nature of a base flange or base plate which forms a convenient attaching member for receiving the upper ends of these tie boltsl Thus the anchoring of different types and styles o-f signal poles, cable posts, etc., merely involves providing appropriate holes "in the base member for receiving the tiebolts. This is illustrated in Figure 1, in which it will be noted that the instrument case 9 i'sformed with a base plate 9",which' is provided with apertures in proper spacing for receiving the upper ends of the tie bolts 23. Nuts 28 thread down over the upper ends of these tie bolts and bear against the base plate 9. The drawing up of these-nuts enables considerable eridwise tension to be placed upon thesetiebolts, which rigidly bind the upper and lower slabs and the pedestals together;
and also firmly anchor the signal pole 8 to the foundation 7, The upper ends 19 of the tubes 19 preferably'terminate short of the top of the upper slab 15 so that: all of the tension obtainable through the tie bolts 28 and nuts 28 is effective for forcing the top slab 15 down on tlie square upper ends of the pedestals'16. i c y It will be understood that the foundation The projecting can be assembled piece by piece in the hole excavated for receiving the same, such as by first placing the lower slab 14 in position and then slipping the pedestals 16 and upper slab 15 down over the tie bolts extending up from the lower slab; or, if desired, theseveral sectional units can be assembled on the ground level and the completed foundation then lowered into its hole. After the foundation has been erected, substantially as shown inFigure 1, earth may be tamped in between the-pedestals 16. This gives in effect a single column having a width on each side equal to the combined,
widths of both, pedestals and the intervening filler of earth. The upper slab 15may project above the ground level to protect the instrument case 9 from water, or this slab may be set below the ground level;
' The sizes of the several-foundationsections may vary widely in accordance with the height and weight of signal pole, cable post, or the like to be supported, but generally the pedestals will range from 3 -to 5' in height and 6" to 8 in thickness. 'The slabs 14 and 15 will range from 1 to 3' on a side and from 4 to 5 in thickness. It
will be understood that the foregoing dimensions "are merely exemplary of sizes found to be practicable for this particular field of utility, from which it will be apparent that all of the sectional units are made of a size that can be handled, readily bytwo or three men, without the necessity of a crane or other machinery.
It will be apparent that within the scope of this concept considerable variation and rearrangement of parts is possible in meeting the requirements of particular installations. By having on hand upper and lower slabs oflarger or smaller size, or having different spacings between the holes 2222 and 2121, and by having different lengths and :sizes of pedestals, different combinations or sections can be conveniently assembled to fit the requirements of any particular installation. As illustrative of one of these modified arrangements, in Figure 5 we have shown a foundation constructed of slabs 14'15 having their holes 21: and 22 disposed in proximity to the corners for setting the pedestals 16' flush with the corners of the slabs. The pipe lengths 19 may also be located in closer proximity to one side of each pedestal than to the other in order concrete bearlngat their ends against said upper and lower sections; a metal tube anchored centrally of each of said spacing members and extending beyond both ends thereof a distance less than the thickness of said upper and lower sections, the said sections being formed with openings for receiving said tube whereby the tube forms a dowel connection between the spacing memher and upper and lower sections; a rod passing through each of said tubes and extending beyond the upper face of said upper member, the said rod being screwthreaded at its end for the reception of a bolt adapted to draw the upper and lower sectionstightly against said spacing members.
In Witness whereof, We hereunto subscribe our names this 12th day of July, 1924.
JOHN H. LA CHANGE. EUGENE GLENN VESSON. Witnesses:
CAMERON A. VVHITsETT, HELEN Gr. DRUNIAK.
US727123A 1924-07-21 1924-07-21 Sectional foundation for mounting signal poles and the like Expired - Lifetime US1529895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US727123A US1529895A (en) 1924-07-21 1924-07-21 Sectional foundation for mounting signal poles and the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US727123A US1529895A (en) 1924-07-21 1924-07-21 Sectional foundation for mounting signal poles and the like

Publications (1)

Publication Number Publication Date
US1529895A true US1529895A (en) 1925-03-17

Family

ID=24921423

Family Applications (1)

Application Number Title Priority Date Filing Date
US727123A Expired - Lifetime US1529895A (en) 1924-07-21 1924-07-21 Sectional foundation for mounting signal poles and the like

Country Status (1)

Country Link
US (1) US1529895A (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2971295A (en) * 1955-03-21 1961-02-14 Phillips Petroleum Co Prestressed concrete units and structures
US3216170A (en) * 1962-08-28 1965-11-09 Stewart Warner Corp Extruded metal support frame
US3500595A (en) * 1967-10-27 1970-03-17 Flehr Hohbach Modular building construction unit and column
WO1984003531A1 (en) * 1983-03-03 1984-09-13 Bakvis Beheer Bv Device for securing an upstanding elongated element at its lower end to the upper surface of a pedestal
US5231808A (en) * 1992-07-20 1993-08-03 Angelette A M Railroad signal foundation and method of producing, transporting and erecting same
US5257489A (en) * 1991-10-15 1993-11-02 Angelette A M Railroad crossing signal foundation
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
US5533835A (en) * 1995-02-06 1996-07-09 Angelette; A. M. Railroad crossing signal foundation and method of producing and erecting the same
US5746036A (en) * 1995-07-10 1998-05-05 Angelette; A. M. Railroad crossing signal foundation and spider and method of producing the same
US5960601A (en) * 1997-10-02 1999-10-05 C & C Concerns, Inc. Post support frame and method for making same
US20050016093A1 (en) * 2003-07-22 2005-01-27 Buarque De Macedo Pedro M. Prestressed, strong foam glass tiles
US20050072067A1 (en) * 2001-10-09 2005-04-07 Aloys Wobben Method for establishing a foundation in particular for a tower of a wind energy plant
US20050257462A1 (en) * 2004-05-21 2005-11-24 Franklin Brown Tower foundation
US20070022705A1 (en) * 2005-08-01 2007-02-01 Rouse Jon M Segmented support assembly
US8220214B1 (en) * 2009-05-02 2012-07-17 Purdy Charles L Prefabricated weight distribution element
US8302357B1 (en) * 2010-10-26 2012-11-06 Kontek Industries, Inc. Blast-resistant foundations
US8806821B1 (en) 2013-02-01 2014-08-19 Franklin Brown Tower foundation pillar slab and method of producing such
US20150113893A1 (en) * 2012-08-07 2015-04-30 Oldcastle Precast, Inc. Modular concrete pole base
US9284710B2 (en) 2011-06-29 2016-03-15 Oldcastle Precast, Inc. Prefabricated concrete pole base and adjustable connector
US20160097199A1 (en) * 2014-10-02 2016-04-07 Board Of Regents Of The Nevada System Of Higher Education On Behalf Of The University Of Nevada Deconstructable support column structures
US11274412B2 (en) 2019-01-31 2022-03-15 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
US11365523B2 (en) 2018-11-13 2022-06-21 Terracon Consultants, Inc. Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US11434617B2 (en) 2014-10-07 2022-09-06 Terraconn Consultants, Inc. Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like
US11661718B2 (en) 2018-07-25 2023-05-30 Terracon Consultants, Inc. Concrete pier foundation with lateral shear reinforcing loops and methods of constructing the same
US11885092B2 (en) 2019-01-31 2024-01-30 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2971295A (en) * 1955-03-21 1961-02-14 Phillips Petroleum Co Prestressed concrete units and structures
US3216170A (en) * 1962-08-28 1965-11-09 Stewart Warner Corp Extruded metal support frame
US3500595A (en) * 1967-10-27 1970-03-17 Flehr Hohbach Modular building construction unit and column
WO1984003531A1 (en) * 1983-03-03 1984-09-13 Bakvis Beheer Bv Device for securing an upstanding elongated element at its lower end to the upper surface of a pedestal
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
US5257489A (en) * 1991-10-15 1993-11-02 Angelette A M Railroad crossing signal foundation
US5231808A (en) * 1992-07-20 1993-08-03 Angelette A M Railroad signal foundation and method of producing, transporting and erecting same
US5533835A (en) * 1995-02-06 1996-07-09 Angelette; A. M. Railroad crossing signal foundation and method of producing and erecting the same
US5746036A (en) * 1995-07-10 1998-05-05 Angelette; A. M. Railroad crossing signal foundation and spider and method of producing the same
US5960601A (en) * 1997-10-02 1999-10-05 C & C Concerns, Inc. Post support frame and method for making same
US20090235597A1 (en) * 2001-10-09 2009-09-24 Aloys Wobben Method for builiding a foundation, in particular a foundation for a wind turbine tower
US20050072067A1 (en) * 2001-10-09 2005-04-07 Aloys Wobben Method for establishing a foundation in particular for a tower of a wind energy plant
US7614200B2 (en) * 2001-10-09 2009-11-10 Aloys Wobben Method for building a foundation, in particular a foundation for a wind turbine tower
US7900406B2 (en) * 2001-10-09 2011-03-08 Aloys Wobben Foundation apparatus for a wind turbine tower
US8453401B2 (en) * 2003-07-22 2013-06-04 Pedro M. Buarque de Macedo Prestressed, strong foam glass tiles
US20070261328A1 (en) * 2003-07-22 2007-11-15 Buarque De Macedo Pedro M Prestressed, strong foam glass tiles
US8453400B2 (en) 2003-07-22 2013-06-04 Pedro M. Buarque de Macedo Prestressed, strong foam glass tiles
US20050016093A1 (en) * 2003-07-22 2005-01-27 Buarque De Macedo Pedro M. Prestressed, strong foam glass tiles
US20050257462A1 (en) * 2004-05-21 2005-11-24 Franklin Brown Tower foundation
US7827748B2 (en) 2004-05-21 2010-11-09 Dixie Precast, Inc. Tower foundation
US7832178B2 (en) * 2005-08-01 2010-11-16 Jon Matthews Rouse Segmented support assembly
US20070022705A1 (en) * 2005-08-01 2007-02-01 Rouse Jon M Segmented support assembly
US8220214B1 (en) * 2009-05-02 2012-07-17 Purdy Charles L Prefabricated weight distribution element
US8302357B1 (en) * 2010-10-26 2012-11-06 Kontek Industries, Inc. Blast-resistant foundations
US8443573B1 (en) 2010-10-26 2013-05-21 Kontek Industries, Inc. Blast-resistant foundations
US8468760B1 (en) 2010-10-26 2013-06-25 Kontek Industries, Inc Blast-resistant foundations
US9284710B2 (en) 2011-06-29 2016-03-15 Oldcastle Precast, Inc. Prefabricated concrete pole base and adjustable connector
US20150113893A1 (en) * 2012-08-07 2015-04-30 Oldcastle Precast, Inc. Modular concrete pole base
US9284744B2 (en) * 2012-08-07 2016-03-15 Oldcastle Precast, Inc. Modular concrete pole base
US8806821B1 (en) 2013-02-01 2014-08-19 Franklin Brown Tower foundation pillar slab and method of producing such
US20160097199A1 (en) * 2014-10-02 2016-04-07 Board Of Regents Of The Nevada System Of Higher Education On Behalf Of The University Of Nevada Deconstructable support column structures
US9677274B2 (en) * 2014-10-02 2017-06-13 Board Of Regents Of The Nevada System Of Higher Education On Behalf Of The University Of Nevada, Reno Deconstructable support column structures
US11434617B2 (en) 2014-10-07 2022-09-06 Terraconn Consultants, Inc. Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like
US11814808B2 (en) 2014-10-07 2023-11-14 Terracon Consultants, Inc. Retrofit reinforcing structure addition and method for wind turbine concrete gravity spread foundations and the like
US11661718B2 (en) 2018-07-25 2023-05-30 Terracon Consultants, Inc. Concrete pier foundation with lateral shear reinforcing loops and methods of constructing the same
US11365523B2 (en) 2018-11-13 2022-06-21 Terracon Consultants, Inc. Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US11976431B2 (en) 2018-11-13 2024-05-07 Terracon Consultants, Inc. Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US11274412B2 (en) 2019-01-31 2022-03-15 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
US11885092B2 (en) 2019-01-31 2024-01-30 Terracon Consultants, Inc. Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same

Similar Documents

Publication Publication Date Title
US1529895A (en) Sectional foundation for mounting signal poles and the like
US4051570A (en) Road bridge construction with precast concrete modules
US1647925A (en) Anchor footing for steel towers
US2772468A (en) Dowel bar or tie bar supporting side forms
US2306107A (en) Form for molding building members
US3130470A (en) Concrete wall form installation
US3219308A (en) Form locator
US2523131A (en) Form for molding concrete walls
US3623353A (en) Vehicle frame straightening installation
US1585254A (en) Dowel bearing plate and method of mounting
US940463A (en) Mold.
US3535841A (en) Building systems
US1673118A (en) Interlocking double twin-stud wall structure
CN108193695A (en) A kind of enclosure structure of foundation pit of subway station support and construction method
KR20150125834A (en) Prefabricated slab connection bracket construction method of the bridge abutment
US2396045A (en) Precast reinforced concrete member
US2383544A (en) Foundation block structure
US1579965A (en) Pole for carrying electric cables, telegraph and telephone wires, and other purposes
US1916796A (en) Road rail form
US2236775A (en) Equipment foundation of sectional type
US2692034A (en) Temporary form support for building concrete bridges
US1617746A (en) Concrete form
US2046410A (en) Pipe guide and anchor for underground conduits
US1034427A (en) Wall-erecting apparatus.
US1539033A (en) Method of and means for reenforcing wall foundations