TW201124333A - Crane. - Google Patents

Crane. Download PDF

Info

Publication number
TW201124333A
TW201124333A TW99100551A TW99100551A TW201124333A TW 201124333 A TW201124333 A TW 201124333A TW 99100551 A TW99100551 A TW 99100551A TW 99100551 A TW99100551 A TW 99100551A TW 201124333 A TW201124333 A TW 201124333A
Authority
TW
Taiwan
Prior art keywords
balance
box
cantilever
base
crane
Prior art date
Application number
TW99100551A
Other languages
Chinese (zh)
Other versions
TWI462865B (en
Inventor
tian-ming Zhang
Ren-Ming Xue
Original Assignee
tian-ming Zhang
Ren-Ming Xue
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by tian-ming Zhang, Ren-Ming Xue filed Critical tian-ming Zhang
Priority to TW99100551A priority Critical patent/TW201124333A/en
Publication of TW201124333A publication Critical patent/TW201124333A/en
Application granted granted Critical
Publication of TWI462865B publication Critical patent/TWI462865B/zh

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A crane comprises: a base, a tower mounted on the base, and a cantilever arm unit. The base comprises a base frame and at least a stability augmentation box mounted on the base frame. The stability augmentation box comprises a stability augmentation box wall that defines a stability augmentation chamber. The cantilever arm unit comprises a cantilever arm and at least one balance box. The cantilever arm has a support section that is mounted on the tower and a suspension arm section and a balance arm section respectively arranged at opposite sides of the support section. The balance box is arranged on the balance arm section and comprises a balance box wall that defines a balance chamber. This arrangement allows a substance, such as water, sand, aggregates, which is readily accessed in a construction site to be positioned in the stability augmentation chamber and the balance chamber to improve stability and balance of an installed crane with reduced costs of construction.

Description

201124333 六、發明說明: 【發明所屬之技術領域】 本發明是關於一種起重機,特別是指一種利用安裝在 塔柱上的懸臂來吊掛物件之起重機。 【先前技術】 參閱圖1、2,習知起重機丨通常包含:一個擺放在地 面上的底框11、一個安裝在該底框U上的旋轉機構12、一 個搭設在該旋轉機構12上的塔柱13、一個橫向架設在該塔 柱13上方的懸臂14、一個懸吊該懸臂14的懸吊單元15, 以及一個可移動地懸掛在該懸臂14下方的吊具16。該底框 11具有兩支平行的下樑柱111,以及兩支垂直架設在該下樑 柱hi上方並供該旋轉機構12安裝的上樑柱112,所述懸 臂14具有一個架設在該塔柱13上方的支點部141、一個自 該支點部141往水平方向突出並供該吊具16安裝的吊掛臂 部142,以及一個自該支點部141往相反於吊掛臂部142方 向水平延伸的平衡臂部143,該平衡臂部143並具有一個遠 離忒支點部141的配重掛端144。又為了讓懸臂14可以在 使用時維持平衡,該起重機〗還包含至少_個擺放在該懸 臂14之配重掛端144上的配重塊17,該配重塊17可為混 凝土或者鋼板等等。 習知起重機1在使用時,是根據吊掛物件之重量及吊 2的位置,計算出懸臂14的平衡關係,然後將重量適 。的屈凝土或者鋼板等等的配重& 17懸;掛在該配重掛端 144上,藉以維持吊掛物件時整個起重機丨的平衡。此種長 201124333 期以來使用的配番古斗、Μ姑、 是這種使用方々/ 、、、°以達到維持平衡的目的’但 用方式必需先製作出各種不同重量的配重塊η, 再以卡車將需要重量的配重塊17 爯以士直f 载運到施工場所,使用後 再卡車將衫配重塊17載離施工場所,故 不方便,也會增加施工時的成本。 此外,習知起重機i雖然可以利用交又之上、下襟柱 112、111來增加該底框u擺放時的穩固性但由於起重機 L通常會吊掛例如鋼筋等等比較重的物件,因此,在使用時 令易產生底框11偏斜、不穩的問題。為了增加起重機1使 用的安全性及穩固性,—般業者通常會如圖卜2所示,在 該等間隔之下樑柱U1 ±方擺放—些金屬的板材,然後 在該板材18上面壓放一些具有重量的水泥塊19。此種以水 泥塊19增加起重機丨擺放穩固性的方式雖然可行,但是這 些水泥塊19同樣必需以卡車來搬運’在工程結束後,這些 水泥塊19也沒有其他用途必需搬離施工現場,故此項增加 穩固性的方式,同樣存在著使用不便、施工成本較高等問 題〇 【發明内容】 本發明之目的是在提供一種可在減少施工成本的情況 下,增加擺放穩固性及平衡性的起重機。 本發明之起重機包含:一底座、一架設在該底座上的 塔柱’以及一懸臂單元,該底座包括一底框,以及至少一 個設在該底框上的增穩箱,所述增穩箱具有一個界定出一 可擺放水、沙、碎石塊等等物質之增穩容室的增穩箱壁; 201124333 而該懸臂單元句把 . 個懸臂,以及至少一個平衡 臂具有一個架設在該 相,該懸 相反側之一吊掛臂卹 /支點部 。、一平衡臂部,所述平衡 該平衡臂部上,並I古y 相疋女裝在 兀具有一個界定出一個可擺放水' 石塊等等物質之平衡容室的平衡箱壁。 碎 本發明的有益功效在於:藉在該懸臂 衡容室的平衡箱,以月有千 箱,可以及在底框上設置具有增穩容室的增穩201124333 VI. Description of the Invention: [Technical Field] The present invention relates to a crane, and more particularly to a crane that uses an cantilever mounted on a tower to hang an object. [Prior Art] Referring to Figures 1 and 2, conventional cranes generally include a bottom frame 11 placed on the ground, a rotating mechanism 12 mounted on the bottom frame U, and a rotating mechanism 12 disposed thereon. The column 13, a cantilever 14 that is erected transversely above the column 13, a suspension unit 15 that suspends the cantilever 14, and a spreader 16 that is movably suspended below the cantilever 14. The bottom frame 11 has two parallel lower beam columns 111, and two upper beam columns 112 vertically erected above the lower beam column hi and mounted by the rotating mechanism 12, the cantilever 14 having one erected on the column a fulcrum portion 141 above the 13, a hanging arm portion 142 protruding from the fulcrum portion 141 in the horizontal direction and mounted to the spreader 16, and a horizontal extending from the fulcrum portion 141 in a direction opposite to the hanging arm portion 142 The balance arm portion 143 has a weight hanging end 144 away from the fulcrum portion 141. In order to allow the boom 14 to maintain balance during use, the crane also includes at least one weight 17 placed on the weight end 144 of the boom 14, which may be concrete or steel, etc. . When the conventional crane 1 is used, the balance relationship of the cantilever 14 is calculated according to the weight of the hanging object and the position of the hanger 2, and then the weight is appropriate. The counterweight & 17 suspension of the concrete or steel plate, etc.; is hung on the counterweight end 144 to maintain the balance of the entire crane when the object is suspended. Such a long time used in the 201124333 period, such as the match, the aunt, the aunt, is the use of the square /,,, ° to achieve the purpose of maintaining balance 'but the method must first produce a variety of weights of the weight η, and then The truck will transport the weight of the weights 17 to the construction site with the weight of the truck. After use, the truck will carry the weights 17 away from the construction site, which is inconvenient and will increase the cost during construction. In addition, the conventional crane i can use the upper and lower masts 112, 111 to increase the stability of the bottom frame u when placed, but since the crane L usually hangs relatively heavy objects such as steel bars, When used, it is easy to cause the bottom frame 11 to be skewed and unstable. In order to increase the safety and stability of the crane 1, the general operator will usually display the metal plates of the beam and column U1 ± at the interval, and then press on the plate 18 Put some cement blocks 19 with weight. Although it is feasible to increase the stability of the crane raft by the cement block 19, these cement blocks 19 must also be transported by trucks. After the completion of the project, these cement blocks 19 have no other use and must be removed from the construction site. The method of increasing the stability also has problems such as inconvenient use and high construction cost. [Invention] The object of the present invention is to provide a crane that can increase the stability and balance of the display while reducing the construction cost. . The crane of the present invention comprises: a base, a tower column disposed on the base and a cantilever unit, the base comprising a bottom frame, and at least one stabilizing box disposed on the bottom frame, the stabilizing box Having a stabilizing chamber wall defining a stabilizing chamber for placing water, sand, gravel, etc.; 201124333 and the cantilever unit having a cantilever, and at least one balance arm having a erection Phase, one of the opposite sides of the suspension hangs the arm-shirt/pivot portion. a balance arm, the balance on the balance arm, and a balance box wall defining a balanced chamber for the placement of water, stones, and the like. The beneficial effect of the invention is that: by the balance box of the cantilever balance chamber, there are thousands of boxes per month, and the stabilization of the room can be set on the bottom frame.

[ 材地利用一般工地很容易取得的水、砂、 碎石4等等的物質來達到平衡及增重的目&, 於不需要額外以卡車恭.置k、p & 由 皁載運水泥塊、鋼板,有些用來增加重 量的物質也可以在施卫現場再度利用,故本發明確實可以 在減少施工成本的情況下’達到提高穩固性及平衡性的功 效。 【實施方式】 有關本發明之前述及其他技術内容、特點與功效,在 以下配合參考圖式之較佳實施例的詳細說明中,將可清楚 的呈現。 參閱圖3、4、5,本發明起重機之—較佳實施例包含: -個底座2、-個安裝在該底座2上的塔柱4,以及一個安 裝在該塔柱4上方的懸臂單元5。 本實紅例之底座2包括:一個底框21、一片架設在該 底框21上的架板22、兩個左右對稱地搭掛在該底框21上 的增穩箱23,以及一個安裝在該架板22上方的旋轉機構 24。该底框21具有兩支平行間隔的第一樑柱2丨丨,以及兩 201124333 支垂直連接第一樑柱211的第二樑柱212,所述架板22是 架設在該等第二樑柱212上方,每個增穩箱23都具有一個 界疋出一朝上之增穩容室231的增穩箱壁232,以及兩片自 该增穩箱壁232往該等第一樑柱211方向突出並固定的架設 片233,前述增穩容室231内並可供一般施工地點容易取得 之碎石塊、水、砂等等具有重量之物質擺放。 而該旋轉機構24是用來連接該底框21及塔柱4,並使 δ玄塔柱4可以旋轉,所述塔柱4包括數個串接地搭架在該 旋轉機構24上方的銜接塔座41,由於本發明之改良與塔柱 4的構造以及旋轉機構24如何驅動塔柱4旋轉無關,不再[Materials use materials such as water, sand, gravel 4, etc., which are easily available on the general site to achieve balance and weight gain, without the need for additional trucks, k, p & Blocks, steel plates, and some substances used to increase the weight can also be reused at the guard site, so the present invention can indeed achieve the effect of improving stability and balance while reducing construction costs. The above and other technical contents, features, and advantages of the present invention will be apparent from the following detailed description of the preferred embodiments of the invention. Referring to Figures 3, 4 and 5, a preferred embodiment of the crane of the present invention comprises: - a base 2 - a tower 4 mounted on the base 2, and a cantilever unit 5 mounted above the tower 4 . The base 2 of the present red example includes: a bottom frame 21, a frame 22 erected on the bottom frame 21, two stabilizing boxes 23 symmetrically hanged on the bottom frame 21, and one mounted on A rotating mechanism 24 above the shelf 22. The bottom frame 21 has two parallel spaced first beams 2丨丨, and two 201124333 second beams 212 connected perpendicularly to the first beam 211, and the frame 22 is erected on the second beams Above the 212, each of the stabilizing tanks 23 has a stabilizing tank wall 232 that opens out an upward stabilizing chamber 231, and two pieces from the stabilizing tank wall 232 toward the first beam 211 The protruding and fixed erecting piece 233 is disposed in the aforementioned stabilizing chamber 231 and can be placed in a weighted substance such as crushed stone, water, sand, etc. which is easily obtained at a general construction site. The rotating mechanism 24 is used to connect the bottom frame 21 and the tower 4, and the δ tower column 4 can be rotated. The tower 4 includes a plurality of connecting towers of the series grounding frame above the rotating mechanism 24. 41, since the improvement of the present invention is independent of the construction of the column 4 and how the rotating mechanism 24 drives the rotation of the column 4, no longer

詳述D 本實施例之懸臂單元5包括:一個架設在最上方之銜 接塔座41上的懸臂51、一個安裝在該懸臂51上的塔尖52 、兩條懸掛在該塔尖52及懸臂51之間的懸吊件53、一個 垂,在該懸臂51下方的吊具54,以及一個平衡箱55。該 懸臂51具有一個固定地安裝在該塔柱4上的支點部511、 -個自該支點部川水平突出並供吊具54安裝的吊掛臂部 2以及一個自該支點部511水平突出的平衡臂部513, β吊掛臂部512具有-個遠離該支點部511的末端514,而 該平衡臂部5U具有-個遠離該支點部511的配重端515, 所述懸吊件53即各別地連接在該塔尖52及末端514間, Χ及塔間52及懸臂51之配重端515間,用以垂吊水平突 出:吊掛臂部512及平衡臂部513β本實施例之平衡箱Μ 則疋垂掛在該懸臂51的配重端515上,並具有—個界定出 201124333 上述平衡容室551内亦可 量之物質擺放。 一平衡容室551的平衡箱壁552, 供例如小石塊、水' 砂等等具有重 本實施例之起重機在使用時,操作者可以根據吊掛物 件的重量,將一般工地容易取得之碎石塊、水、砂等物質 擺放在該平衡|目55之平衡容室551内,同時在該增穩箱23 的增重量容室231内擺放前述物質,由於碎石塊、水、砂 等等的物質在一般工地很容易取得,特別是在-般建築工DETAILED DESCRIPTION The cantilever unit 5 of the present embodiment includes: a cantilever 51 mounted on the uppermost coupling tower 41, a spire 52 mounted on the cantilever 51, and two suspended at the spire 52 and the cantilever 51 A suspension member 53 therebetween, a sling 54 below the cantilever 51, and a balance box 55. The cantilever 51 has a fulcrum portion 511 fixedly mounted on the column 4, a hanging arm portion 2 projecting horizontally from the fulcrum portion and mounted by the spreader 54, and a horizontally protruding portion from the fulcrum portion 511. The balance arm portion 513, the β suspension arm portion 512 has a distal end 514 away from the fulcrum portion 511, and the balance arm portion 5U has a weight end 515 away from the fulcrum portion 511, and the suspension member 53 is It is connected between the spire 52 and the end 514, and between the tower 52 and the weight end 515 of the cantilever 51 for hanging horizontally: the hanging arm 512 and the balancing arm 513β. The balance box 疋 is hung on the weight end 515 of the cantilever 51, and has a substance that defines the amount of material in the balance chamber 551 of 201124333. A balance tank wall 552 of the balance chamber 551 for, for example, small stones, water sand, etc., when the crane of the embodiment is used, the operator can easily obtain the crushed objects according to the weight of the hanging objects. Stones, water, sand, and the like are placed in the balance chamber 551 of the balance 55, and the foregoing substances are placed in the weight-increasing chamber 231 of the stabilization box 23, due to gravel, water, sand. Etc. The material is easy to obtain at the general site, especially at the construction site.

地上,攻些物質往往是施工需要的建築用材料或者工程產 生的廢棄物,因此,利料些物質不僅可以達到平衡及增 加穩疋性的目的,在使用過程也不需要利用卡車來載運, 有二用來增重及維持平衡的物質還可以直接運用在建築物 的製造上。故本發明該起重機的設計不僅結構新穎,更可 在減少施工成本的情況下,達到增加起重機擺放穩固性及 平衡性等功效。 准以上所述者,僅為本發明之較佳實施例而已,當不 能以此限定本發明實施之範圍,即大凡依本發明申請專利 範圍及發明說明内容所作之簡單的等效變化與修飾皆仍 屬本發明專利涵蓋之範圍内。 【圖式簡單說明】 圖1是一種習知起重機之一側視示意圖; 圖2是該習知起重機之一局部立體圖,主要顯示該起 重機之一底框; 圖3是本發明起重機之一較佳實施例的側視示意圖; 圖4是該較佳實施例之一局部立體圖,主要顯示該起 201124333 重機之一底座;及 圖5是該較佳實施例之另一局部立體圖,主要顯示該 起重機之一懸臂單元的局部構造。On the ground, the materials are often used for construction materials or construction-generated waste. Therefore, the materials can not only achieve balance and increase stability, but also do not need to be transported by truck during use. Second, substances used to gain weight and maintain balance can also be directly applied to the manufacture of buildings. Therefore, the design of the crane of the invention not only has a novel structure, but also can achieve the effects of increasing the stability and balance of the crane placement under the condition of reducing the construction cost. The above is only the preferred embodiment of the present invention, and the scope of the invention is not limited thereto, that is, the simple equivalent changes and modifications made by the scope of the invention and the description of the invention are all It is still within the scope of the invention patent. BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a side elevational view of a conventional crane; Fig. 2 is a partial perspective view of one of the conventional cranes, mainly showing one of the bottom frames of the crane; Fig. 3 is a preferred embodiment of the crane of the present invention. 4 is a partial perspective view of the preferred embodiment, showing a base of the 201124333 heavy machine; and FIG. 5 is another partial perspective view of the preferred embodiment, mainly showing the crane A partial configuration of a cantilever unit.

8 201124333 【主要元件符號說明】 2 底座 51 懸臂 21 底框 511 支點部 211 第一樑柱 512 吊掛臂部 212 第二樑柱 513 平衡臂部 22 架板 514 末端 23 增穩箱 515 配重端 231 增穩容室 52 塔尖 232 增穩箱壁 53 懸吊件 233 架設片 54 吊具 24 旋轉機構 55 平衡箱 4 塔柱 551 平衡容室 41 銜接塔座 552 平衡箱壁 5 懸臂單元8 201124333 [Description of main components] 2 Base 51 Cantilever 21 Bottom frame 511 Pivot part 211 First beam 512 Hanging arm part 212 Second beam 513 Balance arm part 22 Rack 514 End 23 Stabilizing box 515 Counterweight end 231 Stabilization chamber 52 Tip 232 Stabilizing box wall 53 Suspension 233 Mounting plate 54 Spreader 24 Rotating mechanism 55 Balance box 4 Column 551 Balance chamber 41 Connection tower 552 Balance box wall 5 Cantilever unit

99

Claims (1)

201124333 七、申請專利範圍: 1. 一種起重機,包含: 一底座,包括一底框,以及至少—個設在該底框上 的增穩箱,所述增穩箱具有一個界定出一增穩容室的增 穩箱壁; 一塔柱,架設在該底座上;及 一懸臂單元,包括一個懸臂,以及至少一個平衡箱 ,該懸臂具有一個架設在該塔柱上的支點部,以及位在 該支點部相反側之一吊掛臂部、一平衡臂部,所述平衡 籲 箱是安裝在該平衡臂部上,並具有一個界定出一平衡容 室的平衡箱壁。 2 ·依據申清專利範圍第1項所述之起重機,其中,該懸臂 之平衡臂部具有一個供該平衡箱安裝並遠離該支點部的 配重端,而該懸臂單元還包括一個吊掛在該吊掛臂部上 的吊具。 3·依據申請專利範圍第丨項或第2項所述之起重機,其中 ,該底座之底框具有兩支平行間隔之第一樑柱,以及兩 鲁 支垂直銜接該等第一樑柱之第二樑柱,所述增穩箱還包 括兩片自該增穩箱壁上突出並安裝在第一樑柱上的架設 片。 4.依據申凊專利範圍第3項所述之起重機,其中,該底座 還包括一片架設在該底框上的架板,以及一個安裝在該 架板上的旋轉機構。 10201124333 VII. Patent application scope: 1. A crane comprising: a base comprising a bottom frame; and at least one stabilizing box disposed on the bottom frame, the stabilizing box having a defined stability a stabilizing box wall; a tower column mounted on the base; and a cantilever unit including a cantilever and at least one balance box having a fulcrum portion erected on the column and located at the One of the opposite sides of the fulcrum portion is a hanging arm portion and a balance arm portion. The balance ring box is mounted on the balance arm portion and has a balance box wall defining a balance chamber. 2. The crane according to claim 1, wherein the balance arm of the cantilever has a weight end for the balance box to be mounted away from the fulcrum portion, and the cantilever unit further comprises a hanging The sling on the hanging arm. 3. The crane according to claim 2 or 2, wherein the bottom frame of the base has two parallel spaced first beams and columns, and the two legs are vertically connected to the first beams. The two beam columns further comprise two erecting pieces protruding from the stabilizing box wall and mounted on the first beam column. 4. The crane according to claim 3, wherein the base further comprises a frame that is erected on the bottom frame, and a rotating mechanism mounted on the frame. 10
TW99100551A 2010-01-11 2010-01-11 Crane. TW201124333A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW99100551A TW201124333A (en) 2010-01-11 2010-01-11 Crane.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW99100551A TW201124333A (en) 2010-01-11 2010-01-11 Crane.

Publications (2)

Publication Number Publication Date
TW201124333A true TW201124333A (en) 2011-07-16
TWI462865B TWI462865B (en) 2014-12-01

Family

ID=45047076

Family Applications (1)

Application Number Title Priority Date Filing Date
TW99100551A TW201124333A (en) 2010-01-11 2010-01-11 Crane.

Country Status (1)

Country Link
TW (1) TW201124333A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897367A (en) * 2019-11-19 2021-06-04 湖南中联重科建筑起重机械有限责任公司 Counterweight containing frame, counterweight component and balance arm mechanism

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0912272A (en) * 1995-06-26 1997-01-14 Kyushu Koatsu Concrete Kogyo Kk Tower crane assembling method and towing device to be used for it
CN2687085Y (en) * 2003-11-03 2005-03-23 鞍钢集团房产建设第五建筑工程公司 Assembled base for fixed tower crane
CN2701914Y (en) * 2004-10-18 2005-05-25 从卫民 Concrete prefabricated and assembled multipurpose tower crane foundation
CN2793032Y (en) * 2005-03-17 2006-07-05 辽宁工程技术大学 Adjustable counterweight tower shaped crane
ITPR20060033A1 (en) * 2006-04-05 2007-10-06 Tgm Srl CRANES AND ITS ASSEMBLY METHOD.
JP5043397B2 (en) * 2006-10-17 2012-10-10 Ihi運搬機械株式会社 Jib crane
JP2008162749A (en) * 2006-12-28 2008-07-17 Koshihara:Kk Jib crane
DE102007009402B4 (en) * 2007-02-23 2009-10-08 Wolffkran Ag Luffing jib tower crane
TW200837001A (en) * 2007-03-08 2008-09-16 He Chian Engineering Co Ltd Method for assembling stationary crane hoist
TW200920678A (en) * 2007-11-15 2009-05-16 Jun-Ming Huang Counterweight block and method for producing the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897367A (en) * 2019-11-19 2021-06-04 湖南中联重科建筑起重机械有限责任公司 Counterweight containing frame, counterweight component and balance arm mechanism
CN112897367B (en) * 2019-11-19 2023-06-23 湖南中联重科建筑起重机械有限责任公司 Counterweight holding rack, counterweight assembly and counterweight arm mechanism

Also Published As

Publication number Publication date
TWI462865B (en) 2014-12-01

Similar Documents

Publication Publication Date Title
CN201794317U (en) Building tower type support frame
CN101845882B (en) Combined device of a mould frame for hanging and casting cement for high-rise buildings and handling and hanging box for building materials
CN206999277U (en) A kind of wallboard turning device
JP2005090116A (en) Method for erecting steel frame column and positioning frame body used for it
CN206308702U (en) A kind of portable basis of derrick crane
TW201124333A (en) Crane.
CN205804277U (en) A kind of supporting construction for sheet-pile wharf breast wall pouring template
CN205314539U (en) Large -scale cantilever type combination steel form
CN208039297U (en) A kind of tower crane differential settlement bracing means
CN206108705U (en) Gallows of frame isolated footing
CN210616901U (en) Precast beam prestressing force stretch-draw platform
CN207330121U (en) A kind of crane hook device for building
CN201647224U (en) Novel brick suspending box
CN210256615U (en) Tower crane counter weight making devices
CN207712729U (en) A kind of PC prefabricated components container
CN207581198U (en) Hollow brick handling apparatus
CN206110639U (en) Ladder is with adjustable triangle scaffold frame
CN206665992U (en) A kind of plant equipment mast-up
CN203889962U (en) Standard counterweight device of self-climbing tower crane
CN107473145A (en) A kind of lowering or hoisting gear for work high above the ground
CN207143960U (en) The fixed structure of deep basal pit elephant trunk scaffold
CN208650498U (en) The support device of scaffold
CN215047975U (en) Assembled building is hoisting frame for assembly
CN203667802U (en) Hanging bracket special for quadrangular hollow concrete blocks
CN218758816U (en) Concrete hopper support frame

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees