SU987028A1 - Method of consolidating sagging soils - Google Patents

Method of consolidating sagging soils Download PDF

Info

Publication number
SU987028A1
SU987028A1 SU813241390A SU3241390A SU987028A1 SU 987028 A1 SU987028 A1 SU 987028A1 SU 813241390 A SU813241390 A SU 813241390A SU 3241390 A SU3241390 A SU 3241390A SU 987028 A1 SU987028 A1 SU 987028A1
Authority
SU
USSR - Soviet Union
Prior art keywords
soil
soaking
soils
wells
water
Prior art date
Application number
SU813241390A
Other languages
Russian (ru)
Inventor
Иван Андреевич Ульчич
Original Assignee
за витель И.А. Ульчич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by за витель И.А. Ульчич filed Critical за витель И.А. Ульчич
Priority to SU813241390A priority Critical patent/SU987028A1/en
Application granted granted Critical
Publication of SU987028A1 publication Critical patent/SU987028A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

(54) СПОСОБ УПЛОТНЕНИЯ .ПРОСАДОЧНЫХ (54) METHOD OF SEALING. VISIBLE

Изобретение относитс  к упрочнению, просадочных грунтов, преимущественно лессовых, путем их уплотнени  предварительным замачиванием и глубинными взрывами зар дов взрывчатого вещества при строительстве оснований и фундаментов зданий и сооружений.The invention relates to the hardening of subsiding soils, mainly loess, by compacting them by pre-soaking and deep explosions of explosive charges during the construction of foundations and foundations of buildings and structures.

Известен способ уплотнени  просадочных лессовых грунтов, включающий замачивание через предварительно пробуренные скважины грунта до состо ни  текучей консистенции., размещение в скважинах зар дов взрывчатого вещества и осуществление взрыва зар дов 1.A known method for compacting subsurface loess soils includes soaking through previously drilled wells of the soil to a fluid consistency state, placing explosive charges in the wells and performing a charge explosion 1.

Недостаток известного.способа заключаетс  в том, что после взрыва зар дов остаетс  недоуплотненный верхний слой грунта, требующий дополнительного уплотнени , что снижает производительность работ.A disadvantage of the known method consists in the fact that after the explosion of charges there remains an incomplete upper layer of soil, which requires additional compaction, which reduces the productivity of the work.

Наиболее близким к предлагаемому  вл етс  способ уплотнени  присадочных грунтов, преимущественно лессовых , включающий образование котлована , бурение скважин, укладку в пределах котлована дренирующего сло , подачу через него в грунт воды с замачиванием последнего до состо ни  текучей консистенции, размещение в скважинах зар дов взрывчатого вещестГРУНТОВThe closest to the present invention is a method for compacting filler soils, mainly loess ones, including the formation of a pit, drilling wells, laying the drainage layer within the pit, feeding water into the soil through it with soaking the latter to a fluid consistency, placing explosive charges in the wells.

ва, осуществление взрыва зар дов и проведение замеров просадки грунта 2.the explosion of charges and the measurement of subsidence of the soil 2.

Однако известный способ характеризуетс  длительным и трудоемким возведением дренирующего сло  и недостаточным уплотнением верхнего сло , что приводит к необходимости дополнительного расхода дорогосто щих материалов, However, the known method is characterized by a long and laborious construction of the drainage layer and insufficient compaction of the upper layer, which leads to the need for additional consumption of expensive materials,

10 а главное - увеличивает продолжительность работ.10 and most importantly - increases the duration of the work.

Цель изобретени  - повышение производительности способа.The purpose of the invention is to increase the productivity of the method.

1515

Поставленна  цель достигаетс  тем, что согласно способу, включающему образование котлована,, бурение скважин, укладку в пределах котлована дренирующего сло , подачу через него в грунт The goal is achieved by the fact that according to the method, including the formation of a pit, the drilling of wells, laying within the pit of a drainage layer, the flow through it into the ground

20 воды с замачиванием последнего до состо ни  текучей консистенции, размещение в скважинах зар дов взрывчатого вещества, осуществление взрыва зар дов и проведение замеров просадки 20 water with soaking the latter to the state of flowing consistency, placing explosive charges in wells, carrying out charge explosions and taking drawdown measurements

25 грунта, в период замачивани  грунта осуществл ют возведение на дренирующем слое пригруза, подачу воды ведут с выдерживанием ее уровн , не доход щего до низа пригруза, а после прове30 дени  замеров просадки грунта осуществл ют удаление пригруза и дренирующего сло .25, during the period of soaking of the soil, a submersible is erected on the drainage layer, water is supplied with keeping its level, which does not reach the bottom of the weight, and after the measurements of the subsidence of the submerged soil and the draining layer is removed.

При этом в качестве пригруза используют местный грунт или равномерно расположенные емкости р ;водой.At the same time, local soil or evenly located containers with water are used as a prigruz.

Способ осуществл етс в следующей последовательности.The method is carried out in the following sequence.

На уплотн емом у астке сн1магот б ульдозером растительный грунт и с помощью обваловани  устраивают котлова .н, в пределах его контура бур т скважины, опускают в них зар дные трубы , отсггшают в котловане слой из -дренирующего материала с одновременной установкой инвентарных поверхностных марок дл  контрол  за понижением поверхности грунта, подают воду в котглован с замачиванием через слой грунта уплотн емого массива и одйовременно начинают отсыпку при помощи бульдозера пригруза из местного лессового грунта, при этом в слое из дренируюш .его материала вы,церживают уровень воды., не доход щий до низа пригруза. По окончании отсыпки пригруза и увлажнени  грунта до Состо ни  текучей консистенции в зар дные трубы опускают , зар ды взрывчатого вещ,ства, осуществл ют последовательные одиночные взрывы зар дов, в результате чего уплотн емый массив грунта оседает и уплотн етс  под собственным весом. Остав- шиес  в грунте после взрыва зар дов верхние части зар дных труб извле: ют , затем контролируют нивелированием по noBepxHOCTHHiNi маркам послевзрывную просадку грунта и по достижении ее необходимой стабилизации снимают пригруз и Слой из дренирующего материала .The plant soil is compacted on a sealed sn1magot b uldozer and using a ramming. Within the bounds of its contour, wells are drilled, charging tubes are lowered in them, a layer of draining material is installed in the pit with simultaneous installation of inventory surface marks for controlling after lowering the surface of the soil, water is fed to the brazier with soaking through the soil layer of the compacting mass and at the same time start dumping with the help of a bulldozer from a local loess soil, while in the layer of drainage uyush .ego material you tserzhivayut water level. no revenue to the bottom conductive prigruza. At the end of the dumping, the priming and moistening of the soil to the state of fluid consistency is lowered into the charging tubes, explosives are charged, and successive single blasts of charges are carried out, as a result of which the compacted soil mass collapses and compresses under its own weight. After the explosion, the upper parts of the charge pipes left in the ground are removed: then post-explosive subsidence of the soil is controlled by leveling with noBepxHOCTHHiNi brands and, after reaching the required stabilization, the weights and the drainage material are removed.

В качестве -пригруза могут использоватьс  равномерно распределенные по площади отдельные емкости, например из эластичного водонепроницаемого материала , заполненные жидкостью, например водой.For -size, separate containers, for example made of elastic waterproof material, filled with a liquid, for example water, can be used evenly distributed over the area.

При наличии достаточного количества местного дренирующего материала (песок, гравий, песчано-гравийна  смесь) пригруз может выполн тьс  из этого материала.If there is a sufficient amount of local drainage material (sand, gravel, sand-gravel mixture), the load can be made of this material.

Применение предлагаемого сПособа на практике обеспечивает возможность одновременного выполнени  замачивани -грунта и возведение пригруза,что иозвол ет ускорить выполнение работ и одновременно снизить расход дренирующего мгчтериала.The application of the proposed method in practice enables the simultaneous execution of the soaking of the primer and the erection of the weights, which makes it possible to accelerate the execution of the work and at the same time reduce the consumption of the draining material.

Claims (3)

1.Способ .уплотнени  просадочных грунтов, преимущественно лессовых, включающий образование котлована, бурение скважин, укладку з пределах котлована дренирующего сло , подачу через него в грунт воды с замачиванием последнего до состо ни  текучей консистенции , размещение в скважинах зар дов взрывчатого вещества, осуществление взрьша зар дов и проведение замеров просадки грунта, о т л и ч а 10 щ и и с  тем, что., с целью повышени  производительности способа, в период замачивани  грунта осуществл ют возведение на дренирующем слое пригруза, подачу воды ведут с вьщер (Живанием ее уровн , не доход щего до низа пригруза, а после проведени  замеров просадки грунта осуществл ют удаление .пригруза и дренирующего сло 1. Method of compaction of subsiding soils, mainly loess, including the formation of a pit, drilling of wells, laying within the pit of a drainage layer, supplying water through it into the soil with soaking the latter to a state of fluid consistency, placing explosive charges in wells, exploding In order to increase the productivity of the method, in the period of soaking of the soil, the weights are erected on the drainage layer , The flow of water lead to vscher (Zhivaniem its level does not reach to the bottom prigruza present, and after performing subsidence measurements performed .prigruza removing and draining layer 2.Способ по п. 1, ртличающ и и с   тем, что в качестве пригруза используют местный грунт.2. The method according to claim 1, rlichlich and with the fact that as a prigozu use local soil. 3.Способ по пп. 1 К 2, отличающийс  тем, что в качестве пригруза используют равномерно расположенные емкости с водой.3. Method according to paragraphs. 1 K 2, characterized in that uniform containers with water are used as a prigruz. Ис: очники информации, прин тые во внимание при экспертизеIs: data points taken into account during the examination 1. Авторское свидетельствоСССР № 18313.1, кл. Е 02 D 3/10, 1963.1. Copyright certificate USSR № 18313.1, cl. E 02 D 3/10, 1963. 2,Методические рекомендации по ускоренному уплотнению Просадочных лессовьЕ{ грунтов большой мощности предва рительным замачиванием и глубинными взрывами. Киев, НИИ СП Госстро  УССР 1977, с. Il-i9, 48.2, Methodical recommendations for the accelerated compaction of the Slump locks E {high-power soils by preliminary soaking and deep-seated explosions. Kiev, Scientific Research Institute SP Gosstro of the USSR 1977, p. Il-i9, 48.
SU813241390A 1981-01-28 1981-01-28 Method of consolidating sagging soils SU987028A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813241390A SU987028A1 (en) 1981-01-28 1981-01-28 Method of consolidating sagging soils

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813241390A SU987028A1 (en) 1981-01-28 1981-01-28 Method of consolidating sagging soils

Publications (1)

Publication Number Publication Date
SU987028A1 true SU987028A1 (en) 1983-01-07

Family

ID=20940655

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813241390A SU987028A1 (en) 1981-01-28 1981-01-28 Method of consolidating sagging soils

Country Status (1)

Country Link
SU (1) SU987028A1 (en)

Similar Documents

Publication Publication Date Title
CN108035335A (en) A kind of construction freezing method well shaft type underground parking garage method
CN106194195A (en) Collapsible Loess District large cross-section tunnel three step is without remaining core soil in advance construction method
SU946409A3 (en) Method for driving lower ends of sheet piles into base soil in erecting sheet piling wall
Abelev Compacting loess soils in the USSR
SU987028A1 (en) Method of consolidating sagging soils
SU1159981A1 (en) Method of consolidating sagging loess soil
RU2060321C1 (en) Method for erecting piles and device for erecting piles
SU1170042A1 (en) Method of consolidating sagging loess soil
RU2656656C2 (en) Method of bulk soil cementation
Buchanan DERWENT DAM-CONSTRUCTION.
SU850801A1 (en) Sagging soil compacting method
SU1125331A1 (en) Method of compacting sagging soils
SU1599481A1 (en) Method of erecting building foundation in heaving soil
SU941469A1 (en) Method of compacting loess soil
SU896180A1 (en) Method of consolidating sagging soil
RU2060320C1 (en) Method for compacting slightly cohesive soil with explosions
SU1723259A1 (en) Method of thickening sagging soil
RU2063077C1 (en) Radioactive waste burial method
SU945284A1 (en) Method of constructing cast-in-place pile
SU1392201A1 (en) Method of compacting sagging soil body
RU2588511C2 (en) Method for soil and device for its implementation
SU727743A1 (en) Quarry working method
SU1158663A1 (en) Method of layer-wise compacting of stone filling in dam construction
SU1114740A1 (en) Method for compacting sagging loess soil
JPS57108328A (en) Formation of basement