SU870728A1 - Complex for advance workings - Google Patents

Complex for advance workings Download PDF

Info

Publication number
SU870728A1
SU870728A1 SU782698647A SU2698647A SU870728A1 SU 870728 A1 SU870728 A1 SU 870728A1 SU 782698647 A SU782698647 A SU 782698647A SU 2698647 A SU2698647 A SU 2698647A SU 870728 A1 SU870728 A1 SU 870728A1
Authority
SU
USSR - Soviet Union
Prior art keywords
workings
complex
lining
lava
rock
Prior art date
Application number
SU782698647A
Other languages
Russian (ru)
Inventor
Николай Константинович Гринько
Владимир Иванович Крутилин
Евгений Иванович Киселев
Юрий Филиппович Тверезый
Иван Трофимович Манжула
Анатолий Георгиевич Скуров
Original Assignee
Копейский Ордена Трудового Красного Знамени Машиностроительный Завод Им. С.М.Кирова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Копейский Ордена Трудового Красного Знамени Машиностроительный Завод Им. С.М.Кирова filed Critical Копейский Ордена Трудового Красного Знамени Машиностроительный Завод Им. С.М.Кирова
Priority to SU782698647A priority Critical patent/SU870728A1/en
Application granted granted Critical
Publication of SU870728A1 publication Critical patent/SU870728A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

II

Изобретение относитс  к горному делу и может быть использовано при проведении подготовительных горных выработок с выемкой угл  и закладкой выработанного пространства при отставании подготовительных забоев от лавы.The invention relates to mining and can be used when carrying out preparatory mine workings with excavation of coal and laying of the worked out space when the preparation faces are lagging behind the lava.

Известен комплекс дл  проведени  подготовительных выработок вслед за лавой с двухсторонним расположением породных полос, включающий механизированную лавную крепь, штрековую : крепь, бермовую крепь и средства закладки породы в выработанное пространство , при этом бермова  крепь снабжена вертикальной перегородкой, предотвращающей попадание закладываемой породы в места нахождени  людей l .A known complex for carrying out preparatory workings following lava with a two-sided arrangement of rock bands, including mechanized laval lining, drift: lining, berm lining and means of laying the rock into the open space, while the berm lining is provided with a vertical partition that prevents the laid rock from getting into the places of people l.

Недостатком этого комплекса  вл етс  отсутствие устройства, обеспечивающего безопасный переход людей из-под лавной крепи под бермовую крепь.The disadvantage of this complex is the absence of a device that ensures the safe passage of people from beneath the laval support to berm brackets.

Наиболее близким к изобретению по технической сущности  вл етс  KOMriлекс дл  проведени  подготовительных выработок с закладкой породы, включающий проходческие комбайны, средства выемки угл  с механизированной крепью, закладочную установку, угловой конвейер с расположенной вдоль оси выработки разгрузочной головкой и устройство дл  выхода людей из лавы по прилегающей к выработке берме с ее крепью Г2 .The closest to the invention to the technical essence is KOMrilex for carrying out preparatory workings with rock filling, including mining machines, coal mining tools with powered roof support, backfilling installation, an angle conveyor with a discharge head located along the working axis and a device for people to exit the lava along the adjacent to the development of the berme with its support G2.

В этом комплексе устройство выхода людей состоит из щитов, перемещаемых вручную вслед за продвижением -механи зированной крепи.In this complex, a people exit device consists of shields that are manually moved in the wake of an advance — mechanized lining.

Недостатком комплекса  вл етс  то, что Примененна  в нем конструкци  выхода людей трудоемки в обслуживании и не обеспечивает полную безопасность обслуживающего персонала, как на участке стыковки механизированной и бермовой крепей, так и в зоне работы Проходческого комбайна. Целью изобретени   вл етс  обеспе чение безопасности выхода людей из лавы в подготовительную выработку. Указанна  цель достигаетс  тем, что устройство дл  выхода людей выполнено в виде наклонных перекрытий, перегородки и распорного механизма, выполненного с верхней и нижней балками и установленных между IWMH гидростоек , при этом верхн   балка выпо нена в виде желоба дл  установки бер мовой крепи, а нижн   балка св зана с лавной крепью посредством гидродом крата. На фиг. 1 показан общий вид комплекса; на фиг. 2 - разрез А-А на фиг . 1 ; на фиг.З - разрез Б-Б на фиг. I; на фиг. 4 - вид В на фиг. 1. Комплекс дл  проведени  подготовительных выработок содержит устанавливаемую в угольном забое лавыF выемочную машину 2, работающую с рамы углового скребкового конвейера 3 и поддерживающую в зоне забо  кровлю механизированную крепь 4. К лаве при легают отстающие от нее подготовительные выработки 5 и b. Поддержка кровли выработанного пространства в зоне за обратными перекрыти ми крепи 4 осуществл етс  с помощью заклад ки выработанного пространства породными полосами 7 и 8. Б забо х 9 и 10 подготовительных выработок 5 и 6 устанавливаютс  проходческие комбайны 11 и 12. В этих же выработках устанавливаютс  .акже и дробильно-закладочные установки 13 и 14, включающие секционные пневмотрубопроводы 15 и 1 монтируемые вдоль выработок и под об ратныьм перекрыти ми крепи 4. Взаимным расположением крепи 4 и проходческих комбайнов предусматриваетс  проведение выработок таким образом, что у стенок выработок образуютс  прилегающие к ним бермы 7 и 18 в ви де остающихс  кутков очистного :эабо  Посредством устройств выхода 19 и 20, включающих крепи 21, распорные устройства 22, перекрыти  23 и вход щий только в устройство выхода 20 оградительный щит 24, осуществл етс  соответственно крепление берм 1 и 18, перекрытие прилегающих к ним обнаженных пространств и ограждение рабочих пространств берм от зоны работы исполнительных органов комбайнов II и 12. Крепь 21 состоит из рам 25, соедин емых между собой прог нами 26. Распорное устройство 2i слу жит дл  удЪбства ус.тановки крепи 21 и поддержани  рам 25, примыкаюищх к механизированной крепи 4, и включает верхнюю 27 и нижнюю 28 балки,, соединенные гидравлическими стойками 29, и гидродомкрат 30, соедин ющий распорное устройство с механизиров.анной крепью 4. Дл  удобства укладки прогонов 26 верхн   балка 27 выполнена в виде жеоба . Перекрытие 23 соедин етс  посредством шарнира 32 с секцией механизированной крепи 4 и опираетс  на прогоны 26. В зоне обработки подготовительного забо  9 над йгтрековыми решетками 32 углового конвейера установлено разделительное устройство 33, включающее наклонные щиты 34, перегоодку 35, выполненные раздвижными дл  регулировки их по мощности пласта, и гибкие элементы 36. Разделительное устройство 33 посредством гибких элементов 36 подвижно соедин етс  с прогонами 26 дл  ограждени  пространства бермы 17 от зоны работ исполнительного органа комбайна 11. Ограждение аналогичного пространства в берме 18 осуществл етс  щитом 24, закрепл емым на прогонах 26 устройства 20. Установленное на штрековых рештаках разделительное устройство перемещаетс  совместно с конвейером . Работа комплекса осуществл етс  следующим образом. Очередной цикл начинаетс  с зарубки выемочной машины 2 в угольный пласт с одновременной передвижкой механизированной крепи 4 к забою, в результате чего за обратными перекрыти ми крепи 4 по вл ютс  зоны дл  зарубки проходческих комбайнов 1I и 12. Отбитый выемочной машиной 2 уголь транспортируетс  вдоль лавы 1 и прилегающей к ней выработке 5 угловым скребковым конвейером 3. Одновременно проходческими комбайнами 11 и 12 производитс  обработка забоев 9 и 10, в результате чего отбита  породна  масса под собственным весом падает на почву в зонах действи  погрузочных органов проходческих комбайнов. Причем, в забое 9 часть отбитой породы сначала попадает на наклонные щиты 34 разделительного устройства 33, по которым и стекает в упом нутую зону.The disadvantage of the complex is that the design of the exit of people used in it is laborious to maintain and does not ensure the complete safety of service personnel, both at the joining site of the mechanized and berm roof supports, and in the work area of the Road Combine. The aim of the invention is to ensure the safety of people exit from the lava in the preparatory development. This goal is achieved by the fact that the device for exit of people is made in the form of inclined floors, partitions and a spacer mechanism, made with upper and lower beams and hydro-racks installed between IWMH, while the upper beam is erected in the form of a groove for installing lining, and the bottom the beam is connected to the lava support by means of a krat hydrodome. FIG. 1 shows a general view of the complex; in fig. 2 shows section A-A in FIG. one ; on fig.Z - section bb in fig. I; in fig. 4 is a view of B in FIG. 1. The complex for carrying out the development workings contains a excavation machine 2 installed in the coal face of the lava, working from the frame of the angular scraper conveyor 3 and supporting the roof support in the zone of the slab 4. The preparatory workings 5 and b falling behind the lava. The maintenance of the roof of the open space in the zone behind the inverse overlap of the lining 4 is carried out using the bedding of the open space by rock bands 7 and 8. In the faces of the 9 and 10 preparatory workings 5 and 6, driving machines 11 and 12 are installed. In the same workings, they are installed. Also, crushing and stowing installations 13 and 14, including sectional pneumatic tubing 15 and 1, are mounted along the workings and under the back brackets 4. Mutual arrangement of the lining 4 and tunneling machines provides for openings in such a way that adjacent berms 7 and 18 are formed at the walls of the openings in the form of the remaining clearances: air through Exit devices 19 and 20, including lining 21, spacers 22, overlap 23 and entering only in exit device 20 fencing shield 24, respectively, fastening berms 1 and 18, overlapping adjacent naked spaces and fencing berms' working spaces from the working area of the executive bodies of combines II and 12. The lining 21 consists of frames 25, interconnected by 26. The spacing device 2i serves to secure the lining 21 and support the frames 25 adjacent to the mechanized lining 4, and includes the upper 27 and lower 28 beams, connected by hydraulic struts 29, and the hydraulic jack 30, which connects the spacer motorized support 4. For ease of installation of the girders 26, the upper beam 27 is made in the form of a jack. The overlap 23 is connected by means of a hinge 32 to the mechanized support section 4 and is supported on the girders 26. A separation device 33 is installed in the processing zone of the preparatory slab 9 above the angled conveyor gratings 32 of the angular conveyor 34, which includes sloping shields 34, which are 35 reservoir, and flexible elements 36. The separation device 33 through flexible elements 36 is movably connected to the purlins 26 to enclose the berm 17 from the work area of the executive body Coin 11. The enclosure of a similar space in berm 18 is carried out by a shield 24 fixed on the runs 26 of the device 20. The separating device mounted on the drip bars is moved together with the conveyor. The operation of the complex is carried out as follows. The next cycle begins with the notch of the excavation machine 2 into the coal seam with simultaneous movement of the powered support 4 to the face, resulting in the reverse overlap of the support 4, zones for the notching of the tunneling machines 1I and 12 emerge. The coal that was broken off by the excavation machine 2 is transported along the lava 1 and the adjoining production of 5 angular scraper conveyor 3. At the same time, the tunneling machines 11 and 12 process the faces 9 and 10, as a result of which the rock mass is beaten out under its own weight falls on the soil in de zones There are loading bodies for tunneling machines. Moreover, in the face 9, a part of the broken rock first falls on inclined shields 34 of the separation device 33, along which it flows into the said zone.

С. помощью погрузочных и транспортных средств проходческих комбайнов 1 и 12 породна  масса направл етс  в дробильно-закладочные установки 13 и 14, откуда по пневмотрубопроводам 15 и 16 транспортируетс  в зоны выкладки породных полос 7 и 8. Одновременно с, этим происходит крепление обнаженных пространств берм 17 и 18, образовавшихс  после передвижки механизированной крепи А. Дп  этого в желоба верхних балок 27 распорных устройств 22 укладываютс  прогоны 26, соедин ющие вновь устанавливаемые рамы 25 с ранее установленными.C. By means of loading and transport vehicles of tunneling machines 1 and 12, the rock mass is sent to the crushing and backfill units 13 and 14, from where it is transported via pneumatic tubing 15 and 16 to the zones of the laying of rock bands 7 and 8. Simultaneously with this, the exposed berths are fastened 17 and 18, which were formed after the advancement of the mechanized support A. In this chute, the upper beams 27 of the spacer devices 22 are stacked 26, connecting the newly installed frames 25 with the previously installed ones.

При этом в устройстве выхода 20 происходит перекрепление оградительного щита 24 на последующий прогон tZ6. Распорным устройством 22 производитс  также и поддержание рам 25, а передвижка его вслед за подвиганием лавы осуществл етс  гидродомк- ратом 30.At the same time, in the exit device 20, the protective shield 24 is perekrepleniya on the subsequent run tZ6. The spacing device 22 also maintains the frames 25, and its movement after the movement of the lava is carried out with a hydraulic lock 30.

Свободный и безопасный проход людей из лавы 1 в выработки 5 и 6 осуществл етс  под обратными перекрыти ми крепи 4 и элементами устройств выхода, ограждающими от вывалов, вследствие про влени  горного давлени  .The free and safe passage of people from lava 1 to the openings 5 and 6 is carried out under the reverse overlaps of the lining 4 and elements of the exit devices, which protect against dumping, due to the manifestation of rock pressure.

Причем О1раждение прохода от попадани  кусков отбиваемой породы осуществл етс  разделительным устройством 33,Moreover, the passage O1 is prevented from entering pieces of the beaten rock by means of a separating device 33,

Claims (2)

1.Патент Фрашдии If 23 7476,1. IfAnd patent 23 7476, кл. Е 21 F 15/02, оиублмк. 11.04.77.cl. E 21 F 15/02, oiublmk. 04.11.77. 2.Гранкин И.С. и Сушко И.Л. Проведение выработок широюсм забоем М., Недаа, 1975, с. 71, рис. 14.2. Grankin I.S. and Sushko I.L. Carrying out the workings of the widespread slaughter of M., Neda, 1975, p. 71, fig. 14. У/Y /
SU782698647A 1978-12-20 1978-12-20 Complex for advance workings SU870728A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782698647A SU870728A1 (en) 1978-12-20 1978-12-20 Complex for advance workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782698647A SU870728A1 (en) 1978-12-20 1978-12-20 Complex for advance workings

Publications (1)

Publication Number Publication Date
SU870728A1 true SU870728A1 (en) 1981-10-07

Family

ID=20799375

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782698647A SU870728A1 (en) 1978-12-20 1978-12-20 Complex for advance workings

Country Status (1)

Country Link
SU (1) SU870728A1 (en)

Similar Documents

Publication Publication Date Title
US5368369A (en) Equipment useful for winning ores particularly coal in longwall mining
RU2344291C2 (en) System of deposit development
RU2015087C1 (en) Method and device for enclosing a waste disposal site by means of a water insulating underground device shrouding the site on the underside
US4029361A (en) Longwall mining roof support for double deck machines
EP0795680B1 (en) Shortwall mining equipment for extraction of pillars in underground coal mines
SU870728A1 (en) Complex for advance workings
US4007966A (en) Single-entry mining development system
US4195886A (en) Radial mining method
US4979780A (en) Mining or underground quarrying method and installation for implementing same
RU2246618C1 (en) Method for controlling hard-destructible ceiling
SU1134726A1 (en) Unit for mining thick coal seams
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
RU2172410C2 (en) Powered tunneling and stoping complex (unit)
RU2138640C1 (en) Method for development of thick gently dipping coal seam
RU2135772C1 (en) Method for development of kimberlite pipes by mechanized complex
US3791155A (en) Stowing and packing debris in mines
US3872677A (en) Mineral mining installations
SU934026A1 (en) Moving form for erecting monolithic trips
SU1222846A1 (en) Mechanized set for mining thick steep coal seams
SU926328A1 (en) Portable form
RU2085738C1 (en) Method for development of steep coal seams of medium thickness
SU58469A1 (en) Device to protect people working in the face from the dam rock
SU1434108A1 (en) Method of exploiting thick steep coal seams
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
RU2013547C1 (en) Method for steep coal seams mining