TH168A - Method of connecting several precast concrete bridge beams into one piece. - Google Patents
Method of connecting several precast concrete bridge beams into one piece.Info
- Publication number
- TH168A TH168A TH8101000024A TH8101000024A TH168A TH 168 A TH168 A TH 168A TH 8101000024 A TH8101000024 A TH 8101000024A TH 8101000024 A TH8101000024 A TH 8101000024A TH 168 A TH168 A TH 168A
- Authority
- TH
- Thailand
- Prior art keywords
- wire
- piece
- casting
- pull
- concrete bridge
- Prior art date
Links
- 239000011178 precast concrete Substances 0.000 title claims 2
- 239000004567 concrete Substances 0.000 claims abstract 3
- 239000004570 mortar (masonry) Substances 0.000 claims abstract 3
- 239000003292 glue Substances 0.000 claims abstract 2
- 238000005266 casting Methods 0.000 abstract 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 2
- 239000004568 cement Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 abstract 1
- 229910052742 iron Inorganic materials 0.000 abstract 1
Abstract
คำนวณแบ่งความยาวของคานสะพานออกเป็นส่วน ๆ ตามขนาดและความเหมาะสมของการขนย้ายตามสภาพและภูมิประเทศ แล้วผูกโครงเหล็ก ตามคานที่ถูกแบ่งโดยวางท่อที่จะร้อยลวดเอาไว้ข้างใน ร้อย ลวดเข้าไปและดำเนินการหล่อคอนกรีตตามแบบที่สร้างไว้ หล่อ ตามท่อนที่ 1 ก่อน แล้วเอาท่อนที่หล่อได้ทำเป็นแบบของส่วน ต่อไป จนกระทั่งหล่อครบหมดทุก ๆ ท่อน นำไปเก็บบ่มจนคอนกรีต ได้ที่ จึงทำการขนย้ายไปที่สถานที่ก่อสร้าง เอาชิ้นส่วนของ คานที่หล่อไว้วางเรียงตามแนวเส้นเดียวกันตามหมายเลขที่ทำ เครื่องหมายไว้ ทากาวชนิดพิเศษตามรอยต่อ แล้วทำการดึงลวด ที่ร้อยเอาไว้ เมื่อได้ขนาดที่ต้องการที่อัดน้ำปูนเข้าไปใน รูที่ร้อยลวด เทปูนทับรอยลวดที่ โผล่พ้นรูร้อยลวดออกมา ทิ้งไว้จนปูนได้ที่จึงยกขึ้นวางบน ฐานของสะพานที่จัดสร้างไว้ต่อไป Calculate the length of the bridge girder into sections according to the size and suitability of the transport according to the conditions and the terrain. And tie the iron frame According to the beam that is divided by placing the pipe that will be wire inside, string the wire into and proceed to casting the concrete according to the design that was built, casting in part 1 first, then remove the cast piece to make the design of the next part until complete casting. All pieces were used for storage, curing until the concrete was possible, so they were moved to the construction site. Take a piece of The cast beams are placed along the same line according to the numbers made. Mark on Apply a special glue along the joint. Then pull the wire Hundreds When the desired size is pressed into the hole, the cement wire is inserted over the wire at Poked through the hole of the wire Leave until the mortar has been lifted and placed on it. The base of the bridge was built next.
Claims (1)
Publications (1)
| Publication Number | Publication Date |
|---|---|
| TH168A true TH168A (en) | 1982-04-02 |
Family
ID=
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109183607B (en) | Prefabricated spliced UHPC pipe-concrete ultra-high bridge pier and construction method | |
| JPS5869908A (en) | Free tension material, method and apparatus for producing and assembling obliquely tentioned cable of bridge | |
| ATE47080T1 (en) | DEVICE FOR PRODUCTION OF REINFORCEMENT. | |
| FR2330818A1 (en) | Reinforced concrete building foundation section - in shape of inverted U, with hook on top and ridge on which wall is built | |
| TH168A (en) | Method of connecting several precast concrete bridge beams into one piece. | |
| CN206143608U (en) | Assembled T beam bridge hogging moment district anchorage sealing system | |
| FR2371549A1 (en) | Cracked concrete highway slab repair system - with steel bars set in drilled holes by epoxy resin | |
| ES477598A1 (en) | Reinforcing core for concrete column - has lengthways alignment hooked anchors for combination with similar elements into rectangular section | |
| ATE47741T1 (en) | METHOD FOR VERTICAL SINGLE WIRE STRESSING FOR SINGLE OR MULTI-STOREY WALLS AND DEVICE FOR AUTOMATIC HOOK-UP OF STRESSING WIRES. | |
| JPH084031A (en) | How to build the substructure | |
| CN110185154A (en) | A kind of dowel invisible structure and its application | |
| CN115897795B (en) | A steel-concrete composite structure with ECC treatment in negative bending moment area and construction method thereof | |
| SU1486591A1 (en) | METHOD OF STRENGTHENING PLATES CLIMBING | |
| JPS5845378Y2 (en) | Structure of concrete truss | |
| JPS646467A (en) | Cast splicing construction method of cloth base and concrete | |
| JPS6128790B2 (en) | ||
| JPS5837235A (en) | Construction work for foundation | |
| Gerwick | Long Span Pres tressed Concrete Bridges Uti lizing Precast Elements | |
| JPH0678639B2 (en) | Construction method of slope protection structure | |
| JPS57187429A (en) | Steel fiber-reinforced concrete formwork | |
| GB743159A (en) | Improvements in or relating to building constructions | |
| GB994152A (en) | Method of producing lattice girders and girders so produced | |
| SU109911A1 (en) | Pre-stressed Reinforced Farm | |
| Libby | Post-tensioning Systems and Procedures | |
| JPH011836A (en) | Construction method for prestressed steel reinforced concrete beams |