EP3247848A1 - Tower and method for constructing a tower - Google Patents

Tower and method for constructing a tower

Info

Publication number
EP3247848A1
EP3247848A1 EP16735539.5A EP16735539A EP3247848A1 EP 3247848 A1 EP3247848 A1 EP 3247848A1 EP 16735539 A EP16735539 A EP 16735539A EP 3247848 A1 EP3247848 A1 EP 3247848A1
Authority
EP
European Patent Office
Prior art keywords
staves
stave
tower
foundation
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP16735539.5A
Other languages
German (de)
French (fr)
Other versions
EP3247848A4 (en
Inventor
Bryant ZAVITZ
William Lowndes Iii
Kevin KIRKLEY
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tindall Corp
Original Assignee
Tindall Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tindall Corp filed Critical Tindall Corp
Priority claimed from PCT/US2016/012833 external-priority patent/WO2016112376A1/en
Publication of EP3247848A1 publication Critical patent/EP3247848A1/en
Publication of EP3247848A4 publication Critical patent/EP3247848A4/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/16Prestressed structures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/22Foundations specially adapted for wind motors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912Mounting on supporting structures or systems on a stationary structure on a tower
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • the present invention relates to a tower and a method for constructing a tower.
  • Wind turbines are increasing relied on for power generation that does not create pollutants. Wind turbines are generally more efficient when the turbine is above approximately 120 m from the surface of the earth. Steel towers have been used to support wind turbines, but steel can become costly above 60-70 m in height. Accordingly, an economical tower that can support a wind turbine 100-120 m or more in the air is desired.
  • the present invention broadly comprises a tower and a method and apparatus for constructing a tower.
  • One embodiment of the invention may be implemented as an apparatus including a foundation, a plurality of lower staves located on the foundation, and a plurality of upper staves located above the lower staves, the upper staves having a poured in place concrete or grouted joint between each adjacent upper stave.
  • a method for constructing a tower may include placing a foundation; assembling a first set of staves into a first tower section on the foundation; assembling a second set of staves into a second tower section; and moving the second tower section onto the first tower section.
  • Another embodiment of the apparatus may include a foundation; a plurality of lower staves located on the foundation; and a plurality of upper staves located above the lower staves.
  • the first upper stave may be connected to a first lower stave by a rod extending through a passage in each of the first upper stave and the first lower stave.
  • FIG. 1 illustrates a side view of an exemplary embodiment of the present invention
  • FIG. 2 illustrates a close up side view of an embodiment of the tower of the present invention
  • FIG. 3 illustrates a close up cross-sectional view of an embodiment of the top of the tower of the present invention
  • FIG.4 illustrates a close up cross-sectional view of an embodiment of the joint between the lower and upper staves
  • FIG. 5 illustrates exemplary lower and upper staves of the present invention
  • FIG. 6 illustrates a horizontal cross-sectional view of an embodiment of the tendon anchors of the present invention
  • FIG.7 illustrates a horizontal cross-sectional view of an embodiment of the monostrand tendons of the present invention
  • FIG. 8 illustrates a horizontal cross-sectional view near the top of an embodiment of the upper staves of the present invention
  • FIG. 9 illustrates a horizontal cross-sectional view of an embodiment of the steel adapter of the present invention.
  • FIGS. 10 and 11 show an embodiment of a method to construct a tower according to the present invention
  • FIG. 12 illustrates an alternative embodiment of a tower as shown in Figure 1;
  • FIG. 13 illustrates a cutaway view of the core component assembly 120 shown in Figure 12;
  • FIGS. 14, 15 , and 18 illustrate alternative embodiments of foundations included in the present invention.
  • FIGS. 16 and 17 show side cross-sectional views of alternative embodiments of a horizontal joint between staves included in the present invention
  • FIGS. 19, 20, and 25 illustrate alternative embodiments of a vertical joint between staves included in the present invention
  • FIGS. 21 and 22 show alternative embodiments of a horizontal joint between a topmost stave and the tower top included in the present invention
  • FIGS. 23 and 24 show a pre-assembly method for one level of the stacked stave tower.
  • FIGS. 26-28 illustrate an alternative embodiment of the pre-assembly method shown in Figures 23 and 24 for one level of the stacked stave tower.
  • Figure 1 shows an exemplary embodiment of a tower 20 supporting steel tower 30, which supports wind turbine 40.
  • Tower 20 includes a plurality of lower staves 22 and a plurality of upper staves 24. In the embodiments shown in Figures 1-11, there are 12 lower staves 22 and 12 upper staves 24. However, any number of upper and lower staves are within the scope of the invention.
  • the lower staves 22 are mounted on foundation 21. The top of the upper staves is connected to steel tower 30 through steel adapter 32.
  • Figure 1 shows tower 20 supporting turbine 40. However, tower 20 may be used to support any kind of machine or structure known in the an.
  • Figure 1 shows that the steel portion is roughly two thirds of the total height and tower 20 is roughly one third of the total height.
  • other proportions are within the scope of the invention, including a tower 20 with no steel structure above.
  • Figure I shows a tower with two sets of staves, lower staves 22 and upper staves 24.
  • the present invention includes towers having either one set of staves and more than two sets of slaves, such as towers 20 including one, three, or four sets of staves. In these cases, each set of adjacent staves may be connected by the joint shown in Figure 4, and the top of the staves are constructed as shown in Figures 8 and 9.
  • Figures 2 and 7 show that the tower 20 may be held together in part by monostrand tendons 23 that pass through horizontal ducts in each of the staves 22 or 24. These monostrand tendons 23 are then tensioned to provide force compressing the staves together.
  • Figures 2 and 6 show tendons 25, which also pass through horizontal ducts in each stave and are tensioned to compress the staves together.
  • tendons 23 there are two tendons 23 in each of two locations near the foundation 21, a plurality of single tendons 23 at intervals along the length of the lower staves 22, four tendons 25 near the joint between the lower staves 22 and the upper staves 24, a plurality of single tendons 23 along the length of the upper staves 24, double tendons 23 near the top of upper staves 24, and multiple sets of 4 tendons 25 at the top of upper staves 24.
  • different configurations and numbers of tendons 23 and 25 are possible and within the scope of the invention.
  • Figure 6 shows plural tendons and Figure 7 shows monostrand tendons.
  • Figure 6 shows plural tendons and Figure 7 shows monostrand tendons.
  • the configuration of Figure 6 may be used with monostrand tendons and the configuration of Figure 7 may be used with plural tendons, and these modifications are within the scope of the present invention.
  • FIG 3 shows a close up vertical cross-section of the top of upper staves 24 and the adapter 32.
  • Tower 20 also includes post tensioning tendons 50 that run through tendon ducts 54.
  • tendon ducts 54 running the length of each of upper staves 24.
  • tendon ducts 54 run the length of the stave, and two run from the top of the lower stave to an endpoint near the top of the lower stave.
  • each tendon 50 passes through a hole in adapter 32 and is terminated by a nut or anchor 52.
  • each tendon 50 serves to compress the joint between the respective upper and lower stave, and also to compress the adapter 32 to the top of the upper staves 24.
  • a grouted joint 33 may also be located between the adapter 32 and the top of the upper staves 24.
  • Figure 4 shows the joint between the lower staves 22 and the upper staves 24.
  • a layer of grout 26 may be used to fill and seal this joint.
  • rod 27 may run through a duct in each stave through the joint. Nuts 28 at each of rod 27 can provide further compressive force on the joint. Grout may also be used to fill empty volume around rod 27.
  • Figure 5 shows that, in one embodiment, the bottom of lower stave 22 is wider than the top of lower stave 22, which is wider than the bottom of upper stave 24, which is wider than the top of upper stave 24.
  • Figure 8 is a horizontal cross-section just below the tops of upper staves 24.
  • Figure 8 shows that in one embodiment the top portions of upper staves 24 are not in contact with each other. Instead, gaps 56 exist between the tops of the staves 24. These gaps 56 may extend 3 m from the tops of upper staves 24 in one embodiment.
  • Rebar 58 extends from inside of the tops of each stave 24 and runs horizontally towards the adjacent stave 24. Further, vertical rebar 57 may run from the bottom of gap 56 to the top of the gap 56.
  • gaps 56 are filled with poured concrete that envelops rebars 57 and 58 to form a field concrete joint in each gap 56.
  • the top of the upper staves 24 can be transitioned from a conical horizontal cross-section to a cylindrical horizontal cross-section. This provides better support to the steel tower 30, and a better joint between adapter 32 and the top of tower 20.
  • Figure 9 shows a top view of the adapter 32 on the top of the staves 24.
  • Nuts or anchors 52 shown in Figure 3 which connect to the tendons 50 hold the adapter 32 to the top of staves 24.
  • vertical rebars 57 may pass through holes in adapter 32 and have fasteners 59 attached thereto. This can add additional compressive force to the joint between the adapter 32 and the tops of staves 24.
  • Figure 10 and 11 show an exemplary method of supporting and locating the lower staves 22.
  • the structure may be assembled as follows:
  • Stave to stave joints in the remainder of the upper staves can proceed concurrently with these activities.
  • Circumferential post tensioning 23 and 25 can proceed as well.
  • Stave joint grout must be 3000+- psi at the level being stressed.
  • Figure 12 shows an alternative embodiment of a tower 10 including ring foundation 112, core component assembly 120, tube elements 113, four sets of staves 114, centerline 116, and wind turbine 119.
  • the core component assembly 120 may be the same as that disclosed in U.S. Patent No. 9,175,493, which is incorporated by reference herein in its entirety. There may be grout at the horizontal joints between staves 114, as well as additional secure me nts as discussed herein.
  • Figure 13 shows a cutaway view of the core component assembly 120 assembled in ground 134.
  • the assembly 120 may include mud slab 130, foundation 132, core component 122, work platform 190, and vertical post-tensioning tendons 118 that are capped at post-tensioning tendon anchors 117.
  • Grout joint 116 is located between core component 122 and stave 114,
  • Figure 14 shows an alternative embodiment including vertical tendon ISO that runs through the foundation 132.
  • foundation 132 may be a disk or conventional foundation that is poured on site.
  • Figure 15 shows an additional embodiment including a ring foundation 142 that is poured on site after tendon anchor 162 at the end of tendon 160 is located in the foundation 142.
  • Figure 16 illustrates an embodiment of a joint between two slaves 114A and 1 14B.
  • Post-tensioning tendons 1 18 run along an inner surface of the staves 114A and 1 14B, Shim 115 is put in place before grout i 10A is added to fill and seal the joint between the staves.
  • Figure 17 illustrates an alternative embodiment of a joint between staves 114A and U4B.
  • post-tension rod 170 capped on each end by nuts 172, runs through corresponding passages in each stave. Nuts 172 are tightened to clamp the staves together.
  • Pre- stress tendons 180 are included in the pre-cast stave 114 and run the length of each stave. Thus, the load is borne by the pre-stress tendons 180 along the length of stave 114A, then the load is transferred to the pie-stress tendons 180 in stave 114B through post-tension rod 170. Shim 115 and grout 116A may also be used to secure the joint.
  • Figure 18 shows an additional embodiment for securing the staves to the foundation.
  • post tension rod 170A is partially cast into field poured disk or ring foundation 132.
  • Stave 114B is then assembled onto the rod 170A, and nut 172 clamps stave 114B to foundation 132.
  • Shims 115 and grout 116 may also be used to secure the joint.
  • Figure 19 shows an embodiment of a structure for securing the vertical edges of staves 1 14 to the adjacent slave edges.
  • vertical reinforcement bars 176A are placed into the gaps between adjacent staves 114.
  • Reinforcement bars 176B are external portions of reinforcement bars 117 that are pre-cast into the staves and extend out of the vertical side edges of the staves into the gap between adjacent staves.
  • concrete joint 176 is field poured around the reinforcement bars 176A and 176B to secure the vertical edges of the staves with respect to each other.
  • Staves 114 include channels 114D through which horizontal post-tensioning tendons 192 are run.
  • Each stave 114 includes shear keys 114C in a channel filled with a filler material 190, which may be a Ihixotropic filler material.
  • Cross over anchor 194 then secures the tensioned tendon 192 to clamp the staves 114 to each other.
  • Figure 21 shows an embodiment of the transition from the staves 114 to the turbine 119.
  • Anchors 172A secure the tops of tendons 118 to the tower top adaptor 200, which may be made of steel.
  • An epoxy joint 210A may be located between tube top element 210 and second element 220. Shim 222 and grout 220A may be located between second element 220 and the top of top stave 114A.
  • alternative embodiments can include multiple elements 220 between top tube element 210 and stave 1 14, or no elements 220 between top tube element 210 and stave 114 (stave 114 directly connected with top tube element 210). All of these modifications are within the scope of the present invention.
  • FIG. 22 An alternative embodiment of the tower top is shown in Figure 22.
  • post tension bolts 272 run from the top of stave 114A, through elements 210 and 220, and are capped off by nuts 172 above adaptor 200.
  • loads from pre-stress tendons 180 in stave 114A are transferred to adaptor 200 through post-tension rod 172.
  • Figures 23 and 24 show a pre-assembly method for one level of the stacked stave tower.
  • the first level of staves is assembled on the foundation as discussed above. Then higher levels may be assembled as shown in Figures 23 and 24 and then lifted as a completed level onto the tower.
  • Tower section 300 includes 1 level of staves assembled on frame 400 (shown in Figure 24), which is placed on cribbing grade 312, Wall pipe 314 runs through a center of the tower to support platforms 316. Brace 318 supports the pipe 314.
  • Platforms 316 allow for ladder placements 310, which in addition to ladder placements 350 and 360, allow workers to place and remove the inner mold form wall for the joints shown in Figure 19.
  • the outer mold form walls can be easily placed and removed from the outside using a lift 380.
  • frame 400 includes members 41 Q, deck 420, anchor bolts 420 and base bolt 430 for disassembling the sections for shipping.
  • Figure 25 shows an alternative embodiment 500 of the joints shown in Figure 19,
  • the front (520) and rear (570) of the mold forms stay in place after the field pour.
  • Mold front 520 includes a hole for J-boit 550 to pass through, which is held in place by nut 510.
  • Gasket 530 is located between mold front 520 and the staves to keep a tight seal for the cement.
  • Reinforcement bars 560 are an extension of pre-cast reinforcement bars 117 of the staves 114.
  • Vertical reinforcement bars 540 are added to the joint before the concrete is poured.
  • Figure 26-28 show an alternative assembly method using scaffolding.
  • tower section 300 is assembled on frame 400 (shown in Figure 27), which is placed on cribbing grade 312.
  • scaffolding system 600 is used to place and remove the moid forms for the vertical joints between staves.
  • System 600 is all supported by frame 630, which is connected to work platform 310 and the tops of the staves.
  • Inner scaffolding 610 can be moved up and down within the tower section 300, and outer scaffolding 620 is moved up and down outside of tower section 300.
  • tower section 300 is complete, it is then lifted onto the tower to continue the erection process.

Abstract

The present invention broadly comprises a tower and a method and apparatus for constructing a tower, where one embodiment of apparatus includes a foundation, a plurality of lower staves located on the foundation, and a plurality of upper staves located above the lower staves, the upper staves having a poured in place concrete or grout joint between each adjacent upper stave.

Description

TOWER AND METHOD FOR CONSTRUCTING A TOWER
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims priority to U.S. Patent Application No. 14/992,297, filed January 11, 2016 and under 35 U.S.C. §119(e) to U.S. Application No. 62/101,617, filed January 9, 2015, the entire content of each of which is incorporated into the present application by reference.
FIELD OF THE INVENTION
[0002] The present invention relates to a tower and a method for constructing a tower.
BACKGROUND OF THE INVENTION
[0003] Wind turbines are increasing relied on for power generation that does not create pollutants. Wind turbines are generally more efficient when the turbine is above approximately 120 m from the surface of the earth. Steel towers have been used to support wind turbines, but steel can become costly above 60-70 m in height. Accordingly, an economical tower that can support a wind turbine 100-120 m or more in the air is desired.
SUMMARY OF THE INVENTION
[0004] The present invention broadly comprises a tower and a method and apparatus for constructing a tower. One embodiment of the invention may be implemented as an apparatus including a foundation, a plurality of lower staves located on the foundation, and a plurality of upper staves located above the lower staves, the upper staves having a poured in place concrete or grouted joint between each adjacent upper stave.
1
SUBSTITUTE SHEET (RULE 26) [0005] A method for constructing a tower may include placing a foundation; assembling a first set of staves into a first tower section on the foundation; assembling a second set of staves into a second tower section; and moving the second tower section onto the first tower section.
[0006] Another embodiment of the apparatus may include a foundation; a plurality of lower staves located on the foundation; and a plurality of upper staves located above the lower staves. The first upper stave may be connected to a first lower stave by a rod extending through a passage in each of the first upper stave and the first lower stave.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007] A full and enabling disclosure of the present subject matter, including the best mode thereof, directed to one of ordinary skill in the art, is set forth in the specification, which makes reference to the appended figures, in which:
[0008] FIG. 1 illustrates a side view of an exemplary embodiment of the present invention;
[0009] FIG. 2 illustrates a close up side view of an embodiment of the tower of the present invention;
[0010] FIG. 3 illustrates a close up cross-sectional view of an embodiment of the top of the tower of the present invention;
[0011] FIG.4 illustrates a close up cross-sectional view of an embodiment of the joint between the lower and upper staves;
[0012] FIG. 5 illustrates exemplary lower and upper staves of the present invention:
[0013] FIG. 6 illustrates a horizontal cross-sectional view of an embodiment of the tendon anchors of the present invention; [0014] FIG.7 illustrates a horizontal cross-sectional view of an embodiment of the monostrand tendons of the present invention;
[0015] FIG. 8 illustrates a horizontal cross-sectional view near the top of an embodiment of the upper staves of the present invention;
[0016] FIG. 9 illustrates a horizontal cross-sectional view of an embodiment of the steel adapter of the present invention;
[0017] FIGS. 10 and 11 show an embodiment of a method to construct a tower according to the present invention;
[0018] FIG. 12 illustrates an alternative embodiment of a tower as shown in Figure 1;
[0019] FIG. 13 illustrates a cutaway view of the core component assembly 120 shown in Figure 12;
[0020] FIGS. 14, 15 , and 18 illustrate alternative embodiments of foundations included in the present invention;
[0021] FIGS. 16 and 17 show side cross-sectional views of alternative embodiments of a horizontal joint between staves included in the present invention;
ΕΘ022] FIGS. 19, 20, and 25 illustrate alternative embodiments of a vertical joint between staves included in the present invention;
[0023] FIGS. 21 and 22 show alternative embodiments of a horizontal joint between a topmost stave and the tower top included in the present invention;
[0024] FIGS. 23 and 24 show a pre-assembly method for one level of the stacked stave tower; and
[0025] FIGS. 26-28 illustrate an alternative embodiment of the pre-assembly method shown in Figures 23 and 24 for one level of the stacked stave tower. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0026] Reference is presently made in detail to exemplary embodiments of the present subject matter, one or more examples of which are illustrated in or represented by the drawings. Each example is provided by way of explanation of the present subject matter, not limitation of the present subject matter. In fact, it will be apparent to those skilled in the art that various modifications and variations can be made in the present subject matter without departing from the scope or spirit of the present subject matter. For instance, features illustrated or described as part of one embodiment can be used with another embodiment to yield a still further embodiment Thus, it is intended that the present subject matter covers such modifications and variations as come within the scope of the disclosure and equivalents thereof.
[0027] Figure 1 shows an exemplary embodiment of a tower 20 supporting steel tower 30, which supports wind turbine 40. Tower 20 includes a plurality of lower staves 22 and a plurality of upper staves 24. In the embodiments shown in Figures 1-11, there are 12 lower staves 22 and 12 upper staves 24. However, any number of upper and lower staves are within the scope of the invention. The lower staves 22 are mounted on foundation 21. The top of the upper staves is connected to steel tower 30 through steel adapter 32. Further, Figure 1 shows tower 20 supporting turbine 40. However, tower 20 may be used to support any kind of machine or structure known in the an.
[0028] In this regard, Figure 1 shows that the steel portion is roughly two thirds of the total height and tower 20 is roughly one third of the total height. However, other proportions are within the scope of the invention, including a tower 20 with no steel structure above. [0029] Further, Figure I shows a tower with two sets of staves, lower staves 22 and upper staves 24. However, the present invention includes towers having either one set of staves and more than two sets of slaves, such as towers 20 including one, three, or four sets of staves. In these cases, each set of adjacent staves may be connected by the joint shown in Figure 4, and the top of the staves are constructed as shown in Figures 8 and 9.
[0030] Figures 2 and 7 show that the tower 20 may be held together in part by monostrand tendons 23 that pass through horizontal ducts in each of the staves 22 or 24. These monostrand tendons 23 are then tensioned to provide force compressing the staves together. Figures 2 and 6 show tendons 25, which also pass through horizontal ducts in each stave and are tensioned to compress the staves together. In the exemplary, embodiments shown in Figures 1-11, there are two tendons 23 in each of two locations near the foundation 21, a plurality of single tendons 23 at intervals along the length of the lower staves 22, four tendons 25 near the joint between the lower staves 22 and the upper staves 24, a plurality of single tendons 23 along the length of the upper staves 24, double tendons 23 near the top of upper staves 24, and multiple sets of 4 tendons 25 at the top of upper staves 24. However, different configurations and numbers of tendons 23 and 25 are possible and within the scope of the invention.
[0031] In this regard, Figure 6 shows plural tendons and Figure 7 shows monostrand tendons. However, the configuration of Figure 6 may be used with monostrand tendons and the configuration of Figure 7 may be used with plural tendons, and these modifications are within the scope of the present invention.
[0032] Figure 3 shows a close up vertical cross-section of the top of upper staves 24 and the adapter 32. Tower 20 also includes post tensioning tendons 50 that run through tendon ducts 54. In the embodiment shown in Figures 1-11, there are four tendon ducts running the length of each of upper staves 24. However- any number of tendon ducts could run the length of each of upper staves 24 and still be within the scope of the invention. In the lower staves 22, two of the ducts 54 run the length of the stave, and two run from the top of the lower stave to an endpoint near the top of the lower stave. Thus, half of the 48 tendons SO run from the top of the upper staves to the foundation 21» and half run from the top of upper stave 24 to the endpoint just below the joint between the upper and lower staves. However, 25-100% of tendons 50 could run from the top of the upper staves to the foundation 21 (while 0-75% run from the top of upper stave 24 to the endpoint just below the joint between the upper and lower staves) and still be within the scope of the invention. Each tendon 50 passes through a hole in adapter 32 and is terminated by a nut or anchor 52. Thus, each tendon 50 serves to compress the joint between the respective upper and lower stave, and also to compress the adapter 32 to the top of the upper staves 24. A grouted joint 33 may also be located between the adapter 32 and the top of the upper staves 24.
[0033] Figure 4 shows the joint between the lower staves 22 and the upper staves 24. A layer of grout 26 may be used to fill and seal this joint. Further, rod 27 may run through a duct in each stave through the joint. Nuts 28 at each of rod 27 can provide further compressive force on the joint. Grout may also be used to fill empty volume around rod 27.
[0034] Figure 5 shows that, in one embodiment, the bottom of lower stave 22 is wider than the top of lower stave 22, which is wider than the bottom of upper stave 24, which is wider than the top of upper stave 24.
[0035] Figure 8 is a horizontal cross-section just below the tops of upper staves 24. Figure 8 shows that in one embodiment the top portions of upper staves 24 are not in contact with each other. Instead, gaps 56 exist between the tops of the staves 24. These gaps 56 may extend 3 m from the tops of upper staves 24 in one embodiment. Rebar 58 extends from inside of the tops of each stave 24 and runs horizontally towards the adjacent stave 24. Further, vertical rebar 57 may run from the bottom of gap 56 to the top of the gap 56. In one embodiment, gaps 56 are filled with poured concrete that envelops rebars 57 and 58 to form a field concrete joint in each gap 56.
[0036] By pouring concrete into gaps 56 to form a field concrete joint in each gap 56, the top of the upper staves 24 can be transitioned from a conical horizontal cross-section to a cylindrical horizontal cross-section. This provides better support to the steel tower 30, and a better joint between adapter 32 and the top of tower 20.
[0037] Figure 9 shows a top view of the adapter 32 on the top of the staves 24. Nuts or anchors 52 (shown in Figure 3) which connect to the tendons 50 hold the adapter 32 to the top of staves 24. Also, vertical rebars 57 may pass through holes in adapter 32 and have fasteners 59 attached thereto. This can add additional compressive force to the joint between the adapter 32 and the tops of staves 24.
[0038] Figure 10 and 11 show an exemplary method of supporting and locating the lower staves 22. In one embodiment, the structure may be assembled as follows:
A) Survey and Layout
1 ) Survey foundation 21 and establish each stave node on the top of foundation 2 i .
2) Establish the tower centerline point on the temporary pole foundation as well as a benchmark for elevation control. Set the nuts on the temporary pole foundation to correct setting elevation.
3) Weld the node point embeds into position.
B) Erect Center Pole Support Tower (Lower Section Only)
1) Erect the Lower section on the anchor bolts and use three main braces to fine tune to plumb. Tighten the remaining three main braces to a snug condition. C) Erect Lower Staves 22
1) Rig, lift and swing the first stave into position sitting it on the hydraulic jacks 70 shown in Figure 10. Lower and rise as necessary to get the top of the stave between the bolting platform node plates and at the correct elevation. When set, place and tighten bolts at the top, run down the support bolts at the bottom, weld the stave corners to the node plates 72. (Crane can now slack the lines, unhook, and start on the next piece) The erection order must be followed.
2) Dam the lower foundation to stave joint and immediately place the base grout on a stave by stave basis,
3) Erect lower staves 22, grouting the base connection as erection proceeds.
D) Erect Center Pole Support Tower flipper Section)
i) Erect the Upper section on the anchor bolts in the top of the lower section. Plumb and align the Upper section using three main braces. Tighten the remaining three braces to a snug condition.
E) Erect Upper Staves 24
I ) Rig, lift and swing the first stave into position sitting it on the hydraulic jacks 70 previously used on the lower staves. Lower and rise as necessary to get the top of the stave between the top bolting platform node plates and at the correct elevation. When set, place and tighten bolts at the lop, run down the support bolts at the bottom.
(Crane can now slack the lines, unhook, and start on the next piece) The erection order must be followed. During this process circumferential P.T. tendons 23 and 25 may be placed and stave to stave joints between the lower staves may be grouted. 2) At completion of erection of the upper staves 24 joint work at elevation 23m+- should commence. This includes placing circumferential P.T. tendons 23 and 25 from elevation 21 m to elevation 24 m and placing the 24 *» 30 mm rods 27.
3) Immediately following 2 above the stave to stave joint from 21 m to 23 m and the horizontal stave to stave joint needs to be grouted. When this is done grout the 30 mm rods 27.
F) Erect Steel Adaptor 32
1) Place the steel adapter on shims to the correct vertical and horizontal alignment.
Check for tendon clearance for the tendons 50.
2) Place circumferential P.T. tendons 23 and 25 from elevation 43 m to 46 m.
3} Place reinforcement 57 in each stave to stave joints 56 (10" x 60" each )
4) Form the inside and outside of the joints.
5) Pour each joint.
6) Stave to stave joints in the remainder of the upper staves can proceed concurrently with these activities.
7) Circumferential post tensioning 23 and 25 can proceed as well. Stave joint grout must be 3000+- psi at the level being stressed.
G) Remove Upper and Lower Center Pole Support Sections
1 ) This can happen either before or after Ή"
H) Place and Stress Vertical Post Tension Tendons 50
I) Install Ladder and Tower Internals
[0039] Further embodiments are shown in Figures 12-28. Figure 12 shows an alternative embodiment of a tower 10 including ring foundation 112, core component assembly 120, tube elements 113, four sets of staves 114, centerline 116, and wind turbine 119. The core component assembly 120 may be the same as that disclosed in U.S. Patent No. 9,175,493, which is incorporated by reference herein in its entirety. There may be grout at the horizontal joints between staves 114, as well as additional secure me nts as discussed herein.
[0040] Figure 13 shows a cutaway view of the core component assembly 120 assembled in ground 134. The assembly 120 may include mud slab 130, foundation 132, core component 122, work platform 190, and vertical post-tensioning tendons 118 that are capped at post-tensioning tendon anchors 117. Grout joint 116 is located between core component 122 and stave 114,
[0041] Figure 14 shows an alternative embodiment including vertical tendon ISO that runs through the foundation 132. In this case, foundation 132 may be a disk or conventional foundation that is poured on site.
[0042] Figure 15 shows an additional embodiment including a ring foundation 142 that is poured on site after tendon anchor 162 at the end of tendon 160 is located in the foundation 142.
[0043] Figure 16 illustrates an embodiment of a joint between two slaves 114A and 1 14B. Post-tensioning tendons 1 18 run along an inner surface of the staves 114A and 1 14B, Shim 115 is put in place before grout i 10A is added to fill and seal the joint between the staves.
[0044] Figure 17 illustrates an alternative embodiment of a joint between staves 114A and U4B. In this case, post-tension rod 170, capped on each end by nuts 172, runs through corresponding passages in each stave. Nuts 172 are tightened to clamp the staves together. Pre- stress tendons 180 are included in the pre-cast stave 114 and run the length of each stave. Thus, the load is borne by the pre-stress tendons 180 along the length of stave 114A, then the load is transferred to the pie-stress tendons 180 in stave 114B through post-tension rod 170. Shim 115 and grout 116A may also be used to secure the joint. [0045] Figure 18 shows an additional embodiment for securing the staves to the foundation. In this embodiment, post tension rod 170A is partially cast into field poured disk or ring foundation 132. Stave 114B is then assembled onto the rod 170A, and nut 172 clamps stave 114B to foundation 132. Shims 115 and grout 116 may also be used to secure the joint.
[0046] Figure 19 shows an embodiment of a structure for securing the vertical edges of staves 1 14 to the adjacent slave edges. Initially, vertical reinforcement bars 176A are placed into the gaps between adjacent staves 114. (Reinforcement bars 176B are external portions of reinforcement bars 117 that are pre-cast into the staves and extend out of the vertical side edges of the staves into the gap between adjacent staves.) Then, concrete joint 176 is field poured around the reinforcement bars 176A and 176B to secure the vertical edges of the staves with respect to each other.
[0047] An alternative embodiment of a joint between vertical edges of the staves is shown in Figure 20. Similar subject matter is also shown in U.S. Patent Application No, 14/172,166, which is incorporated by reference herein in its entirety. Staves 114 include channels 114D through which horizontal post-tensioning tendons 192 are run. Each stave 114 includes shear keys 114C in a channel filled with a filler material 190, which may be a Ihixotropic filler material. Cross over anchor 194 then secures the tensioned tendon 192 to clamp the staves 114 to each other.
[0048] Figure 21 shows an embodiment of the transition from the staves 114 to the turbine 119. Anchors 172A secure the tops of tendons 118 to the tower top adaptor 200, which may be made of steel. There may be grout 116B in the joint between adaptor 200 and top tube element 210, which may be a pre-cast concrete element. An epoxy joint 210A may be located between tube top element 210 and second element 220. Shim 222 and grout 220A may be located between second element 220 and the top of top stave 114A. [0049] In addition, alternative embodiments can include multiple elements 220 between top tube element 210 and stave 1 14, or no elements 220 between top tube element 210 and stave 114 (stave 114 directly connected with top tube element 210). All of these modifications are within the scope of the present invention.
[0050] An alternative embodiment of the tower top is shown in Figure 22. Here, post tension bolts 272 run from the top of stave 114A, through elements 210 and 220, and are capped off by nuts 172 above adaptor 200. Thus, loads from pre-stress tendons 180 in stave 114A are transferred to adaptor 200 through post-tension rod 172.
[0051] Figures 23 and 24 show a pre-assembly method for one level of the stacked stave tower. In one embodiment, the first level of staves is assembled on the foundation as discussed above. Then higher levels may be assembled as shown in Figures 23 and 24 and then lifted as a completed level onto the tower. Tower section 300 includes 1 level of staves assembled on frame 400 (shown in Figure 24), which is placed on cribbing grade 312, Wall pipe 314 runs through a center of the tower to support platforms 316. Brace 318 supports the pipe 314. Platforms 316 allow for ladder placements 310, which in addition to ladder placements 350 and 360, allow workers to place and remove the inner mold form wall for the joints shown in Figure 19. The outer mold form walls can be easily placed and removed from the outside using a lift 380.
[0052] As shown in Figure 24, frame 400 includes members 41 Q, deck 420, anchor bolts 420 and base bolt 430 for disassembling the sections for shipping.
[0053] Figure 25 shows an alternative embodiment 500 of the joints shown in Figure 19, In this case, the front (520) and rear (570) of the mold forms stay in place after the field pour. Mold front 520 includes a hole for J-boit 550 to pass through, which is held in place by nut 510. Gasket 530 is located between mold front 520 and the staves to keep a tight seal for the cement. Reinforcement bars 560 are an extension of pre-cast reinforcement bars 117 of the staves 114. Vertical reinforcement bars 540 are added to the joint before the concrete is poured.
[0054] Figure 26-28 show an alternative assembly method using scaffolding. In a similar manner as shown in Figures 23 and 24, tower section 300 is assembled on frame 400 (shown in Figure 27), which is placed on cribbing grade 312. However, as shown in Figure 28, scaffolding system 600 is used to place and remove the moid forms for the vertical joints between staves. System 600 is all supported by frame 630, which is connected to work platform 310 and the tops of the staves. Inner scaffolding 610 can be moved up and down within the tower section 300, and outer scaffolding 620 is moved up and down outside of tower section 300. When tower section 300 is complete, it is then lifted onto the tower to continue the erection process.
[0055] The present written description uses examples to disclose the present subject matter, including the best mode, and also to enable any person skilled in the art to practice the present subject matter, including making and using any devices or systems and performing any incorporated and/or associated methods. While the present subject matter has been described in detail with respect to specific embodiments thereof, it will be appreciated that those skilled in the art, upon attaining an understanding of the foregoing may readily produce alterations to, variations of, and equivalents to such embodiments. Accordingly, the scope of the present disclosure is by way of example rather than by way of limitation, and the subject disclosure does not preclude inclusion of such modifications, variations and/or additions to the present subject matter as would be readily apparent to one of ordinary skill in the art.

Claims

CLAMS:
1. An apparatus comprising:
a foundation;
a plurality of lower staves located on the foundation; and
a plurality of upper staves located above the lower staves, the upper staves having a poured in place concrete or grouted joint between each adjacent upper stave.
2 A method for constructing a tower comprising:
placing a foundation;
assembling a first set of staves into a first tower section on the foundation;
assembling a second set of staves into a second tower section; and
moving the second tower section onto the first tower section.
3. The method according to Claim 2, wherein the assembling includes:
placing the second set of staves on a cribbing grade;
using ladders within an area surrounded by the staves to provide a back mold form between adjacent staves;
using a machine outside of the area surrounded by the staves to provide a front mold form; and
pouring a field poured concrete joint into a volume between the front mold form, the back mold form, and adjacent staves.
4. The method according to Claim 2, wherein the assembling includes: placing the second set of staves on a cribbing grade;
using first scaffolding within an area surrounded by the staves to provide a back mold form between adjacent staves;
using second scaffolding outside of the area surrounded by the staves to provide a front mold form; and
pouring a field poured concrete joint into a volume between the front mold form, the back mold form, and adjacent staves.
5. An apparatus comprising:
a foundation;
a plurality of lower staves located on the foundation; and
a plurality of upper staves located above the lower staves, a first upper stave connected to a first lower stave by a rod extending through a passage in each of the first upper stave and the first lower stave.
6. The apparatus according to Claim 5, wherein each of the first upper stave and the first lower stave include pre^stress tendons that extend along a length of each stave.
EP16735539.5A 2015-01-09 2016-01-11 Tower and method for constructing a tower Withdrawn EP3247848A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201562101617P 2015-01-09 2015-01-09
PCT/US2016/012833 WO2016112376A1 (en) 2015-01-09 2016-01-11 Tower and method for constructing a tower

Publications (2)

Publication Number Publication Date
EP3247848A1 true EP3247848A1 (en) 2017-11-29
EP3247848A4 EP3247848A4 (en) 2018-12-19

Family

ID=60138135

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16735539.5A Withdrawn EP3247848A4 (en) 2015-01-09 2016-01-11 Tower and method for constructing a tower

Country Status (1)

Country Link
EP (1) EP3247848A4 (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1050130A (en) * 1912-05-03 1913-01-14 George C Harvey Concrete structure.
US5038540A (en) * 1981-11-20 1991-08-13 Krautz Alfons O Sectional smokestack
NL1019953C2 (en) * 2002-02-12 2002-12-19 Mecal Applied Mechanics B V Prefabricated tower or mast, as well as a method for joining and / or re-tensioning segments that must form a single structure, as well as a method for building a tower or mast consisting of segments.
ES1058539Y (en) * 2004-10-11 2005-04-01 Inneo21 S L PERFECTED MODULAR TOWER STRUCTURE FOR WIND TURBINES AND OTHER APPLICATIONS.
EP2631393B1 (en) * 2009-05-19 2015-07-15 Pacadar S.A. A tower for a wind turbine
DE102010039796A1 (en) * 2010-06-14 2011-12-15 Max Bögl Bauunternehmung GmbH & Co. KG Tower with an adapter piece and method of making a tower with an adapter piece
EP2834435A1 (en) * 2012-04-04 2015-02-11 Forida Development A/S Wind turbine comprising a tower part of an ultra-high performance fiber reinforced composite

Also Published As

Publication number Publication date
EP3247848A4 (en) 2018-12-19

Similar Documents

Publication Publication Date Title
US10138648B2 (en) Tower and method for assembling tower
US10513833B2 (en) Foundation with pedestal and ribs for towers
US20240018736A1 (en) Foundation with pedestal and ribs for towers
US9937635B2 (en) Method of constructing a wind tower foundation
EP2427603B1 (en) Fatigue resistant foundation
AU2017330583B2 (en) Foundation for a windmill
US20110061321A1 (en) Fatigue reistant foundation system
US20110113708A1 (en) Method for the assembly of a tower and tower
WO2006038620A1 (en) Joined part structure of pedestal and method of joining pedestal
JP6427045B2 (en) Reinforcement structure and reinforcement method of existing concrete structure
CN111065788B (en) Support structure for wind-driven generator
KR101507924B1 (en) Structure and method of constructing concrete footing structure of top structure
JP2005097946A (en) Construction method of bridge pier
EP3247848A1 (en) Tower and method for constructing a tower
WO2014142672A1 (en) A method and a system for reinforcing a buttress dam
JP2010138617A (en) Installation method for timbering for bridge
DK2427603T3 (en) Exhaustion-resistant foundation

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170809

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RIC1 Information provided on ipc code assigned before grant

Ipc: E04H 12/12 20060101AFI20180807BHEP

A4 Supplementary search report drawn up and despatched

Effective date: 20181120

RIC1 Information provided on ipc code assigned before grant

Ipc: E04H 12/12 20060101AFI20181114BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20191111

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20210803