SU905463A1 - Roof control method - Google Patents

Roof control method Download PDF

Info

Publication number
SU905463A1
SU905463A1 SU792786625A SU2786625A SU905463A1 SU 905463 A1 SU905463 A1 SU 905463A1 SU 792786625 A SU792786625 A SU 792786625A SU 2786625 A SU2786625 A SU 2786625A SU 905463 A1 SU905463 A1 SU 905463A1
Authority
SU
USSR - Soviet Union
Prior art keywords
roof
rocks
control method
hard
zone
Prior art date
Application number
SU792786625A
Other languages
Russian (ru)
Inventor
Николай Федорович Кусов
Оскар Акимович Эдельштейн
Николай Ильич Щербак
Original Assignee
Kusov Nikolaj F
Edelshtejn Oskar A
Shcherbak Nikolaj
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kusov Nikolaj F, Edelshtejn Oskar A, Shcherbak Nikolaj filed Critical Kusov Nikolaj F
Priority to SU792786625A priority Critical patent/SU905463A1/en
Application granted granted Critical
Publication of SU905463A1 publication Critical patent/SU905463A1/en

Links

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Description

(54) СПОСОБ УПРАВЛЕНИЯ КРОВЛЕЙ(54) ROOF CONTROL METHOD

1one

Изобретение относитс  к горной промышленности и Может быть использовано при разработке пластов полезных ископаемых, преимущественно угл .The invention relates to the mining industry and may be used in the development of mineral formations, primarily coal.

Известен способ управлени  труднообрушаемой кровлей, включающий бурение и взрывание скважин в породах труднообрущаемой кровли с предохранением от разрущени  непосредственной кровли I.There is a known method of controlling a hard-to-cut roof, which includes drilling and blasting wells in the rocks of a hard-to-rubbing roof with protection from the destruction of the immediate roof I.

Известен также способ управлени  кровлей при разработке пластов полезных ископаемых , включающий бурение скважин через непосредственную кровлю пласта в породы труднообрущаемой кровли и разоупрочнение пород в зоне раст гивающих напр жений труднообрущаемой кровли 2.There is also a known method of roof management in the development of mineral formations, which includes drilling wells through the direct roof of the formation into the rocks of a hard-to-reach roof and the strengthening of rocks in the zone of tensile stresses of the hard-to-wear roof 2.

Однако оба указанных способа недостаточно эффективны при слабой непосредственной кровле.However, both these methods are not effective enough with a weak immediate roof.

Цель изобретени  - повышение эффективности управлени  кровлей при слабой непосредственной кровле.The purpose of the invention is to increase the efficiency of roof management with a weak immediate roof.

Поставленна  цель достигаетс  те.м, что разупрочнение пород в зоне раст гивающих напр жений труднообрущаемой кровли производ т путем нагнетани  через скважину в указанную зону растворов ПАВ и послеThe goal is achieved by the following principle: that the softening of rocks in the zone of tensile stresses of a hard-to-wear roof is carried out by injection through a well into the specified zone of surfactant solutions and after

разупрочнени  пород через ту же скважину укрепл ют породы в зоне раст гивающих напр жений непосредственной кровли нагнетанием в эту зону скрепл ющего состава. Способ заключаетс  в следующем. При разработке пласта полезного ископаемого через непосредственную кровлю в труд нообрущаемую кровлю бур т скважину. Насосной установкой по высоконапорному шлангу через герметизатор в зону раст гивающих напр жений труднообрущаемой кровли нагнетают раствор ПАВ. Пропитку массива производ т на величину эффективного радиуса увлажнени . После разупрочнени  пород выпускают раствор ПАВ, перемещают герметизаторы и через ту же скважину укрепл ют породы, в зоне раст гивающих напр жений непосредственной кровли. Укрепление производ т путем нагнетани  скрепл ющего состава.The softening of rocks through the same well strengthens the rocks in the zone of tensile stresses of the direct roof by forcing a bonding composition into this zone. The method is as follows. During the development of a mineral reservoir through a direct roof into a hard-to-work roof, a well is drilled. A pump installation along a high-pressure hose through a sealer in a zone of tensile stresses of a hard-to-wear roof is injected with a surfactant solution. The impregnation of the array is carried out by the effective radius of moisture. After the softening of the rocks, a surfactant solution is released, the sealers are moved, and the rocks are strengthened through the same well in the zone of tensile stresses of the immediate roof. Strengthening is done by injecting a bonding compound.

Данный способ позвол ет значительно по2Q высить эффективность управлени  кровлей при слабой непосредственной кровле.This method makes it possible to significantly improve the efficiency of roof control with a weak direct roof.

Claims (2)

1.Авторское свидетельство СССР № 519542, кл. Е 2ГС 41/04, 1974.1. USSR author's certificate number 519542, cl. E 2GS 41/04, 1974. 2.Семенов Ю. А. Управление труднообрущаемыми кровл ми методом передового торпедировани . - «Безопасность труда в2. Semenov Yu.A. Management of intractable roofs by the method of advanced torpedoing. - “Labor safety in промышленности, 1977, № 7, с. 26.industry, 1977, № 7, p. 26
SU792786625A 1979-04-23 1979-04-23 Roof control method SU905463A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792786625A SU905463A1 (en) 1979-04-23 1979-04-23 Roof control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792786625A SU905463A1 (en) 1979-04-23 1979-04-23 Roof control method

Publications (1)

Publication Number Publication Date
SU905463A1 true SU905463A1 (en) 1982-02-15

Family

ID=20836499

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792786625A SU905463A1 (en) 1979-04-23 1979-04-23 Roof control method

Country Status (1)

Country Link
SU (1) SU905463A1 (en)

Similar Documents

Publication Publication Date Title
SU905463A1 (en) Roof control method
SU1293354A1 (en) Method of preventing bulging of soil species
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU1728494A1 (en) Method of support of mine working in unstable grounds
SU1559187A1 (en) Method of controlling the state of rock mass
SU1209872A1 (en) Method of roof control in mining in gently-sloping coal seams
SU1453022A1 (en) Method of driving mine working
SU1536008A1 (en) Method of relieving and consolidating the rock of mine working roof
SU1089264A1 (en) Method of controlling hard-to-cave roof
SU1102984A1 (en) Method of preventing gasodynamic fenomena in rock mass
SU883465A1 (en) Method of preparing geological fault zone to intersection by stoping face
SU787646A1 (en) Device for consolidating rock mass
SU1239336A1 (en) Method of mining thick mineral deposits
SU899974A1 (en) Method of hydro-isulation of the timber of mine shafts
SU1180518A1 (en) Method of enhancing the stability of fissured rock when driving mine workings
SU1627699A1 (en) Method of mining adjoining outburst-prone seams at borders of mine sections or safety coal pillars
SU1767178A1 (en) Method for combination working of mineral deposits
SU1188326A1 (en) Method of mining bedded deposits
SU1219824A1 (en) Method of driving workings in outburst-hazardous rock
SU1357588A1 (en) Method of controlling rock bursts
SU691567A1 (en) Method for the protection of preparatory galleries
SU1479655A1 (en) Method of water insulation of vertical shafts
SU1252492A1 (en) Method of driving an ascending mine working
SU1535991A1 (en) Coal mining method
SU1716145A1 (en) Method of guard of development workings