SU883465A1 - Method of preparing geological fault zone to intersection by stoping face - Google Patents

Method of preparing geological fault zone to intersection by stoping face Download PDF

Info

Publication number
SU883465A1
SU883465A1 SU802897834A SU2897834A SU883465A1 SU 883465 A1 SU883465 A1 SU 883465A1 SU 802897834 A SU802897834 A SU 802897834A SU 2897834 A SU2897834 A SU 2897834A SU 883465 A1 SU883465 A1 SU 883465A1
Authority
SU
USSR - Soviet Union
Prior art keywords
zone
wells
preparing
intersection
fault zone
Prior art date
Application number
SU802897834A
Other languages
Russian (ru)
Inventor
Кенес Омарович Атыгаев
Юрий Рудольфович Куфельд
Вячеслав Иванович Забудченко
Original Assignee
Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт filed Critical Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт
Priority to SU802897834A priority Critical patent/SU883465A1/en
Application granted granted Critical
Publication of SU883465A1 publication Critical patent/SU883465A1/en

Links

Description

(54) СПОСОБ ПОДГОТОВКИ ЗОНЫ ГЕОЛОГИЧЕСКОГО НАРУШЕНИЯ К ПЕРЕХОДУ ОЧИСТНЫМ ЗАБОЕМ Изобретение относитс  к горной промышленности , а именно к способам подготовки зон геологических нарушений к переходу очистными забо ми. Известны способы перехода зон геоло гических нарушений, включак цие подготов ку их непосредственно из лавы, в момент вскрыти  зоны СИ, Однако при таких способах приготонки породы приамплитудной зоны нарушени  прет певают значительные деформации вследствие опережаклцего очистные рабо ты воздействи  опорного давлени . Кроме того, дл  подготовки п ехода требуетс  остановка лавьк Наиболее шшзким к изофетению по технической сущности и достигаемому результату  вл етс  способ подготовки зоны геологического нарушени  к переход очистньм забо&л, включающий бурение скважин из прилегающей к лаве вьфаботки и нагнетание через них в приамплитуд ную зону нарушени  упрочн ющего раство ра 2. Однако осуществление такого способа трудоалко и требует наличи  вышележащих выработок, из которых предусматриваетс  бурить скважины в зону нарушени  и, кроме того, не обеспечивает равномерной и объемной пропитки нарушенных пород упрочн ющим раствором. Цель изобретени  - снижение трудоемкости работ и повышение эффективности упрочнени  пород зоны нарушени . Цель достигаетс  тем, что скважины дл  нагнетани  упрочн ющего раствора бур т спареннь1ми из выемочной вьфаборки лавы параллельно нарушению дл  его оконтуривани  с диаметрально противоположных сторон. На фиг. I изображена схема подготовки зоны геологического, нарушени  к переходу очистным забоем, вид в плане; на ф)аг. 2 - разрез А-А на фиг. 1. Предлагаемый способ.осуществл етс  следукшшм образом. До подхода забо  лавы I к геологич;ескому нарушению 2, в приамплитудную(54) METHOD OF PREPARING THE ZONE OF GEOLOGICAL DISTURBANCE TO TRANSITION BY A CLEARING PASTE The invention relates to the mining industry, namely to methods of preparing zones of geological disturbances for transition by cleaning holes. There are ways to transfer zones of geological disturbances, including preparing them directly from the lava, at the time of opening the SR zones. However, with such methods of preparing the rock of the amplitude zone, the disturbances show significant deformations due to the outbreak of reference pressure. In addition, to prepare the transfer, it is necessary to stop the sludge. The most technologically and the result achieved is to prepare a geological disturbance zone for the transition to a clear hole, including drilling wells from the working area adjacent to the lava and forcing through them into the amplitude zone. violation of the hardening solution 2. However, the implementation of this method is laborious and requires the presence of overlying workings, from which it is planned to drill wells into the zone of violation and, moreover, It cures uniform and bulk impregnation of disturbed rocks with a hardening solution. The purpose of the invention is to reduce the labor intensity of work and increase the efficiency of strengthening of the rocks of the zone of violation. The goal is achieved in that the wells for injecting the reinforcement solution are co-oiled from the excavation of the lava parallel to the disturbance for its contouring from diametrically opposite sides. FIG. I shows a diagram of the preparation of the geological zone, violations to the transition by a mining face, plan view; on f) ag. 2 shows section A-A in FIG. 1. The proposed method is carried out in the following way. Before the approach of Nabalova I to the geological violation, 2, in the amplitude

зону HapymeHira 3 выэугочной.вьфабогки бур г cnap JHbie скважины 4 параллельно нарушению 2 дл  его оконтуривани  с диаметрально противоположных сторон. Затем через скважины 4 нагнетают упрочн юший раствор (цементный или из смолы) в нарушенные породы кровли пласта. Направление скважин 4 задают по простиранию нарушени . Длина скважин соответ ствует длине нарушени . Одну скважину бур т со стороны лежачего бока нарушени , а другую - со стороны вис чего бока на рассто нии от кровли пласта до 1,5 амплитуды нарушй1и , но не более 3-5 м. Количество скважин принимают в зависи- мости от характ а и амплитуды нарушени . Диаметд нагнетательных скважин выбирают в пределах 6О-1ОО мм, а давление нагнетани  в зависимости от степени нарушенностл и проницаемости пород. Рассто ние между скважинами щ инимают в пределах 5-1О м, с учетом амплитуды нарушени . Устье скважин запирают r vметизаторами типа ГАС-6О (ГАС-1ОО) на выступаюший конец которых навинчивают вентиль с напорным шлангом. По шлангу от насоса, подают упрочндаощий раствор нагнетаемый через герметизатор в скважину и в породы приампл тудной зоны.the HapymeHira 3 zone of extremity. The extraction of the drill of the cnap JHbie of borehole 4 is parallel to the disturbance 2 for its contouring from diametrically opposite sides. Then, through the wells 4, a reinforced mortar (cement or resin) is injected into the broken rocks of the seam roof. The direction of the wells 4 is set along the strike of the violation. The length of the wells corresponds to the length of the violation. One well is drilled from the lying side of the violation, and the other from the hanging side of which the sides are at a distance from the seam top up to 1.5 times the amplitude of the disturbance, but not more than 3-5 m. The number of wells is taken depending on the character amplitude of disturbance. The diameter of the injection wells is chosen within the range of 10-100 mm, and the injection pressure depending on the degree of disturbance and the permeability of the rocks. The distance between the wells is within 5-1 O m, taking into account the amplitude of the disturbance. The wellhead is bolted with r grooves of the type GAS-6O (GAS-1OO) onto the protruding end of which screw the valve with the pressure hose. The hose from the pump serves up the hardening solution pumped through the sealer into the well and into the rocks of the primrose zone.

Нагнетание растора из оконтуривак дих нарушение спаренных скважин обеспечивает качественную пропитку пород Щ}иамшштудной зоны и эффективное их упрючнение. В итоге така  подготовка улучшает технико-вкономи 1еские показатели работы очистных забоев в период перехода зон геологических нарушений.The injection of the raster from the contour dih violation of the paired wells provides high-quality impregnation of the rocks of the Y and the shallow zone and their effective tightening. As a result, such training improves the technical performance of cleaning faces during the transition period of geological disturbances.

Форм у л а изобретен и  Formula is invented and

Способ подготовки зоны геологического нарушени  к переходу очистным забоем включающий бурение скважин из прилегающей к лаве выработки и нагнетание через них в приамплитудНую зону нарушени  упрочн ющего раствора, о тличающ и и с   тем, что, с целью снижени  трудоемкости работ и повыи1ени  эффектив ности упрочнени  пород зоны нарушени , скважины дл  нагнетани  угфочн ющего . раствора бур т спаренными из оконтуривани  с диаметрально противоположных сторон.The method of preparing a geological disturbance zone for the transition by a downhole includes drilling wells from the excavation adjacent to the lava and forcing through them into the amplitude zone of the strengthening solution, and in order to reduce the workload and improve the efficiency of the zone rocks hardening infringement, wells for injection of coal. the solution is drilled paired from the contour with diametrically opposite sides.

Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination

1.Переход геологических нарушений механизированными комплексами в Донбассе . Обзор. М., ЦНИИЭИуголь, 1977.1. The transition of geological disturbances by mechanized complexes in the Donbass. Overview. M., TsNIIEIugol, 1977.

2.Анкерна  крепь и химическое укреплеше пород. Сери  Добыча угл  подземным способом . М., ЦНИЭИуголь, 1978 (прототип).2. Anchor lining and chemical fortification of rocks. Seri Extraction coal by underground method. M., ZNIEIugol, 1978 (prototype).

Claims (1)

Форм ул а изобретен и яClaim 10 Способ подготовки зоны геологического нарушения к переходу очистным забоем, включающий бурение скважин из прилегающей к лаве выработки и нагнетание через них в приамплитудную зону нарушения10 A method of preparing a geological disturbance zone for a transition by a face, including drilling wells from a mine adjacent to the lava and injecting through them into an amplitude region of violation 15 упрочняющего раствора, о тличающ и й с я тем, что, с целью снижения трудоемкости работ и повышения эффективности упрочнения пород зоны нарушения, скважины для нагнетания упрочняющего .15 hardening solution, which is explained by the fact that, in order to reduce the laboriousness of work and increase the efficiency of hardening the rocks of the disturbance zone, wells for injection of the hardener. 20 раствора бурят спаренными из оконтуривания с диаметрально противоположных сторон.20 solutions are drilled paired from contouring from diametrically opposite sides.
SU802897834A 1980-03-21 1980-03-21 Method of preparing geological fault zone to intersection by stoping face SU883465A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802897834A SU883465A1 (en) 1980-03-21 1980-03-21 Method of preparing geological fault zone to intersection by stoping face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802897834A SU883465A1 (en) 1980-03-21 1980-03-21 Method of preparing geological fault zone to intersection by stoping face

Publications (1)

Publication Number Publication Date
SU883465A1 true SU883465A1 (en) 1981-11-23

Family

ID=20884330

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802897834A SU883465A1 (en) 1980-03-21 1980-03-21 Method of preparing geological fault zone to intersection by stoping face

Country Status (1)

Country Link
SU (1) SU883465A1 (en)

Similar Documents

Publication Publication Date Title
SU883465A1 (en) Method of preparing geological fault zone to intersection by stoping face
RU2730688C1 (en) Method of directed hydraulic fracturing of coal bed
SU1710699A1 (en) Drill hole plugging-back method
SU1535999A1 (en) Method of plugging a hole
SU1578407A1 (en) Method of restoring mine workings
SU1252492A1 (en) Method of driving an ascending mine working
SU1129384A2 (en) Method of forming a partition in mine working
ES446894A1 (en) Method of reinforcing rock strata
SU779504A1 (en) Device for making holes and consolidating soil
SU1401142A1 (en) Method of eliminating sudden surges of water to working face of a working being driven
SU1146457A1 (en) Method of constructing a water-impervious screen about mine workings
SU877031A1 (en) Method of constructing a vertical shaft
SU1191582A1 (en) Method of solid roof composition
SU1479655A1 (en) Method of water insulation of vertical shafts
SU1502842A1 (en) Method of safeguarding mine working from effect of stoping work
SU1442664A1 (en) Method of consolidating parent rock
RU2001200C1 (en) Method for reinforcement of rock slopes
SU1239363A1 (en) Method of hydraulic working of rock mass
RU2085737C1 (en) Method for treating deep-lying seams of minerals
RU1770585C (en) Method for opening steep outburst-hazard seam
SU1472569A1 (en) Method of stabilizing calcareous rocks
SU1652589A1 (en) Method for strengthening rocks in geological disturbance zone
SU1265362A1 (en) Method of preparing a geological disturbance zone for traversing by mechanised stoping set
SU1461935A1 (en) Method of closing-off discharge workings
SU1567789A1 (en) Method of securing mine working