SU968404A1 - Method of ascending working of sloping beds in pillars - Google Patents

Method of ascending working of sloping beds in pillars Download PDF

Info

Publication number
SU968404A1
SU968404A1 SU813256670A SU3256670A SU968404A1 SU 968404 A1 SU968404 A1 SU 968404A1 SU 813256670 A SU813256670 A SU 813256670A SU 3256670 A SU3256670 A SU 3256670A SU 968404 A1 SU968404 A1 SU 968404A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pillars
wells
coal
ascending working
beds
Prior art date
Application number
SU813256670A
Other languages
Russian (ru)
Inventor
Константин Федорович Федоров
Лев Александрович Зиглин
Лев Иванович Круглов
Владимир Федорович Шахматов
Андрей Геннадиевич Бондарев
Original Assignee
Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского filed Critical Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского
Priority to SU813256670A priority Critical patent/SU968404A1/en
Application granted granted Critical
Publication of SU968404A1 publication Critical patent/SU968404A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

Изобретение относитс  к горной . промьпютенности и предназначено дл  Рс13работки крутых пластов столбами по восстанию.The invention relates to mining. industrialized and designed for P13 working steep seam pillars for the uprising.

Известен способ разработки мощнцх крутопадающих пластов Г1.There is a method of developing powerful steeply dipping seams G1.

Однако способ недостаточно эффективен .However, the method is not effective enough.

Известен способ разработки крутых пластов столбами по восстанию, включающий проведение скважин, подрубку столбов угольной пилой и выпуск отбитого угл  2, I Однако способ характеризуетс  большим выходом негабарита и достаточнонизкой производительностью труда,There is a known method of developing steep seams with pillars for rebellion, including drilling wells, cutting pillars with a coal saw and releasing repulsed coal 2, I. However, the method is characterized by a large yield of oversize and sufficiently low productivity.

Целью изобретени   вл етс  уменьшение выхода негабарита и повышение производительности труда.The aim of the invention is to reduce the oversize yield and increase productivity.

Поставленна  цель достигаетс  тем, что из провёденньи скважин в пласте прюрубают вертикальные щели на всю длину столба, а затем производ т . его подрубку.This goal is achieved by drilling vertical gaps along the entire length of the column from the wells in the reservoir and then producing them. his hemming

На фиг. 1 изображено выемочное поле, общий вид; на фиг. 2 - сечение А-А на фиг. li на фиг. 3 - сечение Б-Б на фиг. 1; на фиг. 4 - сечение на фиг. 1.FIG. 1 shows a notch field, general view; in fig. 2 is a section A-A in FIG. li in fig. 3 is a section BB in FIG. one; in fig. 4 is a sectional view in FIG. one.

Способ осуществл етс  следующим образом.The method is carried out as follows.

Выемочное поле отрабатывают столбами по восстанию в направлении от границ 1 выемочного пол  к участковому квермпагу 2. В первую очередь последовательно на всю длину выемочного пол  отрабатывают первичные столбы 3 с оставлением между ними The excavation field is worked by the columns of the uprising in the direction from the boundaries 1 of the excavation floor to the precinct kwermpag 2. First of all, the primary columns 3 are sequentially for the entire length of the excavation floor, leaving them between

10 временных целиков 4. Дл  отработки столба провод т скважины 5 у почвы Г пласта с конвейерного 6 на вентил ционный 7 штрек..Одну из скважин с конвейерного штрека расшир ют в 10 temporary pillars 4. For the development of the pole, wells 5 are drilled at the soil G of the reservoir from the conveyor 6 to the ventilation 7 drift. One of the wells from the conveyor drift is expanded into

15 дучку 8 и на рассто нии 4-6 м над конвейерным штреком столб подсекают от почвы до кровли пласта с помощью буровзрывных работ и таким образом создают, нависающий забой 9 столба. 15 Duchku 8 and at a distance of 4-6 m above the conveyor drift, the pole is cut from the soil to the top of the formation with the help of drilling and blasting operations and thus create an overhanging face of the 9th pole.

20 Дучку и нависающий забой креп т дерев нной и анкерной крепью.20 Duchka and overhanging face are secured with wooden and anchor lining.

Из скважин врубовой машиной 10 от почвы к кровле пласта прорубают вертикальные Щели 11 на всю ,длину From wells, the cutting-edge machine 10 cuts vertical to the top of the layer from the soil to the roof of the formation for the entire length

25 столба, затем столб, оконтуренный этими щел ми и нависающим забоем, подрубают по восстанию у почвы пласта угольной пилой 12; По мере подрубки уголь в нависающем забое обру30 шаетс  и выпускаетс  из камеры 13The 25 pillars, then the pillar, contoured by these gaps and the overhanging face, are hewn by rebellion on the soil of the stratum with a coal saw 12; As the hem is cut, the coal in the overhanging bottomhole is rimmed and released from chamber 13

Claims (1)

Формула изобретенияClaim Способ разработки крутых пластов столбами по восстанию, включающий проведение скважин, подрубку столбов угольной пилой и выпуск отбитого угля, о тлич ающий с я тем, что, с целью уменьшения выхода негабарита и повышения производительности труда, из проведенных скважин в пласте прорубают вертикальные щели на всю длину столба, а затем производят его подрубку.A method of developing steep seams with pillars for rebellion, including drilling wells, cutting pillars with a coal saw and releasing broken coal, which is the fact that, in order to reduce the oversize output and increase productivity, vertical gaps are cut through from the wells in the reservoir the length of the pillar, and then produce its hem.
SU813256670A 1981-02-24 1981-02-24 Method of ascending working of sloping beds in pillars SU968404A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813256670A SU968404A1 (en) 1981-02-24 1981-02-24 Method of ascending working of sloping beds in pillars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813256670A SU968404A1 (en) 1981-02-24 1981-02-24 Method of ascending working of sloping beds in pillars

Publications (1)

Publication Number Publication Date
SU968404A1 true SU968404A1 (en) 1982-10-23

Family

ID=20946225

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813256670A SU968404A1 (en) 1981-02-24 1981-02-24 Method of ascending working of sloping beds in pillars

Country Status (1)

Country Link
SU (1) SU968404A1 (en)

Similar Documents

Publication Publication Date Title
SU968404A1 (en) Method of ascending working of sloping beds in pillars
RU2176734C2 (en) Method of mining medium-thickness gently sloping and inclined coal seams
SU1257221A1 (en) Method of mining ore bodies
RU2038476C1 (en) Coal deposit exploitation method
RU2123109C1 (en) Method for mining of coal series in marginal zones of opencast
RU2263213C1 (en) Method for thick steeply inclined fire-hazardous bed mining with caving
RU2115803C1 (en) Method for mining thick steep coal seams in upgrade
RU2151295C1 (en) Method of mining kimberlite deposit extended along strike by inclined slicing under flexible guard roofing by powered mining set
SU796425A1 (en) Method of excavating gently sloping coal beds
SU1564348A1 (en) Method of excavating pillars on neighbouring ore deposits
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU783472A1 (en) Method of solid rood control
RU2168629C1 (en) Method of mining of thick flat coal bed
SU1691529A1 (en) Method for preparing disassembly chamber for shield sets
SU855209A1 (en) Method of caving overlapping rocks
RU2151293C1 (en) Method of difficult-to-cave roof control in mining of coal seams by powered mining set
SU617601A1 (en) Method of drawing pillars at chamber-and-pillar system of mining minerals
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU1659656A1 (en) Method of winning panel pillars
SU1666725A1 (en) Method for construction of protective wall made of ore blocks
RU96108488A (en) METHOD FOR DEVELOPING THE COAL FORMATION ENVIRONMENT IN THE EXTRAORDINARY ZONES OF THE CAREER
SU994734A1 (en) Method of working medium-thick and thick coal beds
SU1125373A1 (en) Method of mining unstable ores
SU1642007A1 (en) Method of rock pressure control in mining of a mineral bed
SU1404650A1 (en) Method of working soil at face composed of layers of different strength