TWM635434U - Quick-build beam-column forming combination structure - Google Patents

Quick-build beam-column forming combination structure Download PDF

Info

Publication number
TWM635434U
TWM635434U TW111209140U TW111209140U TWM635434U TW M635434 U TWM635434 U TW M635434U TW 111209140 U TW111209140 U TW 111209140U TW 111209140 U TW111209140 U TW 111209140U TW M635434 U TWM635434 U TW M635434U
Authority
TW
Taiwan
Prior art keywords
surrounding
steel bar
main
steel bars
bar groups
Prior art date
Application number
TW111209140U
Other languages
Chinese (zh)
Inventor
呂福元
呂盈瑩
呂建輝
薛恩妤
李政育
簡順展
柯如娟
王彩竹
Original Assignee
鉅昕鋼鐵股份有限公司
承錡鋼鐵股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 鉅昕鋼鐵股份有限公司, 承錡鋼鐵股份有限公司 filed Critical 鉅昕鋼鐵股份有限公司
Priority to TW111209140U priority Critical patent/TWM635434U/en
Publication of TWM635434U publication Critical patent/TWM635434U/en

Links

Images

Abstract

本薪型快搭式樑柱成型組合結構,其包含有至少二鋼筋組,複數將該等鋼筋組予以支撐定位之定位件,以及複數定位於該鋼筋組外圍之網模;其中,該鋼筋組具有複數間隔設置之主鋼筋、環繞單元、連接單元,且該等環繞單元與該等連接單元共構形成一呈連續彎折以環繞於該等主鋼筋外圍並與該等主鋼筋焊接固定之箍筋,且該每一鋼筋組之箍筋環繞於該等主鋼筋時以圈圍出一容置空間,該等鋼筋組所形成之容置空間大小不同以供該等鋼筋組呈內、外層之套設配置並焊接,而成型後之該等鋼筋組係以快搭方式搭配該定位件與該網模,而快速組成一強度極佳之樑柱組合結構,得以快速搬運至施工現場進行施作。This type of quick-build beam-column forming composite structure includes at least two steel bar groups, a plurality of spacers for supporting and positioning these steel bar groups, and a plurality of mesh forms positioned on the periphery of the steel bar groups; wherein, the steel bar groups There are a plurality of main steel bars, surrounding units, and connecting units arranged at intervals, and the surrounding units and the connecting units are jointly configured to form a stirrup that is continuously bent to surround the periphery of the main steel bars and welded to the main steel bars and the stirrups of each steel bar group surround the main steel bars to enclose an accommodation space. The accommodation spaces formed by the steel bar groups are of different sizes for the inner and outer layers of the steel bar groups. Set up, configure and weld, and the formed steel bars are matched with the positioning piece and the mesh formwork in a quick way to quickly form a beam-column composite structure with excellent strength, which can be quickly transported to the construction site for construction .

Description

快搭式樑柱成型組合結構Quick-build beam-column forming composite structure

本創作係有關於一種組成結構,特別是一種快搭式樑柱成型組合結構。This creation is about a composition structure, especially a quick-build beam-column forming composite structure.

一般以鋼筋混凝土骨架進行建築營造時,通常是在施工現場架設鋼筋及模板,而後灌入混凝土形成支柱,即使在施工營造時,需在每根支柱的基座位置預先固定好鋼筋,再由施工人員一一進行複數箍筋的捆綁定位後,最後再架設固定模板,以便後續進行灌漿作業,且需等到模板內的混凝土凝固後,才可進行下一工程,故在建築時間上稍嫌緩慢,易延長施工時間;再者,由施工人員進行鋼筋捆綁時,該鋼筋通常又分成內外層,必須先由外層捆綁後,再利用該外層中的縫隙去捆綁內層的鋼筋,除了施工難度高且不便外,造成捆綁過程費工費時外,且捆綁也受限施工所限制,無法以一體式進行捆綁,因此,如何能使現場施工速度增加,以及又可增加樑柱之強度,為眾所努力之目標。Generally, when a reinforced concrete skeleton is used for building construction, steel bars and formwork are usually erected on the construction site, and then concrete is poured to form pillars. After the personnel bound and positioned the multiple stirrups one by one, the fixed formwork was finally erected for subsequent grouting operations, and the next project could not be carried out until the concrete in the formwork was solidified, so the construction time was a bit slow. It is easy to prolong the construction time; moreover, when the steel bars are bound by the construction personnel, the steel bars are usually divided into inner and outer layers, which must be bound by the outer layer first, and then use the gaps in the outer layer to bind the inner layer of steel bars. In addition to the inconvenience, the bundling process is labor-intensive and time-consuming, and the bundling is also limited by the construction, and it cannot be bundled in one piece. Therefore, how to increase the speed of on-site construction and increase the strength of beams and columns is a public effort. target.

因此,本新型之目的,是在提供一種快搭式樑柱成型組合結構,其能先有效提高該樑柱成型組合結構之強度,且現場施作具有快速搭建效果。Therefore, the purpose of the present invention is to provide a quick-build beam-column forming combined structure, which can effectively improve the strength of the beam-column forming combined structure, and the on-site construction has a rapid construction effect.

於是,本新型快搭式樑柱成型組合結構,其包含有至少二鋼筋組,複數將該等鋼筋組予以支撐定位之定位件,以及複數定位於該鋼筋組外圍之網模;其中,每一該鋼筋組具有複數間隔設置之主鋼筋,複數環繞於該等主鋼筋外圍並與該等主鋼筋呈焊接定位之環繞單元,以及複數一體連接於該等環繞單元並與該等主鋼筋呈焊接定位之連接單元,每一環繞單元係一體彎折以環繞於該等主鋼筋外圍,該每一環繞單元經彎折後即具有複數延伸於任二相鄰主鋼筋之間之環繞段,且每一環繞段呈直線延伸態樣,每一連接單元傾斜地延伸於任二相鄰環繞單元之間,因而該等環繞單元與該等連接單元共構形成一呈連續彎折以環繞於該等主鋼筋外圍並與該等主鋼筋焊接固定之箍筋,該每一鋼筋組之箍筋環繞於該等主鋼筋時以圈圍出一容置空間,且該等鋼筋組所形成之容置空間大小不同以供該等鋼筋組呈內、外層之套設配置,該等定位件分別固定於該等鋼筋組以使該等鋼筋組呈相互間隔設置,該等網模分別固定於該等定位件,以便該等網模透過該等定位件以固定於位於最外層之該鋼筋組的外圍;是以,該快搭式樑柱成型組合結構可於工廠內先進行施作成型後,直接到現場內即可作為樑柱所使用,同時由於該等主鋼筋外圍之環繞單元及連接單元係由一體之設計,即由該箍筋環繞於該等主鋼筋所形成,更能提高該快搭式樑柱成型組合結構之強度,且該快搭式樑柱成型組合結構後續可直接進行灌漿,更能有效提升施作之速度。Thus, the novel quick-build beam-column forming composite structure comprises at least two steel bar groups, a plurality of spacers for supporting and positioning these steel bar groups, and a plurality of mesh molds positioned on the periphery of the steel bar groups; wherein, each The reinforcement group has a plurality of main reinforcements arranged at intervals, a plurality of surrounding units surrounding the periphery of the main reinforcements and welded to the main reinforcements, and a plurality of surrounding units integrally connected to the surrounding units and welded to the main reinforcements. The connecting unit, each surrounding unit is bent integrally to surround the periphery of the main steel bars, each surrounding unit has a plurality of surrounding sections extending between any two adjacent main steel bars after bending, and each The surrounding section extends in a straight line, and each connecting unit extends obliquely between any two adjacent surrounding units, so that the surrounding units and the connecting units are co-configured to form a continuous bend to surround the periphery of the main steel bars The stirrups are welded and fixed with the main steel bars. When the stirrups of each steel bar group surround the main steel bars, they enclose an accommodation space, and the accommodation space formed by the steel bar groups is different in size. For the arrangement of the inner and outer layers of the steel bars, the positioning pieces are respectively fixed to the steel bars so that the steel bars are spaced apart from each other, and the mesh forms are respectively fixed to the spacers so that the The net mold is fixed on the periphery of the outermost steel bar group through the positioning parts; therefore, the quick-build beam-column forming composite structure can be formed in the factory first, and then it can be directly sent to the site It is used as a beam column, and because the surrounding unit and connecting unit around the main steel bars are designed in one piece, that is, the stirrup is formed by surrounding the main steel bars, which can improve the quick-set beam-column forming combination The strength of the structure, and the quick-build beam-column forming composite structure can be directly grouted later, which can effectively increase the speed of construction.

有關本新型之前述及其他技術內容、特點與功效,在以下配合參考圖式之較佳實施例的詳細說明中,將可清楚的明白。The aforementioned and other technical contents, features and effects of the present invention will be clearly understood in the following detailed description of preferred embodiments with reference to the drawings.

參閱圖1、圖2,本新型之第一較佳實施例,本實施例快搭式樑柱成型組合結構3包含有至少二鋼筋組31,複數將該等鋼筋組31予以支撐定位之定位件32,以及複數定位於該鋼筋組31外圍之網模33;其中,每一該鋼筋組31具有複數間隔設置之主鋼筋311,複數環繞於該等主鋼筋311外圍並與該等主鋼筋311呈焊接定位之環繞單元313,以及複數一體連接於該等環繞單元313並與該等主鋼筋311呈焊接定位之連接單元314,而前述該每一環繞單元313係一體彎折以環繞於該等主鋼筋311外圍,該每一環繞單元313經彎折後即具有複數延伸於任二相鄰主鋼筋311之間之環繞段3131,且每一環繞段3131呈直線延伸態樣,每一連接單元314傾斜地延伸於任二相鄰環繞單元313之間,因而該等環繞單元313與該等連接單元314共構形成一呈連續彎折以環繞於該等主鋼筋311外圍並與該等主鋼筋311焊接固定之箍筋312,因而使該箍筋312可呈一連續多圈環繞模式以將該等主鋼筋311予以環繞。Referring to Fig. 1 and Fig. 2, the first preferred embodiment of the present invention, the quick-build beam-column forming composite structure 3 of this embodiment includes at least two reinforcing bar groups 31, and a plurality of locating parts that support and position these reinforcing bar groups 31 32, and a plurality of mesh forms 33 positioned on the periphery of the reinforcing bar group 31; wherein, each of the reinforcing bar groups 31 has a plurality of main reinforcing bars 311 arranged at intervals, and a plurality of them surrounds the outer periphery of the main reinforcing bars 311 and forms a shape with the main reinforcing bars 311 Surrounding units 313 welded and positioned, and a plurality of connecting units 314 integrally connected to these surrounding units 313 and welded to these main steel bars 311, and each of the aforementioned surrounding units 313 is integrally bent to surround the main steel bars 311 On the periphery of the steel bar 311, each surrounding unit 313 has a plurality of surrounding sections 3131 extending between any two adjacent main steel bars 311 after being bent, and each surrounding section 3131 is in a straight line extending state, and each connecting unit 314 Extending obliquely between any two adjacent surrounding units 313, so that the surrounding units 313 and the connecting units 314 are co-configured to form a continuous bend to surround the periphery of the main steel bars 311 and weld with the main steel bars 311 The stirrups 312 are fixed so that the stirrups 312 can be in a continuous multi-circle pattern to surround the main steel bars 311.

仍續前述,於本實施例中,該每一環繞單元313係基於同一水平位置以環繞於該等主鋼筋311之外圍,即如圖中所示是以每一環繞單元313具有三個環繞段3131為例,該等環繞段3131位於相同高度上,以便該每一環繞單元313基於同一水平位置以環繞於該等主鋼筋311之外圍,而不同環繞單元313則處於不同水平位置上;另,即每一連接單元314可傾斜於該等主鋼筋311,以便任一連接單元314係傾斜地從任一環繞單元313之一環繞段3131延伸至另一相鄰環繞單元313之另一環繞段3131上;再者,於本實施例中,該每一鋼筋組31之箍筋312環繞於該等主鋼筋311時以圈圍出一容置空間315,且該等鋼筋組31所形成之容置空間315大小不同以供該等鋼筋組31呈內、外層之套設配置,即可提供更小外徑成形之鋼筋組31伸至於該容置空間315內,而本實施例中,係以設置有兩個鋼筋組31為例說明;至於,該等定位件32分別固定於該等鋼筋組31以使該等鋼筋組31呈相互間隔設置,該等網模33分別固定於該等定位件32,以便該等網模33透過該等定位件32以固定於位於最外層之該鋼筋組31的外圍。Continuing from the above, in this embodiment, each surrounding unit 313 is based on the same horizontal position to surround the periphery of the main steel bars 311, that is, as shown in the figure, each surrounding unit 313 has three surrounding segments 3131 as an example, the surrounding sections 3131 are located at the same height, so that each surrounding unit 313 surrounds the periphery of the main steel bars 311 based on the same horizontal position, while different surrounding units 313 are at different horizontal positions; That is, each connecting unit 314 can be inclined to the main steel bars 311, so that any connecting unit 314 extends obliquely from one surrounding section 3131 of any surrounding unit 313 to another surrounding section 3131 of another adjacent surrounding unit 313 Furthermore, in this embodiment, the stirrup 312 of each steel bar group 31 surrounds the main steel bars 311 to encircle an accommodating space 315, and the accommodating space formed by these steel bar groups 31 315 are different in size for these steel bar groups 31 to be the inner and outer layers of sleeve configuration, which can provide smaller outer diameter shaped steel bar groups 31 stretching into the accommodation space 315, and in the present embodiment, the system is provided with Two reinforcing bar groups 31 are taken as an example; as for, these positioning parts 32 are respectively fixed on these reinforcing bar groups 31 so that these reinforcing bar groups 31 are arranged at mutual intervals, and these net molds 33 are respectively fixed on these positioning parts 32, So that the mesh forms 33 pass through the positioning pieces 32 to be fixed on the outer periphery of the reinforcing bar group 31 located in the outermost layer.

參閱圖1、圖2,該快搭式樑柱成型組合結構之鋼筋組31與該定位件32及該網模33等,其可於工廠內利用一成型設備先製作成型,即將該等主鋼筋311排列後,再直接利用一成型設備彎折該箍筋312,而該環繞單元313與該連接單元314環繞於該等主鋼筋311上,並且同時使該環繞單元313、連接單元314同時與該主鋼筋311相互焊接,同時將外徑較小之鋼筋組31置入該外徑較大之鋼筋組31的容置空間315內,而後再透過該定位件32將該定位件32橫跨於該等不同外徑之鋼筋組31上,再透過該等定位件32分別連接該等鋼筋組31後予以相互焊接固定,而使該等複數鋼筋組31因該等定位件32呈現間隔固定狀態,即該每一定位件32連接固定於該環繞單元313與另一該鋼筋組31之環繞單元313,或者連接單元314與另一該鋼筋組31之連接單元314上,而該網模33再與該等定位件32相互連接固定,使該網模33透過該等定位件32連接後而包覆固定於最外層之該鋼筋組31的外周圍,如此將完成該快搭式樑柱成型組合結構3,而該快搭式樑柱成型組合結構3可於工廠組裝焊接完成後,到施工現場時即可作為樑柱使用,能有效提升施作之速度外,同時由位於該等主鋼筋311外圍之環繞單元313及連接單元314係由一體之設計,即由該箍筋312環繞於該等主鋼筋311所形成,同時又具有二鋼筋組31套設,且透過該等定位件32相互將該等鋼筋組31焊接固定,更能提高該快搭式樑柱成型組合結構3之強度外;再者,透過該等網模33之設計下,即可阻擋水泥灌漿料,而不需如同習知在採用傳統架板模之方式,而當水泥灌漿料灌漿後,該網模也不需再進行拆卸,同時該網模上的孔洞可提供水泥灌漿料滲出與乾燥,而滲出於該網模33外的水泥灌漿料亦可透過直接粉光該水泥灌漿料之方式,即可形成一平整的牆面所使用,以達到快速組裝及提高現場施作速度。Referring to Fig. 1 and Fig. 2, the reinforcing bar group 31, the positioning part 32 and the net mold 33 etc. of the quick-set beam-column forming composite structure can be formed by using a forming equipment in the factory, that is, the main reinforcing bars 311 are arranged, and then directly use a forming equipment to bend the stirrup 312, and the surrounding unit 313 and the connecting unit 314 surround the main steel bars 311, and at the same time make the surrounding unit 313, connecting unit 314 and the The main steel bars 311 are welded to each other, and at the same time, the steel bar group 31 with a smaller outer diameter is placed in the accommodation space 315 of the steel bar group 31 with a larger outer diameter. The steel bar groups 31 with different outer diameters are connected to the steel bar groups 31 through the positioning pieces 32 and then welded and fixed to each other, so that the plurality of steel bar groups 31 are fixed at intervals due to the positioning pieces 32, that is, This each positioning member 32 is connected and fixed on the surrounding unit 313 of the surrounding unit 313 and another reinforcement group 31, or the connection unit 314 and the connection unit 314 of another reinforcement group 31, and the mesh form 33 is connected with the reinforcement group 31 again. The positioning parts 32 are connected and fixed to each other, so that the mesh formwork 33 is covered and fixed on the outer periphery of the steel bar group 31 of the outermost layer after being connected through the positioning parts 32, so that the quick-build beam-column forming composite structure 3 will be completed. , and the quick-build beam-column forming combined structure 3 can be used as a beam-column when it arrives at the construction site after being assembled and welded in the factory. The surrounding unit 313 and the connecting unit 314 are designed in one piece, that is, the stirrups 312 are formed around the main steel bars 311, and at the same time, there are two steel bar groups 31 sleeved, and the positioning parts 32 mutually connect these The steel bar group 31 is welded and fixed, which can further improve the strength of the quick-build beam-column forming composite structure 3; moreover, through the design of the mesh molds 33, the cement grouting material can be blocked, without the need to Adopt the method of traditional formwork, and when the cement grouting material is grouted, the net formwork does not need to be disassembled, and the holes on the net formwork can allow the cement grouting material to seep and dry, and seep out of the net formwork 33 The cement grouting material can also be used to form a flat wall surface by directly powdering the cement grouting material, so as to achieve rapid assembly and increase the speed of on-site construction.

參閱圖3,本新型之第二較佳實施例,快搭式樑柱成型組合結構3仍包含有複數鋼筋組31、定位件32及網模33等構件,且前述構件、連接關係及欲達成之功效均與第一實施例相同,特別是,本實施例中,該鋼筋組31與該定位件32間設置有複數固定筋34,以增加該等鋼筋組31之連接固定,而該固定筋34可分別設置於該等鋼筋組31上的箍筋312上,使得該固定筋34兩端分別連接該等鋼筋組31之環繞單元313或該連接單元314上,以藉由該固定筋34以使該複數鋼筋組31更緊密結合固定,使整體結構更加穩固,提高該快搭式樑柱成型組合結構3之強度。Referring to Fig. 3, the second preferred embodiment of the present invention, the quick take-up type beam-column forming combined structure 3 still comprises components such as plural reinforcing bar groups 31, spacer 32 and mesh formwork 33, and aforementioned components, connection relationship and desire to achieve The effects are all the same as those of the first embodiment. In particular, in this embodiment, a plurality of fixing ribs 34 are arranged between the reinforcing bar group 31 and the positioning member 32 to increase the connection and fixing of these reinforcing bar groups 31, and the fixing ribs 34 can be respectively arranged on the stirrups 312 on the reinforcement groups 31, so that the two ends of the fixing reinforcement 34 are respectively connected to the surrounding unit 313 or the connection unit 314 of the reinforcement reinforcement groups 31, so that the fixing reinforcement 34 can The plurality of steel bar groups 31 are more closely combined and fixed, so that the overall structure is more stable, and the strength of the quick-build beam-column forming composite structure 3 is improved.

歸納前述,本新型快搭式樑柱成型組合結構,其主要藉由至少該二鋼筋組,複數將該等鋼筋組予以支撐定位之定位件,以及複數定位於該鋼筋組外圍之網模,透過該鋼筋組包括有複數主鋼筋,複數環繞於該等主鋼筋外圍並與該等主鋼筋呈焊接定位之環繞單元,以及複數一體連接於該等環繞單元並與該等主鋼筋呈焊接定位之連接單元,每一環繞單元係一體彎折以環繞於該等主鋼筋外圍,該每一環繞單元經彎折後即具有複數延伸於任二相鄰主鋼筋之間之環繞段,而前述該連接單元與該環繞單元形成一呈連續彎折以環繞於該等主鋼筋外圍並與該等主鋼筋焊接固定之箍筋,即由該箍筋之設計下,更能提高該快搭式樑柱成型組合結構之強度外,再者現場內即可作為樑柱所使用,且該網模灌漿後亦可不須拆卸,故能有效提升施作之速度,故的確能達到本新型之目的To sum up the above, the new type of quick-build beam-column forming composite structure mainly consists of at least the two steel bar groups, a plurality of positioning parts that support and position these steel bar groups, and a plurality of mesh forms positioned on the periphery of the steel bar groups. The reinforcement group includes a plurality of main reinforcements, a plurality of surrounding units surrounding the periphery of the main reinforcements and welded to the main reinforcements, and a plurality of connections integrally connected to the surrounding units and welded to the main reinforcements Units, each surrounding unit is integrally bent to surround the periphery of the main steel bars, each surrounding unit has a plurality of surrounding sections extending between any two adjacent main steel bars after bending, and the aforementioned connecting unit A stirrup that is continuously bent with the surrounding unit to surround the periphery of the main steel bars and is welded and fixed with the main steel bars, that is, the design of the stirrup can further improve the quick-lap beam-column forming combination In addition to the strength of the structure, it can be used as beams and columns on site, and the net formwork does not need to be disassembled after grouting, so it can effectively increase the speed of construction, so it can indeed achieve the purpose of the new model

惟以上所述者,僅為說明本新型之較佳實施例而已,當不能以此限定本新型實施之範圍,即大凡依本新型申請專利範圍及新型說明書內容所作之簡單的等效變化與修飾,皆應仍屬本新型專利涵蓋之範圍內。But the above is only to illustrate the preferred embodiments of the present invention, and should not limit the scope of implementation of the present invention, that is, all the simple equivalent changes and modifications made according to the patent scope of the present application and the content of the new specification , all should still fall within the scope covered by the patent for this model.

[本新型] 3:快搭式樑柱成型組合結構 31:鋼筋組 32:定位件 33:網模 34:固定筋 311:主鋼筋 312:箍筋 313:環繞單元 314:連接單元 315:容置空間 3131:環繞段 [this new type] 3: Quick-build beam-column forming composite structure 31: Reinforcement group 32: Positioning piece 33: mesh model 34: fixed rib 311: main reinforcement 312: Stirrup 313: surround unit 314: connection unit 315:Accommodating space 3131: surround segment

圖1為本新型第一較佳實施例之立體示意圖。 圖2為本新型第一較佳實施例之平面示意圖。 圖3為本新型第二較佳實施例之平面示意圖。 Fig. 1 is a three-dimensional schematic view of the first preferred embodiment of the present invention. Fig. 2 is a schematic plan view of the first preferred embodiment of the present invention. Fig. 3 is a schematic plan view of a second preferred embodiment of the present invention.

3:快搭式樑柱成型組合結構 3: Quick-build beam-column forming composite structure

31:鋼筋組 31: Reinforcement group

32:定位件 32: Positioning piece

33:網模 33: mesh model

311:主鋼筋 311: main reinforcement

312:箍筋 312: Stirrup

313:環繞單元 313: surround unit

314:連接單元 314: connection unit

315:容置空間 315:Accommodating space

3131:環繞段 3131: surround segment

Claims (4)

一種快搭式樑柱成型組合結構,其包含有至少二鋼筋組,複數將該等鋼筋組予以支撐定位之定位件,以及複數定位於該鋼筋組外圍之網模;其中,每一該鋼筋組具有複數間隔設置之主鋼筋,複數環繞於該等主鋼筋外圍並與該等主鋼筋呈焊接定位之環繞單元,以及複數一體連接於該等環繞單元並與該等主鋼筋呈焊接定位之連接單元,每一環繞單元係一體彎折以環繞於該等主鋼筋外圍,該每一環繞單元經彎折後即具有複數延伸於任二相鄰主鋼筋之間之環繞段,且每一環繞段呈直線延伸態樣,每一連接單元傾斜地延伸於任二相鄰環繞單元之間,因而該等環繞單元與該等連接單元共構形成一呈連續彎折以環繞於該等主鋼筋外圍並與該等主鋼筋焊接固定之箍筋,該每一鋼筋組之箍筋環繞於該等主鋼筋時以圈圍出一容置空間,且該等鋼筋組所形成之容置空間大小不同以供該等鋼筋組呈內、外層之套設配置,該等定位件分別固定於該等鋼筋組以使該等鋼筋組呈相互間隔設置,該等網模分別固定於該等定位件,以便該等網模透過該等定位件以固定於位於最外層之該鋼筋組的外圍。 A quick-build beam-column forming composite structure, which includes at least two steel bar groups, a plurality of spacers for supporting and positioning the steel bar groups, and a plurality of mesh forms positioned on the periphery of the steel bar groups; wherein, each of the steel bar groups There are a plurality of main reinforcements arranged at intervals, a plurality of surrounding units surrounding the periphery of the main reinforcements and welded with the main reinforcements, and a plurality of connecting units integrally connected to the surrounding units and welded with the main reinforcements , each surrounding unit is integrally bent to surround the periphery of the main steel bars, and each surrounding unit has a plurality of surrounding sections extending between any two adjacent main steel bars after being bent, and each surrounding section is in the form of In a straight line extension, each connection unit extends obliquely between any two adjacent surrounding units, so that the surrounding units and the connecting units are co-configured to form a continuous bend to surround the periphery of the main steel bars and connect with the For the stirrups fixed by welding the main steel bars, the stirrups of each steel bar group surround the main steel bars to enclose an accommodation space, and the accommodation spaces formed by the steel bar groups are of different sizes for the Reinforcement groups are set in the inner and outer layers, and the positioning pieces are respectively fixed to the reinforcement groups so that the reinforcement groups are spaced apart from each other. The mesh forms are respectively fixed to the positioning pieces so that Through these positioning pieces, it is fixed on the periphery of the steel bar group located in the outermost layer. 根據請求項1所述之快搭式樑柱成型組合結構,其中,每一環繞單元係基於同一水平位置以環繞於該等主鋼筋之外圍。 According to the quick-build beam-column forming composite structure described in claim 1, each surrounding unit is based on the same horizontal position to surround the periphery of the main steel bars. 根據請求項1或2所述之快搭式樑柱成型組合結構,其中,該等鋼筋組與該等定位件間設置有複數固定筋,以增加該等鋼筋組間之連接固定力。 According to the quick-build beam-column forming composite structure described in claim 1 or 2, a plurality of fixing ribs are arranged between the steel bar groups and the positioning parts to increase the connection and fixing force between the steel bar groups. 根據請求項1或2所述之快搭式樑柱成型組合結構,其中,該每一環繞單元之環繞段的數量為三個。 According to the quick-build beam-column forming composite structure described in claim 1 or 2, the number of surrounding segments of each surrounding unit is three.
TW111209140U 2022-08-23 2022-08-23 Quick-build beam-column forming combination structure TWM635434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW111209140U TWM635434U (en) 2022-08-23 2022-08-23 Quick-build beam-column forming combination structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111209140U TWM635434U (en) 2022-08-23 2022-08-23 Quick-build beam-column forming combination structure

Publications (1)

Publication Number Publication Date
TWM635434U true TWM635434U (en) 2022-12-11

Family

ID=85786576

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111209140U TWM635434U (en) 2022-08-23 2022-08-23 Quick-build beam-column forming combination structure

Country Status (1)

Country Link
TW (1) TWM635434U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI799342B (en) * 2022-08-23 2023-04-11 鉅昕鋼鐵股份有限公司 A quickly-built combination structure for forming a beam column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI799342B (en) * 2022-08-23 2023-04-11 鉅昕鋼鐵股份有限公司 A quickly-built combination structure for forming a beam column

Similar Documents

Publication Publication Date Title
Asprone et al. Rethinking reinforcement for digital fabrication with concrete
JP5497713B2 (en) Steel structures for reinforced concrete structures
TWM635434U (en) Quick-build beam-column forming combination structure
CN103410269A (en) Unbonded prestress cast-in-place reinforced concrete hollow slab construction structure and method
KR200383490Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
KR101663132B1 (en) Self-supporting type column structure
TWI799342B (en) A quickly-built combination structure for forming a beam column
CN113898102A (en) Ribbed concrete laminated slab
CN107237453B (en) Steel pipe concrete composite column
JP6030274B1 (en) Frame structure and its construction method
CN111042442A (en) Precast concrete hollow component and preparation method thereof
JP4490532B2 (en) Precast composite beam structure
TW202409392A (en) A quickly-built combination structure for forming a beam column
CN105507475B (en) A kind of continuous alternately semicircle cone-shaped roofing and its construction method
JP2009013592A (en) Frame assembling method and frame of building
JP7020046B2 (en) How to repair existing structures
JPH08209858A (en) Reinforcement cage and assembling method thereof
CN117661784A (en) Quick-lapping beam column forming combined structure
CN204112493U (en) The reinforced steel bar perforation reinforced structure of section steel beam and steel column node
CN111778862A (en) Box girder inner mold and assembling method thereof
JPH01178649A (en) Concrete reinforcing member
TWI769610B (en) Reinforced structure of reinforced concrete structure by replacing part of steel bars with section steel
TWI755188B (en) Construction method of reinforced concrete structure by replacing part of steel bars with section steel
JPH0959933A (en) Filled and coated steel pipe concrete structure and construction method
JPH07158015A (en) Steel pipe lap joint structure of steel pipe/concrete composite structure columnar body