SU97031A1 - The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams - Google Patents

The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams

Info

Publication number
SU97031A1
SU97031A1 SU442781A SU442781A SU97031A1 SU 97031 A1 SU97031 A1 SU 97031A1 SU 442781 A SU442781 A SU 442781A SU 442781 A SU442781 A SU 442781A SU 97031 A1 SU97031 A1 SU 97031A1
Authority
SU
USSR - Soviet Union
Prior art keywords
overlap
wire mesh
development
powerful
construction
Prior art date
Application number
SU442781A
Other languages
Russian (ru)
Inventor
В.А. Бакатин
В.К. Блюменфельд
Г.Е. Пузырев
Original Assignee
В.А. Бакатин
В.К. Блюменфельд
Г.Е. Пузырев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.А. Бакатин, В.К. Блюменфельд, Г.Е. Пузырев filed Critical В.А. Бакатин
Priority to SU442781A priority Critical patent/SU97031A1/en
Application granted granted Critical
Publication of SU97031A1 publication Critical patent/SU97031A1/en

Links

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Description

Способы возведени  перекгллтп  из проволочной сетки при разработке мощнь.1х, наклонно залегающих, угольных пластов длинными столбами по падепию или камепами с обратной выемкой без разделени  на слои известны. Но они ке обеспечивают выемкн пласта ка всю мощность без применени  обратной крепи в очистном забое.Methods for erecting wireflocks from a wire mesh in the design of powerful 1 x oblique coal seams with long poles along padapia or cam with reverse notch without layer separation are known. But they do not provide the reservoir with full power without the use of reverse lining in the longwall.

В опнс1).м сиособе этот недостаток устранен: проволочную еетку завод т иредварнтельно под кровлю пласта и со стороны вышележащего подэтажа на почву отрабатываемого дл  этой целп наклонного сло , в верхней пачке пласта, и горизонтального сло -со стороны вышележащего подэтажа.In the case of this method, this drawback is eliminated: the wire net is irregularly placed under the roof of the reservoir and from the side of the overlying substage on the soil of the inclined layer in the upper pack of the reservoir, and the horizontal layer from the side of the overlying substage.

На фнг. 1 изображена схема системы разработки с перекрытием из проволочной сетки; на фйг. 2-разрез по АА н ББ на фиг. }; на фиг. 3-разрез но СС на фиг. 1.On fng. 1 is a diagram of a development system with wire mesh overlap; on fig. 2 is a section along AA nBB in FIG. }; in fig. 3-section but CC in FIG. one.

Основной штрек 1 проводитс  у лежачего бока пласта.The main drift 1 is held at the recumbent side of the formation.

На высоте 4-6 м от основного штрека у вис чего бока пласта проводитс  первый параллельный штрек 2.At a height of 4-6 m from the main roadway, the first parallel roadway 2 is held at the sides of the bed.

Вентил ционных штреков проводитс  два: один 3 у кровли, другой 4 у почвы пласта, причем они доллсны находитьс  на одном уровне.There are two ventilation drifts: one is 3 at the roof, the other 4 is at the seam soil, and they are at the same level.

Выемочные печи 5 провод тс  с основного дл  вентил ционного П1трека у почвы пласта через каждые 7 м по простиранию пласта, и R цел х вентил ции, сбиваютс  между собой через каждые 10 м сбойками 6.Extraction furnaces 5 are conducted from the ground for the ventilation track near the soil of the reservoir every 7 m along the strike of the reservoir, and R is the purpose of ventilation, are knocked together after every 10 m by coupling 6.

На пластах мощностью свыше 8 м параллельно выемочной печи и в одной вертикальной плоскости с ней проводитс  промежуточна  печь 7 на рассто нии 3-б м от верхн ков выедкочной печи.An intermediate furnace 7 is conducted on formations with a thickness of more than 8 m parallel to the excavation kiln and in the same vertical plane with it, at a distance of 3-m from the tops of the mining furnace.

Эти печи дл  целей вентил ции сбиваютс  ортами 8 через каждые 10 м.For ventilation purposes, these ovens are knocked down by orths 8 every 10 meters.

ДЬ 97031- 2 -DG 97031-2 -

При слабых угл х Bi ip;i6oTKn провод тс  с креплением, а при угл х средней устойчивости и устойчивых с креплением провод тс : Ьй параллельный штрек, выемочные печи и вентил ционные штреки. Все остальные выработки провод тс  без креплени -аркой.For weak coals, Bi ip; i6oTKn are carried out with fastening, while for coals of medium stability and resistant with fastening, the following are carried out: Üb parallel drift, excavation furnaces and ventilation drifts. All other workings are carried out without fastening the park.

На Гранине выемочного по;1  провод тс  разрезные нечи: одна у почвы, друга  у кровли пласта (в одной вертикальной плоскости).On the Granin of the excavation section; 1, the cutting necks are conducted: one near the soil, the other near the roof of the seam (in the same vertical plane).

По печн у вис чего бока проводитс  обычный «лавный разрез 9, в одну линию с разрезе., по п декню проводитс  орт 10 дл  выемки горизонтального сло  между вентил ционными штреками.On the sides of the wall of which the side is drawn a conventional "section 9, in one line with the section." On the side, an ort 10 is conducted to cut the horizontal layer between the ventilation drifts.

печью у лежачего бока и разрезом проводитс  Н1ель шириною 1 -1,5 м, котора  крепитс  лавными «кругами на лежн х. the furnace at the recumbent side and the incision is carried out by a hiler with a width of 1-1.5 m, which is fastened with plaster circles on the beds.

Щель служит л.л  укладки еетки на границе работ по простиранию пласта.The gap serves as a liter of laying the net on the boundary of the work on the strike of the reservoir.

Очистные работы начинаютс  с выемки угл  в разрезе-лаве и в горизонтально.м слое. После того, как лава и горизонтальный слой продвинутс  на 3-4 м, производитс  укладка сетки по почве лавы, в горизонтальном слое и в щели в следующем пор дке.The cleaning works begin with coal extraction in the lava section and in the horizontal layer. After the lava and horizontal layer is advanced by 3-4 meters, the grid is laid on the soil of the lava, in the horizontal layer and in the slot in the following order.

По всей поверхности лавы и горизонтального сло  раскатывают рулоны первого р да, 1;)ичем нечетные рулоны должны опережать четные (или наоборот) на 1 м. Затем полностью разматывают рулоны второго р да по падению. Третий р д сетки укладывают по падению сверху переплетенных двух р дов, noc;ie чего производитс  CHJHBKa трех р дов сеткн прово.локо.Rolls of the first row, 1;) are rolled over the entire surface of the lava and the horizontal layer; The third row of the grid is laid over the top of interlaced two rows, noc; i.e., CHJHBKa produces three rows of net wires.

Может быть применен и д,;:угоГ в; р1ЬП т . сетки: по.лосы ее но длине соедин ют между собою внахлестку с носледуюи.1:ей сшивкой у концов нроволокою.Can be applied and d,;: p1np t. nets: its lengths but the length is connected overlapping with each other and 1: it is stitched at the ends with a wire.

Такнм образом, получаетс  достаточно прочное черекрытие. В горизонтальном слое сетка настилаетс  на почву сло  и укрепл етс  на ней стойками.In this way, a sufficiently strong overlap is obtained. In the horizontal layer, the mesh is laid on the soil of the layer and is supported on it by the uprights.

Обработка лавы и горизонтального сло  производитс  с обрушением обычным епссобс.м.The processing of the lava and the horizontal layer is performed with the collapse of the usual episobs.

Очистные работы под сеткой начинаютс.  после того, как лава и горизонтальный слой от выемопюй печн по простиранию на два «шага посадки и заключаютс  в выемке угл  из выемочной и промежуточной (при мощности пласта свьпне 8 м) печей.Cleaning work under the screen begins. after the lava and horizontal layer from the pelvic furnace along the strike for two "landing steps" and consist in dredging the coal from the excavation and intermediate (with a seam thickness of 8 m) furnaces.

Отбитый уголь нод действием еобственного веса доставл етс  по выемочной печи на основной штрек и здесь грузитс  в вагонетки.Repulsed carbon node by the action of its own weight is delivered through the excavation furnace to the main drift and here it is loaded into trolleys.

Сеточное перекрытие П под действием обрушенной в выработанное пространство породы движетс  вслед за забоем.The grid overlap P under the action of a rock that has collapsed into the developed space moves after the bottom.

Одновременно могут отрабатыватьс  два-три забо  с опережением в 15-20 м.At the same time, two or three slabs with an advance of 15–20 m can be worked out.

П р е д :. е т изобретени P rede:. invented by

Способ возведени  перекрыти  из проволочной сетки при разработке мощных, наклонно залегающих, угольных пластов длинными столбами по падению или камерами с обратной выемкой без разделени  на слои, отличающийс  тем, что, с целью выемки пласта иа всю моидноеть без применени  обычной крепи в очистном забое, проволочную сетку завод т предварительно под кровлю пласта и со стороны вы111ележаи1,его подзта к    отп батываемого дл  этой цели наклонного сло , в верхней пачке пласта и горизонтального сло - со стороны В11:шележатего н:;д: тажа.The method of erecting overlapping wire mesh in the development of thick, obliquely lying coal seams with long pillars in the fall or chambers with a reverse notch without division into layers, characterized in that, in order to excavate the layer and the whole mine without the use of conventional lining the grid is preliminarily made under the roof of the reservoir and from the side of the upper deck and its podsat to the inclined layer being removed for this purpose, in the top pack of the reservoir and the horizontal layer from the side B11: sheleng n:; d: taj.

7i:Tf:- i- K: c-/tf / / 4-- /:6ci;r l Г7i: Tf: - i- K: c- / tf / / 4-- /: 6ci; r l Γ

)-.;i:.:s::y f I ) -. i:.: s :: y f I

,JAxHi i Mjg Ш U r.. , JAxHi i Mjg W U r ..

f / л л .: - r ./i.V nf / l l.: - r ./i.V n

.A,J :| |Д. ::; S , j --,./-.,; л--Гр; Я---.,г,-.- I V.A, J: | | D. ::; S, j -,. / -.,; l - Gr; I ---., G, -.- I V

f    f

-, -( fj И; -, - (fj and;

fefe

.,-1- ..,,0.--.-Vi. и .,|ir ir/rV7 ., - 1- .. ,, 0. - .- Vi. and., ir ir / rV7

iM. 0,v .-J 4.:.,v.;.Nivl.VN, C;§-YiM. 0, v.-J 4.:.,v.;.Nivl.VN, C; §-Y

r41 Wr r41 wr

/ 77Д j/ 77Д j

1 . i: one . i:

S:: r::iil l 3: S :: r :: iil l 3:

Разрез no йй Разрез па bb Section no yy Section pa bb

X ,-. ::: д-ГiJ.-- .; i;...-. ., L.X, -. ::: giJ .--. i; ...-. ., L.

Т; -:7Т//7 Г , У-7Г,-Г7//777- -У/-/У 7- 77- Г 7Г/.T; -: 7Т // 7 Г, У-7Г, -Г7 // 777--У / - / У 7- 77- Г 7Г /.

/ t I /,S I -t f. )./it -J, v %-. -, , IJ I II III /II/ t I /, S I -t f. ) ./ it -J, v% -. -,, IJ I II III / II

,,|..,, | ..

Er....-:..-..;..Разрез no CCEr ....-: ..- ..; .. Incision no CC

/Ijx .- Г 1;/7г 777Л/ Ijx .- Г 1; / 7г 777Л

IK.Ik.

:/uiiii 2: ; i4: / uiiii 2:; i4

SU442781A 1950-05-03 1950-05-03 The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams SU97031A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU442781A SU97031A1 (en) 1950-05-03 1950-05-03 The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU442781A SU97031A1 (en) 1950-05-03 1950-05-03 The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams

Publications (1)

Publication Number Publication Date
SU97031A1 true SU97031A1 (en) 1953-11-30

Family

ID=48371736

Family Applications (1)

Application Number Title Priority Date Filing Date
SU442781A SU97031A1 (en) 1950-05-03 1950-05-03 The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams

Country Status (1)

Country Link
SU (1) SU97031A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2488693C1 (en) * 2012-01-31 2013-07-27 Открытое акционерное общество "Севуралбокситруда" Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2488693C1 (en) * 2012-01-31 2013-07-27 Открытое акционерное общество "Севуралбокситруда" Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system

Similar Documents

Publication Publication Date Title
SU97031A1 (en) The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams
RU2039261C1 (en) Method for mining of contiguous gently dipping beds
RU2487240C1 (en) Method for open-underground mining of heavy slope coal bed
RU2263213C1 (en) Method for thick steeply inclined fire-hazardous bed mining with caving
GB890329A (en) Method of, and means for, mining seam-like mineral deposits
SU825961A1 (en) Method of working thick coal seams
SU63711A1 (en) Method of mining ore deposits in horizontal layers from top to bottom
SU1467186A1 (en) Method of mining steep and sloping thick coal seams with hydraulic techniques
SU1624177A1 (en) Flexible canopy
SU690184A1 (en) Method of mining thick sloping coal seams
SU796425A1 (en) Method of excavating gently sloping coal beds
SU84007A1 (en) The way to develop thick layers of flat and inclined bed
SU643644A1 (en) Method of mining thick steep coal seams
SU899956A1 (en) Method of mining sloping and steep fire-hazardous coal beds
SU909173A1 (en) Method of directing artificial pillars
SU926328A1 (en) Portable form
RU2038476C1 (en) Coal deposit exploitation method
SU1579963A1 (en) Method of working out thick steep and inclined seams
SU566933A1 (en) Method of exploitation of thick gently sloping gas-bearing-strata
SU1666726A1 (en) Method for mining sloping coal beds
SU840365A1 (en) Method of working ore bodies
SU796428A1 (en) Method of working gently sloping and sloping adjoining coal beds
SU885558A1 (en) Method of mining thick mineral beds
SU1046536A1 (en) Method for ventilating stoping face in working thick steep and inclined seams in horizontal splices using mechanized complexes
SU1714131A1 (en) Method of mining flat stratified mineral deposits