SU883465A1 - Method of preparing geological fault zone to intersection by stoping face - Google Patents
Method of preparing geological fault zone to intersection by stoping face Download PDFInfo
- Publication number
- SU883465A1 SU883465A1 SU802897834A SU2897834A SU883465A1 SU 883465 A1 SU883465 A1 SU 883465A1 SU 802897834 A SU802897834 A SU 802897834A SU 2897834 A SU2897834 A SU 2897834A SU 883465 A1 SU883465 A1 SU 883465A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- zone
- wells
- preparing
- intersection
- fault zone
- Prior art date
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
(54) СПОСОБ ПОДГОТОВКИ ЗОНЫ ГЕОЛОГИЧЕСКОГО НАРУШЕНИЯ К ПЕРЕХОДУ ОЧИСТНЫМ ЗАБОЕМ Изобретение относитс к горной промышленности , а именно к способам подготовки зон геологических нарушений к переходу очистными забо ми. Известны способы перехода зон геоло гических нарушений, включак цие подготов ку их непосредственно из лавы, в момент вскрыти зоны СИ, Однако при таких способах приготонки породы приамплитудной зоны нарушени прет певают значительные деформации вследствие опережаклцего очистные рабо ты воздействи опорного давлени . Кроме того, дл подготовки п ехода требуетс остановка лавьк Наиболее шшзким к изофетению по технической сущности и достигаемому результату вл етс способ подготовки зоны геологического нарушени к переход очистньм забо&л, включающий бурение скважин из прилегающей к лаве вьфаботки и нагнетание через них в приамплитуд ную зону нарушени упрочн ющего раство ра 2. Однако осуществление такого способа трудоалко и требует наличи вышележащих выработок, из которых предусматриваетс бурить скважины в зону нарушени и, кроме того, не обеспечивает равномерной и объемной пропитки нарушенных пород упрочн ющим раствором. Цель изобретени - снижение трудоемкости работ и повышение эффективности упрочнени пород зоны нарушени . Цель достигаетс тем, что скважины дл нагнетани упрочн ющего раствора бур т спареннь1ми из выемочной вьфаборки лавы параллельно нарушению дл его оконтуривани с диаметрально противоположных сторон. На фиг. I изображена схема подготовки зоны геологического, нарушени к переходу очистным забоем, вид в плане; на ф)аг. 2 - разрез А-А на фиг. 1. Предлагаемый способ.осуществл етс следукшшм образом. До подхода забо лавы I к геологич;ескому нарушению 2, в приамплитудную(54) METHOD OF PREPARING THE ZONE OF GEOLOGICAL DISTURBANCE TO TRANSITION BY A CLEARING PASTE The invention relates to the mining industry, namely to methods of preparing zones of geological disturbances for transition by cleaning holes. There are ways to transfer zones of geological disturbances, including preparing them directly from the lava, at the time of opening the SR zones. However, with such methods of preparing the rock of the amplitude zone, the disturbances show significant deformations due to the outbreak of reference pressure. In addition, to prepare the transfer, it is necessary to stop the sludge. The most technologically and the result achieved is to prepare a geological disturbance zone for the transition to a clear hole, including drilling wells from the working area adjacent to the lava and forcing through them into the amplitude zone. violation of the hardening solution 2. However, the implementation of this method is laborious and requires the presence of overlying workings, from which it is planned to drill wells into the zone of violation and, moreover, It cures uniform and bulk impregnation of disturbed rocks with a hardening solution. The purpose of the invention is to reduce the labor intensity of work and increase the efficiency of strengthening of the rocks of the zone of violation. The goal is achieved in that the wells for injecting the reinforcement solution are co-oiled from the excavation of the lava parallel to the disturbance for its contouring from diametrically opposite sides. FIG. I shows a diagram of the preparation of the geological zone, violations to the transition by a mining face, plan view; on f) ag. 2 shows section A-A in FIG. 1. The proposed method is carried out in the following way. Before the approach of Nabalova I to the geological violation, 2, in the amplitude
зону HapymeHira 3 выэугочной.вьфабогки бур г cnap JHbie скважины 4 параллельно нарушению 2 дл его оконтуривани с диаметрально противоположных сторон. Затем через скважины 4 нагнетают упрочн юший раствор (цементный или из смолы) в нарушенные породы кровли пласта. Направление скважин 4 задают по простиранию нарушени . Длина скважин соответ ствует длине нарушени . Одну скважину бур т со стороны лежачего бока нарушени , а другую - со стороны вис чего бока на рассто нии от кровли пласта до 1,5 амплитуды нарушй1и , но не более 3-5 м. Количество скважин принимают в зависи- мости от характ а и амплитуды нарушени . Диаметд нагнетательных скважин выбирают в пределах 6О-1ОО мм, а давление нагнетани в зависимости от степени нарушенностл и проницаемости пород. Рассто ние между скважинами щ инимают в пределах 5-1О м, с учетом амплитуды нарушени . Устье скважин запирают r vметизаторами типа ГАС-6О (ГАС-1ОО) на выступаюший конец которых навинчивают вентиль с напорным шлангом. По шлангу от насоса, подают упрочндаощий раствор нагнетаемый через герметизатор в скважину и в породы приампл тудной зоны.the HapymeHira 3 zone of extremity. The extraction of the drill of the cnap JHbie of borehole 4 is parallel to the disturbance 2 for its contouring from diametrically opposite sides. Then, through the wells 4, a reinforced mortar (cement or resin) is injected into the broken rocks of the seam roof. The direction of the wells 4 is set along the strike of the violation. The length of the wells corresponds to the length of the violation. One well is drilled from the lying side of the violation, and the other from the hanging side of which the sides are at a distance from the seam top up to 1.5 times the amplitude of the disturbance, but not more than 3-5 m. The number of wells is taken depending on the character amplitude of disturbance. The diameter of the injection wells is chosen within the range of 10-100 mm, and the injection pressure depending on the degree of disturbance and the permeability of the rocks. The distance between the wells is within 5-1 O m, taking into account the amplitude of the disturbance. The wellhead is bolted with r grooves of the type GAS-6O (GAS-1OO) onto the protruding end of which screw the valve with the pressure hose. The hose from the pump serves up the hardening solution pumped through the sealer into the well and into the rocks of the primrose zone.
Нагнетание растора из оконтуривак дих нарушение спаренных скважин обеспечивает качественную пропитку пород Щ}иамшштудной зоны и эффективное их упрючнение. В итоге така подготовка улучшает технико-вкономи 1еские показатели работы очистных забоев в период перехода зон геологических нарушений.The injection of the raster from the contour dih violation of the paired wells provides high-quality impregnation of the rocks of the Y and the shallow zone and their effective tightening. As a result, such training improves the technical performance of cleaning faces during the transition period of geological disturbances.
Форм у л а изобретен и Formula is invented and
Способ подготовки зоны геологического нарушени к переходу очистным забоем включающий бурение скважин из прилегающей к лаве выработки и нагнетание через них в приамплитудНую зону нарушени упрочн ющего раствора, о тличающ и и с тем, что, с целью снижени трудоемкости работ и повыи1ени эффектив ности упрочнени пород зоны нарушени , скважины дл нагнетани угфочн ющего . раствора бур т спаренными из оконтуривани с диаметрально противоположных сторон.The method of preparing a geological disturbance zone for the transition by a downhole includes drilling wells from the excavation adjacent to the lava and forcing through them into the amplitude zone of the strengthening solution, and in order to reduce the workload and improve the efficiency of the zone rocks hardening infringement, wells for injection of coal. the solution is drilled paired from the contour with diametrically opposite sides.
Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination
1.Переход геологических нарушений механизированными комплексами в Донбассе . Обзор. М., ЦНИИЭИуголь, 1977.1. The transition of geological disturbances by mechanized complexes in the Donbass. Overview. M., TsNIIEIugol, 1977.
2.Анкерна крепь и химическое укреплеше пород. Сери Добыча угл подземным способом . М., ЦНИЭИуголь, 1978 (прототип).2. Anchor lining and chemical fortification of rocks. Seri Extraction coal by underground method. M., ZNIEIugol, 1978 (prototype).
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802897834A SU883465A1 (en) | 1980-03-21 | 1980-03-21 | Method of preparing geological fault zone to intersection by stoping face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802897834A SU883465A1 (en) | 1980-03-21 | 1980-03-21 | Method of preparing geological fault zone to intersection by stoping face |
Publications (1)
Publication Number | Publication Date |
---|---|
SU883465A1 true SU883465A1 (en) | 1981-11-23 |
Family
ID=20884330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802897834A SU883465A1 (en) | 1980-03-21 | 1980-03-21 | Method of preparing geological fault zone to intersection by stoping face |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU883465A1 (en) |
-
1980
- 1980-03-21 SU SU802897834A patent/SU883465A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU883465A1 (en) | Method of preparing geological fault zone to intersection by stoping face | |
RU2730688C1 (en) | Method of directed hydraulic fracturing of coal bed | |
SU1710699A1 (en) | Drill hole plugging-back method | |
SU1535999A1 (en) | Method of plugging a hole | |
SU1578407A1 (en) | Method of restoring mine workings | |
SU1252492A1 (en) | Method of driving an ascending mine working | |
SU1129384A2 (en) | Method of forming a partition in mine working | |
ES446894A1 (en) | Method of reinforcing rock strata | |
SU779504A1 (en) | Device for making holes and consolidating soil | |
SU1401142A1 (en) | Method of eliminating sudden surges of water to working face of a working being driven | |
SU1146457A1 (en) | Method of constructing a water-impervious screen about mine workings | |
SU877031A1 (en) | Method of constructing a vertical shaft | |
SU1191582A1 (en) | Method of solid roof composition | |
SU1479655A1 (en) | Method of water insulation of vertical shafts | |
SU1502842A1 (en) | Method of safeguarding mine working from effect of stoping work | |
SU1442664A1 (en) | Method of consolidating parent rock | |
RU2001200C1 (en) | Method for reinforcement of rock slopes | |
SU1239363A1 (en) | Method of hydraulic working of rock mass | |
RU2085737C1 (en) | Method for treating deep-lying seams of minerals | |
RU1770585C (en) | Method for opening steep outburst-hazard seam | |
SU1472569A1 (en) | Method of stabilizing calcareous rocks | |
SU1652589A1 (en) | Method for strengthening rocks in geological disturbance zone | |
SU1265362A1 (en) | Method of preparing a geological disturbance zone for traversing by mechanised stoping set | |
SU1461935A1 (en) | Method of closing-off discharge workings | |
SU1567789A1 (en) | Method of securing mine working |