SU926328A1 - Portable form - Google Patents
Portable form Download PDFInfo
- Publication number
- SU926328A1 SU926328A1 SU802900369A SU2900369A SU926328A1 SU 926328 A1 SU926328 A1 SU 926328A1 SU 802900369 A SU802900369 A SU 802900369A SU 2900369 A SU2900369 A SU 2900369A SU 926328 A1 SU926328 A1 SU 926328A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- formwork
- pillar
- shields
- artificial
- erection
- Prior art date
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
(5) ПЕРЕДВИЙНАЯ ОПАЛУБКА(5) ADAPTED FORMWORK
Изобретение относитс к горному делу и предназначено длй возведени искусственного целика из твердеющих закладочных смесей около вентил цион ных гезенков при щитовой выемке стол ба по падению. Известна передвижна опалубка дл возведени закладочного массива, вкл чающа раздвижнь1е щиты, установленные на раме, и гидроцилиндры дл перемещени опалубки СП. Недостатками данной передвижной опалубки вл ютс сломность конструкции , трудоемкость монтажа и перемещени , а также невозможность возведени искусственных целиков одновременно с выемкой угл . Известна передвижна опалубка дл возведени бутовых полос из твердеющей смеси, включающа передний и боковые оградительные щиты, жестко сое диненные меиду собой и корпусом выемочной машины, и средство дл передвижки опалубки. Эта опалубка позвол ет совмещать очистные работы с закладочными при отработке крутых пластов лавами, движущимис по простиранию . При этом искусственные целики возвод тс снизу вверх параллельно очистному забою C2l. Недостатком известной опалубки вл етс то, что с ее помощью нельз возводить искусственные целики перпе (чдикул рно очистному забою. Кроме того, в случае выхода из стро отдельных злементов конструкции, невозмо )хно производить их быструю замену непосредственно в лаве. Целью изобретени вл етс упрощение монтажа и демонтажа опалубки и создание условий дл возведени искусственного целика как в перпендикул рном , так и в параллельном очистному забою направлени х. Указанна цель достигаетс тем, что в передвижной опалубке, включающей донное перекрытие, боковые ограждающие щиты и средство дл передвижки опалубки, боковые ограждающие щиты шарнирно соединены с донным пе рекрытием, которое неподвижно закреплено на секци х крепи щитового агрегата, при этом передний ограждающий щит выполнен с отверсти ми, снабженными крышками. На фиг. 1 изоОрак ена передвижна опалубка и схема возведени искусст венного целика с ее помощью; на фиг.2 - разрез Л-А на фиг.1. Передвижна опалубка выполнена U-образной формы и состоит из переднего 1. и заднего 2 ограждающих щитов, соединенных посредством шарниров 3 с плоским донным перекрытие , которое неподвижно закреплено н секции крепи 5 щитового агрегата. Внутренние стенки опалубки покрыты эластичным материалом 6, например транспортерной лентой, загнутым внутрь. Передний ограждающий щит 1 выполнен с отверсти ми 7. которые снабжены крьииками 8. Донное перекрытие k имеет йиксатор 9 перпендику л рного положени ограждающего щита Передвижна опалубка работает следующим образом. При работе щитового агрегата опа лубка перемещаетс по падению пласт вместе с секци ми крепи 5 щитового агрегата в направл ющих пазах 10, образованных вертикальными стенками ранее возведенного участка целика 1 крепью 12 вентил ционного гезенка и породной подушкой 13. После перемещени опалубки на длину очередного участка, на котором возводитс цели твердеющую смесь укладывают с помощью машины дл набрызгбетонировани через отверсти 7 в переднем щите 1. Шаг перемещени опалубки пе ред заполнением твердеющей смесью принимают несколько меньшим, чем длина опалубки., К преимуществам предлагаемой передвижной опалубки относитс то, чт шарнирное соединение боковых ограждающих щитов с донным перекрытием облегчает услови транспортировани опалубки по горным выработкам, монтаж и демонтаж, а также в случае выхода из стро отдельных элементов опалубки обеспечивает быструю их замену непосредственно в лаве. Кроме того, шарнирное соединение щитов опалубки позвол ет возводить целики как в перпендикул рном, так и в параллельном очистному забою направлени х . Использование передвижной опалубки только в центральном районе Донбаса позвол ет получить экономический эффект в размере около tOOjO тыс. руб. в год. Формула .изобретени Передвижна опалубка дл возведени охранного и изол ционного искусственного целика из твердеющих смесей у вентил ционного гезенка при щитовой отработке столба по падению , включающа донное перекрытие, боковые ограждающие щиты и средство дл передви : ки опалубки, отличающа с тем, что, с целью упрощени монтажа и демонтажа опалубки и создани .условий дл возведени искусственного целика как в перпендикул рном, так и параллельном очистному забою направлени х, боковые ограждающие щиты шарнирно соединены с донным перекрытием, которое неподвижно закреплено на секци х крепи щитового агрегата, при этом передний ограждающий щит (выполнен с отверсти ми, снабженными крышками. Источники информации, прин тые во внимание при экспертизе 1.Авторское свидетельство СССР ff 460371, кл. Е 21 F 15/02, 1973. 2.Авторское свидетельство СССР № 617613, кл. Е 21 F 15/02, 1977 (прототип).The invention relates to mining and is intended for the erection of an artificial pillar from hardening filling mixtures near the ventilation gesenki during a panel board excavation of the drop table. The known mobile formwork for the erection of the backfill array, including sliding shields mounted on the frame, and hydraulic cylinders for moving the formwork SP. The disadvantages of this mobile formwork are the breakage of the structure, the complexity of installation and movement, as well as the impossibility of erecting artificial pillars at the same time as excavating coal. The known mobile formwork for the erection of quarry strips of hardening mixture, including front and side protective shields, rigidly connected between the medium and the body of the excavation machine, and means for shifting the formwork. This formwork allows you to combine the cleaning work with the backfill when working steep seams with lavas moving along strike. In this case, artificial pillars are raised from the bottom up, parallel to the clearing face C2l. A disadvantage of the known formwork is that it cannot be used to build artificial pillars of the perp (cleansing face. In addition, in the case of individual structural elements, it is impossible) to quickly replace them directly in the lava. The aim of the invention is to simplify the installation and dismantling of the formwork and the creation of conditions for the erection of an artificial pillar in both perpendicular and parallel to the clearing face directions. This goal is achieved by the fact that in the mobile formwork, including bottom overlap, side fencing shields and means for shifting the formwork, side fencing shields are hinged to the bottom overlap, which is fixedly mounted on the shield sections of the switchboard unit, while the front fencing shield is made with openings provided with lids. FIG. 1 isorak mobile formwork and a scheme for the construction of an artificial pillar with its help; figure 2 is a section of the LA in figure 1. Mobile formwork is U-shaped and consists of front 1. and rear 2 fencing panels, connected by means of hinges 3 with a flat bottom overlap, which is fixedly mounted on the support section 5 of the panel board. The inner walls of the formwork are covered with elastic material 6, such as a conveyor belt, curved inward. The front fencing shield 1 is made with openings 7. which are equipped with crimps 8. The bottom overlap k has ixator 9 perpendicular to the position of the fencing shield The mobile formwork works as follows. During the operation of the shield unit, the form moves along the dip along the formation together with the fixture sections 5 of the shield unit in guide grooves 10 formed by the vertical walls of the previously erected section of the rear sight 1 with the support 12 of the ventilation gesenk and the breed pillow 13. After moving the formwork by the length of the next section, on which the target hardens the mixture is placed using a machine for spraying concrete through the holes 7 in the front panel 1. The step of moving the formwork before filling with a hardening mixture is taken More than formwork length. The advantages of the proposed mobile formwork include the fact that the hinged connection of side fencing panels with bottom overlap facilitates the transportation of the formwork through the mine workings, installation and dismantling, as well as in the event of the release of individual formwork elements, which ensures their quick replacement. directly in the lava. In addition, the hinged connection of the formwork panels allows the pillars to be erected both in the perpendicular and in parallel to the clearing of the face. The use of mobile formwork only in the central region of Donbas allows to obtain an economic effect of about tOOjO thousand rubles. in year. Formula of the invention Mobile formwork for erecting a protective and insulating artificial pillar from hardening mixtures near a ventilation gesen when shielding the post by a fall, including bottom overlap, side fencing shields and means for shifting formwork, characterized in that simplifying the installation and dismantling of the formwork and creating conditions for the erection of an artificial pillar in both perpendicular and parallel to the cleansing face directions, side fencing shields are hinged to the bottom overlap, which is fixed on the support sections of the panel board unit, while the front fencing shield (made with openings with lids. Sources of information taken into account during the examination 1. USSR author's certificate ff 460371, cl. 02, 1973. 2. USSR author's certificate No. 617613, CL E 21 F 15/02, 1977 (prototype).
Фиг. fFIG. f
А-АAa
v.:v .:
т;t;
/«J. .../ "J. ...
//
66
иг.гIG
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802900369A SU926328A1 (en) | 1980-03-28 | 1980-03-28 | Portable form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802900369A SU926328A1 (en) | 1980-03-28 | 1980-03-28 | Portable form |
Publications (1)
Publication Number | Publication Date |
---|---|
SU926328A1 true SU926328A1 (en) | 1982-05-07 |
Family
ID=20885517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802900369A SU926328A1 (en) | 1980-03-28 | 1980-03-28 | Portable form |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU926328A1 (en) |
-
1980
- 1980-03-28 SU SU802900369A patent/SU926328A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BG34764A3 (en) | Excavation consilidation | |
RU2344291C2 (en) | System of deposit development | |
SU926328A1 (en) | Portable form | |
RU2103507C1 (en) | Method and cutter-loader machine for development of seam deposits of minerals | |
SU948295A3 (en) | Winning machine for working thick steep seams | |
SU1266988A1 (en) | Method of working pillars | |
SU934026A1 (en) | Moving form for erecting monolithic trips | |
SU645612A3 (en) | Self-propelled roof support of underground mining working | |
SU92852A1 (en) | Metallic overlap for fencing workspace of the cleaning face from the collapsing side rocks | |
SU920212A1 (en) | Method of working sloping coal beds | |
SU870728A1 (en) | Complex for advance workings | |
SU97031A1 (en) | The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams | |
SU702185A1 (en) | Method and arrangement for erecting a support pilee | |
SU848661A1 (en) | Flexible roof | |
SU840376A1 (en) | Temporary movable unrelieving roof support for mine workings | |
SU934003A1 (en) | Method of working thick coal beds with use of flexible partition | |
SU97852A1 (en) | The method of increasing the strength of dyes with oxyazo dyes obtained on the fiber to friction | |
RU2058487C1 (en) | Complex-aggregate powered support | |
SU724753A1 (en) | Tunnel shuttering | |
SU802477A1 (en) | Tunnel lining | |
RU2052123C1 (en) | Unitized aggregated powered support | |
SU1165786A1 (en) | Method of of pillar-less protection of development workings | |
SU859654A1 (en) | Filling ix coffer-dam | |
SU920233A1 (en) | Method and unit of power roof support for filling-in an excavated space | |
SU752015A1 (en) | Shield for driving horizontal workings |