TW201542913A - Metal building materials structure innovation - Google Patents

Metal building materials structure innovation Download PDF

Info

Publication number
TW201542913A
TW201542913A TW103116575A TW103116575A TW201542913A TW 201542913 A TW201542913 A TW 201542913A TW 103116575 A TW103116575 A TW 103116575A TW 103116575 A TW103116575 A TW 103116575A TW 201542913 A TW201542913 A TW 201542913A
Authority
TW
Taiwan
Prior art keywords
plane
metal building
building material
component
hanging
Prior art date
Application number
TW103116575A
Other languages
Chinese (zh)
Other versions
TWI550166B (en
Inventor
Mao-Hsuan Su
Original Assignee
Lu Fo Ga Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lu Fo Ga Engineering Co Ltd filed Critical Lu Fo Ga Engineering Co Ltd
Priority to TW103116575A priority Critical patent/TWI550166B/en
Publication of TW201542913A publication Critical patent/TW201542913A/en
Application granted granted Critical
Publication of TWI550166B publication Critical patent/TWI550166B/en

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

This invention relate to a metal building materials structure innovation, which include a metal building material. Said metal building material having a structure portion, a flat portion and a combine portion, and said structure portion and flat portion can be plural. Inside said structure portion is provided with a guide groove to set a reinforced plate to increase the section that the locking element use to lock the metal building material, and increase the locking strength between said metal building material and the locking element to improve the wind pressure strength of the roof. Said combine portion is located on both sides of the house. When combined with the adjacent metal building material, beneath the combine portion will formed a hanging slot to hang the hanging objects and keep the direction of the hanging objects. And said hanging objects can bear the weight of pipeline fire, drain line, power line, signal line and light steel frame to enhance the usefulness of metal building materials.

Description

金屬建材結構創新 Metal building materials structure innovation

本發明係關於金屬建材結構創新,主要乃是於金屬建材之結構部內內側設有導引槽,以為強化板伸設其中,得以增大栓設元件鎖合金屬建材之斷面,強化栓設元件與金屬建材之鎖合強度,以增加屋頂之抗風壓強度;且當相鄰金屬建材互相結合後,可於結合部下方形成懸掛槽,得為懸掛件掛置其中,且可保持懸掛件之方向,足以承載消防管線、排水管線、電源管線、信號管線與輕鋼架之設置,用以提升金屬建材承載重量。 The invention relates to the structural innovation of the metal building materials, mainly for providing a guiding groove on the inner side of the structural part of the metal building material, so as to extend the reinforcing plate, thereby increasing the section of the locking component locking metal building material and strengthening the bolting component. The strength of the lock with the metal building materials to increase the wind pressure resistance of the roof; and when the adjacent metal building materials are combined with each other, a suspension groove can be formed under the joint portion, and the suspension member can be hung therein, and the suspension member can be held. The direction is sufficient to carry the installation of fire-fighting pipelines, drainage pipelines, power pipelines, signal pipelines and light steel frames to increase the weight of metal building materials.

按目前之金屬建築物,為強化其屋頂結構,乃有先行於鋼架上鋪設一樓層板1(如圖1及2),之後,再於樓層板1之結構部10的上平面11上方鋪設金屬板2,且為讓樓層板1得與金屬板2結合成一體,施工者均會以自攻螺絲20自金屬板2往下栓設到樓層板1之結構部10,並貫穿樓層板1之結構部10的上平面11。惟因為製造成本之考量,目前市售樓層板1所採用金屬板材之厚度,有越來越薄之趨勢。因此,當施工者以自攻螺絲20自金屬板2往下栓設到樓層板1之結構部10並貫穿上平面11時,實際上,前述自攻螺絲20的螺紋與樓層板1之結構部10之鎖合狀態,並未超過二分之一牙紋,造成自攻螺絲20與樓層板1之結構部10之間為假性鎖合,稍有強大風壓時,尤其是作為工廠用途之大型金屬建築物,高度均超過10米,且為開放空間,因此,金屬建築物之屋頂,時常遭受重大風壓之衝擊,前述風壓即會直接破壞自攻螺絲20與樓層板1結構部10間之假性鎖合,而自樓層板之下方往上被掀開,影響建築物之屋頂結構與安全。 According to the current metal building, in order to strengthen the roof structure, a floor panel 1 (see Figs. 1 and 2) is laid on the steel frame, and then laid over the upper plane 11 of the structural portion 10 of the floor panel 1. The metal plate 2, and in order to integrate the floor panel 1 with the metal plate 2, the constructor will bolt down from the metal plate 2 to the structural portion 10 of the floor panel 1 with the self-tapping screws 20, and penetrate the floor panel 1 The upper plane 11 of the structural portion 10. However, due to the consideration of manufacturing cost, the thickness of the metal sheet used in the commercially available floor panel 1 is getting thinner and thinner. Therefore, when the constructor bolts the self-tapping screws 20 from the metal plate 2 to the structural portion 10 of the floor panel 1 and penetrates the upper plane 11, the thread of the self-tapping screw 20 and the structural portion of the floor panel 1 are actually The locking state of 10 does not exceed one-half of the tooth pattern, resulting in a false lock between the self-tapping screw 20 and the structural portion 10 of the floor panel 1. When there is a slight wind pressure, especially for factory use. Large metal buildings, all of which are more than 10 meters in height and open space. Therefore, the roof of metal buildings is often subjected to severe wind pressure, and the wind pressure directly destroys the self-tapping screws 20 and the floor panel 1 structural part 10 The false lock between the two is opened from the bottom of the floor panel, affecting the roof structure and safety of the building.

其次,傳統之金屬浪板,係直接鋪設於鋼架上方,且以自攻 螺絲由浪板之結構部往下栓設到鋼架中,同樣的,金屬浪板與自攻螺絲間亦為一種假性鎖合,無法抵抗強大之風壓,因此,於颱風天,時常會看到金屬建築物之屋頂被強大風壓掀開,造成意外傷害之問題。 Secondly, the traditional metal wave board is laid directly on the steel frame and self-tapping. The screw is bolted down from the structural part of the wave board to the steel frame. Similarly, the metal wave board and the self-tapping screw are also a kind of false lock, which cannot resist the strong wind pressure. Therefore, in the typhoon days, it is often seen. The roof of a metal building was opened by strong wind pressure, causing accidental injury.

再按目前之建築物以金屬建材施作樓層,主要乃是於金屬建材上方填注混凝土,以形成樓層間之地板,相對於各樓層間,位於上樓層之地板的下方,即成為下樓層的天花板,為解決目前建築物管線均採用明施工的方法,以利維修,因此,前述作為天花板之金屬建材下方,即須具備可懸掛管線之功能。如發明第I262975號,乃是於樓層板的懸吊開口之邊壁設有向內延伸之扣合端,再以該扣合端為懸吊勾勾合,即可以令懸吊勾被固定。或如新型第162335號,乃是於樓層板之浪形補強體的懸吊槽設小開口,且於小開口內側形成適當的空間,且形成有支承面,可利用懸吊槽以為定位塊自側邊置入,再為吊桿栓合,即可使定位塊與吊桿充份結合,而方便物品之懸吊者。惟前述二先前技術,均無法承受重量較大之懸掛物,如消防管線,排水管等,且者第二案更因為其方向亦變動,安裝施工耗時,無法符合需求。 According to the current building, the metal building materials are used as the floor. The main reason is to fill the concrete above the metal building materials to form the floor between the floors. Compared with the floors, it is below the floor of the upper floor, which becomes the lower floor. In the ceiling, in order to solve the current building pipelines, the method of clear construction is adopted to facilitate maintenance. Therefore, the above-mentioned metal building materials as ceilings must have the function of suspending pipelines. According to the invention No. I262975, the side wall of the hanging opening of the floor panel is provided with an inwardly extending fastening end, and the fastening end is hooked by the hanging hook, so that the hanging hook can be fixed. Or, as in the new type No. 162335, a small opening is formed in the suspension groove of the wave-shaped reinforcing body of the floor panel, and an appropriate space is formed inside the small opening, and a support surface is formed, and the suspension groove can be used as the positioning block. The side is placed in, and then the boom is bolted, so that the positioning block and the boom can be fully combined, and the hanger of the article is convenient. However, the above two prior technologies are unable to withstand heavy hanging objects, such as fire pipes, drain pipes, etc., and the second case is also because the direction is also changed, and the installation and construction are time-consuming and cannot meet the demand.

為此,本發明者積多年相關金屬建材之製造與設計經驗,特針對前述習知者之問題,加以研究,乃發明本案。 For this reason, the inventors have accumulated years of experience in the manufacture and design of related metal building materials, and have studied the problems of the aforementioned conventional persons, and have invented the present case.

本發明之目的,乃是在提供一種於金屬建材之結構部內側設導引槽,以為強化板伸設其中,當於金屬建材上方鋪設金屬板,並以栓設元件(通常為自攻螺絲)自金屬板往下栓設到金屬建材之結構部時,得以同時鎖合於結構部與強化板,產生正性鎖合,提升屋頂之抗風壓能力,且當相鄰金屬建材互相結合後,可於結合部下方形成懸掛槽,得為懸掛件掛置其中,且可保持懸掛件之方向,足以承載消防管線、電源管線、信號管線與輕鋼架之設置,用以提升金屬建材之實用性。 The object of the present invention is to provide a guiding groove inside the structural part of the metal building material, so as to extend the reinforcing plate, when laying a metal plate above the metal building material, and tying the component (usually a self-tapping screw) When the metal plate is bolted down to the structural part of the metal building material, it can be locked at the same time to the structural part and the reinforcing plate, and the positive locking is achieved, the wind pressure resistance of the roof is improved, and when the adjacent metal building materials are combined with each other, A suspension slot can be formed under the joint portion, and the suspension member can be hung therein, and the direction of the suspension member can be maintained, which is sufficient for carrying the installation of the fire pipeline, the power pipeline, the signal pipeline and the light steel frame, so as to improve the practicability of the metal building materials. .

為達前述目的,本發明之金屬建材結構創新,乃是於金屬建材設結構部與平板部,前述結構部與平板部得為複數,且於前述結構部內 側設有導引槽,以為強化板伸設其中,以為栓設元件同時鎖合結構部與強化板,提升栓設效果,增加屋頂之抗風壓能能力。 In order to achieve the above object, the metal building material structure innovation of the present invention is to provide a structural portion and a flat plate portion of the metal building material, and the structural portion and the flat plate portion are plural, and are in the foregoing structural portion. The side is provided with a guiding groove for extending the reinforcing plate, so that the bolting component simultaneously locks the structural part and the reinforcing plate, thereby improving the bolting effect and increasing the wind pressure resistance capability of the roof.

本發明之金屬建材結構創新,得於金屬建材之結合部形成懸掛槽,當相鄰金屬建材互相結合後,得利用前述懸掛槽為懸掛件掛置,且為懸掛件為由第一元件與第二元件結合而成,因此,可隨時維持懸掛件之方向,並於懸掛件預留有穿孔,以為栓設元件穿過,並鎖固建築物之消防管線、排水管線、電源管線、信號管線與輕鋼架,得提升金屬建材之重量承載力。 The structural innovation of the metal building materials of the present invention is formed by forming a suspension groove at the joint portion of the metal building materials. When the adjacent metal building materials are combined with each other, the suspension groove is used as the suspension member, and the suspension member is the first component and the first component. The two components are combined, so that the direction of the suspension member can be maintained at any time, and a perforation is reserved in the suspension member to pass through the bolting component and lock the fire-fighting pipeline, the drainage pipeline, the power pipeline, the signal pipeline of the building and Light steel frame, to enhance the weight bearing capacity of metal building materials.

3‧‧‧金屬建材 3‧‧‧Metal building materials

3a‧‧‧金屬建材 3a‧‧‧Metal building materials

30‧‧‧結構部 30‧‧‧Structural Department

31‧‧‧平板部 31‧‧‧ Flat section

300‧‧‧上平面 300‧‧‧Upper plane

301‧‧‧側邊面 301‧‧‧ side faces

302‧‧‧直壁面 302‧‧‧ Straight wall

303‧‧‧彎折部 303‧‧‧Bending

32‧‧‧導引槽 32‧‧‧ guiding slot

320‧‧‧下彎折端 320‧‧‧Bottom bent end

d1‧‧‧寬度 Width of d1‧‧‧

d2‧‧‧寬度 D2‧‧‧Width

33‧‧‧結合部 33‧‧‧Combination Department

330‧‧‧第一結合部 330‧‧‧ first joint

331‧‧‧第二結合部 331‧‧‧Second junction

34‧‧‧懸掛槽 34‧‧‧suspension slot

340‧‧‧開口 340‧‧‧ openings

341‧‧‧折角 341‧‧‧Folding angle

342‧‧‧懸掛彎折部 342‧‧‧ hanging bends

4‧‧‧強化板 4‧‧‧Strengthened board

5‧‧‧金屬板 5‧‧‧Metal plates

50‧‧‧栓設元件 50‧‧‧Equipment components

6‧‧‧懸掛件 6‧‧‧ hanging parts

60‧‧‧第一元件 60‧‧‧ first component

61‧‧‧第二元件 61‧‧‧second component

600、610‧‧‧第一平面 600, 610‧‧‧ first plane

601、611‧‧‧穿孔 601, 611‧‧‧ perforation

602、612‧‧‧第二平面 602, 612‧‧‧ second plane

603、613‧‧‧穿孔 603, 613‧‧‧ perforation

604、614‧‧‧第三平面 604, 614‧‧‧ third plane

605、615‧‧‧掛置件 605, 615‧‧‧ hanging parts

606、616‧‧‧圓弧狀凹角 606, 616‧‧‧ arc-shaped concave corner

620‧‧‧栓設元件 620‧‧‧Equipment components

621‧‧‧栓設元件 621‧‧‧Equipment components

圖1是習知金屬建材之視圖。 Figure 1 is a view of a conventional metal building material.

圖2是習知金屬建材與金屬板栓設狀態圖。 2 is a state diagram of a conventional metal building material and a metal plate.

圖3是本發明金屬建材實施例一之分解視圖。 Figure 3 is an exploded view of the first embodiment of the metal building material of the present invention.

圖4是本發明金屬建材實施例一之部分放大視圖。 Figure 4 is a partial enlarged view of the first embodiment of the metal building material of the present invention.

圖5是本發明金屬建材實施例一之前視圖。 Figure 5 is a front elevational view of a first embodiment of the metal building material of the present invention.

圖6是本發明金屬建材實施例一與金屬板結合後之部分視圖。 Fig. 6 is a partial view showing the first embodiment of the metal building material of the present invention combined with a metal plate.

圖7A是本發明金屬建材實施例二之視圖。 Fig. 7A is a view showing a second embodiment of the metal building material of the present invention.

圖7B是本發明金屬建材實施例三之視圖。 Fig. 7B is a view showing a third embodiment of the metal building material of the present invention.

圖7C是本發明金屬建材實施例四之視圖。 Fig. 7C is a view showing the fourth embodiment of the metal building material of the present invention.

圖7D是本發明金屬建材實施例五之視圖。 Fig. 7D is a view showing a fifth embodiment of the metal building material of the present invention.

圖7E是本發明金屬建材實施例六之視圖。 Fig. 7E is a view showing the sixth embodiment of the metal building material of the present invention.

圖7F是本發明金屬建材實施例七之視圖。 Fig. 7F is a view showing the seventh embodiment of the metal building material of the present invention.

圖7G是本發明金屬建材實施例八之視圖。 Fig. 7G is a view showing the eighth embodiment of the metal building material of the present invention.

圖7H是本發明金屬建材實施例九之視圖。 Fig. 7H is a view showing a ninth embodiment of the metal building material of the present invention.

圖7I是本發明金屬建材實施例十之視圖。 Figure 7I is a view of a tenth embodiment of the metal building material of the present invention.

圖8是本發明相鄰金屬建材互相結合前之視圖。 Figure 8 is a view of the adjacent metal building materials of the present invention before being joined to each other.

圖9是本發明相鄰金屬建材互相結合後之視圖。 Figure 9 is a view showing the adjacent metal building materials of the present invention combined with each other.

圖10是本發明相鄰金屬建材互相結合後之部分放大視圖。 Figure 10 is a partial enlarged view of the adjacent metal building materials of the present invention combined with each other.

圖11是本發明相鄰金屬建材之結合部與懸掛件結合動作一。 Fig. 11 is a view showing the first action of the joint portion of the adjacent metal building materials of the present invention and the suspension member.

圖12是本發明相鄰金屬建材之結合部與懸掛件結合動作二。 Fig. 12 is a second assembly operation of the joint portion of the adjacent metal building materials of the present invention and the suspension member.

圖13是本發明相鄰金屬建材之結合部與懸掛件結合動作三。 Fig. 13 is a third joint operation of the joint portion of the adjacent metal building material of the present invention and the suspension member.

圖14是本發明懸掛件之分解圖。 Figure 14 is an exploded view of the suspension of the present invention.

圖15是本發明懸掛件之組合圖。 Figure 15 is a combination view of the suspension of the present invention.

如此,為使 貴審查員得以充分了解本發明之金屬建材結構創新,茲依附圖示說明如下:如圖3~6,為本發明金屬建材結構創新之實施例一,本發明至少包含:金屬建材3,設結構部30與平板部31,前述結構部30與平板部31得為單數或複數,均無不可,端視金屬建材之寬度而定。前述結構部30設上平面300與兩側邊面301,前述兩側邊面301並自上平面300之兩側向下成一定角度內縮而之繼續往下延伸而形成直壁面302後,再延伸到彎折部303而與平板部31相銜接;或前述兩側邊面301亦可自前述上平面300之兩側向下成一定角度內縮而之繼續往下延伸彎折部303而與平板部31相銜接,而省略直壁面302之區段,亦無不可。 In this way, in order to enable the examiner to fully understand the structural innovation of the metal building materials of the present invention, the following is a description of the following: FIG. 3 to FIG. 6 are the first embodiment of the metal building material structure innovation of the present invention, and the present invention at least includes: metal building materials 3. The structural portion 30 and the flat plate portion 31 are provided, and the structural portion 30 and the flat plate portion 31 are singular or plural, and are not limited, depending on the width of the metal building material. The structural portion 30 is provided with an upper surface 300 and two side surfaces 301. The two side surfaces 301 are retracted downward from the two sides of the upper surface 300 at an angle to form a straight wall surface 302, and then Extending to the bent portion 303 to engage with the flat portion 31; or the two side surfaces 301 may also be retracted downward from the two sides of the upper surface 300 at an angle to continue to extend the bent portion 303 downwardly The flat portion 31 is engaged, and the section of the straight wall 302 is omitted.

如圖4,前述金屬建材3之結構部30之內側並設有導引槽32,此導引槽32,係於結構部成型時同時成型為最理想,當然如事後再加工,亦無不可,前述導引槽32乃是存在於前述上平面300與兩側邊面301之稍上方,讓導引槽32之對應下彎折端320之寬度d1小於導引槽之寬度d2。如此,當金屬建材3施工鋪設完成後,得以前述導引槽32為強化板4伸設其中,前述強化板4之寬度通常接近於導引槽32之寬度d2,因此,強化板4之寬度乃大於導引槽32對應下彎折端320之寬度d1,得以讓前述強化板4被穩固的安裝於導引槽32之中,並呈現定位(如圖5及6)。 As shown in FIG. 4, the inner side of the structural portion 30 of the metal building material 3 is provided with a guiding groove 32. The guiding groove 32 is formed at the same time when the structural part is formed, and it is ideal if it is processed afterwards. The guiding groove 32 is slightly above the upper surface 300 and the two side surfaces 301, so that the width d1 of the corresponding lower bending end 320 of the guiding groove 32 is smaller than the width d2 of the guiding groove. In this way, after the construction of the metal building material 3 is completed, the guiding groove 32 is extended therein as the reinforcing plate 4, and the width of the reinforcing plate 4 is generally close to the width d2 of the guiding groove 32. Therefore, the width of the reinforcing plate 4 is The width d1 of the lower bending end 320 corresponding to the guiding groove 32 is such that the reinforcing plate 4 is stably mounted in the guiding groove 32 and is positioned (see FIGS. 5 and 6).

如圖6,當前述金屬建材3之結構部30上方被鋪設金屬板5後,施工者得以栓設元件50(通常為自攻螺絲)金屬板5往下攻牙栓設,鎖合進入金屬建材3之結構部30的上平面30,並同時鎖合位於導引槽32內 之強化板4,前述強化板4為由金屬材質製成條狀,當然以接近於金屬建材3之導引槽32長度為最佳,縱使為線段狀,亦無不可,且縱使栓設元件50於栓設過程會產生較大之鎖合鑽孔力量,亦因強化板4已與金屬建材3之導引槽32結合成一體,而無法向下推移強化板4,故最終能讓栓設元件與金屬建材3之結構部30及強化板4保持最佳的鎖合狀態,提升栓設效果,足以增加金屬建築物屋頂之抗風壓能力,同時強化金屬建築物之結構安全性。 As shown in FIG. 6, after the metal plate 5 is laid over the structural portion 30 of the metal building material 3, the constructor can bolt the component 50 (usually a self-tapping screw) to the metal tapping plate 5, and lock into the metal building material. The upper plane 30 of the structural portion 30 of the 3 is simultaneously locked in the guiding slot 32 In the reinforcing plate 4, the reinforcing plate 4 is made of a metal material, and of course, the length of the guiding groove 32 close to the metal building material 3 is optimal, and even if it is a line segment, it is indispensable, and even the bolting member 50 In the bolting process, a large locking drilling force is generated, and the reinforcing plate 4 has been integrated with the guiding groove 32 of the metal building material 3, and the reinforcing plate 4 cannot be pushed downward, so that the plugging component can be finally obtained. It maintains the optimal locking state with the structural part 30 and the reinforcing plate 4 of the metal building material 3, and enhances the bolting effect, which is sufficient to increase the wind pressure resistance of the metal building roof and strengthen the structural safety of the metal building.

其次,本發明之強化板無法直接設置於圖1習知金屬建材之結構部內側,乃是因為圖1之習知金屬建材無法提供強化板之適當支承,當施工者以栓設元件自金屬板往下攻牙栓設,穿過金屬建材之結構部的上平面時,栓設元件之末端即會以強大之鎖合鑽孔力量碰觸強化板,會將強化板向下推移而偏離一角度,造成栓設元件無法栓進強化板之問題,更足顯見本發明確實具備實用性與進步性。 Secondly, the reinforcing plate of the present invention cannot be directly disposed inside the structural part of the conventional metal building material of FIG. 1 because the conventional metal building material of FIG. 1 cannot provide proper support of the reinforcing plate, and the constructor uses the bolting component from the metal plate. When the lower tapping bolt is passed through the upper plane of the structural part of the metal building material, the end of the bolting component will touch the reinforcing plate with a strong locking drilling force, and the reinforcing plate will be moved downward and deviated from an angle. The problem that the plugging component cannot be inserted into the reinforcing plate is more obvious, and it is obvious that the present invention is practical and progressive.

如圖7A~7H,為本發明之金屬建材3之各種實施例二至九,足見本發明之金屬建材,並非限定於圖示所揭示者,只要可於結構部30內側設置強化板4之導引槽32,均為本發明所涵蓋。 7A to 7H are various embodiments 2 to 9 of the metal building material 3 of the present invention. The metal building materials of the present invention are not limited to those shown in the drawings, as long as the reinforcing plate 4 can be disposed inside the structural portion 30. The guide grooves 32 are all covered by the present invention.

如圖7I,為本發明金屬建材之實施例十,本發明之金屬建材得運用於各類金屬浪板,本實施例十至少包含:金屬建材3a,設結構部30與平板部31,前述結構部30與平板部31得為單數或複數,均無不可,端視金屬建材之寬度而定。前述結構部30設上平面300與兩側邊面301,前述兩側邊面301並自上平面300之兩側向下成一定角度之外展狀。前述金屬建材3a之結構部30之內側並設有導引槽32,此導引槽32,係於結構部成型時同時成型為最理想,當然如事後再加工,亦無不可,前述導引槽32乃是存在於前述上平面30與兩側邊面301之稍上方,讓導引槽32之對應下彎折端320之寬度d1小於導引槽之寬度d2。如此,當金屬建材3a施工鋪設完成後,得以前述導引槽32為強化板4伸設其中,前述強化板4之寬度通常接近於導引槽32之寬度d2,因此,強化板4之寬度乃大於導引槽 32對應下彎折端320之寬度d1,得以讓前述強化板4被穩固的安裝於導引槽32之中,並呈現定位(可參閱圖5及6)。施工者得以栓設元件50(通常為自攻螺絲)自金屬建材3a往下攻牙栓設,鎖合進入金屬建材3a之結構部30的上平面30,並同時鎖合位於導引槽32內之強化板4,讓栓設元件與金屬建材3a之結構部30及強化板4得以保持最佳的鎖合狀態,提升金屬建築物屋頂之抗風壓能力,同時強化金屬建築物之結構安全性同樣的具有。 As shown in FIG. 7I, in the tenth embodiment of the metal building material of the present invention, the metal building materials of the present invention are applied to various metal wave plates. The tenth embodiment includes at least: a metal building material 3a, a structural portion 30 and a flat plate portion 31, and the foregoing structural portion. 30 and the flat plate portion 31 are singular or plural, and are not limited, depending on the width of the metal building material. The structural portion 30 is provided with an upper surface 300 and two side surfaces 301, and the two side surfaces 301 are outwardly formed at a certain angle from both sides of the upper surface 300. The inner side of the structural portion 30 of the metal building material 3a is provided with a guiding groove 32. The guiding groove 32 is formed at the same time when the structural portion is formed, and it is ideal if it is processed afterwards. 32 is present slightly above the upper plane 30 and the side edges 301, so that the width d1 of the corresponding lower bending end 320 of the guiding groove 32 is smaller than the width d2 of the guiding groove. In this way, after the construction of the metal building material 3a is completed, the guiding groove 32 is extended as the reinforcing plate 4, and the width of the reinforcing plate 4 is generally close to the width d2 of the guiding groove 32. Therefore, the width of the reinforcing plate 4 is Greater than the guide slot 32 corresponds to the width d1 of the lower bent end 320, so that the reinforcing plate 4 is firmly mounted in the guiding groove 32 and presents positioning (refer to FIGS. 5 and 6). The constructor can suspend the component 50 (usually a self-tapping screw) from the metal building material 3a to the lower tapping bolt, and lock into the upper plane 30 of the structural portion 30 of the metal building material 3a, and at the same time, the locking is located in the guiding groove 32. The reinforcing plate 4 allows the bolting member and the structural portion 30 of the metal building material 3a and the reinforcing plate 4 to maintain an optimal locking state, thereby improving the wind pressure resistance of the roof of the metal building and strengthening the structural safety of the metal building. The same has.

如圖8~12,為本發明之相鄰金屬建材互相結合後之運用實施例,前述金屬建材3於成型時乃於其兩側同時成型有第一結合部330與對應於第一結合部330之第二結合部331,故而當相鄰之金屬建材3、3a互相結合時,即可將金屬建材3之第一結合部330與金屬建材3a之第二結合部331互相結合而形成結合部33,且在前述結合部33的下方並形成有懸掛槽34,此懸掛槽34設有開口340,前述開口340係由二對稱之折角341所構成,於前述開口340上方兩側並形成懸掛彎折部342(如圖1O及11),以為懸掛件6設置,如此讓懸掛槽34與懸掛件6之掛置件605、615之形狀相近,利於懸掛槽34與懸掛件6之掛置件之結合。 8 to 12, in which the adjacent metal building materials of the present invention are combined with each other, the metal building materials 3 are simultaneously formed with a first joint portion 330 and corresponding to the first joint portion 330 on both sides thereof during molding. The second joint portion 331 is such that when the adjacent metal building materials 3, 3a are combined with each other, the first joint portion 330 of the metal building material 3 and the second joint portion 331 of the metal building material 3a can be combined with each other to form the joint portion 33. A suspension groove 34 is formed below the joint portion 33. The suspension groove 34 is provided with an opening 340. The opening 340 is formed by two symmetrical corners 341, and a suspension bend is formed on both sides of the opening 340. The portion 342 (as shown in FIGS. 10 and 11) is configured such that the suspension member 6 is disposed such that the suspension groove 34 and the hanging members 605, 615 of the suspension member 6 are similar in shape, which facilitates the combination of the suspension groove 34 and the hanging member of the suspension member 6. .

如圖14及15,本發明之懸掛件6,乃是由第一元件60與第二元件61組合而成,前述第一元件60與第二元件61均設有第一平面600、610,前述第一平面600、610均設有穿孔601、611,前述穿孔601、611得為單一;或二;或二以上之數量,端視實際需求。前述第一元件60與第二元件61均設有第二平面602、612,係位於前述第一平面600、610上方,前述第二平面602、612均設有穿孔603、613,前述穿孔603、613得為單一或二或二以上之數量,端視實際需求。前述第一元件60與第二元件61均設有第三平面604、614,係位於前述第二平面602、612上方,前述第三平面604、614上方均設有掛置件605、615,前述掛置件605、615得為倒三角形,且於與前述第三平面604、614之結合處均設圓弧狀凹角606、616,前述第一元件60之第三平面604與前述第二元件61之第三平面614為反向設置,即前述第一元件60之第三平面604為自前述第二平面602之前側彎折,而前述第二元件61之第三平面614為自前述第二平面612 之後側彎折,如此,當以前述第一元件60與第二元件61互相並靠,即以第一元件之第一平面600至於第二元件61之第一平面610上方,讓前述第一平面600、610所設之穿孔601、611接近於同心狀態,以方便栓設元件620之設置,以方便將第一元件60與第二元件61結合固設,並讓前述第一元件60之第二平面602緊貼於第二元件61之第二平面612前側,且前述第二平面602、612所設之穿孔603、613接近於同心狀態,以方便栓設元件621之設置,用以栓設拉引承載消防管線、電源管線、信號管線與輕鋼架,且讓前述懸掛件6之掛置件605、615得以向外展開而保持適當之距離。 14 and 15, the suspension member 6 of the present invention is a combination of a first member 60 and a second member 61. The first member 60 and the second member 61 are each provided with a first plane 600, 610. The first planes 600, 610 are each provided with perforations 601, 611, and the perforations 601, 611 are singular; or two; or more than two, depending on actual needs. The first element 60 and the second element 61 are respectively provided with second planes 602 and 612, which are located above the first planes 600 and 610, and the second planes 602 and 612 are respectively provided with through holes 603 and 613. 613 can be single or two or more, depending on actual demand. The first element 60 and the second element 61 are respectively provided with third planes 604 and 614, which are located above the second planes 602 and 612, and the third planes 604 and 614 are provided with hanging members 605 and 615. The hanging members 605 and 615 are formed as inverted triangles, and arc-shaped concave corners 606 and 616 are disposed at the junction with the third planes 604 and 614, and the third plane 604 of the first component 60 and the second component 61 are disposed. The third plane 614 is disposed in a reverse direction, that is, the third plane 604 of the first component 60 is bent from the front side of the second plane 602, and the third plane 614 of the second component 61 is from the second plane. 612 The rear side is bent, such that when the first element 60 and the second element 61 are abutted against each other, that is, above the first plane 600 of the first element and above the first plane 610 of the second element 61, the first plane is The perforations 601 and 611 of the 600 and 610 are close to the concentric state to facilitate the setting of the embedding member 620 to facilitate the fixation of the first component 60 and the second component 61, and to allow the second component 60 to be second. The plane 602 is in close contact with the front side of the second plane 612 of the second component 61, and the through holes 603, 613 of the second planes 602, 612 are close to the concentric state, so as to facilitate the setting of the bolting component 621 for bolting The fire-fighting pipeline, the power pipeline, the signal pipeline and the light steel frame are carried, and the hanging members 605, 615 of the aforementioned suspension member 6 are deployed outward to maintain an appropriate distance.

如圖11~13,當相鄰之金屬建材3互相結合而形成結合部33,並以前述結合部33之懸掛槽34為懸掛件6設置時,乃是先將前述懸掛件6之第一元件60與第二元件61互相並靠,並讓前述懸掛件6之掛置件605、615與懸掛槽34保持同方向(如圖11),此時,再將懸掛件6之掛置件605、615往上伸入到懸掛槽34中(如圖12),之後,再將懸掛件6轉動約90度角,讓懸掛件6之掛置件605、615與懸掛槽34成垂直狀態(如圖13),即可讓懸掛件6之二掛置件605、615同時與懸掛槽34之槽壁接觸結合,得藉由二掛置件605、615所形成之間距,讓前述懸掛件6與懸掛槽34形成面的結合,確保懸掛件6得與懸掛槽34維持一定之方向,不易轉動。如此,即可利用前述懸掛件6之栓設元件620及栓設元件621,或栓設元件621以為栓設承載消防管線、排水管線、電源管線、信號管線與輕鋼架之設置,且因為前述懸掛件6得以保持一定之方向,因此容易施工安裝,更可提升金屬建材承載重量,以配合目前建築物明管管線之設置,方便將來更換與維修。 11 to 13, when the adjacent metal building materials 3 are combined with each other to form the joint portion 33, and the suspension groove 34 of the joint portion 33 is provided as the suspension member 6, the first member of the suspension member 6 is firstly used. 60 and the second member 61 abut each other, and the hanging members 605, 615 of the suspension member 6 and the suspension groove 34 in the same direction (as shown in Figure 11), at this time, the hanger 6 of the suspension member 605, The 615 extends upward into the suspension slot 34 (Fig. 12), and then rotates the suspension member 6 by an angle of about 90 degrees, so that the hanging members 605, 615 of the suspension member 6 are perpendicular to the suspension slot 34 (as shown in the figure). 13), the two hanging members 605, 615 of the suspension member 6 can be simultaneously combined with the groove wall of the hanging slot 34, so that the distance between the two hanging members 605, 615 is formed, so that the suspension member 6 and the suspension are suspended. The combination of the grooves 34 forms a face, ensuring that the suspension member 6 is maintained in a certain direction with the suspension groove 34 and is not easily rotated. Thus, the bolting member 620 and the bolting member 621 of the suspension member 6 or the bolting member 621 can be utilized to embed the fire-fighting pipeline, the drain pipeline, the power pipeline, the signal pipeline and the light steel frame, and because of the foregoing The suspension member 6 can be kept in a certain direction, so it is easy to be installed and installed, and the weight of the metal building materials can be increased to meet the current setting of the open pipe of the building, which is convenient for future replacement and maintenance.

綜上所述,本發明於金屬建材之結構部內側設置強化板,除了可因應目前作為金屬建材成型用之金屬材料厚度改變之因素外,更可提升金屬建材作為屋頂內層時所需抗風壓之能力,須讓栓設元件得以將金屬板與金屬建材充分鎖合固定,再者,當金屬建材作為建築物之天花板時,得以配合目前建築物之管線設置趨勢,乃於金屬建材之結合部以結構特別強化之懸掛件6設置其下方,讓施工者更易於施工安裝乃於建築物之消防 管線、排水管線、電源管線、信號管線與輕鋼架,足見本發明確已具備實用性、新穎性與進步性,為本案之組成。 In summary, the present invention provides a reinforcing plate on the inner side of the structural part of the metal building material, in addition to the fact that the thickness of the metal material used for forming the metal building material is changed, and the metal building material is required to be used as the inner layer of the roof. The ability to press, the bolting component must be able to fully lock and fix the metal plate and the metal building materials. Moreover, when the metal building material is used as the ceiling of the building, it can match the trend of the pipeline installation of the current building, and is a combination of metal building materials. The suspension member 6 with special structure is placed underneath, which makes it easier for the constructor to install and install the fire in the building. Pipeline, drainage pipeline, power pipeline, signal pipeline and light steel frame, it can be seen that the present invention has practical, novel and progressive, and is the composition of this case.

3‧‧‧金屬建材 3‧‧‧Metal building materials

30‧‧‧結構部 30‧‧‧Structural Department

31‧‧‧平板部 31‧‧‧ Flat section

300‧‧‧上平面 300‧‧‧Upper plane

301‧‧‧側邊面 301‧‧‧ side faces

302‧‧‧直壁面 302‧‧‧ Straight wall

303‧‧‧彎折部 303‧‧‧Bending

32‧‧‧導引槽 32‧‧‧ guiding slot

320‧‧‧下彎折端 320‧‧‧Bottom bent end

d1‧‧‧寬度 Width of d1‧‧‧

d2‧‧‧寬度 D2‧‧‧Width

4‧‧‧強化板 4‧‧‧Strengthened board

5‧‧‧金屬板 5‧‧‧Metal plates

50‧‧‧栓設元件 50‧‧‧Equipment components

Claims (19)

一種金屬建材結構創新,至少包含:金屬建材,設結構部與平板部,前述結構部內側設有導引槽,以為強化板伸設,利於栓設元件同時鎖合結構部與強化板,提升栓設效果,並增加屋頂之抗風壓強度。 The invention relates to a metal building material structure innovation, which comprises at least: a metal building material, a structural part and a flat part, wherein the inner side of the structural part is provided with a guiding groove for extending the reinforcing plate, which is convenient for bolting the component and locking the structural part and the reinforcing plate, and the lifting bolt Set the effect and increase the wind pressure resistance of the roof. 依請求項1所述之金屬建材結構創新,其中金屬建材之結構部內側所設之導引槽係設置於結構部之上平面與兩側邊面之稍上方。 According to the innovation of the metal building material structure described in claim 1, the guiding groove provided on the inner side of the structural part of the metal building material is disposed slightly above the plane and the side surfaces of the structural part. 依請求項1所述之金屬建材結構創新,其中金屬建材之結構部之導引槽之對應下彎折端之寬度d1小於導引槽之寬度d2,當以前述導引槽為強化板伸設後,前述強化板之寬度通常接近於導引槽之寬度,及強化板之寬度並大於導引槽之對應下彎折端之寬度d1,讓前述強化板被穩固的安裝於導引槽,並定位。 According to the innovation of the metal building material structure described in claim 1, wherein the width d1 of the corresponding lower bending end of the guiding groove of the structural part of the metal building material is smaller than the width d2 of the guiding groove, when the guiding groove is used as the reinforcing plate Thereafter, the width of the reinforcing plate is generally close to the width of the guiding groove, and the width of the reinforcing plate is larger than the width d1 of the corresponding lower bending end of the guiding groove, so that the reinforcing plate is stably mounted on the guiding groove, and Positioning. 一種金屬建材結構創新,至少包含:金屬建材,設結構部與平板部,前述結構部內側設有導引槽,以為強化板伸設,利於栓設元件同時鎖合結構部與強化板,以提升栓設效果,並增加以屋頂之抗風壓強度;前述金屬建材設結合部,係位於金屬建材之兩側,當相鄰金屬建材互相結合後,可於結合部下方形成懸掛槽,得為懸掛件掛置其中,前述懸掛件得由第一元件與第二元件組成,當前述懸掛件與前述懸掛槽結合後,得藉由懸掛件之第一元件與第二元件所設之掛置件形成適當之間距,讓前述懸掛件與懸掛槽形成面的結合,確保懸掛件得與懸掛槽維持一定之方向,並以前述懸掛件之第一元件與第二元件所設之穿孔得為栓設元件穿設而栓設承載各類管線或輕鋼架之設置,用以提升金屬建材之實用性。 The invention relates to a metal building material structure innovation, which comprises at least: a metal building material, a structural part and a flat part, wherein the inner side of the structural part is provided with a guiding groove, so as to extend the reinforcing plate, which facilitates the bolting of the component and simultaneously locks the structural part and the reinforcing plate to enhance The effect of tying and increasing the wind-resistant strength of the roof; the joint of the metal building materials is located on both sides of the metal building materials. When the adjacent metal building materials are combined with each other, a suspension groove can be formed under the joint portion to be suspended. The hanging member is composed of a first component and a second component. When the suspension component is coupled with the suspension slot, the first component and the second component of the suspension component are formed by the hanging component. Appropriate distance, the combination of the suspension member and the suspension groove forming surface ensures that the suspension member maintains a certain direction with the suspension groove, and the perforation provided by the first member and the second member of the suspension member is used as the bolting member. It is installed and bolted to carry various types of pipelines or light steel frames to enhance the practicality of metal building materials. 依請求項4所述之金屬建材結構創新,其中金屬建材之結構部內側所設之導引槽係設置於結構部之上平面與兩側邊面之稍上方。 According to the innovation of the metal building material structure described in claim 4, the guiding groove provided on the inner side of the structural part of the metal building material is disposed above the upper surface of the structural part and slightly above the side surfaces. 依請求項4所述之金屬建材結構創新,其中金屬建材之結構部之導引槽之對應下彎折端之寬度d1小於導引槽之寬度d2,當以前述導引槽為強化板伸設後,前述強化板之寬度通常接近於導引槽之寬度,及強化板之寬度 並大於導引槽之對應下彎折端之寬度d1,讓前述強化板被穩固的安裝於導引槽,並定位。 According to the innovation of the metal building material structure described in claim 4, wherein the width d1 of the corresponding lower bending end of the guiding groove of the structural part of the metal building material is smaller than the width d2 of the guiding groove, when the guiding groove is used as the reinforcing plate Thereafter, the width of the reinforcing plate is generally close to the width of the guiding groove, and the width of the reinforcing plate And larger than the width d1 of the corresponding lower bending end of the guiding groove, the reinforcing plate is stably mounted on the guiding groove and positioned. 依請求項4所述之金屬建材結構創新,其中金屬建材之兩側分別成型有第一結合部與對應於第一結合部之第二結合部,當相鄰二金屬建材互相結合時,即可將其中一金屬建材之第一結合部與另一金屬建材之第二結合部互相結合而形成結合部,且在前述結合部下方並形成有懸掛槽,前述懸掛槽設開口,前述開口係由二對稱之折角所構成,前述開口上方兩側並形成懸掛彎折部,以為懸掛件設置,讓懸掛槽與懸掛件之掛置件之形狀相近,利於懸掛槽與懸掛件之掛置件之結合。 According to the innovation of the metal building material structure described in claim 4, wherein the two sides of the metal building material are respectively formed with a first joint portion and a second joint portion corresponding to the first joint portion, when the adjacent two metal building materials are combined with each other, Forming a joint portion by combining a first joint portion of one metal building material with a second joint portion of another metal building material, and forming a joint groove below the joint portion, wherein the hanging groove is provided with an opening, and the opening is composed of two The symmetrical folding angle is formed on the upper side of the opening to form a hanging bending portion for the hanging member, so that the hanging groove and the hanging member are similar in shape, which is advantageous for the combination of the hanging groove and the hanging member. 依請求項4所述之金屬建材結構創新,其中懸掛件之第一元件與第二元件均設有第一平面,前述第一平面均設有穿孔,前述第一元件與第二元件均設有第二平面,係位於前述第一平面上方,前述第二平面均設有穿孔,前述第一元件與第二元件均設有第三平面,係位於前述第二平面上方,前述第三平面上方均設有掛置件,前述第一元件之第三平面與前述第二元件之第三平面為反向設置,即前述第一元件之第三平面為自前述第二平面之前側彎折,而前述第二元件之第三平面為自前述第二平面之後側彎折,當前述第一元件與第二元件互相並靠,即以第一元件之第一平面置於第二元件之第一平面上方,讓前述第一平面所設之穿孔接近於同心狀態,以方便栓設元件之設置,將第一元件與第二元件結合固設,並讓前述第一元件之第二平面緊貼於第二元件之第二平面前側,且前述第二平面所設之穿孔接近於同心狀態,以方便栓設元件之設置,用以栓設拉引承載各類管線或輕鋼架,且讓前述第一元件與第二元件之掛置件得以向外展開而保持適當之距離。 The metal building material structure innovation according to claim 4, wherein the first element and the second element of the suspension member are each provided with a first plane, the first plane is provided with a perforation, and the first element and the second element are respectively provided. The second plane is located above the first plane, and the second plane is provided with a perforation, and the first element and the second element are each provided with a third plane, which is located above the second plane, and above the third plane a third surface of the first element is opposite to the third plane of the second element, that is, the third plane of the first element is bent from the front side of the second plane, and the foregoing The third plane of the second element is bent from the rear side of the second plane, and when the first element and the second element abut each other, that is, the first plane of the first element is placed above the first plane of the second element The perforations provided in the first plane are close to the concentric state, so as to facilitate the setting of the bolting component, the first component and the second component are combined and fixed, and the second plane of the first component is closely attached to the second Second flat component The front side, and the perforations provided in the second plane are close to a concentric state, so as to facilitate the setting of the bolting elements for bolting and carrying various types of pipelines or light steel frames, and allowing the first element and the second element to be The hangers are deployed outwardly to maintain an appropriate distance. 依請求項4所述之金屬建材結構創新,其中得於懸掛件之第一元件與第二元件之第一平面所設之穿孔得為單一;或二;或二以上之數量。 The metal building material structure innovation according to claim 4, wherein the perforations provided in the first plane of the suspension member and the first plane of the second component are single; or two; or two or more. 依請求項4所述之金屬建材結構創新,其中得於懸掛件之第一元件與第二元件之第二平面所設之穿孔得為單一或二或二以上之數量。 The metal building material structure innovation according to claim 4, wherein the perforations provided in the second plane of the first component and the second component of the suspension member are one or two or more. 依請求項4所述之金屬建材結構創新,其中掛置件為倒三角形,且於第三平面之結合處均設圓弧狀凹角。 The metal building material structure innovation according to claim 4, wherein the hanging member is an inverted triangle, and the arc-shaped concave corner is disposed at the joint of the third plane. 依請求項4所述之金屬建材結構創新,其中相鄰二金屬建材互相結合所形成之結合部的懸掛槽與懸掛件結合時,係先將懸掛件之第一元件與第二元件互相並靠,並讓懸掛件之掛置件與懸掛槽保持同方向,再將懸掛件之掛置件往上伸入到懸掛槽中,之後,再將懸掛件轉動約90度角,讓懸掛件之掛置件與懸掛槽成垂直狀態,即可讓懸掛件之掛置件與懸掛槽充分結合,以保持懸掛件於懸掛槽之方向。 According to the innovation of the metal building material structure described in claim 4, when the hanging groove of the joint formed by the combination of the adjacent two metal building materials is combined with the hanging member, the first element and the second element of the hanging piece are firstly placed on each other. And let the hanging piece of the suspension piece keep the same direction as the hanging groove, and then extend the hanging piece of the hanging piece into the hanging slot, and then rotate the hanging piece by about 90 degrees to let the hanging piece hang The mounting member is perpendicular to the suspension slot to allow the suspension member to fully engage the suspension slot to maintain the suspension member in the direction of the suspension slot. 一種金屬建材結構創新,至少包含:金屬建材,設結構部、平板部與結合部,前述結合部係位於金屬建材之兩側,當相鄰金屬建材互相結合後,可於結合部下方形成懸掛槽,得為懸掛件掛置其中,前述懸掛件由第一元件與第二元件組成,當前述懸掛件與前述懸掛槽結合後,得藉由懸掛件之第一元件與第二元件所設之掛置件形成適當之間距,讓前述懸掛件與懸掛槽形成面的結合,確保懸掛件得與懸掛槽維持一定之方向,並以前述懸掛件之第一元件與第二元件所設之穿孔得為栓設元件穿設而栓設承載各類管線或輕鋼架之設置。 A metal building material structure innovation, comprising at least: a metal building material, comprising a structural part, a flat part and a joint part, wherein the joint part is located on both sides of the metal building material, and when the adjacent metal building materials are combined with each other, a hanging groove can be formed under the joint part The suspension member is suspended by the first component and the second component. When the suspension component is coupled with the suspension slot, the first component and the second component of the suspension component are suspended. The arrangement forms a proper distance, and the combination of the suspension member and the suspension groove forming surface ensures that the suspension member maintains a certain direction with the suspension groove, and the perforation of the first member and the second member of the suspension member is The bolting elements are pierced and arranged to carry various types of pipelines or light steel frames. 依請求項13所述之金屬建材結構創新,其中金屬建材之兩側分別成型有第一結合部與對應於第一結合部之第二結合部,當相鄰二金屬建材互相結合時,即可將其中一金屬建材之第一結合部與另一金屬建材之第二結合部互相結合而形成結合部,且在前述結合部下方並形成有懸掛槽,前述懸掛槽設開口,前述開口係由二對稱之折角所構成,前述開口上方兩側並形成懸掛彎折部,以為懸掛件設置,讓懸掛槽與懸掛件之掛置件之形狀相近,利於懸掛槽與懸掛件之掛置件之結合。 According to the innovation of the metal building material structure described in claim 13, wherein the two sides of the metal building material are respectively formed with a first joint portion and a second joint portion corresponding to the first joint portion, when the adjacent two metal building materials are combined with each other, Forming a joint portion by combining a first joint portion of one metal building material with a second joint portion of another metal building material, and forming a joint groove below the joint portion, wherein the hanging groove is provided with an opening, and the opening is composed of two The symmetrical folding angle is formed on the upper side of the opening to form a hanging bending portion for the hanging member, so that the hanging groove and the hanging member are similar in shape, which is advantageous for the combination of the hanging groove and the hanging member. 依請求項13所述之金屬建材結構創新,其中懸掛件之第一元件與第二元件均設有第一平面,前述第一平面均設有穿孔,前述第一元件與第二元件均設有第二平面,係位於前述第一平面上方,前述第二平面均設有穿孔,前述第一元件與第二元件均設有第三平面,係位於前述第二平面上方, 前述第三平面上方均設有掛置件,前述第一元件之第三平面與前述第二元件之第三平面為反向設置,即前述第一元件之第三平面為自前述第二平面之前側彎折,而前述第二元件之第三平面為自前述第二平面之後側彎折,當前述第一元件與第二元件互相並靠,即以第一元件之第一平面置於第二元件之第一平面上方,讓前述第一平面所設之穿孔接近於同心狀態,以方便栓設元件之設置,將第一元件與第二元件結合固設,並讓前述第一元件之第二平面緊貼於第二元件之第二平面前側,且前述第二平面所設之穿孔接近於同心狀態,以方便栓設元件之設置,用以栓設拉引承載各類管線或輕鋼架,且讓前述第一元件與第二元件之掛置件得以向外展開而保持適當之距離。 The metal building material structure innovation according to claim 13, wherein the first element and the second element of the suspension member are respectively provided with a first plane, and the first plane is provided with a perforation, and the first element and the second element are respectively provided with The second plane is located above the first plane, and the second plane is provided with a through hole. The first element and the second element are each provided with a third plane, which is located above the second plane. A hanging member is disposed above the third plane, and the third plane of the first component is opposite to the third plane of the second component, that is, the third plane of the first component is before the second plane The side is bent, and the third plane of the second element is bent from the rear side of the second plane. When the first element and the second element abut each other, the first plane of the first element is placed in the second plane. Above the first plane of the component, the perforations provided in the first plane are close to a concentric state to facilitate the setting of the plugging component, the first component and the second component are combined and fixed, and the second component is second The plane is in close contact with the front side of the second plane of the second component, and the perforations provided by the second plane are close to a concentric state, so as to facilitate the setting of the bolting component for tying the puller to carry various pipelines or light steel frames. And the hanging members of the first element and the second element are outwardly deployed to maintain an appropriate distance. 依請求項13所述之金屬建材結構創新,其中懸掛件之第一元件與第二元件之第一平面所設之穿孔得為單一;或二;或二以上之數量。 The metal building material structure innovation according to claim 13, wherein the first element of the suspension member and the first plane of the second element are provided with a single perforation; or two; or two or more. 依請求項13所述之金屬建材結構創新,其中懸掛件之第一元件與第二元件之第二平面所設之穿孔得為單一或二或二以上之數量。 The metal building material structure innovation according to claim 13, wherein the perforations of the first element of the suspension member and the second plane of the second element are provided in a single or two or more. 依請求項13所述之金屬建材結構創新,其中掛置件為倒三角形,且於第三平面之結合處均設圓弧狀凹角。 The metal building material structure innovation according to claim 13, wherein the hanging member is an inverted triangle, and the arc-shaped concave corner is disposed at the joint of the third plane. 依請求項13所述之金屬建材結構創新,其中相鄰二金屬建材互相結合所形成之結合部的懸掛槽與懸掛件結合時,係先將懸掛件之第一元件與第二元件互相並靠,並讓懸掛件之掛置件與懸掛槽保持同方向,再將懸掛件之掛置件往上伸入到懸掛槽中,之後,再將懸掛件轉動約90度角,讓懸掛件之掛置件與懸掛槽成垂直狀態,即可讓懸掛件之掛置件與懸掛槽充分結合,以保持懸掛件於懸掛槽之方向。 According to the metal building material structure innovation described in claim 13, wherein the suspension groove of the joint formed by the combination of the adjacent two metal materials and the suspension member is combined with the first component and the second component of the suspension member. And let the hanging piece of the suspension piece keep the same direction as the hanging groove, and then extend the hanging piece of the hanging piece into the hanging slot, and then rotate the hanging piece by about 90 degrees to let the hanging piece hang The mounting member is perpendicular to the suspension slot to allow the suspension member to fully engage the suspension slot to maintain the suspension member in the direction of the suspension slot.
TW103116575A 2014-05-09 2014-05-09 Metal building materials structure innovation TWI550166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW103116575A TWI550166B (en) 2014-05-09 2014-05-09 Metal building materials structure innovation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW103116575A TWI550166B (en) 2014-05-09 2014-05-09 Metal building materials structure innovation

Publications (2)

Publication Number Publication Date
TW201542913A true TW201542913A (en) 2015-11-16
TWI550166B TWI550166B (en) 2016-09-21

Family

ID=55220842

Family Applications (1)

Application Number Title Priority Date Filing Date
TW103116575A TWI550166B (en) 2014-05-09 2014-05-09 Metal building materials structure innovation

Country Status (1)

Country Link
TW (1) TWI550166B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI629398B (en) * 2016-12-21 2018-07-11 坴賦佳金屬有限公司 Metal building material
TWI766358B (en) * 2020-09-03 2022-06-01 蘇睿豪 Deck

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI714970B (en) * 2019-02-25 2021-01-01 蘇睿豪 Deck suspension base
TWI785218B (en) * 2019-03-15 2022-12-01 蘇睿豪 Bearing deck

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI402402B (en) * 2010-07-13 2013-07-21 Lu Fo Ga Engineering Co Ltd Fire-enduring steel plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI629398B (en) * 2016-12-21 2018-07-11 坴賦佳金屬有限公司 Metal building material
TWI766358B (en) * 2020-09-03 2022-06-01 蘇睿豪 Deck

Also Published As

Publication number Publication date
TWI550166B (en) 2016-09-21

Similar Documents

Publication Publication Date Title
US9091056B2 (en) Multipurpose concrete anchor clip
TWI550166B (en) Metal building materials structure innovation
KR101323638B1 (en) Brick wall type masonry
SK533188A3 (en) Wall panel
CN216091950U (en) H-shaped steel beam door bolt type safety belt hanging device
KR20070035288A (en) A supporting structure of the ceiling-frame
TWM639207U (en) Omnidirectional grille installation and fixing system
JP6534852B2 (en) Fireproof ceiling base material mounting device
KR20230039804A (en) Reinforcement for dry walls
RU132823U1 (en) INVISIBLE FASTENERS "ZIGZAG" FOR MOUNTING THE FACING BOARD
CN207633641U (en) It is a kind of can Buried pipe assembled cold bending thin wall steel reversed beam
JP2012092497A (en) Fireproof panel
JP3190407U (en) Locking bracket for openable partition
TWI835346B (en) Full-direction grille installation and fixing system
CN220247347U (en) Large-size corrugated aluminum plate furred ceiling mounting structure
WO2023054015A1 (en) Panel installation structure
JP5179117B2 (en) Scaffold wall mounting hardware
WO2023054014A1 (en) Panel device and installation structure therefor
JP2710650B2 (en) Wall panel mounting structure
CN207110196U (en) A kind of furred ceiling support
CN209053357U (en) The cladding panel structure of hall
JP4166375B2 (en) Uneven wall structure with ALC opening
JPS6357577B2 (en)
JPH0342167Y2 (en)
JP2022083547A (en) Gasket temporary fastening clip and gasket mounting method