SU866099A1 - Method of driving wells in earth - Google Patents
Method of driving wells in earth Download PDFInfo
- Publication number
- SU866099A1 SU866099A1 SU802866546A SU2866546A SU866099A1 SU 866099 A1 SU866099 A1 SU 866099A1 SU 802866546 A SU802866546 A SU 802866546A SU 2866546 A SU2866546 A SU 2866546A SU 866099 A1 SU866099 A1 SU 866099A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- blasting
- charge
- explosion
- action
- well
- Prior art date
Links
Landscapes
- Piles And Underground Anchors (AREA)
Description
Изобретение относится к строительству и может быть использовано для образования посредством взрыва различных скважин и камуфпетных уширений в грунте.The invention relates to the construction and can be used for the formation by explosion of various wells and camouflage broadening in the ground.
Известен способ образования уширений предварительно пробуренных скважин, включающий установку заряда на дно скважины, заполнение ее бетоном и взрывание заряда [1].A known method of generating broadening of pre-drilled wells, including installing a charge on the bottom of the well, filling it with concrete and blasting the charge [1].
Однако такой способ применим для устройства свайных фундаментов и не может использоваться для проведения выработок.However, this method is applicable for the construction of pile foundations and cannot be used for mine workings.
Наиболее близким по технической сущности и достигаемому результату к изобретению является способ проходки скважин, включающий последовательное взрывание зарядов бризантного действия в среде закрепляющего раствора [2]·The closest in technical essence and the achieved result to the invention is a method of sinking wells, comprising sequentially blasting charges of blasting action in the medium of a fixing solution [2] ·
Основным недостатком известного способа является образование скважины бТупенчатой формы в продольном сечении .The main disadvantage of this method is the formation of b-shaped wells in a longitudinal section.
Цель изобретения - повышение эффективности проходки.The purpose of the invention is to increase the efficiency of sinking.
Поставленная цель достигается тем, 5 что в известном способе проходки скважин, включающем последовательное взрывание зарядов бризантного действия в среде закрепляющего раствора, после взрывания каждого заряда бри0 зантного действия производят взрывание заряда метательного действия.The goal is achieved by the fact that 5 the known method of making holes, comprising successive blasting charge blasting action in the medium of the fixing solution after each blasting charge brie 0 zantnogo actions produce propellant charge blasting action.
Проходку скважин предлагаемым способом производят следующим образом.The drilling of the proposed method is as follows.
На поверхности грунта, с которой 5 начинается проходка скважины, размещают заряд бризантного действия и закрепляющую среду, при этом обеспечивают действие продуктов взрыва только в сторону грунта. После этого за- ® ряд взрывают, а после прекращения действия газообразных продуктов взрыва данного заряда на грунт, взрывают заряд метательного действия.On the surface of the soil, from which 5 the sinking of the well begins, a blasting charge and a fixing medium are placed, while the action of the explosion products is provided only in the direction of the soil. After that, the charge is blown up, and after the termination of the action of the gaseous products of the explosion of a given charge on the ground, a propellant charge is blown up.
Взрывоимпульсное давление на грунт полости, образованной взрывом заряда бризантного действия, способствует обсадке скважины и достижению скважины цилиндрической формы.Explosive-pulsed pressure on the soil of the cavity formed by the explosion of a blast of a blasting charge promotes casing of the well and the achievement of the cylindrical well.
В дальнейшем проходку ведут повторением описанных операций.Further driving is carried out by repeating the described operations.
Использование изобретения позволяет выполнять взрывом скважины с цилиндрической поверхностью, исклю-. чить буровые работы для образования пионерных скважин и значительно повысить прочность стенок скважины.The use of the invention allows the explosion of a well with a cylindrical surface, except. read drilling operations to form pioneer wells and significantly increase the strength of well walls.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802866546A SU866099A1 (en) | 1980-01-04 | 1980-01-04 | Method of driving wells in earth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802866546A SU866099A1 (en) | 1980-01-04 | 1980-01-04 | Method of driving wells in earth |
Publications (1)
Publication Number | Publication Date |
---|---|
SU866099A1 true SU866099A1 (en) | 1981-09-23 |
Family
ID=20870864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802866546A SU866099A1 (en) | 1980-01-04 | 1980-01-04 | Method of driving wells in earth |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU866099A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106906828A (en) * | 2017-03-31 | 2017-06-30 | 中国建筑土木建设有限公司 | Blasting construction method for ice layer underwater bridge foundation pit |
RU2641684C1 (en) * | 2017-03-07 | 2018-01-19 | Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук | Method of manufacturing piles with widened heel |
WO2021169038A1 (en) * | 2020-02-28 | 2021-09-02 | 青岛理工大学 | Deep foundation pit blasting vibration velocity risk level big data evaluation method |
-
1980
- 1980-01-04 SU SU802866546A patent/SU866099A1/en active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2641684C1 (en) * | 2017-03-07 | 2018-01-19 | Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук | Method of manufacturing piles with widened heel |
CN106906828A (en) * | 2017-03-31 | 2017-06-30 | 中国建筑土木建设有限公司 | Blasting construction method for ice layer underwater bridge foundation pit |
CN106906828B (en) * | 2017-03-31 | 2018-09-18 | 中国建筑土木建设有限公司 | Blasting construction method for ice layer underwater bridge foundation pit |
WO2021169038A1 (en) * | 2020-02-28 | 2021-09-02 | 青岛理工大学 | Deep foundation pit blasting vibration velocity risk level big data evaluation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1123726A (en) | Explosive fracturing of deep rock | |
SU866099A1 (en) | Method of driving wells in earth | |
CN109322683A (en) | Underground Large chamber medium-length hole controls blasting construction method | |
CN209263807U (en) | Micro-vibration rock and soil blasting structure | |
US4135450A (en) | Method of underground mining | |
US4550786A (en) | Method of driving steel profiles into a rock substratum | |
RU2186904C1 (en) | Process of ground compaction | |
RU2066741C1 (en) | Method for production of oil or gas | |
SU941469A1 (en) | Method of compacting loess soil | |
SU909173A1 (en) | Method of directing artificial pillars | |
RU2058464C1 (en) | Method for making foundation | |
RU2081240C1 (en) | Method for erecting cast-in-place pile | |
SU866101A1 (en) | Method of setting charge into unstable rock for simulating seismic action | |
RU2060320C1 (en) | Method for compacting slightly cohesive soil with explosions | |
RU2021518C1 (en) | Method for erection of wall of underground structure | |
RU2136816C1 (en) | Ground compaction method | |
SU1656130A1 (en) | Method of driving the under-vault part of large-span underground structure | |
SU968411A1 (en) | Method of constructing a wall in soil | |
SU898080A1 (en) | Mine shaft sinking method | |
RU2097679C1 (en) | Method of driving of mine working | |
SU1640514A1 (en) | Method of backfilling voids | |
SU850800A1 (en) | Sagging soil compacting method | |
RU2055209C1 (en) | Method for creating underground drifts such as tunnels | |
SU126780A1 (en) | The method of construction of narrow trenches with vertical walls in bonded soils by the explosive method | |
SU1190068A1 (en) | Method of erecting artificial pillar |