Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Полтавський Інженерно-Будівельний Інститут, Полтавский инженерно-строительный институтfiledCriticalПолтавський Інженерно-Будівельний Інститут
Priority to UA93006592ApriorityCriticalpatent/UA9599A/en
Publication of UA9599ApublicationCriticalpatent/UA9599A/en
Underground Structures, Protecting, Testing And Restoring Foundations
(AREA)
Abstract
The invention relates to building. The method includes well penetration with cylindrical rammer, ramming rigid material to earth with formation of enlarged toe and well filling with concrete. The toe is formed as intersecting ovaloids of rotation surrounded with surface of round cone turned with top down, with angle at top equal to 909--, through sequential ramming with cylindrical rammer to well bottom in sequence from down upwards separate increasing in volume with decrease of well depth portions of rigid material.
UA93006592A1993-07-301993-07-30Method for erection of basement
UA9599A
(en)