TW507257B - IC sample delivery procedure of IC testing processor and its structure - Google Patents

IC sample delivery procedure of IC testing processor and its structure Download PDF

Info

Publication number
TW507257B
TW507257B TW90102311A TW90102311A TW507257B TW 507257 B TW507257 B TW 507257B TW 90102311 A TW90102311 A TW 90102311A TW 90102311 A TW90102311 A TW 90102311A TW 507257 B TW507257 B TW 507257B
Authority
TW
Taiwan
Prior art keywords
shuttle
test
tray
area
group
Prior art date
Application number
TW90102311A
Other languages
Chinese (zh)
Inventor
Yi-Ching Tsai
Original Assignee
Task Technology Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Task Technology Inc filed Critical Task Technology Inc
Priority to TW90102311A priority Critical patent/TW507257B/en
Application granted granted Critical
Publication of TW507257B publication Critical patent/TW507257B/en

Links

Landscapes

  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

The present invention relates to an IC sample delivery procedure of IC testing processor and its structure, and more particularly to an integrated circuit (IC) delivery procedure, in which several buffer regions are provided at the front terminal and the rear terminal of IC test region. The structure comprises an empty tray dispatching region, a sample feeding region, a master buffer region (preheat region), a test region, and a completed test for distributing region. Through the use of the master buffer region (preheat region) and plural buffer regions arranged inside the test region and the completed test for distributing regions, the delivering IC time difference between the master buffer region (preheat region) and the completed test for distributing regions is effectively used to continuously make the test region perform the action of testing IC such that the highest efficiency for the utilization of production capability can be obtained.

Description

507257 不追求其生產 之最終測試階 造成了時程上 提高變成各研 機並不注 嘴之遞送 後再由另 的1C輸送 但卻是整 機的機台 供料中斷 之I C料盤 迫中斷, 重其 手臂 一遞 流程 個機 輸送 之情 用完 嚴重 妙地將整個作 吸收I C,使得 (預熱區)中之 換I C料盤動作 試,而不必整 (預熱區)中之 完成。 的,本發明提 可有限度地|蜀 五、發明說明(l) 舉凡自動化機械莫 處理k,因屬於生產線 生產線所延誤的時間, I C測試處理機之產能的 題。 一般的IC測試處理 往往僅由一設有真空吸 試頭上逕行測試,完測 集中。如此簡單、直接 流程上不甚引人注目, 鍵,因為在該測試處理 換I C料盤而使測試區的 I C後段的I C完測配送區 導致整個測試區作業被 產效率。 緣此,本發明人巧 並另設置數個緩衝區來 某個程序,如主緩衝區 逆時針方向轉動、或更 緩衝功能,斷續做I c測 盤更換動作或主緩衝區 逆時針方向轉動程序的 為達成前述之諸目 ‘區於I P輸送流程中 '使 效能,尤 段,往往 被嚴重地 發廠商最 I c在機台 從入料處 送手臂輸 雖說在整 械生產效 線上,時 形產生, 後更換新 影響該測 業程序作 當測試區 1C承置盤 時,可藉 機停下來 1C承置盤 供一種具 立運·作,507257 The failure to pursue the final test stage of its production caused the time schedule to increase, and the IC trays of the entire machine were interrupted after the delivery of the other 1C was delivered by the other 1C without delivery. Receiving the condition of one-handed transfer of the arm, the entire machine is used to absorb the IC seriously, so that the IC tray change operation in the (preheating zone) is tried, and it is not necessary to complete the whole (preheating zone). However, the present invention provides a limited amount of benefits. Shu V. Description of the Invention (l) Jufan automated machinery cannot process k, because it belongs to the delay of the production line, and the IC test the capacity of the processor. The general IC test processing is usually only performed by a vacuum suction test head, and the test is concentrated. It is so simple and straightforward that the process is not very eye-catching. The key is because changing the IC tray in this test process makes the I C complete testing and distribution area at the back of the I C in the test area, resulting in the entire test area operating efficiency. For this reason, the inventor has set up several buffers for a certain program, such as turning the main buffer counterclockwise, or a buffer function, intermittently doing the I c disc replacement action or turning the main buffer counterclockwise. In order to achieve the above-mentioned goals of the program, "are in the IP transport process," the performance, especially the segment, is often severely sent by the manufacturer. I sent the arm from the feed to the machine. Although it is on the machine production efficiency line, If the test area is set up in the 1C test plate, you can take the opportunity to stop the 1C set disk for a kind of operation.

其是I C測贫 吸收了整個 壓縮,因此 重要的課 上的流程, 吸取I C至測 送至完測區 個機台作業 能的大關 常存在著更 或在測試完 的料盤時, 試處理機生 適度分割, 之前、後段 (預熱盤)作 由緩衝區的 ’等待I C料 (預熱盤)作 備數個緩衝 而不必因IC 507257 五、發明說明(2) ,必需整機停下來等待中 斯 簡單 輸送流程中某部份短暫中斷時 原因結束後方能工作。 特點及功效, 為闡明本發明之技術内容 圖式說明如后。 具體實施例: 本發明係一種丨c測試處理機之丨c料件輸送 構,(請參照第;L圖所示)主要係由空料盤調度其結 =區1、主緩衝區(預熱區)2、測試區3、完測配送區4及入It is the IC measurement that absorbs the entire compression, so it is an important class process. There is often a barrier to the operation of the machine from the IC to the test area and the test area. The machine is divided appropriately. The front and back sections (preheating disks) are used as buffers for waiting for the IC material (preheating disks) to prepare several buffers without having to use IC 507257. 5. Description of the invention (2), the entire machine must be stopped. Wait for a short interruption of some parts of the Sino-Sri Lanka simple transportation process before the cause ends before working. The features and effects are described below to illustrate the technical content of the present invention. Specific embodiments: The present invention is a c material conveying structure of a c test processor. (Please refer to the figure; shown in Figure L.) The main task is to schedule the junction by the empty material tray = zone 1, the main buffer (preheating). Area) 2, test area 3, completed test distribution area 4 and entry

環置在各區外圍之1C遞送手臂R1、R2、R3及R4所組成,其 中: 空,,調度區13:由空的IC料盤12所層疊而成; 入料區1 ··將待測I Ca置於I C料盤1 1内,並集中於本區層 主緩衝區(預熱區)2:在一大方盤21内設置五只相同大 小=ic承置盤(預熱盤)22,使留下一盤大小的空間,而該 五只IC承置盤(預熱盤)22可作逆時針方向轉動25,並可作 適當的力^溫,使承置的I C加熱者; 測^試區3 ·在一測試台3 0上設有一測試座3 0 1,該測試座 301 5又有一排(可安裝二、四、六或八支)的測試頭302、 .^〇3 ’其寬度t合為二声車(飛梭)寬度之半,並由第一梭車 π飛&梭^ ^與第二梭^ (飛梭)3 3 一左、一右錯開並平行穿過 車(飛梭)32與ί 測試座301可前、後移動於第一梭 之左側設有二=一梭車(飛梭)33間;另在二梭車(飛梭)間 只可承置數枚I C之第二緩衝區3 1。The 1C delivery arms R1, R2, R3, and R4 are placed at the periphery of each area. Among them: empty, dispatch area 13: stacked by empty IC tray 12; incoming area 1 ·· will be tested I Ca is placed in the IC tray 1 1 and is concentrated in the main buffer zone (pre-heating zone) of the local area. 2: Five large-size plates 21 are set with the same size = ic receiving tray (pre-heating tray) 22, A space of one tray size is left, and the five IC receiving trays (preheating trays) 22 can be rotated 25 counterclockwise, and an appropriate force can be applied to warm the placed ICs; Trial area 3 · A test stand 3 01 is provided on a test stand 30, and the test stand 3015 has a row of test heads 302,. ^ 〇3 'its The width t is half of the width of the two-sound car (flying shuttle), and the first shuttle π flies & shuttle ^ ^ and the second shuttle ^ (flying shuttle) 3 3 One left and one right staggered and pass through the car in parallel (Shuttle) 32 and ί test base 301 can be moved forward and backward on the left side of the first shuttle. There are two = one shuttle (shuttle) and 33; the other can only accommodate a number of shuttles (shuttle). The second buffer area 31 of the IC.

507257 五、發明說明(3) ----— 兀測配送區4 ·由一只第三緩衝區3 4及二組出料梭車載 盤(42 )、三只固定之完測κ料盤(46、47、48 )及三區 可層疊之完測1C料盤49所組成; ^遞送手臂^卜”^^广第一組^遞送手臂 R/,主要係負責將待測丨Ca由入料區i移至主緩衝區(預熱 區)2之入口區23 ’·第二組ic遞送手臂R2,主要是負責將待 測ICa由主緩衝區(預熱區)2之取出區24搬移至第二緩衝區 31或第一梭車(飛梭)32及第二梭車(飛梭)33之左載盤 (3一21、331)上的 1(:座(3211、3212;3311、3312)内,· 第二組1C遞送手臂“,主要負責將完測之第一梭車(飛梭) 32、第二梭車(飛梭)33右載盤(322、332)上之完測1(:取 $至第三緩衝區34或42;第四組1C遞送手臂R4,負責將出 ^梭車載盤42内之完測ICb移至固定之完測IC料盤(46、 、48)或層疊之完測IC料盤49者。 根據上述各結構,其主要IC輸送程序如下: )將待測之ICa層疊·置於入料區1之1C料盤11上; · 由第一組1C遞送手臂R1將待測ICa移至可適當加熱的主 緩衝區(預熱區)2内之入口區23的1C承置盤(預熱盤)22 内’並於該1C承置盤(預熱盤)22載滿後依逆時針方向25轉 動一袼,依此類推。 3) 當主緩衝區(預熱區)2内之裝置有ic之1C承置盤(預熱 盤)22轉至取出區24之位置時,即以第二組1C遞送手臂!^ 將其1C取至第二緩衝區31内,並依序將其填滿者。 4) 隹第二緩衝區3 1填滿I c後,續將接下來取出之丨c置於第507257 V. Description of the invention (3) ----- Wushu distribution area 4 · A third buffer zone 34 and two sets of discharging shuttle car trays (42), three fixed finished κ trays ( 46, 47, 48) and three-layer cascadable complete test 1C tray 49; ^ Delivery arm ^ Bu "^^ The first group ^ Delivery arm R /, mainly responsible for feeding the test 丨 Ca from the material Zone i is moved to the entrance zone 23 'of the main buffer zone (preheating zone) 2. The second group ic delivery arm R2 is mainly responsible for moving the ICa to be tested from the withdrawal zone 24 of the main buffer zone (preheating zone) 2. 1 (: seat (3211, 3212; 3311, 3312) on the left loading plate (3-21, 331) of the second buffer zone 31 or the first shuttle (shuttle) 32 and the second shuttle (shuttle) 33 ), · The second group of 1C delivery arms "is mainly responsible for the completion of the first test on the first shuttle (shuttle) 32, the second shuttle (shuttle) 33 on the right load plate (322, 332). (: Take $ to the third buffer zone 34 or 42; the fourth group 1C delivery arm R4 is responsible for moving the finished ICb in the shuttle car tray 42 to the fixed finished IC tray (46, 48) or Finished testing of the IC tray 49. According to the above structures, the main IC output The procedure is as follows:) The ICa to be tested is stacked and placed on the 1C tray 11 in the feeding area 1; The first group 1C delivery arm R1 moves the ICa to be tested to the main buffer area (preheating zone) that can be heated appropriately ) 2 inside the 1C receiving plate (preheating plate) 22 in the entrance area 23 and rotate the counterclockwise direction 25 after the 1C receiving plate (preheating plate) 22 is full, and so on. 3 ) When the device in the main buffer zone (preheating zone) 2 has the IC 1C receiving tray (preheating tray) 22 turned to the position of the taking out zone 24, the arm will be delivered in the second group of 1C! ^ Take 1C into the second buffer 31 and fill it up in order. 4) 隹 After the second buffer area 3 1 is filled with I c, continue to take out the next 丨 c

507257 五、發明說明(4) , 一梭車(飛梭)32左載盤321内(第2A圖示出)。 5) 第二組1C遞送手臂R2回至取出區24再取出二只ic,並將 弟一梭車(飛梭)送出、第二梭車(飛梭)送回(第2b圖示 出)。 6) 第二組1C遞送手臂R2放入1C於第二梭車(飛梭)33左載盤 331内,同時測試座301之測試頭302取出第一梭車(飛 梭)3 2左載盤3 2 1上之二I C後往前移至中心位置預備下壓作 測試,此時另一排測試頭3〇3則位於第二梭車(飛梭)33之 右載盤332上方(第2C圖示出)。507257 V. Description of the invention (4), a shuttle car (flying shuttle) 32 inside the left loading plate 321 (shown in Figure 2A). 5) The second group 1C delivery arm R2 returns to the take-out area 24 and then takes out two ic, and sends the younger shuttle (flying shuttle) and the second shuttle (flying shuttle) back (shown in Figure 2b). 6) The second group of 1C delivery arm R2 is placed in 1C in the second shuttle (shuttle) 33 left carrier 331, while the test head 302 of the test base 301 takes out the first shuttle (shuttle) 3 2 left carrier 3 2 1 The second IC moves forward to the center position to prepare for the test. At this time, the other row of test heads 30 is located above the right carrier plate 332 of the second shuttle (shuttle) 33 (No. 2C). Pictured).

7) 第二組1C遞送手臂R2回至主緩衝區(預熱區取出區24 再取出二只1C、測試頭30 2作Ic測試,同時將第一梭車(飛 梭)3 2β送回、第二梭*車(飛梭)33送出(.第2D圖示出)。, 8) 測試頭303至第二梭車(飛梭)33左載盤331上取出1C預借 作測試、將測試座3 0 1往後移動,令測試頭3 〇 2將完測之I c 置入第一梭車(飛梭)32右載盤322内、並且第二組Ic遞送 手臂R2放入1C於第一梭車(飛梭)32左載盤321内(第2E圖 示出)。7) The second group 1C delivers the arm R2 back to the main buffer zone (the warm-up area extraction area 24 then takes out two 1C and test heads 30 2 for the Ic test, and at the same time sends the first shuttle (flying shuttle) 3 2β back, The second shuttle * car (shuttle) 33 is sent out (.shown in Figure 2D)., 8) The test head 303 to the second shuttle car (shuttle) 33 is taken out from the left loading plate 331 and pre-loaned for testing and testing. Seat 3 0 1 moves backward, so that test head 3 0 2 puts the finished I c into the first shuttle (flying shuttle) 32 right loading plate 322, and the second group Ic delivery arm R2 puts 1C in the first A shuttle (flying shuttle) 32 is inside the left loading plate 321 (shown in FIG. 2E).

9) 第二組1C遞送手臂R2回至主緩衝2取出區24再取出二只 1C、測試頭303作1C測試,同時將第一梭車(飛梭)32送 出、第二梭車(飛梭)33送回(第2F圖示出)。 10) 測試頭302至第一梭車(飛梭)32左載盤321上取出1C預 備作測試、將測試座3 〇 1往前移,使測試頭3 〇 3將完測之I C 置入第二梭車(飛梭)33右載盤332内、並同時第二組ic遞 送手臂R2放入1C於第二梭車(飛梭)33左載盤331内,且第9) The second group 1C delivery arm R2 returns to the main buffer 2 take-out area 24 and then takes out two 1C and test heads 303 for the 1C test. At the same time, the first shuttle (flying shuttle) 32 is sent out, and the second shuttle (flying shuttle) ) 33 return (shown in Figure 2F). 10) Take the test head 302 to the first shuttle (flying shuttle) 32 from the left loading plate 321 and take out 1C for testing. Move the test seat 3 〇1 forward so that the test head 3 〇03 puts the completed IC into the The second shuttle (flying shuttle) 33 is placed in the right loading plate 332, and at the same time, the second group ic delivery arm R2 is placed in 1C in the second shuttle (flying shuttle) 33 left loading plate 331, and the first

第7頁 ^07257 五、發明說明(5) 三組1C遞送手臂R3將第一梭車(飛梭)32右載盤π〗上之ic J取料梭車載盤42之梭車載盤載送起點43 2 g 圖不出)。 =第二組1C遞送手臂R2回至主緩衝區(預熱 再取出二只1C、測試頭302作ΤΓ:目丨丨4 门士 . -)39^ θ @ 作1€測试,同時將第一梭車(飛 ^)32运回、弟一梭車(飛梭)33送出、出料梭車載盤“由 示Κ盤載送起點43載至梭車載盤載送終點43a (第2h圖 12)測試頭303至第二梭車(飛梭)33在載盤331上取出丨c . 備作測試、測試座3 〇 1往德蔣翻 ...^Page 7 ^ 07257 V. Description of the invention (5) Three sets of 1C delivery arms R3 carry the starting point ic J on the right shuttle disc 32 of the first shuttle (flying shuttle) 32 to the starting point of the shuttle vehicle disc 42 43 2 g not shown). = The second group of 1C delivers the arm R2 back to the main buffer zone (preheat and then remove two 1C, test head 302 as ΤΓ: 目 丨 丨 4 disciple.-) 39 ^ θ @ for 1 € test, at the same time One shuttle (Fly ^) 32 is transported back, younger one shuttle (Fly shuttle) 33 is sent out, and the shuttle car tray is loaded from the starting position 43 on the shuttle disk to the ending point 43a on the shuttle disk (2h Figure 12 ) The test head 303 to the second shuttle (shuttle) 33 are taken out from the carrier 331 丨 c. For the test and test seat 3 〇1 turn to Dejiang ... ^

署入Μ 一& * /1 後移動,使測試頭302將完測之1C 5丰右載盤322内、並同時第二組1C遞 笛手# R2放入ic於第一梭車(飛梭)32左載盤321 第「三組_送手臂二梭車(飛梭)33右載盤川上= c吸=至出料梭車載盤42之梭車載盤載送起點4, rncb ^ ., C,., Λ Λ Λ^43;:!: ;c^ue;^ # W Κ2β? ^ ^ ^ ^ ^ ^ ^ )2^ 24 梭)32送出、,第二梭車(飛梭)33送回、出載=(飛 ίίΐ盤載达起點44載至梭車載盤載送終點“a、另一出 2梭車載盤42由梭車載盤載送終點43a送 起點43(第2J圖示出)。 仅早戟盤載迗After entering M & * / 1, move it, so that the test head 302 will put the completed 1C 5 Feng right carrier 322, and at the same time put the second group of 1C 笛 笛手 # R2 into the ic on the first shuttle (flying Shuttle) 32 left loading disc 321 "three sets_send arm two shuttles (flying shuttle) 33 right loading disc Chuan Shang = c suction = to the shuttle car disc loading starting point 4 of the shuttle car disc 42, rncb ^., C,., Λ Λ Λ ^ 43;:!:; C ^ ue; ^ # W Κ2β? ^ ^ ^ ^ ^ ^ ^ ^) 2 ^ 24 shuttle) 32, and the second shuttle (flying shuttle) 33 Return, delivery = (Flying the starting point 44 from the disk to the end point of the shuttle car disk "a, the other end of the 2 shuttle car disk 42 from the end point 43a of the shuttle car disk to the starting point 43 (shown in Figure 2J) . Only Early Halberd

507257 五、發明說明(6) 14)苐四組1C遞送手臂R4由梭車載盤巷译 ICb,並根據該“測試結果予取出完測 ^ ( 4B 48 ) , ^ φ IC^497 Υ'Ι;1 第10步驟斷續進行者。 料盤49内’並跳由 由上述步驟可知,在測試區3内之楚 _ . ^ =:r飛請左載盤(心 m 衝區(預熱區)2索取待測Ka,但當主緩衝區 區)2因轉動IC承置盤(預熱盤)22而使第二組ic遞送 手j R2無法由主緩衝區(預熱區)2取出1(:時,程式可馬上 指f 1由第二緩衝區31内拿取待測1Ca,繼續執行測試1C 的動作,而不必停機等待,等到先前暫停的因素停止(即 1C承置盤(預熱盤)2 2轉動一格到位)後再恢復正常程序, 並由於1C遞送手臂R2的搬送速度較1(:測試速快,可在稍後 空檔時間内,斷續將第二緩衝區2内的待測ICa填滿;同樣 地,當完測配送區4因更換I C料盤而暫時無法供完洌i⑶輸 出放置時,程式亦可暫時指定第三組丨c遞送手臂R3取出完 測ICa (即由第一、第二梭車(飛梭)右載盤内取出)後放 置的位置(即出料梭車載盤42或完測1C料盤46、47、48 ) 改至放置於第二緩衝區w内,俾利第三組I c遞送手臂u繼 續動作’待先前暫停原因消除時,再回覆原來的丨c運送流 程’且,1C遞送手臂R3的運送1(:速度較快,使能在空檔 時’斷績由第三緩衝區34内取出完測ICb至出料梭車載盤 4/ ’以將第三緩衝區34内的丨c清空;如此,保持第二緩衝 區3 1被填滿待測I Ca、第三緩衝區3 4清空完測丨Cb的狀態,507257 V. Description of the invention (6) 14) Twenty groups of 1C delivery arms R4 are translated into ICb by shuttle lanes and will be taken out according to the "test results ^ (4B 48), ^ φ IC ^ 497 Υ'Ι; 1 Step 10 is performed intermittently. In the tray 49, the parallel jump can be seen from the above steps. In the test zone 3, _. ^ =: R fly to the left loading plate (heart m punch zone (preheat zone)) 2 to obtain the Ka to be tested, but when the main buffer zone) 2 turns the IC receiving tray (preheating tray) 22, the second group of IC delivery hands j R2 cannot be taken out from the main buffer zone (preheating zone) 2 (: At this time, the program can immediately refer to f 1 to take the 1Ca to be tested from the second buffer 31 and continue to perform the test of 1C without stopping and waiting until the previously suspended factors stop (ie the 1C holding plate (preheating disk)). 2 2 turn one space in place) and then resume the normal procedure, and because the 1C delivery arm R2 has a faster transfer speed than 1 (: the test speed is faster, the waiting time in the second buffer zone 2 can be intermittently The test ICa is full; similarly, when the test distribution area 4 is temporarily unavailable due to the replacement of the IC tray, the program can also temporarily specify the third group. C The delivery arm R3 is placed after taking out the ICa (that is, it is taken out from the right tray of the first and second shuttle (shuttle)) (that is, the car tray 42 of the discharge shuttle or the tray 46, 47, 48 of the 1C after the test) ) Change to place in the second buffer w, the third group I c delivery arm u continues to move 'when the cause of the previous pause is eliminated, then reply to the original 丨 c delivery process' and 1C delivery arm R3 delivery 1 (: The speed is fast, enabling the 'interrupted performance' to take out the measured ICb from the third buffer zone 34 to the vehicle shuttle 4 / 'of the discharge shuttle in the neutral position to empty the 丨 c in the third buffer zone 34; so, Keep the state where the second buffer 3 1 is filled with the I Ca to be tested, and the third buffer 3 4 is cleared to complete the measurement Cb,

507257 五、發明說明(7), 方能不中斷在整個I C測試處理機中最重要的測試區3測試 I C的作業,以增加整體效能。 雖然本發明以一較佳實施例揭露如上,然其並非用以限 定本發明,任何熟習此項技藝者,在不脫離本發明之精神 和範圍内,當可作各種等效之更動與潤飾,因此本發明之 保護範圍應同時參酌後附之申請專利範圍所界定者。507257 V. Description of the invention (7), the test operation of the IC in the most important test area 3 of the entire IC test processor can not be interrupted to increase the overall efficiency. Although the present invention is disclosed as above with a preferred embodiment, it is not intended to limit the present invention. Any person skilled in the art can make various equivalent changes and decorations without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention should also refer to those defined by the appended patent application scope.

第10頁 507257 圖式簡單說明 -- 圖式簡單說明 第1圖係本發明之I c輸送配置圖。 第2圖係本發明之測試區I c置於第二緩衝區示意圖。 第2 A圖係本發明之測試區丨c置於第一梭車(飛^ )左載盤 I C座示意圖。 第2 B圖係本發明之測試區中: a) 第一梭車(飛梭)送出; b) 第二梭車(飛梭)送回之示意圖。 第2 C圖係本發明之測試區中: a) 測试頭取出第一梭車(飛梭)左載盤I C作測試; b) 將1C置入第二梭車(飛梭)左載盤之1(:座之示意 圖。 第2 D圖係本發明之測試區中: a) 第一梭車(飛梭)送回; b) 第二梭車(飛梭)送出之示意圖。 第2 E圖係本發明之測試區中: a)測試頭放回完測IC於第一梭車(飛梭)右載盤之 1C座ί Λ b)取出第二·梭車(飛梭)左載盤ί C #測試; c) 再一次將待測I c放入第一梭車(飛梭)左載盤内 之示意圖。 第2 F圖係本發明之測試區中: a) 第一梭車(飛梭)送出; b) 第二梭車(飛梭)送回之示意圖。Page 10 507257 Simple illustration of the drawing-Simple illustration of the drawing Figure 1 is the I c conveying configuration diagram of the present invention. FIG. 2 is a schematic diagram of placing the test area I c of the present invention in a second buffer zone. FIG. 2A is a schematic diagram of the test area 丨 c of the present invention placed on the left loading plate I C of the first shuttle (fly). Figure 2B is a schematic diagram of the test area of the present invention: a) the first shuttle (shuttle) is sent out; b) the second shuttle (shuttle) is sent back. Fig. 2C shows the test area of the present invention: a) the test head takes out the left carrier IC of the first shuttle (shuttle) for testing; b) puts 1C into the left carrier of the second shuttle (shuttle) No. 1 (: seat schematic diagram. Figure 2 D is a schematic diagram of the test area of the present invention: a) the first shuttle (shuttle) returned; b) the second shuttle (shuttle) sent out. Figure 2E is in the test area of the present invention: a) Put the test head back to the test IC at the 1C seat of the right shuttle of the first shuttle (flying shuttle) Λ) Take out the second shuttle (flying shuttle) Left loading plate C # test; c) Put the I c to be tested into the left loading plate of the first shuttle (shuttle) again. Figure 2F is a schematic diagram of the test area of the present invention: a) the first shuttle (shuttle) is sent out; b) the second shuttle (shuttle) is sent back.

507257 圖式簡單說明 第2 G圖係本發明之測試區中: a)測試頭放回完測I C於第二梭車(飛梭)右載盤之 1C座。 b )取出第一梭車(飛梭)左載盤I C作測試; c) 將第一梭車(飛梭)右載盤上之完測1C取出至第 三緩衝區之承置盤内; d) 再一次將待測I C放入第二梭車(飛梭)左載盤内 之示意圖。 第2 Η圖係本發明之測試區中:507257 Brief description of diagrams Figure 2G is in the test area of the present invention: a) Put the test head back and finish the test IC at Block 1C on the right side of the second shuttle (shuttle). b) Take out the left carrier IC of the first shuttle (flying shuttle) for testing; c) Take the finished test 1C on the right carrier of the first shuttle (flying shuttle) into the receiving tray of the third buffer zone; d ) Put the IC under test into the left loading disc of the second shuttle (shuttle) again. Figure 2 shows the test area of the present invention:

a) 第一梭車(飛梭)送回; b) 第二梭車(飛梭)送出之,示意圖。 第2 I圖係本發明之測試區中: a)測試頭放回完測1C於第一梭車(飛梭)右載盤之 1C座; * b)取出第二·梭車(飛梭)左載盤IC#測試; c) 將第二梭車(飛梭)右載盤上之完測1C取出至第 三緩衝區之承置盤内;a) The first shuttle (shuttle) is sent back; b) The second shuttle (shuttle) is sent out, schematic diagram. Figure 2I is in the test area of the present invention: a) Put the test head back and finish the test 1C on the 1C seat of the right shuttle of the first shuttle (shuttle); * b) Take out the second shuttle (shuttle) IC # test on the left loading plate; c) Take the completed test 1C on the right loading plate of the second shuttle (flying shuttle) into the receiving plate of the third buffer zone;

d) 再一次將待測I C放入第一梭車(飛梭)左載盤内 之示意圖。 第2 J圖係本發明之測試區中: a) 第一梭車(飛梭)送出; b) 第二梭車(飛梭)送回之示意圖。 各圖式所用符號簡單說明d) Put the IC under test into the left loading disc of the first shuttle (shuttle) again. Figure 2J is a schematic diagram of the test area of the present invention: a) the first shuttle (shuttle) is sent out; b) the second shuttle (shuttle) is sent back. Simple explanation of symbols used in each drawing

Rl、R2、R3、R4. 1C遞送手臂Rl, R2, R3, R4.1.1C delivery arm

第12頁 507257 圖式簡單說明.Simple illustration on page 12 507257.

a. 待測I C b. 完測I C 1.入料區 1 1. I C料盤 1 2 .空的I C料盤 1 3 .空料盤調度區 2·主緩衝區(預熱區) 21.大方盤 22· 1C承置盤(預熱盤) 23·入口區 24. 取出區 25. 逆時針芳向轉動 3.測試區 3 0.測試台 3 0 1.測試座 302、303.測試頭 3 1.第二緩衝區 32·第一梭車(飛梭) 321. 左載盤 3211 、 3212.1C座 322. 右載盤 3221 、 3222.1C座 33·第二梭車(飛梭) 331.左載盤a. IC to be tested b. IC to be tested 1. Feed area 1 1. IC tray 1 2. Empty IC tray 1 3. Empty tray scheduling area 2 · Main buffer zone (preheating area) 21. Generous Plate 22 · 1C receiving plate (preheating plate) 23 · Entrance area 24. Take-out area 25. Rotate counterclockwise 3. Test area 3 0. Test bench 3 0 1. Test stand 302, 303. Test head 3 1 The second buffer zone 32. The first shuttle (flying shuttle) 321. The left carrier 3211, 3212.1C seat 322. The right carrier 3221, 3222.1C seat 33. The second shuttle (fly shuttle) 331. The left carrier

第13頁 507257 圖式簡單說明 3311 、 3312.1C座 332.右載盤 3321 、 3322,1C座 34.第三緩衝區 4.完測配送區 42. 出料梭車載盤 43、 44.梭車載盤載送起點 43a、44a.梭車載盤載送終點 46、47、48.完測1C料盤Page 13 507257 The diagram briefly explains the 3311 and 3312.1C blocks 332. The right loading discs 3321, 3322, and 1C blocks 34. The third buffer zone 4. The complete test distribution area 42. The discharging shuttle car disc 43, 44. shuttle car disc Loading start point 43a, 44a. Shuttle car tray loading end point 46, 47, 48. Finish test 1C tray

49.完測1C料盤49. Finish test 1C tray

第14頁Page 14

Claims (1)

507257 六、 申請專利範圍 1 · 一種IC測試處理機之IC料件輸送結構,主要係由空料盤 調度區、入料區、主緩衝區(預熱區)、測試區、完測配送 區及環置在各區外圍之1C遞送手臂所組成,其中·· 空料盤調度區:由空的I c料盤所層疊而成; 入料區:將待測1C置於1C料盤内,並集中於本區層疊; 主缓衝區(預熱區):在一大方盤内設置五只相同大小的 1C承置盤(預熱盤),使留下一盤大小的空間,而該五只IC 承置盤(預熱盤)可作逆時針方向轉動,並可作適當的加 溫,使承置的IC加熱者;507257 VI. Scope of patent application1. An IC material conveying structure of an IC test processor is mainly composed of an empty tray scheduling area, a feeding area, a main buffer zone (preheating area), a testing area, a finished testing distribution area, and It is composed of 1C delivery arms placed around the periphery of each area. The empty tray scheduling area is formed by stacking empty I c trays. Feeding area: Place the 1C to be tested in the 1C tray, and Focus on the stacking of this area; Main buffer zone (preheating zone): set five 1C holding plates (preheating plates) of the same size in a large square, leaving a space of one disk size, and the five The IC receiving plate (preheating plate) can be rotated counterclockwise and can be appropriately heated to heat the placed IC; 測試區:在一測試台上設有一測試座,該測試座設有二 排(可安裝二、四、六或八支)的測試頭,其寬度恰為二 梭飞車(飛梭)寬度之半,並由第一梭車(飛梭)與第二梭車 飛梭)二左、一右錯開並平行穿過測試台冑、後侧;該測 二座可前、後移動於第一梭車(飛梭0與第二梭車(飛梭) :ί ΐ一梭車(飛梭)間之左侧設有一只可承置數枚IC之 第二緩衝區; 一 測配送區.由一只第三緩衝區及二組出料梭車載盤、 :只固定之完測1C料盤及三區可層疊之完測1(:料盤所組Test area: There is a test stand on a test stand. The test stand is provided with two rows of test heads (two, four, six, or eight can be installed), the width of which is exactly the width of the second shuttle (shuttle). Half, and the first shuttle (flying shuttle) and the second shuttle flying shuttle) two left and one right staggered and pass through the test bench 胄, the rear side; the two test seats can be moved forward and backward on the first shuttle Car (Shuttle 0 and the second shuttle (shuttle)): There is a second buffer zone on the left side of the shuttle shuttle (shuttle) that can hold several ICs; a test distribution area. Only the third buffer zone and two sets of discharge shuttle car trays: only fixed fixed 1C trays and three zones can be stacked to complete the test 1 (: tray set Cfj手臂.第一㈣遞送手臂主要係負責將待測丨 ::广移至,緩衝區(預熱區)之入口區;第二組㈣ ϊ = 疋負責將待測lca由主緩衝區(預熱區)之添 梭)之左載盤上的IC座内;第三組1(:遞送手臂,主梭車1Cfj arm. The first ㈣ delivery arm is mainly responsible for moving the test 丨 :: to the entrance area of the buffer zone (preheating zone); the second group ㈣ ϊ = 疋 is responsible for transferring the lca to be tested from the main buffer zone (previously Hot zone) in the IC seat on the left carrier plate; the third group 1 (: delivery arm, main shuttle 1 507257507257 m =測之第一梭車(飛梭)、第二梭車(飛梭)右載盤上之ic =出至第三緩衝區或出料梭車載盤;第四組IC遞送手臂, 矗t將出料裨車載·盤内之完測〗c移至固定完測丨c 疊之完測ic料盤者。 ’ t二種IC測試處理機之IC料件輸送程序,其1c料件輸送步 驟特徵如下: 1) 將待測之I c層疊置於入料 2) 由第一組1C遞送手臂將待 區(預熱區)内之入口區的ic 承置盤(預熱盤)載滿後依逆 推; 區之IC料盤上; 測IC移至可適當加熱的主緩衝 承置盤(預熱盤)内,並於該Ic 時針方向轉動一格,依此類 3) 當主緩衝區(預熱區)内之裝置有1(:之1(:承置盤(預熱盤) :至取出區之位置時,即以第二組IC遞送手臂將其Ic取至 第二緩衝區内,並依序將其填滿者; 4) 俟第二緩衝區填滿1(:後,續將接下來取出之丨〔置於第一 梭車(飛梭)左載盤内; 、 5) 第二組ic遞送手臂回至取出區再取出二只ic,並將第一 梭車(飛梭)送出、第二梭車(飛梭)送回; 6) 第二組1C遞送手臂放入Ic於第二梭車(飛梭)左載盤内, 同時測試座之測試頭、取出第一梭車(飛梭)左載盤上之二IC 後往前移至中心位置釋備下壓作測試,此時另一測試頭則 位於第二梭車(飛梭)之右載盤上方; 7) 第二組1C遞送手臂回至主緩衝區(預熱區)取出區再取出 二只1C、測試頭作1(:測試,同時將第一梭車(飛梭)送回、m = ic on the right loading plate of the first shuttle (flying shuttle) and second shuttle (flying shuttle) measured = out to the third buffer zone or on-board tray of the shuttle; the fourth group of IC delivery arms, 矗 t Move the finished car to the finished test in the tray: c to the fixed finished test, and then stack the finished test ic tray. 't The IC material conveying procedure of the two types of IC test handlers, the 1c material conveying steps are as follows: 1) The I c to be tested is stacked on the feed 2) The first group of 1 C delivery arms will place the area to be processed ( The ic holding tray (preheating tray) in the entrance area inside the preheating zone) is pushed backwards after being full; on the IC tray of the zone; the test IC is moved to the main buffer holding tray (preheating tray) that can be heated appropriately. Inside, and rotate one division in the clockwise direction of the Ic, and so on. 3) When the device in the main buffer zone (preheating zone) has 1 (: 1 (: receiving tray (preheating tray): to the take out zone) Position, that is, the second group of IC delivery arms to take its Ic into the second buffer, and fill it in order; 4) 俟 the second buffer is filled with 1 (:, then continue to take out the next [丨 Placed in the left loading disc of the first shuttle (shuttle);, 5) The second group of ic delivery arms returns to the take-out area and then takes out two ic, and sends the first shuttle (shuttle) out, the first The second shuttle (shuttle) returns; 6) The second group 1C delivery arm is placed in the IC on the left loading plate of the second shuttle (shuttle), while testing the test head of the seat, and taking out the first shuttle (shuttle) ) The second IC on the carrier plate is moved forward to the center position and released for testing. At this time, the other test head is located above the right carrier plate of the second shuttle (shuttle); 7) The second group of 1C delivery arms Return to the main buffer (preheating area) take-out area and take out two 1C, test head for 1 (: test, at the same time return the first shuttle (flying shuttle), ^07257 六、申請專利範圍 第二梭車(飛梭)送出; 8)測試頭至第二梭車(飛梭)左載盤上取出1(:預備作測試、 將測試座往後移動,令測試頭將完測之IC置入第一梭車 (氣梭)右載盤内、並且第二組IC遞送手臂放入1(:於第一梭 車(飛梭)左載盤内; 第一組1 c遞送手臂回至主緩衝取出區再取出二只IC、測 試頭作1C測試,同時將第一梭車(飛梭)送出、第二梭車 (飛梭)送回; 3)測試頭至第一梭車(飛梭)左載盤上取與IC預備作測 忒、將測試座往前’移,使測試頭將’完測之〖c置入第二梭車 (飛梭)右載盤内、並同時第二組1(:·遞送手臂放入IC於第二 梭飞車(飛梭)左載盤内,且第三組IC遞送手臂將第一梭車 (飛梭)右載盤上之1C吸取至出料梭車載盤之梭車載盤載送 起點内, 11)_第u二組1C遞送手臂回至主緩衝區(預熱區)取出區再取 ^ 一只1C、測試頭作1(:測試,同時將第一梭車(飛梭)送 回、第二梭車(飛梭)送出、出料梭車載盤由梭車載盤載送 起點載至梭車載盤載送終點; 1 2 )測減頭至第一梭車(飛梭)左載盤上取出I c預備作測 试測試座往後移動,使測試頭將完測之IC置入第一梭車 (飛梭)右載盤内、並同時第二組1(:遞送手臂放入ic,於第一 梭車(飛梭)左載盤内、並由第三組IC遞送手臂將第二梭車 (飛梭)右載盤上之1(:吸取至出料梭車載盤之梭車載^載送 起點内,同時,第四組1(:遞送手臂由梭車載盤載送終點取 第17頁 507257 六、申請專利範圍 出完測IC,並根據該IC測試結果予以歸類至三口、固〜 ^ 測1C料盤内或層疊至完測IC料盤内; —/、疋之完 13) 第二組1C遞送手臂回至主緩衝區(預熱區)取出區 出二只1C、測試頭作1C測試,同時將第一梭 梭r回、出料梭車載盤由梭車二 (點載至梭車載盤載送終點、另一出料梭車載盤 盤載送終點送回活動出料梭車載盤起點; 14) 第四組^遞送手臂由梭車載盤載送終點取出完 並根據該1C測試結果予以歸類至三只固 或層疊至完測1C料盤内,並跳由第i。步驟盤内 根據上述步驟,在測試區内之第一梭車(飛梭)與第二 (預’在正常的程序下,係直接由主緩衝區 署般:待測IC,但當主緩衝區(預熱區)因轉動1C承 敎ί 使第二組1C遞送手臂無法由主緩衝區(預 Ζ Γ, 、’程式可馬上指定改由第二緩衝區内拿取 d:繼、,執行測試ic的動作,而不必停機等待,等到 亭止(即IC承置盤(預熱盤)轉動到位= 、#椒 *、.序並由於1 c遞送手臂的搬送速度較IC測試 1C填滿;同檨地,“、B, 斷、,將第二緩衝區内的待測 供完測1C幹出放晋:疋。Ϊ送區因更換IC料盤而暫時無法 即由第一、第二梭車(飛上載盤= 置於第三緩衝區内,俾利第三級IC J至J^ 07257 6. The scope of the patent application is sent out by the second shuttle (shuttle); 8) Take the test head to the left loading plate of the second shuttle (shuttle) and take out 1 (: prepare for testing, move the test seat back, so that The test head puts the completed IC into the right loading disc of the first shuttle (air shuttle), and the second set of IC delivery arms is placed in the 1 (: left loading disc of the first shuttle (flying shuttle); first In group 1c, return the arm to the main buffer take-out area and take out two ICs and test heads for 1C test. At the same time, send out the first shuttle (shuttle) and return the second shuttle (shuttle); 3) Test head Go to the left shuttle of the first shuttle (shuttle) and take the IC to prepare for the test. Move the test seat forward, so that the test head will put “c” after the test into the right of the second shuttle (shuttle). In the loading tray, and at the same time, the second group of 1 (: · delivery arm is placed in the IC of the second shuttle (shuttle) left loading plate, and the third group of IC delivery arms The 1C on the loading tray is sucked into the starting point of the shuttle loading tray of the unloading shuttle loading tray. 11) _The second group of 1C delivery arms is returned to the main buffer zone (preheating area) and then taken out. Then a 1C, Measurement The first 1 (: test, at the same time, the first shuttle (shuttle) is returned, the second shuttle (shuttle) is sent out, and the shuttle car tray is loaded from the shuttle car tray to the starting point to the shuttle car tray to the end 1 2) Measure the head down to the left shuttle of the first shuttle (flying shuttle) and take out I c to prepare for the test and test seat to move backward, so that the test head puts the IC that has been tested into the first shuttle (flying shuttle) ) In the right loading disc, and at the same time the second group 1 (: the delivery arm is placed in ic, in the left loading disc of the first shuttle (flying shuttle), and the third group of IC is delivering the arm to the second shuttle (flying shuttle) 1) on the right loading disc (: sucked to the shuttle car ^ loading starting point of the discharging shuttle car tray), at the same time, the fourth group 1 (: delivery arm is taken from the shuttle car loading end point on page 17 507257 VI. Application The scope of the patent is to complete the test IC, and classify it into three ports, according to the test results of the IC. ^ Test 1C tray or stacked inside the test IC tray; ---, the end of the 13) second group 1C delivery Return the arm to the main buffer area (preheating area) and take out two 1C and test heads for 1C test. At the same time, return the first shuttle shuttle and the discharge shuttle to the shuttle tray from the second shuttle (point load to the shuttle shuttle). The end of the disk loading, the other end of the delivery shuttle car disk loading end returns to the starting point of the active discharging shuttle car tray; 14) The fourth group ^ delivery arm is taken out from the shuttle loading end of the car and is based on the 1C test result. Classified into three solid or stacked into the finished 1C tray, and jump from the i. Step According to the above steps in the tray, the first shuttle (flying shuttle) and the second (pre- ' Under the procedure, it is directly executed by the main buffer zone: the IC under test, but when the main buffer zone (preheat zone) is turned by 1C, the second group of 1C delivery arms cannot be transferred from the main buffer zone (pre-Z Γ, , 'The program can be immediately designated to be fetched from the second buffer: Continue: Execute the test ic without having to stop and wait until the booth (ie, the IC receiving tray (preheating tray) turns into place = 、 # The pepper *,. Sequence and the transfer speed of the 1 c delivery arm are fuller than the IC test 1C; at the same time, ", B, break, and put the test to be completed in the second buffer for the test 1C and release: Alas. The delivery area is temporarily unable to be replaced by the first and second shuttle due to the replacement of the IC tray. (Flying tray = placed in the third buffer zone, and the third-level IC J to J mm 第18頁 507257 六、申請專利範圍 先前暫停原因消除時,再回覆原來的IC運送流程,且該I C 遞送手臂的運送IC速度較快,使能在空檔時,斷續由第三 緩衝區内取出完測I C至出料梭車載盤,以將第三缓衝區内 的IC清空;如此,保持第二緩衝區被填滿待測I C、第三緩 衝區清空完測IC的狀態,方能不中斷測試區測試IC的作業 者。mm Page 18 507257 6. When the reason for the suspension of the patent application scope is eliminated, the original IC delivery process will be replied, and the IC delivery arm will transport ICs faster, enabling the third buffer to be intermittent when in neutral. Take out the test IC to the car tray of the discharge shuttle to empty the IC in the third buffer zone. In this way, keep the second buffer zone filled with the test IC and the third buffer zone to clear the test IC. Operator who can test IC without interrupting test area. 第19頁Page 19
TW90102311A 2001-02-01 2001-02-01 IC sample delivery procedure of IC testing processor and its structure TW507257B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW90102311A TW507257B (en) 2001-02-01 2001-02-01 IC sample delivery procedure of IC testing processor and its structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW90102311A TW507257B (en) 2001-02-01 2001-02-01 IC sample delivery procedure of IC testing processor and its structure

Publications (1)

Publication Number Publication Date
TW507257B true TW507257B (en) 2002-10-21

Family

ID=27621787

Family Applications (1)

Application Number Title Priority Date Filing Date
TW90102311A TW507257B (en) 2001-02-01 2001-02-01 IC sample delivery procedure of IC testing processor and its structure

Country Status (1)

Country Link
TW (1) TW507257B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI409899B (en) * 2008-08-28 2013-09-21 King Yuan Electronics Co Ltd Automatic conversion disk device
CN103926480A (en) * 2013-01-10 2014-07-16 致茂电子(苏州)有限公司 Test machine table with dry environment
TWI456220B (en) * 2012-12-27 2014-10-11 Chroma Ate Inc Test apparatus with dry environment
TWI456213B (en) * 2013-01-18 2014-10-11 Hon Tech Inc Electronic component working unit, working method and working equipment thereof
TWI816373B (en) * 2022-04-21 2023-09-21 京元電子股份有限公司 Automatic burn-in test structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI409899B (en) * 2008-08-28 2013-09-21 King Yuan Electronics Co Ltd Automatic conversion disk device
TWI456220B (en) * 2012-12-27 2014-10-11 Chroma Ate Inc Test apparatus with dry environment
CN103926480A (en) * 2013-01-10 2014-07-16 致茂电子(苏州)有限公司 Test machine table with dry environment
TWI456213B (en) * 2013-01-18 2014-10-11 Hon Tech Inc Electronic component working unit, working method and working equipment thereof
TWI816373B (en) * 2022-04-21 2023-09-21 京元電子股份有限公司 Automatic burn-in test structure

Similar Documents

Publication Publication Date Title
TWI275814B (en) Electronic component testing apparatus
CN106486398B (en) The manufacturing method of chip attachment machine, attaching method and semiconductor devices
JP5140428B2 (en) Supply mechanism for chuck of integrated circuit dicing machine
TW507257B (en) IC sample delivery procedure of IC testing processor and its structure
KR101414690B1 (en) Semiconductor Strip Sawing Apparatus
US20140290453A1 (en) Discharging Workpieces
JPH0395001A (en) Automatic warehouse for data processor
JP3824847B2 (en) Work taping system
TWM561331U (en) Rotary disc device for loading electrode group in container
KR102391516B1 (en) Semiconductor test apparatus
JP3691195B2 (en) Manufacturing method of semiconductor device
JPH05338728A (en) Wafer carrying method and device thereof
CN100570815C (en) A kind of chip bonding machine platform and heating plate thereof
JP4482957B2 (en) Plate material transfer device
KR101266512B1 (en) High speed led chip sorter
JPH08170976A (en) Handler mechanism for semiconductor tester
US20080308514A1 (en) Tray transportation device
JP2623361B2 (en) Work delivery system
CN207690138U (en) Automated Sorting System and automatic transportation unit
TWI623750B (en) Turret handler with dual pickers
JP6679871B2 (en) Support transport device
TW201209952A (en) Inspection machine for semiconductor component with single penetrating transport shuttle
TWI309222B (en)
TW200929421A (en) Wafer transfer apparatus
KR100806374B1 (en) Transfer method for semiconductor package of sawing sorter system

Legal Events

Date Code Title Description
GD4A Issue of patent certificate for granted invention patent