SU943401A1 - Method of consolidating mine working with monolithic concrete - Google Patents
Method of consolidating mine working with monolithic concrete Download PDFInfo
- Publication number
- SU943401A1 SU943401A1 SU802924157A SU2924157A SU943401A1 SU 943401 A1 SU943401 A1 SU 943401A1 SU 802924157 A SU802924157 A SU 802924157A SU 2924157 A SU2924157 A SU 2924157A SU 943401 A1 SU943401 A1 SU 943401A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- sections
- concrete
- ribs
- excavation
- formwork
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
(54) СПОСОБ КРЕПЛЕНИЯ ГОРНОЙ ВЫРАБОТКИ МОНОЛИТНЫМ БЕТОНОМ(54) METHOD OF MOUNTING OF MINING PROCESS BY MONOLITHIC CONCRETE
1one
Изобретение относитс к строительству подземных сооружений и касаетс креплени горных выработок.The invention relates to the construction of underground structures and relates to the attachment of mine workings.
Данный способ креплени выработки может быть использован в различных отрасл х народного хоз йства, где требуетс сооружение прот женных выработок преимущественно тоннельного типа, например транспортных тоннелей, проходимых в трещиноватых скальных массивах, в особенности, когда применение обычной дл этих условий металлической арочной крепи неэкономично из-за большой потребности металлопроката, а использование облегченных типов крепи из набрызг-бетона, анкеров и их комбинаций затруднено по услови м безопасности из-за возможных отслаиваний породы трещиноватого массива.This method of fastening the excavation can be used in various parts of the national economy where it is necessary to construct extensive workings of a predominantly tunnel type, for example, transport tunnels that pass through fractured rock massifs, especially when using metal arch support that is usual for these conditions. for the great need of rolled metal, and the use of lightweight types of spray-concrete lining, anchors and their combinations is difficult due to safety conditions due to possible formations of fissured rock massif.
Известен способ креплени горной выработки , включающий установку в забое сборных несущих тоннельных конструкций (тюбингов , блоков) и заполнение закрепного пространства твердеющей массой, обычно цементно-песчаными смес ми 1.There is a known method of fastening mine workings, which includes installation in the bottom of prefabricated load-bearing tunnel structures (tubings, blocks) and filling the fixed space with a hardening mass, usually cement-sand mixtures 1.
Недостаток этого способа - больща потребность в сборных конструкци х, что ограничивает его применение в удаленныхThe disadvantage of this method is the greater need for prefabricated structures, which limits its use in remote
районах, где затруднено производство сборных конструкций и их доставка к месту строительства.areas where it is difficult to manufacture prefabricated structures and their delivery to the construction site.
Наиболее близким по технической сущности к предлагаемому вл етс способThe closest in technical essence to the proposed method is
5 креплени горной выработки монолитным бетоном, включающий установку в забое секций переставной опалубки, из спецпрофил с распором в поверхность выработки дл использовани секций в качестве менной крепи и укладки бетонной смеси 2.5 fastening of mine workings with monolithic concrete, including installation in the face of sections of the adjustable formwork, from a special profile with expansion into the surface of the mine for using sections as a support and laying concrete mix 2.
Недостатки данного, способа и необходимость в операции перемонтировани секций перед бетонированием, что снижает темп проходки, требует дополнительных затратThe disadvantages of this method and the need for the operation of remounting sections before concreting, which reduces the rate of penetration, requires additional costs
15 труда. Кроме того, опускание находивщейс до этого в распором в выработку состо нии секции может витьс причиной отслаивани породы и обрущений, что исключает применение способа в сильно трещиноватых по2Q родах, или может быть причиной снижени несущей способности массива, что потребует увеличени расчетной несущей способности монолитной крепи.15 labor. In addition, the lowering of the previously existing section into the production section may be caused by the separation of rocks and collapses, which eliminates the use of the method in highly cracked poles, or may cause a decrease in the bearing capacity of the array, which will require an increase in the calculated bearing capacity of the monolithic support.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802924157A SU943401A1 (en) | 1980-04-07 | 1980-04-07 | Method of consolidating mine working with monolithic concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802924157A SU943401A1 (en) | 1980-04-07 | 1980-04-07 | Method of consolidating mine working with monolithic concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
SU943401A1 true SU943401A1 (en) | 1982-07-15 |
Family
ID=20895549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802924157A SU943401A1 (en) | 1980-04-07 | 1980-04-07 | Method of consolidating mine working with monolithic concrete |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU943401A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113565541A (en) * | 2021-08-30 | 2021-10-29 | 山西潞安环保能源开发股份有限公司漳村煤矿 | Regeneration top plate reconstruction method for interchange type dense roadway group lower roadway |
-
1980
- 1980-04-07 SU SU802924157A patent/SU943401A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113565541A (en) * | 2021-08-30 | 2021-10-29 | 山西潞安环保能源开发股份有限公司漳村煤矿 | Regeneration top plate reconstruction method for interchange type dense roadway group lower roadway |
CN113565541B (en) * | 2021-08-30 | 2024-04-05 | 山西潞安环保能源开发股份有限公司漳村煤矿 | Method for regenerating top plate of undersides of interchange type dense roadway groups |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060803B (en) | Tunnel construction method by utilizing pipe curtain grouting | |
CN107725068A (en) | A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab | |
CN109838240B (en) | River-crossing tunnel arch cover covering and digging construction method | |
CN112031814B (en) | Cave-entering construction method for crossing shallow-layer high-load highway | |
RU2485318C1 (en) | Method to construct station tunnels with low subsidence of earth surface | |
KR102129608B1 (en) | Semi open cut type tunnel construction method at low overburden | |
SU943401A1 (en) | Method of consolidating mine working with monolithic concrete | |
US4648743A (en) | Method of producing a subterranean structure | |
CN114673527B (en) | Progressive roadway and tunnel broken surrounding rock reinforcing method | |
KR20030065963A (en) | A method of constrution method for tunnel of structure pipe | |
CN110735641A (en) | Construction method of transfer passage of underpass pipeline | |
CN112228076B (en) | Fast excavation construction method for hard rock large-span tunnel | |
GB2076449A (en) | Process for the construction of an underground structure and a strucutre thus obtained | |
KR102289576B1 (en) | Top-down type underground structure construction method using earth support plate | |
RU2099534C1 (en) | Method for support of underground working in water-logged frozen grounds | |
RU2082884C1 (en) | Method of construction of deep-seated subway station | |
RU2152473C1 (en) | Method for erection of vehicular traffic tunnel of urban ring highway of megapolis | |
RU2004811C1 (en) | Method for tunnel lining with monolithic concrete | |
Plumelle et al. | Three full-scale experiments of French project on soil nailing: CLOUTERRE | |
JPS62220616A (en) | Construction work for underground space | |
CN217999598U (en) | Joint stratum large-span tunnel pilot tunnel subsection step excavation supporting construction in advance | |
CN211081922U (en) | Grouting anchoring structure for karst stratum tunnel secondary lining renovation construction | |
CN207673347U (en) | A kind of assembled supporting construction based on outside steel arch-shelf and inside concrete slab | |
SU625044A1 (en) | Method of supporting mine workings | |
RU2030586C1 (en) | Method for erection of ceiling of underground structure |