TR201814594A2 - PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD - Google Patents

PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD Download PDF

Info

Publication number
TR201814594A2
TR201814594A2 TR2018/14594A TR201814594A TR201814594A2 TR 201814594 A2 TR201814594 A2 TR 201814594A2 TR 2018/14594 A TR2018/14594 A TR 2018/14594A TR 201814594 A TR201814594 A TR 201814594A TR 201814594 A2 TR201814594 A2 TR 201814594A2
Authority
TR
Turkey
Prior art keywords
pipe pile
production method
reinforced pipe
related production
pressed
Prior art date
Application number
TR2018/14594A
Other languages
Turkish (tr)
Inventor
Ferhat Kemaloğlu Hüseyi̇n
Original Assignee
Sentez Insaat Yazilim Sanayi Ve Ticaret Ltd Sirketi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sentez Insaat Yazilim Sanayi Ve Ticaret Ltd Sirketi filed Critical Sentez Insaat Yazilim Sanayi Ve Ticaret Ltd Sirketi
Priority to TR2018/14594A priority Critical patent/TR201814594A2/en
Publication of TR201814594A2 publication Critical patent/TR201814594A2/en
Priority to PCT/TR2019/050493 priority patent/WO2020072015A1/en
Priority to EP19869823.5A priority patent/EP3861173A4/en
Priority to EA202190781A priority patent/EA202190781A1/en
Priority to MA053834A priority patent/MA53834A/en
Priority to IL281911A priority patent/IL281911A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • B28B21/32Feeding the material into the moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/68Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts and applying centrifugal forces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/76Moulds
    • B28B21/80Moulds adapted to centrifugal or rotational moulding
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/10Ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • E04C5/125Anchoring devices the tensile members are profiled to ensure the anchorage, e.g. when provided with screw-thread, bulges, corrugations

Abstract

Buluş, kara yapıları altında fore kazıklar yerine kullanılabilen, özellikle de deniz üzerine kurulan iskele, köprü, platform vb. yapıları güvenli şekilde taşıyan, bir ucundan deniz üzerindeki yapı ile irtibatlı olan, diğer ucundan ise deniz zeminine belli bir derinlikte çakılan öngerilmeli betonarme boru kazık (1) ile ilgilidir.The invention can be used instead of bored piles under land structures, especially piers, bridges, platforms and so on. It is related to the prestressed reinforced concrete pipe pile (1), which carries the structures safely, is connected to the structure on the sea at one end and is driven at a certain depth to the sea floor from the other end.

TR2018/14594A 2018-10-04 2018-10-04 PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD TR201814594A2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
TR2018/14594A TR201814594A2 (en) 2018-10-04 2018-10-04 PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD
PCT/TR2019/050493 WO2020072015A1 (en) 2018-10-04 2019-06-24 Prestressed reinforced concrete pipe pile and a production method thereof
EP19869823.5A EP3861173A4 (en) 2018-10-04 2019-06-24 Prestressed reinforced concrete pipe pile and a production method thereof
EA202190781A EA202190781A1 (en) 2018-10-04 2019-06-24 TUBULAR PILES FROM PRE-STRESSED REINFORCED CONCRETE AND METHOD OF ITS MANUFACTURING
MA053834A MA53834A (en) 2018-10-04 2019-06-24 PRESTRESSED REINFORCED CONCRETE PIPE PILE AND PRODUCTION METHOD THEREOF
IL281911A IL281911A (en) 2018-10-04 2021-03-30 Prestressed reinforced concrete pipe pile and a production method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TR2018/14594A TR201814594A2 (en) 2018-10-04 2018-10-04 PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD

Publications (1)

Publication Number Publication Date
TR201814594A2 true TR201814594A2 (en) 2019-02-21

Family

ID=67955902

Family Applications (1)

Application Number Title Priority Date Filing Date
TR2018/14594A TR201814594A2 (en) 2018-10-04 2018-10-04 PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD

Country Status (6)

Country Link
EP (1) EP3861173A4 (en)
EA (1) EA202190781A1 (en)
IL (1) IL281911A (en)
MA (1) MA53834A (en)
TR (1) TR201814594A2 (en)
WO (1) WO2020072015A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115256626A (en) * 2022-08-01 2022-11-01 宁夏中隆管桩有限公司 Production device and method of photovoltaic tubular pile

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111923200B (en) * 2020-08-12 2021-08-17 深圳信息职业技术学院 Prefabricated equipment of sea sand regeneration mixed concrete member
CN112049108A (en) * 2020-09-30 2020-12-08 福州大学 Sectional UHPC-concrete pipe pile and centrifugal forming construction method thereof
CN114378938B (en) * 2020-10-20 2023-08-11 宝山钢铁股份有限公司 Rhombic concrete pipe pile, mould for rhombic concrete pipe pile, preparation and installation method
CN113172749B (en) * 2021-04-15 2022-07-08 江苏汤辰机械装备制造股份有限公司 Centrifugal equipment and centrifugal method
EP4098996A1 (en) * 2021-06-01 2022-12-07 Vilnius Gediminas Technical University Anchorage system of structural components for manufac-turing and testing of composite elements
CN113927728B (en) * 2021-11-29 2023-01-24 郑州大学综合设计研究院有限公司 Novel prestressed concrete mixed reinforcement pipe pile manufacturing device and method
CN114311274A (en) * 2021-12-03 2022-04-12 南京钜力智能制造技术研究院有限公司 High-pressure pouring forming device for concrete tubular pile and tubular pile manufacturing method
CN114809125B (en) * 2022-04-15 2023-09-12 中交天津港湾工程研究院有限公司 Method for predicting anti-tilting stability of steel cylinder
CN114809451B (en) * 2022-05-27 2023-11-17 上海上大建筑设计院有限公司 Combined steel pipe concrete column
CN115387400B (en) * 2022-07-18 2023-08-29 广东三和管桩股份有限公司 Tubular pile weight distribution on-line monitoring method, device and application

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60198209A (en) * 1984-03-22 1985-10-07 松元 幸男 Manufacture of pretension type composite reinforcement pc member and composite reinforcement pc member
CA2361813A1 (en) 2001-01-29 2002-07-29 Peter O. Paulson Low frequency electromagnetic analysis of prestressed concrete tensioning strands
CN101544020B (en) * 2009-04-15 2011-05-11 上海中技桩业股份有限公司 Preparation method for prestressed high-strength concrete pile
KR101150854B1 (en) 2009-09-30 2012-06-13 이엑스티 주식회사 Reinforcing plate integrated phc pile and the manufacturing method for the same
TR200909745A2 (en) 2009-12-24 2011-04-21 Yildirim Sali̇h The method of coating scaffolding legs and pipelines
CN101906776B (en) * 2010-07-07 2012-10-24 东南大学 Major-diameter prestressed concrete pipe pile of glass steel pipe die and preparation method thereof
CN102199919A (en) * 2011-06-03 2011-09-28 广东三和管桩有限公司 Prestressed concrete pipe pile anticorrosion joint
CN103046545B (en) * 2013-01-17 2014-11-05 浙江东欣建设集团有限公司 Production process of prestress FRP-rib (fiber reinforce plastic-rib) concrete pipe pile
MY184136A (en) * 2013-08-21 2021-03-22 Chin Chai Ong End plate for concrete piles
CN104416675A (en) * 2013-09-02 2015-03-18 青岛兴河建材有限公司 Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile
CN105386441A (en) 2015-10-19 2016-03-09 广西大学 PVC pipe wrapped inner supporting cross prestress recycled concrete tubular pile
CN205100205U (en) * 2015-11-18 2016-03-23 黄贺明 Concrete ocean tubular pile
TR201615468A2 (en) 2016-10-31 2017-03-21 Ihi Infrastructure Sys Co Ltd A SEISMIC INSULATION SYSTEM FOR APPLICATION TO SUSPENDED BRIDGE FOOTS

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115256626A (en) * 2022-08-01 2022-11-01 宁夏中隆管桩有限公司 Production device and method of photovoltaic tubular pile

Also Published As

Publication number Publication date
WO2020072015A1 (en) 2020-04-09
EP3861173A1 (en) 2021-08-11
EA202190781A1 (en) 2021-07-28
IL281911A (en) 2021-05-31
EP3861173A4 (en) 2022-06-29
MA53834A (en) 2022-01-12

Similar Documents

Publication Publication Date Title
TR201814594A2 (en) PRESSED REINFORCED PIPE PILE AND A RELATED PRODUCTION METHOD
JP2012184596A (en) Pile loading test method
Sun et al. Prediction of pile running during the driving process of large diameter pipe piles
JP4329068B2 (en) Yamauchi composite wall and method for constructing Yamauchi composite wall
RU2620112C1 (en) Method of arranging pile foundations with widening by method of crushing
JP2016003553A (en) Box-shaped marine floating bridge using sw slab
GB749979A (en) Improved pile anchorage of submerged structures
RU2697753C1 (en) Underwater transition of "zero buoyancy"
Thorsen et al. The New Lillebælt Bridge–a settlement model
Fernandes et al. Hydrodynamic aspects of the Torpedo anchor installation
Fedorovsky et al. Piles in hydrotechnical engineering
RU152441U1 (en) TYPICAL UNDERWATER TUNNEL BRIDGE
Doubrovsky et al. Innovative design and technological solutions and test method for pile supports with increased bearing capacity
RU155900U1 (en) TYPICAL UNDERWATER TUNNELEMS
Prakoso et al. Evaluation of tunnel jacking induced ground surface heave
Kang et al. Dynamic behavior of shore connection of submerged floating tunnel under dynamic load
RU2657885C2 (en) Reinforced concrete drilling pile and method of its erection
Tefera et al. Control of excess pore pressure development during pile installations in soft sensitive clay
Schaffer et al. Structural and conservation solutions for the treatment of the sea front walls of old Akko (Acre), Israel
Popa et al. Analysis of various constitutive laws for numerical modeling of a diaphragm wall
Ruddock John Rennie and Waterloo Bridge, London, UK
Armbruster et al. Bahia Urbana: Overcoming Structural Engineering Challenges for Successful Port Redevelopment, San Juan, Puerto Rico
JP1748750S (en) Hanging jig for steel pipe piles
PE20160791Z (en) MULTICOMPONENT GEOCELLULAR CONFINEMENT SYSTEM
Mankbadi et al. Case History: Shallow Foundation for “The Gut” Movable Bridge