TW202020272A - Bathroom floor structure comprising a drainage pit extending along one side of a floor laying body from one end of the bathroom to an opposite end in a manner of being independent of the floor laying body - Google Patents

Bathroom floor structure comprising a drainage pit extending along one side of a floor laying body from one end of the bathroom to an opposite end in a manner of being independent of the floor laying body Download PDF

Info

Publication number
TW202020272A
TW202020272A TW108134594A TW108134594A TW202020272A TW 202020272 A TW202020272 A TW 202020272A TW 108134594 A TW108134594 A TW 108134594A TW 108134594 A TW108134594 A TW 108134594A TW 202020272 A TW202020272 A TW 202020272A
Authority
TW
Taiwan
Prior art keywords
floor
bathroom
pool
drainage
wall
Prior art date
Application number
TW108134594A
Other languages
Chinese (zh)
Other versions
TWI720629B (en
Inventor
飯野武寬
Original Assignee
日商積水房屋科技股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日商積水房屋科技股份有限公司 filed Critical 日商積水房屋科技股份有限公司
Publication of TW202020272A publication Critical patent/TW202020272A/en
Application granted granted Critical
Publication of TWI720629B publication Critical patent/TWI720629B/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02177Floor elements for use at a specific location
    • E04F15/02188Floor elements for use at a specific location for use in wet rooms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Residential Or Office Buildings (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

An objective of the present invention is to enlarge the capacity of a drainage pit of a bathroom without being constrained by operability of installation. The present invention provides a support frame 3 on a bottom of a bathroom floor 1a, and a floor laying body 1 is laid on the support frame 3. A drainage pit 4 is arranged to extend along one side of the floor laying body 2 from one end of the bathroom 1 in a direction to an opposite end. The drainage pit 4 and the floor laying body 2 are arranged as individual structures with respect to each other and are supported by the support frame in a manner of being independent of each other.

Description

浴室地板構造Bathroom floor structure

本發明係關於一種浴室之地板構造,尤其是關於一種適用於包含大容量之排水池之大型之浴室的浴室地板構造。The invention relates to a bathroom floor structure, in particular to a bathroom floor structure suitable for a large bathroom including a large-capacity drain.

在一般之獨棟住宅之浴室之情形下,浴缸容量為250 L左右,1天之沐浴次數相應於居住人數為1次~數次左右,浴缸排水時間為6分鐘左右,排水流量為每分鐘40 L左右。 相對於此,在面向護理設施等之大型浴室中,要求例如浴缸容量為600 L左右,1天之沐浴次數為10次左右,浴缸排水時間為2分左右,排水流量為每分鐘300 L左右之規格。 [先前技術文獻] [專利文獻]In the case of the bathroom in a general single-family house, the bathtub capacity is about 250 L, the number of baths per day corresponds to about 1 to several times, the drainage time of the bathtub is about 6 minutes, and the drainage flow rate is 40 per minute Around L. In contrast, in large bathrooms for nursing facilities, for example, the bathtub capacity is about 600 L, the number of baths per day is about 10 times, the bathtub drainage time is about 2 minutes, and the drainage flow rate is about 300 L per minute. specification. [Prior Technical Literature] [Patent Literature]

[專利文獻1]日本特開2017-218799號公報 [專利文獻2]日本特開2000-230261號公報[Patent Document 1] Japanese Patent Application Publication No. 2017-218799 [Patent Document 2] Japanese Patent Laid-Open No. 2000-230261

[發明所欲解決之問題][Problems to be solved by the invention]

在大型浴室中,與大容量之浴缸對應地要求大容量之排水構造。另一方面,通常,排水池與浴室地板面板一體地形成。在將上述之排水池一體型之浴室地板面板大型化時,設置作業並不容易,排水阱或排水管對排水池之連接作業及配管作業也並不容易。 本發明鑒於上述之事態,目的在於提供一種可在不受設置操作性等侷限下將浴室之排水池大容量化之浴室地板構造。 [解決問題之技術手段]In a large bathroom, a large-capacity drainage structure is required corresponding to a large-capacity bathtub. On the other hand, in general, the drainage pool is formed integrally with the bathroom floor panel. When the above-mentioned bathroom floor panel of the integrated drainage pool type is enlarged, installation work is not easy, and the connection operation and piping operation of the drainage well or the drainage pipe to the drainage pool are also not easy. In view of the above-mentioned situation, the present invention aims to provide a bathroom floor structure that can increase the capacity of a bathroom drain without being limited by installation operability and the like. [Technical means to solve the problem]

為了解決前述問題,本發明之浴室地板構造之特徵在於具備: 架台,其設置於浴室地板之底部; 地板鋪設體,其鋪設於前述架台上;及 排水池,其沿前述地板鋪設體之一側部自前述浴室之一方向之一端部延伸至另一端部;且 前述排水池及地板鋪設體相互為個別構體,且相互獨立地由前述架台支持。In order to solve the aforementioned problems, the bathroom floor structure of the present invention is characterized by having: Shelf, which is set at the bottom of the bathroom floor; Floor laying body, which is laid on the aforementioned platform; and A drainage pool, which extends from one end to the other end of one direction of the bathroom along one side of the floor laying body; and The drainage pool and the floor-laying body are separate structures from each other, and are independently supported by the gantry.

根據該浴室地板構造,可將排水池與地板鋪設體分開另行設置於架台上。因而,即便排水池為大容量,亦可容易地進行設置作業。反言之,可在不受設置操作性侷限下將排水池大容量化。又,由於可將地板鋪設體與排水池分開另行設置,故藉由例如在地板鋪設體之設置前將排水管及排水阱配管於地板下且連接於排水池,而可將配管及連接作業容易化。之後,將地板鋪設體設置於架台上。According to this bathroom floor structure, the drainage pool and the floor paving body can be separately installed on the stand. Therefore, even if the drainage tank has a large capacity, installation work can be easily performed. Conversely, the capacity of the drainage tank can be increased without being limited by the operability of installation. In addition, since the floor laying body and the drainage pool can be separately provided, the piping and connection work can be easily performed by, for example, piping the drain pipe and the drainage trap under the floor and connecting it to the drainage pool before installing the floor laying body Change. After that, the floor paving body is installed on the gantry.

較佳為,前述架台包含沿前述排水池之一對長邊側緣延伸之一對地板樑;且 前述排水池被懸架於前述一對地板樑之間,且由前述各長邊側緣所對應之地板樑支持。 若將排水池插入一對地板樑彼此之間,將地板樑載置於排水池之一對長邊側緣,則即便在將排水池接合並固定於架台前,亦可將排水池穩定地懸架於架台。藉此,可使排水池之設置作業進一步容易化。藉由將排水池設為上述之懸架構造,而可充分地增大排水池之深度、寬度、長度,從而可確保大容量。Preferably, the platform includes a pair of floor beams extending along a pair of long side edges of the drainage basin; and The drainage pool is suspended between the pair of floor beams, and supported by the floor beams corresponding to the long side edges. If the drainage pool is inserted between a pair of floor beams and the floor beam is placed on a pair of long side edges of the drainage pool, even before the drainage pool is joined and fixed to the gantry, the drainage pool can be stably suspended on shelf. Thereby, the installation operation of the drainage tank can be further facilitated. By setting the drainage tank to the above-mentioned suspension structure, the depth, width, and length of the drainage pool can be sufficiently increased, thereby ensuring a large capacity.

前述排水池與前述地板鋪設體較佳為被支持或連結於相互共通之前述地板樑的相互隔開之部位。 藉此,可分別進行排水池之設置作業與地板鋪設體之設置作業。可將排水池與地板鋪設體以互不干涉之方式支持或連結於1個地板樑。 可將排水池之對地板樑施加荷重之部分和與地板樑連結固定之部分相互隔開而分別設置。 可將地板鋪設體之對地板樑施加荷重之部分和與地板樑連結固定之部分相互隔開而分別設置。It is preferable that the drainage pool and the floor paving body are supported or connected to mutually spaced portions of the floor beams that are common to each other. Thereby, the installation work of the drainage pool and the installation work of the floor laying body can be performed separately. The drainage pool and the floor paving body can be supported or connected to one floor beam without interference. The part of the drainage pool that applies the load to the floor beam and the part connected and fixed to the floor beam can be separated from each other and set separately. The portion of the floor paving body that applies a load to the floor beam and the portion connected and fixed to the floor beam can be separated from each other and provided separately.

較佳為,在前述長邊側緣形成沿前述地板樑之上表面朝向前述地板鋪設體突出之突出緣部,在前述突出緣部於前述長邊側緣之延伸方向隔開而設置連結座與退避凹部,前述連結座經由池連結機構與前述地板樑連結; 在前述退避凹部配置前述地板鋪設體之連結凸片,該連結凸片經由鋪設體連結機構與前述地板樑連結。 藉此,可使排水池與地板樑之連結部和地板鋪設體與地板樑之連結部相互隔開而不干涉。Preferably, a protruding edge portion protruding toward the floor laying body along the upper surface of the floor beam is formed on the long-side side edge, and the protruding edge portion is spaced apart from the extending direction of the long-side side edge to provide a coupling seat Retreat the recess, the connection seat is connected to the floor beam via a pool connection mechanism; The connecting fins of the floor laid body are arranged in the retreat recesses, and the connection fins are connected to the floor beam via a floor body connecting mechanism. Thereby, the connection between the drainage pool and the floor beam and the connection between the floor paving body and the floor beam can be separated from each other without interference.

較佳為,在前述排水池形成沿前述長邊側緣延伸之凸條壁部,在前述凸條壁部與前述地板鋪設體之間區劃出凹槽,在前述凹槽之底部配置前述突出緣部; 以覆蓋前述突出緣部之方式在前述凹槽內收容有間隔件構件; 前述地板鋪設體之表層片之端部跨於前述間隔件構件之上表面而覆蓋前述凸條壁部之上表面。 若在將排水池及地板鋪設體中一者設置於架台上且與地板樑連結後,將另一者設置於架台上,則在排水池之凸條壁部與地板鋪設體之間形成凹槽,在其底部出現突出緣部之連結座與退避凹部。藉此,可通過前述凹槽進行排水池及地板鋪設體之另一者與地板樑之連結作業。之後,以間隔件構件將凹槽封塞,並以表層片材覆蓋。Preferably, a convex wall portion extending along the long side edge is formed in the drainage basin, a groove is defined between the convex wall portion and the floor paving body, and the protruding edge is disposed at the bottom of the groove unit; The spacer member is accommodated in the groove so as to cover the protruding edge; The end of the surface layer sheet of the floor covering body spans the upper surface of the spacer member and covers the upper surface of the rib wall portion. If one of the drainage pool and the floor laying body is installed on the gantry and connected with the floor beam, and the other is installed on the gantry, a groove is formed between the convex wall of the drainage pool and the floor laying body, At its bottom, a connecting seat protruding from the edge and a recessed recess appear. Thereby, the connection operation between the drain pool and the floor paving body and the floor beam can be performed through the aforementioned groove. After that, the groove is blocked with a spacer member and covered with a surface sheet.

較佳為,前述地板樑包含:具有上板及一對側板的倒U字狀之剖面之上側樑構件、及具有下板及一對側板的U字狀之剖面之下側樑構件,該等上下之樑構件相互以彼此之側板重疊之方式嵌合。 藉此,可提高地板樑之撓曲強度,而可確實地支持大容量之排水池及地板鋪設體。Preferably, the floor beam includes an inverted U-shaped cross-sectional upper side beam member having an upper plate and a pair of side plates, and a U-shaped cross-sectional lower side beam member having a lower plate and a pair of side plates. The upper and lower beam members are fitted with each other so that their side plates overlap. Thereby, the flexural strength of the floor beam can be increased, and the large-capacity drainage pool and floor paving body can be reliably supported.

較佳為,前述排水池包含沿延伸方向排列為一直線之長條之第1池及短條之第2池,該等第1、第2池在彼此之間隔著水密材料而抵接且連結。 藉由組合長度不同之池,而可與浴室之各種尺寸對應地調整排水池之全長。Preferably, the drainage pool includes a long first pool and a short second pool arranged in a straight line along the extending direction, and the first and second pools are abutted and connected with a water-tight material therebetween. By combining pools with different lengths, the total length of the drainage pool can be adjusted corresponding to the various sizes of the bathroom.

較佳為,沿前述地板鋪設體之外周部設置承接浴室之壁面板或門框之相對較長之壁/門承接框部; 在前述排水池之短邊端緣設置相對較短之壁/門承接框部; 前述長短之壁/門承接框部彼此經由連接裝置而連接。 藉此,不僅沿地板鋪設體之外周部,亦可沿排水池之短邊端緣設置浴室壁面板或門框。可經由壁/門承接框部連接排水池與地板鋪設體。Preferably, a relatively long wall/door receiving frame portion for receiving the wall panel of the bathroom or the door frame is provided along the outer peripheral portion of the floor laying body; A relatively short wall/door receiving frame portion is provided at the short-side end edge of the aforementioned drainage tank; The aforementioned long/short wall/door receiving frame portions are connected to each other via a connecting device. By this, not only along the outer peripheral part of the floor paving body, but also along the short edge of the drainage pool, a bathroom wall panel or a door frame can be provided. The drainage pool and the floor laying body can be connected via the wall/door receiving frame part.

較佳為,前述連接裝置包含: 第1連接零件,其具有卡合構件及操作構件,且設置於前述長短之壁/門承接框部之一者;及 第2連接零件,其設置於前述長短之壁/門承接框部之另一者;且 藉由前述操作構件之操作,而前述卡合構件可在拆裝位置與約束位置之間升降; 前述第2連接零件與前述拆裝位置之前述卡合構件為可拆裝,且前述第2連接零件會藉由前述約束位置之前述卡合構件而被約束為彼此無法分開。 藉由將卡合構件設定於拆裝位置且與第2連接零件卡合,繼而對操作構件進行操作,而使卡合構件朝約束位置移動。藉此,卡合構件與第2連接零件被約束為無法分開。其結果為,可容易且穩固地將地板鋪設體與排水池之壁/門承接框部彼此連接。操作構件較佳為出現在第1連接零件之上表面。藉此,可自上方對操作構件進行操作。例如即便結構壁接近浴室之俯視下外側而配置,亦可無障礙地對操作構件進行操作。Preferably, the aforementioned connection device includes: The first connecting part, which has an engaging member and an operating member, and is provided on one of the aforementioned long/short wall/door receiving frame portions; and The second connecting part, which is provided on the other of the aforementioned long/short wall/door receiving frame; and By the operation of the operation member, the engagement member can be raised and lowered between the disassembly position and the restraint position; The second connecting component and the engaging member at the disassembly and assembly position are detachable, and the second connecting component is constrained by the engaging member at the constraining position so that they cannot be separated from each other. By setting the engaging member at the detachable position and engaging with the second connecting part, and then operating the operating member, the engaging member is moved toward the restraining position. As a result, the engagement member and the second connection part are constrained so as not to be separated. As a result, the floor paving body and the wall/door receiving frame portion of the drainage pool can be easily and firmly connected to each other. The operating member preferably appears on the upper surface of the first connecting part. Thereby, the operation member can be operated from above. For example, even if the structural wall is arranged close to the outside of the bathroom in a plan view, the operation member can be operated without any trouble.

較佳為,前述地板鋪設體包含:排列於前述排水池之延伸方向之複數個地板面板、及跨於前述複數個地板面板之上表面而鋪設之表層片材。 藉此,可與浴室之各種尺寸對應地調整地板鋪設體之大小。可利用表層片材覆蓋地板面板彼此之接縫。 [發明之效果]Preferably, the floor covering body includes a plurality of floor panels arranged in the extending direction of the drainage basin, and a surface sheet laid across the upper surfaces of the plurality of floor panels. With this, the size of the floor paving body can be adjusted corresponding to various sizes of the bathroom. The seam of the floor panels can be covered with the surface sheet. [Effect of invention]

根據本發明,可在不受設置操作性等侷限下將排水池大容量化。According to the present invention, it is possible to increase the capacity of the drainage tank without being limited by the installation operability and the like.

以下,依照圖式說明本發明之一實施形態。 本實施形態之浴室1係在例如護理設施等中所使用之比較大型之浴室。如圖1所示,浴室1之整體成為洗浴場所。在浴室1之提供使用時,可另行搬入移動式浴缸(未圖示)。 該浴室1之規格大於一般獨棟住宅之浴室,例如浴缸容量為600 L左右,1天之沐浴次數為10次左右,浴缸排水時間為2分鐘左右,排水流量為每分鐘300 L左右。此外,本發明並不限定於前述數值範圍內。Hereinafter, an embodiment of the present invention will be described in accordance with the drawings. The bathroom 1 of this embodiment is a relatively large bathroom used in, for example, nursing facilities. As shown in FIG. 1, the entire bathroom 1 becomes a bathing place. When the bathroom 1 is provided for use, it can be moved into a portable bathtub (not shown). The size of the bathroom 1 is larger than that of a general single-family house, for example, the bathtub capacity is about 600 L, the number of baths per day is about 10 times, the bathtub drainage time is about 2 minutes, and the drainage flow rate is about 300 L per minute. In addition, the present invention is not limited to the aforementioned numerical range.

如圖1及圖2所示,浴室地板1a(浴室地板構造)具備2個地板鋪設體2、排水池4、及架台3。在浴室地板1a之底部設置有架台3。地板鋪設體2與排水池4由架台3支持。地板鋪設體2及排水池4相互為個別構體,且相互獨立地由架台3支持。 排水池4配置於浴室1之進深方向D(在圖1中為左右方向)之中央部(特定部位),且自浴室1之寬度方向W(一方向、在圖1中為上下)之一端部延伸至另一端部。As shown in FIGS. 1 and 2, the bathroom floor 1 a (bathroom floor structure) includes two floor paving bodies 2, a drainage pool 4, and a gantry 3. A shelf 3 is provided at the bottom of the bathroom floor 1a. The floor laying body 2 and the drainage pool 4 are supported by the gantry 3. The floor-laying body 2 and the drainage pool 4 are separate structures from each other, and supported by the gantry 3 independently of each other. The drain 4 is arranged at the center (specific location) of the bathroom 1 in the depth direction D (left-right direction in FIG. 1) and from one end of the bathroom 1 in the width direction W (one direction, up and down in FIG. 1) Extend to the other end.

浴室地板1a隔著排水池4被分為2個地板鋪設體2。各地板鋪設體2包含複數個(在圖1中例如為4個)地板面板5、及表層片材6。各地板面板5為利用鋼板製之上側補強板5b及下側補強板5c隔著發泡樹脂製之面板本體5a之夾層構造。藉此,可將地板面板5之製造成本低成本化,且可確保所需之強度。The bathroom floor 1a is divided into two floor coverings 2 via a drain 4. Each floor covering 2 includes a plurality (for example, four in FIG. 1) of floor panels 5 and surface layer sheets 6. Each floor panel 5 has a sandwich structure in which a panel body 5a made of foamed resin is sandwiched between an upper reinforcing plate 5b and a lower reinforcing plate 5c made of steel plates. As a result, the manufacturing cost of the floor panel 5 can be reduced, and the required strength can be ensured.

複數個浴室地板面板5在排水池4之延伸方向W排列,且鋪設於架台3上。表層片材6跨於該等複數個地板面板5之上表面而鋪設。 在浴室地板1a之上表面(地板面)形成有自浴室進深方向D之兩側部(在圖1中為左右兩端)朝向排水池4朝下傾斜之水流梯度。 此外,在浴室地板1a之1個轉角形成有避開建築物結構之支柱之支柱缺口1c。支柱缺口1c之有無及位置可相應於設置浴室1之建築物結構而適宜變更。A plurality of bathroom floor panels 5 are arranged in the extending direction W of the drainage pool 4 and are laid on the stand 3. The surface sheet 6 is laid across the upper surfaces of the plurality of floor panels 5. On the upper surface (floor surface) of the bathroom floor 1a, there are formed water flow gradients sloping downward toward the drain 4 from both side portions (left and right ends in FIG. 1) of the bathroom depth direction D. In addition, a pillar notch 1c that avoids the pillar of the building structure is formed at one corner of the bathroom floor 1a. The presence and location of the notch 1c of the pillar can be suitably changed according to the structure of the building where the bathroom 1 is installed.

進一步詳細敘述。 如圖1~圖3所示,架台3包含朝正交之方向W、D之任一方向水平地延伸之地板樑31、32、33等。在浴室地板1a之進深方向D之中央部,2條中央地板樑33(地板樑)相互隔以間隔地平行配置。各中央地板樑33自浴室地板1a之寬度方向W之一端部水平延伸至另一端部。中央地板樑33之兩端部與浴室地板1a之外周之朝進深方向D延伸之地板樑32接合。Further detailed description. As shown in FIGS. 1 to 3, the gantry 3 includes floor beams 31, 32, 33, etc. that extend horizontally in any of the orthogonal directions W, D. In the central portion of the bathroom floor 1a in the depth direction D, two central floor beams 33 (floor beams) are arranged parallel to each other with an interval therebetween. Each central floor beam 33 extends horizontally from one end of the bathroom floor 1a in the width direction W to the other end. Both ends of the central floor beam 33 are joined to the floor beam 32 extending in the depth direction D from the outer periphery of the bathroom floor 1a.

如圖4所示,地板樑33包含上側樑構件34、及下側樑構件35。上側樑構件34具有上板34a及一對側板34b,剖面形成為倒U字狀。側板34b自水平之上板34a之兩端部垂下。下側樑構件35具有下板25a及一對側板35b,剖面形成為U字狀。側板35b自水平之下板25a之兩端部朝上方突出。該等樑構件34、35彼此上下嵌合,彼此之側板34b、35b在厚度方向重疊。下側樑構件35嵌於上側樑構件34之內側,上側樑構件34之側板34b貼靠於下側樑構件35之側板35b之外表面。側板34b、35b彼此可藉由熔接、螺固等之接合方法而接合。 此外,可行的是,上側樑構件34嵌於下側樑構件35之內側,下側樑構件35之側板35b貼靠於上側樑構件34之側板34b之外表面。As shown in FIG. 4, the floor beam 33 includes an upper beam member 34 and a lower beam member 35. The upper side beam member 34 has an upper plate 34a and a pair of side plates 34b, and has an inverted U-shaped cross section. The side plate 34b hangs down from both ends of the horizontal upper plate 34a. The lower beam member 35 has a lower plate 25a and a pair of side plates 35b, and has a U-shaped cross section. The side plate 35b protrudes upward from both ends of the horizontal lower plate 25a. The beam members 34 and 35 are vertically fitted to each other, and the side plates 34b and 35b of each other overlap in the thickness direction. The lower side beam member 35 is embedded inside the upper side beam member 34, and the side plate 34 b of the upper side beam member 34 abuts against the outer surface of the side plate 35 b of the lower side beam member 35. The side plates 34b and 35b can be joined together by welding, screwing, or the like. In addition, it is feasible that the upper side beam member 34 is embedded inside the lower side beam member 35, and the side plate 35 b of the lower side beam member 35 abuts against the outer surface of the side plate 34 b of the upper side beam member 34.

如圖1所示,排水池4被支持及連結於一對地板樑33。在較地板樑33更靠浴室進深方向D之兩外側之架台3鋪設有地板鋪設體2。地板鋪設體2之排水池4側之端部被支持及連結於地板樑33。總而言之,排水池4與地板鋪設體2被支持及連結於相互共通之地板樑33。As shown in FIG. 1, the drain 4 is supported and connected to a pair of floor beams 33. A floor laying body 2 is laid on the pedestals 3 on both outer sides of the bathroom depth direction D than the floor beam 33. The end of the floor laying body 2 on the side of the drain 4 is supported and connected to the floor beam 33. In short, the drainage tank 4 and the floor paving body 2 are supported and connected to the floor beam 33 common to each other.

如圖1所示,排水池4包含第1池4a及第2池4b。第1池4a相對而言為長條。第2池4b較第1池4a為短條。第1池4a及第2池4b沿浴室寬度方向W(排水池4之延伸方向)排列為一直線。如圖6所示,在各池4a、4b之對向端面設置有凸緣部4h。如圖7所示,兩池之凸緣部4h隔著由EPDM(乙烯丙烯二烯橡膠)等構成之水密材料4s而抵接,且藉由螺栓緊固而連結。As shown in FIG. 1, the drainage pool 4 includes a first pool 4a and a second pool 4b. The first pool 4a is relatively long. The second pool 4b is shorter than the first pool 4a. The first pool 4a and the second pool 4b are arranged in a straight line along the width direction W of the bathroom (the extending direction of the drain 4). As shown in FIG. 6, a flange portion 4h is provided on the opposite end surfaces of the cells 4a and 4b. As shown in FIG. 7, the flange portions 4h of the two pools are contacted via a watertight material 4s made of EPDM (ethylene propylene diene rubber) or the like, and are connected by bolting.

如圖3所示,各第1、第2池4a、4b乃至排水池4一體地具有池本體40、及一對長邊框部41(長邊側緣)。池本體40形成為上表面開口之凹槽狀。如圖1所示,在第1池4a之池本體40之底面之一處設置有排水口4c。雖然省略詳細之圖示,但在池本體40之底面形成有朝向排水口4c向下傾斜之排水梯度。此外,排水口4c亦可設置於第2池4b。As shown in FIG. 3, each of the first, second pools 4a, 4b and even the drainage pool 4 integrally includes a pool body 40 and a pair of long frame portions 41 (long side edges). The cell body 40 is formed in a groove shape with an open upper surface. As shown in FIG. 1, a drain port 4c is provided at one of the bottom surfaces of the pool body 40 of the first pool 4a. Although detailed illustration is omitted, a drain gradient inclined downward toward the drain 4c is formed on the bottom surface of the tank body 40. In addition, the drain port 4c may be provided in the second tank 4b.

如圖3所示,在排水口4c連著排水阱4d及排水管4e。如前述般,池本體40具有可對來自大容量(例如600 L左右)之浴缸之排水加以暫時保水之容量。且,排水口4c、排水阱4d及排水管4e為能以例如2分鐘左右將暫時積存於前述池本體40之排水高速排水之大小。As shown in FIG. 3, a drain well 4d and a drain pipe 4e are connected to the drain port 4c. As described above, the pool body 40 has a capacity to temporarily retain the water discharged from the bathtub with a large capacity (for example, about 600 L). In addition, the drain port 4c, the drain trap 4d, and the drain pipe 4e are of a size capable of draining the drain water temporarily stored in the tank body 40 at a high speed for about 2 minutes, for example.

如圖3所示,沿池本體40之一對長邊側緣部設置有長邊框部41。一對長邊框部41朝浴室寬度方向W相互平行地延伸,並與中央地板樑33平行地延伸。各長邊框部41被載置、支持於對應之中央地板樑33上。池本體40被插入2條中央地板樑33之間,且朝較中央地板樑33更靠下方懸吊。藉此,將排水池4懸架於一對中央地板樑33、33之間。As shown in FIG. 3, a long frame portion 41 is provided along a pair of long-side side edge portions of the pool body 40. The pair of long frame portions 41 extend parallel to each other in the bathroom width direction W, and extend parallel to the central floor beam 33. Each long frame portion 41 is placed and supported on the corresponding central floor beam 33. The pool body 40 is inserted between the two central floor beams 33 and is suspended downward from the central floor beam 33. Thereby, the drain 4 is suspended between the pair of central floor beams 33, 33.

如圖4所示,排水池4之長邊框部41具有凸條壁部43及突出緣部44,剖面形成為大致凸字狀。在凸條壁部43之朝向池本體40之側部形成有階差43d。在階差43d載置在圖3中以兩點鏈線表示之格柵46之緣部。 在凸條壁部43之上表面與階差43d之角部,凸緣部43b以朝上方突出之方式形成。As shown in FIG. 4, the long frame portion 41 of the drainage pool 4 has a convex wall portion 43 and a protruding edge portion 44, and the cross section is formed in a substantially convex shape. A step 43d is formed on the side of the convex wall portion 43 facing the pool body 40. The step 43d is placed on the edge of the grid 46 indicated by the two-dot chain line in FIG. 3. At the corner between the upper surface of the rib wall portion 43 and the step 43d, the flange portion 43b is formed to protrude upward.

如圖4所示,凸條壁部43朝排水池4之長度方向(圖4之紙面正交方向)延伸,且在內部形成有倒槽部43a而成為中空。倒槽部43a朝下方開放。在倒槽部43a嵌入支撐構件45。支撐構件45由例如上下縱長之四角筒形狀之鋁擠出型材構成,朝排水池4之長度方向(浴室寬度方向W)筆直地延伸。支撐構件45之材質並不限定於鋁等之金屬,可為樹脂。在支撐構件45設置有包含位準調節螺栓之池框腳部42。池框腳部42被載置於中央地板樑33之上表面。排水池4之荷重自池框腳部42施加至中央樑構件33。As shown in FIG. 4, the protruding strip wall portion 43 extends in the longitudinal direction of the drainage tank 4 (the orthogonal direction of the paper surface in FIG. 4 ), and an inverted groove portion 43 a is formed inside to become hollow. The inverted groove portion 43a opens downward. The support member 45 is fitted into the inverted groove portion 43a. The support member 45 is composed of, for example, an aluminum extruded profile in the shape of a rectangular tube in the vertical direction, and extends straight in the longitudinal direction of the drain 4 (bathroom width direction W). The material of the supporting member 45 is not limited to metal such as aluminum, and may be resin. The supporting member 45 is provided with a pool frame leg 42 including a level adjustment bolt. The pool frame foot 42 is placed on the upper surface of the central floor beam 33. The load of the drain 4 is applied to the center beam member 33 from the leg 42 of the pool frame.

池框腳部42僅單單載置於地板樑33,並未與地板樑33固定。在排水池4中,與地板樑33之連結部44a係與池框腳部42分開另行設置。即,排水池4之對地板樑33施加荷重之部分42和與地板樑33連結固定之部分44a相互隔開而分別設置。The pool frame foot 42 is only placed on the floor beam 33 and is not fixed to the floor beam 33. In the drainage pool 4, the connection portion 44a with the floor beam 33 is separately provided from the pool frame leg portion 42. That is, a portion 42 of the drain 4 that applies a load to the floor beam 33 and a portion 44a connected and fixed to the floor beam 33 are spaced apart from each other and provided separately.

如圖4及圖5所示,在朝向與排水池4之凸條壁部43之池本體40為相反側的外側部形成有突出緣部44。突出緣部44自凸條壁部43之底部朝向地板鋪設體2突出,且沿地板樑33之上表面朝該樑33及排水池4之長度方向延伸。在突出緣部44中,連結座44a與退避凹部44c分別在長度方向(浴室寬度方向W)隔以間隔地形成有複數個。池固定螺釘47(池連結機構)通過連結座44a螺入中央地板樑33。藉此,將排水池4連結固定於架台3。As shown in FIGS. 4 and 5, a protruding edge 44 is formed on the outer side of the pool body 40 that faces the convex wall portion 43 of the drain 4. The protruding edge portion 44 protrudes from the bottom of the protruding strip wall portion 43 toward the floor paving body 2, and extends along the upper surface of the floor beam 33 toward the longitudinal direction of the beam 33 and the drain 4. In the protruding edge portion 44, a plurality of connecting seats 44a and retreat recesses 44c are formed at intervals in the longitudinal direction (bathroom width direction W). The pool fixing screw 47 (pool connection mechanism) is screwed into the center floor beam 33 through the connection seat 44a. By this, the drainage tank 4 is connected and fixed to the gantry 3.

退避凹部44c與連結座44a在排水池4之長度方向隔開而配置,形成為朝向凸條壁部43凹入之缺口狀。在退避凹部44c之內側配置有自地板鋪設體2之各地板面板5突出之連結凸片5g。換言之,排水池4藉由退避凹部44c而使連結凸片5g退避。連結凸片5g在地板樑33之上方相離地與地板樑33對峙。藉由面板固定螺釘5h(鋪設體連結機構)通過連結凸片5g螺入地板樑33,而將地板鋪設體2連結固定於架台3。 此外,藉由在地板鋪設體2之各地板面板5中設置包含位準調整螺栓之腳部5d,且將該腳部5d載置於地板樑33,而地板鋪設體2之荷重自腳部5d施加至地板樑33。即,在地板鋪設體2中亦然,對地板樑33施加荷重之部分5d和與地板樑33連結固定之部分5g相互隔開而分別設置。The retreat concave portion 44c and the connecting seat 44a are arranged apart from each other in the longitudinal direction of the drainage tank 4, and are formed in a notch shape that is concave toward the convex wall portion 43. Inside the retreat recess 44c, a connecting tab 5g protruding from each floor panel 5 of the floor-laying body 2 is arranged. In other words, the drainage pool 4 retracts the connecting fin 5g by the recessed recess 44c. The connecting tab 5g faces the floor beam 33 so as to be separated above the floor beam 33. The floor fixing body 2 is connected and fixed to the gantry 3 by the panel fixing screws 5h (laying body connection mechanism) being screwed into the floor beam 33 through the connection tab 5g. In addition, by providing foot portions 5d including level adjustment bolts in the floor panels 5 of the floor lay body 2, and placing the foot portions 5d on the floor beam 33, the load of the floor lay body 2 is derived from the foot portions 5d Apply to the floor beam 33. That is, also in the floor paving body 2, the portion 5d that applies a load to the floor beam 33 and the portion 5g that is connected and fixed to the floor beam 33 are spaced apart from each other and provided separately.

在排水池4之凸條壁部43與地板鋪設體2之間形成有凹槽48。在凹槽48之底部配置有突出緣部44。面板固定螺釘5h及池固定螺釘47之頭部面向凹槽48內。如圖4所示,在凹槽48收容有間隔件構件49。該間隔件構件49覆蓋於突出緣部44及螺釘5h、47上。 間隔件構件49由例如上下縱長之四角筒形狀之鋁擠出型材構成,朝排水池4之長度方向(浴室寬度方向W)筆直地延伸。間隔件構件49可為角柱形狀。間隔件構件49之材質並不限定於鋁等之金屬,可為樹脂。A groove 48 is formed between the protruding strip wall portion 43 of the drainage tank 4 and the floor-laying body 2. A protruding edge 44 is arranged at the bottom of the groove 48. The heads of the panel fixing screw 5h and the pool fixing screw 47 face into the groove 48. As shown in FIG. 4, the spacer member 49 is accommodated in the groove 48. The spacer member 49 covers the protruding edge 44 and the screws 5h and 47. The spacer member 49 is composed of, for example, an aluminum extruded profile in the shape of a rectangular tube in the vertical direction, and extends straight in the longitudinal direction (bathroom width direction W) of the drain 4. The spacer member 49 may be in the shape of a corner pillar. The material of the spacer member 49 is not limited to metal such as aluminum, and may be resin.

如圖4所示,表層片材6之排水池4側之端部6b自地板鋪設體2之上表面延伸而出,跨於間隔件構件49之上表面而覆蓋凸條壁部43之上表面。在凸條壁部43之上表面設置有包含丙烯酸發泡體等之防水膠帶6g(水密材料),該防水膠帶6g與表層片材端部6b之下表面接合。As shown in FIG. 4, the end 6 b of the surface sheet 6 on the drain 4 side extends from the upper surface of the floor covering 2, spans the upper surface of the spacer member 49 and covers the upper surface of the convex wall portion 43 . A waterproof tape 6g (watertight material) containing acrylic foam or the like is provided on the upper surface of the rib wall portion 43, and the waterproof tape 6g is joined to the lower surface of the surface sheet end 6b.

表層片材端部6b之端面接近或抵接於凸緣部43b。可利用凸緣部43b進行表層片材端部6b之定位。在表層片材端部6b之端面與凸緣部43b之間塗佈矽酮等之密封材6s。 利用表層片材端部6b之下表面之防水膠帶6g與端面之密封材6s,在表層片材端部6b與排水池4之間進行雙重防水處理。 表層片材6與間隔件構件49為非接合狀態,但可以接著劑等接合。The end surface of the surface sheet end 6b is close to or abuts on the flange 43b. The flange portion 43b can be used to position the surface sheet end 6b. A sealing material 6s such as silicone is applied between the end surface of the end portion 6b of the surface layer sheet and the flange portion 43b. Using the waterproof tape 6g on the lower surface of the surface sheet end 6b and the sealing material 6s on the end face, a double waterproof treatment is performed between the surface sheet end 6b and the drain 4. The surface layer sheet 6 and the spacer member 49 are in a non-joined state, but may be joined with an adhesive or the like.

如圖1及圖9所示,沿各地板面板5甚至地板鋪設體2之外周部設置有較長之壁/門承接框部2f。在排水池4之短邊端緣設置有較短之壁/門承接框部4f。在浴室1之進深方向側緣部之中央部,壁/門承接框部2f、4f彼此經由連接裝置9相連為一直線。該等長短之壁/門承接框部2f、4f包含互為相同之剖面之鋁擠出型材,承接以圖10之兩點鏈線表示之浴室1之壁面板7(或門框)之底部。 此外,在各壁/門承接框部2f、4f之朝向浴室內側之側部設置有承接表層片材6之端部之片材端承接框部2k、4k。在地板鋪設體2之進深方向D延伸之片材端承接框部2k與水流梯度相配對應地傾斜。As shown in FIGS. 1 and 9, a long wall/door receiving frame portion 2 f is provided along the outer peripheral portion of each floor panel 5 or even the floor laid body 2. A short wall/door receiving frame portion 4f is provided at the short edge of the drain 4. In the central portion of the side edge portion of the bathroom 1 in the depth direction, the wall/door receiving frame portions 2f and 4f are connected to each other via a connecting device 9 in a straight line. The long/short wall/door receiving frame portions 2f, 4f include aluminum extruded profiles with the same cross section, and receive the bottom of the wall panel 7 (or door frame) of the bathroom 1 indicated by the two-dot chain line in FIG. In addition, on the side of each wall/door receiving frame portion 2f, 4f facing the inside of the bathroom, sheet end receiving frame portions 2k, 4k that receive the ends of the surface sheet 6 are provided. The sheet end receiving frame portion 2k extending in the depth direction D of the floor covering 2 is inclined corresponding to the water flow gradient.

如圖10所示,連接裝置9具備第1連接零件10、及第2連接零件20。第1連接零件10設置於排水池4之壁/門承接框部4f之端部。第2連接零件20設置於地板鋪設體2之壁/門承接框部2f之與框部4f之對向端部。As shown in FIG. 10, the connection device 9 includes a first connection component 10 and a second connection component 20. The first connection member 10 is provided at the end of the wall/door receiving frame portion 4f of the drain 4. The second connection member 20 is provided at the opposite end of the wall/door receiving frame portion 2f of the floor paving body 2 and the frame portion 4f.

如圖11及圖12所示,第1連接零件10具有保持器構件11、卡合構件12、及操作構件13。 保持器構件11由硬質樹脂構成,成為上下較長之殼體狀。保持器構件11之兩側板11a、11b之形狀與壁/門承接框部2f、4f之剖面形狀大致相同地形成。在側板11a、11b之外側面設置有包含例如EPDM之發泡體之水密材料51、52。 在保持器構件11之上表面部形成有承接浴室壁面板7(或浴室門框)之底部之壁/門承接凹部11g。如圖8所示,相鄰之框部2f、4f之壁/門承接凹部2g、4g彼此經由保持器構件11之壁/門承接凹部11g相連為一直線。As shown in FIGS. 11 and 12, the first connection component 10 includes a holder member 11, an engagement member 12, and an operation member 13. The retainer member 11 is made of hard resin and has a long and long casing shape. The shapes of the side plates 11a, 11b of the holder member 11 are formed substantially the same as the cross-sectional shapes of the wall/door receiving frame portions 2f, 4f. Watertight materials 51 and 52 containing foams such as EPDM are provided on the outer sides of the side plates 11a and 11b. On the upper surface of the holder member 11, a wall/door receiving recess 11g for receiving the bottom of the bathroom wall panel 7 (or bathroom door frame) is formed. As shown in FIG. 8, the wall/door receiving recesses 2g and 4g of adjacent frame portions 2f and 4f are connected to each other via a wall/door receiving recess 11g of the holder member 11 in a straight line.

如圖10所示,保持器構件11介隔著補強金屬件14藉由固定螺釘17而固定於壁/門承接框部4f之端面。將側板11a與壁/門承接框部4f之間之水密材料51壓縮而進行防水處理。As shown in FIG. 10, the retainer member 11 is fixed to the end surface of the wall/door receiving frame portion 4f by the fixing screw 17 via the reinforcing metal 14. The watertight material 51 between the side plate 11a and the wall/door receiving frame portion 4f is compressed to perform waterproof treatment.

如圖10及圖11所示,在保持器構件11之內部收容有卡合構件12。卡合構件12包含上下較長之コ字狀之金屬件,配置為追隨第2側板11b之內側面。在卡合構件12之縱板部12a形成有上下一對卡合承接部15。此外,卡合構件12之卡合承接部15之數目既可僅為1個,也可為3個以上。As shown in FIGS. 10 and 11, the engagement member 12 is housed inside the holder member 11. The engaging member 12 includes a U-shaped metal piece which is long vertically, and is arranged to follow the inner side surface of the second side plate 11b. A pair of upper and lower engagement receiving portions 15 are formed on the vertical plate portion 12a of the engagement member 12. In addition, the number of engagement receiving portions 15 of the engagement member 12 may be only one, or may be three or more.

如圖12所示,各卡合承接部15包含接收孔15a、約束槽15b、及約束隆起部16。約束槽15b自圓形之接收孔15a朝下方延伸。約束槽15b之寬度小於接收孔15a之直徑。As shown in FIG. 12, each engagement receiving portion 15 includes a receiving hole 15 a, a constraining groove 15 b, and a constraining raised portion 16. The restraining groove 15b extends downward from the circular receiving hole 15a. The width of the constraining groove 15b is smaller than the diameter of the receiving hole 15a.

在縱板部12a之約束槽15b之兩側之側緣部,藉由分別切起而將約束隆起部16形成為朝第1側板11a側隆起。約束隆起部16之朝向第1側板11a之表側面包含平坦頂面16a及傾斜導引面16b。傾斜導引面16b與接收孔15a之下側之緣部相連,且自該處朝向下方往第1側板11a側傾斜。在傾斜導引面16b之下端部連著平坦頂面16a。平坦頂面16a朝較縱板部12a之朝向第1側板11a之表側面更靠第1側板11a側突出,且相對於框部2f、4f彼此之對向方向D正交。In the side edge portions on both sides of the restraining groove 15b of the vertical plate portion 12a, the restraining ridge portions 16 are formed to bulge toward the first side plate 11a side by being cut out respectively. The front and side surfaces of the restraining protrusion 16 facing the first side plate 11a include a flat top surface 16a and an inclined guide surface 16b. The inclined guide surface 16b is connected to the lower edge of the receiving hole 15a, and is inclined downward from the point toward the first side plate 11a. A flat top surface 16a is connected to the lower end of the inclined guide surface 16b. The flat top surface 16a protrudes toward the first side plate 11a side from the front surface of the vertical plate portion 12a toward the first side plate 11a, and is orthogonal to the opposing direction D with respect to the frame portions 2f and 4f.

如圖10及圖14所示,卡合構件12可在保持器構件11內升降。在保持器構件11設置有前述升降用之操作構件13。操作構件13由螺釘構成。該操作構件13貫通保持器構件11之上板部11c(上表面部),於保持器構件11之內部空間垂下,且螺入卡合構件12之上板部12b。構成操作構件13之螺釘之頭部13a(操作部)可旋轉地卡止於上板部11c。頭部13a顯露於保持器構件11之壁/門承接凹部11g之底部。As shown in FIGS. 10 and 14, the engaging member 12 can be raised and lowered in the holder member 11. The holder member 11 is provided with the operation member 13 for lifting mentioned above. The operating member 13 is composed of screws. The operation member 13 penetrates the upper plate portion 11 c (upper surface portion) of the holder member 11, hangs down in the internal space of the holder member 11, and is screwed into the upper plate portion 12 b of the engaging member 12. The head portion 13a (operation portion) of the screw constituting the operation member 13 is rotatably locked to the upper plate portion 11c. The head 13a is exposed at the bottom of the wall/door receiving recess 11g of the holder member 11.

藉由操作構件13之螺釘轉動操作,卡合構件12在上側之約束位置(圖10)與下側之拆裝位置(圖14)之間升降。此時,卡合構件12以不會因來自操作構件13之轉矩而旋轉之方式由保持器構件11保持。By the screw rotation operation of the operating member 13, the engaging member 12 moves up and down between the upper restraining position (FIG. 10) and the lower disassembling position (FIG. 14). At this time, the engagement member 12 is held by the holder member 11 so as not to rotate due to the torque from the operation member 13.

如圖10及圖11所示,設置於壁/門承接框部2f之第2連接零件20包含上下一對連接螺釘構件21。連接螺釘構件21由有肩螺釘構成。各連接螺釘構件21朝向壁/門承接框部2f之長度方向,螺釘部22螺入壁/門承接框部2f之與框部4f之對向端部。連接螺釘構件21之較螺釘部22靠向頭部側之部分自壁/門承接框部2f突出,而構成卡合突起23。卡合突起23包含突出軸部24及軸頭部25。突出軸部24之直徑小於約束槽15b之寬度。在突出軸部24之前端形成有較其更大徑之軸頭部25。軸頭部25之直徑小於卡合構件12之接收孔15a之直徑,且大於約束槽15b之寬度。As shown in FIGS. 10 and 11, the second connecting member 20 provided in the wall/door receiving frame portion 2f includes a pair of upper and lower connecting screw members 21. The connection screw member 21 is composed of a shoulder screw. Each connecting screw member 21 faces the longitudinal direction of the wall/door receiving frame portion 2f, and the screw portion 22 is screwed into the opposite end portion of the wall/door receiving frame portion 2f and the frame portion 4f. The portion of the connecting screw member 21 that is closer to the head side than the screw portion 22 protrudes from the wall/door receiving frame portion 2f to constitute the engaging protrusion 23. The engaging protrusion 23 includes a protruding shaft portion 24 and a shaft head 25. The diameter of the protruding shaft portion 24 is smaller than the width of the constraining groove 15b. A shaft head 25 having a larger diameter is formed at the front end of the protruding shaft portion 24. The diameter of the shaft head 25 is smaller than the diameter of the receiving hole 15a of the engaging member 12 and larger than the width of the restraining groove 15b.

如圖14及圖15所示,在卡合構件12位於拆裝位置時,卡合突起23可對接收孔15a插拔,可將卡合突起23與卡合構件12拆裝。 如圖10及圖11所示,在卡合構件12位於約束位置時,卡合突起23之突出軸部24通過約束槽15b,且軸頭部25壓抵於約束隆起部16之平坦頂面16a而被約束。藉此,將第1、第2連接零件10、20彼此無法分開地卡合,並將壁/門承接框部2f、4f彼此無法分開地連接。再者,將側板11b與壁/門承接框部2f之間之水密材料52壓縮而進行防水處理。在組裝完成之浴室地板1a中,卡合構件12配置於約束位置。 此外,如圖1所示,在浴室寬度方向相鄰之地板面板5之壁/門承接框部2f彼此經由與前述連接裝置9同樣之連接裝置9B連接。As shown in FIGS. 14 and 15, when the engaging member 12 is in the detachable position, the engaging protrusion 23 can be inserted into and removed from the receiving hole 15 a, and the engaging protrusion 23 can be detached from the engaging member 12. As shown in FIGS. 10 and 11, when the engaging member 12 is at the restraining position, the protruding shaft portion 24 of the engaging protrusion 23 passes through the restraining groove 15 b, and the shaft head 25 presses against the flat top surface 16 a of the restraining protrusion 16 While being constrained. As a result, the first and second connecting parts 10 and 20 are inseparably engaged with each other, and the wall/door receiving frame portions 2f and 4f are inseparably connected with each other. Furthermore, the watertight material 52 between the side plate 11b and the wall/door receiving frame portion 2f is compressed to perform waterproofing treatment. In the assembled bathroom floor 1a, the engaging member 12 is arranged at the restraining position. In addition, as shown in FIG. 1, the wall/door receiving frame portion 2 f of the floor panel 5 adjacent in the bathroom width direction is connected to each other via a connection device 9B similar to the aforementioned connection device 9.

如圖13所示,當在建築結構之施工現場建構浴室地板1a時,首先,設置架台3。 其次,設置排水池4。2個(複數個)池4a、4b可在工廠等中預先連接,也可在施工現場連接。藉由組合長度不同之池4a、4b,而可相應於浴室1之各種尺寸調整排水池4之全長。 將該排水池4之池本體40插入2條中央地板樑33間,將一對長邊框部41載置於分別對應之中央地板樑33之上。藉此,排水池4被懸架於2條中央地板樑33間。若將長邊框部41載置於地板樑33,則即便在將排水池4接合、固定於架台3前,亦可利用架台3穩定地支持排水池4。 繼而,將池固定螺釘47通過連結座44a而螺入中央地板樑33,而將排水池4固定於架台3。由於排水池4被穩定地懸架、支持於中央地板樑33間,故可容易進行利用池固定螺釘47之固定作業。 而且,在此階段中,由於尚未設置地板面板5,故確實可將排水池4之設置作業容易化。即便排水池4為大容量之大型池,亦無損設置操作性。 反言之,可在不受設置操作性侷限下將排水池大容量化。As shown in FIG. 13, when constructing the bathroom floor 1a on the construction site of the building structure, first, the stand 3 is provided. Secondly, a drainage pool 4. Two (plural) pools 4a, 4b may be connected in advance in a factory or the like, or may be connected at the construction site. By combining the pools 4a and 4b with different lengths, the total length of the drainage pool 4 can be adjusted according to various sizes of the bathroom 1. The pool body 40 of the drainage pool 4 is inserted between two central floor beams 33, and a pair of long frame portions 41 are placed on the corresponding central floor beams 33, respectively. Thereby, the drainage pool 4 is suspended between two central floor beams 33. If the long frame portion 41 is placed on the floor beam 33, even before the drainage tank 4 is joined and fixed to the gantry 3, the drainage pond 4 can be stably supported by the gantry 3. Then, the pool fixing screw 47 is screwed into the central floor beam 33 through the connection seat 44a, and the drain 4 is fixed to the gantry 3. Since the drainage tank 4 is suspended steadily and supported between the central floor beams 33, the fixing operation using the pool fixing screws 47 can be easily performed. Furthermore, at this stage, since the floor panel 5 has not yet been installed, it is indeed possible to facilitate the installation work of the drain 4. Even if the drainage pool 4 is a large-capacity large-scale pool, the operability of the installation is not impaired. Conversely, the capacity of the drainage tank can be increased without being limited by the operability of installation.

其次,將排水阱4d配置於排水池4之下側,並與排水口4c連接。進而,將連接於排水阱4d之排水管4e配管於架台3之水平之地板樑之下方的浴室地板下空間1b。 在此階段中,由於尚未設置地板面板5,且浴室地板下空間1b經開放,故可容易進行排水阱4d之連接作業及排水管4e之配管作業。即便排水阱4d為大型,且排水管4e為大徑,亦不會對連接、配管作業帶來障礙。Next, the drain trap 4d is arranged below the drain tank 4 and connected to the drain port 4c. Furthermore, the drain pipe 4e connected to the drain well 4d is piped to the bathroom under-floor space 1b below the horizontal floor beam of the gantry 3. At this stage, since the floor panel 5 has not been installed, and the under-floor space 1b of the bathroom is opened, the connection operation of the drain well 4d and the piping operation of the drain pipe 4e can be easily performed. Even if the drain trap 4d is large in size and the drain pipe 4e is large in diameter, it does not cause obstacles to connection and piping operations.

其次,隔著排水池4在兩側之架台3上設置複數個地板面板5。將各地板面板5之腳部5d載置於中央地板樑33上。再者,利用面板固定螺釘5h將連結凸片5g與中央地板樑33連結。藉此,將浴室地板面板5固定於架台3。 如圖5所示,在此階段中,由於連結凸片5g出現在凹槽48之底部,故可容易進行面板固定螺釘5h之螺入操作。甚至可進行浴室地板面板5與架台3之連結作業。 將複數個浴室地板面板5以同樣之程序排列設置於架台3上,並經由連接構件9B將相鄰之地板面板5之壁/門承接框部2f彼此連接。Next, a plurality of floor panels 5 are provided on the trestles 3 on both sides via the drainage pool 4. The foot 5d of each floor panel 5 is placed on the central floor beam 33. Furthermore, the panel fixing screw 5h is used to connect the connecting tab 5g to the central floor beam 33. By this, the bathroom floor panel 5 is fixed to the stand 3. As shown in FIG. 5, at this stage, since the connecting tab 5g appears at the bottom of the groove 48, the screwing operation of the panel fixing screw 5h can be easily performed. It is even possible to connect the bathroom floor panel 5 and the stand 3. A plurality of bathroom floor panels 5 are arranged on the gantry 3 in the same procedure, and the adjacent wall/door receiving frame portions 2f of the floor panel 5 are connected to each other via a connecting member 9B.

又,如下述般連接地板鋪設體2之壁/門承接框部2f與排水池4之壁/門承接框部4f。 如圖14所示,連接裝置9之卡合構件12預先配置於拆裝位置。而後,如圖14~圖15所示,使框部2f、4f彼此水平對峙且相互接近、抵接。伴隨於此,卡合突起23由接收孔15a接收。 繼而,藉由對操作構件13進行操作,而如圖10及圖11所示,使卡合構件12上升至約束位置。藉由將操作構件13之頭部13a配置於保持器構件11之上板部11c,而可容易自上方對操作構件13進行螺釘轉動操作。因而,即便結構壁8等接近浴室地板1a之俯視下外側而配置,亦不會對操作構件13之操作帶來障礙。 伴隨著卡合構件12朝向約束位置上升,而卡合突起23之突出軸部24自接收孔15a轉移至約束槽15b。進而,如在圖17(a)~圖17(b)中放大而顯示般,軸頭部25沿約束隆起部16之傾斜導引面16b一面朝壁/門承接框部4f側(在圖17中為左側)被按壓一面朝平坦頂面16a側轉移。伴隨於此,卡合突起23甚至壁/門承接框部2f朝壁/門承接框部4f側拉引。In addition, the wall/door receiving frame portion 2f of the floor paving body 2 and the wall/door receiving frame portion 4f of the drainage pool 4 are connected as follows. As shown in FIG. 14, the engaging member 12 of the connection device 9 is arranged at a detachable position in advance. Then, as shown in FIG. 14 to FIG. 15, the frame portions 2f and 4f are horizontally opposed to each other, close to each other, and abut. Along with this, the engaging protrusion 23 is received by the receiving hole 15a. Then, by operating the operating member 13, as shown in FIGS. 10 and 11, the engaging member 12 is raised to the restraint position. By arranging the head 13a of the operation member 13 on the upper plate portion 11c of the holder member 11, the operation member 13 can be easily screw-operated from above. Therefore, even if the structural wall 8 and the like are arranged close to the outer side of the bathroom floor 1a in plan view, it does not hinder the operation of the operating member 13. As the engaging member 12 rises toward the restraining position, the protruding shaft portion 24 of the engaging protrusion 23 is transferred from the receiving hole 15a to the restraining groove 15b. Furthermore, as shown enlarged in FIGS. 17(a) to 17(b), the shaft head 25 faces the wall/door receiving frame portion 4f side along the inclined guide surface 16b of the restraining ridge 16 (in FIG. Left side in 17) The pressed side moves toward the flat top surface 16a side. Along with this, the engagement protrusion 23 is drawn even toward the wall/door receiving frame portion 4f side of the wall/door receiving frame portion 2f.

若卡合構件12到達約束位置,則軸頭部25攀上約束隆起部16之平坦頂面16a,且朝壁/門承接框部4f側被強勁按壓。因而,強勁之按壓力乃至拉引力朝向框部4f側作用於卡合突起23甚至壁/門承接框部2f。藉此,經由連接裝置9可將壁/門承接框部2f、4f彼此牢固地接合。繼而,將水密材料52強勁壓縮。藉此,可確實地表現水密材料52之防水能力,而可確實地將第1連接零件10與壁/門承接框部2f之間密封。When the engaging member 12 reaches the restraining position, the shaft head 25 climbs up the flat top surface 16a of the restraining raised portion 16 and is strongly pressed toward the wall/door receiving frame portion 4f side. Therefore, a strong pressing force or a pulling force acts on the engaging protrusion 23 and even the wall/door receiving frame portion 2f toward the frame portion 4f side. Thereby, the wall/door receiving frame portions 2f and 4f can be firmly joined to each other via the connection device 9. Then, the watertight material 52 is strongly compressed. As a result, the waterproof ability of the watertight material 52 can be reliably expressed, and the first connection member 10 and the wall/door receiving frame portion 2f can be reliably sealed.

之後,如圖13所示,將間隔件構件49收容於凹槽48。 進而,進行表層片材6之鋪設、壁面板7及未圖示之門框之設置等。如以圖10之兩點鏈線表示般,浴室壁面板7(或門框)之底部不僅嵌入地板鋪設體2之框部2f之壁/門承接凹部2g,也嵌入排水池4之框部4f之壁/門承接凹部4g,進而還嵌入連接裝置9之壁/門承接凹部11g(參照圖11)。因而,可利用浴室壁面板7(或門框)將操作構件13隱藏。Thereafter, as shown in FIG. 13, the spacer member 49 is accommodated in the groove 48. Furthermore, the laying of the surface layer sheet 6, the installation of the wall panel 7 and the not-shown door frame, etc. are performed. As shown by the two-dot chain line in FIG. 10, the bottom of the bathroom wall panel 7 (or door frame) is not only embedded in the wall/door receiving concave portion 2g of the frame portion 2f of the floor paving body 2, but also in the frame portion 4f of the drainage basin 4 The wall/door receiving recess 4g is further fitted into the wall/door receiving recess 11g of the connection device 9 (see FIG. 11). Therefore, the operating member 13 can be hidden by the bathroom wall panel 7 (or door frame).

根據該浴室地板構造,藉由如前述般,將地板鋪設體2與排水池4設為個別構體,且相互獨立地由架台3支持,而可分別進行排水池4之設置作業與地板鋪設體2之設置作業。因而,即便排水池4為大容量,亦可容易地進行設置作業。反言之,可在不受設置操作性侷限下將排水池大容量化。同樣地,針對排水阱4d及排水管4e亦然,可在不受連接操作性及配管操作性侷限下實現大型化。 藉由採用將排水池4懸架於一對地板樑33、33之間之懸架構造,且自浴室寬度方向W之一端部橫切至另一端部,而可充分地增大排水池4之深度、寬度、長度,從而可確保大容量。 再者,根據浴室地板構造,可使排水池4與地板鋪設體2支持、連結於共通之地板樑33。而且,可經由地板樑33將排水池4與地板面板5以不直接連接,且互不干涉之方式連接。 地板樑33藉由採用將U字狀剖面之上下之樑構件34、35嵌合之構造,而可提高撓曲強度,從而可確實地支持大容量之排水池4及大面積之地板鋪設體2。 藉由排列複數個地板面板5,而可與浴室之各種尺寸對應地調整地板鋪設體2之大小。 藉由使表層片材6跨於複數個地板面板5之上表面,而可利用表層片材6覆蓋地板面板5彼此之接縫。According to this bathroom floor structure, by setting the floor paving body 2 and the drainage tank 4 as separate structures as described above and independently supported by the gantry 3, the installation work of the drainage pool 4 and the floor laying body can be performed separately 2. Set up the job. Therefore, even if the drainage tank 4 has a large capacity, installation work can be easily performed. Conversely, the capacity of the drainage tank can be increased without being limited by the operability of installation. Similarly, the drain trap 4d and the drain pipe 4e can also be increased in size without being restricted by the connection operability and piping operability. By adopting a suspension structure for suspending the drain 4 between a pair of floor beams 33, 33, and crossing from one end of the bathroom width direction W to the other, the depth of the drain 4 can be sufficiently increased, Width and length to ensure large capacity. In addition, according to the structure of the bathroom floor, the drainage pool 4 and the floor paving body 2 can be supported and connected to the common floor beam 33. Furthermore, the drainage pool 4 and the floor panel 5 can be connected via the floor beam 33 in a manner not directly interfering with each other. The floor beam 33 can improve the flexural strength by adopting a structure in which the upper and lower beam members 34 and 35 of the U-shaped cross section are fitted, and thus can reliably support the large-capacity drainage tank 4 and the large-area floor laying body 2 . By arranging a plurality of floor panels 5, the size of the floor paving body 2 can be adjusted corresponding to various sizes of the bathroom. By making the surface sheet 6 span the upper surfaces of the plurality of floor panels 5, the surface sheet 6 can cover the joint between the floor panels 5.

本發明並不限定於前述實施形態,在不脫離其旨趣之範圍內可形成各種改變。 例如,可僅在排水池4之一側設置地板鋪設體2。 可行的是,將連接裝置9之第1連接零件10設置於地板鋪設體2之壁/門承接框部2f,將第2連接零件20設置於排水池4之壁/門承接框部4f。 可行的是,第1連接零件10之卡合構件具有卡合突起,該卡合突起藉由操作構件13而可在拆裝位置與約束位置之間移動。且,可行的是,第2連接零件20具有對於前述第1連接零件10之卡合突起的接收孔15a及約束槽15b,且更具有約束隆起部16。 約束位置可相對於拆裝位置位於下方。可形成為藉由使卡合構件下降而成為約束位置。 本發明之浴室地板構造並不限定於護理設施等之大型浴室,也可應用於獨棟住宅或集合住宅之其他浴室。 地板面板可為FRP製。 浴室可具有浴缸及浴缸承接盤。本發明之地板面板可包含前述浴缸承接盤。 [產業上之可利用性]The present invention is not limited to the foregoing embodiments, and various changes can be made without departing from the scope of the intention. For example, the floor paving body 2 may be provided only on one side of the drain 4. It is feasible that the first connection part 10 of the connection device 9 is provided on the wall/door receiving frame portion 2f of the floor covering 2, and the second connection part 20 is provided on the wall/door receiving frame portion 4f of the drainage pool 4. It is feasible that the engaging member of the first connecting member 10 has an engaging protrusion, and the engaging protrusion can be moved between the disassembly position and the restraint position by the operating member 13. Furthermore, it is feasible that the second connecting member 20 has a receiving hole 15a and a restraining groove 15b for the engaging protrusion of the first connecting member 10, and further has a restraining bulge 16. The restraint position may be located below the disassembly position. It may be formed to be a restrained position by lowering the engaging member. The bathroom floor structure of the present invention is not limited to large bathrooms such as nursing facilities, but can also be applied to other bathrooms in single-family houses or collective houses. The floor panel can be made of FRP. The bathroom may have a bathtub and bathtub receiving tray. The floor panel of the present invention may include the aforementioned bathtub receiving tray. [Industry availability]

本發明可應用於例如護理設施等之大型之浴室。The invention can be applied to large bathrooms such as nursing facilities.

1:浴室 1a:浴室地板 1b:浴室地板下空間 1c:支柱缺口 2:地板鋪設體 2k:片材端承接框部 2f:壁/门承接框部/框部 2g:壁/門承接凹部 3:架台 4:排水池 4a:第1池/池 4b:第2池/池 4c:排水口 4d:排水阱 4e:排水管 4f:壁/門承接框部/框部 4g:壁/門承接凹部 4h:凸緣部 4k:片材端承接框部 4s:水密材料 5:地板面板 5a:面板本體 5b:上側補強板 5c:下側補強板 5d:腳部/部分 5g:連結凸片/部分 5h:面板固定螺釘(鋪設體連結機構)/螺釘 6:表層片材 6b:表層片材端部/端部 6g:防水膠帶 6s:密封材 7:壁面板(或門框)/浴室壁面板(或浴室門框) 8:結構壁 9:連接裝置 9B:連接裝置/連接構件 10:第1連接零件 11:保持器構件 11a:側板 11b:側板 11c:上板部(上表面部) 11g:壁/門承接凹部 12:卡合構件 12a:縱板部 12b:上板部 13:螺釘之頭部/操作構件/頭部 13a:操作部 14:補強金屬件 15:卡合承接部 15a:接收孔 15b:約束槽 16:約束隆起部 16a:平坦頂面 16b:傾斜導引面 17:固定螺釘 20:第2連接零件 21:連接螺釘構件 22:螺釘部 23:卡合突起 24:突出軸部 25:軸頭部 31:地板樑 32:地板樑 33:地板樑/中央地板樑/中央樑構件/樑 34:上側樑構件/樑構件 34a:上板 34b:側板 35:下側樑構件/樑構件 35b:側板 40:池本體 41:長邊框部(長邊側緣) 42:池框腳部/部分 43:凸條壁部 43a:倒槽部 43b:凸緣部 43d:階差 44:突出緣部 44a:連結部/部分/連結座 44c:退避凹部 45:支撐構件 46:格柵 47:池固定螺釘(池連結機構)/螺釘 48:凹槽 49:間隔件構件 51:水密材料 52:水密材料 D:進深方向/方向/對向方向 V:圓部 W:浴室寬度方向/方向 III-III:線 IV-IV:線 VI-VI:線 VII-VII:線 VIII:圓部 X-X:線 XVI-XVI:線 XVII-XVII:線 1: bathroom 1a: bathroom floor 1b: Space under the bathroom floor 1c: pillar gap 2: Floor laying body 2k: Sheet end receiving frame 2f: wall/door receiving frame/frame 2g: wall/door receiving recess 3: Stand 4: drainage pool 4a: 1st pool/pool 4b: 2nd pool/pool 4c: Drain 4d: drain trap 4e: drainage pipe 4f: wall/door receiving frame/frame 4g: wall/door receiving recess 4h: flange part 4k: Sheet end receiving frame 4s: watertight material 5: Floor panel 5a: Panel body 5b: Upper side reinforcement board 5c: Lower reinforcement plate 5d: foot/part 5g: connecting tab/part 5h: Panel fixing screw (laying body connection mechanism)/screw 6: Surface sheet 6b: end/end of surface sheet 6g: waterproof tape 6s: Sealing material 7: Wall panel (or door frame) / bathroom wall panel (or bathroom door frame) 8: Structural wall 9: Connect the device 9B: connecting device/connecting member 10: 1st connection part 11: retainer component 11a: side panel 11b: side panel 11c: Upper plate part (upper surface part) 11g: wall/door receiving recess 12: Snap member 12a: Vertical plate section 12b: Upper board 13: Screw head/operating member/head 13a: Operation Department 14: Reinforcing metal parts 15: Catching Undertaking Department 15a: receiving hole 15b: Restraint slot 16: Constrained bulge 16a: flat top surface 16b: inclined guide surface 17: fixing screw 20: 2nd connection part 21: connecting screw member 22: Screw part 23: Engagement protrusion 24: Protruding shaft 25: shaft head 31: Floor beam 32: Floor beam 33: Floor beam/Central floor beam/Central beam member/Beam 34: Upper side beam member/beam member 34a: Upper board 34b: side panel 35: Lower beam member/beam member 35b: side panel 40: Pool body 41: Long frame part (long side edge) 42: Pool frame foot/part 43: convex wall 43a: inverted groove 43b: Flange 43d: step difference 44: Protruding edge 44a: Connection part/part/connection seat 44c: Retreat recess 45: Support member 46: Grille 47: Pool fixing screw (pool connection mechanism)/screw 48: groove 49: spacer member 51: Watertight material 52: Watertight material D: depth direction/direction/opposite direction V: Circle W: Bathroom width direction/direction III-III: line IV-IV: line VI-VI: line VII-VII: line VIII: Circle X-X: line XVI-XVI: line XVII-XVII: line

圖1係將本發明之一實施形態之浴室地板局部剖視而顯示之平面圖。 圖2係前述浴室地板之分解立體圖。 圖3係沿圖1之III-III線之剖視圖。 圖4係沿圖1之IV-IV線之剖視圖。 圖5係將圖1之圓部V放大而顯示之平面圖。 圖6係沿圖1之VI-VI線之前述浴室地板之排水池之第1池的剖面圖。 圖7係沿圖6之VII-VII線之前述排水池之剖視圖。 圖8係將圖1之圓部VIII放大而顯示之平面圖。 圖9係前述圓部VIII之周邊部之分解立體圖。 圖10係沿圖8之X-X線之前視剖視圖。 圖11係沿圖10之XI線之前述浴室地板之連接裝置的側視剖視圖。 圖12係前述連接裝置之分解立體圖。 圖13係顯示前述浴室地板之設置工序之剖視圖。 圖14係顯示欲利用前述連接裝置連接地板鋪設體之壁/門承接框部與排水池之壁/門承接框部之樣態之前視剖視圖。 圖15係顯示將前述壁/門承接框部彼此抵接之階段之前視剖視圖。 圖16係沿圖15之XVI-XVI線之前述浴室地板面板連接裝置之側視剖視圖。 圖17(a)係沿圖16之XVII-XVII線之放大剖視圖。圖17(b)係對前述連接裝置之卡合構件自圖17(a)之狀態略作上升操作之階段之放大剖視圖。FIG. 1 is a plan view showing a bathroom floor according to an embodiment of the present invention partially cut away. Figure 2 is an exploded perspective view of the aforementioned bathroom floor. FIG. 3 is a cross-sectional view taken along line III-III of FIG. 1. FIG. 4 is a cross-sectional view taken along line IV-IV of FIG. 1. FIG. 5 is a plan view showing the circle V of FIG. 1 enlarged. Fig. 6 is a cross-sectional view of the first pool of the drain pool of the aforementioned bathroom floor taken along the line VI-VI of Fig. 1. FIG. 7 is a cross-sectional view of the aforementioned drainage tank along the line VII-VII of FIG. 6. FIG. 8 is a plan view showing a circle VIII of FIG. 1 enlarged. 9 is an exploded perspective view of the peripheral portion of the aforementioned circular portion VIII. FIG. 10 is a front sectional view taken along line X-X of FIG. 8. FIG. FIG. 11 is a side cross-sectional view of the aforementioned bathroom floor connecting device taken along line XI of FIG. 10. 12 is an exploded perspective view of the aforementioned connection device. 13 is a cross-sectional view showing the installation process of the aforementioned bathroom floor. FIG. 14 is a front cross-sectional view showing a state in which the wall/door receiving frame portion of the floor paving body and the wall/door receiving frame portion of the drainage pool are to be connected by the aforementioned connection device. FIG. 15 is a front cross-sectional view showing the stage where the aforementioned wall/door receiving frame portions are in contact with each other. 16 is a side cross-sectional view of the aforementioned bathroom floor panel connection device along the line XVI-XVI of FIG. 15. Fig. 17(a) is an enlarged cross-sectional view taken along the line XVII-XVII of Fig. 16. FIG. 17(b) is an enlarged cross-sectional view of a stage in which the engaging member of the connection device is slightly raised from the state of FIG. 17(a).

1:浴室 1: bathroom

1a:浴室地板 1a: bathroom floor

1c:支柱缺口 1c: pillar gap

2:地板鋪設體 2: Floor laying body

2f:壁/門承接框部/框部 2f: wall/door receiving frame/frame

2k:片材端承接框部 2k: Sheet end receiving frame

3:架台 3: Stand

4:排水池 4: drainage pool

4a:第1池/池 4a: 1st pool/pool

4b:第2池/池 4b: 2nd pool/pool

4c:排水口 4c: Drain

4f:壁/門承接框部/框部 4f: wall/door receiving frame/frame

5:地板面板 5: Floor panel

6:表層片材 6: Surface sheet

9:連接裝置 9: Connect the device

9B:連接裝置/連接構件 9B: connecting device/connecting member

31:地板樑 31: Floor beam

32:地板樑 32: Floor beam

33:地板樑/中央地板樑/中央樑構件/樑 33: Floor beam/Central floor beam/Central beam member/Beam

40:池本體 40: Pool body

41:長邊框部(長邊側緣) 41: Long frame part (long side edge)

43:凸條壁部 43: convex wall

44:突出緣部 44: Protruding edge

D:進深方向/方向/對向方向 D: depth direction/direction/opposite direction

V:圓部 V: Circle

W:浴室寬度方向/方向 W: Bathroom width direction/direction

III-III:線 III-III: line

IV-IV:線 IV-IV: line

VI-VI:線 VI-VI: line

VIII:圓部 VIII: Circle

Claims (10)

一種浴室地板構造,其特徵在於具備: 架台,其設置於浴室地板之底部; 地板鋪設體,其鋪設於前述架台上;及 排水池,其沿前述地板鋪設體之一側部自前述浴室之一方向之一端部延伸至另一端部;且 前述排水池及地板鋪設體相互為個別構體,且相互獨立地由前述架台支持。A bathroom floor structure characterized by: Shelf, which is set at the bottom of the bathroom floor; Floor laying body, which is laid on the aforementioned platform; and A drainage pool, which extends from one end to the other end of one direction of the bathroom along one side of the floor laying body; and The drainage pool and the floor-laying body are separate structures from each other, and are independently supported by the gantry. 如請求項1之浴室地板構造,其中前述架台包含沿前述排水池之一對長邊側緣延伸之一對地板樑;且 前述排水池被懸架於前述一對地板樑之間,且由前述各長邊側緣所對應之地板樑支持。The bathroom floor structure as claimed in claim 1, wherein the aforementioned platform includes a pair of floor beams extending along a pair of long side edges of the aforementioned drainage basin; and The drainage pool is suspended between the pair of floor beams, and supported by the floor beams corresponding to the long side edges. 如請求項2之浴室地板構造,其中前述排水池與前述地板鋪設體被支持或連結於相互共通之前述地板樑的相互隔開之部位。The bathroom floor structure according to claim 2, wherein the drainage basin and the floor paving body are supported or connected to the spaced apart portions of the floor beams in common with each other. 如請求項2之浴室地板構造,其中在前述長邊側緣形成沿前述地板樑之上表面朝向前述地板鋪設體突出之突出緣部,在前述突出緣部於前述長邊側緣之延伸方向隔開而設置連結座與退避凹部,前述連結座經由池連結機構與前述地板樑連結;且 在前述退避凹部配置前述地板鋪設體之連結凸片,該連結凸片經由鋪設體連結機構與前述地板樑連結。The bathroom floor structure according to claim 2, wherein a protruding edge portion protruding toward the floor laying body along the upper surface of the floor beam is formed on the long-side side edge, and the protruding edge portion is spaced from the extending direction of the long-side side edge Open to provide a connection seat and a recessed recess, the connection seat is connected to the floor beam via a pool connection mechanism; and The connecting fins of the floor laid body are arranged in the retreat recesses, and the connection fins are connected to the floor beam via a floor body connecting mechanism. 如請求項4之浴室地板構造,其中在前述排水池形成沿前述長邊側緣延伸之凸條壁部,在前述凸條壁部與前述地板鋪設體之間區劃出凹槽,在前述凹槽之底部配置前述突出緣部;且 以覆蓋前述突出緣部之方式在前述凹槽內收容有間隔件構件; 前述地板鋪設體之表層片材之端部跨於前述間隔件構件之上表面而覆蓋前述凸條壁部之上表面。The bathroom floor structure according to claim 4, wherein a convex strip wall portion extending along the long side edge is formed in the drainage basin, a groove is defined between the convex strip wall portion and the floor paving body, and the groove The bottom is provided with the protruding edge; and The spacer member is accommodated in the groove so as to cover the protruding edge; The end of the surface layer sheet of the floor covering body spans the upper surface of the spacer member and covers the upper surface of the rib wall portion. 如請求項2之浴室地板構造,其中前述地板樑包含:具有上板及一對側板的倒U字狀剖面之上側樑構件、及具有下板及一對側板的U字狀剖面之下側樑構件,該等上下之樑構件相互以彼此之側板重疊之方式嵌合。The bathroom floor structure according to claim 2, wherein the aforementioned floor beams include: an inverted U-shaped cross-section upper side beam member having an upper plate and a pair of side plates, and a U-shaped cross-section lower side beam having a lower plate and a pair of side plates Components, the upper and lower beam members are fitted with each other such that their side plates overlap. 如請求項1之浴室地板構造,其中前述排水池包含沿延伸方向排列為一直線之長條之第1池及短條之第2池,該等第1、第2池在彼此之間隔著水密材料而抵接且連結。The bathroom floor structure according to claim 1, wherein the aforementioned drainage pool includes a long first pool and a short second pool arranged in a straight line along the extending direction, and the first and second pools are separated by watertight materials between each other And abut and connect. 如請求項1之浴室地板構造,其中沿前述地板鋪設體之外周部設置承接浴室之壁面板或門框之相對較長之壁/門承接框部;且 在前述排水池之短邊端緣設置相對較短之壁/門承接框部; 前述長短之壁/門承接框部彼此經由連接裝置而連接。The bathroom floor structure according to claim 1, wherein a relatively long wall/door receiving frame portion for receiving a bathroom wall panel or door frame is provided along the outer periphery of the aforementioned floor paving body; and A relatively short wall/door receiving frame portion is provided on the short side edge of the aforementioned drainage tank; The aforementioned long/short wall/door receiving frame portions are connected to each other via a connecting device. 如請求項8之浴室地板構造,其中前述連接裝置包含: 第1連接零件,其具有卡合構件及操作構件,且設置於前述長短之壁/門承接框部之一者;及 第2連接零件,其設置於前述長短之壁/門承接框部之另一者;且 藉由前述操作構件之操作,而前述卡合構件可在拆裝位置與約束位置之間升降; 前述第2連接零件與前述拆裝位置之前述卡合構件為可拆裝,且前述第2連接零件藉由前述約束位置之前述卡合構件而被約束為彼此無法分開。The bathroom floor structure according to claim 8, wherein the aforementioned connection device includes: The first connecting part, which has an engaging member and an operating member, and is provided on one of the aforementioned long/short wall/door receiving frame parts; and The second connecting part, which is provided on the other of the aforementioned long/short wall/door receiving frame; and By the operation of the operation member, the engagement member can be raised and lowered between the disassembly position and the restraint position; The second connecting component and the engaging member at the disassembly and installation position are detachable, and the second connecting component is restrained from being separated from each other by the engaging member at the restricting position. 如請求項1至9中任一項之浴室地板構造,其中前述地板鋪設體包含:排列於前述排水池之延伸方向之複數個地板面板、及跨於前述複數個地板面板之上表面而鋪設之表層片材。The bathroom floor structure according to any one of claims 1 to 9, wherein the floor laying body comprises: a plurality of floor panels arranged in the extending direction of the drainage basin, and a surface layer laid across the upper surfaces of the plurality of floor panels Sheet.
TW108134594A 2018-10-05 2019-09-25 Bathroom floor structure TWI720629B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-190424 2018-10-05
JP2018190424A JP7184427B2 (en) 2018-10-05 2018-10-05 bathroom floor structure

Publications (2)

Publication Number Publication Date
TW202020272A true TW202020272A (en) 2020-06-01
TWI720629B TWI720629B (en) 2021-03-01

Family

ID=70110821

Family Applications (1)

Application Number Title Priority Date Filing Date
TW108134594A TWI720629B (en) 2018-10-05 2019-09-25 Bathroom floor structure

Country Status (3)

Country Link
JP (1) JP7184427B2 (en)
CN (1) CN111005526B (en)
TW (1) TWI720629B (en)

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK487285A (en) * 1985-10-24 1987-04-25 Benny Koudal FLOOR-MOUNTED PIPE INSTALLATION IN BUILDINGS AND PROCEDURES OF BUILDING THEREOF
WO1992006251A1 (en) * 1990-09-27 1992-04-16 Allan Bruce Caulley A modular slab on ground building system
JPH0978863A (en) * 1995-09-12 1997-03-25 Inax Corp Floor structure of bathroom
JPH0988142A (en) * 1995-09-21 1997-03-31 Toto Ltd Floor pan
JPH09317220A (en) * 1996-05-27 1997-12-09 Toto Ltd Bathroom unit
JPH09328797A (en) * 1996-06-11 1997-12-22 Sekisui Chem Co Ltd Waterproof pan
JPH1129967A (en) * 1997-07-11 1999-02-02 Toto Ltd Waterproof floor pan for bathroom
JPH1161927A (en) * 1997-08-19 1999-03-05 Sekisui Chem Co Ltd Bathroom
JPH1171795A (en) * 1997-08-29 1999-03-16 Toto Ltd Division type waterproof floor pan
JP2001003426A (en) * 1999-06-25 2001-01-09 Cleanup Corp Washing space floor in bathroom module
KR100714029B1 (en) * 1999-08-09 2007-05-03 기무라 가부시끼가이샤 Flooring for a building
JP2001254416A (en) * 2000-03-09 2001-09-21 Sekisui Chem Co Ltd Support leg fixing structure of bathroom unit
DE20115277U1 (en) * 2001-09-15 2001-12-13 Nötzold, Matthias, 09366 Stollberg Flooring for areas exposed to the weather, especially for balconies and patios
JP2003313911A (en) * 2002-04-23 2003-11-06 Matsushita Electric Works Ltd Bathroom floor pan
JP2003328413A (en) * 2002-05-16 2003-11-19 Nihon Pit:Kk Drain gutter formation body
KR101249846B1 (en) * 2009-09-02 2013-04-02 재성진흥 주식회사 Structure for heating bath room
JP5284387B2 (en) * 2011-02-24 2013-09-11 ヤマハリビングテック株式会社 Sanitary equipment floor and its construction method
JP5660318B2 (en) * 2011-03-25 2015-01-28 Toto株式会社 Washroom floor
CN104074333B (en) * 2013-03-29 2017-04-12 松下知识产权经营株式会社 Bathroom floor plate, bathroom unit with the same, and waterproof structure of bathroom floor plate
CN207405718U (en) * 2017-08-08 2018-05-25 黄裕华 A kind of family expenses caisson type toilet is flushed the toilet energy saver

Also Published As

Publication number Publication date
JP7184427B2 (en) 2022-12-06
JP2020059994A (en) 2020-04-16
CN111005526B (en) 2022-03-01
CN111005526A (en) 2020-04-14
TWI720629B (en) 2021-03-01

Similar Documents

Publication Publication Date Title
US9808124B2 (en) Membranous waterproof juncture
US20110067175A1 (en) Drain assembly, drain body for use in such an assembly and method for building-in of a drain
JP4961770B2 (en) Double waterproof structure of outdoor floor
TW202020270A (en) Bathroom floor panel connecting device and bathroom floor structure capable of reliably and easily connecting floor panels to each other in a bathroom floor where a plurality of floor panels are arranged
TW202020272A (en) Bathroom floor structure comprising a drainage pit extending along one side of a floor laying body from one end of the bathroom to an opposite end in a manner of being independent of the floor laying body
JP7164168B2 (en) bathroom floor structure
JP3605296B2 (en) Building and building construction methods
JPH07292791A (en) Waterproof construction of unit building
JP2006144299A (en) Waterproof floor with draining gradient
JP5312276B2 (en) Waist wall and soil structure
JP2003313911A (en) Bathroom floor pan
TWI783442B (en) Hygiene unit structure and method for implementing same
JP7222156B2 (en) Storage space for building storage tanks for rainwater runoff control facilities
JP5947531B2 (en) Building floor structure and flooring installation method
AU2023274182B1 (en) Wet Room System
JP4056931B2 (en) Water stop structure of vertical joint between outer wall panels
JP3899949B2 (en) Piping unit of apartment house
JP2007231561A (en) Double waterproofing construction method of outdoor floor
JPH10331250A (en) Structure of balcony and corridor, and floor board therefor
JP2006132198A (en) Floor structure
JP2009052216A (en) Water sealing structure between upper and lower external facing materials
KR101746706B1 (en) Panel assembling-type water tank with single pad floor structure
JP4017048B2 (en) Piping structure of building unit
JP2005240329A (en) Partition structure between bath room and outside of bath room
JP2006188880A (en) Outer wall structure and execution method therefor