CN207581198U - Hollow brick handling apparatus - Google Patents

Hollow brick handling apparatus Download PDF

Info

Publication number
CN207581198U
CN207581198U CN201721754337.7U CN201721754337U CN207581198U CN 207581198 U CN207581198 U CN 207581198U CN 201721754337 U CN201721754337 U CN 201721754337U CN 207581198 U CN207581198 U CN 207581198U
Authority
CN
China
Prior art keywords
crossbeam
girder
hollow brick
horizontal
horizontal girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721754337.7U
Other languages
Chinese (zh)
Inventor
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201721754337.7U priority Critical patent/CN207581198U/en
Application granted granted Critical
Publication of CN207581198U publication Critical patent/CN207581198U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of hollow brick handling apparatus, include two fork arms of horizontal and parallel face setting, and two fork arms are connected in the both ends of crossbeam, and the upper surface of crossbeam and the medium position positioned at crossbeam length direction, which couple, vertical girder;The upper end connection of vertical girder has horizontal girder, the free end of horizontal girder and two fork arms is towards the same side, the top of horizontal girder is equipped with lifting cross bar in parallel, the both ends downward bending for lifting by crane cross bar couples horizontal girder, for lifting cross bar towards being equipped at intervals with several grooves on the face of horizontal girder along its length, lifting cross bar is located at the side of the free end of horizontal girder with the semicircle ring portion to raise up to form common load-bearing lifting point;Balance muscle is connected respectively between the both sides of vertical girder and crossbeam.Hollow brick hexahedron easily can be pitched the problem of fortune heap is high, and can directly be transported to hollow brick hexahedron fork needs floor to be used to cause efficiency low to avoid pile again, and waste is a large amount of artificial by the utility model.

Description

Hollow brick handling apparatus
Technical field
The utility model belongs to the technical field of traction enhancement in operation transport, and in particular to a kind of hollow brick handling dress It puts.
Background technology
In the building wall of building, needing to use a large amount of hollow brick, hollow brick is manufactured by special brickmaking factory, Hollow brick is as shown in Figure 7, is piled up and binds bundled hexahedron state by its state of supplying(Hereinafter referred to as " hollow brick six Cube "), and horizontal entry position has been reserved in order to transshipment, brickmaking on hollow brick hexahedron during piling up There is the broad place dedicated for stacking hollow brick hexahedron in factory, in this way, wheeled fork truck can be used easily to realize hollow brick six Carrying of the cube in the broad place of brickmaking factory is put, and wheeled fork truck can also be used to pitch hollow brick hexahedron to tablet during shipment On lorry, construction site is transported to by lorry.But hollow brick hexahedron is unloaded and is removed after being transported to construction site Fortune is stacked just into problem, because construction site can only dismantle hollow brick hexahedron usually and without using wheeled fork truck Carry out carrying pile again afterwards, it is extremely inefficient, and even if having used wheeled fork truck in construction site for unloading and carrying pendulum It puts, however it remains two distinct issues:1. construction site as brickmaking factory without stacking hollow brick six The broad place of cube, just can only will be empty once the accumulation of hollow brick hexahedron occur in hollow brick arrival and construction speed imbalance Heart brick hexahedron heap height is insufficient to solve the problems, such as the stacking site area of construction site, but the high height of fork of wheeled fork truck It is limited, it is impossible to meet the needs of heap is high;2. building floor is higher, it is also not possible to be pitched hollow brick hexahedron using wheeled fork truck The floor for needing that wall is piled up using hollow brick is transported to, and can only will bind bundled hollow brick hexahedron and dismantle, again pile Into the handling apparatus of fortune brick, then the floor of needs is hoisted to by tower crane, less efficient, artificial input is big.
But tower crane is the most common equipment of construction site, it is contemplated that manufacture and design a kind of handling apparatus, it is convenient Used in construction site cooperation tower crane with solve above-mentioned hollow brick hexahedron can not heap height and needs again pile to special The problem of handling is carried out in handling apparatus again.
Utility model content
For the above-mentioned deficiency of the prior art, the technical problem to be solved by the present invention is to provide a kind of hollow brick handlings Device, avoid hollow brick hexahedron can not the high problem of heap and need manually by hollow brick again pile to special handling apparatus again The problem of efficiency need to being caused low using floor is hoisted to, hollow brick hexahedron can largely be stacked in construction site by reaching, and be turned Artificial less investment during fortune, efficient effect.
In order to solve the above technical problems, the utility model adopts the following technical solution:
Hollow brick handling apparatus includes two fork arms of horizontal and parallel face setting, and one end of two fork arm is connected in It is connected on crossbeam and respectively the both ends of the crossbeam, the other end of two fork arm is towards the same side;The upper table of the crossbeam Face and positioned at crossbeam length direction medium position connection have vertical girder;The upper end of the vertical girder couples horizontal girder One end, the other end of the other end of horizontal girder and two fork arm towards the same side, the top of the horizontal girder be equipped with Its parallel lifting cross bar, the both ends downward bending of the lifting cross bar couple the horizontal girder, the lifting cross bar direction Selection of several grooves in order to balancing lifting point, the lifting are equipped at intervals on the face of the horizontal girder along its length There is the semicircle ring portion to raise up to form common load-bearing lifting point for the side that cross bar is located at the other end of the horizontal girder; Balance muscle is connected respectively between the both sides of the vertical girder and crossbeam.
The utility model can be inserted by fork arm in the two horizontal entries reserved on hollow brick hexahedron, coordinate construction The tower crane at scene uses, and can hollow brick hexahedron easily be pitched fortune heap height and stack hollow brick to save construction site The site area of hexahedron, can directly be transported to hollow brick hexahedron fork needs floor to be used to cause to imitate to avoid pile again The problem of rate is low, and waste is a large amount of artificial;
Common load-bearing lifting point on lifting cross bar makes the process of connection tower crane hook lifting more convenient, because of hollow brick Hexahedron is as supply of material state, and its consistency is preferable, and the common load-bearing lifting point set after being calculated by center of gravity can ensure hanging Hollow brick handling apparatus and hollow brick hexahedron are in equilibrium state when playing most hollow brick hexahedrons(I.e. fork arm is horizontal State), so the hook of tower crane is moved to common load-bearing lifting point after the entry of fork arm insertion hollow brick hexahedron to trust Lifting.The setting for lifting by crane several grooves on cross bar is then to facilitate unconventional hollow brick hexahedron(Weight is unconventional)It is during handling Ensure its equilibrium state, itself other than common load-bearing lifting point may be selected it is ensured that the lifting point of balance, avoids tower crane from hanging The sliding of hook;When being also convenient for the non-load-bearing of hollow brick handling apparatus simultaneously, in order to ensure its equilibrium state in order to being inserted into entry, tower The hook hung can reliably be hooked on itself other than common load-bearing lifting point it is ensured that the lifting point of balance;
Balance the setting of muscle, be because during load-bearing handling, fork arm in addition to the downward power of load-bearing, handling state Hollow brick handling apparatus can also rotate along lifting rope, and balance muscle can balance the rotation that fork arm passes to vertical girder by crossbeam Torsion makes handling process more steady, securely and reliably;Meanwhile it balances muscle and also functions to the effect for strengthening integral strength.
Preferably, the crossbeam is square steel, and one end of two fork arm, which couples, has the connection part with square hole, and pass through The square hole, which is set on crossbeam, slidably to be coupled to adjust the spacing of two fork arms with crossbeam;Articulated connection is equipped with vertical To perforative pin hole I, the both ends of the crossbeam are respectively separated along its length equipped with several longitudinal holes, by wearing simultaneously It crosses on pin hole I and crossbeam on connection part and fixes fork arm with longitudinal bolt of described I corresponding longitudinal hole of pin hole Position on crossbeam length direction.
In this way, the spacing of two fork arms is adjustable, it may be because pile worker's because piling up hollow brick and binding bundled process Error causes reserved horizontal entry spacing different, forms unconventional hollow brick hexahedron, the spacing of two fork arms is adjustable, is convenient for The fork fortune of unconventional hollow brick hexahedron, while can be additionally used in the fork fortune of other substances, adaptability is good.
Preferably, the vertical girder is the two-part composite structure of adjustable in length, including rectangular steel tube and slidably The cooperation square steel being inserted in rectangular steel tube, the rectangular steel tube are equipped with the pin hole II extended transversely through, the pin hole II Be arranged in parallel with horizontal girder, it is described cooperation square steel be equipped at intervals with several cross through hole along its length, by also cross Consolidate on pin hole II and cooperation square steel on rectangular steel tube with the lateral bolt of II corresponding cross through hole of pin hole Surely position of the cooperation square steel in rectangular steel tube is so as to achieve the purpose that adjust vertical girder length;The crossbeam is connected in rectangular The lower end of steel pipe, the horizontal girder are connected in the upper end of cooperation square steel, the balance muscle be connected in rectangular steel tube and crossbeam it Between.
In this way, vertical girder length is adjustable, when the horizontal entry high and low position reserved convenient for hollow brick hexahedron is problematic Unconventional hollow brick hexahedron fork fortune, while can be additionally used in the fork fortune of other substances, adaptability is good.
Preferably, coupling between the vertical girder and horizontal girder has stiffener plate.
In this way, avoiding the stress concentration of vertical girder and horizontal girder connection place, ensure the use intensity of device.
Compared with prior art, the utility model has the advantages that:
1st, the hollow brick handling apparatus of the utility model and tower crane coordinate, and it is high can hollow brick hexahedron easily to be pitched fortune heap The site area of hollow brick hexahedron is stacked to save construction site, can directly be transported to hollow brick hexahedron fork needs The problem of floor to be used causes efficiency low to avoid pile again, and waste is a large amount of artificial.
2nd, the utility model by horizontal girder and lifts by crane the setting of cross bar, ensures to be used cooperatively with tower crane, makes handling Process is steadily reliable.
3rd, the setting of the common load-bearing lifting point on the lifting cross bar of the utility model and several grooves hangs connection tower crane It is more convenient reliable to hook the process hung.
4th, the reasonable design of the utility model, intensity is reliable, safe to use;Vertical girder length is adjustable, between two fork arms It away from adjustable, is transported convenient for the fork of unconventional hollow brick hexahedron, it can also be used to which the fork fortune of other substances, adaptability are good.
Description of the drawings
One front view of Fig. 1-the utility model embodiment;
The left view of Fig. 2-Fig. 1;
The vertical view of Fig. 3-Fig. 1;
Two front view of Fig. 4-the utility model embodiment;
The left view of Fig. 5-Fig. 4;
The vertical view of Fig. 6-Fig. 4;
Hollow brick is piled up and binds bundled hexahedron by Fig. 7-supply of material state(Hollow brick hexahedron);
Wherein, fork arm 1, connection part 11, crossbeam 2, longitudinal hole 21, vertical girder 3, rectangular steel tube 31 coordinate square steel 32, Cross through hole 33, horizontal girder 4, lifting cross bar 5, groove 51, semicircle ring portion 52, balance muscle 6, stiffener plate 7, longitudinal bolt 8, Lateral bolt 9.
Specific embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment one:
Referring to Fig. 1~3, hollow brick handling apparatus includes two fork arms 1 that horizontal and parallel face is set, two fork arm 1 One end be welded and fixed the both ends for being connected on crossbeam 2 and being connected in respectively the crossbeam 2, the other end is described towards the same side The upper surface of crossbeam 2 and medium position positioned at 2 length direction of crossbeam is welded and fixed connection and has vertical girder 3;The vertical master The upper end of beam 3 and one end of horizontal girder 4 are welded and fixed, the other end direction of the other end of horizontal girder 4 and two fork arm 1 The same side, the top of the horizontal girder 4 are equipped with lifting cross bar 5 in parallel, the both ends downward bending of the lifting cross bar 5 And be welded and fixed and couple with the horizontal girder 4, the lifting cross bar 5 is towards side along its length on the face of the horizontal girder 4 To several grooves 51 are equipped at intervals in order to the selection of balancing lifting point, the lifting cross bar 5 is located at the another of the horizontal girder 4 The side of one end has the semicircle ring portion 52 to raise up to form common load-bearing lifting point;The both sides of the vertical girder 3 with It is respectively welded to be fixedly connected between crossbeam 2 and has balance muscle 6;In the lower surface of horizontal girder 4, the vertical girder 3 and level master The root weld that beam 4 couples is fixedly connected and has the stiffener plate 7 of triangle.
Embodiment two:
Referring to Fig. 4~6, the hollow brick handling apparatus of embodiment two is implemented on the basis of embodiment one,
Wherein, the crossbeam 2 is square steel, and one end of two fork arm 1 couples the connection part 11 having with square hole, and leads to It crosses the square hole and is set on crossbeam 2 and slidably couple to adjust the spacing of two fork arms 1 with crossbeam 2;Articulated connection 11 The perforative pin hole I in longitudinal direction is equipped with, the both ends of the crossbeam 2 are respectively separated along its length equipped with several longitudinal holes 21, by also cross on the pin hole I on connection part 11 and crossbeam 2 with described I corresponding longitudinal hole 21 of pin hole Longitudinal bolt 8 fix position of the fork arm 1 on 2 length direction of crossbeam.
Wherein, the vertical girder 3 is the two-part composite structure of adjustable in length, including rectangular steel tube 31 and slidably The cooperation square steel 32 being inserted in rectangular steel tube 31, the rectangular steel tube 31 is equipped with the pin hole II extended transversely through, described to insert Pin hole II is arranged in parallel with horizontal girder 4, and the cooperation square steel 32 is equipped at intervals with several cross through hole 33 along its length, leads to It crosses and leads to also cross on the pin hole II on rectangular steel tube 31 and cooperation square steel 32 with described II corresponding transverse direction of pin hole Position of the 9 secure fit square steel 32 of lateral bolt in hole 33 in rectangular steel tube 31 adjusts vertical 3 length of girder so as to reach Purpose;The crossbeam 2 is connected in the lower end of rectangular steel tube 31, and the horizontal girder 4 is connected in the upper end of cooperation square steel 32, described Balance muscle 7 be connected between rectangular steel tube 31 and crossbeam 2, the stiffener plate 7 be connected in cooperation square steel 32 and horizontal girder 4 it Between.
Finally illustrate, above example is merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those of ordinary skill in the art that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the right of the utility model.

Claims (4)

1. hollow brick handling apparatus includes two fork arms of horizontal and parallel face setting, one end of two fork arm is connected in horizontal stroke It is connected on beam and respectively the both ends of the crossbeam, the other end of two fork arm is towards the same side;The upper surface of the crossbeam And there is vertical girder positioned at the medium position connection of crossbeam length direction;It is characterized in that:The upper end connection of the vertical girder One end of horizontal girder, the other end of the other end of horizontal girder and two fork arm towards the same side, the horizontal girder Top is equipped with lifting cross bar in parallel, and the both ends downward bending of the lifting cross bar couples the horizontal girder, described Cross bar is hung towards being equipped at intervals with choosing of several grooves in order to balancing lifting point along its length on the face of the horizontal girder It selects, the side of the other end that the lifting cross bar is located at the horizontal girder is common to be formed with the semicircle ring portion to raise up Load-bearing lifting point;Balance muscle is connected respectively between the both sides of the vertical girder and crossbeam.
2. hollow brick handling apparatus according to claim 1, it is characterised in that:The crossbeam is square steel, two fork arm One end, which couples, the connection part with square hole, and pass through the square hole be set on crossbeam slidably couple with crossbeam in order to Adjust the spacing of two fork arms;Articulated connection is equipped with the perforative pin hole I in longitudinal direction, and the both ends of the crossbeam are along its length It is respectively separated equipped with several longitudinal holes, by also cross right with the pin hole I on the pin hole I and crossbeam on connection part The longitudinal bolt for the longitudinal hole answered fixes position of the fork arm on crossbeam length direction.
3. hollow brick handling apparatus according to claim 1, it is characterised in that:The vertical girder is the two of adjustable in length Segmentation composite structure, the cooperation square steel including rectangular steel tube and being slidably inserted in rectangular steel tube are set on the rectangular steel tube There is the pin hole II extended transversely through, the pin hole II is arranged in parallel with horizontal girder, and the cooperation square steel is along its length Be equipped at intervals with several cross through hole, by also cross the pin hole II on rectangular steel tube and cooperation square steel on the pin hole Position of the lateral bolt secure fit square steel of an II corresponding cross through hole in rectangular steel tube is adjusted vertically so as to reach The purpose of girder length;The crossbeam is connected in the lower end of rectangular steel tube, and the horizontal girder is connected in the upper end of cooperation square steel, The balance muscle is connected between rectangular steel tube and crossbeam.
4. according to any one of the claim 1-3 hollow brick handling apparatus, it is characterised in that:The vertical girder and level master Connection has stiffener plate between beam.
CN201721754337.7U 2017-12-15 2017-12-15 Hollow brick handling apparatus Active CN207581198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721754337.7U CN207581198U (en) 2017-12-15 2017-12-15 Hollow brick handling apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721754337.7U CN207581198U (en) 2017-12-15 2017-12-15 Hollow brick handling apparatus

Publications (1)

Publication Number Publication Date
CN207581198U true CN207581198U (en) 2018-07-06

Family

ID=62738058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721754337.7U Active CN207581198U (en) 2017-12-15 2017-12-15 Hollow brick handling apparatus

Country Status (1)

Country Link
CN (1) CN207581198U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116902749A (en) * 2023-09-12 2023-10-20 江苏春兰机械制造有限公司 Lifting equipment for split charging tray of engine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116902749A (en) * 2023-09-12 2023-10-20 江苏春兰机械制造有限公司 Lifting equipment for split charging tray of engine

Similar Documents

Publication Publication Date Title
CN207108229U (en) A kind of reversal hanger
CN105129602B (en) Grow up vertical reinforcement monoblock type raising suspender
CN203486726U (en) Brick and building block hoisting device
CN201276399Y (en) Apparatus hoisting mechanism for tall building floor non-steel platform
CN207581198U (en) Hollow brick handling apparatus
CN214326960U (en) Indoor equipment for existing high-rise building hoisting large-scale device
CN103058069B (en) Horizontal arm tower-type crane
CN102071812B (en) Method for vertically transporting building materials
CN206680061U (en) A kind of gravity type board suspending frame
CN206407810U (en) Hoisting steel mesh piece frame
CN206767435U (en) A kind of fragment of brick hanging apparatus for building
CN207511723U (en) A kind of flat arm tower crane supporting beam transporting device of new construction inner climbing type
CN204899247U (en) Building site stirrup shipment hanging flower basket device
CN206842828U (en) Stainless steel tube dock container handling instrument
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN203833510U (en) Multiple lifting point door type electromagnetic lifting device with steering function
CN207774614U (en) A kind of horizontal tray for the storage lifting of prefabricated superimposed sheet
CN206553079U (en) A kind of gallery suspender for seabed tunnel
CN206901580U (en) A kind of slingcart trapeze
CN204198306U (en) A kind of device for purlin lifting in building operation
CN208668432U (en) A kind of connection structure of steel purlin and bracing members
CN212387560U (en) Hoisting device for assembly type building
CN207017663U (en) Small building block brick reinforcing bar cage
CN207608243U (en) A kind of building tower crane of stable safety
CN203034819U (en) Brick conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant