SU63711A1 - Method of mining ore deposits in horizontal layers from top to bottom - Google Patents

Method of mining ore deposits in horizontal layers from top to bottom

Info

Publication number
SU63711A1
SU63711A1 SU30364A SU30364A SU63711A1 SU 63711 A1 SU63711 A1 SU 63711A1 SU 30364 A SU30364 A SU 30364A SU 30364 A SU30364 A SU 30364A SU 63711 A1 SU63711 A1 SU 63711A1
Authority
SU
USSR - Soviet Union
Prior art keywords
ore
trench
horizontal layers
ore deposits
mining ore
Prior art date
Application number
SU30364A
Other languages
Russian (ru)
Inventor
Л.С. Щетников
Original Assignee
Л.С. Щетников
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Л.С. Щетников filed Critical Л.С. Щетников
Priority to SU30364A priority Critical patent/SU63711A1/en
Application granted granted Critical
Publication of SU63711A1 publication Critical patent/SU63711A1/en

Links

Landscapes

  • Road Paving Structures (AREA)

Description

Все ранее примен вшиес  в практике варианты системы разработки рудных месторождений горизонтальными сло ми с направлением отработки сверху вниз (в Пределах этажа), с закладкой выработавного пространства имели очень много существенных недостатков, ,в силу которых эта система ,не получила применени .All previously used in practice options for the development of ore deposits in horizontal layers with the direction of mining from top to bottom (within the Limits of the floor), with the laying of the working space had a lot of significant drawbacks, due to which this system has not received application.

Основными недостатками этой системь  вл ютс : сложность производства закладочных работ, трудность поддержани  очистных выработок -при условии наличи  вверху ;-)Ыхлой закладки, мала  производительность очистных работ, высока  себестоимость руды и большой срок отработки этажа. Несмотр  на приведенные недостатки, эта система имеет большие преимуш, перед другими системами, так как даёт возможность иметь в одновременной отработке всю площадь месторождени  без оставлени  целиков, причём закладка выработанного пространства ликвидирует опасность колчеданных пожаров . Кроме того система применима дл  отработки слабой руды.The main disadvantages of this system are: the complexity of the backfill work, the difficulty of maintaining the clearing workings - provided it is at the top ;-) Ykhloi bookmarks, the productivity of the cleansing work is low, the cost of ore is high and the floor is long. Despite these drawbacks, this system has great advantages over other systems, since it makes it possible to have the entire field in simultaneous mining without abandoning the pillars, and laying out the developed space eliminates the danger of pyrite fires. In addition, the system is applicable for the mining of weak ore.

Основ ной целью нзобретеии   вл етс  разработка такого способа, который, сохран   все переч слен (fbte достоинства, разрешил бы в положительном смысле вопрос Механизации закладки выработанного пространства, простого тгоддержани  кровли и большой производительности очистных работ.The main goal of the invention is to develop such a method that, keeping all the lists of slang (fbte advantages, would solve in a positive sense the question of mechanization of laying the open space, simple roof support and high productivity of cleaning works.

Достигаетс  это, согласно изобретению , тем, что по всей высоте этажа из заезда-орта в рудном теле провод т разрезную траншею посередине предполагаемого блока, с целью установки в траншее скреперной лебёдки дл  доставки руды в рудоспуски и дл  размещени  закладочной машины и конвейера, подающего к ней материал.This is achieved, according to the invention, by a split trench in the middle of the proposed block along the entire height of the check-in floor in the ore body, in order to install a scraper winch in the trench to deliver the ore to the ore passes and to place a stowing machine and a conveyor her stuff.

Предлагаемый способ может примен тьс  дл  отработки .месторождений с большой мощностью (свыше 15 м), которые разбиваютс  по простиранию «а блоки, длиной но 25-30 м. Подготовка сюиовного горизонта заключаетс  в проведении по лежачему боку полевого штрека и заездов-ортов в рудном теле посередине предполагаемых блоков. Из орта блок рассекаетс  по всейThe proposed method can be used for mining fields with high power (over 15 m), which are broken up along the strike of blocks, but 25-30 meters long. Preparation of syuovnogo horizon consists in conducting along the lateral side of the field drift and body in the middle of the alleged blocks. From ort, the block is dissected throughout

высоте этажа и по всей мощности азрез11ОЙ траншеей. По мере проходки траншеи производитс  присечка иустых лород лежачего бока и наращивание в контакте трёхотделенного восстающего, служащего впоследствии дл  спуска закладки, леса, а также дл  хода сообщени  и вентил ции. Верхн   часть восстающего выводитс  на. орт закладочного горизонта. the height of the floor and the entire power of the cutting trench. As the trench is penetrated, the lying side of the lying side is compacted and built up at the contact of the three-pronged insurgent, which later serves to lower the bedding, scaffolding, as well as for the communication and ventilation. The upper part of the uprising is displayed on. ort stowing horizon.

Отработка блока производитс  гогнзонтальными сло ми, высотою 2,5 м с наиравлетгием отработки, с-ю  от вис чего к лежачему боку, т. е. вкрест простирани  рудного тела. Отработка сло  производитс  ироким фронтом-лавой. Лава, ширина которой равна длине блока, т. е. 25-30 м, разделена посередине т а:ншеей, причём одно крыло лавы отстаёт от другого на 3 м. ачало отработки сло  заключаетс  в проведении но вис чему боку, в обе стороны от транщеи, до граииц блока так называ:емого отрезного njTpeKH шириной 2 м и высотой 2,5 м. После окоичани  проходки штрека на1пра;вление очистных работ 11зме.н етс , и забой движетс  Bceii фронтом от вис чего бока к лежачему .The testing of the block is carried out by horizontal layers, 2.5 m in height with the aim of working off, from the rear to the recumbent side, i.e. across the stretch of the ore body. The development of the layer is carried out by the world-front lava. Lava, the width of which is equal to the length of the block, i.e. 25-30 m, is divided in the middle of the a: nsheye, and one wing of the lava lags 3 m behind the other. the trench, up to the border of the block is the so-called cut-off njTpeKH, 2 m wide and 2.5 m high. After the road penetration has been completed, the phenomenon of cleaning works 11mean, and the bottomhole moves Bceii front from the side of the side to the recumbent.

Бурение производитс  поочерёдно - Вначале в одном крыле лавы, затем в другом. Шурфы бур тс  глубиной около 1,6м с таким расчётом , чтобы носле отпалки получалс  уход 1,5 м.Drilling is done alternately - First in one wing of the lava, then in the other. The pits are about 1.6m deep, so that it takes 1.5 m to drift away.

Руда иосле отбойки доставл етс  в траншею скрепером. Скреперна  .ебёдка устанавливаетс  аа тележке , двигающейс  по рельсам, уложенным на лёжках посередине траншеи. При наличии иескольких сортов руды, требующих селективной вые.мки, в траншее, в следующе .м слое, устраиваетс  аккумулирующий орт путём настилки на .1ёжках настила и скрепированн  по нему в Рудоспуски руды, сваливаеАюй скрепером с очистного сло . В этом случае потребуетс  наличие в траншее двух или трёх одноотделенных рудоспусков.The ore, after breaking, is delivered to the trench with a scraper. Scrapernage is installed by aa trolley moving along rails laid on slopes in the middle of the trench. If there are several grades of ore that require selective extraction, a trench, in the next layer, arranges accumulating ort by laying on decks of the flooring and stapled it into the ore passes of the ore, dumping the scraper from the cleaning layer. In this case, the presence of two or three single ore chunks in the trench will be required.

В случае массовой выемк  руды устройство аккумулирующего горизо .нта нзлищне, и руда с очистного сло  скреперуетс  непосредственно в наклонные рудоспуски, отшитые в креплении траншей па рассто нии 6 м друг от друга. Дл  возможности производства погрузю: руды из любой ленты руда перепускаетс  в рудоспуски но специально устраиваемым в тратипее нак.юнным ешёткам.In the case of mass excavation of ore, the device accumulating horizontally, and the ore from the clearing layer is fastened directly to inclined ore passes, made in the trench anchorage at a distance of 6 meters from each other. For the possibility of production, I will plunge the ores from any belt into the ore by-pass into the ore passes, but specially arranged in the tract of the river.

Крепление очистных забоев .изводитс  подхватною крепью, о ycTanoBKOii стоек р дами, нри i.-iCсто нии между р дами 1,5 м и между стойками в РЯД} - 1 м.The fixing of the stope faces is made with a support lining, with ycTanoBKOii racks in rows, at i.– iStandard between 1.5 m rows and between racks in ROW} - 1 m.

Стойки устанавливаютс  непосредственно на почву сло . На каждые две стонкп кладётс  nci eклад , длиной 2 м.Racks are mounted directly on the soil of the layer. For every two stonkp put nci eklad, 2 m long

Р ды-стоек дсмжиы быть . изительно совмещены с креплением тра|ншеи с тем, чтобы иметь возможность концами подхватов распереть узел креплени  траншеи в цел х её сохранени .Rd-dmszhiy racks to be. it is compounded with the fastening of the rail in order to be able to open the trench fastening assembly with the tips of the grab ends in order to preserve it.

Ввиду того что носле отработки слоев нроизводитс  параллельна  их закладка, дл  возможности отработки нижних слоев на почву рабочего сло  укладываетс  слой- дерев нный настил, на который впоследствии сваливаетс  закладочный материал.Due to the fact that during the working of the layers, their laying is parallelized, in order to work out the lower layers, a layer of wood is laid on the soil of the working layer, on which the filling material is subsequently dumped.

Укладка настила производитс  в «обратную нахлёстку ; надёжность такого настила позвол ет производить отработку сло  ниже без опаснссти нарушени  настила ч прорыва закладки в очистное пространство .Laying the flooring is done in reverse overlap; The reliability of such a flooring allows the layer to be worked down below without the risk of disturbing the flooring by breaking the bedding into the cleaning space.

Укладка лёжек производитс  одновре .менно в двух закладываемых .лентах, дл  чего на рассто нии 0,5 м от ближнего к забою р да стоек и параллельно ему укладываетс  на поЧву сплошной р д лёжек из горбылей.Laying of the lugs is performed simultaneously in two laid tapes, for which, at a distance of 0.5 m from the row of racks closest to the face, and parallel to it, a continuous row of slabs is laid on the soil.

Настил, также из горбылей, укладываетс  в промежутках между стойками перПендикул рно к лёжкам , причём задний конец кладётс  на почву, а противоположный - .на лёжку с таким расчётом, чтобы канцы гор-былей выступали из-за стоек «а 0,2 .f. Таким: образом концы уложендого сло  горбылей, обращённые в сторону забо , оказыThe flooring, also of slabs, is laid perpendicularly to the beds between the uprights, the rear end is laid on the ground, and the opposite end is laid on the floor so that the stationery of the former existed due to the posts. . In this way: the ends of the laid layer of croakers, facing the bottom, turn out

SU30364A 1940-03-03 1940-03-03 Method of mining ore deposits in horizontal layers from top to bottom SU63711A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU30364A SU63711A1 (en) 1940-03-03 1940-03-03 Method of mining ore deposits in horizontal layers from top to bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU30364A SU63711A1 (en) 1940-03-03 1940-03-03 Method of mining ore deposits in horizontal layers from top to bottom

Publications (1)

Publication Number Publication Date
SU63711A1 true SU63711A1 (en) 1943-11-30

Family

ID=48244599

Family Applications (1)

Application Number Title Priority Date Filing Date
SU30364A SU63711A1 (en) 1940-03-03 1940-03-03 Method of mining ore deposits in horizontal layers from top to bottom

Country Status (1)

Country Link
SU (1) SU63711A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2624490C1 (en) * 2016-03-04 2017-07-04 Публичное акционерное общество Приаргунское производственное горно-химическое объединение (ПАО ППГХО) Method of the low and medium powered ore bodies preparation, cutting and mining

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2624490C1 (en) * 2016-03-04 2017-07-04 Публичное акционерное общество Приаргунское производственное горно-химическое объединение (ПАО ППГХО) Method of the low and medium powered ore bodies preparation, cutting and mining

Similar Documents

Publication Publication Date Title
US10036252B2 (en) Method for removing hydraulic support for solid filling coal mining
CN103696771B (en) Skip-mining type wangeviry stope branch roadway filling and coal mining method
US20160102553A1 (en) Inclined layered solid-filling mining method in ultrathick coal layer
CN103742176B (en) A kind of pick anchor one unit
CN108756885A (en) A kind of high-dipping ore block that ore-rock is smashed to pieces it is lower to or on to consolidated fill mechanized mining method
RU2327037C1 (en) Excavation method of thick flat-lying coal seam with fast roof
CN104033151A (en) Safe mining method of ten million-ton mine under complicated conditions of dual-system coal seams
CN108266189A (en) A kind of lane top Tunnelling Along Goaf goaf isolation method
RU2555712C1 (en) Method of preparing and working of thick pitching coal bed
CN203742636U (en) Tunneling, supporting and anchoring integrated unit
SU63711A1 (en) Method of mining ore deposits in horizontal layers from top to bottom
GB890329A (en) Method of, and means for, mining seam-like mineral deposits
RU2487240C1 (en) Method for open-underground mining of heavy slope coal bed
SU1728488A1 (en) Method of mining coal seams
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU1129354A1 (en) Method of underground working of mineral deposits
SU1461942A1 (en) Method of mining thick ore deposits
SU1795100A1 (en) Method for mining thick steeply dipping coal seams
RU2077673C1 (en) Method for excavating graphite from a thin steeply dipping sheet deposit
SU899953A1 (en) Method of mining thick sloping coal beds in horizontal layers
RU2422638C1 (en) Compound development method of series of gently sloping beds of syncline and brachysyncline mine fields
SU1710751A1 (en) Method of mining thick steeply dipping seams with filling
SU1467186A1 (en) Method of mining steep and sloping thick coal seams with hydraulic techniques
SU907250A1 (en) Method of working gently sloping and sloping coal beds
SU97031A1 (en) The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams