SU941469A1 - Method of compacting loess soil - Google Patents

Method of compacting loess soil Download PDF

Info

Publication number
SU941469A1
SU941469A1 SU813233997A SU3233997A SU941469A1 SU 941469 A1 SU941469 A1 SU 941469A1 SU 813233997 A SU813233997 A SU 813233997A SU 3233997 A SU3233997 A SU 3233997A SU 941469 A1 SU941469 A1 SU 941469A1
Authority
SU
USSR - Soviet Union
Prior art keywords
soil
wells
compacted
charges
slope
Prior art date
Application number
SU813233997A
Other languages
Russian (ru)
Inventor
Иван Андреевич Ульчич
Original Assignee
Научно-Исследовательский Институт Строительных Конструкций Госстроя Ссср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институт Строительных Конструкций Госстроя Ссср filed Critical Научно-Исследовательский Институт Строительных Конструкций Госстроя Ссср
Priority to SU813233997A priority Critical patent/SU941469A1/en
Application granted granted Critical
Publication of SU941469A1 publication Critical patent/SU941469A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

(54) СПОСОБ УПЛОТНЕНИЯ ПРОСАДОЧНОГО ЛЕССОВОГО ГРУНТА(54) METHOD OF SEALING PASSING LESS GROUND

1one

Изобретение относитс  к строительству зданий и сооружений на просадочных грунтах , в частности к уплотнению лессового грунта путем замачивани  и воздействи  The invention relates to the construction of buildings and structures on subsiding soils, in particular to the compaction of loess soil by soaking and

Ф энергией взрыва зар дов взрывчатого вещества .F is the explosion energy of explosive charges.

Известен способ уплотнени  просадочных лессовых грунтов путем предварительного замачивани  и последующего осущ ествлени  в грунте взрыва зар дов взрывчатого вещества 1 .A known method for compacting subsurface loess soils by pre-soaking and subsequently carrying out explosive charges 1 in the ground.

Наиболее близким к изобретению  вл етс  способ уплотнени  лессового грунта, включающий равномерное по площади бурение скважин на глубину в пределах толщины уплотн емого массива грунта, размещение в них зар дов взрывчатого вещества , замачивание грунта и осуществление взрыва зар дов 2.Closest to the invention is a method for compacting loess soil, which includes drilling wells that are evenly distributed throughout the depth within the thickness of the compacted soil mass, placing explosive charges in them, soaking the soil, and carrying out a charge explosion 2.

Недостаток указанных способов - невозможность применени  дл  уплотнени  массива грунта на склонах из-за повыщени  давлени  замоченного до текучего состо ни  массива грунта на ниже расположенный по склону незамоченный, что приводит к потере устойчивости уплотн емого массива.The disadvantage of these methods is the impossibility of applying for compacting the soil mass on the slopes due to an increase in the pressure of the soil mass wetted to a fluid state on the lower one located on the slope, which leads to a loss of stability of the compact mass.

при этом поверхность уплотн емого массива на склоне, опуска сь, сползает по нему, а это вызывает дополнительные трудозатраты на выполнение подготовительных работ по выравниванию поверхности при возведенииat the same time, the surface of the compacted massif on the slope, descending, slides along it, and this causes additional labor to perform the preparatory work on leveling the surface during the construction

фундамента зданий и сооружений. foundation of buildings and structures.

Цель изобретени  - повыщение устойчивости уплотн емого массива на склоне и снижение трудоемкости возведени  на нем фундамента.The purpose of the invention is to increase the stability of the compacted array on a slope and reduce the complexity of the construction of the foundation on it.

10 Указанна  цель достигаетс  тем, что согласно способу, включающему равномерное по площади бурение скважин, размещение в них зар дов взрывчатого вещества, замачивание грунта и осуществление взрыва зар дов дл  осадки замоченного грунта, бурение выщерасположенных по склону скважин производ т с входом в плотный нижележащий грунт, а остальных скважин - на глубину в пределах толщины уплотн емого массива грунта, размещение зар дов взрывчатого вещества в выщерасположенных по склону скважинах осуществл ют в пределах их части, расположенной в плотном грунте, а до или после замачивани  грунта ведут предварительное последовательное взрывание10 This goal is achieved in that according to the method, which includes equally well drilling, placing explosive charges in them, soaking the soil and exploding charges for precipitating wetted soil, drilling sloping wells that are well sloping and the remaining wells, to a depth within the thickness of the compacted soil mass, the placement of explosive charges in sloping wells located within their part, is located a second dense soil, and the soil before or after steeping are preliminary sequential blasting

дл  образовани  полостей в плотном грунте зар дов, размещенных в скважинах, расположенных выше по склону.for the formation of cavities in dense soil charges placed in wells located up the slope.

На фиг. 1 представлен общий вид участка уплотнени  и размещени  на нем скважин; на фиг. 2 - разрез А-А на фиг. 1 после увлажнени  грунта; на фиг. 3 - то же, после осуществлени  взрыва зар дов.FIG. 1 is a general view of the compaction section and the location of wells therein; in fig. 2 shows section A-A in FIG. 1 after wetting the ground; in fig. 3 - the same, after the explosion of charges.

Предложенный способ осуществл етс  следующим образом.The proposed method is carried out as follows.

На участке работ, расположенном на склоне, равномерно по его площади бур т скважины 1 и 2, первые из них размещают ниже по склону и бур т на глубину в пределах уплотн емого массива грунта, вторые бур т выще по склону и заглубл ют в плотный нижележащий грунт 3. В скважины 1 и 2 опускают зар дные трубы 4, пространство между трубами и стенкой скважин 1 и 2 заполн ют дренирующим материалом 5 и через него производ т замачивание уплотн емого грунта до текучей консистенции. По окончании замачивани  грунта в трубы 4 скважин 1 опускают зар ды 6, а скважин 2 - зар ды 7, при этом верх зар да 7 размещают от поверхности плотного грунтаAt the work site located on a slope, wells 1 and 2 are drilled evenly over its area, the first of them are placed down the slope and drilled to a depth within the compacted array of soil, the second ones are higher down the slope and are buried in a dense underlying soil 3. In wells 1 and 2, charge pipes 4 are lowered, the space between the pipes and the walls of wells 1 and 2 is filled with drainage material 5 and compacted soil is soaked through it to a fluid consistency. At the end of the soaking of the soil, the pipes 4 of the wells 1 lower the charges 6, and the wells 2 - the charges 7, while the top of the charge 7 is placed from the surface of the dense soil

3на рассто нии, не превышающем радиус образуемой при взрыве этого зар да полости 8.3 at a distance not exceeding the radius of the cavity formed by the explosion of this charge 8.

После замачивани  уплотн емого массива грунта осуществл ют поэтапное взрывание зар дов 6 и 7. На первом этапе ведут последовательное взрывание зар дов 7 дл  образовани  полостей 8, затем взрывают зар ды 6, в результате чего уплотн емый массив грунта оседает и уплотн етс  под собственным весом, при этом увлажненный до текучей консистенции грунт заполн ет полости 8, что приводит к образованию горизонтальной поверхности уплотненного массива. Оставшиес  в грунте после взрыва зар дов 6 и 7 верхние части трубAfter soaking the compacted soil mass, the bombs 6 and 7 are gradually detonated. At the first stage, the bombs 7 are sequentially detonated to form the cavities 8, then the 6 bursts explode, resulting in the compacted soil mass collapsing At the same time, the soil moistened to a fluid consistency fills the cavities 8, which leads to the formation of a horizontal surface of the compacted array. The charges 6 and 7 of the upper parts of the pipes remaining in the ground after the explosion

4извлекают. В цел х снижени  сейсмического воздействи  на устойчивость нижележащего по склону грунта взрывание зар дов4 recover. In order to reduce the seismic effect on the stability of the underlying slope of the soil, blasting charges

7, особенно на склонах с больщим уклоном, может осуществл тьс  до замачивани  грунта , при этом образующиес  при взрыве полости 8 будут полностью заполнены грунтом также после взрыва зар дов 6.7, especially on slopes with a large incline, can be carried out before the soil is soaked, while the cavities 8 formed during the explosion will be completely filled with soil 6 as well after the explosion.

Така  последовательность выполнени  способа с образованием в нижележащем плотном грунте полостей, заполн емых уплотн емым грунтом, обеспечивает разную осадку грунта на склоне с выравниванием его поверхности до горизонтальной и снижает сейсмическое воздействие на нижележащий массив грунта, что позвол ет повысить устойчивость уплотн емого массива и снизить трудоемкость подготовки поверхности уплотненного массива к воздействию на нем фундамента здани  или сооружени .Such a sequence of the method with the formation of cavities in the underlying dense soil, filled with compacted soil, provides a different sediment of the soil on the slope with its surface leveling to horizontal and reduces the seismic effect on the underlying soil mass, which improves the stability of the compacted array and reduces labor intensity preparing the surface of the compacted massif to affect the foundation of the building or structure on it.

Claims (2)

1.Авторское свидетельство СССР J№ 183131, кл. Е 02 D 3/10, 1963.1. USSR author's certificate J№ 183131, cl. E 02 D 3/10, 1963. 2.Авторское свидетельство СССР № 776112, кл. Е 02 D 3/10, 1978.2. USSR author's certificate number 776112, cl. E 02 D 3/10, 1978. lili
SU813233997A 1981-01-05 1981-01-05 Method of compacting loess soil SU941469A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813233997A SU941469A1 (en) 1981-01-05 1981-01-05 Method of compacting loess soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813233997A SU941469A1 (en) 1981-01-05 1981-01-05 Method of compacting loess soil

Publications (1)

Publication Number Publication Date
SU941469A1 true SU941469A1 (en) 1982-07-07

Family

ID=20937942

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813233997A SU941469A1 (en) 1981-01-05 1981-01-05 Method of compacting loess soil

Country Status (1)

Country Link
SU (1) SU941469A1 (en)

Similar Documents

Publication Publication Date Title
US2236759A (en) Compacting soil
SU941469A1 (en) Method of compacting loess soil
Abelev Compacting loess soils in the USSR
RU2635421C1 (en) Method of transforming construction properties of low-bound watered grounds by explosion of explosive charges
SU866099A1 (en) Method of driving wells in earth
SU896180A1 (en) Method of consolidating sagging soil
SU1346729A1 (en) Method of forming contour trench
RU2060320C1 (en) Method for compacting slightly cohesive soil with explosions
SU1534139A2 (en) Method of compacting the body of sagging soil
SU861471A1 (en) Method of windening pile
SU1599481A1 (en) Method of erecting building foundation in heaving soil
SU850800A1 (en) Sagging soil compacting method
SU1159981A1 (en) Method of consolidating sagging loess soil
RU2037602C1 (en) Method to manufacture club-footed piles
RU2186904C1 (en) Process of ground compaction
SU813991A1 (en) Method of driving sinking well into ground
SU572094A1 (en) Method of thickening saggeloess grounds
RU2062834C1 (en) Method for consolidating water-side landslide slope
SU1170042A1 (en) Method of consolidating sagging loess soil
SU1758161A1 (en) Method of consolidating sagged loessial soil
SU987028A1 (en) Method of consolidating sagging soils
SU937610A1 (en) Method of compacting sagging soil body
SU962443A1 (en) Method of consolidating sagging soil under building foundations
SU1125331A1 (en) Method of compacting sagging soils
SU850801A1 (en) Sagging soil compacting method